{"id":101005,"date":"2026-10-17T13:00:38","date_gmt":"2026-10-17T13:00:38","guid":{"rendered":"https:\/\/skyplanner.ai\/?page_id=101005"},"modified":"2026-10-17T13:00:38","modified_gmt":"2026-10-17T13:00:38","slug":"razosanas-planosana","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/netsuite\/razosanas-planosana\/","title":{"rendered":"Vai NetSuite nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu? Ieb\u016bv\u0113t\u0101s iesp\u0113jas un SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lv\/integracija\/\">Integr\u0101cijas<\/a> \/ <a href=\"\/lv\/integracija\/erp\/\">ERP<\/a> \/ Oracle NetSuite<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Vai NetSuite nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu? <span class=\"hl\">Ieb\u016bv\u0113t\u0101s iesp\u0113jas un SkyPlanner APS<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">Oracle NetSuite sast\u0101da ra\u017eo\u0161anas grafiku, pie\u0146emot neierobe\u017eotu jaudu, ja vien nav pievienota Advanced Manufacturing SuiteApp. <a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/netsuite\/ns-online-help\/bridgehead_1508338236.html\">Oracle dokument\u0101cij\u0101<\/a> teikts, ka pl\u0101no\u0161ana ar neierobe\u017eotu jaudu &#8220;doesn&#8217;t account for current work center capacity or resource use.&#8221; (ne\u0146em v\u0113r\u0101 darba centra pa\u0161reiz\u0113jo jaudu vai resursu noslodzi). Advanced Manufacturing pievieno Finite Scheduling ciklu, kur\u0101 ra\u017eo\u0161anas pas\u016bt\u012bjumi tiek nodoti izpildei pl\u0101not\u0101ja noteikt\u0101 sec\u012bb\u0101.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt laika skala ar darba centros iepl\u0101notiem ra\u017eo\u0161anas uzdevumiem un pas\u016bt\u012bjumu sarakstu zem t\u0101s.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u0160aj\u0101 cikl\u0101 pl\u0101not\u0101js nosaka pas\u016bt\u012bjumu nodo\u0161anas sec\u012bbu un, apst\u0101k\u013ciem mainoties, atk\u0101rto nodo\u0161anu izpildei. Ra\u017eotnes, kas v\u0113las, lai grafiku apr\u0113\u0137in\u0101tu sist\u0113ma, l\u012bdztekus NetSuite izmanto SkyPlanner APS, lai ieg\u016btu:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>apr\u0113\u0137in\u0101tu ra\u017eo\u0161anas uzdevumu sec\u012bbu katrai iek\u0101rtai, darbiniekam un instrumentam<\/li>\n\n\n<li>grafiku, kas \u0146em v\u0113r\u0101 no uzdevumu sec\u012bbas atkar\u012bgu p\u0101rregul\u0113\u0161anu, koplietojamus instrumentus un vair\u0101kus operatorus vienam ra\u017eo\u0161anas uzdevumam<\/li>\n\n\n<li>pl\u0101nu, kur\u0101 \u0146emts v\u0113r\u0101 materi\u0101lu pieejam\u012bbas laiks<\/li>\n\n\n<li>grafiku, kas autom\u0101tiski p\u0101rpl\u0101nojas, mainoties situ\u0101cijai ra\u017eo\u0161anas ceh\u0101<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-netsuite-schedules-production-step-by-step\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101 NetSuite sast\u0101da ra\u017eo\u0161anas grafiku: soli pa solim<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h3 class=\"wp-block-heading\">1. Darba centri un darba kalend\u0101ri<\/h3>\n\n\n<p>NetSuite darba centrs nav iek\u0101rtas ieraksts. T\u0101 ir statiska <strong>Group<\/strong> (Lists &gt; Relationships &gt; Groups, <a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/netsuite\/ns-online-help\/subsect_158618203997.html\">Oracle<\/a>) ar atz\u012bm\u0113tu izv\u0113les r\u016bti\u0146u <strong>Manufacturing Work Center<\/strong>. Grupas apak\u0161ciln\u0113 <strong>Manufacturing Work Center Settings<\/strong> ir lauki <strong>Machine Resources<\/strong>, <strong>Labor Resources<\/strong> un <strong>Work Calendar<\/strong>. Resursu skaita noklus\u0113juma v\u0113rt\u012bba ir 0, bet noklus\u0113juma kalend\u0101rs ir <strong>Default Work Calendar<\/strong>.<\/p>\n\n\n<p>Standarta ra\u017eo\u0161anas funkcionalit\u0101t\u0113 katra darba centra jaudu nosaka iek\u0101rtu skaits, darbinieku skaits un kalend\u0101rs. Atsevi\u0161\u0137us resursus var defin\u0113t ar Advanced Manufacturing Work Bench (5. solis).<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. Tehnolo\u0123iskais process<\/h3>\n\n\n<p>Ierakst\u0101 <a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/netsuite\/ns-online-help\/section_N2345383.html\">Manufacturing Routing<\/a> (REST: <code>manufacturingRouting<\/code>) ir nor\u0101d\u012bti izstr\u0101d\u0101juma mont\u0101\u017eas posmi. Katram posmam ir lauki <strong>Operation Sequence<\/strong>, <strong>Operation Name<\/strong>, <strong>Manufacturing Work Center<\/strong>, <strong>Setup Time<\/strong>, <strong>Run Rate<\/strong> un nob\u012bdes iestat\u012bjumi (<strong>Auto-calculate Lag<\/strong>, <strong>Lag Type<\/strong>, <strong>Lag Amount<\/strong>, <strong>Lag Unit<\/strong>). Setup Time nor\u0101da p\u0101rregul\u0113\u0161anas laiku min\u016bt\u0113s uz pas\u016bt\u012bjumu, bet Run Rate \u2014 izpildes laiku min\u016bt\u0113s uz vien\u012bbu. NetSuite izmanto abus r\u0101d\u012bt\u0101jus kop\u0101 ar darba kalend\u0101ru, lai iepl\u0101notu katru posmu. Ja ra\u017eo\u0161anas pas\u016bt\u012bjum\u0101 tiek izmantots tehnolo\u0123iskais process, NetSuite izveido <strong>Manufacturing Operation Task<\/strong> ierakstus (REST: <code>manufacturingOperationTask<\/code>) \u2014 pa vienam katram posmam.