{"name":"SkyPlanner","description":"AI-powered production scheduling and planning software","url":"https:\/\/skyplanner.ai","home":"https:\/\/skyplanner.ai\/lv\/","gmt_offset":"0","timezone_string":"","page_for_posts":0,"page_on_front":7749,"show_on_front":"page","namespaces":["oembed\/1.0","wpml\/v1","betterdocs\/v1","generateblocks\/v1","generatepress-pro\/v1","generatepress-site-library\/v1","yoast\/v1","wpml\/st\/v1","ldlms\/v1","ldlms\/v2","learndash\/v1","wpml\/tm\/v1","wpml\/ate\/v1","spectra\/v1","uag\/v1","generatepress\/v1","betterdocs","betterdocs-pro\/v1","learndashCourseReviews\/v1","ld-propanel\/v1","otgs\/installer\/v1","zipwp-images\/v1","nps-survey\/v1","zipwp\/v1","gutenberg-templates\/v1","wpforms\/v1","wp\/v2","wp-site-health\/v1","wp-block-editor\/v1","wp-abilities\/v1"],"authentication":{"application-passwords":{"endpoints":{"authorization":"https:\/\/skyplanner.ai\/wp-admin\/authorize-application.php"}}},"routes":{"\/":{"namespace":"","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"default":"view","required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/"}]}},"\/batch\/v1":{"namespace":"","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"validation":{"type":"string","enum":["require-all-validate","normal"],"default":"normal","required":false},"requests":{"type":"array","maxItems":25,"items":{"type":"object","properties":{"method":{"type":"string","enum":["POST","PUT","PATCH","DELETE"],"default":"POST"},"path":{"type":"string","required":true},"body":{"type":"object","properties":[],"additionalProperties":true},"headers":{"type":"object","properties":[],"additionalProperties":{"type":["string","array"],"items":{"type":"string"}}}}},"required":true}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/batch\/v1"}]}},"\/oembed\/1.0":{"namespace":"oembed\/1.0","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"oembed\/1.0","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/oembed\/1.0"}]}},"\/oembed\/1.0\/embed":{"namespace":"oembed\/1.0","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"url":{"description":"The URL of the resource for which to fetch oEmbed data.","type":"string","format":"uri","required":true},"format":{"default":"json","required":false},"maxwidth":{"default":600,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/oembed\/1.0\/embed"}]}},"\/oembed\/1.0\/proxy":{"namespace":"oembed\/1.0","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"url":{"description":"The URL of the resource for which to fetch oEmbed data.","type":"string","format":"uri","required":true},"format":{"description":"The oEmbed format to use.","type":"string","default":"json","enum":["json","xml"],"required":false},"maxwidth":{"description":"The maximum width of the embed frame in pixels.","type":"integer","default":600,"required":false},"maxheight":{"description":"The maximum height of the embed frame in pixels.","type":"integer","required":false},"discover":{"description":"Whether to perform an oEmbed discovery request for unsanctioned providers.","type":"boolean","default":true,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/oembed\/1.0\/proxy"}]}},"\/wpml\/v1":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wpml\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wpml\/v1"}]}},"\/wpml\/v1\/custom-xml-config":{"namespace":"wpml\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wpml\/v1\/custom-xml-config"}]}},"\/wpml\/v1\/custom-xml-config\/validate":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wpml\/v1\/custom-xml-config\/validate"}]}},"\/betterdocs\/v1":{"namespace":"betterdocs\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"betterdocs\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/betterdocs\/v1"}]}},"\/betterdocs\/v1\/doc-categories":{"namespace":"betterdocs\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"password":{"description":"The password for password-protected docs.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/betterdocs\/v1\/doc-categories"}]}},"\/betterdocs\/v1\/doc-categories-kb":{"namespace":"betterdocs\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/betterdocs\/v1\/doc-categories-kb"}]}},"\/betterdocs\/v1\/search":{"namespace":"betterdocs\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"password":{"description":"The password for password-protected docs.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/betterdocs\/v1\/search"}]}},"\/betterdocs\/v1\/search-insert":{"namespace":"betterdocs\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/betterdocs\/v1\/search-insert"}]}},"\/betterdocs\/v1\/get-terms":{"namespace":"betterdocs\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/betterdocs\/v1\/get-terms"}]}},"\/betterdocs\/v1\/months-with-posts":{"namespace":"betterdocs\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/betterdocs\/v1\/months-with-posts"}]}},"\/betterdocs\/v1\/order_docs":{"namespace":"betterdocs\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"password":{"description":"The password for password-protected docs.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/betterdocs\/v1\/order_docs"}]}},"\/betterdocs\/v1\/docs-faq-count":{"namespace":"betterdocs\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/betterdocs\/v1\/docs-faq-count"}]}},"\/betterdocs\/v1\/faq-terms-by-keyword-search":{"namespace":"betterdocs\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"password":{"description":"The password for password-protected FAQs.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/betterdocs\/v1\/faq-terms-by-keyword-search"}]}},"\/betterdocs\/v1\/faq-accordion-toggle":{"namespace":"betterdocs\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/betterdocs\/v1\/faq-accordion-toggle"}]}},"\/betterdocs\/v1\/feedback\/(?P<id>\\d+)":{"namespace":"betterdocs\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"id":{"type":"integer","default":null,"required":false},"feelings":{"type":"string","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/betterdocs\/v1\/settings":{"namespace":"betterdocs\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/betterdocs\/v1\/settings"}]}},"\/betterdocs\/v1\/dark-mode":{"namespace":"betterdocs\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/betterdocs\/v1\/dark-mode"}]}},"\/betterdocs\/v1\/plugin_insights":{"namespace":"betterdocs\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/betterdocs\/v1\/plugin_insights"}]}},"\/betterdocs\/v1\/create-sample-docs":{"namespace":"betterdocs\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/betterdocs\/v1\/create-sample-docs"}]}},"\/betterdocs\/v1\/reporting-test":{"namespace":"betterdocs\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/betterdocs\/v1\/reporting-test"}]}},"\/betterdocs\/v1\/export-docs":{"namespace":"betterdocs\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/betterdocs\/v1\/export-docs"}]}},"\/betterdocs\/v1\/export-settings":{"namespace":"betterdocs\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/betterdocs\/v1\/export-settings"}]}},"\/betterdocs\/v1\/import-docs":{"namespace":"betterdocs\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/betterdocs\/v1\/import-docs"}]}},"\/betterdocs\/v1\/import-settings":{"namespace":"betterdocs\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/betterdocs\/v1\/import-settings"}]}},"\/betterdocs\/v1\/parse-xml":{"namespace":"betterdocs\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/betterdocs\/v1\/parse-xml"}]}},"\/betterdocs\/v1\/parse-csv":{"namespace":"betterdocs\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/betterdocs\/v1\/parse-csv"}]}},"\/betterdocs\/v1\/migrate":{"namespace":"betterdocs\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/betterdocs\/v1\/migrate"}]}},"\/betterdocs\/v1\/helpscout-migration":{"namespace":"betterdocs\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/betterdocs\/v1\/helpscout-migration"}]}},"\/betterdocs\/v1\/dashboard-mode":{"namespace":"betterdocs\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/betterdocs\/v1\/dashboard-mode"}]}},"\/generateblocks\/v1":{"namespace":"generateblocks\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"generateblocks\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/generateblocks\/v1"}]}},"\/generateblocks\/v1\/settings":{"namespace":"generateblocks\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/generateblocks\/v1\/settings"}]}},"\/generateblocks\/v1\/setting":{"namespace":"generateblocks\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/generateblocks\/v1\/setting"}]}},"\/generateblocks\/v1\/regenerate_css_files":{"namespace":"generateblocks\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/generateblocks\/v1\/regenerate_css_files"}]}},"\/generateblocks\/v1\/onboarding":{"namespace":"generateblocks\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/generateblocks\/v1\/onboarding"}]}},"\/generateblocks\/v1\/get-attachment-by-url":{"namespace":"generateblocks\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/generateblocks\/v1\/get-attachment-by-url"}]}},"\/generateblocks\/v1\/get-wp-query":{"namespace":"generateblocks\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/generateblocks\/v1\/get-wp-query"}]}},"\/generateblocks\/v1\/get-user-query":{"namespace":"generateblocks\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/generateblocks\/v1\/get-user-query"}]}},"\/generateblocks\/v1\/meta\/get-post-meta":{"namespace":"generateblocks\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/generateblocks\/v1\/meta\/get-post-meta"}]}},"\/generateblocks\/v1\/meta\/get-user-meta":{"namespace":"generateblocks\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/generateblocks\/v1\/meta\/get-user-meta"}]}},"\/generateblocks\/v1\/meta\/get-term-meta":{"namespace":"generateblocks\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/generateblocks\/v1\/meta\/get-term-meta"}]}},"\/generateblocks\/v1\/meta\/get-option":{"namespace":"generateblocks\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/generateblocks\/v1\/meta\/get-option"}]}},"\/generateblocks\/v1\/pattern-library\/libraries":{"namespace":"generateblocks\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/generateblocks\/v1\/pattern-library\/libraries"}]}},"\/generateblocks\/v1\/pattern-library\/libraries\/save":{"namespace":"generateblocks\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/generateblocks\/v1\/pattern-library\/libraries\/save"}]}},"\/generateblocks\/v1\/pattern-library\/categories":{"namespace":"generateblocks\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/generateblocks\/v1\/pattern-library\/categories"}]}},"\/generateblocks\/v1\/pattern-library\/patterns":{"namespace":"generateblocks\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/generateblocks\/v1\/pattern-library\/patterns"}]}},"\/generateblocks\/v1\/pattern-library\/get-cache-data":{"namespace":"generateblocks\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/generateblocks\/v1\/pattern-library\/get-cache-data"}]}},"\/generateblocks\/v1\/pattern-library\/clear-cache":{"namespace":"generateblocks\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/generateblocks\/v1\/pattern-library\/clear-cache"}]}},"\/generateblocks\/v1\/dynamic-tag-replacements":{"namespace":"generateblocks\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/generateblocks\/v1\/dynamic-tag-replacements"}]}},"\/generateblocks\/v1\/post-record":{"namespace":"generateblocks\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"postId":{"required":true},"load":{"required":false},"options":{"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/generateblocks\/v1\/post-record"}]}},"\/generateblocks\/v1\/get-user-record":{"namespace":"generateblocks\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"id":{"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/generateblocks\/v1\/get-user-record"}]}},"\/generatepress-pro\/v1":{"namespace":"generatepress-pro\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"generatepress-pro\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/generatepress-pro\/v1"}]}},"\/generatepress-pro\/v1\/modules":{"namespace":"generatepress-pro\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/generatepress-pro\/v1\/modules"}]}},"\/generatepress-pro\/v1\/license":{"namespace":"generatepress-pro\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/generatepress-pro\/v1\/license"}]}},"\/generatepress-pro\/v1\/beta":{"namespace":"generatepress-pro\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/generatepress-pro\/v1\/beta"}]}},"\/generatepress-pro\/v1\/export":{"namespace":"generatepress-pro\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/generatepress-pro\/v1\/export"}]}},"\/generatepress-pro\/v1\/import":{"namespace":"generatepress-pro\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/generatepress-pro\/v1\/import"}]}},"\/generatepress-pro\/v1\/reset":{"namespace":"generatepress-pro\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/generatepress-pro\/v1\/reset"}]}},"\/generatepress-site-library\/v1":{"namespace":"generatepress-site-library\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"generatepress-site-library\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/generatepress-site-library\/v1"}]}},"\/generatepress-site-library\/v1\/get_sites":{"namespace":"generatepress-site-library\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/generatepress-site-library\/v1\/get_sites"}]}},"\/generatepress-site-library\/v1\/get_site_data":{"namespace":"generatepress-site-library\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/generatepress-site-library\/v1\/get_site_data"}]}},"\/generatepress-site-library\/v1\/import_theme_options":{"namespace":"generatepress-site-library\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/generatepress-site-library\/v1\/import_theme_options"}]}},"\/generatepress-site-library\/v1\/activate_plugins":{"namespace":"generatepress-site-library\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/generatepress-site-library\/v1\/activate_plugins"}]}},"\/generatepress-site-library\/v1\/import_content":{"namespace":"generatepress-site-library\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/generatepress-site-library\/v1\/import_content"}]}},"\/generatepress-site-library\/v1\/import_site_options":{"namespace":"generatepress-site-library\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/generatepress-site-library\/v1\/import_site_options"}]}},"\/generatepress-site-library\/v1\/import_widgets":{"namespace":"generatepress-site-library\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/generatepress-site-library\/v1\/import_widgets"}]}},"\/generatepress-site-library\/v1\/restore_theme_options":{"namespace":"generatepress-site-library\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/generatepress-site-library\/v1\/restore_theme_options"}]}},"\/generatepress-site-library\/v1\/restore_content":{"namespace":"generatepress-site-library\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/generatepress-site-library\/v1\/restore_content"}]}},"\/yoast\/v1":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"yoast\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/yoast\/v1"}]}},"\/yoast\/v1\/file_size":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"url":{"type":"string","description":"The url to retrieve","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/yoast\/v1\/file_size"}]}},"\/yoast\/v1\/statistics":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/yoast\/v1\/statistics"}]}},"\/yoast\/v1\/ai_generator\/callback":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"access_jwt":{"type":"string","description":"The access JWT.","required":true},"refresh_jwt":{"type":"string","description":"The JWT to be used when the access JWT needs to be refreshed.","required":true},"code_challenge":{"type":"string","description":"The SHA266 of the verification code used to check the authenticity of a callback call.","required":true},"user_id":{"type":"integer","description":"The id of the user associated to the code verifier.","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/yoast\/v1\/ai_generator\/callback"}]}},"\/yoast\/v1\/ai_generator\/refresh_callback":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"access_jwt":{"type":"string","description":"The access JWT.","required":true},"refresh_jwt":{"type":"string","description":"The JWT to be used when the access JWT needs to be refreshed.","required":true},"code_challenge":{"type":"string","description":"The SHA266 of the verification code used to check the authenticity of a callback call.","required":true},"user_id":{"type":"integer","description":"The id of the user associated to the code verifier.","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/yoast\/v1\/ai_generator\/refresh_callback"}]}},"\/yoast\/v1\/ai_generator\/consent":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"consent":{"type":"boolean","description":"Whether the consent to use AI-based services has been given by the user.","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/yoast\/v1\/ai_generator\/consent"}]}},"\/yoast\/v1\/ai\/free_sparks":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/yoast\/v1\/ai\/free_sparks"}]}},"\/yoast\/v1\/ai_generator\/bust_subscription_cache":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/yoast\/v1\/ai_generator\/bust_subscription_cache"}]}},"\/yoast\/v1\/ai_generator\/get_suggestions":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"type":{"type":"string","enum":["seo-title","meta-description","product-seo-title","product-meta-description","product-taxonomy-seo-title","product-taxonomy-meta-description","taxonomy-seo-title","taxonomy-meta-description"],"description":"The type of suggestion requested.","required":true},"prompt_content":{"type":"string","description":"The content needed by the prompt to ask for suggestions.","required":true},"focus_keyphrase":{"type":"string","description":"The focus keyphrase associated to the post.","required":true},"language":{"type":"string","description":"The language the post is written in.","required":true},"platform":{"type":"string","enum":["Google","Facebook","Twitter"],"description":"The platform the post is intended for.","required":true},"editor":{"type":"string","enum":["classic","elementor","gutenberg"],"description":"The current editor.","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/yoast\/v1\/ai_generator\/get_suggestions"}]}},"\/yoast\/v1\/ai_generator\/get_usage":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"is_woo_product_entity":{"type":"boolean","default":false,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/yoast\/v1\/ai_generator\/get_usage"}]}},"\/yoast\/v1\/new-content-type-visibility\/dismiss-post-type":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"postTypeName":{"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/yoast\/v1\/new-content-type-visibility\/dismiss-post-type"}]}},"\/yoast\/v1\/new-content-type-visibility\/dismiss-taxonomy":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"taxonomyName":{"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/yoast\/v1\/new-content-type-visibility\/dismiss-taxonomy"}]}},"\/yoast\/v1\/site_kit_configuration_permanent_dismissal":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"is_dismissed":{"type":"bool","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/yoast\/v1\/site_kit_configuration_permanent_dismissal"}]}},"\/yoast\/v1\/readability_scores":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"contentType":{"type":"string","required":true},"taxonomy":{"type":"string","default":"","required":false},"term":{"type":"integer","default":null,"required":false},"troubleshooting":{"type":"bool","default":null,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/yoast\/v1\/readability_scores"}]}},"\/yoast\/v1\/seo_scores":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"contentType":{"type":"string","required":true},"taxonomy":{"type":"string","default":"","required":false},"term":{"type":"integer","default":null,"required":false},"troubleshooting":{"type":"bool","default":null,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/yoast\/v1\/seo_scores"}]}},"\/yoast\/v1\/setup_steps_tracking":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"setup_widget_loaded":{"type":"string","enum":["yes","no"],"required":false},"first_interaction_stage":{"type":"string","enum":["install","activate","setup","grantConsent","successfullyConnected"],"required":false},"last_interaction_stage":{"type":"string","enum":["install","activate","setup","grantConsent","successfullyConnected"],"required":false},"setup_widget_temporarily_dismissed":{"type":"string","enum":["yes","no"],"required":false},"setup_widget_permanently_dismissed":{"type":"string","enum":["yes","no"],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/yoast\/v1\/setup_steps_tracking"}]}},"\/yoast\/v1\/introductions\/(?P<introduction_id>[\\w-]+)\/seen":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"introduction_id":{"type":"string","required":true},"is_seen":{"type":"bool","default":true,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/yoast\/v1\/wistia_embed_permission":{"namespace":"yoast\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"args":{"value":{"type":"bool","default":true,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/yoast\/v1\/wistia_embed_permission"}]}},"\/yoast\/v1\/available_posts":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"search":{"type":"string","default":"","required":false},"postType":{"type":"string","default":"page","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/yoast\/v1\/available_posts"}]}},"\/yoast\/v1\/alerts\/dismiss":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"key":{"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/yoast\/v1\/alerts\/dismiss"}]}},"\/yoast\/v1\/configuration\/site_representation":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"company_or_person":{"type":"string","enum":["company","person"],"required":true},"company_name":{"type":"string","required":false},"company_logo":{"type":"string","required":false},"company_logo_id":{"type":"integer","required":false},"person_logo":{"type":"string","required":false},"person_logo_id":{"type":"integer","required":false},"company_or_person_user_id":{"type":"integer","required":false},"description":{"type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/yoast\/v1\/configuration\/site_representation"}]}},"\/yoast\/v1\/configuration\/social_profiles":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"facebook_site":{"type":"string","required":false},"twitter_site":{"type":"string","required":false},"other_social_urls":{"type":"array","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/yoast\/v1\/configuration\/social_profiles"}]}},"\/yoast\/v1\/configuration\/check_capability":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"user_id":{"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/yoast\/v1\/configuration\/check_capability"}]}},"\/yoast\/v1\/configuration\/enable_tracking":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"tracking":{"type":"boolean","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/yoast\/v1\/configuration\/enable_tracking"}]}},"\/yoast\/v1\/configuration\/save_configuration_state":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"finishedSteps":{"type":"array","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/yoast\/v1\/configuration\/save_configuration_state"}]}},"\/yoast\/v1\/configuration\/get_configuration_state":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/yoast\/v1\/configuration\/get_configuration_state"}]}},"\/yoast\/v1\/import\/(?P<plugin>[\\w-]+)\/(?P<type>[\\w-]+)":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/yoast\/v1\/get_head":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"url":{"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/yoast\/v1\/get_head"}]}},"\/yoast\/v1\/indexing\/posts":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/yoast\/v1\/indexing\/posts"}]}},"\/yoast\/v1\/indexing\/terms":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/yoast\/v1\/indexing\/terms"}]}