{"id":100827,"date":"2026-10-17T13:00:38","date_gmt":"2026-10-17T13:00:38","guid":{"rendered":"https:\/\/skyplanner.ai\/?page_id=100827"},"modified":"2026-10-17T13:00:38","modified_gmt":"2026-10-17T13:00:38","slug":"odoo","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/odoo\/","title":{"rendered":"SkyPlanner APS Odoo lietot\u0101jiem: ra\u017eo\u0161anas pl\u0101no\u0161ana un integr\u0101cija"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lv\/integracija\/\">Integr\u0101cijas<\/a> \/ <a href=\"\/lv\/integracija\/erp\/\">ERP<\/a> \/ Odoo<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SkyPlanner APS Odoo lietot\u0101jiem: <span class=\"hl\">ra\u017eo\u0161anas pl\u0101no\u0161ana un integr\u0101cija<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">SkyPlanner APS nodro\u0161ina ra\u017eot\u0101jiem, kas izmanto Odoo, vienotu grafiku, kur\u0101 \u0146emta v\u0113r\u0101 katra darba centra, operatora, instrumenta un materi\u0101la pieejam\u012bba. Visi atv\u0113rtie izgatavo\u0161anas pas\u016bt\u012bjumi tiek sak\u0101rtoti vien\u0101 pl\u0101n\u0101, un Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku, kad ra\u017eo\u0161an\u0101 notiek izmai\u0146as.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Pieteikt demonstr\u0101ciju<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt laika skala ar darba centros iepl\u0101notiem ra\u017eo\u0161anas uzdevumiem un pas\u016bt\u012bjumu sarakstu zem t\u0101s.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner integr\u0101cija ar Odoo darbojas abos virzienos: SkyPlanner sa\u0146em izgatavo\u0161anas pas\u016bt\u012bjumus, ra\u017eo\u0161anas pas\u016bt\u012bjumus, materi\u0101lu specifik\u0101cijas, darba centrus un iepirkuma pas\u016bt\u012bjumus, bet atpaka\u013c nos\u016bta pl\u0101notos datumus, darba centrus un re\u0123istr\u0113to laiku. Ievie\u0161anas laik\u0101 SkyPlanner komanda piel\u0101go integr\u0101ciju j\u016bsu Odoo konfigur\u0101cijai.<\/p>\n\n\n<p><a href=\"\/lv\/cenu-noteiksana\/\">Cena<\/a> ir no 199 \u20ac m\u0113nes\u012b par 5 darba centriem, un katrs papildu darba centrs maks\u0101 20 \u20ac m\u0113nes\u012b. Bezmaksas izm\u0113\u0123in\u0101jums ilgst 30 dienas un \u013cauj izmantot l\u012bdz 20 darba centriem. Kred\u012btkarte nav nepiecie\u0161ama.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-production\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas main\u0101s j\u016bsu ra\u017eo\u0161an\u0101<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card ind-icard\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<span class=\"ind-chip\" aria-hidden=\"true\"><svg viewBox=\"0 0 24 24\" fill=\"none\" stroke=\"currentColor\" stroke-width=\"1.8\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><path d=\"M4 18a8 8 0 1 1 16 0\"\/><path d=\"M12 18l4-5\"\/><circle cx=\"12\" cy=\"18\" r=\"1.2\" fill=\"currentColor\" stroke=\"none\"\/><\/svg><\/span>\n\n\n<p class=\"fx-pain__t\">Iek\u0101rt\u0101m vairs neiepl\u0101no vair\u0101k, nek\u0101 t\u0101s sp\u0113j paveikt.<\/p>\n\n\n<p class=\"fx-pain__b\">Katras iek\u0101rtas, darbinieka un instrumenta grafiks tiek veidots atbilsto\u0161i pieejamajai jaudai, faktiskaj\u0101m mai\u0146\u0101m, promb\u016btnei un virsstund\u0101m. Presformu, kas tiek izmantota vien\u0101 iek\u0101rt\u0101, nekad neiepl\u0101no darbam cit\u0101 iek\u0101rt\u0101 vienlaikus. Uzdevumam, kuram vajadz\u012bgi tr\u012bs operatori, tiek iepl\u0101noti tr\u012bs cilv\u0113ki ar br\u012bvu laiku mai\u0146\u0101s. Ja iek\u0101rta ir aiz\u0146emta, darbs tiek p\u0101rcelts uz alternat\u012bvu iek\u0101rtu vai pie cita darbinieka.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card ind-icard\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<span class=\"ind-chip ind-chip--green\" aria-hidden=\"true\"><svg viewBox=\"0 0 24 24\" fill=\"none\" stroke=\"currentColor\" stroke-width=\"1.8\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><circle cx=\"12\" cy=\"12\" r=\"8.5\"\/><path d=\"M12 7.5V12l3 2\"\/><\/svg><\/span>\n\n\n<p class=\"fx-pain__t\">Pieg\u0101des termi\u0146i, ko varat apsol\u012bt.