{"id":79067,"date":"2025-05-13T09:37:46","date_gmt":"2025-05-13T09:37:46","guid":{"rendered":"https:\/\/skyplanner.ai\/docs\/pasutit-preces\/"},"modified":"2025-10-08T07:15:24","modified_gmt":"2025-10-08T07:15:24","password":"","slug":"pasutit-preces","status":"publish","type":"docs","link":"https:\/\/skyplanner.ai\/lv\/docs\/pasutit-preces\/","title":{"rendered":"Pas\u016bt\u012bt preces"},"content":{"rendered":"\n<p>\u0160eit m\u0113s s\u012bk\u0101k aprakst\u012bsim pas\u016bt\u012bjumu elementu ieg\u016b\u0161anu, izveidi, atjaunin\u0101\u0161anu un dz\u0113\u0161anu.<\/p>\n\n<p>Pas\u016bt\u012bjuma vien\u012bb\u0101m var piek\u013c\u016bt no galapunkta <mark style=\"background-color:var(--contrast-3)\" class=\"has-inline-color\">\/phaser-order-rows<\/mark>.<\/p>\n\n<h4 class=\"wp-block-heading\" id=\"h-fetching-order-items\">Pas\u016bt\u012bjuma elementu ieg\u016b\u0161ana<\/h4>\n\n<p>Pas\u016bt\u012bjuma vienumus varat ieg\u016bt, nos\u016btot GET piepras\u012bjumu uz galapunktu <mark style=\"background-color:var(--contrast-3)\" class=\"has-inline-color\">\/phaser-order-rows<\/mark>:<\/p>\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"825\" height=\"995\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-5.png\" alt=\"\" class=\"wp-image-69594\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-5.png 825w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-5-249x300.png 249w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-5-768x926.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-5-360x434.png 360w\" sizes=\"(max-width: 825px) 100vw, 825px\" \/><figcaption class=\"wp-element-caption\"><strong>1. att\u0113ls.<\/strong>  Pas\u016bt\u012bjuma elementu ieg\u016b\u0161ana<\/figcaption><\/figure>\n\n<p>Pas\u016bt\u012bjuma vienumus var mekl\u0113t p\u0113c da\u017e\u0101diem parametriem:<\/p>\n\n<ul class=\"wp-block-list\">\n<li><strong>phaser_order_id  <\/strong>\n<ul class=\"wp-block-list\">\n<li>iek\u0161\u0113jo Skyplanner <strong>pas\u016bt\u012bjuma <\/strong>id, ko var atrast no <mark style=\"background-color:var(--contrast-3)\" class=\"has-inline-color\">\/phaser-orders-endpoint<\/mark>.<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>external_id<\/strong>\n<ul class=\"wp-block-list\">\n<li>Pas\u016bt\u012bjuma vien\u012bbas \u0101r\u0113jais identifikators<\/li>\n\n\n\n<li>Piem\u0113ram, \u0101r\u0113j\u0101s sist\u0113mas (ERP u. c.) unik\u0101lais identifikators.<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>production_planning_product_id<\/strong>\n<ul class=\"wp-block-list\">\n<li>Iek\u0161\u0113jais Skyplanner produkta id<\/li>\n\n\n\n<li>Var atrast no <mark style=\"background-color:var(--contrast-3)\" class=\"has-inline-color\">\/products-endpoint<\/mark><\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>parent_id<\/strong>\n<ul class=\"wp-block-list\">\n<li>Ja pas\u016bt\u012bjuma vien\u012bbai ir apak\u0161poz\u012bcijas (piem\u0113ram, apak\u0161produkti), apak\u0161poz\u012bcij\u0101m lauk\u0101 parent_id ir nor\u0101d\u012bts to vec\u0101k\u0101s pas\u016bt\u012bjuma poz\u012bcijas id.<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>row_index<\/strong>\n<ul class=\"wp-block-list\">\n<li>Pas\u016bt\u012bjuma poz\u012bcijas indeksa numurs<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"278\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-6-1024x278.png\" alt=\"\" class=\"wp-image-69624\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-6-1024x278.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-6-300x81.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-6-768x208.