},"\/yoast\/v1\/indexing\/post-type-archives":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/yoast\/v1\/indexing\/post-type-archives"}]}},"\/yoast\/v1\/indexing\/general":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/yoast\/v1\/indexing\/general"}]}},"\/yoast\/v1\/indexing\/prepare":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/yoast\/v1\/indexing\/prepare"}]}},"\/yoast\/v1\/indexing\/indexables-complete":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/yoast\/v1\/indexing\/indexables-complete"}]}},"\/yoast\/v1\/indexing\/complete":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/yoast\/v1\/indexing\/complete"}]}},"\/yoast\/v1\/link-indexing\/posts":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/yoast\/v1\/link-indexing\/posts"}]}},"\/yoast\/v1\/link-indexing\/terms":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/yoast\/v1\/link-indexing\/terms"}]}},"\/yoast\/v1\/integrations\/set_active":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"active":{"type":"boolean","required":true},"integration":{"type":"string","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/yoast\/v1\/integrations\/set_active"}]}},"\/yoast\/v1\/meta\/search":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/yoast\/v1\/meta\/search"}]}},"\/yoast\/v1\/semrush\/authenticate":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"code":{"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/yoast\/v1\/semrush\/authenticate"}]}},"\/yoast\/v1\/semrush\/country_code":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"country_code":{"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/yoast\/v1\/semrush\/country_code"}]}},"\/yoast\/v1\/semrush\/related_keyphrases":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"keyphrase":{"required":true},"country_code":{"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/yoast\/v1\/semrush\/related_keyphrases"}]}},"\/yoast\/v1\/wincher\/authorization-url":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/yoast\/v1\/wincher\/authorization-url"}]}},"\/yoast\/v1\/wincher\/authenticate":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"code":{"required":true},"websiteId":{"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/yoast\/v1\/wincher\/authenticate"}]}},"\/yoast\/v1\/wincher\/keyphrases\/track":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"keyphrases":{"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/yoast\/v1\/wincher\/keyphrases\/track"}]}},"\/yoast\/v1\/wincher\/keyphrases":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"keyphrases":{"required":false},"permalink":{"required":false},"startAt":{"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/yoast\/v1\/wincher\/keyphrases"}]}},"\/yoast\/v1\/wincher\/keyphrases\/untrack":{"namespace":"yoast\/v1","methods":["DELETE"],"endpoints":[{"methods":["DELETE"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/yoast\/v1\/wincher\/keyphrases\/untrack"}]}},"\/yoast\/v1\/wincher\/account\/limit":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/yoast\/v1\/wincher\/account\/limit"}]}},"\/yoast\/v1\/wincher\/account\/upgrade-campaign":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/yoast\/v1\/wincher\/account\/upgrade-campaign"}]}},"\/yoast\/v1\/workouts":{"namespace":"yoast\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"args":{"cornerstone":{"required":true},"orphaned":{"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/yoast\/v1\/workouts"}]}},"\/yoast\/v1\/complete_task":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"options":{"type":"object","properties":{"task":{"type":"string","required":true,"sanitize_callback":"sanitize_text_field"}},"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/yoast\/v1\/complete_task"}]}},"\/yoast\/v1\/get_tasks":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"options":{"type":"object","properties":{"filter":{"type":"string","required":false,"sanitize_callback":"sanitize_text_field"},"limit":{"type":"int","required":false,"sanitize_callback":"absint"}},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/yoast\/v1\/get_tasks"}]}},"\/yoast\/v1\/action_tracking":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"action":{"type":"string","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/yoast\/v1\/action_tracking"}]}},"\/yoast\/v1\/ai\/optimize":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"assessment":{"type":"string","enum":["seo-keyphrase-introduction","seo-keyphrase-density","seo-keyphrase-distribution","seo-keyphrase-subheadings","read-sentence-length","read-paragraph-length"],"description":"The assessment.","required":true},"language":{"type":"string","description":"The language the post is written in.","required":true},"prompt_content":{"type":"string","description":"The content needed by the prompt to ask for suggestions.","required":true},"focus_keyphrase":{"type":"string","description":"The focus keyphrase associated to the post.","required":false},"synonyms":{"type":"string","description":"The synonyms for the focus keyphrase.","required":false},"editor":{"type":"string","enum":["Classic","Gutenberg"],"description":"The editor type, either Classic or Gutenberg.","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/yoast\/v1\/ai\/optimize"}]}},"\/yoast\/v1\/ai\/summarize":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"language":{"type":"string","description":"The language the post is written in.","required":true},"prompt_content":{"type":"string","description":"The content needed by the prompt to ask for a summary.","required":true},"focus_keyphrase":{"type":"string","description":"The focus keyphrase associated to the post.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/yoast\/v1\/ai\/summarize"}]}},"\/yoast\/v1\/link_suggestions":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"prominent_words":{"type":"object","description":"Stems of prominent words and their term frequencies we want link suggestions based on","required":true},"object_id":{"type":"integer","description":"The object id of the current indexable.","required":true},"object_type":{"type":"string","description":"The object type of the current indexable.","required":true},"limit":{"default":5,"type":"integer","description":"The maximum number of link suggestions to retrieve","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/yoast\/v1\/link_suggestions"}]}},"\/yoast\/v1\/prominent_words\/get_content":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/yoast\/v1\/prominent_words\/get_content"}]}},"\/yoast\/v1\/prominent_words\/complete":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/yoast\/v1\/prominent_words\/complete"}]}},"\/yoast\/v1\/prominent_words\/save":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"data":{"type":"array","items":{"type":"object","properties":{"object_id":{"type":"number","required":true},"prominent_words":{"type":"object","required":false}}},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/yoast\/v1\/prominent_words\/save"}]}},"\/yoast\/v1\/workouts\/noindex":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"object_id":{"type":"integer","required":true},"object_type":{"type":"string","required":true},"object_sub_type":{"type":"string","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/yoast\/v1\/workouts\/noindex"}]}},"\/yoast\/v1\/workouts\/remove_redirect":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"object_id":{"type":"integer","required":true},"object_type":{"type":"string","required":true},"object_sub_type":{"type":"string","required":true},"permalink":{"type":"string","required":true},"redirect_url":{"type":"string","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/yoast\/v1\/workouts\/remove_redirect"}]}},"\/yoast\/v1\/workouts\/link_suggestions":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"indexableId":{"type":"integer","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/yoast\/v1\/workouts\/link_suggestions"}]}},"\/yoast\/v1\/workouts\/last_updated":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"postId":{"type":"integer","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/yoast\/v1\/workouts\/last_updated"}]}},"\/yoast\/v1\/workouts\/cornerstone_data":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/yoast\/v1\/workouts\/cornerstone_data"}]}},"\/yoast\/v1\/workouts\/enable_cornerstone":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"object_id":{"type":"integer","required":true},"object_type":{"type":"string","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/yoast\/v1\/workouts\/enable_cornerstone"}]}},"\/wpml\/st\/v1":{"namespace":"wpml\/st\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wpml\/st\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wpml\/st\/v1"}]}},"\/wpml\/st\/v1\/strings\/settings":{"namespace":"wpml\/st\/v1","methods":["POST","GET"],"endpoints":[{"methods":["POST"],"args":{"autoregisterType":{"type":"integer","default":0,"required":false},"shouldRegisterBackendStrings":{"type":"integer","default":0,"required":false},"setNoticeThatCachePluginCanBlockAutoregisterAsDismissed":{"type":"integer","default":0,"required":false},"setDetectStringsInJS":{"type":"integer","default":0,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wpml\/st\/v1\/strings\/settings"}]}},"\/wpml\/st\/v1\/strings\/itemscount":{"namespace":"wpml\/st\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"kind":{"type":"integer","default":null,"required":false},"type":{"type":"string","required":false},"source":{"type":"integer","default":null,"required":false},"domain":{"type":"string","default":null,"required":false},"translationPriority":{"type":"string","default":null,"required":false},"title":{"type":"string","required":false},"sourceLanguageCode":{"type":"string","required":false},"targetLanguageCode":{"type":"string","required":false},"translationStatuses":{"default":[],"required":false},"limit":{"type":"integer","default":10,"required":false},"offset":{"type":"integer","default":0,"required":false},"sorting":{"default":null,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wpml\/st\/v1\/strings\/itemscount"}]}},"\/wpml\/st\/v1\/strings":{"namespace":"wpml\/st\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"kind":{"type":"integer","default":null,"required":false},"type":{"type":"string","required":false},"source":{"type":"integer","default":null,"required":false},"domain":{"type":"string","default":null,"required":false},"translationPriority":{"type":"string","default":null,"required":false},"title":{"type":"string","required":false},"sourceLanguageCode":{"type":"string","required":false},"targetLanguageCode":{"type":"string","required":false},"translationStatuses":{"default":[],"required":false},"limit":{"type":"integer","default":10,"required":false},"offset":{"type":"integer","default":0,"required":false},"sorting":{"default":null,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wpml\/st\/v1\/strings"}]}},"\/wpml\/st\/v1\/strings\/filters":{"namespace":"wpml\/st\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wpml\/st\/v1\/strings\/filters"}]}},"\/wpml\/st\/v1\/string-packages":{"namespace":"wpml\/st\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"type":{"type":"string","required":false},"title":{"type":"string","required":false},"sourceLanguageCode":{"type":"string","required":false},"targetLanguageCode":{"type":"string","required":false},"translationStatuses":{"default":[],"required":false},"limit":{"type":"integer","default":10,"required":false},"offset":{"type":"integer","default":0,"required":false},"sorting":{"default":null,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wpml\/st\/v1\/string-packages"}]}},"\/wpml\/st\/v1\/strings\/processstringsqueue":{"namespace":"wpml\/st\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wpml\/st\/v1\/strings\/processstringsqueue"}]}},"\/ldlms\/v1":{"namespace":"ldlms\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"ldlms\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/ldlms\/v1"}]}},"\/ldlms\/v1\/echo":{"namespace":"ldlms\/v1","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/ldlms\/v1\/echo"}]}},"\/ldlms\/v1\/sfwd-courses":{"namespace":"ldlms\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"menu_order":{"description":"Limit