{"id":100886,"date":"2026-10-17T13:00:38","date_gmt":"2026-10-17T13:00:38","guid":{"rendered":"https:\/\/skyplanner.ai\/?page_id=100886"},"modified":"2026-10-17T13:00:38","modified_gmt":"2026-10-17T13:00:38","slug":"infor-cloudsuite-industrial","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/infor-cloudsuite-industrial\/","title":{"rendered":"SkyPlanner APS sist\u0113mai Infor CloudSuite Industrial (SyteLine): ra\u017eo\u0161anas pl\u0101no\u0161ana"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lv\/integracija\/\">Integr\u0101cijas<\/a> \/ <a href=\"\/lv\/integracija\/erp\/\">ERP<\/a> \/ Infor CloudSuite Industrial<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SkyPlanner APS sist\u0113mai Infor CloudSuite Industrial (SyteLine): <span class=\"hl\">ra\u017eo\u0161anas pl\u0101no\u0161ana<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">Ra\u017eot\u0101jiem, kas izmanto Infor CloudSuite Industrial (CSI, agr\u0101k SyteLine), SkyPlanner APS nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu, \u0146emot v\u0113r\u0101 iek\u0101rtu un darbinieku re\u0101lo jaudu, k\u0101 ar\u012b katra darba centra, operatora, instrumenta un materi\u0101la pieejam\u012bbu. J\u016bs redzat, kur un kad tiks izpild\u012bts katrs ra\u017eo\u0161anas uzdevums, un Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku, kad ra\u017eo\u0161an\u0101 notiek izmai\u0146as.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt laika skala ar darba centros iepl\u0101notiem ra\u017eo\u0161anas uzdevumiem un pas\u016bt\u012bjumu sarakstu zem t\u0101s.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner integr\u0101cija ar CloudSuite Industrial darbojas abos virzienos: SkyPlanner sa\u0146em ra\u017eo\u0161anas pas\u016bt\u012bjumus, oper\u0101cijas, preces, resursus, kr\u0101jumu datus un iepirkuma pas\u016bt\u012bjumus, bet atpaka\u013c nos\u016bta pl\u0101notos oper\u0101ciju datumus un uzskait\u012bto darbu. Ievie\u0161anas laik\u0101 SkyPlanner komanda piel\u0101go integr\u0101ciju j\u016bsu CSI konfigur\u0101cijai.<\/p>\n\n\n<p>Cena ir no 199 \u20ac m\u0113nes\u012b par 5 darba centriem, un katrs papildu darba centrs maks\u0101 20 \u20ac m\u0113nes\u012b. Bezmaksas izm\u0113\u0123in\u0101jums ilgst 30 dienas un \u013cauj izmantot l\u012bdz 20 darba centriem. Kred\u012btkarte nav nepiecie\u0161ama.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-production\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas main\u0101s j\u016bsu ra\u017eo\u0161an\u0101<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card ind-icard\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<span class=\"ind-chip\" aria-hidden=\"true\"><svg viewBox=\"0 0 24 24\" fill=\"none\" stroke=\"currentColor\" stroke-width=\"1.8\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><path d=\"M4 18a8 8 0 1 1 16 0\"\/><path d=\"M12 18l4-5\"\/><circle cx=\"12\" cy=\"18\" r=\"1.2\" fill=\"currentColor\" stroke=\"none\"\/><\/svg><\/span>\n\n\n<p class=\"fx-pain__t\">Iek\u0101rt\u0101m vairs neiepl\u0101no vair\u0101k, nek\u0101 t\u0101s sp\u0113j paveikt.<\/p>\n\n\n<p class=\"fx-pain__b\">Katras iek\u0101rtas, darbinieka un instrumenta grafiks tiek veidots atbilsto\u0161i pieejamajai jaudai, faktiskaj\u0101m mai\u0146\u0101m, promb\u016btnei un virsstund\u0101m. Presformu, kas tiek izmantota vien\u0101 iek\u0101rt\u0101, nekad neiepl\u0101no darbam cit\u0101 iek\u0101rt\u0101 vienlaikus. Uzdevumam, kuram vajadz\u012bgi tr\u012bs operatori, tiek iepl\u0101noti tr\u012bs cilv\u0113ki ar br\u012bvu laiku mai\u0146\u0101s. Ja iek\u0101rta ir aiz\u0146emta, darbs tiek p\u0101rcelts uz alternat\u012bvu iek\u0101rtu vai pie cita darbinieka.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card ind-icard\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<span class=\"ind-chip ind-chip--green\" aria-hidden=\"true\"><svg viewBox=\"0 0 24 24\" fill=\"none\" stroke=\"currentColor\" stroke-width=\"1.8\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><circle cx=\"12\" cy=\"12\" r=\"8.5\"\/><path d=\"M12 7.5V12l3 2\"\/><\/svg><\/span>\n\n\n<p class=\"fx-pain__t\">Pieg\u0101des termi\u0146i, ko varat apsol\u012bt.<\/p>\n\n\n<p class=\"fx-pain__b\">Grafiks par\u0101da, kad katrs pas\u016bt\u012bjums patie\u0161\u0101m b\u016bs pabeigts. Klientiem atbildat, balstoties uz pl\u0101nu, nevis min\u0113jumiem.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card ind-icard\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<span class=\"ind-chip ind-chip--purple\" aria-hidden=\"true\"><svg viewBox=\"0 0 24 24\" fill=\"none\" stroke=\"currentColor\" stroke-width=\"1.8\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><path d=\"M3 12a9 9 0 0 1 15-6.7L21 8\"\/><path d=\"M21 3v5h-5\"\/><path d=\"M21 12a9 9 0 0 1-15 6.7L3 16\"\/><path d=\"M3 21v-5h5\"\/><\/svg><\/span>\n\n\n<p class=\"fx-pain__t\">Autom\u0101tiska p\u0101rpl\u0101no\u0161ana steidzamu pas\u016bt\u012bjumu un boj\u0101jumu gad\u012bjum\u0101.<\/p>\n\n\n<p class=\"fx-pain__b\">Ja iek\u0101rta apst\u0101jas, pien\u0101k steidzams pas\u016bt\u012bjums vai darbs tiek pabeigts agr\u0101k, Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku. J\u016bsu fiks\u0113tie uzdevumi un noteikt\u0101s priorit\u0101tes joproj\u0101m tiek iev\u0113rotas.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card ind-icard\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<span class=\"ind-chip ind-chip--orange\" aria-hidden=\"true\"><svg viewBox=\"0 0 24 24\" fill=\"none\" stroke=\"currentColor\" stroke-width=\"1.8\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><path d=\"M4 9h13l-3.5-3.5M20 15H7l3.5 3.5\"\/><\/svg><\/span>\n\n\n<p class=\"fx-pain__t\">Maz\u0101k p\u0101rregul\u0113\u0161anas.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner zina, cik laika nepiecie\u0161ams iek\u0101rtas p\u0101rregul\u0113\u0161anai no viena produkta uz citu abos virzienos. P\u0101reja no zilas kr\u0101sas uz sarkanu var aiz\u0146emt 30 min\u016btes, bet no sarkanas uz zilu \u2014 60. Uzdevumi grafik\u0101 tiek sak\u0101rtoti t\u0101, lai p\u0101rregul\u0113\u0161anai zaud\u0113tu p\u0113c iesp\u0113jas maz\u0101k laika.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card ind-icard\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<span class=\"ind-chip\" aria-hidden=\"true\"><svg viewBox=\"0 0 24 24\" fill=\"none\" stroke=\"currentColor\" stroke-width=\"1.8\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><path d=\"M3 21V9l9-5 9 5v12\"\/><path d=\"M2 21h20\"\/><rect x=\"8\" y=\"13\" width=\"8\" height=\"8\"\/><\/svg><\/span>\n\n\n<p class=\"fx-pain__t\">Grafiks atbilsto\u0161i materi\u0101lu pieejam\u012bbai.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner p\u0101rbauda kr\u0101jumus un gaid\u0101mos iepirkuma pas\u016bt\u012bjumus. Uzdevums, kuram vajadz\u012bga pieg\u0101de no pieg\u0101d\u0101t\u0101ja, tiek iepl\u0101nots p\u0113c t\u0101s datuma, lai darbs ceh\u0101 neb\u016btu j\u0101aptur.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card ind-icard\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<span class=\"ind-chip ind-chip--green\" aria-hidden=\"true\"><svg viewBox=\"0 0 24 24\" fill=\"none\" stroke=\"currentColor\" stroke-width=\"1.8\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><circle cx=\"9\" cy=\"8\" r=\"3\"\/><path d=\"M3 20a6 6 0 0 1 12 0\"\/><path d=\"M16 6a3 3 0 0 1 0 6M21 20a6 6 0 0 0-4-5.7\"\/><\/svg><\/span>\n\n\n<p class=\"fx-pain__t\">Operatori redz savu darbu rindu.<\/p>\n\n\n<p class=\"fx-pain__b\">Katrs operators t\u0101lrun\u012b vai plan\u0161etdator\u0101 redz n\u0101kamos ra\u017eo\u0161anas uzdevumus un re\u0123istr\u0113 darbu t\u0101 izpildes laik\u0101. Biroj\u0101 darba gaita ir redzama re\u0101llaik\u0101, un uzskait\u012btais darbs tiek nos\u016bt\u012bts atpaka\u013c uz CloudSuite Industrial k\u0101 ra\u017eo\u0161anas uzdevumu transakcijas.