<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. Pl\u0101no\u0161ana uz priek\u0161u vai atpaka\u013c<\/h3>\n\n\n<p>Katram ra\u017eo\u0161anas pas\u016bt\u012bjumam grafiku sast\u0101da ar vienu no <a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/netsuite\/ns-online-help\/section_4000988757.html\">div\u0101m metod\u0113m<\/a>. <strong>Forward Scheduling<\/strong>: nor\u0101d\u0101t <strong>Production Start Date<\/strong>, un NetSuite apr\u0113\u0137ina beigu datumu. <strong>Backward Scheduling<\/strong>: nor\u0101d\u0101t <strong>Production End Date<\/strong>, un NetSuite apr\u0113\u0137ina s\u0101kuma datumu atpaka\u013cgait\u0101, izmantojot tehnolo\u0123isko procesu un darba centra kalend\u0101ru. Lai ra\u017eo\u0161anas pas\u016bt\u012bjumiem var\u0113tu iestat\u012bt \u0161o metodi, vispirms j\u0101iesp\u0113jo iestat\u012bjums <strong>Generate Work Orders in Supply Planning<\/strong>.<\/p>\n\n\n<p>Abas metodes pie\u0146em neierobe\u017eotu jaudu. Oracle skaidri nor\u0101da: &#8220;NetSuite uses infinite capacity scheduling to schedule work&#8221; (NetSuite sast\u0101da darbu grafiku, pie\u0146emot neierobe\u017eotu jaudu), un \u0161\u012b pieeja &#8220;can result in resource overloads.&#8221; (var izrais\u012bt resursu p\u0101rslodzi). Katra ra\u017eo\u0161anas pas\u016bt\u012bjuma laiku apr\u0113\u0137ina p\u0113c t\u0101 tehnolo\u0123isk\u0101 procesa un kalend\u0101ra, it k\u0101 darba centrs b\u016btu pieejams tikai \u0161im pas\u016bt\u012bjumam. Desmit ra\u017eo\u0161anas pas\u016bt\u012bjumi, kas j\u0101pabeidz piektdien, visi var non\u0101kt viena darba centra ceturtdienas grafik\u0101. Oracle ar\u012b br\u012bdina, ka, pl\u0101nojot atpaka\u013cgait\u0101, s\u0101kuma datums &#8220;may be a date in the past, prior to the current date.&#8221; (var b\u016bt pag\u0101tn\u0113, pirms pa\u0161reiz\u0113j\u0101 datuma).<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. Supply Planning un Rough-Cut Capacity Planning<\/h3>\n\n\n<p><strong>Demand Planning<\/strong>, <strong>Supply Planning<\/strong> un <strong>Master Production Schedule<\/strong> nosaka, ko ra\u017eot un kad tas ir vajadz\u012bgs. Jaudu var p\u0101rbaud\u012bt div\u0113j\u0101di:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong><a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/netsuite\/ns-online-help\/article_0707031656.html\">Rough-Cut Capacity Planning<\/a> (RCCP)<\/strong> standarta ra\u017eo\u0161anas funkcionalit\u0101t\u0113 (Transactions &gt; Manufacturing &gt; Capacity Planning). \u0160\u012b funkcija sal\u012bdzina darba centru jaudu ar ra\u017eo\u0161anas pas\u016bt\u012bjumos un pl\u0101notajos ra\u017eo\u0161anas pas\u016bt\u012bjumos paredz\u0113to laiku, sniedzot &#8220;a mid- to long-term view,&#8221; (vid\u0113ja un ilga termi\u0146a p\u0101rskatu), un atz\u012bm\u0113 p\u0101rslodzi un nepietiekamu noslodzi.<\/li>\n\n\n<li><strong><a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/netsuite\/ns-online-help\/bridgehead_1508338018.html\">Rough Cut Capacity Planning<\/a> (RCP)<\/strong> risin\u0101jum\u0101 Advanced Manufacturing (Advanced Manufacturing &gt; Capacity Planning &gt; Capacity Planning &gt; Create Plan). \u0160\u012b funkcija par\u0101da darba centru noslodzi procentos pl\u0101no\u0161anas period\u0101 un \u013cauj veidot scen\u0101rijus, lai p\u0101rbaud\u012btu, kas notiktu, mainot apst\u0101k\u013cus.<\/li>\n\n<\/ul>\n\n\n<p>Abos gad\u012bjumos t\u0101s ir jaudas atskaites. Neviena no \u0161\u012bm funkcij\u0101m nep\u0101rce\u013c nevienu oper\u0101ciju.<\/p>\n\n\n<h3 class=\"wp-block-heading\">5. Advanced Manufacturing: Work Bench un resursi<\/h3>\n\n\n<p><a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/netsuite\/ns-online-help\/chapter_1506100009.html\">Advanced Manufacturing SuiteApp<\/a> papildina katru tehnolo\u0123isk\u0101 procesa soli ar <strong>Manufacturing Work Bench<\/strong> ierakstu. Taj\u0101 defin\u0113 resursus, nogaid\u012b\u0161anas laikus, darbasp\u0113ka pras\u012bbas, darba instrukcijas, materi\u0101lu pat\u0113ri\u0146u un pl\u0101notos laikus. Work Bench oper\u0101ciju sec\u012bbai, oper\u0101cijas nosaukumam un darba centram j\u0101atbilst NetSuite tehnolo\u0123iskajam procesam.<\/p>\n\n\n<h3 class=\"wp-block-heading\">6. Finite Scheduling: sec\u012bba un nodo\u0161ana izpildei<\/h3>\n\n\n<p>\u0160is ir ra\u017eo\u0161anas pl\u0101no\u0161anas posms. Pl\u0101not\u0101js atver <strong>Advanced Manufacturing &gt; Finite Scheduling &gt; Release Work Orders<\/strong> un \u0161aj\u0101 skat\u0101 veic \u0161\u0101das darb\u012bbas:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li>Iestata att\u0113lojuma filtrus: <strong>Location<\/strong>, <strong>Production Class<\/strong>, <strong>Horizon Start<\/strong> (j\u0101b\u016bt pirmdienai) un <strong>Horizon End<\/strong>, <strong>Planned Orders<\/strong>, <strong>Released Orders<\/strong>.<\/li>\n\n\n<li>Izv\u0113las <strong>Schedule Date<\/strong>, <strong>Schedule Method<\/strong> (uz priek\u0161u vai atpaka\u013c) un to, k\u0101 apstr\u0101d\u0101t <strong>Child Work Orders<\/strong>.<\/li>\n\n\n<li>Katram ra\u017eo\u0161anas pas\u016bt\u012bjumam atz\u012bm\u0113 <strong>WO Release<\/strong> t\u0101d\u0101 sec\u012bb\u0101, k\u0101d\u0101 pas\u016bt\u012bjumi j\u0101nodod izpildei. Lauks <strong>Sequence<\/strong> tiek aizpild\u012bts autom\u0101tiski, un to var redi\u0123\u0113t.<\/li>\n\n\n<li>Noklik\u0161\u0137ina uz <strong>Sort Demand<\/strong>, p\u0113c vajadz\u012bbas uz <strong>Preview Schedule<\/strong> un tad uz <strong>Release Work Orders<\/strong>.<\/li>\n\n<\/ol>\n\n\n<p>Nododot pas\u016bt\u012bjumus izpildei, NetSuite p\u0101rstata oper\u0101ciju s\u0101kuma un beigu datumus atbilsto\u0161i ra\u017eo\u0161anas grafikam, kur\u0101 \u0146emta v\u0113r\u0101 pieejam\u0101 jauda. P\u0113c noklus\u0113juma katru oper\u0101ciju pie\u0161\u0137ir vienam resursam \u2014 tam, kur\u0161 atbr\u012bvojas visagr\u0101k. Pl\u0101not\u0101js var iestat\u012bt paral\u0113lu izpildi, lai oper\u0101cija vienlaikus tiktu veikta ar vair\u0101kiem resursiem.