result set to posts with a specific menu_order value.","type":"integer","required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"title","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title","menu_order","rand","menu_order"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","acf-disabled","graded","not_graded","hidden","any"],"type":"string"},"required":false},"tax_relation":{"description":"Limit result set based on relationship between multiple taxonomies.","type":"string","enum":["AND","OR"],"required":false},"categories":{"description":"Limit result set to items with specific terms assigned in the categories taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"categories_exclude":{"description":"Limit result set to items except those with specific terms assigned in the categories taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false}},"additionalProperties":false}],"required":false},"tags":{"description":"Limit result set to items with specific terms assigned in the tags taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"tags_exclude":{"description":"Limit result set to items except those with specific terms assigned in the tags taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]}},"additionalProperties":false}],"required":false},"ld_course_category":{"description":"Limit result set to items with specific terms assigned in the ld_course_category taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"ld_course_category_exclude":{"description":"Limit result set to items except those with specific terms assigned in the ld_course_category taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false}},"additionalProperties":false}],"required":false},"ld_course_tag":{"description":"Limit result set to items with specific terms assigned in the ld_course_tag taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"ld_course_tag_exclude":{"description":"Limit result set to items except those with specific terms assigned in the ld_course_tag taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]}},"additionalProperties":false}],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","graded","not_graded","hidden"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"categories":{"description":"The terms assigned to the post in the category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tags":{"description":"The terms assigned to the post in the post_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"ld_course_category":{"description":"The terms assigned to the post in the ld_course_category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"ld_course_tag":{"description":"The terms assigned to the post in the ld_course_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"course_materials":{"description":"Course Materials","type":"html","required":false},"course_price_type":{"default":"open","description":"Course Price Type","type":"string","enum":["open","closed","free","buynow","subscribe"],"required":false},"custom_button_label":{"description":"Custom Button Label","type":"text","required":false},"custom_button_url":{"description":"Custom Button URL","type":"text","required":false},"course_price":{"description":"Course Price","type":"text","required":false},"course_prerequisite_enabled":{"default":false,"description":"Enable Course Prerequisites","type":"boolean","required":false},"course_prerequisite":{"default":[],"description":"Course Prerequisites","type":"array","required":false},"course_prerequisite_compare":{"default":"ANY","description":"Course Prerequisites Compare","type":"string","enum":["ANY","ALL"],"required":false},"course_points_enabled":{"description":"Enable Course Points","type":"boolean","required":false},"course_points":{"description":"Course Points","type":"number","required":false},"course_points_access":{"description":"Course Points Access","type":"number","required":false},"course_disable_lesson_progression":{"default":0,"description":"Disable Lesson Progression","type":"boolean","required":false},"expire_access":{"description":"Expire Access","type":"boolean","required":false},"expire_access_days":{"description":"Expire Access After (days)","type":"number","required":false},"expire_access_delete_progress":{"description":"Delete Course and Quiz Data After Expiration","type":"boolean","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/ldlms\/v1\/sfwd-courses"}]}},"\/ldlms\/v1\/sfwd-courses\/(?P<id>[\\d]+)":{"namespace":"ldlms\/v1","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Unique identifier for the object.","type":"integer","required":true},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"Unique identifier for the object.","type":"integer","required":true},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","graded","not_graded","hidden"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"categories":{"description":"The terms assigned to the post in the category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tags":{"description":"The terms assigned to the post in the post_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"ld_course_category":{"description":"The terms assigned to the post in the ld_course_category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"ld_course_tag":{"description":"The terms assigned to the post in the ld_course_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"course_materials":{"description":"Course Materials","type":"html","required":false},"course_price_type":{"description":"Course Price Type","type":"string","enum":["open","closed","free","buynow","subscribe"],"required":false},"custom_button_label":{"description":"Custom Button Label","type":"text","required":false},"custom_button_url":{"description":"Custom Button URL","type":"text","required":false},"course_price":{"description":"Course Price","type":"text","required":false},"course_prerequisite_enabled":{"description":"Enable Course Prerequisites","type":"boolean","required":false},"course_prerequisite":{"description":"Course Prerequisites","type":"array","required":false},"course_prerequisite_compare":{"description":"Course Prerequisites Compare","type":"string","enum":["ANY","ALL"],"required":false},"course_points_enabled":{"description":"Enable Course Points","type":"boolean","required":false},"course_points":{"description":"Course Points","type":"number","required":false},"course_points_access":{"description":"Course Points Access","type":"number","required":false},"course_disable_lesson_progression":{"description":"Disable Lesson Progression","type":"boolean","required":false},"expire_access":{"description":"Expire Access","type":"boolean","required":false},"expire_access_days":{"description":"Expire Access After (days)","type":"number","required":false},"expire_access_delete_progress":{"description":"Delete Course and Quiz Data After Expiration","type":"boolean","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"args":{"id":{"description":"Unique identifier for the object.","type":"integer","required":true},"force":{"type":"boolean","default":false,"description":"Whether to bypass trash and force deletion.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/ldlms\/v1\/sfwd-courses\/(?P<id>[\\d]+)\/steps":{"namespace":"ldlms\/v1","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Course ID to enroll user into.","type":"integer","required":true},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"type":{"description":"Filter returned results by step type.","type":"string","default":"all","enum":["all","h","l","t","r"],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"Course ID to enroll user into.","type":"integer","required":true},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"type":{"description":"Filter returned results by step type.","type":"string","default":"all","enum":["all","h","l","t","r"],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/ldlms\/v1\/sfwd-courses\/(?P<id>[\\d]+)\/users":{"namespace":"ldlms\/v1","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Course ID.","type":"integer","required":true},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"fields":{"description":"Returned values.","type":"string","default":"ids","enum":["ids","objects"],"required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"default":"asc","description":"Order sort attribute ascending or descending.","enum":["asc","desc"],"type":"string","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"roles":{"description":"Limit result set to users matching at least one specific role provided. Accepts csv list or single role.","type":"array","items":{"type":"string"},"required":false},"slug":{"description":"Limit result set to users with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"Course ID.","type":"integer","required":true},"user_ids":{"description":"User IDs to enroll into course. Limit 50 per request.","type":"array","items":{"type":"integer"},"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"args":{"id":{"description":"Course ID.","type":"integer","required":true},"user_ids":{"description":"User IDs to remove from group. Limit 50 per request.","type":"array","items":{"type":"integer"},"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/ldlms\/v1\/sfwd-courses\/(?P<id>[\\d]+)\/groups":{"namespace":"ldlms\/v1","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Course ID to enroll into.","type":"integer","required":true},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"fields":{"description":"Returned values.","type":"string","default":"ids","enum":["ids","objects"],"required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"title","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title","rand","menu_order"],"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"Course ID to enroll into.","type":"integer","required":true},"group_ids":{"description":"Group IDs to enroll into Course.","type":"array","items":{"type":"integer"},"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"args":{"id":{"description":"Course ID to enroll into.","type":"integer","required":true},"group_ids":{"description":"Group IDs to remove from Course.","type":"array","items":{"type":"integer"},"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/ldlms\/v1\/sfwd-lessons":{"namespace":"ldlms\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"menu_order":{"description":"Limit result set to posts with a specific menu_order value.","type":"integer","required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"title","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title","menu_order","rand","menu_order"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","acf-disabled","graded","not_graded","hidden","any"],"type":"string"},"required":false},"tax_relation":{"description":"Limit result set based on relationship between multiple taxonomies.","type":"string","enum":["AND","OR"],"required":false},"categories":{"description":"Limit result set to items with specific terms assigned in the categories taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"categories_exclude":{"description":"Limit result set to items except those with specific terms assigned in the categories taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false}},"additionalProperties":false}],"required":false},"tags":{"description":"Limit result set to items with specific terms assigned in the tags taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"tags_exclude":{"description":"Limit result set to items except those with specific terms assigned in the tags taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]}},"additionalProperties":false}],"required":false},"ld_lesson_category":{"description":"Limit result set to items with specific terms assigned in the ld_lesson_category taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"ld_lesson_category_exclude":{"description":"Limit result set to items except those with specific