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ra\u017eot\u0101ju atsauksmes par SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"UTU pieg\u0101des \u0137\u0113des speci\u0101lists Kalle Kalliom\u00e4ki elektrosadales skapju ra\u017eo\u0161anas ceh\u0101 Ulvil\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>ietaup\u012btas katru ned\u0113\u013cu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner ir \u013c\u0101vis mums p\u0101riet no ra\u017eo\u0161anas pl\u0101no\u0161anas Excel tabul\u0101s uz ra\u017eo\u0161anas optimiz\u0101ciju re\u0101llaik\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, pieg\u0101des \u0137\u0113des speci\u0101lists<\/b><br>UTU \u00b7 Elektrosadales skapji un sadaliek\u0101rtas<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas pl\u0101no\u0161an\u0101 katru ned\u0113\u013cu tiek ietaup\u012btas 2 darba stundas, un jaun\u0101 darbu rinda ra\u017eo\u0161anas l\u012bniju sasniedz da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/utu\/\">Las\u012bt UTU atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori t\u012brtelpu aizsargt\u0113rpos pie pude\u013cu pild\u012b\u0161anas l\u012bnijas Laboratory &amp; Allied farm\u0101cijas r\u016bpn\u012bc\u0101 Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>ra\u017eo\u0161anas efektivit\u0101te<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cRa\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT vad\u012bt\u0101js<\/b><br>Laboratory &amp; Allied \u00b7 Farmaceitisko produktu ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%, un optimiz\u0113ta tr\u012bs m\u0113ne\u0161u pl\u0101na sast\u0101d\u012b\u0161ana visiem darba centriem aiz\u0146em maz\u0101k nek\u0101 30 min\u016btes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/laboratory-allied\/\">Las\u012bt Laboratory &amp; Allied atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Mamec izpilddirektors Hannu Ryyn\u00e4nen uz\u0146\u0113muma ra\u017eo\u0161anas hall\u0113 Lohj\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>1 000-iem<\/b><span>ra\u017eo\u0161anas pas\u016bt\u012bjumu grafiki sast\u0101d\u012bti autom\u0101tiski<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cTagad ra\u017eo\u0161anu kontrol\u0113jam pavisam cit\u0101di, un m\u016bsu izpratne par jaudu ir piln\u012bgi cit\u0101 l\u012bmen\u012b.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, izpilddirektors<\/b><br>Mamec \u00b7 R\u016bpnieciskie mais\u012bt\u0101ji, s\u016bk\u0146i un augsto tehnolo\u0123iju l\u012bgumra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">T\u016bksto\u0161iem ra\u017eo\u0161anas pas\u016bt\u012bjumu grafiki tiek sast\u0101d\u012bti autom\u0101tiski, un visa organiz\u0101cija redz ra\u017eo\u0161anas gaitu re\u0101llaik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/mamec\/\">Las\u012bt Mamec atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"KJH-Comp metin\u0101t\u0101js sl\u012bp\u0113 metin\u0101tu t\u0113rauda konstrukciju Alahermes r\u016bpn\u012bc\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>pieg\u0101\u017eu savlaic\u012bgums \u2014 iepriek\u0161 aptuveni 50%<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner ir iz\u0161\u0137iro\u0161a loma m\u016bsu pieg\u0101\u017eu savlaic\u012bguma uztur\u0113\u0161an\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, r\u012bkot\u0101jdirektors<\/b><br>KJH-Comp \u00b7 Lok\u0161\u0146u met\u0101la deta\u013cu izgatavo\u0161ana un l\u012bgumra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Pieg\u0101\u017eu savlaic\u012bgums pieauga no aptuveni 50% l\u012bdz pat 98%, un tagad grafiku sast\u0101d\u012b\u0161anai divu meistaru viet\u0101 vajadz\u012bgs tikai viens.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/kjh-comp\/\">Las\u012bt KJH-Comp atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-skyplanner-works-with-cloudsuite-industrial\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101 SkyPlanner darbojas kop\u0101 ar CloudSuite Industrial<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fxv-how ind-how\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fxv-how__step\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"fxv-how__num\" aria-hidden=\"true\">1<\/div>\n\n\n<h3 class=\"wp-block-heading fxv-how__t\">CloudSuite Industrial nos\u016bta darba datus.<\/h3>\n\n\n<p class=\"fxv-how__b\">SkyPlanner sa\u0146em ra\u017eo\u0161anas pas\u016bt\u012bjumus, oper\u0101cijas, resursus, kr\u0101jumu datus un iepirkuma pas\u016bt\u012bjumus.