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-6-360x98.png 360w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-6.png 1238w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\"><strong>2. att\u0113ls.<\/strong>  Pas\u016bt\u012bjuma elementu rindu indeksi<\/figcaption><\/figure>\n\n<ul class=\"wp-block-list\">\n<li><strong>darba numurs<\/strong>\n<ul class=\"wp-block-list\">\n<li>Pas\u016bt\u012bjuma vien\u012bbas darba numura v\u0113rt\u012bba<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>statuss<\/strong>\n<ul class=\"wp-block-list\">\n<li>Pas\u016bt\u012bjuma poz\u012bcijas statuss<\/li>\n\n\n\n<li>At\u013caut\u0101s v\u0113rt\u012bbas: <strong>jauns<\/strong>, <strong>s\u0101kts<\/strong> vai <strong>pabeigts<\/strong><\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>poz\u012bcija<\/strong>\n<ul class=\"wp-block-list\">\n<li>Pas\u016bt\u012bjuma vien\u012bbas poz\u012bcijas v\u0113rt\u012bba<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"252\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-7-1024x252.png\" alt=\"\" class=\"wp-image-69653\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-7-1024x252.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-7-300x74.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-7-768x189.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-7-360x89.png 360w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-7.png 1225w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">3. att\u0113ls. Pas\u016bt\u012bjuma poz\u012bcijas v\u0113rt\u012bbas <\/figcaption><\/figure>\n\n<ul class=\"wp-block-list\">\n<li><strong>delivery_date<\/strong>\n<ul class=\"wp-block-list\">\n<li>Pas\u016bt\u012bjuma vien\u012bbas pieg\u0101des datums<\/li>\n\n\n\n<li>Form\u0101ts: <strong>2025-06-05T22:00:00+00:00<\/strong><\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>delivery_date_condition<\/strong>\n<ul class=\"wp-block-list\">\n<li>Pieg\u0101des datuma mekl\u0113\u0161anas izv\u0113les nosac\u012bjums<\/li>\n\n\n\n<li>Iesp\u0113jas: &gt;, =, &lt;=, =, =, !=<\/li>\n\n\n\n<li>Ja v\u0113rt\u012bba nav nor\u0101d\u012bta, tiks izmantots <strong>&gt;= nosac\u012bjums.<\/strong> <\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>is_prospect<\/strong>\n<ul class=\"wp-block-list\">\n<li>Atgrieziet tikai tos pas\u016bt\u012bjuma priek\u0161metus, kas ir perspekt\u012bvi<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>include_archived<\/strong>\n<ul class=\"wp-block-list\">\n<li>Arhiv\u0113to (m\u012bksti dz\u0113sto) pas\u016bt\u012bjumu elementu iek\u013cau\u0161ana atlas\u0113<\/li>\n\n\n\n<li>Apz\u012bm\u0113 ar <strong>is_archive<\/strong> v\u0113rt\u012bbu<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>modific\u0113ts<\/strong>\n<ul class=\"wp-block-list\">\n<li>Atgriezt pas\u016bt\u012bjuma vienumus, kas modific\u0113ti p\u0113c nor\u0101d\u012bt\u0101 datuma<\/li>\n\n\n\n<li>Form\u0101ts: <strong>2025-06-05T22:00:00+00:00<\/strong><\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>modifiedCondition<\/strong>\n<ul class=\"wp-block-list\">\n<li>Izv\u0113les nosac\u012bjums modific\u0113tu v\u0113rt\u012bbu mekl\u0113\u0161anai<\/li>\n\n\n\n<li>Iesp\u0113jas: &gt;, =, &lt;=, =, =, !=<\/li>\n\n\n\n<li>Ja v\u0113rt\u012bba nav nor\u0101d\u012bta, tiks izmantots <strong>&gt;= nosac\u012bjums.<\/strong> <\/li>\n<\/ul>\n<\/li>\n<\/ul>\n\n<p>Varat ar\u012b kombin\u0113t un saska\u0146ot mekl\u0113\u0161anas parametrus, piem\u0113ram, \u0161\u0101di:<\/p>\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"784\" height=\"777\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-8.png\" alt=\"\" class=\"wp-image-69732\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-8.png 784w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-8-300x297.