terms assigned in the ld_lesson_category taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false}},"additionalProperties":false}],"required":false},"ld_lesson_tag":{"description":"Limit result set to items with specific terms assigned in the ld_lesson_tag taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"ld_lesson_tag_exclude":{"description":"Limit result set to items except those with specific terms assigned in the ld_lesson_tag taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]}},"additionalProperties":false}],"required":false},"course":{"description":"Limit results to be within a specific Course. Required for non-admin users.","type":"integer","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","graded","not_graded","hidden"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"categories":{"description":"The terms assigned to the post in the category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tags":{"description":"The terms assigned to the post in the post_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"ld_lesson_category":{"description":"The terms assigned to the post in the ld_lesson_category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"ld_lesson_tag":{"description":"The terms assigned to the post in the ld_lesson_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"lesson_materials":{"description":"Lesson Materials","type":"html","required":false},"forced_lesson_time":{"default":"","description":"Forced Lesson Timer","type":"text","required":false},"lesson_assignment_upload":{"default":0,"description":"Upload Assignment","type":"boolean","required":false},"auto_approve_assignment":{"default":"on","description":"Auto Approve Assignment","type":"boolean","required":false},"assignment_upload_limit_count":{"default":"1","description":"Limit number of uploaded files","type":"number","required":false},"lesson_assignment_deletion_enabled":{"default":0,"description":"Allow Student to Delete own Assignment(s)","type":"boolean","required":false},"lesson_assignment_points_enabled":{"default":0,"description":"Award Points for Assignment","type":"boolean","required":false},"lesson_assignment_points_amount":{"default":0,"description":"Set Number of Points for Assignment","type":"number","required":false},"assignment_upload_limit_extensions":{"default":"","description":"Allowed File Extensions","type":"text","required":false},"assignment_upload_limit_size":{"default":"","description":"Allowed File Size","type":"text","required":false},"visible_after":{"default":0,"description":"Make Lesson visible X Days After Sign-up","type":"number","required":false},"visible_after_specific_date":{"description":"Make Lesson Visible on Specific Date","type":"wp_date_selector","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/ldlms\/v1\/sfwd-lessons"}]}},"\/ldlms\/v1\/sfwd-lessons\/(?P<id>[\\d]+)":{"namespace":"ldlms\/v1","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Unique identifier for the object.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"Unique identifier for the object.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","graded","not_graded","hidden"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"categories":{"description":"The terms assigned to the post in the category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tags":{"description":"The terms assigned to the post in the post_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"ld_lesson_category":{"description":"The terms assigned to the post in the ld_lesson_category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"ld_lesson_tag":{"description":"The terms assigned to the post in the ld_lesson_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"lesson_materials":{"description":"Lesson Materials","type":"html","required":false},"forced_lesson_time":{"description":"Forced Lesson Timer","type":"text","required":false},"lesson_assignment_upload":{"description":"Upload Assignment","type":"boolean","required":false},"auto_approve_assignment":{"description":"Auto Approve Assignment","type":"boolean","required":false},"assignment_upload_limit_count":{"description":"Limit number of uploaded files","type":"number","required":false},"lesson_assignment_deletion_enabled":{"description":"Allow Student to Delete own Assignment(s)","type":"boolean","required":false},"lesson_assignment_points_enabled":{"description":"Award Points for Assignment","type":"boolean","required":false},"lesson_assignment_points_amount":{"description":"Set Number of Points for Assignment","type":"number","required":false},"assignment_upload_limit_extensions":{"description":"Allowed File Extensions","type":"text","required":false},"assignment_upload_limit_size":{"description":"Allowed File Size","type":"text","required":false},"visible_after":{"description":"Make Lesson visible X Days After Sign-up","type":"number","required":false},"visible_after_specific_date":{"description":"Make Lesson Visible on Specific Date","type":"wp_date_selector","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"args":{"id":{"description":"Unique identifier for the object.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass trash and force deletion.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/ldlms\/v1\/sfwd-topic":{"namespace":"ldlms\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"menu_order":{"description":"Limit result set to posts with a specific menu_order value.","type":"integer","required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"title","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title","menu_order","rand","menu_order"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","acf-disabled","graded","not_graded","hidden","any"],"type":"string"},"required":false},"tax_relation":{"description":"Limit result set based on relationship between multiple taxonomies.","type":"string","enum":["AND","OR"],"required":false},"ld_topic_category":{"description":"Limit result set to items with specific terms assigned in the ld_topic_category taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"ld_topic_category_exclude":{"description":"Limit result set to items except those with specific terms assigned in the ld_topic_category taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false}},"additionalProperties":false}],"required":false},"ld_topic_tag":{"description":"Limit result set to items with specific terms assigned in the ld_topic_tag taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"ld_topic_tag_exclude":{"description":"Limit result set to items except those with specific terms assigned in the ld_topic_tag taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]}},"additionalProperties":false}],"required":false},"course":{"description":"Limit results to be within a specific Course. Required for non-admin users.","type":"integer","required":false},"lesson":{"description":"Limit results to be within a specific Lesson. Must be used with Course parameter.","type":"integer","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","graded","not_graded","hidden"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"ld_topic_category":{"description":"The terms assigned to the post in the ld_topic_category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"ld_topic_tag":{"description":"The terms assigned to the post in the ld_topic_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"topic_materials":{"description":"Topic Materials","type":"html","required":false},"forced_lesson_time":{"default":"","description":"Forced Topic Timer","type":"text","required":false},"lesson_assignment_upload":{"default":0,"description":"Upload Assignment","type":"boolean","required":false},"auto_approve_assignment":{"default":"on","description":"Auto Approve Assignment","type":"boolean","required":false},"assignment_upload_limit_count":{"default":"1","description":"Limit number of uploaded files","type":"number","required":false},"lesson_assignment_points_enabled":{"default":0,"description":"Award Points for Assignment","type":"boolean","required":false},"lesson_assignment_points_amount":{"default":0,"description":"Set Number of Points for Assignment","type":"number","required":false},"assignment_upload_limit_extensions":{"default":"","description":"Allowed File Extensions","type":"text","required":false},"assignment_upload_limit_size":{"default":"","description":"Allowed File Size","type":"text","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/ldlms\/v1\/sfwd-topic"}]}},"\/ldlms\/v1\/sfwd-topic\/(?P<id>[\\d]+)":{"namespace":"ldlms\/v1","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Unique identifier for the object.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"Unique identifier for the object.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","graded","not_graded","hidden"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"ld_topic_category":{"description":"The terms assigned to the post in the ld_topic_category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"ld_topic_tag":{"description":"The terms assigned to the post in the ld_topic_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"topic_materials":{"description":"Topic Materials","type":"html","required":false},"forced_lesson_time":{"description":"Forced Topic Timer","type":"text","required":false},"lesson_assignment_upload":{"description":"Upload Assignment","type":"boolean","required":false},"auto_approve_assignment":{"description":"Auto Approve Assignment","type":"boolean","required":false},"assignment_upload_limit_count":{"description":"Limit number of uploaded files","type":"number","required":false},"lesson_assignment_points_enabled":{"description":"Award Points for Assignment","type":"boolean","required":false},"lesson_assignment_points_amount":{"description":"Set Number of Points for Assignment","type":"number","required":false},"assignment_upload_limit_extensions":{"description":"Allowed File Extensions","type":"text","required":false},"assignment_upload_limit_size":{"description":"Allowed File Size","type":"text","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"args":{"id":{"description":"Unique identifier for the object.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass trash and force deletion.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/ldlms\/v1\/sfwd-quiz":{"namespace":"ldlms\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"menu_order":{"description":"Limit result set to posts with a specific menu_order value.","type":"integer","required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"title","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title","menu_order","rand","menu_order"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","acf-disabled","graded","not_graded","hidden","any"],"type":"string"},"required":false},"course":{"description":"Limit results to be within a specific Course. Required for non-admin users.","type":"integer","required":false},"lesson":{"description":"Limit results to be within a specific Lesson. Pass zero to show global Course Quizzes. Must be used with Course parameter.","type":"integer","required":false},"topic":{"description":"Limit results to be within a specific Topic. Must be used with Course parameter.","type":"integer","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","graded","not_graded","hidden"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"quiz_materials":{"description":"Quiz Materials","type":"html","required":false},"threshold":{"default":"0.8","description":"Certificate Threshold","type":"text","required":false},"passingpercentage":{"default":"80","description":"Passing Percentage","type":"text","required":false},"certificate":{"default":"","description":"Associated Certificate","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/ldlms\/v1\/sfwd-quiz"}]}},"\/ldlms\/v1\/sfwd-quiz\/(?P<id>[\\d]+)":{"namespace":"ldlms\/v1","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Unique identifier for the quiz object.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"Unique identifier for the quiz object.