<\/p>\n\n\n<p>Oracle nor\u0101da, ka Advanced Manufacturing ra\u017eo\u0161anas pl\u0101no\u0161ana &#8220;optimizes work center throughput&#8221; (optimiz\u0113 darba centra ra\u017e\u012bgumu) un &#8220;considers the facility&#8217;s current and future capacity.&#8221; (\u0146em v\u0113r\u0101 ra\u017eotnes pa\u0161reiz\u0113jo un turpm\u0101ko jaudu). Papildus teikts: &#8220;Planners can influence both the work order sequence and the number of assets that a work order can use at one time.&#8221; (Pl\u0101not\u0101ji var ietekm\u0113t gan ra\u017eo\u0161anas pas\u016bt\u012bjumu sec\u012bbu, gan resursu skaitu, ko pas\u016bt\u012bjums var izmantot vienlaikus.) T\u0101s ir abas iesp\u0113jas, ar kur\u0101m pl\u0101not\u0101js var ietekm\u0113t grafiku.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-oracle-documents-and-what-it-leaves-to-the\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ko Oracle apraksta dokument\u0101cij\u0101 un ko atst\u0101j pl\u0101not\u0101ja zi\u0146\u0101<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Standarta ra\u017eo\u0161anas funkcionalit\u0101te pie\u0146em neierobe\u017eotu jaudu.<\/strong> Bez Advanced Manufacturing p\u0101rslodze atkl\u0101jas ra\u017eo\u0161anas ceh\u0101, nevis pl\u0101n\u0101. (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/netsuite\/ns-online-help\/bridgehead_1508338236.html\">Oracle<\/a>)<\/li>\n\n\n<li><strong>Sec\u012bbu nosaka pl\u0101not\u0101js.<\/strong> Oracle: &#8220;work orders must be released in sequence after they are created.&#8221; (P\u0113c izveides ra\u017eo\u0161anas pas\u016bt\u012bjumi j\u0101nodod izpildei sec\u012bgi.) Pl\u0101not\u0101js atz\u012bm\u0113 WO Release vai redi\u0123\u0113 lauku Sequence, un Oracle nor\u0101da, ka ra\u017eo\u0161anas pas\u016bt\u012bjumu sec\u012bba ir viens no pl\u0101not\u0101ja ietekmes l\u012bdzek\u013ciem. (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/netsuite\/ns-online-help\/bridgehead_1508338324.html\">Oracle<\/a>)<\/li>\n\n\n<li><strong>Ieteicami \u012bsi pl\u0101no\u0161anas periodi.<\/strong> Lai ierobe\u017eotu apstr\u0101des laiku, Oracle iesaka: &#8220;keep horizon periods as short as possible. Generally less than one week.&#8221; (Izv\u0113lieties p\u0113c iesp\u0113jas \u012bs\u0101kus pl\u0101no\u0161anas periodus. Parasti \u012bs\u0101kus par vienu ned\u0113\u013cu.) Praks\u0113 Finite Scheduling noz\u012bm\u0113 ikned\u0113\u013cas pas\u016bt\u012bjumu nodo\u0161anu izpildei. (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/netsuite\/ns-online-help\/bridgehead_1508338324.html\">Oracle<\/a>)<\/li>\n\n\n<li><strong>P\u0101rpl\u0101no\u0161ana noz\u012bm\u0113 atk\u0101rtotu nodo\u0161anu izpildei.<\/strong> &#8220;The planner can review existing commitments to capacity and re-schedule them when necessary.&#8221; (Pl\u0101not\u0101js var p\u0101rskat\u012bt jau pie\u0161\u0137irto jaudu un vajadz\u012bbas gad\u012bjum\u0101 to p\u0101rpl\u0101not.) Filtrs Released Orders ir paredz\u0113ts &#8220;to reschedule released work orders,&#8221; (lai p\u0101rpl\u0101notu izpildei nodotos ra\u017eo\u0161anas pas\u016bt\u012bjumus), un pl\u0101not\u0101js atk\u0101rtoti palai\u017e nodo\u0161anu izpildei. (Tas pats avots.)<\/li>\n\n\n<li><strong>Pl\u0101notajiem ra\u017eo\u0161anas pas\u016bt\u012bjumiem atbalsts ir tikai da\u013c\u0113js.<\/strong> &#8220;Planned status work orders don&#8217;t support full or end-to-end scheduling, even when Auto-Scheduling is enabled.&#8221; (Ra\u017eo\u0161anas pas\u016bt\u012bjumiem ar statusu Planned netiek atbalst\u012bta pilna grafika sast\u0101d\u012b\u0161ana no s\u0101kuma l\u012bdz beig\u0101m, pat ja ir iesl\u0113gta Auto-Scheduling.) (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/netsuite\/ns-online-help\/bridgehead_1508338278.html\">Oracle<\/a>)<\/li>\n\n\n<li><strong>Bez tehnolo\u0123isk\u0101 procesa nav ra\u017eo\u0161anas grafika, kas \u0146em v\u0113r\u0101 pieejamo jaudu.<\/strong> &#8220;Work orders not associated with a NetSuite routing should not be scheduled.&#8221; (Ra\u017eo\u0161anas pas\u016bt\u012bjumiem, kas nav saist\u012bti ar NetSuite tehnolo\u0123isko procesu, grafiku nevajadz\u0113tu sast\u0101d\u012bt.) (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/netsuite\/ns-online-help\/bridgehead_1508338278.html\">Oracle<\/a>)<\/li>\n\n\n<li><strong>Paral\u0113lai izpildei ir ierobe\u017eojums.<\/strong> &#8220;The number of concurrent assets shouldn&#8217;t exceed the number of assets assigned to the manufacturing work bench operation sequence.&#8221; (Vienlaikus izmantoto resursu skaitam nevajadz\u0113tu p\u0101rsniegt Manufacturing Work Bench oper\u0101cijai ar attiec\u012bgo sec\u012bbas numuru pie\u0161\u0137irto resursu skaitu.) (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/netsuite\/ns-online-help\/bridgehead_1508338278.html\">Oracle<\/a>)<\/li>\n\n\n<li><strong>P\u0101rregul\u0113\u0161anas laiks ir tehnolo\u0123iskaj\u0101 proces\u0101 noteikta v\u0113rt\u012bba.<\/strong> Tehnolo\u0123isk\u0101 procesa sol\u012b lauks Setup Time nor\u0101da min\u016btes vienam pas\u016bt\u012bjumam. \u0160is laiks nemain\u0101s neatkar\u012bgi no t\u0101, kas darba centr\u0101 ra\u017eots iepriek\u0161. (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/netsuite\/ns-online-help\/section_N2345383.html\">Oracle<\/a>)<\/li>\n\n\n<li><strong>Katra tehnolo\u0123isk\u0101 procesa izmai\u0146a j\u0101ievada divreiz.