<\/p>\n\n\n<svg class=\"fxv-how__arrow\" width=\"26\" height=\"20\" viewBox=\"0 0 26 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M2 10h20m0 0l-7-7m7 7l-7 7\" stroke=\"currentColor\" stroke-width=\"2.4\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fxv-how__step\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"fxv-how__num\" aria-hidden=\"true\">2<\/div>\n\n\n<h3 class=\"wp-block-heading fxv-how__t\">SkyPlanner sast\u0101da grafiku un uztur to aktu\u0101lu.<\/h3>\n\n\n<p class=\"fxv-how__b\">Arcturus pl\u0101no\u0161anas dzinis da\u017eu sekun\u017eu laik\u0101 iepl\u0101no katru oper\u0101ciju un p\u0101rpl\u0101no grafiku, kad ra\u017eo\u0161an\u0101 notiek izmai\u0146as.<\/p>\n\n\n<svg class=\"fxv-how__arrow\" width=\"26\" height=\"20\" viewBox=\"0 0 26 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M2 10h20m0 0l-7-7m7 7l-7 7\" stroke=\"currentColor\" stroke-width=\"2.4\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fxv-how__step\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"fxv-how__num\" aria-hidden=\"true\">3<\/div>\n\n\n<h3 class=\"wp-block-heading fxv-how__t\">Termi\u0146i un re\u0123istr\u0113tais darbs tiek nos\u016bt\u012bti atpaka\u013c.<\/h3>\n\n\n<p class=\"fxv-how__b\">Pl\u0101notie oper\u0101ciju datumi tiek nos\u016bt\u012bti atpaka\u013c uz CSI ra\u017eo\u0161anas uzdevumiem, bet uzskait\u012btais darbs \u2014 k\u0101 ra\u017eo\u0161anas uzdevumu transakcijas, ko iegr\u0101mato CSI.<\/p>\n\n\n<svg class=\"fxv-how__arrow\" width=\"26\" height=\"20\" viewBox=\"0 0 26 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M2 10h20m0 0l-7-7m7 7l-7 7\" stroke=\"currentColor\" stroke-width=\"2.4\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner darbojas m\u0101kon\u012b un savienojas ar Infor standarta saskarn\u0113m, t\u0101p\u0113c CSI sist\u0113m\u0101 nav j\u0101instal\u0113 SkyPlanner programmat\u016bra. Katr\u0101 r\u016bpn\u012bc\u0101 CSI izmanto at\u0161\u0137ir\u012bgi, t\u0101p\u0113c ievie\u0161anas laik\u0101 SkyPlanner komanda piel\u0101go integr\u0101ciju j\u016bsu konfigur\u0101cijai un nodro\u0161ina t\u0101s atbalstu ar\u012b p\u0113c palai\u0161anas. Integr\u0101cijas cenu pied\u0101v\u0101jumu sagatavojam iepriek\u0161 atbilsto\u0161i j\u016bsu procesam un vajadz\u012bb\u0101m. Ar\u012b j\u016bsu Infor partneris vai j\u016bsu izstr\u0101d\u0101t\u0101ji var veidot integr\u0101ciju, izmantojot SkyPlanner dokument\u0113to API (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API dokument\u0101cija<\/a>).<\/p>\n\n\n<p>Tehnisk\u0101 inform\u0101cija ir pieejama <a href=\"\/lv\/integracija\/erp\/infor-cloudsuite-industrial\/integracijas-celvedis\/\">CloudSuite Industrial integr\u0101cijas ce\u013cved\u012b ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"where-cloudsuite-industrial-s-own-scheduling-fal\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kur ar CloudSuite Industrial grafiku sast\u0101d\u012b\u0161anas iesp\u0113j\u0101m nepietiek<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>CloudSuite Industrial ar licenc\u0113tu APS moduli nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu, \u0146emot v\u0113r\u0101 re\u0101lo pieejamo jaudu, savuk\u0101rt Scheduler nosaka tuv\u0101kaj\u0101 laik\u0101 veicamo darbu sec\u012bbu. Par darbu bez licences <a href=\"https:\/\/docs.infor.com\/csi\/9.01.x\/en-us\/csbiolh\/lsm1454144402967.html\">Infor dokument\u0101cij\u0101<\/a> ir skaidri teikts: &#8220;If the APS module is unlicensed, APS Planning can only be run in Infinite mode.&#8221; (Ja APS modulis nav licenc\u0113ts, APS Planning var darbin\u0101t tikai Infinite re\u017e\u012bm\u0101 \u2014 bez jaudas ierobe\u017eojumiem.) Ta\u010du ar\u012b ar licenci ikdienas ra\u017eo\u0161an\u0101 situ\u0101cija ir \u0161\u0101da:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>P\u0101rpl\u0101no\u0161ana gaida pl\u0101not\u0101ja r\u012bc\u012bbu.<\/strong> P\u0113c iek\u0101rtas boj\u0101juma grafiks paliek nemain\u012bgs, l\u012bdz k\u0101ds p\u0101rvieto oper\u0101cijas vai atk\u0101rtoti palai\u017e Scheduler. Steidzamam pas\u016bt\u012bjumam tiek atv\u0113l\u0113ta tikai v\u0113l br\u012bv\u0101 jauda.