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","graded","not_graded","hidden"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"quiz_materials":{"description":"Quiz Materials","type":"html","required":false},"threshold":{"description":"Certificate Threshold","type":"text","required":false},"passingpercentage":{"description":"Passing Percentage","type":"text","required":false},"certificate":{"description":"Associated Certificate","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"args":{"id":{"description":"Unique identifier for the quiz object.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass trash and force deletion.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/ldlms\/v1\/groups":{"namespace":"ldlms\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"title","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title","rand","menu_order"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","acf-disabled","graded","not_graded","hidden","any"],"type":"string"},"required":false},"tax_relation":{"description":"Limit result set based on relationship between multiple taxonomies.","type":"string","enum":["AND","OR"],"required":false},"categories":{"description":"Limit result set to items with specific terms assigned in the categories taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"categories_exclude":{"description":"Limit result set to items except those with specific terms assigned in the categories taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false}},"additionalProperties":false}],"required":false},"tags":{"description":"Limit result set to items with specific terms assigned in the tags taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"tags_exclude":{"description":"Limit result set to items except those with specific terms assigned in the tags taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]}},"additionalProperties":false}],"required":false},"ld_group_category":{"description":"Limit result set to items with specific terms assigned in the ld_group_category taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"ld_group_category_exclude":{"description":"Limit result set to items except those with specific terms assigned in the ld_group_category taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false}},"additionalProperties":false}],"required":false},"ld_group_tag":{"description":"Limit result set to items with specific terms assigned in the ld_group_tag taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"ld_group_tag_exclude":{"description":"Limit result set to items except those with specific terms assigned in the ld_group_tag taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]}},"additionalProperties":false}],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","graded","not_graded","hidden"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"categories":{"description":"The terms assigned to the post in the category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tags":{"description":"The terms assigned to the post in the post_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"ld_group_category":{"description":"The terms assigned to the post in the ld_group_category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"ld_group_tag":{"description":"The terms assigned to the post in the ld_group_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/ldlms\/v1\/groups"}]}},"\/ldlms\/v1\/groups\/(?P<id>[\\d]+)":{"namespace":"ldlms\/v1","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Unique identifier for the object.","type":"integer","required":true},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"Unique identifier for the object.","type":"integer","required":true},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","graded","not_graded","hidden"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"categories":{"description":"The terms assigned to the post in the category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tags":{"description":"The terms assigned to the post in the post_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"ld_group_category":{"description":"The terms assigned to the post in the ld_group_category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"ld_group_tag":{"description":"The terms assigned to the post in the ld_group_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"args":{"id":{"description":"Unique identifier for the object.","type":"integer","required":true},"force":{"type":"boolean","default":false,"description":"Whether to bypass trash and force deletion.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/ldlms\/v1\/groups\/(?P<id>[\\d]+)\/courses":{"namespace":"ldlms\/v1","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Group ID to enroll into.","type":"integer","required":true},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"fields":{"description":"Returned values.","type":"string","default":"ids","enum":["ids","objects"],"required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"title","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title","menu_order","rand","menu_order"],"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"Group ID to enroll into.","type":"integer","required":true},"course_ids":{"description":"Course IDs to enroll into group.","type":"array","items":{"type":"integer"},"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"args":{"id":{"description":"Group ID to enroll into.","type":"integer","required":true},"course_ids":{"description":"Course IDs to remove from group.","type":"array","items":{"type":"integer"},"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/ldlms\/v1\/groups\/(?P<id>[\\d]+)\/leaders":{"namespace":"ldlms\/v1","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"group ID to enroll group leader into.","type":"integer","required":true},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"fields":{"description":"Returned values.","type":"string","default":"ids","enum":["ids","objects"],"required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"default":"asc","description":"Order sort attribute ascending or descending.","enum":["asc","desc"],"type":"string","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"roles":{"description":"Limit result set to users matching at least one specific role provided. Accepts csv list or single role.","type":"array","items":{"type":"string"},"required":false},"slug":{"description":"Limit result set to users with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"group ID to enroll group leader into.","type":"integer","required":true},"user_ids":{"description":"Group Leader User IDs to enroll into Group","type":"array","items":{"type":"integer"},"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"args":{"id":{"description":"group ID to enroll group leader into.","type":"integer","required":true},"user_ids":{"description":"Group Leader User IDs to remove from Group","type":"array","items":{"type":"integer"},"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/ldlms\/v1\/groups\/(?P<id>[\\d]+)\/users":{"namespace":"ldlms\/v1","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"group ID to enroll group leader into.","type":"integer","required":true},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"fields":{"description":"Returned values.","type":"string","default":"ids","enum":["ids","objects"],"required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"default":"asc","description":"Order sort attribute ascending or descending.","enum":["asc","desc"],"type":"string","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"roles":{"description":"Limit result set to users matching at least one specific role provided. Accepts csv list or single role.","type":"array","items":{"type":"string"},"required":false},"slug":{"description":"Limit result set to users with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"group ID to enroll group leader into.","type":"integer","required":true},"user_ids":{"description":"User IDs to enroll into Group.","type":"array","items":{"type":"integer"},"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"args":{"id":{"description":"group ID to enroll group leader into.","type":"integer","required":true},"user_ids":{"description":"User IDs to remove from Group.","type":"array","items":{"type":"integer"},"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/ldlms\/v1\/users\/(?P<id>[\\d]+)\/groups":{"namespace":"ldlms\/v1","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"User ID","type":"integer","required":true},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"fields":{"description":"Returned values.","type":"string","default":"ids","enum":["ids","objects"],"required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"title","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title","rand","menu_order"],"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"User ID","type":"integer","required":true},"group_ids":{"description":"Group IDs to add to User.","type":"array","items":{"type":"integer"},"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"args":{"id":{"description":"User ID","type":"integer","required":true},"group_ids":{"description":"Group IDs to remove from User.","type":"array","items":{"type":"integer"},"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/ldlms\/v1\/users\/(?P<id>[\\d]+)\/courses":{"namespace":"ldlms\/v1","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"User ID to enroll user into.","type":"integer","required":true},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"fields":{"description":"Returned values.","type":"string","default":"ids","enum":["ids","objects"],"required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"title","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title","menu_order","rand","menu_order"],"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"User ID to enroll user into.","type":"integer","required":true},"course_ids":{"description":"Courses IDs to add to User.","type":"array","items":{"type":"integer"},"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"args":{"id":{"description":"User ID to enroll user into.","type":"integer","required":true},"course_ids":{"description":"Courses IDs to remove from User.","type":"array","items":{"type":"integer"},"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/ldlms\/v1\/sfwd-questions\/(?P<id>[\\d]+)":{"namespace":"ldlms\/v1","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"The question ID","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"The question ID","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"args":{"id":{"description":"The question ID","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/ldlms\/v1\/sections\/(?P<id>[\\d]+)":{"namespace":"ldlms\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"id":{"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/ldlms\/v2":{"namespace":"ldlms\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"ldlms\/v2","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/ldlms\/v2"}]}},"\/ldlms\/v2\/sfwd-courses":{"namespace":"ldlms\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"menu_order":{"description":"Limit result set to posts with a specific menu_order value.","type":"integer","required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"title","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title","menu_order","rand","menu_order"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","acf-disabled","graded","not_graded","hidden","any"],"type":"string"},"required":false},"tax_relation":{"description":"Limit result set based on relationship between multiple taxonomies.","type":"string","enum":["AND","OR"],"required":false},"categories":{"description":"Limit result set to items with specific terms assigned in the categories taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"categories_exclude":{"description":"Limit result set to items except those with specific terms assigned in the categories taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false}},"additionalProperties":false}],"required":false},"tags":{"description":"Limit