{"id":100946,"date":"2026-10-17T13:00:38","date_gmt":"2026-10-17T13:00:38","guid":{"rendered":"https:\/\/skyplanner.ai\/?page_id=100946"},"modified":"2026-10-17T13:00:38","modified_gmt":"2026-10-17T13:00:38","slug":"razosanas-planosana","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/business-central\/razosanas-planosana\/","title":{"rendered":"Vai Business Central atbalsta ra\u017eo\u0161anas pl\u0101no\u0161anu? Capacity Constrained Resources un SkyPlanner APS sal\u012bdzin\u0101jums"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lv\/integracija\/\">Integr\u0101cijas<\/a> \/ <a href=\"\/lv\/integracija\/erp\/\">ERP<\/a> \/ Microsoft Dynamics 365 Business Central<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Vai Business Central atbalsta ra\u017eo\u0161anas pl\u0101no\u0161anu? <span class=\"hl\">Capacity Constrained Resources un SkyPlanner APS sal\u012bdzin\u0101jums<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">Microsoft Dynamics 365 Business Central ra\u017eo\u0161anas pl\u0101no\u0161an\u0101 iev\u0113ro jaudas ierobe\u017eojumus tikai tiem darba centriem un iek\u0101rtu centriem, kurus re\u0123istr\u0113jat k\u0101 Capacity Constrained Resources. Visu p\u0101r\u0113jo, ar\u012b MRP, pl\u0101no, pie\u0146emot neierobe\u017eotu jaudu, un Microsoft rezult\u0101tu d\u0113v\u0113 par aptuvenu grafiku. Ra\u017eotnes, kur\u0101m vajadz\u012bga <a href=\"\/lv\/resursi\/ierobezotas-jaudas-planosana\/\">ra\u017eo\u0161anas pl\u0101no\u0161ana<\/a>, kas \u0146em v\u0113r\u0101 re\u0101lo iek\u0101rtu un darbinieku jaudu vis\u0101 ceh\u0101, l\u012bdz\u0101s Business Central izmanto SkyPlanner APS.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt laika skala ar darba centros iepl\u0101notiem ra\u017eo\u0161anas uzdevumiem un pas\u016bt\u012bjumu sarakstu zem t\u0101s.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Microsoft funkcija Planning Optimization, kas nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i re\u0101lajai jaudai, ir da\u013ca no cita produkta \u2014 Dynamics 365 Supply Chain Management. Uz Business Central t\u0101 neattiecas.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-business-central-plans-capacity-step-by-step\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101 Business Central pl\u0101no jaudu \u2014 soli pa solim<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ra\u017eo\u0161anas funkcijas ir redzamas tikai <strong>Premium<\/strong> re\u017e\u012bm\u0101. Premium &#8220;shows all actions and fields for all business functionality, including Manufacturing and Service Management.&#8221; (par\u0101da visas darb\u012bbas un laukus vis\u0101m uz\u0146\u0113muma funkcij\u0101m, tostarp ra\u017eo\u0161anai un servisa p\u0101rvald\u012bbai). Essentials re\u017e\u012bm\u0101 nav pieejams neviens no t\u0101l\u0101k aprakst\u012btajiem ekr\u0101niem.<\/p>\n\n\n<h3 class=\"wp-block-heading\">1. Jaudas pamatdati<\/h3>\n\n\n<p>Jaudu model\u0113 tr\u012bs l\u012bme\u0146os: <strong>Work Center Group<\/strong>, <strong>Work Center<\/strong> un <strong>Machine Center<\/strong>. Katram darba centram un iek\u0101rtu centram ir lauki <strong>Shop Calendar Code<\/strong>, <strong>Capacity<\/strong>, <strong>Efficiency<\/strong>, <strong>Queue Time<\/strong> un <strong>Unit of Measure Code<\/strong>. Ra\u017eo\u0161anas kalend\u0101r\u0101 nor\u0101da <strong>Work Shifts<\/strong>, darba dienas un br\u012bvdienas. <strong>Absence<\/strong> ieraksti samazina attiec\u012bgaj\u0101 dien\u0101 pieejamo jaudu.<\/p>\n\n\n<p>Grafiku nevar sast\u0101d\u012bt, kam\u0113r izv\u0113l\u0113tajam datumu diapazonam nav izpild\u012bta darb\u012bba <strong>Calculate Work Center Calendar<\/strong> (un <strong>Calculate Machine Center Calendar<\/strong>).<\/p>\n\n\n<p>T\u0101 tiek izveidoti kalend\u0101ra ieraksti, kas, p\u0113c Microsoft teikt\u0101, nosaka &#8220;the detailed scheduling of operations performed at the work center.&#8221; (darba centr\u0101 veicamo oper\u0101ciju detaliz\u0113tu pl\u0101no\u0161anu). Lauks <strong>Calendar Entries Available Until<\/strong> r\u0101da, l\u012bdz kuram datumam ieraksti ir izveidoti. Ja \u0161is datums ir agr\u0101ks par sist\u0113m\u0101 iestat\u012bto darba datumu, lauks tiek att\u0113lots br\u012bdin\u0101juma stil\u0101. (<a href=\"https:\/\/learn.microsoft.com\/en-us\/dynamics365\/business-central\/production-how-to-create-work-center-calendars\">avots<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. Tehnolo\u0123iskie procesi un BOM<\/h3>\n\n\n<p><strong>Routing<\/strong> var b\u016bt ar tipu Serial vai Parallel, un t\u0101 statusam j\u0101b\u016bt Certified. Katrai oper\u0101cijai nor\u0101da:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Operation No.<\/strong> un <strong>Type<\/strong> (Work Center vai Machine Center)<\/li>\n\n\n<li><strong>Setup Time<\/strong>, <strong>Run Time<\/strong>, <strong>Wait Time<\/strong> un <strong>Move Time<\/strong><\/li>\n\n\n<li><strong>Concurrent Capacities<\/strong>, <strong>Send-Ahead Quantity<\/strong> un <strong>Routing Link Code<\/strong><\/li>\n\n<\/ul>\n\n\n<p>Ar\u012b <strong>Production BOM<\/strong> statusam j\u0101b\u016bt Certified, lai to var\u0113tu izmantot pl\u0101no\u0161an\u0101.<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. MPS un MRP lap\u0101 Planning Worksheet<\/h3>\n\n\n<p>Lap\u0101 <strong>Planning Worksheet<\/strong> izpilda <strong>Calculate Regenerative Plan<\/strong> vai <strong>Calculate Net Change Plan<\/strong>. Sist\u0113ma l\u012bdzsvaro piepras\u012bjumu un pieg\u0101des atbilsto\u0161i katras preces kr\u0101jumu papildin\u0101\u0161anas politikai un ar darb\u012bbu zi\u0146ojumiem ierosina iepirkuma, p\u0101rvieto\u0161anas, komplekt\u0113\u0161anas un ra\u017eo\u0161anas pas\u016bt\u012bjumus.