<\/p>\n\n\n<p class=\"fx-pain__b\">Grafiks par\u0101da, kad katrs pas\u016bt\u012bjums patie\u0161\u0101m b\u016bs pabeigts. Klientiem atbildat, balstoties uz pl\u0101nu, nevis min\u0113jumiem.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card ind-icard\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<span class=\"ind-chip ind-chip--purple\" aria-hidden=\"true\"><svg viewBox=\"0 0 24 24\" fill=\"none\" stroke=\"currentColor\" stroke-width=\"1.8\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><path d=\"M3 12a9 9 0 0 1 15-6.7L21 8\"\/><path d=\"M21 3v5h-5\"\/><path d=\"M21 12a9 9 0 0 1-15 6.7L3 16\"\/><path d=\"M3 21v-5h5\"\/><\/svg><\/span>\n\n\n<p class=\"fx-pain__t\">Autom\u0101tiska p\u0101rpl\u0101no\u0161ana steidzamu pas\u016bt\u012bjumu un boj\u0101jumu gad\u012bjum\u0101.<\/p>\n\n\n<p class=\"fx-pain__b\">Ja iek\u0101rta apst\u0101jas, pien\u0101k steidzams pas\u016bt\u012bjums vai darbs tiek pabeigts agr\u0101k, Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku. J\u016bsu fiks\u0113tie uzdevumi un noteikt\u0101s priorit\u0101tes joproj\u0101m tiek iev\u0113rotas.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card ind-icard\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<span class=\"ind-chip ind-chip--orange\" aria-hidden=\"true\"><svg viewBox=\"0 0 24 24\" fill=\"none\" stroke=\"currentColor\" stroke-width=\"1.8\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><path d=\"M4 9h13l-3.5-3.5M20 15H7l3.5 3.5\"\/><\/svg><\/span>\n\n\n<p class=\"fx-pain__t\">Maz\u0101k p\u0101rregul\u0113\u0161anas.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner zina, cik laika nepiecie\u0161ams iek\u0101rtas p\u0101rregul\u0113\u0161anai no viena produkta uz citu abos virzienos. P\u0101reja no zilas kr\u0101sas uz sarkanu var aiz\u0146emt 30 min\u016btes, bet no sarkanas uz zilu \u2014 60. Uzdevumi grafik\u0101 tiek sak\u0101rtoti t\u0101, lai p\u0101rregul\u0113\u0161anai zaud\u0113tu p\u0113c iesp\u0113jas maz\u0101k laika.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card ind-icard\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<span class=\"ind-chip\" aria-hidden=\"true\"><svg viewBox=\"0 0 24 24\" fill=\"none\" stroke=\"currentColor\" stroke-width=\"1.8\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><path d=\"M3 21V9l9-5 9 5v12\"\/><path d=\"M2 21h20\"\/><rect x=\"8\" y=\"13\" width=\"8\" height=\"8\"\/><\/svg><\/span>\n\n\n<p class=\"fx-pain__t\">Grafiks atbilsto\u0161i materi\u0101lu pieejam\u012bbai.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner p\u0101rbauda kr\u0101jumus un gaid\u0101mos iepirkuma pas\u016bt\u012bjumus. Uzdevums, kuram vajadz\u012bga pieg\u0101de no pieg\u0101d\u0101t\u0101ja, tiek iepl\u0101nots p\u0113c t\u0101s datuma, lai darbs ceh\u0101 neb\u016btu j\u0101aptur.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card ind-icard\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<span class=\"ind-chip ind-chip--green\" aria-hidden=\"true\"><svg viewBox=\"0 0 24 24\" fill=\"none\" stroke=\"currentColor\" stroke-width=\"1.8\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><circle cx=\"9\" cy=\"8\" r=\"3\"\/><path d=\"M3 20a6 6 0 0 1 12 0\"\/><path d=\"M16 6a3 3 0 0 1 0 6M21 20a6 6 0 0 0-4-5.7\"\/><\/svg><\/span>\n\n\n<p class=\"fx-pain__t\">Operatori redz savu darbu rindu.<\/p>\n\n\n<p class=\"fx-pain__b\">Katrs operators t\u0101lrun\u012b vai plan\u0161et\u0113 redz n\u0101kamos ra\u017eo\u0161anas uzdevumus un re\u0123istr\u0113 darbu t\u0101 izpildes laik\u0101. Biroj\u0101 darba gaitu redz re\u0101llaik\u0101, un re\u0123istr\u0113tie dati par darbu tiek nos\u016bt\u012bti atpaka\u013c uz Odoo.