result set to items with specific terms assigned in the tags taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"tags_exclude":{"description":"Limit result set to items except those with specific terms assigned in the tags taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]}},"additionalProperties":false}],"required":false},"ld_course_category":{"description":"Limit result set to items with specific terms assigned in the ld_course_category taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"ld_course_category_exclude":{"description":"Limit result set to items except those with specific terms assigned in the ld_course_category taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false}},"additionalProperties":false}],"required":false},"ld_course_tag":{"description":"Limit result set to items with specific terms assigned in the ld_course_tag taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"ld_course_tag_exclude":{"description":"Limit result set to items except those with specific terms assigned in the ld_course_tag taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]}},"additionalProperties":false}],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","graded","not_graded","hidden"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"categories":{"description":"The terms assigned to the post in the category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tags":{"description":"The terms assigned to the post in the post_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"ld_course_category":{"description":"The terms assigned to the post in the ld_course_category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"ld_course_tag":{"description":"The terms assigned to the post in the ld_course_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"price_type":{"default":"open","description":"Course Price Type","type":"string","enum":["open","closed","free","paynow","subscribe"],"required":false},"price_type_paynow_price":{"default":"","description":"Pay Now Course Price","type":"string","required":false},"price_type_paynow_enrollment_url":{"default":"","description":"Pay Now course Enrollment URL","type":"string","required":false},"price_type_subscribe_price":{"default":"","description":"Subscribe Course Price","type":"string","required":false},"trial_price":{"default":"","description":"Course Trial Price","type":"string","required":false},"price_type_subscribe_enrollment_url":{"default":"","description":"Subscribe course Enrollment URL","type":"string","required":false},"price_type_closed_price":{"default":"","description":"Closed Course Price","type":"string","required":false},"price_type_closed_custom_button_url":{"default":"","description":"Closed Course Button URL","type":"string","required":false},"materials_enabled":{"default":false,"description":"Supplemental Materials Enabled","type":"boolean","required":false},"materials":{"default":"","description":"Supplemental Materials","type":"string","format":"html","required":false},"exam_challenge":{"default":0,"description":"Challenge Exam","type":"integer","required":false},"disable_content_table":{"default":false,"description":"Disable Course Content Table","type":"boolean","required":false},"lessons_per_page":{"default":false,"description":"Custom Pagination","type":"boolean","required":false},"lesson_per_page_custom":{"default":0,"description":"Lessons per page","type":"integer","required":false},"topic_per_page_custom":{"default":0,"description":"Topics per page","type":"integer","required":false},"requirements_for_enrollment":{"default":"","description":"Requirements for Enrollment. Empty string means no restrictions and students have access without prerequisite restrictions. \"course_prerequisite_enabled\" means prerequisite courses must be completed first. \"course_points_enabled\" means a specific number of course points are required for access.","type":"string","enum":["","course_prerequisite_enabled","course_points_enabled"],"required":false},"prerequisite_compare":{"default":"ANY","description":"Prerequisite Compare Mode. \"ALL\" means all prerequisites must be completed. \"ANY\" means at least one prerequisite must be completed. Requires \"requirements_for_enrollment\" to be set to \"course_prerequisite_enabled\".","type":"string","enum":["ANY","ALL"],"required":false},"prerequisites":{"default":[],"description":"Course prerequisites. Requires \"requirements_for_enrollment\" to be set to \"course_prerequisite_enabled\".","type":"array","items":{"type":"integer"},"required":false},"points_enabled":{"default":false,"description":"","type":"boolean","required":false},"points_access":{"default":0,"description":"Number of course points required to gain access to this course.","type":"number","required":false},"expire_access":{"default":false,"description":"Course Access Expiration","type":"boolean","required":false},"expire_access_days":{"description":"Access Period","type":"integer","required":false},"expire_access_delete_progress":{"default":false,"description":"Data Deletion","type":"boolean","required":false},"course_start_date":{"default":"0","description":"Start Date in RFC3339 format. IMPORTANT: LLMs must ALWAYS ask for the user&#039;s timezone if not explicitly provided - do not assume UTC. If the user does not specify a timezone, stop and ask them before proceeding. The user&#039;s timezone must be included with the date for accuracy (e.g., &#039;2025-12-01T04:30:00-05:00&#039; for EST). Setting this to &#039;0&#039; will clear the date.","type":"string","required":false},"course_end_date":{"default":"0","description":"End Date in RFC3339 format. IMPORTANT: LLMs must ALWAYS ask for the user&#039;s timezone if not explicitly provided - do not assume UTC. If the user does not specify a timezone, stop and ask them before proceeding. The user&#039;s timezone must be included with the date for accuracy (e.g., &#039;2025-12-01T04:30:00-05:00&#039; for EST). Setting this to &#039;0&#039; will clear the date.","type":"string","required":false},"course_seats_limit":{"default":0,"description":"Limits the number of students who can take your course. When the limit is reached the course can no longer be purchased or enrolled in. Admins can enroll students even if the limit is reached. It does not affect open courses. 0 means no limit.","type":"integer","required":false},"certificate":{"default":0,"description":"Course Certificate","type":"integer","required":false},"points_amount":{"default":0,"description":"Course Completion Points","type":"number","required":false},"progression_disabled":{"default":false,"description":"Course Progression Disabled","type":"boolean","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/ldlms\/v2\/sfwd-courses"}]}},"\/ldlms\/v2\/sfwd-courses\/(?P<id>[\\d]+)":{"namespace":"ldlms\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Course ID","type":"integer","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"Course ID","type":"integer","required":true},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","graded","not_graded","hidden"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"categories":{"description":"The terms assigned to the post in the category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tags":{"description":"The terms assigned to the post in the post_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"ld_course_category":{"description":"The terms assigned to the post in the ld_course_category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"ld_course_tag":{"description":"The terms assigned to the post in the ld_course_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"price_type":{"description":"Course Price Type","type":"string","enum":["open","closed","free","paynow","subscribe"],"required":false},"price_type_paynow_price":{"description":"Pay Now Course Price","type":"string","required":false},"price_type_paynow_enrollment_url":{"description":"Pay Now course Enrollment URL","type":"string","required":false},"price_type_subscribe_price":{"description":"Subscribe Course Price","type":"string","required":false},"trial_price":{"description":"Course Trial Price","type":"string","required":false},"price_type_subscribe_enrollment_url":{"description":"Subscribe course Enrollment URL","type":"string","required":false},"price_type_closed_price":{"description":"Closed Course Price","type":"string","required":false},"price_type_closed_custom_button_url":{"description":"Closed Course Button URL","type":"string","required":false},"materials_enabled":{"description":"Supplemental Materials Enabled","type":"boolean","required":false},"materials":{"description":"Supplemental Materials","type":"string","format":"html","required":false},"exam_challenge":{"description":"Challenge Exam","type":"integer","required":false},"disable_content_table":{"description":"Disable Course Content Table","type":"boolean","required":false},"lessons_per_page":{"description":"Custom Pagination","type":"boolean","required":false},"lesson_per_page_custom":{"description":"Lessons per page","type":"integer","required":false},"topic_per_page_custom":{"description":"Topics per page","type":"integer","required":false},"requirements_for_enrollment":{"description":"Requirements for Enrollment. Empty string means no restrictions and students have access without prerequisite restrictions. \"course_prerequisite_enabled\" means prerequisite courses must be completed first. \"course_points_enabled\" means a specific number of course points are required for access.","type":"string","enum":["","course_prerequisite_enabled","course_points_enabled"],"required":false},"prerequisite_compare":{"description":"Prerequisite Compare Mode. \"ALL\" means all prerequisites must be completed. \"ANY\" means at least one prerequisite must be completed. Requires \"requirements_for_enrollment\" to be set to \"course_prerequisite_enabled\".","type":"string","enum":["ANY","ALL"],"required":false},"prerequisites":{"description":"Course prerequisites. Requires \"requirements_for_enrollment\" to be set to \"course_prerequisite_enabled\".","type":"array","items":{"type":"integer"},"required":false},"points_enabled":{"description":"","type":"boolean","required":false},"points_access":{"description":"Number of course points required to gain access to this course.","type":"number","required":false},"expire_access":{"description":"Course Access Expiration","type":"boolean","required":false},"expire_access_days":{"description":"Access Period","type":"integer","required":false},"expire_access_delete_progress":{"description":"Data Deletion","type":"boolean","required":false},"course_start_date":{"description":"Start Date in RFC3339 format. IMPORTANT: LLMs must ALWAYS ask for the user&#039;s timezone if not explicitly provided - do not assume UTC. If the user does not specify a timezone, stop and ask them before proceeding. The user&#039;s timezone must be included with the date for accuracy (e.g., &#039;2025-12-01T04:30:00-05:00&#039; for EST). Setting this to &#039;0&#039; will clear the date.","type":"string","required":false},"course_end_date":{"description":"End Date in RFC3339 format. IMPORTANT: LLMs must ALWAYS ask for the user&#039;s timezone if not explicitly provided - do not assume UTC. If the user does not specify a timezone, stop and ask them before proceeding. The user&#039;s timezone must be included with the date for accuracy (e.g., &#039;2025-12-01T04:30:00-05:00&#039; for EST). Setting this to &#039;0&#039; will clear the date.","type":"string","required":false},"course_seats_limit":{"description":"Limits the number of students who can take your course. When the limit is reached the course can no longer be purchased or enrolled in. Admins can enroll students even if the limit is reached. It does not affect open courses. 