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-8-150x150.png 150w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-8-768x761.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-8-360x357.png 360w\" sizes=\"(max-width: 784px) 100vw, 784px\" \/><figcaption class=\"wp-element-caption\"><strong>4. att\u0113ls. <\/strong>Pas\u016bt\u012bjuma elementu ieg\u016b\u0161ana p\u0113c <strong>phaser_order_id <\/strong>un <strong>row_index<\/strong><\/figcaption><\/figure>\n\n<p>Lai ieg\u016btu konkr\u0113tu pas\u016bt\u012bjuma elementu ar t\u0101 iek\u0161\u0113jo Skyplanner id, varat veikt \u0161\u0101du piepras\u012bjumu:<\/p>\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"621\" height=\"664\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-32.png\" alt=\"\" class=\"wp-image-70681\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-32.png 621w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-32-281x300.png 281w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-32-360x385.png 360w\" sizes=\"(max-width: 621px) 100vw, 621px\" \/><figcaption class=\"wp-element-caption\"><strong>5. att\u0113ls.<\/strong>  Pas\u016bt\u012bjuma vienuma ar Skyplanner id 4 ieg\u016b\u0161ana<\/figcaption><\/figure>\n\n<h4 class=\"wp-block-heading\" id=\"h-creating-order-items\">Pas\u016bt\u012bjuma elementu izveide<\/h4>\n\n<p>\u0145emiet v\u0113r\u0101, ka pirms pas\u016bt\u012bjuma vienuma izveides ir j\u0101izveido <strong>pas\u016bt\u012bjums<\/strong>!<\/p>\n\n<p>Lai izveidotu pas\u016bt\u012bjuma elementu, nos\u016btiet POST piepras\u012bjumu uz galapunktu <mark style=\"background-color:var(--contrast-3)\" class=\"has-inline-color\">\/phaser-order-rows<\/mark>:<\/p>\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"669\" height=\"1024\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-10-669x1024.png\" alt=\"\" class=\"wp-image-69818\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-10-669x1024.png 669w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-10-196x300.png 196w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-10-768x1175.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-10-335x512.png 335w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-10.png 815w\" sizes=\"(max-width: 669px) 100vw, 669px\" \/><figcaption class=\"wp-element-caption\"><strong>6.<\/strong> <strong>att\u0113ls.<\/strong> Pas\u016bt\u012bjuma vienuma izveide<\/figcaption><\/figure>\n\n<figure class=\"wp-block-image size-large is-resized\"><img decoding=\"async\" width=\"1024\" height=\"536\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-13-1024x536.png\" alt=\"\" class=\"wp-image-69909\" style=\"width:1024px;height:auto\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-13-1024x536.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-13-300x157.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-13-768x402.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-13-1536x803.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-13-360x188.png 360w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-13.png 1807w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\"><strong>7. att\u0113ls.<\/strong>  Izveidots pas\u016bt\u012bjuma vienums<\/figcaption><\/figure>\n\n<p>\u0160eit ir sniegts p\u0101rskats par laukiem, kurus varat izmantot, veidojot pas\u016bt\u012bjuma vienumu:<\/p>\n\n<ul class=\"wp-block-list\">\n<li><strong>phaser_order_id<\/strong>\n<ul class=\"wp-block-list\">\n<li>Iek\u0161\u0113jais Skyplanner id <strong>pas\u016bt\u012bjumam,<\/strong> kuram ir pievienots pas\u016bt\u012bjuma vienums.