<\/li>\n\n\n<li><strong>Izmai\u0146as j\u0101veic katrai oper\u0101cijai atsevi\u0161\u0137i.<\/strong> Katrs labojums Gantt diagramm\u0101 tiek p\u0101rbaud\u012bts atsevi\u0161\u0137i, un turpm\u0101k\u0101s oper\u0101cijas pl\u0101not\u0101js kori\u0123\u0113 manu\u0101li.<\/li>\n\n\n<li><strong>J\u0101saska\u0146o divu pl\u0101no\u0161anas dzin\u0113ju darbs.<\/strong> APS pl\u0101no ilg\u0101kam periodam, bet Scheduler \u2014 n\u0101kamajai dienai, t\u0101p\u0113c pl\u0101not\u0101jiem j\u0101zina, kur\u0101 apr\u0113\u0137in\u0101 katrs datums ir noteikts.<\/li>\n\n<\/ul>\n\n\n<p>Visi pl\u0101no\u0161anas l\u012bme\u0146i ir izskaidroti rakst\u0101 <a href=\"\/lv\/integracija\/erp\/infor-cloudsuite-industrial\/razosanas-planosana\/\">Vai Infor CloudSuite Industrial nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu?<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"cloudsuite-industrial-alone-vs-with-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">CloudSuite Industrial atsevi\u0161\u0137i un kop\u0101 ar SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>Tikai CloudSuite Industrial<\/th><th>CloudSuite Industrial kop\u0101 ar SkyPlanner APS<\/th><\/tr><\/thead><tbody><tr><td>Jauda<\/td><td>Ra\u017eo\u0161anas pl\u0101no\u0161ana atbilsto\u0161i pieejamajai jaudai \u2014 tikai ar APS licenci<\/td><td>Katras iek\u0101rtas, darbinieka un instrumenta pl\u0101no\u0161an\u0101 \u0146em v\u0113r\u0101 re\u0101lo jaudu un mai\u0146as<\/td><\/tr><tr><td>Grafiks<\/td><td>APS apr\u0113\u0137ini un ikdienas Scheduler apr\u0113\u0137ins<\/td><td>Detaliz\u0113ts grafiks katrai oper\u0101cijai da\u017eu sekun\u017eu laik\u0101<\/td><\/tr><tr><td>P\u0101rregul\u0113\u0161ana<\/td><td>P\u0101rregul\u0113\u0161anas tabulas katrai resursu grupai<\/td><td>Ra\u017eo\u0161anas uzdevumi sak\u0101rtoti \u012bs\u0101kajam kop\u0113jam p\u0101rregul\u0113\u0161anas laikam, \u0146emot v\u0113r\u0101 p\u0101rejas laiku abos virzienos<\/td><\/tr><tr><td>Materi\u0101li<\/td><td>MRP pl\u0101no materi\u0101lus, ne\u0146emot v\u0113r\u0101 jaudu<\/td><td>Ra\u017eo\u0161anas uzdevumi s\u0101kas, kad materi\u0101li ir noliktav\u0101 vai ir sa\u0146emtas gaid\u012bt\u0101s pieg\u0101des<\/td><\/tr><tr><td>Izmai\u0146as<\/td><td>Pl\u0101not\u0101js labo Gantt diagrammu vai atk\u0101rtoti palai\u017e Scheduler<\/td><td>Autopilot p\u0101rpl\u0101no visas r\u016bpn\u012bcas darbu atbilsto\u0161i j\u016bsu priorit\u0101t\u0113m<\/td><\/tr><tr><td>Ra\u017eo\u0161anas cehs<\/td><td>Darba uzskaites datus un ra\u017eo\u0161anas uzdevumu transakcijas ievada CSI sist\u0113m\u0101<\/td><td>Operatori t\u0101lrun\u012b vai plan\u0161etdator\u0101 redz savu uzdevumu rindu un re\u0123istr\u0113 darbu<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"how-to-choose-a-scheduler-for-cloudsuite-industr\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101 izv\u0113l\u0113ties grafiku sast\u0101d\u012b\u0161anas risin\u0101jumu sist\u0113mai CloudSuite Industrial<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>CloudSuite Industrial ieb\u016bv\u0113tie APS un Scheduler ir piem\u0113roti r\u016bpn\u012bcai ar licenc\u0113tu APS moduli, prec\u012bziem tehnolo\u0123iskajiem mar\u0161rutiem un ra\u017eo\u0161anu, kur\u0101 starp Scheduler palai\u0161anas reiz\u0113m ir maz izmai\u0146u.<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Izv\u0113lieties SkyPlanner, ja pl\u0101not\u0101ji pavada r\u012btu, p\u0101rvietojot oper\u0101cijas Resource Gantt skat\u0101.<\/strong> Autopilot p\u0101rpl\u0101no grafiku, bet Running Time Lock ne\u013cauj p\u0101rvietot jau uzs\u0101ktos darbus grafik\u0101.<\/li>\n\n\n<li><strong>Izv\u0113lieties SkyPlanner, ja p\u0101rregul\u0113\u0161ana nosaka sara\u017eoto apjomu.<\/strong> SkyPlanner sak\u0101rto ra\u017eo\u0161anas uzdevumus t\u0101, lai kop\u0113jais p\u0101rregul\u0113\u0161anas laiks b\u016btu p\u0113c iesp\u0113jas \u012bs\u0101ks.<\/li>\n\n\n<li><strong>Izv\u0113lieties SkyPlanner, ja koplietojamo instrumentu un brig\u0101\u017eu pieejam\u012bba nosaka, ko var ra\u017eot t\u0101l\u0101k.