<\/p>\n\n\n<p>Par jaudu Microsoft \u0161eit izsak\u0101s nep\u0101rprotami: &#8220;With each planned method, Business Central generates worksheet entries that assume infinite capacity. When you develop schedules, work center and machine center capacity isn&#8217;t considered.&#8221; (Ar katru pl\u0101no\u0161anas metodi Business Central \u0123ener\u0113 darblapas ierakstus, pie\u0146emot neierobe\u017eotu jaudu. Sast\u0101dot grafikus, darba centru un iek\u0101rtu centru jauda netiek \u0146emta v\u0113r\u0101.) (<a href=\"https:\/\/learn.microsoft.com\/en-us\/dynamics365\/business-central\/production-how-to-run-mps-and-mrp\">avots<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. Ra\u017eo\u0161anas pas\u016bt\u012bjumi, Refresh un Replan<\/h3>\n\n\n<p>Ra\u017eo\u0161anas pas\u016bt\u012bjumi sec\u012bgi p\u0101riet statusos <strong>Simulated<\/strong>, <strong>Planned<\/strong>, <strong>Firm Planned<\/strong>, <strong>Released<\/strong> un <strong>Finished<\/strong>. Darb\u012bba <strong>Refresh<\/strong> apr\u0113\u0137ina rindas, tehnolo\u0123iskos procesus un komponentu vajadz\u012bbu, izmantojot <strong>Scheduling Direction<\/strong> v\u0113rt\u012bbu Forward vai Backward. <strong>Replan<\/strong> veic to pa\u0161u un aptver ar\u012b zem\u0101kos BOM l\u012bme\u0146us. Oper\u0101ciju datumi lap\u0101 <strong>Prod. Order Routing<\/strong> tiek noteikti p\u0113c darba centru kalend\u0101riem.<\/p>\n\n\n<p>P\u0113c noklus\u0113juma jauda netiek ierobe\u017eota: &#8220;By default, Business Central uses infinite capacity scheduling.&#8221; (P\u0113c noklus\u0113juma Business Central sast\u0101da grafikus, pie\u0146emot neierobe\u017eotu jaudu.) (<a href=\"https:\/\/learn.microsoft.com\/en-us\/dynamics365\/business-central\/production-how-to-view-the-load-on-work-centers\">avots<\/a>) Divi pas\u016bt\u012bjumi var tikt iepl\u0101noti uz vienas iek\u0101rtas vien\u0101 un taj\u0101 pa\u0161\u0101 stund\u0101.<\/p>\n\n\n<h3 class=\"wp-block-heading\">5. Capacity Constrained Resources: kur tiek ierobe\u017eota jauda<\/h3>\n\n\n<p>T\u0101 ir sist\u0113m\u0101 ieb\u016bv\u0113t\u0101 funkcija slodzes pl\u0101no\u0161anai ar jaudas ierobe\u017eojumiem. Lap\u0101 <strong>Capacity Constrained Resources<\/strong> pievieno resursu, nor\u0101dot \u0161\u0101dus laukus:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Lauks<\/th><th>Funkcija<\/th><\/tr><\/thead><tbody><tr><td>Capacity Type<\/td><td>Work Center vai Machine Center<\/td><\/tr><tr><td>Capacity No.<\/td><td>Resurss, kura jaudu ierobe\u017eot<\/td><\/tr><tr><td>Critical Load %<\/td><td>Slodzes l\u012bmenis, ko grafika sast\u0101d\u012b\u0161anas laik\u0101 nedr\u012bkst p\u0101rsniegt<\/td><\/tr><tr><td>Dampener (% of Total Capacity)<\/td><td>Pielaide, kas \u013cauj, sast\u0101dot grafiku, nedaudz p\u0101rsniegt kritisko slodzi, lai oper\u0101cija neb\u016btu j\u0101sadala<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Resursam ar ierobe\u017eotu jaudu sist\u0113ma katru oper\u0101ciju iepl\u0101no tuv\u0101kaj\u0101 br\u012bvaj\u0101 laika interv\u0101l\u0101. Ja viens interv\u0101ls ir par \u012bsu, oper\u0101ciju sadala div\u0101s vai vair\u0101k\u0101s da\u013c\u0101s. Sadal\u012btai oper\u0101cijai p\u0101rregul\u0113\u0161anas laiku pie\u0161\u0137ir tikai vienu reizi, &#8220;because it&#8217;s assumed that some manual adjustment is done to optimize the schedule.&#8221; (jo tiek pie\u0146emts, ka grafika optimiz\u0113\u0161anai tiks veikti manu\u0101li labojumi). (<a href=\"https:\/\/learn.microsoft.com\/en-us\/dynamics365\/business-central\/production-how-to-set-up-work-and-machine-centers#to-set-up-a-capacity-constrained-machine-or-work-center\">avots<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">6. Slodzes p\u0101rbaude un pas\u016bt\u012bjumu manu\u0101la p\u0101rcel\u0161ana<\/h3>\n\n\n<p>Pl\u0101not\u0101js p\u0101rbauda rezult\u0101tu tr\u012bs viet\u0101s:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>darba centra skat\u0101 <strong>Load<\/strong> (View by: Day, Week, Month, Quarter, Year vai Accounting Period; View as: Net Change vai Balance at Date)<\/li>\n\n\n<li>sarakst\u0101 <strong>Work Center Task List<\/strong><\/li>\n\n\n<li>matric\u0101 <strong>Work Center Calendar<\/strong><\/li>\n\n<\/ul>\n\n\n<p>Ja sada\u013c\u0101 <strong>Manufacturing Setup<\/strong> ir iesl\u0113gts <strong>Manual Scheduling<\/strong>, pl\u0101not\u0101js var p\u0101rcelt pas\u016bt\u012bjuma s\u0101kuma vai izpildes datumu, saglab\u0101jot lauk\u0101 <strong>Safety Lead Time for Manual Scheduling<\/strong> noteikto laika rezervi.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"where-business-central-stops\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Business Central iesp\u0113ju robe\u017eas<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Paredz\u0113ts aptuvenam grafikam.<\/strong> &#8220;Business Central doesn&#8217;t support detailed shop floor control. It plans for a feasible utilization of resources by providing a rough-cut schedule, but doesn&#8217;t automatically create and maintain detailed schedules based on priorities or optimization rules.&#8221; (Business Central neatbalsta detaliz\u0113tu ra\u017eo\u0161anas ceha vad\u012bbu. Tas veido aptuvenu grafiku, lai resursu izmanto\u0161anu pl\u0101notu atbilsto\u0161i re\u0101laj\u0101m iesp\u0113j\u0101m, bet autom\u0101tiski neveido un neuztur detaliz\u0113tus grafikus, balstoties uz priorit\u0101t\u0113m vai optimiz\u0101cijas noteikumiem.) (<a href=\"https:\/\/learn.microsoft.com\/en-us\/dynamics365\/business-central\/production-how-to-set-up-work-and-machine-centers\">avots<\/a>)<\/li>\n\n\n<li><strong>MRP ne\u0146em v\u0113r\u0101 jaudu.