<\/li>\n\n\n\n<li><strong>Oblig\u0101tais lauks<\/strong><\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>production_planning_order_row_id<\/strong>\n<ul class=\"wp-block-list\">\n<li>P\u0113c pas\u016bt\u012bjuma eksport\u0113\u0161anas uz Skyplanner ra\u017eo\u0161anas pl\u0101no\u0161anas moduli tiek izveidota atsevi\u0161\u0137a vien\u012bba, ko sauc par <strong>ra\u017eo\u0161anas pl\u0101no\u0161anas pas\u016bt\u012bjuma rindu<\/strong>, un t\u0101s id tiek iestat\u012bts \u0161aj\u0101 lauk\u0101.<\/li>\n\n\n\n<li><strong>Nav ieteicams izmantot <\/strong>(atst\u0101jiet k\u0101 nulli vai visp\u0101r nes\u016btiet \u0161o lauku piepras\u012bjuma lauk\u0101).<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>production_planning_product_id<\/strong>\n<ul class=\"wp-block-list\">\n<li>Skyplanner produkta ID produktam, ko ra\u017eo pas\u016bt\u012bjuma vien\u012bba.<\/li>\n\n\n\n<li>Nepiecie\u0161ams, ja v\u0113laties izmantot noklus\u0113juma procesa so\u013cus no produkta.<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>external_id<\/strong>\n<ul class=\"wp-block-list\">\n<li>Pas\u016bt\u012bjuma vien\u012bbas unik\u0101lais identifikators<\/li>\n\n\n\n<li>Izmantojiet \u0161o vienumu, lai savienotu Skyplanner pas\u016bt\u012bjuma vienumu ar \u0101r\u0113j\u0101s sist\u0113mas (ERP u. c.) pas\u016bt\u012bjuma vienumu.<\/li>\n\n\n\n<li><strong>J\u0101b\u016bt unik\u0101lam<\/strong><\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>parent_id<\/strong>\n<ul class=\"wp-block-list\">\n<li>Ja pas\u016bt\u012bjuma vien\u012bba ir citas pas\u016bt\u012bjuma vien\u012bbas apak\u0161poz\u012bcija, \u0161eit nor\u0101diet vec\u0101k\u0101s vien\u012bbas id v\u0113rt\u012bbu.<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>row_index<\/strong>\n<ul class=\"wp-block-list\">\n<li>Kur pas\u016bt\u012bjuma vien\u012bbu sarakst\u0101 atrodas \u0161\u012b vien\u012bba.<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>darba numurs<\/strong>\n<ul class=\"wp-block-list\">\n<li>Izmanto tikai k\u0101 informat\u012bvu darba numura v\u0113rt\u012bbu pas\u016bt\u012bjuma vien\u012bbai.<\/li>\n\n\n\n<li>Nav redzams Skyplanner UI<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>statuss<\/strong>\n<ul class=\"wp-block-list\">\n<li>Pas\u016bt\u012bjuma vien\u012bbas statuss<\/li>\n\n\n\n<li>At\u013caut\u0101s v\u0113rt\u012bbas: <strong>jauns, s\u0101kts, gatavs, pak\u0101peniski<\/strong><\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>is_archive<\/strong>\n<ul class=\"wp-block-list\">\n<li>Vai pas\u016bt\u012bjuma vien\u012bba ir arhiv\u0113ta (viegli dz\u0113sta)<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>poz\u012bcija<\/strong>\n<ul class=\"wp-block-list\">\n<li>Pas\u016bt\u012bjuma poz\u012bcijas identifikatora v\u0113rt\u012bba (skat\u012bt 3. att\u0113lu).<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>summa<\/strong>\n<ul class=\"wp-block-list\">\n<li>Kop\u0113jais sara\u017eotais produkta daudzums<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>ordered_amount<\/strong>\n<ul class=\"wp-block-list\">\n<li>Pas\u016bt\u012btais produkta daudzums<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>cena<\/strong>\n<ul class=\"wp-block-list\">\n<li>Produkta vien\u012bbas cena<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>use_custom_materials<\/strong>\n<ul class=\"wp-block-list\">\n<li>Ja nev\u0113laties izmantot noklus\u0113juma materi\u0101lu iestat\u012bjumu no produkta datiem, iestatiet \u0161o v\u0113rt\u012bbu uz true.<\/li>\n\n\n\n<li>Noklus\u0113juma iestat\u012bjums: <strong>false<\/strong><\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>use_custom_materials_calculculated<\/strong>\n<ul class=\"wp-block-list\">\n<li>Custom materi\u0101lu daudzumi tiek apr\u0113\u0137in\u0101ti, pamatojoties uz sara\u017eoto produktu daudzumu.