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ra\u017eot\u0101ju atsauksmes par SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"UTU pieg\u0101des \u0137\u0113des speci\u0101lists Kalle Kalliom\u00e4ki elektrosadales skapju ra\u017eo\u0161anas ceh\u0101 Ulvil\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>ietaup\u012btas katru ned\u0113\u013cu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner ir \u013c\u0101vis mums p\u0101riet no ra\u017eo\u0161anas pl\u0101no\u0161anas Excel tabul\u0101s uz ra\u017eo\u0161anas optimiz\u0101ciju re\u0101llaik\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, pieg\u0101des \u0137\u0113des speci\u0101lists<\/b><br>UTU \u00b7 Elektrosadales skapji un sadaliek\u0101rtas<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas pl\u0101no\u0161an\u0101 katru ned\u0113\u013cu tiek ietaup\u012btas 2 darba stundas, un jaun\u0101 darbu rinda ra\u017eo\u0161anas l\u012bniju sasniedz da\u017eu sekun\u017eu laik\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/utu\/\">Las\u012bt UTU atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori t\u012brtelpu aizsargt\u0113rpos pie pude\u013cu pild\u012b\u0161anas l\u012bnijas Laboratory &amp; Allied farm\u0101cijas r\u016bpn\u012bc\u0101 Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>ra\u017eo\u0161anas efektivit\u0101te<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cRa\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT vad\u012bt\u0101js<\/b><br>Laboratory &amp; Allied \u00b7 Farmaceitisko produktu ra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Ra\u017eo\u0161anas efektivit\u0101te ir pieaugusi par 90%, un optimiz\u0113ta tr\u012bs m\u0113ne\u0161u pl\u0101na sast\u0101d\u012b\u0161ana visiem darba centriem aiz\u0146em maz\u0101k nek\u0101 30 min\u016btes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/laboratory-allied\/\">Las\u012bt Laboratory &amp; Allied atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"KJH-Comp metin\u0101t\u0101js sl\u012bp\u0113 metin\u0101tu t\u0113rauda konstrukciju Alahermes r\u016bpn\u012bc\u0101\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>pieg\u0101\u017eu savlaic\u012bgums, iepriek\u0161 aptuveni 50%<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner ir iz\u0161\u0137iro\u0161a loma m\u016bsu pieg\u0101\u017eu savlaic\u012bguma uztur\u0113\u0161an\u0101.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, izpilddirektors<\/b><br>KJH-Comp \u00b7 Lok\u0161\u0146u met\u0101la apstr\u0101de un l\u012bgumra\u017eo\u0161ana<\/p>\n\n\n<p class=\"ind-cust__result\">Pieg\u0101\u017eu savlaic\u012bgums pieauga no aptuveni 50% l\u012bdz pat 98%, un tagad grafiku sast\u0101d\u012b\u0161anai divu meistaru viet\u0101 pietiek ar vienu.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/kjh-comp\/\">Las\u012bt KJH-Comp atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"Piristeel jumta dro\u0161\u012bbas apr\u012bkojuma r\u016bpn\u012bca Kauhav\u0101 no putna lidojuma\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>99,2%<\/b><span>pieg\u0101\u017eu savlaic\u012bgums<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner ir \u013c\u0101vis skaidri saskat\u012bt \u0161aur\u0101s vietas un padar\u012bjis ra\u017eo\u0161anas vad\u012bbu p\u0101rskat\u0101m\u0101ku.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, ra\u017eo\u0161anas vad\u012bt\u0101js<\/b><br>Piristeel \u00b7 Jumta dro\u0161\u012bbas apr\u012bkojums un lietus\u016bdens novad\u012b\u0161anas sist\u0113mas<\/p>\n\n\n<p class=\"ind-cust__result\">\u0160ogad pieg\u0101\u017eu savlaic\u012bgums sasniedza 99,2%, un grafiku sast\u0101d\u012b\u0161ana \u013cauj ietaup\u012bt l\u012bdz \u010detr\u0101m darba stund\u0101m dien\u0101.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lv\/klientu-stasti\/piristeel\/\">Las\u012bt Piristeel atsauksmi<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-skyplanner-works-with-odoo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101 SkyPlanner darbojas kop\u0101 ar Odoo<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fxv-how ind-how\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fxv-how__step\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"fxv-how__num\" aria-hidden=\"true\">1<\/div>\n\n\n<h3 class=\"wp-block-heading fxv-how__t\">Odoo nos\u016bta darbus.<\/h3>\n\n\n<p class=\"fxv-how__b\">SkyPlanner sa\u0146em izgatavo\u0161anas pas\u016bt\u012bjumus, ra\u017eo\u0161anas pas\u016bt\u012bjumus, materi\u0101lu specifik\u0101cijas, darba centrus, kr\u0101jumu datus un iepirkuma pas\u016bt\u012bjumus.