<\/strong> Katram tehnolo\u0123isk\u0101 procesa solim vajadz\u012bgs savs Work Bench ieraksts ar atbilsto\u0161u sec\u012bbas numuru, oper\u0101cijas nosaukumu un darba centru. T\u0101p\u0113c tehnolo\u0123isk\u0101 procesa izmai\u0146as j\u0101atk\u0101rto ar\u012b Work Bench. (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/netsuite\/ns-online-help\/bridgehead_1508337105.html\">Oracle<\/a>)<\/li>\n\n<\/ul>\n\n\n<p>Praks\u0113 pl\u0101not\u0101js nosaka pas\u016bt\u012bjumu nodo\u0161anas ritmu, veido sec\u012bbu p\u0113c savas pieredzes un atk\u0101rtoti palai\u017e nodo\u0161anu izpildei ikreiz, kad apst\u0101jas iek\u0101rta vai pien\u0101k steidzams pas\u016bt\u012bjums.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"when-netsuite-s-native-scheduling-is-enough\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kad pietiek ar NetSuite ieb\u016bv\u0113taj\u0101m grafiku sast\u0101d\u012b\u0161anas iesp\u0113j\u0101m<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ar NetSuite pa\u0161a r\u012bkiem pietiek, ja:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Izmantojat maz resursu un ra\u017eojat \u0161auru sortimentu.<\/strong> Viens vai divi jaudu ierobe\u017eojo\u0161i posmi, stabili tehnolo\u0123iskie procesi un atk\u0101rtoti ra\u017eoti produkti. \u0160\u0101dos apst\u0101k\u013cos pietiks ar pl\u0101no\u0161anu bez jaudas ierobe\u017eojumiem, Rough-Cut Capacity Planning un pl\u0101not\u0101ju, kas vizu\u0101li p\u0101rbauda noslodzi.<\/li>\n\n\n<li><strong>Jau izmantojat Advanced Manufacturing, un ra\u017eo\u0161ana ir vienk\u0101r\u0161a.<\/strong> Viens resurss katrai oper\u0101cijai, \u012bsi tehnolo\u0123iskie procesi, ned\u0113\u013cas darba ritms un pl\u0101not\u0101js, kuram der sec\u012bbas noteik\u0161ana manu\u0101li. To nodro\u0161ina Finite Scheduling.<\/li>\n\n\n<li><strong>Ra\u017eojat noliktavai ar ilgiem izpildes termi\u0146iem.<\/strong> Ja iepirkumus nosaka Supply Planning un jaudai vajadz\u012bga tikai aptuvena p\u0101rbaude, detaliz\u0113ts oper\u0101ciju grafiks dod maz papildu ieguvuma.<\/li>\n\n<\/ul>\n\n\n<p>Kad sortiments papla\u0161in\u0101s, ned\u0113\u013cas vid\u016b pien\u0101k steidzami pas\u016bt\u012bjumi vai operatoru pieejam\u012bba s\u0101k ierobe\u017eot jaudu, par\u0101d\u0101s t\u0101l\u0101k min\u0113t\u0101s paz\u012bmes.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"when-you-need-a-finite-capacity-scheduler\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kad vajadz\u012bgs ra\u017eo\u0161anas pl\u0101no\u0161anas risin\u0101jums<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ar ieb\u016bv\u0113tajiem r\u012bkiem vairs nepietiek, ja uz j\u016bsu ra\u017eo\u0161anu attiecas vair\u0101kas no \u0161\u012bm paz\u012bm\u0113m:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Ned\u0113\u013cai noteikt\u0101 pas\u016bt\u012bjumu nodo\u0161anas sec\u012bba jau otrdien vairs neatbilst situ\u0101cijai, un pl\u0101not\u0101js to veido no jauna vair\u0101kas reizes ned\u0113\u013c\u0101.<\/li>\n\n\n<li>Pieg\u0101des datumus nosaka p\u0113c izpildes ilguma, un p\u0101rdo\u0161anas komanda turpina sol\u012bt termi\u0146us, kurus ra\u017eotne nesp\u0113j izpild\u012bt.<\/li>\n\n\n<li>P\u0101rregul\u0113\u0161anas laiks ir atkar\u012bgs no iepriek\u0161 ra\u017eot\u0101 produkta, un pareiza sec\u012bba katru ned\u0113\u013cu ietaup\u012btu vair\u0101kas stundas.<\/li>\n\n\n<li>Ra\u017eo\u0161anas uzdevumu izpilde kav\u0113jas, gaidot instrumentu, pal\u012bgier\u012bci vai materi\u0101lu, kas grafik\u0101 nav \u0146emts v\u0113r\u0101, vai ar\u012b div\u0101m iek\u0101rt\u0101m vienlaikus vajadz\u012bgs viens un tas pats instruments.<\/li>\n\n\n<li>Da\u017eiem ra\u017eo\u0161anas uzdevumiem vienlaikus vajadz\u012bgi divi vai tr\u012bs operatori, bet pl\u0101n\u0101 nav redzams, kuri ir pieejami.<\/li>\n\n\n<li>Faktisko jaudu nosaka operatori, mai\u0146as un promb\u016btnes, nevis Labor Resources nor\u0101d\u012btais skaits darba centra grup\u0101.<\/li>\n\n\n<li>J\u016bs neizmantojat Advanced Manufacturing un nev\u0113laties to ieviest tikai ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai.<\/li>\n\n<\/ul>\n\n\n<h3 class=\"wp-block-heading\">Kam piev\u0113rst uzman\u012bbu<\/h3>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i katra resursa jaudai<\/strong>, \u0146emot v\u0113r\u0101 mai\u0146as, darbiniekus, atva\u013cin\u0101jumus un virsstundas, nevis tikai darba centru grupas kop\u0113jo jaudu.<\/li>\n\n\n<li><strong>Autom\u0101tiska sec\u012bbas noteik\u0161ana<\/strong> p\u0113c izpildes termi\u0146iem un priorit\u0101t\u0113m \u2014 sec\u012bbu apr\u0113\u0137ina sist\u0113ma, nevis pl\u0101not\u0101js to nor\u0101da manu\u0101li.<\/li>\n\n\n<li><strong>No sec\u012bbas atkar\u012bga p\u0101rregul\u0113\u0161ana<\/strong>: katram produktu p\u0101rim abos p\u0101rejas virzienos ir noteikts p\u0101rregul\u0113\u0161anas laiks, ko izmanto sec\u012bbas izv\u0113l\u0113.<\/li>\n\n\n<li><strong>Instrumenti k\u0101 ierobe\u017eoti resursi<\/strong>, lai vienu instrumentu nekad neiepl\u0101notu divos darba centros vienlaikus.<\/li>\n\n\n<li><strong>Vair\u0101ki operatori vienam ra\u017eo\u0161anas uzdevumam<\/strong> un <strong>alternat\u012bvas iek\u0101rtas un darbinieki<\/strong>, ja galvenais resurss nav pieejams.<\/li>\n\n\n<li><strong>Materi\u0101lu pieejam\u012bbas p\u0101rbaude<\/strong> katras oper\u0101cijas pl\u0101notaj\u0101 s\u0101kuma br\u012bd\u012b, \u0146emot v\u0113r\u0101 gan noliktavas kr\u0101jumus, gan v\u0113l nepieg\u0101d\u0101tos pas\u016bt\u012btos materi\u0101lus.<\/li>\n\n\n<li><strong>Nep\u0101rtraukta grafika p\u0101rpl\u0101no\u0161ana<\/strong>, ja darbs tiek pabeigts ar kav\u0113\u0161anos, apst\u0101jas iek\u0101rta vai main\u0101s pas\u016bt\u012bjums.