<\/li>\n\n\n\n<li>Ja iestat\u012bts uz false, materi\u0101lu daudzumi ir fiks\u0113ti<\/li>\n\n\n\n<li>Noklus\u0113juma iestat\u012bjums: <strong>false<\/strong><\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>get_default_steps<\/strong>\n<ul class=\"wp-block-list\">\n<li>Procesa so\u013cu izveide, lai pas\u016bt\u012btu preci, pamatojoties uz produkta noklus\u0113juma procesa so\u013ciem.<\/li>\n\n\n\n<li>Noklus\u0113juma iestat\u012bjums: <strong>false<\/strong><\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>use_calculated_job_durations<\/strong>\n<ul class=\"wp-block-list\">\n<li>Apr\u0113\u0137in\u0101t procesa posmu ilgumu, pamatojoties uz iepriek\u0161\u0113jiem laika re\u0123istra datiem.<\/li>\n\n\n\n<li>Ja nav pieejami pietiekami daudz datu, lai apr\u0113\u0137in\u0101tu, tiek izmantoti noklus\u0113juma ilgumi.<\/li>\n\n\n\n<li>Noklus\u0113juma iestat\u012bjums: <strong>false<\/strong><\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>sub_items<\/strong>\n<ul class=\"wp-block-list\">\n<li>Izveidot ar\u012b produkta apak\u0161poz\u012bcijas, ja t\u0101das ir pieejamas<\/li>\n\n\n\n<li>Noklus\u0113juma iestat\u012bjums: <strong>false<\/strong><\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>delivery_date<\/strong>\n<ul class=\"wp-block-list\">\n<li>Form\u0101ts: 2022-01-01 10:30:11<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>start_eligibility_date<\/strong>\n<ul class=\"wp-block-list\">\n<li>Form\u0101ts: 2022-01-01 10:30:11<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>drawing_identifier<\/strong>\n<ul class=\"wp-block-list\">\n<li>Z\u012bm\u0113jums\/z\u012bm\u0113jums\/instrukciju identifikators<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>apraksts<\/strong>\n<ul class=\"wp-block-list\">\n<li>Pas\u016bt\u012bjuma poz\u012bcijas apraksts<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>additional_description<\/strong>\n<ul class=\"wp-block-list\">\n<li>Pas\u016bt\u012bjuma poz\u012bcijas papildu apraksts<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>is_prospect<\/strong>\n<ul class=\"wp-block-list\">\n<li>Vai pas\u016bt\u012bjuma vien\u012bba ir perspekt\u012bva<\/li>\n\n\n\n<li>Noklus\u0113juma iestat\u012bjums: <strong>false<\/strong><\/li>\n<\/ul>\n<\/li>\n<\/ul>\n\n<h4 class=\"wp-block-heading\" id=\"h-updating-order-items\">Pas\u016bt\u012bjuma elementu atjaunin\u0101\u0161ana<\/h4>\n\n<p>Lai atjaunin\u0101tu pas\u016bt\u012bjuma elementu datus, varat nos\u016bt\u012bt PUT piepras\u012bjumu uz <mark style=\"background-color:var(--contrast-3)\" class=\"has-inline-color\">\/phaser-order-rows<\/mark> galapunktu:<\/p>\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"802\" height=\"1000\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-17.png\" alt=\"\" class=\"wp-image-70065\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-17.png 802w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-17-241x300.png 241w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-17-768x958.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-17-360x449.png 360w\" sizes=\"(max-width: 802px) 100vw, 802px\" \/><figcaption class=\"wp-element-caption\"><strong>8. att\u0113ls.  <\/strong>Pas\u016bt\u012bjuma vienuma atjaunin\u0101\u0161ana<\/figcaption><\/figure>\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"536\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-15-1024x536.png\" alt=\"\" class=\"wp-image-70003\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-15-1024x536.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-15-300x157.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-15-768x402.