<\/p>\n\n\n<svg class=\"fxv-how__arrow\" width=\"26\" height=\"20\" viewBox=\"0 0 26 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M2 10h20m0 0l-7-7m7 7l-7 7\" stroke=\"currentColor\" stroke-width=\"2.4\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fxv-how__step\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"fxv-how__num\" aria-hidden=\"true\">2<\/div>\n\n\n<h3 class=\"wp-block-heading fxv-how__t\">SkyPlanner sast\u0101da grafiku un uztur to aktu\u0101lu.<\/h3>\n\n\n<p class=\"fxv-how__b\">Arcturus pl\u0101no\u0161anas dzinis da\u017eu sekun\u017eu laik\u0101 iepl\u0101no katru oper\u0101ciju un p\u0101rpl\u0101no grafiku, kad ra\u017eo\u0161an\u0101 notiek izmai\u0146as.<\/p>\n\n\n<svg class=\"fxv-how__arrow\" width=\"26\" height=\"20\" viewBox=\"0 0 26 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M2 10h20m0 0l-7-7m7 7l-7 7\" stroke=\"currentColor\" stroke-width=\"2.4\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fxv-how__step\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"fxv-how__num\" aria-hidden=\"true\">3<\/div>\n\n\n<h3 class=\"wp-block-heading fxv-how__t\">Termi\u0146i un re\u0123istr\u0113tais darbs tiek nos\u016bt\u012bti atpaka\u013c.<\/h3>\n\n\n<p class=\"fxv-how__b\">Pl\u0101notie s\u0101kuma un beigu datumi un izv\u0113l\u0113tais darba centrs tiek nos\u016bt\u012bti atpaka\u013c uz Odoo ra\u017eo\u0161anas pas\u016bt\u012bjumiem, savuk\u0101rt re\u0123istr\u0113tie dati par darbu k\u013c\u016bst par Odoo Time Logs ierakstiem.<\/p>\n\n\n<svg class=\"fxv-how__arrow\" width=\"26\" height=\"20\" viewBox=\"0 0 26 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M2 10h20m0 0l-7-7m7 7l-7 7\" stroke=\"currentColor\" stroke-width=\"2.4\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner izmanto Odoo standarta \u0101r\u0113jo API, t\u0101p\u0113c Odoo nekas nav j\u0101instal\u0113. Katr\u0101 ra\u017eotn\u0113 Odoo izmanto at\u0161\u0137ir\u012bgi, t\u0101p\u0113c ievie\u0161anas laik\u0101 SkyPlanner komanda piel\u0101go integr\u0101ciju j\u016bsu versijai, mitin\u0101\u0161anas veidam un konfigur\u0101cijai un nodro\u0161ina atbalstu ar\u012b p\u0113c darba uzs\u0101k\u0161anas. Integr\u0101cijas cenu pied\u0101v\u0101jumu sagatavojam iepriek\u0161 atbilsto\u0161i j\u016bsu procesam un vajadz\u012bb\u0101m. Ar\u012b j\u016bsu Odoo partneris vai izstr\u0101d\u0101t\u0101ji var izveidot integr\u0101ciju, izmantojot SkyPlanner dokument\u0113to API (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API dokument\u0101cija<\/a>).<\/p>\n\n\n<p>Tehnisk\u0101 inform\u0101cija par Odoo integr\u0101ciju ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161anai ir pieejama <a href=\"\/lv\/integracija\/erp\/odoo\/integracijas-celvedis\/\">integr\u0101cijas rokasgr\u0101mat\u0101<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"why-odoo-s-own-planning-is-not-enough\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101p\u0113c ar Odoo pl\u0101no\u0161anas iesp\u0113j\u0101m vien nepietiek<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Odoo poga Plan iepl\u0101no katru ra\u017eo\u0161anas pas\u016bt\u012bjumu t\u0101 darba centra pirmaj\u0101 br\u012bvaj\u0101 laika interv\u0101l\u0101. Turpm\u0101k\u0101s izmai\u0146as <a href=\"https:\/\/www.odoo.com\/documentation\/19.0\/applications\/inventory_and_mrp\/manufacturing\/advanced_configuration\/using_work_centers.html\">Odoo dokument\u0101cij\u0101<\/a> aprakst\u012btas k\u0101 manu\u0101las: &#8220;Times and planned work centers can be changed by clicking to access the individual work order.&#8221; (Laikus un pl\u0101notos darba centrus var main\u012bt, atverot atsevi\u0161\u0137o ra\u017eo\u0161anas pas\u016bt\u012bjumu.) Ikdienas ra\u017eo\u0161an\u0101 tas noz\u012bm\u0113:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Pas\u016bt\u012bjumi tiek pl\u0101noti pa vienam.<\/strong> Katram pas\u016bt\u012bjumam izmanto jaudu, kas palikusi br\u012bva p\u0113c iepriek\u0161\u0113jo pas\u016bt\u012bjumu iepl\u0101no\u0161anas. Sist\u0113ma neizv\u0113rt\u0113 pieg\u0101des termi\u0146us kop\u0101 ar p\u0101rregul\u0113\u0161anas vajadz\u012bb\u0101m.