<\/strong> Katr\u0101 apr\u0113\u0137ina reiz\u0113 Planning Worksheet pie\u0146em neierobe\u017eotu jaudu neatkar\u012bgi no t\u0101, vai ir iestat\u012bti resursi ar ierobe\u017eotu jaudu (skatiet iepriek\u0161\u0113jo cit\u0101tu).<\/li>\n\n\n<li><strong>Jaudu ierobe\u017eo tikai nor\u0101d\u012btajiem resursiem.<\/strong> Katram darba centram, kas nav iek\u013cauts lap\u0101 Capacity Constrained Resources, joproj\u0101m tiek pie\u0146emta neierobe\u017eota jauda, un uz viena resursa iepl\u0101not\u0101s oper\u0101cijas var p\u0101rkl\u0101ties.<\/li>\n\n\n<li><strong>Sec\u012bga pl\u0101no\u0161ana.<\/strong> &#8220;Operations on work centers or machine centers that are set up as constrained resources are always planned serially.&#8221; (Oper\u0101cijas darba centros vai iek\u0101rtu centros, kas iestat\u012bti k\u0101 resursi ar ierobe\u017eotu jaudu, vienm\u0113r tiek pl\u0101notas sec\u012bgi.) T\u0101tad darba centram ar ierobe\u017eotu jaudu un Capacity v\u0113rt\u012bbu 3 grafik\u0101 netiek iepl\u0101noti tr\u012bs paral\u0113li ra\u017eo\u0161anas uzdevumi.<\/li>\n\n\n<li><strong>Alternat\u012bvs tehnolo\u0123iskais process netiek izv\u0113l\u0113ts autom\u0101tiski.<\/strong> &#8220;The alternate work center is for information only, and isn&#8217;t automatically included in planning processes.&#8221; (Alternat\u012bvais darba centrs ir nor\u0101d\u012bts tikai inform\u0101cijai un netiek autom\u0101tiski iek\u013cauts pl\u0101no\u0161anas procesos.)<\/li>\n\n\n<li><strong>Iek\u0101rtu centri var palikt \u0101rpus pl\u0101no\u0161anas.<\/strong> &#8220;If you turn off the Consolidated Calendar toggle, only the capacity of the work center is assigned in the planning. The machine center capacity is excluded.&#8221; (Ja izsl\u0113dz sl\u0113dzi Consolidated Calendar, pl\u0101no\u0161an\u0101 tiek pie\u0161\u0137irta tikai darba centra jauda. Iek\u0101rtu centra jauda netiek iek\u013cauta.)<\/li>\n\n\n<li><strong>Pl\u0101notie pas\u016bt\u012bjumi nenostiprina grafiku.<\/strong> Par ra\u017eo\u0161anas pas\u016bt\u012bjumiem ar statusu Planned Microsoft nor\u0101da: &#8220;Business Central deletes them the next time you run planning.&#8221; (Business Central tos izdz\u0113\u0161 n\u0101kamaj\u0101 pl\u0101no\u0161anas apr\u0113\u0137ina reiz\u0113.) (<a href=\"https:\/\/learn.microsoft.com\/en-us\/dynamics365\/business-central\/production-about-production-orders\">avots<\/a>)<\/li>\n\n\n<li><strong>P\u0101rpl\u0101no\u0161ana noz\u012bm\u0113 ar\u012b grafika p\u0101rskat\u012b\u0161anu.<\/strong> &#8220;Changes implemented with the Replan action probably change the capacity need of the production order. You might have to reschedule operations afterwards.&#8221; (Ar darb\u012bbu Replan veikt\u0101s izmai\u0146as, visticam\u0101k, main\u012bs ra\u017eo\u0161anas pas\u016bt\u012bjumam nepiecie\u0161amo jaudu. P\u0113c tam var n\u0101kties main\u012bt oper\u0101ciju grafiku.) (<a href=\"https:\/\/learn.microsoft.com\/en-us\/dynamics365\/business-central\/production-how-to-replan-refresh-production-orders\">avots<\/a>)<\/li>\n\n\n<li><strong>P\u0101rregul\u0113\u0161anas laiks nav atkar\u012bgs no sec\u012bbas.<\/strong> Setup Time ir viena fiks\u0113ta v\u0113rt\u012bba katrai tehnolo\u0123isk\u0101 procesa rindai, ko apr\u0113\u0137ina katram ra\u017eo\u0161anas pas\u016bt\u012bjumam. P\u0101rejai no produkta A uz B paredz tikpat daudz laika k\u0101 p\u0101rejai no C uz B, t\u0101p\u0113c sist\u0113mai nav iemesla sak\u0101rtot ra\u017eo\u0161anas uzdevumus t\u0101, lai samazin\u0101tu p\u0101rregul\u0113\u0161anas laiku. Oper\u0101ciju sadal\u012b\u0161ana aizpilda br\u012bvos interv\u0101lus, bet nenosaka uzdevumu sec\u012bbu. Microsoft paredz, ka pl\u0101not\u0101js sadal\u012bt\u0101s oper\u0101cijas sak\u0101rtos manu\u0101li.<\/li>\n\n\n<li><strong>Instrumentiem un konkr\u0113tiem darbiniekiem jauda netiek uzskait\u012bta.<\/strong> Routing Tool un Routing Personnel rind\u0101s re\u0123istr\u0113 oper\u0101cijai nepiecie\u0161amo, ta\u010du t\u0101m nav ne kalend\u0101ra, ne jaudas. Nekas neliedz div\u0101m oper\u0101cij\u0101m vienlaikus piepras\u012bt vienu un to pa\u0161u pal\u012bgier\u012bci vai speci\u0101listu. <strong>Concurrent Capacities<\/strong> \u013cauj vienas oper\u0101cijas izpild\u0113 izmantot vair\u0101kas viena darba centra vai iek\u0101rtu centra vien\u012bbas, sa\u012bsinot t\u0101s izpildes laiku. Tas nerezerv\u0113 atsevi\u0161\u0137us darbiniekus ar vi\u0146u pa\u0161u mai\u0146u grafikiem.<\/li>\n\n<\/ul>\n\n\n<p>Praks\u0113 tas noz\u012bm\u0113 p\u0101rslogotas iek\u0101rtas, kuras nav ra\u017eo\u0161anas \u0161aur\u0101s vietas, manu\u0101lu uzdevumu sec\u012bbas mai\u0146u un paral\u0113lu grafiku Excel.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"when-business-central-s-native-scheduling-is-eno\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kad pietiek ar Business Central ieb\u016bv\u0113to grafiku sast\u0101d\u012b\u0161anu<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ar Capacity Constrained Resources un skatu Load pietiek, ja:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Jums ir viena vai divas \u012bstas ra\u017eo\u0161anas \u0161aur\u0101s vietas, bet p\u0101r\u0113j\u0101 ceh\u0101 ir br\u012bva jauda.<\/li>\n\n\n<li>Tehnolo\u0123iskie procesi ir \u012bsi un stabili, un j\u016bs galvenok\u0101rt ra\u017eojat noliktavai vai klientiem nor\u0101d\u0101t ilgus pas\u016bt\u012bjuma izpildes laikus.