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-15-1536x804.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-15-360x188.png 360w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-15.png 1816w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\"><strong>9. att\u0113ls.  <\/strong>Atjaunin\u0101ts pas\u016bt\u012bjuma vienums<\/figcaption><\/figure>\n\n<h4 class=\"wp-block-heading\" id=\"h-deleting-order-items\">Pas\u016bt\u012bjuma vien\u012bbu dz\u0113\u0161ana<\/h4>\n\n<p>Pas\u016bt\u012bjuma elementu dz\u0113\u0161ana tiek veikta, izmantojot &#8220;maig\u0101s dz\u0113\u0161anas&#8221; metodi. Faktiski, dz\u0113\u0161ot pas\u016bt\u012bjuma elementu, t\u0101 <strong>is_archive<\/strong> v\u0113rt\u012bba tiek main\u012bta uz true. Tas noz\u012bm\u0113, ka var atjaunot izdz\u0113stos pas\u016bt\u012bjuma vienumus, atjauninot is_archive v\u0113rt\u012bbu uz false.  <\/p>\n\n<p>Dz\u0113\u0161ot pas\u016bt\u012bjuma vien\u012bbu, sist\u0113ma dz\u0113s\u012bs ar\u012b saist\u012btos procesa so\u013cus.<\/p>\n\n<p>Pas\u016bt\u012bjuma vienumus var dz\u0113st, nos\u016btot DELETE piepras\u012bjumu uz <mark style=\"background-color:var(--contrast-3)\" class=\"has-inline-color\">\/phaser-order-rows<\/mark> galapunktu:<\/p>\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"675\" height=\"633\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-19.png\" alt=\"\" class=\"wp-image-70149\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-19.png 675w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-19-300x281.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-19-360x338.png 360w\" sizes=\"(max-width: 675px) 100vw, 675px\" \/><figcaption class=\"wp-element-caption\"><strong>10. att\u0113ls.  <\/strong>Pas\u016bt\u012bjuma vien\u012bbu dz\u0113\u0161ana<\/figcaption><\/figure>\n\n<p>J\u016bs varat dz\u0113st pas\u016bt\u012bjuma vienumus, nor\u0101dot iek\u0161\u0113jos Skyplanner id mas\u012bv\u0101 <strong>&#8220;ids<\/strong> &#8221; vai \u0101r\u0113jos_id mas\u012bv\u0101 <strong>&#8220;external_ids<\/strong> &#8220;.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>\u0160eit m\u0113s s\u012bk\u0101k aprakst\u012bsim pas\u016bt\u012bjumu elementu ieg\u016b\u0161anu, izveidi, atjaunin\u0101\u0161anu un dz\u0113\u0161anu. Pas\u016bt\u012bjuma vien\u012bb\u0101m var piek\u013c\u016bt no galapunkta \/phaser-order-rows. Pas\u016bt\u012bjuma elementu ieg\u016b\u0161ana Pas\u016bt\u012bjuma vienumus varat ieg\u016bt, nos\u016btot GET piepras\u012bjumu uz galapunktu \/phaser-order-rows: Pas\u016bt\u012bjuma vienumus var mekl\u0113t p\u0113c da\u017e\u0101diem parametriem: Varat ar\u012b kombin\u0113t un saska\u0146ot mekl\u0113\u0161anas parametrus, piem\u0113ram, \u0161\u0101di: Lai ieg\u016btu konkr\u0113tu pas\u016bt\u012bjuma elementu ar t\u0101 iek\u0161\u0113jo &#8230; <a title=\"Pas\u016bt\u012bt preces\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lv\/docs\/pasutit-preces\/\" aria-label=\"Read more about Pas\u016bt\u012bt preces\">Read more<\/a><\/p>\n","protected":false},"author":8,"featured_media":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"doc_category":[645],"doc_tag":[646,1527],"class_list":["post-79067","docs","type-docs","status-publish","hentry","doc_category-integracija","doc_tag-api-lv","doc_tag-integracija-lv"],"acf":[],"year_month":"2026-11","word_count":1134,"total_views":"198","reactions":{"happy":"0","normal":"0","sad":"0"},"author_info":{"name":"Sami","author_nicename":"sami","author_url":"https:\/\/skyplanner.ai\/lv\/author\/sami\/"},"doc_category_info":[{"term_name":"Integr\u0101cija","term_url":"https:\/\/skyplanner.ai\/lv\/docs-category\/integracija\/"}],"doc_tag_info":[{"term_name":"API","term_url":"https:\/\/skyplanner.ai\/lv\/docs-tag\/api-lv\/"},{"term_name":"Integr\u0101cija","term_url":"https:\/\/skyplanner.ai\/lv\/docs-tag\/integracija-lv\/"}],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Pas\u016bt\u012bt