<\/li>\n\n\n<li><strong>Vizu\u0101ls laika grafiks<\/strong>, ko pl\u0101not\u0101ji var redi\u0123\u0113t, un <strong>atgriezenisk\u0101 saite no ra\u017eo\u0161anas ceha<\/strong>, uz kuru grafiks rea\u0123\u0113.<\/li>\n\n\n<li><strong>NetSuite integr\u0101cijas pieeja, kas der 2026. gadam un turpm\u0101k.<\/strong> <a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/netsuite\/ns-online-help\/article_2104046421.html\">Oracle nor\u0101da<\/a>, ka no versijas 2026.1 jaunas integr\u0101cijas j\u0101veido, izmantojot REST t\u012bmek\u013ca pakalpojumus ar OAuth 2.0. No versijas 2027.1 vairs nevar\u0113s veidot jaunas SOAP vai TBA integr\u0101cijas, bet versij\u0101 2028.2 visi SOAP galapunkti tiks atsp\u0113joti. Lielu datu apjomu nolas\u012b\u0161anai izmanto <a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/netsuite\/ns-online-help\/section_157909186990.html\">SuiteQL<\/a> (<code>POST \/services\/rest\/query\/v1\/suiteql<\/code>, l\u012bdz 100 000 rezult\u0101tu vien\u0101 vaic\u0101jum\u0101).<\/li>\n\n\n<li><strong>\u012ass izm\u0113\u0123in\u0101jums ar saviem datiem<\/strong>, pirms tiek rakst\u012bts integr\u0101cijas kods.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"where-skyplanner-fits\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101 pal\u012bdz SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner APS ir m\u0101ko\u0146risin\u0101jums ra\u017eo\u0161anas pl\u0101no\u0161anai, kas darbojas l\u012bdz\u0101s NetSuite un sast\u0101da grafiku atbilsto\u0161i re\u0101lajai iek\u0101rtu un darbinieku jaudai. Pre\u010du dati, materi\u0101lu specifik\u0101cijas, iepirkumi, kr\u0101jumi un finanses paliek NetSuite p\u0101rzi\u0146\u0101. SkyPlanner apr\u0113\u0137ina sec\u012bbu un p\u0101rpl\u0101no grafiku katram darba centram, darbiniekam un instrumentam \u2014 tie ir uzdevumi, ko Finite Scheduling atst\u0101j pl\u0101not\u0101ja zi\u0146\u0101.<\/p>\n\n\n<p>K\u0101 SkyPlanner atbilst iepriek\u0161 min\u0113tajiem krit\u0113rijiem:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Sec\u012bbu apr\u0113\u0137ina, nevis nor\u0101da manu\u0101li.<\/strong> Arcturus dzin\u0113js da\u017eu sekun\u017eu laik\u0101 izveido ra\u017eo\u0161anas grafiku atbilsto\u0161i pieejamajai jaudai, izpildes termi\u0146iem, priorit\u0101t\u0113m, klientu priorit\u0101tei un j\u016bsu noteikumiem. Pl\u0101not\u0101ji to piel\u0101go interakt\u012bv\u0101 Gantt diagramm\u0101.<\/li>\n\n\n<li><strong>Past\u0101v\u012bgi aktualiz\u0113ts pl\u0101ns, nevis ikned\u0113\u013cas pas\u016bt\u012bjumu nodo\u0161ana izpildei.<\/strong> Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku, kad ra\u017eo\u0161an\u0101 rodas izmai\u0146as. Fiks\u0113tos grafika elementus un priorit\u0101tes joproj\u0101m kontrol\u0113jat j\u016bs.<\/li>\n\n\n<li><strong>P\u0101rregul\u0113\u0161ana atbilsto\u0161i sec\u012bbai.<\/strong> P\u0101rregul\u0113\u0161anas laiku matric\u0101 glab\u0101jas at\u0161\u0137ir\u012bgi p\u0101rejas laiki starp produktiem katr\u0101 virzien\u0101 (no zil\u0101 uz sarkano \u2014 30 min\u016btes, no sarkan\u0101 uz zilo \u2014 60), un dzin\u0113js izv\u0113las sec\u012bbu ar vismaz\u0101ko p\u0101rregul\u0113\u0161anas laiku. Sagatavo\u0161anas un demont\u0101\u017eas laiku piem\u0113ro katram ra\u017eo\u0161anas uzdevumam.<\/li>\n\n\n<li><strong>Instrumenti, darbinieki un alternat\u012bvas.<\/strong> Instrumenti ir ierobe\u017eoti koplietojami resursi: instrumentu, kas tiek izmantots vien\u0101 darba centr\u0101, vienlaikus neiepl\u0101no cit\u0101. Vienam ra\u017eo\u0161anas uzdevumam var vienlaikus nor\u012bkot vair\u0101kus operatorus. Ja galven\u0101 iek\u0101rta vai darbinieks nav pieejams, dzin\u0113js izv\u0113rt\u0113 alternat\u012bvas. Model\u012b ir iek\u013cautas ar\u012b darba centru grupas un to efektivit\u0101te.<\/li>\n\n\n<li><strong>Materi\u0101li ir iek\u013cauti pl\u0101n\u0101.<\/strong> Katrai oper\u0101cijai p\u0101rbauda materi\u0101lu pieejam\u012bbu noliktav\u0101 un gaid\u0101majos iepirkuma pas\u016bt\u012bjumos: pas\u016bt\u012bto materi\u0101lu uzskata par pieejamu iepirkuma pas\u016bt\u012bjum\u0101 nor\u0101d\u012btaj\u0101 pieg\u0101des datum\u0101.<\/li>\n\n\n<li><strong>Nav j\u0101dubl\u0113 Work Bench ieraksti.<\/strong> SkyPlanner uztur savus procesa so\u013cus, t\u0101p\u0113c nav vajadz\u012bgs ne Advanced Manufacturing, ne Work Bench ieraksts katram tehnolo\u0123isk\u0101 procesa solim.<\/li>\n\n\n<li><strong>Atgriezenisk\u0101 saite no ra\u017eo\u0161anas ceha taj\u0101 pa\u0161\u0101 r\u012bk\u0101.<\/strong> Operatori t\u0101lrun\u012b vai plan\u0161etdator\u0101 redz savu darbu rindu un re\u0123istr\u0113 darbu, izmantojot Mobile Confirmations, Production Timer un Quick Log Mode.<\/li>\n\n<\/ul>\n\n\n<p><strong>Izv\u0113lieties SkyPlanner, ja<\/strong> pl\u0101not\u0101js vair\u0101kas reizes ned\u0113\u013c\u0101 no jauna veido sec\u012bbu, k\u0101d\u0101 pas\u016bt\u012bjumi tiek nodoti ra\u017eo\u0161anai.<\/p>\n\n\n<p><strong>Izv\u0113lieties SkyPlanner, ja<\/strong> p\u0101rregul\u0113\u0161ana ir atkar\u012bga no produktu sec\u012bbas vai iesp\u0113ju izpild\u012bt darbu nosaka koplietojama instrumenta vai tr\u012bs cilv\u0113ku brig\u0101des pieejam\u012bba.<\/p>\n\n\n<p><strong>Izv\u0113lieties SkyPlanner, ja<\/strong> ra\u017eo\u0161anas pl\u0101n\u0101 j\u0101paredz gaid\u012b\u0161ana uz materi\u0101liem, kas tiek pieg\u0101d\u0101ti p\u0113c iepirkuma pas\u016bt\u012bjumiem.<\/p>\n\n\n<p><strong>Izv\u0113lieties SkyPlanner, ja<\/strong> nev\u0113laties ieviest Advanced Manufacturing tikai ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai.<\/p>\n\n\n<p>UTU Oy, elektrisko sadal\u0146u un sadales iek\u0101rtu ra\u017eot\u0101js Ulvil\u0101, Somij\u0101, sast\u0101da ra\u017eo\u0161anas grafikus ar SkyPlanner, izmantojot to l\u012bdz\u0101s Oracle NetSuite. Uz\u0146\u0113muma ERP konsultanti pied\u0101v\u0101ja tr\u012bs grafiku sast\u0101d\u012b\u0161anas risin\u0101jumus, un UTU izv\u0113l\u0113j\u0101s SkyPlanner t\u0101 elast\u012bbas un modul\u0101r\u0101s uzb\u016bves d\u0113\u013c. UTU s\u0101ka izmantot risin\u0101jumu ikdienas darb\u0101 2025. gada septembr\u012b, integr\u0113jot SkyPlanner ar NetSuite un UTU algu apr\u0113\u0137ina sist\u0113mu.<\/p>\n\n\n<p>SkyPlanner nodro\u0161ina divvirzienu integr\u0101ciju ar NetSuite. No NetSuite tiek sa\u0146emti ra\u017eo\u0161anas pas\u016bt\u012bjumi, tehnolo\u0123iskie procesi, darba centri, pre\u010du dati un iepirkuma pas\u016bt\u012bjumi. Atpaka\u013c tiek nos\u016bt\u012bti pl\u0101notie oper\u0101ciju datumi, izpildes gaita un re\u0123istr\u0113t\u0101s darba stundas, savuk\u0101rt ar webhook pazi\u0146ojumiem grafika izmai\u0146as tiek nos\u016bt\u012btas uzreiz, tikl\u012bdz t\u0101s notiek.<\/p>\n\n\n<p>Katram uz\u0146\u0113mumam NetSuite konfigur\u0101cija ir at\u0161\u0137ir\u012bga. Ievie\u0161anas laik\u0101 SkyPlanner komanda piel\u0101go integr\u0101ciju j\u016bsu tehnolo\u0123iskajiem procesiem, darba centriem un piel\u0101gotajiem laukiem un nodro\u0161ina t\u0101s atbalstu ar\u012b p\u0113c darba uzs\u0101k\u0161anas. Ar\u012b j\u016bsu NetSuite partneris vai izstr\u0101d\u0101t\u0101ji var izveidot integr\u0101ciju, izmantojot SkyPlanner dokument\u0113to REST API (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API uzzi\u0146a<\/a>, <a href=\"\/lv\/docs\/integracijas-pamaciba\/\">SkyPlanner dokument\u0101cija<\/a>) \u2014 tam nepiecie\u0161ama tikai API atsl\u0113ga.<\/p>\n\n\n<p>S\u0101ciet ar CSV eksportiem no NetSuite <a href=\"\/lv\/izmeginajums\/\">30 dienu bezmaksas izm\u0113\u0123in\u0101jum\u0101<\/a> (l\u012bdz 20 darba centriem, bez kred\u012btkartes) un apskatiet savu ra\u017eo\u0161anas grafiku, kas atbilst pieejamajai jaudai, v\u0113l pirms integr\u0101cijas projekta. P\u0113c tam cena ir <a href=\"\/lv\/cenu-noteiksana\/\">no 199 \u20ac m\u0113nes\u012b<\/a>, ietverot 5 darba centrus; maksa tiek iekas\u0113ta reizi m\u0113nes\u012b, un abonementu var atcelt jebkur\u0101 laik\u0101. Integr\u0101cijas cenu atbilsto\u0161i j\u016bsu procesam un vajadz\u012bb\u0101m pied\u0101v\u0101jam iepriek\u0161 kop\u0101 ar izv\u0113l\u0113to pl\u0101nu, lai visas izmaksas b\u016btu zin\u0101mas pirms darba s\u0101k\u0161anas. Ievie\u0161ana parasti tiek pabeigta da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c ievie\u0161anas sagatavo\u0161anas darbu s\u0101kuma, t\u0101p\u0113c re\u0101lu ra\u017eo\u0161anas grafiku varat s\u0101kt izmantot da\u017eu ned\u0113\u013cu laik\u0101, nevis tikai p\u0113c ilga projekta.<\/p>\n\n\n<p>P\u0101rskatu skatiet lap\u0101 <a href=\"\/lv\/integracija\/erp\/netsuite\/\">SkyPlanner APS sist\u0113mai NetSuite<\/a>, bet tehnisk\u0101s ievie\u0161anas inform\u0101ciju \u2014 <a href=\"\/lv\/integracija\/erp\/netsuite\/integracijas-rokasgramata\/\">NetSuite integr\u0101cijas rokasgr\u0101mat\u0101<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ra\u017eot\u0101ju atsauksmes par SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, UTU pieg\u0101des \u0137\u0113des speci\u0101lists, elektrisko sadal\u0146u ra\u017eo\u0161anas ceh\u0101 Ulvil\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>ietaup\u012btas katru ned\u0113\u013cu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cAr SkyPlanner esam p\u0101rg\u0101ju\u0161i no ra\u017eo\u0161anas pl\u0101no\u0161anas Excel tabul\u0101s uz ra\u017eo\u0161anas optimiz\u0101ciju re\u0101llaik\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, pieg\u0101des \u0137\u0113des speci\u0101lists<\/b><br>UTU \u00b7 Elektrisk\u0101s sadalnes un sadales iek\u0101rtas<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas pl\u0101no\u0161an\u0101 katru ned\u0113\u013cu tiek ietaup\u012btas 2 darba stundas, un jaun\u0101 darbu rinda sasniedz ra\u017eo\u0161anas l\u012bniju da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/customers\/utu\/\">Las\u012bt UTU atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori t\u012brtelpu aizsargt\u0113rpos pie pude\u013cu pild\u012b\u0161anas l\u012bnijas Laboratory &amp; Allied farm\u0101cijas r\u016bpn\u012bc\u0101 Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>ra\u017eo\u0161anas efektivit\u0101te<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cRa\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT vad\u012bt\u0101js<\/b><br>Laboratory &amp; Allied \u00b7 Farmaceitisk\u0101 ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%, un optimiz\u0113ta tr\u012bs m\u0113ne\u0161u pl\u0101na izveide visiem darba centriem aiz\u0146em maz\u0101k nek\u0101 30 min\u016btes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/customers\/laboratory-allied\/\">Las\u012bt Laboratory &amp; Allied atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/13-9cbf2d28-08ef-49a1-94e3-0095e107df55.jpg\" alt=\"Anu J\u00e4rvinen, Fredman Operations ra\u017eo\u0161anas vad\u012bt\u0101ja, pie robotiz\u0113tas palet\u0113\u0161anas \u0161\u016bnas Raum\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/10-2fd983ec-02a7-440d-b77d-281f37545c8d.png\" alt=\"Fredman Operations\" width=\"137\" height=\"48\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>6 m\u0113ne\u0161us<\/b><span>uz priek\u0161u p\u0101rdo\u0161anas komanda redz br\u012bvo jaudu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner nodro\u0161ina stabilu un uzticamu pamatu visai ra\u017eo\u0161anas pl\u0101no\u0161anai.