<\/li>\n\n\n<li>J\u016bs pl\u0101nojat pa ned\u0113\u013c\u0101m, un pl\u0101not\u0101jam vajadz\u012bga tikai aptuvena p\u0101rbaude, vai pl\u0101ns ir izpild\u0101ms.<\/li>\n\n\n<li>Uzdevumu sec\u012bba ir tik vienk\u0101r\u0161a, ka meistars to nosaka pie iek\u0101rtas.<\/li>\n\n\n<li>Koplietojamie instrumenti, operatoru pieejam\u012bba un materi\u0101lu pien\u0101k\u0161anas laiks neierobe\u017eo darbu sec\u012bbu.<\/li>\n\n\n<li>Ra\u017eo\u0161ana ir neliela uz\u0146\u0113muma darb\u012bbas da\u013ca, un j\u016bs v\u0113laties str\u0101d\u0101t vien\u0101 sist\u0113m\u0101.<\/li>\n\n<\/ul>\n\n\n<p>Ja tas raksturo j\u016bsu ra\u017eotni, r\u016bp\u012bgi iestatiet resursus ar jaudas ierobe\u017eojumiem, apr\u0113\u0137iniet kalend\u0101rus krietni t\u0101l\u0101k par pl\u0101no\u0161anas perioda beig\u0101m un iesl\u0113dziet Consolidated Calendar tur, kur svar\u012bgi ir iek\u0101rtu centri. Ar to pietiek.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"when-you-need-a-finite-capacity-scheduler\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kad vajadz\u012bgs ra\u017eo\u0161anas pl\u0101no\u0161anas r\u012bks<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Ar ieb\u016bv\u0113to funkciju vairs nepietiek, ja uz j\u016bsu ra\u017eotni attiecas vair\u0101ki no \u0161iem apgalvojumiem:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Atkar\u012bb\u0101 no ra\u017eojumu sortimenta par ra\u017eo\u0161anas \u0161auraj\u0101m viet\u0101m k\u013c\u016bst vair\u0101k nek\u0101 divi resursi.<\/li>\n\n\n<li>Pieg\u0101des kav\u0113jas, lai gan Load skat\u0101 ned\u0113\u013cas griezum\u0101 slodze izskat\u0101s atbilsto\u0161a.<\/li>\n\n\n<li>P\u0101rregul\u0113\u0161anas laiks ir atkar\u012bgs no iepriek\u0161 ra\u017eot\u0101 produkta, t\u0101p\u0113c ra\u017eo\u0161anas uzdevumu sec\u012bba ietekm\u0113 izlaidi.<\/li>\n\n\n<li>Darbinieku pieejam\u012bba, mai\u0146as un promb\u016btnes ierobe\u017eo pl\u0101nu tikpat liel\u0101 m\u0113r\u0101 k\u0101 iek\u0101rtas, un da\u017eiem ra\u017eo\u0161anas uzdevumiem vienlaikus vajadz\u012bgi divi vai tr\u012bs operatori.<\/li>\n\n\n<li>Vair\u0101kas iek\u0101rtas izmanto vienas un t\u0101s pa\u0161as \u0161tances, veidnes vai pal\u012bgier\u012bces.<\/li>\n\n\n<li>Materi\u0101lu pieejam\u012bba nosaka, kuru ra\u017eo\u0161anas uzdevumu var s\u0101kt.<\/li>\n\n\n<li>Jums ir re\u0101li izmantojamas alternat\u012bvas iek\u0101rtas, un v\u0113laties t\u0101s iek\u013caut pl\u0101n\u0101.<\/li>\n\n\n<li>Steidzami pas\u016bt\u012bjumi un iek\u0101rtu boj\u0101jumi liek p\u0101rpl\u0101not vair\u0101kas reizes ned\u0113\u013c\u0101.<\/li>\n\n<\/ul>\n\n\n<h3 class=\"wp-block-heading\">Kam piev\u0113rst uzman\u012bbu<\/h3>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Jaudas ierobe\u017eojumu iev\u0113ro\u0161ana visiem resursiem vienlaikus<\/strong>, nevis tikai atz\u012bm\u0113tajiem resursiem.<\/li>\n\n\n<li><strong>Oper\u0101ciju sec\u012bbas pl\u0101no\u0161ana<\/strong>, iev\u0113rojot priorit\u0101tes un izpildes termi\u0146us.<\/li>\n\n\n<li><strong>P\u0101rregul\u0113\u0161anas laiku matrica<\/strong>: no produktu sec\u012bbas atkar\u012bgi, abos p\u0101rejas virzienos at\u0161\u0137ir\u012bgi p\u0101rregul\u0113\u0161anas laiki, ko pl\u0101no\u0161anas algoritms izmanto, lai l\u012bdz minimumam samazin\u0101tu kop\u0113jo p\u0101rregul\u0113\u0161anas laiku.<\/li>\n\n\n<li><strong>Instrumenti k\u0101 koplietojami resursi ar ierobe\u017eotu pieejam\u012bbu<\/strong>, lai viena pal\u012bgier\u012bce nekad netiktu iepl\u0101nota div\u0101m iek\u0101rt\u0101m vienlaikus.<\/li>\n\n\n<li><strong>Ra\u017eo\u0161anas uzdevumi ar vair\u0101kiem operatoriem<\/strong>: ja uzdevumam vien\u0101 darba centr\u0101 vajadz\u012bgi vair\u0101ki cilv\u0113ki, tie tiek iepl\u0101noti, iev\u0113rojot katra mai\u0146u grafiku.<\/li>\n\n\n<li><strong>Person\u0101la un mai\u0146u ierobe\u017eojumi<\/strong>, tostarp promb\u016btnes un virsstundas.<\/li>\n\n\n<li><strong>Grafiku sast\u0101d\u012b\u0161ana, iev\u0113rojot materi\u0101lu pieejam\u012bbu<\/strong>, ar kr\u0101jumu un gaid\u0101mo pieg\u0101\u017eu p\u0101rbaudi.<\/li>\n\n\n<li><strong>Alternat\u012bvas iek\u0101rtas un darbinieki<\/strong>, kurus pl\u0101no\u0161anas algoritms patie\u0161\u0101m izmanto, ja prim\u0101rais resurss nav pieejams.<\/li>\n\n\n<li><strong>Vizu\u0101la redi\u0123\u0113\u0161ana Gantt diagramm\u0101<\/strong>, saglab\u0101jot saska\u0146otu grafiku ar\u012b p\u0113c viena ra\u017eo\u0161anas uzdevuma p\u0101rvieto\u0161anas.<\/li>\n\n\n<li><strong>Autom\u0101tiska p\u0101rpl\u0101no\u0161ana<\/strong>, mainoties ra\u017eo\u0161anas gaitai vai pas\u016bt\u012bjumiem.<\/li>\n\n\n<li><strong>Skaidrs datu p\u0101rvald\u012bbas sadal\u012bjums ar Business Central.<\/strong> Grafikus ierakstiet pas\u016bt\u012bjumos ar statusu Firm Planned vai Released, nekad pas\u016bt\u012bjumos ar statusu Planned, un nosakiet, kura sist\u0113ma p\u0101rvalda oper\u0101ciju datumus.<\/li>\n\n\n<li><strong>Konkr\u0113ts risin\u0101jums datu ierakst\u012b\u0161anai atpaka\u013c sist\u0113m\u0101, izmantojot standarta saskarnes.<\/strong> Standarta Business Central API v2.0 nav ent\u012btiju ra\u017eo\u0161anas pas\u016bt\u012bjumiem, tehnolo\u0123iskajiem procesiem, BOM vai darba centriem. Business Central \u013cauj public\u0113t savas ra\u017eo\u0161anas lapas k\u0101 OData v4 t\u012bmek\u013ca pakalpojumus bez programm\u0113\u0161anas, un public\u0113t\u0101 lap\u0101, kas ir redi\u0123\u0113jama, var atjaunin\u0101t datus. Katram pieg\u0101d\u0101t\u0101jam pajaut\u0101jiet, k\u0101 oper\u0101ciju s\u0101kuma un beigu datumi non\u0101k Prod. Order Routing Line. Noskaidrojiet, vai tam j\u016bsu Business Central vajadz\u012bgs piel\u0101gots kods un kas to uztur\u0113s p\u0113c palai\u0161anas.