<\/li>\n\n\n<li><strong>P\u0101rregul\u0113\u0161ana, instrumenti un cilv\u0113ki netiek \u0146emti v\u0113r\u0101.<\/strong> P\u0101rregul\u0113\u0161anas laiks ir vien\u0101ds neatkar\u012bgi no iepriek\u0161\u0113j\u0101 darba. P\u0113c operatoriem var filtr\u0113t, ta\u010du vi\u0146u pieejam\u0101 jauda pl\u0101nu neierobe\u017eo, un instrumenti pl\u0101no\u0161anu neietekm\u0113.<\/li>\n\n\n<li><strong>Pl\u0101not\u0101js p\u0101rpl\u0101no manu\u0101li.<\/strong> Iek\u0101rtas boj\u0101jums vai steidzams pas\u016bt\u012bjums pats par sevi grafik\u0101 neko nemaina. Kad darbs ir s\u0101kts, Odoo vairs neatce\u013c pas\u016bt\u012bjuma iepl\u0101nojumu.<\/li>\n\n<\/ul>\n\n\n<p>Visi ierobe\u017eojumi ir izskaidroti rakst\u0101 <a href=\"\/lv\/integracija\/erp\/odoo\/razosanas-planosana\/\">Vai Odoo nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu?<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"odoo-alone-vs-with-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Odoo atsevi\u0161\u0137i un kop\u0101 ar SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>Tikai Odoo<\/th><th>Odoo kop\u0101 ar SkyPlanner APS<\/th><\/tr><\/thead><tbody><tr><td>Jauda<\/td><td>Tikai darba centra kalend\u0101rs; operatori kalpo k\u0101 filtrs<\/td><td>Katrai iek\u0101rtai, cilv\u0113kam un instrumentam ir noteikta re\u0101l\u0101 jauda un mai\u0146as<\/td><\/tr><tr><td>Grafiks<\/td><td>Pas\u016bt\u012bjumus pa vienam ievieto pirmaj\u0101 br\u012bvaj\u0101 laika interv\u0101l\u0101<\/td><td>Detaliz\u0113ts grafiks visiem atv\u0113rtajiem pas\u016bt\u012bjumiem da\u017eu sekun\u017eu laik\u0101<\/td><\/tr><tr><td>P\u0101rregul\u0113\u0161ana<\/td><td>Vien\u0101ds p\u0101rregul\u0113\u0161anas laiks neatkar\u012bgi no iepriek\u0161\u0113j\u0101 darba<\/td><td>Ra\u017eo\u0161anas uzdevumi sak\u0101rtoti t\u0101, lai p\u0101rregul\u0113\u0161anas laiks b\u016btu vismaz\u0101kais<\/td><\/tr><tr><td>Materi\u0101li<\/td><td>Pl\u0101nojot ra\u017eo\u0161anas pas\u016bt\u012bjumu, netiek p\u0101rbaud\u012bti<\/td><td>Ra\u017eo\u0161anas uzdevumi s\u0101kas, kad materi\u0101li ir noliktav\u0101 vai ir pien\u0101ku\u0161as pieg\u0101des<\/td><\/tr><tr><td>Izmai\u0146as<\/td><td>Pas\u016bt\u012bjumu iepl\u0101nojumu atce\u013c un tos p\u0101rpl\u0101no manu\u0101li<\/td><td>Autopilot p\u0101rpl\u0101no visu ra\u017eotni atbilsto\u0161i j\u016bsu priorit\u0101t\u0113m<\/td><\/tr><tr><td>Ra\u017eo\u0161anas cehs<\/td><td>Gantt un Shop Floor pieejami tikai Enterprise versij\u0101<\/td><td>Gantt un operatora uzdevumu rinda t\u0101lrun\u012b vai plan\u0161et\u0113, ar\u012b Community versij\u0101<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"how-to-choose-a-scheduler-for-odoo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101 izv\u0113l\u0113ties grafiku sast\u0101d\u012b\u0161anas r\u012bku Odoo vajadz\u012bb\u0101m<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Odoo pl\u0101no\u0161anas iesp\u0113jas ir piem\u0113rotas ra\u017eotnei, kur katrai oper\u0101cijai ir viens skaidri noteikts darba centrs, apjomi ir m\u0113reni un p\u0101rregul\u0113\u0161ana nav atkar\u012bga no iepriek\u0161\u0113j\u0101 ra\u017eo\u0161anas uzdevuma.<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Izv\u0113lieties SkyPlanner, ja pl\u0101nu ierobe\u017eo katra iek\u0101rta, cilv\u0113ks un instruments,<\/strong> nevis tikai darba centra kalend\u0101rs.<\/li>\n\n\n<li><strong>Izv\u0113lieties SkyPlanner, ja p\u0101rregul\u0113\u0161ana nosaka sara\u017eoto apjomu.<\/strong> SkyPlanner sak\u0101rto ra\u017eo\u0161anas uzdevumus t\u0101, lai kop\u0113jais p\u0101rregul\u0113\u0161anas laiks b\u016btu vismaz\u0101kais.<\/li>\n\n\n<li><strong>Izv\u0113lieties SkyPlanner, ja koplietojami instrumenti un brig\u0101des nosaka, kuru darbu var s\u0101kt n\u0101kamo.<\/strong><\/li>\n\n\n<li><strong>Izv\u0113lieties SkyPlanner, ja materi\u0101lu pien\u0101k\u0161ana nosaka, kuru ra\u017eo\u0161anas uzdevumu var s\u0101kt.<\/strong><\/li>\n\n\n<li><strong>Izv\u0113lieties SkyPlanner, ja pl\u0101ns main\u0101s vair\u0101kas reizes ned\u0113\u013c\u0101.