<\/strong><\/li>\n\n\n<li><strong>Izv\u0113lieties SkyPlanner, ja materi\u0101lu pieg\u0101de nosaka, kuru ra\u017eo\u0161anas uzdevumu var s\u0101kt.<\/strong><\/li>\n\n\n<li><strong>Izv\u0113lieties SkyPlanner, ja v\u0113laties pl\u0101not ra\u017eo\u0161anu atbilsto\u0161i re\u0101lajai jaudai bez APS modu\u013ca licenc\u0113\u0161anas un piel\u0101go\u0161anas.<\/strong><\/li>\n\n\n<li><strong>Izv\u0113lieties SkyPlanner, ja v\u0113laties sast\u0101d\u012bt grafikus un uzskait\u012bt ceh\u0101 paveikto vien\u0101 r\u012bk\u0101.<\/strong><\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101 s\u0101kt<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>S\u0101ciet bezmaksas izm\u0113\u0123in\u0101jumu.<\/strong> 30 dienas, l\u012bdz 20 darba centriem, visas Basic funkcijas. Kred\u012btkarte nav nepiecie\u0161ama.<\/li>\n\n\n<li><strong>Model\u0113jiet savu ra\u017eo\u0161anu.<\/strong> Izveidojiet darba centrus no CSI resursiem un resursu grup\u0101m, p\u0113c tam pievienojiet mai\u0146as, instrumentus un p\u0101rregul\u0113\u0161anas laikus. Ir pieejama pal\u012bdz\u012bba ievie\u0161an\u0101.<\/li>\n\n\n<li><strong>Iel\u0101d\u0113jiet ra\u017eo\u0161anas uzdevumus.<\/strong> Ar Save to Excel eksport\u0113jiet no CSI atv\u0113rtos ra\u017eo\u0161anas uzdevumus un oper\u0101cijas, import\u0113jiet tos un sal\u012bdziniet SkyPlanner grafiku ar savu pa\u0161reiz\u0113jo pl\u0101nu.<\/li>\n\n\n<li><strong>Savienojiet ar CloudSuite Industrial.<\/strong> SkyPlanner komanda konfigur\u0113 divvirzienu integr\u0101ciju un nodro\u0161ina t\u0101s atbalstu p\u0113c palai\u0161anas.<\/li>\n\n<\/ol>\n\n\n<p><strong>Cenas.<\/strong> Maksa par izv\u0113l\u0113to pl\u0101nu tiek apr\u0113\u0137in\u0101ta katru m\u0113nesi atbilsto\u0161i darba centru skaitam. Jebkur\u0101 laik\u0101 varat pievienot vai no\u0146emt darba centrus vai atcelt abonementu. S\u012bk\u0101ku inform\u0101ciju skatiet <a href=\"\/lv\/cenu-noteiksana\/\">cenu lap\u0101<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Sazin\u0101ties ar p\u0101rdo\u0161anas komandu<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Bie\u017e\u0101k uzdotie jaut\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai Infor CloudSuite Industrial nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu?<\/summary>\n<p class=\"sp-faq__a\">J\u0101, div\u0101s viet\u0101s. Lai ar APS Planning pl\u0101notu ra\u017eo\u0161anu atbilsto\u0161i re\u0101lajai jaudai, ir vajadz\u012bga APS licence, savuk\u0101rt Scheduler nosaka tuv\u0101k\u0101 laika oper\u0101ciju sec\u012bbu, ko pl\u0101not\u0101ji kori\u0123\u0113 Gantt diagramm\u0101. SkyPlanner APS papildus nodro\u0161ina autom\u0101tisku p\u0101rpl\u0101no\u0161anu visiem resursiem, apvienojot p\u0101rregul\u0113\u0161anu, instrumentus, brig\u0101des un materi\u0101lus vien\u0101 grafik\u0101.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai CloudSuite Industrial sist\u0113m\u0101 kaut kas j\u0101instal\u0113?<\/summary>\n<p class=\"sp-faq__a\">N\u0113. SkyPlanner darbojas m\u0101kon\u012b atsevi\u0161\u0137i no CSI un savienojas ar to, izmantojot Infor standarta IDO REST API un ION. Lok\u0101li instal\u0113ta SyteLine sist\u0113ma savienojas caur to pa\u0161u IDO sl\u0101ni.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai SkyPlanner aizst\u0101j CloudSuite Industrial ra\u017eo\u0161anas funkcijas?<\/summary>\n<p class=\"sp-faq__a\">N\u0113, tas papildina eso\u0161o sist\u0113mu. Preces, materi\u0101lu specifik\u0101cijas, MRP, iepirkumi, kr\u0101jumi, izmaksu apr\u0113\u0137ini un finanses paliek CSI p\u0101rzi\u0146\u0101. SkyPlanner sast\u0101da apstiprin\u0101to un izpildei nodoto ra\u017eo\u0161anas uzdevumu grafikus atbilsto\u0161i re\u0101lajai jaudai un nos\u016bta datumus un uzskait\u012bto darbu atpaka\u013c uz CSI.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cik SkyPlanner maks\u0101 ra\u017eotnei, kas izmanto CloudSuite Industrial?