<\/li>\n\n<\/ul>\n\n\n<p>Risin\u0101jumus var iedal\u012bt \u010detr\u0101s grup\u0101s:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Business Central ieb\u016bv\u0113t\u0101 pl\u0101no\u0161ana<\/strong> aptver atz\u012bm\u0113tas ra\u017eo\u0161anas \u0161aur\u0101s vietas vien\u0101 sist\u0113m\u0101.<\/li>\n\n\n<li><strong>Pl\u0101no\u0161anas pane\u013ci Business Central klient\u0101<\/strong> att\u0113lo ra\u017eo\u0161anas pas\u016bt\u012bjumus vizu\u0101l\u0101 panel\u012b, kur tos vada pl\u0101not\u0101js.<\/li>\n\n\n<li><strong>Lieluz\u0146\u0113mumu APS risin\u0101jumu komplekti<\/strong> tiek piesl\u0113gti ievie\u0161anas projekta ietvaros, un ar tiem str\u0101d\u0101 atsevi\u0161\u0137a pl\u0101no\u0161anas komanda.<\/li>\n\n\n<li><strong>M\u0101ko\u0146vides APS ar ra\u017eo\u0161anas izpildes funkcij\u0101m<\/strong> darbojas l\u012bdz\u0101s Business Central un autom\u0101tiski sast\u0101da grafikus visiem resursiem. Pie \u0161\u012bs grupas pieder SkyPlanner. Mainoties ra\u017eo\u0161anai, \u0161ie risin\u0101jumi turpina p\u0101rpl\u0101not un nodro\u0161ina operatoriem piek\u013cuvi grafikam.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"where-skyplanner-fits\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101da ir SkyPlanner loma<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner APS nov\u0113r\u0161 visus iepriek\u0161 min\u0113tos tr\u016bkumus. Jaudas ierobe\u017eojumi tiek iev\u0113roti katram darba centram, nevis tikai atz\u012bm\u0113tai centru da\u013cai. Arcturus AI da\u017eu sekun\u017eu laik\u0101 izveido oper\u0101ciju l\u012bme\u0146a grafiku un sak\u0101rto oper\u0101cijas atbilsto\u0161i j\u016bsu priorit\u0101t\u0113m un izpildes termi\u0146iem. Pl\u0101not\u0101jam vairs nav manu\u0101li j\u0101sadala un j\u0101sak\u0101rto oper\u0101cijas.<\/p>\n\n\n<p>P\u0101rregul\u0113\u0161anas laiku matric\u0101 ir nor\u0101d\u012bts laiks p\u0101rejai starp katru produktu p\u0101ri abos virzienos, un pl\u0101no\u0161anas algoritms izv\u0113las sec\u012bbu ar maz\u0101ko kop\u0113jo p\u0101rregul\u0113\u0161anas laiku. Instrumenti ir koplietojami resursi ar ierobe\u017eotu pieejam\u012bbu, un vienam ra\u017eo\u0161anas uzdevumam var b\u016bt vajadz\u012bgi vair\u0101ki operatori vienlaikus. Ja iek\u0101rta vai darbinieks nav pieejams, algoritms p\u0101rce\u013c darbu uz j\u016bsu nor\u0101d\u012btajiem alternat\u012bvajiem resursiem.<\/p>\n\n\n<p>Sast\u0101dot grafiku p\u0113c materi\u0101lu pieejam\u012bbas, sist\u0113ma model\u0113 n\u0101kotnes kr\u0101jumus, \u0146emot v\u0113r\u0101 eso\u0161os kr\u0101jumus un gaid\u0101m\u0101s pieg\u0101des p\u0113c iepirkuma pas\u016bt\u012bjumiem. Pas\u016bt\u012btais materi\u0101ls tiek uzskat\u012bts par pieejamu t\u0101 pieg\u0101des datum\u0101, t\u0101p\u0113c darbs tiek iepl\u0101nots tikai tad, kad materi\u0101ls ir pieejams.<\/p>\n\n\n<p>Sist\u0113m\u0101 tiek model\u0113tas darba centru grupas un efektivit\u0101te, un vienu ra\u017eo\u0161anas uzdevumu var sadal\u012bt starp vair\u0101kiem darba centriem. Priorit\u0101tes nosaka ra\u017eo\u0161anas uzdevuma priorit\u0101te, pabeig\u0161anas datums, klienta priorit\u0101te, Fast Track un Dynamic Priorities, savuk\u0101rt Running Time Lock ne\u013cauj p\u0101rvietot jau s\u0101ktos ra\u017eo\u0161anas uzdevumus.<\/p>\n\n\n<p>Mainoties ra\u017eo\u0161anai, Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku, iev\u0113rojot j\u016bsu fiks\u0113tos uzdevumus un priorit\u0101tes. T\u0101p\u0113c Replan, iek\u0101rtas boj\u0101jums vai steidzams pas\u016bt\u012bjums vairs nenoz\u012bm\u0113 oper\u0101ciju manu\u0101lu p\u0101rpl\u0101no\u0161anu. Pl\u0101not\u0101ji piel\u0101go ra\u017eo\u0161anas uzdevumus interakt\u012bv\u0101 Gantt laika skal\u0101. Operatori redz savu uzdevumu rindu un re\u0123istr\u0113 darbu t\u0101lrun\u012b vai plan\u0161etdator\u0101 ar Mobile Confirmations, Production Timer un Quick Log Mode. T\u0101d\u0113j\u0101di grafiku sast\u0101d\u012b\u0161ana un ra\u017eo\u0161anas izpilde ir apvienota vien\u0101 r\u012bk\u0101.<\/p>\n\n\n<p><strong>Izv\u0113lieties SkyPlanner, ja<\/strong> ra\u017eo\u0161anas \u0161aur\u0101s vietas main\u0101s l\u012bdz ar produktu sortimentu un Capacity Constrained Resources sarakst\u0101 b\u016btu j\u0101iek\u013cauj puse ra\u017eo\u0161anas ceha.<\/p>\n\n\n<p><strong>Izv\u0113lieties SkyPlanner, ja<\/strong> p\u0101rregul\u0113\u0161anas laiks ir atkar\u012bgs no sec\u012bbas vai koplietojami instrumenti un uzdevumi ar vair\u0101kiem operatoriem nosaka, ko var ra\u017eot n\u0101kamo.<\/p>\n\n\n<p><strong>Izv\u0113lieties SkyPlanner, ja<\/strong> p\u0101rpl\u0101nojat vair\u0101kas reizes ned\u0113\u013c\u0101 un v\u0113laties praktiski izmantojamu savas ra\u017eo\u0161anas grafiku da\u017eu ned\u0113\u013cu laik\u0101, nevis p\u0113c ilga projekta.<\/p>\n\n\n<p>S\u0101ciet ar CSV vai Excel eksportu <a href=\"\/lv\/izmeginajums\/\">30 dienu bezmaksas izm\u0113\u0123in\u0101jum\u0101<\/a> (l\u012bdz 20 darba centriem, bez maks\u0101jumu kartes). P\u0113c tam cena ir no 199 \u20ac m\u0113nes\u012b ar 5 iek\u013cautiem darba centriem. Nor\u0113\u0137ini ir reizi m\u0113nes\u012b, un abonementu var atcelt jebkur\u0101 laik\u0101. Integr\u0101cijas cenu apr\u0113\u0137in\u0101m iepriek\u0161 atbilsto\u0161i j\u016bsu procesam un vajadz\u012bb\u0101m un pied\u0101v\u0101jam kop\u0101 ar abon\u0113\u0161anas pl\u0101nu, lai visas izmaksas b\u016btu zin\u0101mas pirms darba s\u0101k\u0161anas. Ievie\u0161ana parasti tiek pabeigta da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c tam, kad s\u0101kat darbu ar SkyPlanner.