<\/strong> Autopilot p\u0101rpl\u0101no grafiku, un jaunie datumi tiek nos\u016bt\u012bti atpaka\u013c uz Odoo.<\/li>\n\n\n<li><strong>Izv\u0113lieties SkyPlanner, ja izmantojat Odoo Community un v\u0113laties Gantt diagrammu un ra\u017eo\u0161anas ceha darba uzskaiti vien\u0101 r\u012bk\u0101.<\/strong><\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0101 s\u0101kt<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>S\u0101ciet bezmaksas izm\u0113\u0123in\u0101jumu.<\/strong> 30 dienas, l\u012bdz 20 darba centriem, visas Basic funkcijas. Kred\u012btkarte nav nepiecie\u0161ama.<\/li>\n\n\n<li><strong>Izveidojiet savas ra\u017eo\u0161anas modeli.<\/strong> Izveidojiet darba centrus un mai\u0146as, balstoties uz Odoo darba centriem un darba laiku, vai import\u0113jiet tos. Ir pieejama pal\u012bdz\u012bba ievie\u0161an\u0101.<\/li>\n\n\n<li><strong>Iel\u0101d\u0113jiet pas\u016bt\u012bjumus.<\/strong> Eksport\u0113jiet apstiprin\u0101tos izgatavo\u0161anas pas\u016bt\u012bjumus un ra\u017eo\u0161anas pas\u016bt\u012bjumus no Odoo uz Excel un import\u0113jiet tos. Sal\u012bdziniet SkyPlanner grafiku ar pa\u0161reiz\u0113jo pl\u0101nu, p\u0113c tam pievienojiet steidzamu pas\u016bt\u012bjumu un v\u0113rojiet, k\u0101 Autopilot p\u0101rpl\u0101no grafiku.<\/li>\n\n\n<li><strong>Savienojiet ar Odoo.<\/strong> SkyPlanner komanda piel\u0101go divvirzienu integr\u0101ciju j\u016bsu Odoo versijai un mitin\u0101\u0161anas veidam un nodro\u0161ina atbalstu p\u0113c darba uzs\u0101k\u0161anas.<\/li>\n\n<\/ol>\n\n\n<p><strong>Cenas.<\/strong> Maksa par izv\u0113l\u0113to pl\u0101nu tiek apr\u0113\u0137in\u0101ta katru m\u0113nesi atbilsto\u0161i darba centru skaitam. Jebkur\u0101 laik\u0101 varat pievienot vai no\u0146emt darba centrus vai atcelt abonementu. S\u012bk\u0101ku inform\u0101ciju skatiet <a href=\"\/lv\/cenu-noteiksana\/\">cenu lap\u0101<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/izmeginajums\/\">S\u0101kt bezmaksas izm\u0113\u0123in\u0101jumu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lv\/sazinieties-ar-pardosanas-specialistiem\/\">Sazin\u0101ties ar p\u0101rdo\u0161anas komandu<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Bie\u017e\u0101k uzdotie jaut\u0101jumi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai Odoo nodro\u0161ina ra\u017eo\u0161anas pl\u0101no\u0161anu?<\/summary>\n<p class=\"sp-faq__a\">Pamata l\u012bmen\u012b. Poga Plan iepl\u0101no katru ra\u017eo\u0161anas pas\u016bt\u012bjumu t\u0101 darba centra pirmaj\u0101 br\u012bvaj\u0101 laika interv\u0101l\u0101, vienu pas\u016bt\u012bjumu p\u0113c otra. Operatori, instrumenti un materi\u0101li netiek \u0146emti v\u0113r\u0101 k\u0101 ierobe\u017eojumi, un nekas netiek p\u0101rpl\u0101nots autom\u0101tiski. SkyPlanner APS papildina Odoo ar <a href=\"\/lv\/resursi\/ierobezotas-jaudas-planosana\/\">ra\u017eo\u0161anas pl\u0101no\u0161anu<\/a> visai ra\u017eotnei, sast\u0101dot grafiku atbilsto\u0161i iek\u0101rtu un darbinieku faktiskajai pieejamajai jaudai.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai Odoo ir j\u0101instal\u0113 lietotne vai modulis?<\/summary>\n<p class=\"sp-faq__a\">N\u0113. SkyPlanner darbojas m\u0101kon\u012b l\u012bdz\u0101s Odoo un savienojas ar to, izmantojot Odoo standarta \u0101r\u0113jo API.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai SkyPlanner aizst\u0101j Odoo Manufacturing?<\/summary>\n<p class=\"sp-faq__a\">N\u0113, tas papildina Odoo Manufacturing. Produkti, materi\u0101lu specifik\u0101cijas, kr\u0101jumi, iepirkumi, gr\u0101matved\u012bba un kr\u0101jumu papildin\u0101\u0161ana paliek Odoo p\u0101rzi\u0146\u0101. Odoo pl\u0101no, ko ra\u017eot, bet SkyPlanner \u2014 kad un kur, un p\u0113c tam nos\u016bta datumus atpaka\u013c.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cik SkyPlanner maks\u0101 ra\u017eot\u0101jam, kas izmanto Odoo?