preces &#8211; SkyPlanner<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lv\/docs\/pasutit-preces\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Pas\u016bt\u012bt preces\" \/>\n<meta property=\"og:description\" content=\"\u0160eit m\u0113s s\u012bk\u0101k aprakst\u012bsim pas\u016bt\u012bjumu elementu ieg\u016b\u0161anu, izveidi, atjaunin\u0101\u0161anu un dz\u0113\u0161anu. Pas\u016bt\u012bjuma vien\u012bb\u0101m var piek\u013c\u016bt no galapunkta \/phaser-order-rows. Pas\u016bt\u012bjuma elementu ieg\u016b\u0161ana Pas\u016bt\u012bjuma vienumus varat ieg\u016bt, nos\u016btot GET piepras\u012bjumu uz galapunktu \/phaser-order-rows: Pas\u016bt\u012bjuma vienumus var mekl\u0113t p\u0113c da\u017e\u0101diem parametriem: Varat ar\u012b kombin\u0113t un saska\u0146ot mekl\u0113\u0161anas parametrus, piem\u0113ram, \u0161\u0101di: Lai ieg\u016btu konkr\u0113tu pas\u016bt\u012bjuma elementu ar t\u0101 iek\u0161\u0113jo ... Read more\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lv\/docs\/pasutit-preces\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:modified_time\" content=\"2025-10-08T07:15:24+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-5.png\" \/>\n\t<meta property=\"og:image:width\" content=\"825\" \/>\n\t<meta property=\"og:image:height\" content=\"995\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"6 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/docs\\\/pasutit-preces\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/docs\\\/pasutit-preces\\\/\",\"name\":\"Pas\u016bt\u012bt preces &#8211; SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/docs\\\/pasutit-preces\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/docs\\\/pasutit-preces\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2025\\\/05\\\/image-5.png\",\"datePublished\":\"2025-05-13T09:37:46+00:00\",\"dateModified\":\"2025-10-08T07:15:24+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/docs\\\/pasutit-preces\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/docs\\\/pasutit-preces\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/docs\\\/pasutit-preces\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2025\\\/05\\\/image-5.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2025\\\/05\\\/image-5.png\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/docs\\\/pasutit-preces\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Docs\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/docs\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Pas\u016bt\u012bt preces\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lv\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Pas\u016bt\u012bt preces &#8211; SkyPlanner","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lv\/docs\/pasutit-preces\/","og_locale":"lv_LV","og_type":"article","og_title":"Pas\u016bt\u012bt preces","og_description":"\u0160eit m\u0113s s\u012bk\u0101k aprakst\u012bsim pas\u016bt\u012bjumu elementu ieg\u016b\u0161anu, izveidi, atjaunin\u0101\u0161anu un dz\u0113\u0161anu. Pas\u016bt\u012bjuma vien\u012bb\u0101m var piek\u013c\u016bt no galapunkta \/phaser-order-rows. Pas\u016bt\u012bjuma elementu ieg\u016b\u0161ana Pas\u016bt\u012bjuma vienumus varat ieg\u016bt, nos\u016btot GET piepras\u012bjumu uz galapunktu \/phaser-order-rows: Pas\u016bt\u012bjuma vienumus var mekl\u0113t p\u0113c da\u017e\u0101diem parametriem: Varat ar\u012b kombin\u0113t un saska\u0146ot