<\/p>\n\n\n<p>SkyPlanner nodro\u0161ina divvirzienu integr\u0101ciju ar Business Central, izmantojot pa\u0161a Business Central t\u012bmek\u013ca pakalpojumus. Pl\u0101notie s\u0101kuma un beigu laiki tiek ierakst\u012bti Prod. Order Routing Lines, savuk\u0101rt operatoru laika uzskaites ieraksti tiek nos\u016bt\u012bti atpaka\u013c izlaides uzskaitei. SkyPlanner komanda konfigur\u0113 integr\u0101ciju s\u0101kotn\u0113j\u0101s uzst\u0101d\u012b\u0161anas laik\u0101 un uztur to p\u0113c palai\u0161anas. J\u016bsu partneris vai uz\u0146\u0113muma izstr\u0101d\u0101t\u0101ji var str\u0101d\u0101t ar dokument\u0113to REST API (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API uzzi\u0146a<\/a>), izmantojot tikai API atsl\u0113gu. Produkta dokument\u0101cija ir publiski pieejama sada\u013c\u0101 <a href=\"\/lv\/docs\/integracijas-pamaciba\/\">SkyPlanner dokument\u0101cija<\/a>.<\/p>\n\n\n<p>Par risin\u0101jumu savieno\u0161anu lasiet lap\u0101 <a href=\"\/lv\/integracija\/erp\/business-central\/\">SkyPlanner integr\u0101cija ar Business Central<\/a> vai uzreiz atveriet <a href=\"\/lv\/integracija\/erp\/business-central\/integracijas-celvedis\/\">Business Central integr\u0101cijas ce\u013cvedi<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ra\u017eot\u0101ju atsauksmes par SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, UTU pieg\u0101des \u0137\u0113des speci\u0101lists, elektrisko sadales skapju ra\u017eo\u0161anas ceh\u0101 Ulvil\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>ietaup\u012btas katru ned\u0113\u013cu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cAr SkyPlanner esam p\u0101rg\u0101ju\u0161i no ra\u017eo\u0161anas pl\u0101no\u0161anas Excel tabul\u0101s uz ra\u017eo\u0161anas optimiz\u0101ciju re\u0101llaik\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, pieg\u0101des \u0137\u0113des speci\u0101lists<\/b><br>UTU \u00b7 Elektriskie sadales skapji un sadaliek\u0101rtas<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas pl\u0101no\u0161an\u0101 katru ned\u0113\u013cu tiek ietaup\u012btas 2 darba stundas, un jaun\u0101 uzdevumu rinda non\u0101k ra\u017eo\u0161anas l\u012bnij\u0101 da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/utu\/\">Las\u012bt UTU atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori t\u012brtelpu aizsargt\u0113rpos pie pude\u013cu uzpildes l\u012bnijas Laboratory &amp; Allied farm\u0101cijas r\u016bpn\u012bc\u0101 Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>ra\u017eo\u0161anas efektivit\u0101te<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cRa\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT vad\u012bt\u0101js<\/b><br>Laboratory &amp; Allied \u00b7 Farmaceitisko produktu ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%, un optimiz\u0113ta tr\u012bs m\u0113ne\u0161u pl\u0101na izveide visiem darba centriem aiz\u0146em maz\u0101k nek\u0101 30 min\u016btes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/laboratory-allied\/\">Las\u012bt Laboratory &amp; Allied atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"Skats no gaisa uz Piristeel jumta dro\u0161\u012bbas apr\u012bkojuma r\u016bpn\u012bcu Kauhav\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>99,2%<\/b><span>pieg\u0101\u017eu savlaic\u012bgums<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner ir pal\u012bdz\u0113jis skaidri saskat\u012bt ra\u017eo\u0161anas \u0161aur\u0101s vietas un padar\u012bjis ra\u017eo\u0161anas vad\u012bbu p\u0101rskat\u0101m\u0101ku.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, ra\u017eo\u0161anas vad\u012bt\u0101js<\/b><br>Piristeel \u00b7 Jumta dro\u0161\u012bbas apr\u012bkojums un lietus\u016bdens novad\u012b\u0161anas sist\u0113mas<\/p>\n\n\n<p class=\"ind-cust__result\">Pieg\u0101\u017eu savlaic\u012bgums \u0161ogad sasniedza 99,2%, un grafiku sast\u0101d\u012b\u0161an\u0101 tiek ietaup\u012btas l\u012bdz \u010detr\u0101m darba stund\u0101m dien\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/piristeel\/\">Las\u012bt Piristeel atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Hannu Ryyn\u00e4nen, Mamec izpilddirektors, uz\u0146\u0113muma ra\u017eo\u0161anas ceh\u0101 Lohj\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>1 000-iem<\/b><span>autom\u0101tiski iepl\u0101notu ra\u017eo\u0161anas pas\u016bt\u012bjumu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cRa\u017eo\u0161anu tagad kontrol\u0113jam cit\u0101di, un m\u016bsu izpratne par jaudu ir pavisam cit\u0101 l\u012bmen\u012b.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, izpilddirektors<\/b><br>Mamec \u00b7 R\u016bpnieciskie mais\u012bt\u0101ji, s\u016bk\u0146i un augsto tehnolo\u0123iju l\u012bgumra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">T\u016bksto\u0161iem ra\u017eo\u0161anas pas\u016bt\u012bjumu tiek iepl\u0101noti autom\u0101tiski, un visam uz\u0146\u0113mumam ir pieejams re\u0101llaika p\u0101rskats par ra\u017eo\u0161anu.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/mamec\/\">Las\u012bt Mamec atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Bie\u017e\u0101k uzdotie jaut\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai Business Central ir grafiku sast\u0101d\u012b\u0161anas r\u012bks?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. Ra\u017eo\u0161anas pas\u016bt\u012bjumiem sast\u0101da grafiku uz priek\u0161u vai atpaka\u013c laik\u0101, pamatojoties uz darba centru kalend\u0101riem, un Capacity Constrained Resources \u013cauj iev\u0113rot jaudas ierobe\u017eojumus izv\u0113l\u0113taj\u0101s ra\u017eo\u0161anas \u0161auraj\u0101s viet\u0101s. Microsoft rezult\u0101tu raksturo k\u0101 aptuvenu grafiku, nevis detaliz\u0113tu ra\u017eo\u0161anas ceha vad\u012bbu.