<\/summary>\n<p class=\"sp-faq__a\">No 199 \u20ac m\u0113nes\u012b par 5 darba centriem un v\u0113l 20 \u20ac m\u0113nes\u012b par katru papildu darba centru. Tiek skait\u012bti grafik\u0101 pl\u0101notie resursi, nevis Odoo lietot\u0101ji. J\u016bsu procesam un vajadz\u012bb\u0101m atbilsto\u0161u integr\u0101cijas cenu pied\u0101v\u0101jumu sagatavojam iepriek\u0161 kop\u0101 ar izv\u0113l\u0113t\u0101 pl\u0101na cenu, lai visas izmaksas b\u016btu zin\u0101mas pirms darba s\u0101k\u0161anas.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cik ilga ir ievie\u0161ana?<\/summary>\n<p class=\"sp-faq__a\">Ievie\u0161ana parasti tiek pabeigta da\u017eu ned\u0113\u013cu laik\u0101 p\u0113c t\u0101s uzs\u0101k\u0161anas. Komanda izveido darba centru un oper\u0101ciju atbilst\u012bbas, savieno pas\u016bt\u012bjumu un iepirkuma pas\u016bt\u012bjumu datus un nodro\u0161ina pl\u0101noto datumu nos\u016bt\u012b\u0161anu atpaka\u013c. Pirms darba uzs\u0101k\u0161anas viss tiek p\u0101rbaud\u012bts, sal\u012bdzinot ar j\u016bsu pa\u0161reiz\u0113jo pl\u0101nu.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai varam izm\u0113\u0123in\u0101t SkyPlanner pirms integr\u0101cijas ar Odoo?<\/summary>\n<p class=\"sp-faq__a\">J\u0101. 30 dienu izm\u0113\u0123in\u0101jum\u0101 varat izmantot no Odoo eksport\u0113tu Excel vai CSV failu. Jau pirms integr\u0101cijas darbu s\u0101k\u0161anas redz\u0113siet savu ra\u017eo\u0161anas pas\u016bt\u012bjumu grafiku, kas sast\u0101d\u012bts atbilsto\u0161i iek\u0101rtu un darbinieku faktiskajai pieejamajai jaudai.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Vai SkyPlanner izmanto\u0161anai ir nepiecie\u0161ams Odoo Enterprise?<\/summary>\n<p class=\"sp-faq__a\">N\u0113. Ra\u017eo\u0161anas pas\u016bt\u012bjumi, darba centri un materi\u0101lu specifik\u0101ciju oper\u0101cijas ir pieejamas ar\u012b Community versij\u0101, savuk\u0101rt SkyPlanner nodro\u0161ina Gantt diagrammu un ra\u017eo\u0161anas ceha skatu. Integr\u0101cija darbojas ar jebkuru Odoo vidi, kurai ir piek\u013cuve \u0101r\u0113jam API: Odoo.sh, lok\u0101li mitin\u0101tu Odoo vai Odoo Online ar Custom pl\u0101nu.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0101cijas \/ ERP \/ Odoo SkyPlanner APS Odoo lietot\u0101jiem: ra\u017eo\u0161anas pl\u0101no\u0161ana un integr\u0101cija SkyPlanner APS nodro\u0161ina ra\u017eot\u0101jiem, kas izmanto Odoo, vienotu grafiku, kur\u0101 \u0146emta v\u0113r\u0101 katra darba centra, operatora, instrumenta un materi\u0101la pieejam\u012bba. Visi atv\u0113rtie izgatavo\u0161anas pas\u016bt\u012bjumi tiek sak\u0101rtoti vien\u0101 pl\u0101n\u0101, un Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku, kad ra\u017eo\u0161an\u0101 notiek izmai\u0146as. skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana &#8230; <a title=\"SkyPlanner APS Odoo lietot\u0101jiem: ra\u017eo\u0161anas pl\u0101no\u0161ana un integr\u0101cija\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/odoo\/\" aria-label=\"Read more about SkyPlanner APS Odoo lietot\u0101jiem: ra\u017eo\u0161anas pl\u0101no\u0161ana un integr\u0101cija\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100678,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-100827","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Odoo ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana un APS integr\u0101cija | SkyPlanner<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS pl\u0101no Odoo darbus p\u0113c jaudas, cilv\u0113ku un materi\u0101lu pieejam\u012bbas, nos\u016bta datumus atpaka\u013c. No 199 \u20ac m\u0113nes\u012b, 30 dienu izm\u0113\u0123in\u0101jums.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/odoo\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SkyPlanner APS Odoo lietot\u0101jiem: ra\u017eo\u0161anas pl\u0101no\u0161ana un integr\u0101cija\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS pl\u0101no Odoo darbus p\u0113c jaudas, cilv\u0113ku un materi\u0101lu pieejam\u012bbas, nos\u016bta datumus atpaka\u013c. No 199 \u20ac m\u0113nes\u012b, 30 dienu izm\u0113\u0123in\u0101jums.