<\/summary>\n<p class=\"sp-faq__a\">No 199 \u20ac m\u0113nes\u012b ar 5 iek\u013cautiem darba centriem un 20 \u20ac m\u0113nes\u012b par katru papildu darba centru. Darba centrs ir ra\u017eo\u0161anas resurss ar savu pl\u0101noto uzdevumu rindu. Cena nav atkar\u012bga no j\u016bsu Infor abonementa vai APS licences. Integr\u0101cijas cenu pied\u0101v\u0101jumu sagatavojam iepriek\u0161 atbilsto\u0161i j\u016bsu procesam un vajadz\u012bb\u0101m, iek\u013caujot taj\u0101 ar\u012b izv\u0113l\u0113to abon\u0113\u0161anas pl\u0101nu, lai visas izmaksas b\u016btu zin\u0101mas pirms darba s\u0101k\u0161anas.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cik ilga ir ievie\u0161ana?<\/summary>\n<p class=\"sp-faq__a\">Ievie\u0161anu parasti pabeidz da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c ievie\u0161anas darbu s\u0101kuma. Komanda izveido j\u016bsu resursu un tehnolo\u0123isko mar\u0161rutu atbilst\u012bbu starp sist\u0113m\u0101m, savieno ra\u017eo\u0161anas un iepirkuma pas\u016bt\u012bjumus un nodro\u0161ina pl\u0101noto datumu un uzskait\u012bt\u0101 darba nos\u016bt\u012b\u0161anu atpaka\u013c. Pirms palai\u0161anas visu p\u0101rbauda, sal\u012bdzinot ar j\u016bsu pa\u0161reiz\u0113jo pl\u0101nu.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai varam izm\u0113\u0123in\u0101t SkyPlanner pirms integr\u0101cijas ar CloudSuite Industrial?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. 30 dienu izm\u0113\u0123in\u0101jum\u0101 varat izmantot no CSI eksport\u0113tu Excel failu. V\u0113l pirms integr\u0101cijas darbu s\u0101kuma j\u016bs redzat saviem ra\u017eo\u0161anas uzdevumiem un resursiem sast\u0101d\u012btu <a href=\"\/lv\/resursi\/ierobezotas-jaudas-planosana\/\">ra\u017eo\u0161anas grafiku<\/a>, kur\u0101 \u0146emta v\u0113r\u0101 re\u0101l\u0101 pieejam\u0101 jauda.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai SkyPlanner lieto\u0161anai ir vajadz\u012bga CSI APS licence?<\/summary>\n<p class=\"sp-faq__a\">N\u0113. SkyPlanner patst\u0101v\u012bgi veic ra\u017eo\u0161anas pl\u0101no\u0161anu atbilsto\u0161i re\u0101lajai resursu jaudai, izmantojot CSI ra\u017eo\u0161anas pas\u016bt\u012bjumus, oper\u0101cijas un resursus. MRP vai Infinite APS var turpin\u0101t pl\u0101not materi\u0101lus CSI sist\u0113m\u0101.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0101cijas \/ ERP \/ Infor CloudSuite Industrial SkyPlanner APS sist\u0113mai Infor CloudSuite Industrial (SyteLine): ra\u017eo\u0161anas pl\u0101no\u0161ana Ra\u017eot\u0101jiem, kas izmanto Infor CloudSuite Industrial (CSI, agr\u0101k SyteLine), SkyPlanner APS nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu, \u0146emot v\u0113r\u0101 iek\u0101rtu un darbinieku re\u0101lo jaudu, k\u0101 ar\u012b katra darba centra, operatora, instrumenta un materi\u0101la pieejam\u012bbu. J\u016bs redzat, kur un kad tiks izpild\u012bts katrs &#8230; <a title=\"SkyPlanner APS sist\u0113mai Infor CloudSuite Industrial (SyteLine): ra\u017eo\u0161anas pl\u0101no\u0161ana\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/infor-cloudsuite-industrial\/\" aria-label=\"Read more about SkyPlanner APS sist\u0113mai Infor CloudSuite Industrial (SyteLine): ra\u017eo\u0161anas pl\u0101no\u0161ana\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100678,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-100886","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>CloudSuite Industrial: ra\u017eo\u0161anas grafiki | SkyPlanner APS<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS pl\u0101no Infor CloudSuite Industrial (SyteLine) uzdevumus p\u0113c re\u0101l\u0101s jaudas un atgrie\u017e sist\u0113m\u0101 datumus un darbasp\u0113ka datus. No 199 \u20ac m\u0113nes\u012b.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/infor-cloudsuite-industrial\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SkyPlanner APS sist\u0113mai Infor CloudSuite Industrial (SyteLine): ra\u017eo\u0161anas pl\u0101no\u0161ana\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS pl\u0101no Infor CloudSuite Industrial (SyteLine) uzdevumus p\u0113c re\u0101l\u0101s jaudas un atgrie\u017e sist\u0113m\u0101 datumus un darbasp\u0113ka datus. No 199 \u20ac m\u0113nes\u012b.