mekl\u0113\u0161anas parametrus, piem\u0113ram, \u0161\u0101di: Lai ieg\u016btu konkr\u0113tu pas\u016bt\u012bjuma elementu ar t\u0101 iek\u0161\u0113jo ... Read more","og_url":"https:\/\/skyplanner.ai\/lv\/docs\/pasutit-preces\/","og_site_name":"SkyPlanner","article_modified_time":"2025-10-08T07:15:24+00:00","og_image":[{"width":825,"height":995,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-5.png","type":"image\/png"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"6 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lv\/docs\/pasutit-preces\/","url":"https:\/\/skyplanner.ai\/lv\/docs\/pasutit-preces\/","name":"Pas\u016bt\u012bt preces &#8211; SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lv\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/lv\/docs\/pasutit-preces\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/docs\/pasutit-preces\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-5.png","datePublished":"2025-05-13T09:37:46+00:00","dateModified":"2025-10-08T07:15:24+00:00","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lv\/docs\/pasutit-preces\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lv\/docs\/pasutit-preces\/"]}]},{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/docs\/pasutit-preces\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-5.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/05\/image-5.png"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lv\/docs\/pasutit-preces\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lv\/"},{"@type":"ListItem","position":2,"name":"Docs","item":"https:\/\/skyplanner.ai\/lv\/docs\/"},{"@type":"ListItem","position":3,"name":"Pas\u016bt\u012bt preces"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lv\/#website","url":"https:\/\/skyplanner.ai\/lv\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lv\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lv\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lv\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lv\/","logo":{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lv\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Sami","author_link":"https:\/\/skyplanner.ai\/lv\/author\/sami\/"},"uagb_comment_info":0,"uagb_excerpt":"\u0160eit m\u0113s s\u012bk\u0101k aprakst\u012bsim pas\u016bt\u012bjumu elementu ieg\u016b\u0161anu, izveidi, atjaunin\u0101\u0161anu un dz\u0113\u0161anu. Pas\u016bt\u012bjuma vien\u012bb\u0101m var piek\u013c\u016bt no galapunkta \/phaser-order-rows. Pas\u016bt\u012bjuma elementu ieg\u016b\u0161ana Pas\u016bt\u012bjuma vienumus varat ieg\u016bt, nos\u016btot GET piepras\u012bjumu uz galapunktu \/phaser-order-rows: Pas\u016bt\u012bjuma vienumus var mekl\u0113t p\u0113c da\u017e\u0101diem parametriem: Varat ar\u012b kombin\u0113t un saska\u0146ot mekl\u0113\u0161anas parametrus, piem\u0113ram, \u0161\u0101di: Lai ieg\u016btu konkr\u0113tu pas\u016bt\u012bjuma elementu ar t\u0101 iek\u0161\u0113jo&hellip;","knowledge_base_info":[],"knowledge_base_slug":[],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/docs\/79067","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/docs"}],"about":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types\/docs"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments?post=79067"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/docs\/79067\/revisions"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media?parent=79067"}],"wp:term":[{"taxonomy":"doc_category","embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/doc_category?post=79067"},{"taxonomy":"doc_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/doc_tag?post=79067"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}