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/odoo\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"11 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/odoo\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/odoo\\\/\",\"name\":\"Odoo ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana un APS integr\u0101cija | SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"datePublished\":\"2026-10-17T13:00:38+00:00\",\"description\":\"SkyPlanner APS pl\u0101no Odoo darbus p\u0113c jaudas, cilv\u0113ku un materi\u0101lu pieejam\u012bbas, nos\u016bta datumus atpaka\u013c. No 199 \u20ac m\u0113nes\u012b, 30 dienu izm\u0113\u0123in\u0101jums.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/odoo\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/odoo\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/odoo\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bsu ERP sist\u0113mai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/integracija\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS Odoo lietot\u0101jiem: ra\u017eo\u0161anas pl\u0101no\u0161ana un integr\u0101cija\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Odoo ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana un APS integr\u0101cija | SkyPlanner","description":"SkyPlanner APS pl\u0101no Odoo darbus p\u0113c jaudas, cilv\u0113ku un materi\u0101lu pieejam\u012bbas, nos\u016bta datumus atpaka\u013c. No 199 \u20ac m\u0113nes\u012b, 30 dienu izm\u0113\u0123in\u0101jums.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/odoo\/","og_locale":"lv_LV","og_type":"article","og_title":"SkyPlanner APS Odoo lietot\u0101jiem: ra\u017eo\u0161anas pl\u0101no\u0161ana un integr\u0101cija","og_description":"SkyPlanner APS pl\u0101no Odoo darbus p\u0113c jaudas, cilv\u0113ku un materi\u0101lu pieejam\u012bbas, nos\u016bta datumus atpaka\u013c. No 199 \u20ac m\u0113nes\u012b, 30 dienu izm\u0113\u0123in\u0101jums.","og_url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/odoo\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"11 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/odoo\/","url":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/odoo\/","name":"Odoo ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana un APS integr\u0101cija | SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"datePublished":"2026-10-17T13:00:38+00:00","description":"SkyPlanner APS pl\u0101no Odoo darbus p\u0113c jaudas, cilv\u0113ku un materi\u0101lu pieejam\u012bbas, nos\u016bta datumus atpaka\u013c. No 199 \u20ac m\u0113nes\u012b, 30 dienu izm\u0113\u0123in\u0101jums.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/odoo\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/integracija\/erp\/odoo\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/odoo\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"ERP un MES programmat\u016bras integr\u0101cijas ar SkyPlanner","item":"https:\/\/skyplanner.ai\/lv\/integracija\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bsu ERP sist\u0113mai","item":"https:\/\/skyplanner.ai\/lv\/integracija\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS Odoo lietot\u0101jiem: ra\u017eo\u0161anas pl\u0101no\u0161ana un integr\u0101cija"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lv\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0101cijas \/ ERP \/ Odoo SkyPlanner APS Odoo lietot\u0101jiem: ra\u017eo\u0161anas pl\u0101no\u0161ana un integr\u0101cija SkyPlanner APS nodro\u0161ina ra\u017eot\u0101jiem, kas izmanto Odoo, vienotu grafiku, kur\u0101 \u0146emta v\u0113r\u0101 katra darba centra, operatora, instrumenta un materi\u0101la pieejam\u012bba. Visi atv\u0113rtie izgatavo\u0161anas pas\u016bt\u012bjumi tiek sak\u0101rtoti vien\u0101 pl\u0101n\u0101, un Autopilot autom\u0101tiski p\u0101rpl\u0101no grafiku, kad ra\u017eo\u0161an\u0101 notiek izmai\u0146as. skyplanner.ai \u00b7 Ra\u017eo\u0161anas grafiku sast\u0101d\u012b\u0161ana&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/100827","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=100827"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/100827\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages\/100678"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=100827"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}