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Anu J\u00e4rvinen, ra\u017eo\u0161anas vad\u012bt\u0101ja<\/b><br>Fredman Operations \u00b7 Saskarei ar p\u0101rtiku piem\u0113rots iepakojuma pap\u012brs<\/p>\n\n\n<p class=\"ind-cust__result\">P\u0101rdo\u0161anas komanda redz br\u012bvo jaudu se\u0161us m\u0113ne\u0161us uz priek\u0161u, un uz grafika izmai\u0146u piepras\u012bjumiem, kuru izskat\u012b\u0161ana agr\u0101k pras\u012bja stundu vai ilg\u0101k, tagad atbild da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/customers\/fredman-operations\/\">Las\u012bt Fredman Operations atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"KJH-Comp metin\u0101t\u0101js sl\u012bp\u0113 metin\u0101tu t\u0113rauda konstrukciju Alahermes r\u016bpn\u012bc\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>pieg\u0101\u017eu savlaic\u012bgums, iepriek\u0161 aptuveni 50%<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner ir iz\u0161\u0137iro\u0161a loma m\u016bsu pieg\u0101\u017eu savlaic\u012bguma uztur\u0113\u0161an\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, izpilddirektors<\/b><br>KJH-Comp \u00b7 Lok\u0161\u0146u met\u0101la konstrukcijas un l\u012bgumra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Pieg\u0101\u017eu savlaic\u012bgums pieauga no aptuveni 50% l\u012bdz pat 98%, un tagad grafiku sast\u0101d\u012b\u0161anai divu meistaru viet\u0101 pietiek ar vienu.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/customers\/kjh-comp\/\">Las\u012bt KJH-Comp atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Bie\u017e\u0101k uzdotie jaut\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai NetSuite ir r\u012bks ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. NetSuite standarta funkcionalit\u0101te iepl\u0101no ra\u017eo\u0161anas pas\u016bt\u012bjumus uz priek\u0161u vai atpaka\u013c laik\u0101, balstoties uz Manufacturing Routing un darba centru kalend\u0101riem, ne\u0146emot v\u0113r\u0101 jaudas ierobe\u017eojumus. Advanced Manufacturing SuiteApp pievieno Finite Scheduling, kur pl\u0101not\u0101js nosaka ra\u017eo\u0161anas pas\u016bt\u012bjumu sec\u012bbu un nodod tos izpildei atbilsto\u0161i iek\u0101rtu pieejam\u012bbai.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ar ko NetSuite sist\u0113m\u0101 at\u0161\u0137iras ra\u017eo\u0161anas pl\u0101no\u0161ana ar jaudas ierobe\u017eojumiem un bez tiem?<\/summary>\n<p class=\"sp-faq__a\">Pl\u0101nojot bez jaudas ierobe\u017eojumiem, katra ra\u017eo\u0161anas pas\u016bt\u012bjuma laiku nosaka p\u0113c t\u0101 tehnolo\u0123isk\u0101 procesa un kalend\u0101ra, ne\u0146emot v\u0113r\u0101 p\u0101r\u0113jo darba centra slodzi. Advanced Manufacturing funkcija Finite Scheduling iepl\u0101no ra\u017eo\u0161anas pas\u016bt\u012bjumus pieejamaj\u0101s iek\u0101rt\u0101s t\u0101d\u0101 sec\u012bb\u0101, k\u0101d\u0101 pl\u0101not\u0101js tos nodod izpildei. Oracle parasti iesaka pl\u0101no\u0161anas periodu, kas ir \u012bs\u0101ks par ned\u0113\u013cu.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai NetSuite ir pieejama aptuvena ra\u017eo\u0161anas jaudas pl\u0101no\u0161ana?<\/summary>\n<p class=\"sp-faq__a\">J\u0101, div\u0101s viet\u0101s. Standarta ra\u017eo\u0161anas funkcionalit\u0101t\u0113 Rough-Cut Capacity Planning ir atrodama izv\u0113ln\u0113 Transactions &gt; Manufacturing &gt; Capacity Planning, savuk\u0101rt Advanced Manufacturing ir savi RCP pl\u0101ni. Abi risin\u0101jumi par\u0101da katra darba centra slodzi attiec\u012bb\u0101 pret t\u0101 jaudu. Neviens no tiem neveido oper\u0101ciju grafiku.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai ir nepiecie\u0161ams Advanced Manufacturing, lai izmantotu SkyPlanner APS kop\u0101 ar NetSuite?<\/summary>\n<p class=\"sp-faq__a\">N\u0113. SkyPlanner pats veic ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i re\u0101lajai iek\u0101rtu un darbinieku jaudai, t\u0101p\u0113c k\u0101 ievaddati ir pietiekami NetSuite standarta ra\u017eo\u0161anas pas\u016bt\u012bjumi, tehnolo\u0123iskie procesi un darba centri.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai SkyPlanner sp\u0113j \u0146emt v\u0113r\u0101 no sec\u012bbas atkar\u012bgu p\u0101rregul\u0113\u0161anu un koplietojamus instrumentus?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. P\u0101rregul\u0113\u0161anas laiku matric\u0101 katram produktu p\u0101rim ir noteikts p\u0101rejas laiks abos virzienos, un dzin\u0113js izv\u0113las sec\u012bbu ar vismaz\u0101ko p\u0101rregul\u0113\u0161anas laiku. Instrumenti ir ierobe\u017eoti resursi, t\u0101p\u0113c instrumentu, kas tiek izmantots vien\u0101 darba centr\u0101, vienlaikus neiepl\u0101no cit\u0101. Ra\u017eo\u0161anas uzdevumam var b\u016bt vajadz\u012bgi vair\u0101ki operatori vienlaikus, un dzin\u0113js izmanto alternat\u012bvas iek\u0101rtas vai darbiniekus, ja galvenais resurss nav pieejams.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0101cijas \/ ERP \/ Oracle NetSuite Vai NetSuite nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu? Ieb\u016bv\u0113t\u0101s iesp\u0113jas un SkyPlanner APS Oracle NetSuite sast\u0101da ra\u017eo\u0161anas grafiku, pie\u0146emot neierobe\u017eotu jaudu, ja vien nav pievienota Advanced Manufacturing SuiteApp. Oracle dokument\u0101cij\u0101 teikts, ka pl\u0101no\u0161ana ar neierobe\u017eotu jaudu &#8220;doesn&#8217;t account for current work center capacity or resource use.