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai Business Central MRP \u0146em v\u0113r\u0101 jaudu?<\/summary>\n<p class=\"sp-faq__a\">N\u0113. Planning Worksheet funkcijas Calculate Regenerative Plan un Calculate Net Change Plan \u0123ener\u0113 ierakstus, pie\u0146emot, ka jauda ir neierobe\u017eota. Jaudas ierobe\u017eojumi tiek \u0146emti v\u0113r\u0101 tikai tad, kad ra\u017eo\u0161anas pas\u016bt\u012bjumiem sast\u0101da grafiku.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kur\u0101 Business Central licenc\u0113 ir iek\u013cauta ra\u017eo\u0161anas funkcionalit\u0101te?<\/summary>\n<p class=\"sp-faq__a\">Premium. Ra\u017eo\u0161anas lapas un lauki ir pieejami tikai Premium re\u017e\u012bm\u0101, un lietot\u0101ji ar Essentials licenci nevar pierakst\u012bties uz\u0146\u0113mum\u0101, kas izmanto \u0161o re\u017e\u012bmu. Microsoft nor\u0101d\u012bt\u0101 Premium cena ir $110 par lietot\u0101ju m\u0113nes\u012b, savuk\u0101rt Essentials cena ir $80 (ASV cenr\u0101\u017ea cenas, maks\u0101jot par gadu).<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ko nosaka Critical Load % un Dampener?<\/summary>\n<p class=\"sp-faq__a\">Critical Load % nosaka maksim\u0101lo da\u013cu no ierobe\u017eota resursa jaudas, ko var noslogot, sast\u0101dot grafiku; v\u0113rt\u012bba 90 atst\u0101j 10% rezervi. Dampener (% of Total Capacity) \u013cauj nedaudz p\u0101rsniegt \u0161o robe\u017eu, ja t\u0101 var izvair\u012bties no oper\u0101cijas sadal\u012b\u0161anas. Oper\u0101cijas, kur\u0101m joproj\u0101m nepietiek vietas, tiek sadal\u012btas pa tuv\u0101kajiem br\u012bvajiem laika interv\u0101liem.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>K\u0101 SkyPlanner APS savieno ar Business Central?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner nodro\u0161ina divvirzienu integr\u0101ciju ar Business Central, un SkyPlanner komanda to konfigur\u0113 ievie\u0161anas laik\u0101. Pas\u016bt\u012bjumi, tehnolo\u0123iskie procesi, darba centri, preces un pirk\u0161anas pas\u016bt\u012bjumi tiek sa\u0146emti, izmantojot API v2.0 un standarta ra\u017eo\u0161anas lapas, kas public\u0113tas k\u0101 OData v4 t\u012bmek\u013ca pakalpojumi. Programm\u0113\u0161ana nav nepiecie\u0161ama. Oper\u0101ciju datumi tiek nos\u016bt\u012bti atpaka\u013c uz Prod. Order Routing Line, izmantojot public\u0113to lapu, savuk\u0101rt t\u012bmek\u013ca aiz\u0137eres nos\u016bta grafika izmai\u0146as, tikl\u012bdz t\u0101s notiek. Re\u0123istr\u0113t\u0101s darba stundas tiek nos\u016bt\u012btas atpaka\u013c sara\u017eot\u0101s produkcijas uzskaitei, un, ja v\u0113laties, sara\u017eoto produkciju un pat\u0113ri\u0146u var iegr\u0101matot autom\u0101tiski.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai Business Central \u0146em v\u0113r\u0101 p\u0101rregul\u0113\u0161anas laiku, kas atkar\u012bgs no ra\u017eo\u0161anas sec\u012bbas?<\/summary>\n<p class=\"sp-faq__a\">N\u0113. Setup Time ir fiks\u0113ta v\u0113rt\u012bba katr\u0101 tehnolo\u0123isk\u0101 procesa rind\u0101. To apr\u0113\u0137ina vienu reizi katram ra\u017eo\u0161anas pas\u016bt\u012bjumam neatkar\u012bgi no t\u0101, kas iepriek\u0161 ra\u017eots ar attiec\u012bgo iek\u0101rtu. SkyPlanner APS t\u0101 viet\u0101 izmanto p\u0101rregul\u0113\u0161anas laiku matricu. Taj\u0101 glab\u0101jas p\u0101rregul\u0113\u0161anas laiki starp produktu p\u0101riem (no zila uz sarkanu \u2014 30 min\u016btes, no sarkana uz zilu \u2014 60), un ra\u017eo\u0161anas uzdevumi tiek sak\u0101rtoti t\u0101d\u0101 sec\u012bb\u0101, lai \u0161os laikus samazin\u0101tu l\u012bdz minimumam.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai varu izm\u0113\u0123in\u0101t SkyPlanner pirms integr\u0101cijas ar Business Central?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. Eksport\u0113jiet ra\u017eo\u0161anas pas\u016bt\u012bjumus, tehnolo\u0123iskos procesus un darba centrus no Business Central uz Excel, import\u0113jiet tos SkyPlanner 30 dienu izm\u0113\u0123in\u0101juma laik\u0101 un sal\u012bdziniet ieg\u016bto grafiku ar pa\u0161reiz\u0113jo pl\u0101nu. Kred\u012btkarte nav nepiecie\u0161ama. Apskatiet <a href=\"\/lv\/cenu-noteiksana\/\">cenas<\/a>, <a href=\"\/lv\/izmeginajums\/\">s\u0101ciet izm\u0113\u0123in\u0101jumu<\/a> vai <a href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">sazinieties ar p\u0101rdo\u0161anas komandu<\/a>.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0101cijas \/ ERP \/ Microsoft Dynamics 365 Business Central Vai Business Central atbalsta ra\u017eo\u0161anas pl\u0101no\u0161anu? Capacity Constrained Resources un SkyPlanner APS sal\u012bdzin\u0101jums Microsoft Dynamics 365 Business Central ra\u017eo\u0161anas pl\u0101no\u0161an\u0101 iev\u0113ro jaudas ierobe\u017eojumus tikai tiem darba centriem un iek\u0101rtu centriem, kurus re\u0123istr\u0113jat k\u0101 Capacity Constrained Resources. Visu p\u0101r\u0113jo, ar\u012b MRP, pl\u0101no, pie\u0146emot neierobe\u017eotu jaudu, un Microsoft &#8230; <a title=\"Vai Business Central atbalsta ra\u017eo\u0161anas pl\u0101no\u0161anu? Capacity Constrained Resources un SkyPlanner APS sal\u012bdzin\u0101jums\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/business-central\/razosanas-planosana\/\" aria-label=\"Read more about Vai Business Central atbalsta ra\u017eo\u0161anas pl\u0101no\u0161anu? Capacity Constrained Resources un SkyPlanner APS sal\u012bdzin\u0101jums\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100708,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-100946","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Vai Business Central atbalsta ra\u017eo\u0161anas pl\u0101no\u0161anu?