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/infor-cloudsuite-industrial\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"12 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/infor-cloudsuite-industrial\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/infor-cloudsuite-industrial\\\/\",\"name\":\"CloudSuite Industrial: ra\u017eo\u0161anas grafiki | SkyPlanner APS\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"datePublished\":\"2026-10-17T13:00:38+00:00\",\"description\":\"SkyPlanner APS pl\u0101no Infor CloudSuite Industrial (SyteLine) uzdevumus p\u0113c re\u0101l\u0101s jaudas un atgrie\u017e sist\u0113m\u0101 datumus un darbasp\u0113ka datus. No 199 \u20ac m\u0113nes\u012b.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/infor-cloudsuite-industrial\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/infor-cloudsuite-industrial\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/infor-cloudsuite-industrial\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bsu ERP sist\u0113mai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS sist\u0113mai Infor CloudSuite Industrial (SyteLine): ra\u017eo\u0161anas pl\u0101no\u0161ana\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"CloudSuite Industrial: ra\u017eo\u0161anas grafiki | SkyPlanner APS","description":"SkyPlanner APS pl\u0101no Infor CloudSuite Industrial (SyteLine) uzdevumus p\u0113c re\u0101l\u0101s jaudas un atgrie\u017e sist\u0113m\u0101 datumus un darbasp\u0113ka datus. No 199 \u20ac m\u0113nes\u012b.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/infor-cloudsuite-industrial\/","og_locale":"lv_LV","og_type":"article","og_title":"SkyPlanner APS sist\u0113mai Infor CloudSuite Industrial (SyteLine): ra\u017eo\u0161anas pl\u0101no\u0161ana","og_description":"SkyPlanner APS pl\u0101no Infor CloudSuite Industrial (SyteLine) uzdevumus p\u0113c re\u0101l\u0101s jaudas un atgrie\u017e sist\u0113m\u0101 datumus un darbasp\u0113ka datus. No 199 \u20ac m\u0113nes\u012b.","og_url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/infor-cloudsuite-industrial\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"12 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/infor-cloudsuite-industrial\/","url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/infor-cloudsuite-industrial\/","name":"CloudSuite Industrial: ra\u017eo\u0161anas grafiki | SkyPlanner APS","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"datePublished":"2026-10-17T13:00:38+00:00","description":"SkyPlanner APS pl\u0101no Infor CloudSuite Industrial (SyteLine) uzdevumus p\u0113c re\u0101l\u0101s jaudas un atgrie\u017e sist\u0113m\u0101 datumus un darbasp\u0113ka datus. No 199 \u20ac m\u0113nes\u012b.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/infor-cloudsuite-industrial\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/integracija\/erp\/infor-cloudsuite-industrial\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/infor-cloudsuite-industrial\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner","item":"https:\/\/skyplanner.ai\/lv\/integracija\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bsu ERP sist\u0113mai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS sist\u0113mai Infor CloudSuite Industrial (SyteLine): ra\u017eo\u0161anas pl\u0101no\u0161ana"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0101cijas \/ ERP \/ Infor CloudSuite Industrial SkyPlanner APS sist\u0113mai Infor CloudSuite Industrial (SyteLine): ra\u017eo\u0161anas pl\u0101no\u0161ana Ra\u017eot\u0101jiem, kas izmanto Infor CloudSuite Industrial (CSI, agr\u0101k SyteLine), SkyPlanner APS nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu, \u0146emot v\u0113r\u0101 iek\u0101rtu un darbinieku re\u0101lo jaudu, k\u0101 ar\u012b katra darba centra, operatora, instrumenta un materi\u0101la pieejam\u012bbu. J\u016bs redzat, kur un kad tiks izpild\u012bts katrs&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/100886","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=100886"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/100886\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/100678"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=100886"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}