&#8221; (ne\u0146em v\u0113r\u0101 darba centra pa\u0161reiz\u0113jo jaudu &#8230; <a title=\"Vai NetSuite nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu? Ieb\u016bv\u0113t\u0101s iesp\u0113jas un SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/netsuite\/razosanas-planosana\/\" aria-label=\"Read more about Vai NetSuite nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu? Ieb\u016bv\u0113t\u0101s iesp\u0113jas un SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100738,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-101005","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>NetSuite: ra\u017eo\u0161anas pl\u0101no\u0161ana? | SkyPlanner<\/title>\n<meta name=\"description\" content=\"NetSuite pl\u0101no bez jaudas ierobe\u017eojumiem. Advanced Manufacturing: pl\u0101not\u0101ja vad\u012bts Finite Scheduling cikls. Ko tie dara, un kad der SkyPlanner APS?\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/netsuite\/razosanas-planosana\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Vai NetSuite nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu? Ieb\u016bv\u0113t\u0101s iesp\u0113jas un SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"NetSuite pl\u0101no bez jaudas ierobe\u017eojumiem. Advanced Manufacturing: pl\u0101not\u0101ja vad\u012bts Finite Scheduling cikls. Ko tie dara, un kad der SkyPlanner APS?\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/netsuite\/razosanas-planosana\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"20 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/netsuite\\\/razosanas-planosana\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/netsuite\\\/razosanas-planosana\\\/\",\"name\":\"NetSuite: ra\u017eo\u0161anas pl\u0101no\u0161ana? | SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"datePublished\":\"2026-10-17T13:00:38+00:00\",\"description\":\"NetSuite pl\u0101no bez jaudas ierobe\u017eojumiem. Advanced Manufacturing: pl\u0101not\u0101ja vad\u012bts Finite Scheduling cikls. Ko tie dara, un kad der SkyPlanner APS?\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/netsuite\\\/razosanas-planosana\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/netsuite\\\/razosanas-planosana\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/netsuite\\\/razosanas-planosana\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bsu ERP sist\u0113mai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS sist\u0113mai Oracle NetSuite: ra\u017eo\u0161anas pl\u0101no\u0161ana\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/netsuite\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Vai NetSuite nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu? Ieb\u016bv\u0113t\u0101s iesp\u0113jas un SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"NetSuite: ra\u017eo\u0161anas pl\u0101no\u0161ana? | SkyPlanner","description":"NetSuite pl\u0101no bez jaudas ierobe\u017eojumiem. Advanced Manufacturing: pl\u0101not\u0101ja vad\u012bts Finite Scheduling cikls. Ko tie dara, un kad der SkyPlanner APS?","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/netsuite\/razosanas-planosana\/","og_locale":"lv_LV","og_type":"article","og_title":"Vai NetSuite nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu? Ieb\u016bv\u0113t\u0101s iesp\u0113jas un SkyPlanner APS","og_description":"NetSuite pl\u0101no bez jaudas ierobe\u017eojumiem. Advanced Manufacturing: pl\u0101not\u0101ja vad\u012bts Finite Scheduling cikls. Ko tie dara, un kad der SkyPlanner APS?","og_url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/netsuite\/razosanas-planosana\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"20 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/netsuite\/razosanas-planosana\/","url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/netsuite\/razosanas-planosana\/","name":"NetSuite: ra\u017eo\u0161anas pl\u0101no\u0161ana? | SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"datePublished":"2026-10-17T13:00:38+00:00","description":"NetSuite pl\u0101no bez jaudas ierobe\u017eojumiem. Advanced Manufacturing: pl\u0101not\u0101ja vad\u012bts Finite Scheduling cikls. Ko tie dara, un kad der SkyPlanner APS?","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/netsuite\/razosanas-planosana\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/integracija\/erp\/netsuite\/razosanas-planosana\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/netsuite\/razosanas-planosana\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner","item":"https:\/\/skyplanner.ai\/lv\/integracija\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bsu ERP sist\u0113mai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS sist\u0113mai Oracle NetSuite: ra\u017eo\u0161anas pl\u0101no\u0161ana","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/netsuite\/"},{"@type":"ListItem","position":5,"name":"Vai NetSuite nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu? Ieb\u016bv\u0113t\u0101s iesp\u0113jas un SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0101cijas \/ ERP \/ Oracle NetSuite Vai NetSuite nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu? Ieb\u016bv\u0113t\u0101s iesp\u0113jas un SkyPlanner APS Oracle NetSuite sast\u0101da ra\u017eo\u0161anas grafiku, pie\u0146emot neierobe\u017eotu jaudu, ja vien nav pievienota Advanced Manufacturing SuiteApp. Oracle dokument\u0101cij\u0101 teikts, ka pl\u0101no\u0161ana ar neierobe\u017eotu jaudu &#8220;doesn&#8217;t account for current work center capacity or resource use.&#8221; (ne\u0146em v\u0113r\u0101 darba centra pa\u0161reiz\u0113jo jaudu&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/101005","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=101005"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/101005\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/100738"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=101005"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}