<\/title>\n<meta name=\"description\" content=\"Business Central ierobe\u017eo tikai Capacity Constrained Resources slodzi, veidojot aptuvenu pl\u0101nu. Ko tas sp\u0113j, k\u0101das ir robe\u017eas un kad vajadz\u012bga APS.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/business-central\/razosanas-planosana\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Vai Business Central atbalsta ra\u017eo\u0161anas pl\u0101no\u0161anu? Capacity Constrained Resources un SkyPlanner APS sal\u012bdzin\u0101jums\" \/>\n<meta property=\"og:description\" content=\"Business Central ierobe\u017eo tikai Capacity Constrained Resources slodzi, veidojot aptuvenu pl\u0101nu. Ko tas sp\u0113j, k\u0101das ir robe\u017eas un kad vajadz\u012bga APS.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/business-central\/razosanas-planosana\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"20 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/business-central\\\/razosanas-planosana\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/business-central\\\/razosanas-planosana\\\/\",\"name\":\"Vai Business Central atbalsta ra\u017eo\u0161anas pl\u0101no\u0161anu?\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"datePublished\":\"2026-10-17T13:00:38+00:00\",\"description\":\"Business Central ierobe\u017eo tikai Capacity Constrained Resources slodzi, veidojot aptuvenu pl\u0101nu. Ko tas sp\u0113j, k\u0101das ir robe\u017eas un kad vajadz\u012bga APS.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/business-central\\\/razosanas-planosana\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/business-central\\\/razosanas-planosana\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/business-central\\\/razosanas-planosana\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bsu ERP sist\u0113mai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS sist\u0113mai Business Central: ra\u017eo\u0161anas pl\u0101no\u0161ana\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/business-central\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Vai Business Central atbalsta ra\u017eo\u0161anas pl\u0101no\u0161anu? Capacity Constrained Resources un SkyPlanner APS sal\u012bdzin\u0101jums\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Vai Business Central atbalsta ra\u017eo\u0161anas pl\u0101no\u0161anu?","description":"Business Central ierobe\u017eo tikai Capacity Constrained Resources slodzi, veidojot aptuvenu pl\u0101nu. Ko tas sp\u0113j, k\u0101das ir robe\u017eas un kad vajadz\u012bga APS.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/business-central\/razosanas-planosana\/","og_locale":"lv_LV","og_type":"article","og_title":"Vai Business Central atbalsta ra\u017eo\u0161anas pl\u0101no\u0161anu? Capacity Constrained Resources un SkyPlanner APS sal\u012bdzin\u0101jums","og_description":"Business Central ierobe\u017eo tikai Capacity Constrained Resources slodzi, veidojot aptuvenu pl\u0101nu. Ko tas sp\u0113j, k\u0101das ir robe\u017eas un kad vajadz\u012bga APS.","og_url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/business-central\/razosanas-planosana\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"20 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/business-central\/razosanas-planosana\/","url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/business-central\/razosanas-planosana\/","name":"Vai Business Central atbalsta ra\u017eo\u0161anas pl\u0101no\u0161anu?","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"datePublished":"2026-10-17T13:00:38+00:00","description":"Business Central ierobe\u017eo tikai Capacity Constrained Resources slodzi, veidojot aptuvenu pl\u0101nu. Ko tas sp\u0113j, k\u0101das ir robe\u017eas un kad vajadz\u012bga APS.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/business-central\/razosanas-planosana\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/integracija\/erp\/business-central\/razosanas-planosana\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/business-central\/razosanas-planosana\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner","item":"https:\/\/skyplanner.ai\/lv\/integracija\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bsu ERP sist\u0113mai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS sist\u0113mai Business Central: ra\u017eo\u0161anas pl\u0101no\u0161ana","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/business-central\/"},{"@type":"ListItem","position":5,"name":"Vai Business Central atbalsta ra\u017eo\u0161anas pl\u0101no\u0161anu? Capacity Constrained Resources un SkyPlanner APS sal\u012bdzin\u0101jums"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0101cijas \/ ERP \/ Microsoft Dynamics 365 Business Central Vai Business Central atbalsta ra\u017eo\u0161anas pl\u0101no\u0161anu? Capacity Constrained Resources un SkyPlanner APS sal\u012bdzin\u0101jums Microsoft Dynamics 365 Business Central ra\u017eo\u0161anas pl\u0101no\u0161an\u0101 iev\u0113ro jaudas ierobe\u017eojumus tikai tiem darba centriem un iek\u0101rtu centriem, kurus re\u0123istr\u0113jat k\u0101 Capacity Constrained Resources. Visu p\u0101r\u0113jo, ar\u012b MRP, pl\u0101no, pie\u0146emot neierobe\u017eotu jaudu, un Microsoft&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/100946","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=100946"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/100946\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/100708"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=100946"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}