0 means no limit.","type":"integer","required":false},"certificate":{"description":"Course Certificate","type":"integer","required":false},"points_amount":{"description":"Course Completion Points","type":"number","required":false},"progression_disabled":{"description":"Course Progression Disabled","type":"boolean","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"args":{"id":{"description":"Course ID","type":"integer","required":true},"force":{"type":"boolean","default":false,"description":"Whether to bypass trash and force deletion.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/ldlms\/v2\/sfwd-courses\/(?P<id>[\\d]+)\/steps":{"namespace":"ldlms\/v2","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Course ID","type":"integer","required":true},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"type":{"description":"Filter returned results by step type.","type":"string","default":"all","enum":["all","h","l","t","r","co","sections","legacy"],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"Course ID","type":"integer","required":true},"sfwd-lessons":{"description":"Course lessons structure with topics and quizzes. Keys must be valid lesson post IDs.","type":"object","additionalProperties":{"description":"Lesson post ID (e.g., \"123\")","type":"object","properties":{"sfwd-topic":{"description":"Topic within this lesson. Keys must be valid topic post IDs.","type":"object","additionalProperties":{"description":"Topic post ID (e.g., \"123\")","type":"object","properties":{"sfwd-quiz":{"description":"Quiz within this topic. Keys must be valid quiz post IDs.","type":"object","additionalProperties":{"description":"Quiz post ID (e.g., \"123\")","type":"object"}}}},"example":{"3":{},"4":{"sfwd-quiz":{"5":{}}}}},"sfwd-quiz":{"description":"Quizzes directly within this lesson. Keys must be valid quiz post IDs.","type":"object","additionalProperties":{"description":"Quiz post ID (e.g., \"123\")","type":"object"},"example":{"5":{}}}}},"required":false},"sfwd-quiz":{"description":"Course quizzes structure. Keys must be valid Quiz post IDs.","type":"object","additionalProperties":{"description":"Quiz post ID (e.g., \"123\")","type":"object"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/ldlms\/v2\/sfwd-courses\/(?P<id>[\\d]+)\/prerequisites":{"namespace":"ldlms\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Course ID","type":"integer","required":true},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"menu_order":{"description":"Limit result set to posts with a specific menu_order value.","type":"integer","required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"title","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title","menu_order","rand","menu_order"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","acf-disabled","graded","not_graded","hidden","any"],"type":"string"},"required":false},"tax_relation":{"description":"Limit result set based on relationship between multiple taxonomies.","type":"string","enum":["AND","OR"],"required":false},"categories":{"description":"Limit result set to items with specific terms assigned in the categories taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"categories_exclude":{"description":"Limit result set to items except those with specific terms assigned in the categories taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false}},"additionalProperties":false}],"required":false},"tags":{"description":"Limit result set to items with specific terms assigned in the tags taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"tags_exclude":{"description":"Limit result set to items except those with specific terms assigned in the tags taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]}},"additionalProperties":false}],"required":false},"ld_course_category":{"description":"Limit result set to items with specific terms assigned in the ld_course_category taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"ld_course_category_exclude":{"description":"Limit result set to items except those with specific terms assigned in the ld_course_category taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false}},"additionalProperties":false}],"required":false},"ld_course_tag":{"description":"Limit result set to items with specific terms assigned in the ld_course_tag taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"ld_course_tag_exclude":{"description":"Limit result set to items except those with specific terms assigned in the ld_course_tag taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]}},"additionalProperties":false}],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/ldlms\/v2\/sfwd-courses\/(?P<id>[\\d]+)\/users":{"namespace":"ldlms\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Course ID.","type":"integer","required":true},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"default":"asc","description":"Order sort attribute ascending or descending.","enum":["asc","desc"],"type":"string","required":false},"orderby":{"default":"name","description":"Sort collection by user attribute.","enum":["id","include","name","registered_date","slug","include_slugs","email","url"],"type":"string","required":false},"slug":{"description":"Limit result set to users with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"roles":{"description":"Limit result set to users matching at least one specific role provided. Accepts csv list or single role.","type":"array","items":{"type":"string"},"required":false},"capabilities":{"description":"Limit result set to users matching at least one specific capability provided. Accepts csv list or single capability.","type":"array","items":{"type":"string"},"required":false},"who":{"description":"Limit result set to users who are considered authors.","type":"string","enum":["authors"],"required":false},"has_published_posts":{"description":"Limit result set to users who have published posts.","type":["boolean","array"],"items":{"type":"string","enum":{"post":"post","page":"page","attachment":"attachment","nav_menu_item":"nav_menu_item","wp_block":"wp_block","wp_template":"wp_template","wp_template_part":"wp_template_part","wp_global_styles":"wp_global_styles","wp_navigation":"wp_navigation","wp_font_family":"wp_font_family","wp_font_face":"wp_font_face","sfwd-courses":"sfwd-courses","sfwd-lessons":"sfwd-lessons","sfwd-topic":"sfwd-topic","sfwd-quiz":"sfwd-quiz","sfwd-question":"sfwd-question","ld-exam":"ld-exam","groups":"groups","docs":"docs","gp_elements":"gp_elements","spectra-popup":"spectra-popup","betterdocs_faq":"betterdocs_faq"}},"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["email","name","id","username","slug"],"type":"string"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"Course ID.","type":"integer","required":true},"user_ids":{"description":"User IDs to update in Course. Limit 50 per request.","type":"array","items":{"type":"integer"},"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"args":{"id":{"description":"Course ID.","type":"integer","required":true},"user_ids":{"description":"User IDs to remove from Course. Limit 50 per request.","type":"array","items":{"type":"integer"},"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/ldlms\/v2\/sfwd-courses\/(?P<id>[\\d]+)\/groups":{"namespace":"ldlms\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Course ID","type":"integer","required":true},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"title","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title","rand","menu_order"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","acf-disabled","graded","not_graded","hidden","any"],"type":"string"},"required":false},"tax_relation":{"description":"Limit result set based on relationship between multiple taxonomies.","type":"string","enum":["AND","OR"],"required":false},"categories":{"description":"Limit result set to items with specific terms assigned in the categories taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"categories_exclude":{"description":"Limit result set to items except those with specific terms assigned in the categories taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false}},"additionalProperties":false}],"required":false},"tags":{"description":"Limit result set to items with specific terms assigned in the tags taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"tags_exclude":{"description":"Limit result set to items except those with specific terms assigned in the tags taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]}},"additionalProperties":false}],"required":false},"ld_group_category":{"description":"Limit result set to items with specific terms assigned in the ld_group_category taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"ld_group_category_exclude":{"description":"Limit result set to items except those with specific terms assigned in the ld_group_category taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false}},"additionalProperties":false}],"required":false},"ld_group_tag":{"description":"Limit result set to items with specific terms assigned in the ld_group_tag taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"ld_group_tag_exclude":{"description":"Limit result set to items except those with specific terms assigned in the ld_group_tag taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]}},"additionalProperties":false}],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"Course ID","type":"integer","required":true},"group_ids":{"description":"Group IDs to enroll into Course.","type":"array","items":{"type":"integer"},"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"args":{"id":{"description":"Course ID","type":"integer","required":true},"group_ids":{"description":"Group IDs to remove from Course.","type":"array","items":{"type":"integer"},"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/ldlms\/v2\/sfwd-lessons":{"namespace":"ldlms\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"menu_order":{"description":"Limit result set to posts with a specific menu_order value.","type":"integer","required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"title","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title","menu_order","rand","menu_order"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","acf-disabled","graded","not_graded","hidden","any"],"type":"string"},"required":false},"tax_relation":{"description":"Limit result set based on relationship between multiple taxonomies.","type":"string","enum":["AND","OR"],"required":false},"categories":{"description":"Limit result set to items with specific terms assigned in the categories taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"categories_exclude":{"description":"Limit result set to items except those with specific terms assigned in the categories taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false}},"additionalProperties":false}],"required":false},"tags":{"description":"Limit result set to items with specific terms assigned in the tags taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"tags_exclude":{"description":"Limit result set to items except those with specific terms assigned in the tags taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]}},"additionalProperties":false}],"required":false},"ld_lesson_category":{"description":"Limit result set to items with specific terms assigned in the ld_lesson_category taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"ld_lesson_category_exclude":{"description":"Limit result set to items except those with specific terms assigned in the ld_lesson_category taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false}},"additionalProperties":false}],"required":false},"ld_lesson_tag":{"description":"Limit result set to items with specific terms assigned in the ld_lesson_tag taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"ld_lesson_tag_exclude":{"description":"Limit result set to items except those with specific terms assigned in the ld_lesson_tag taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]}},"additionalProperties":false}],"required":false},"course":{"description":"Limit results to be within a specific Course. Required for non-admin users.","type":"integer","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","graded","not_graded","hidden"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"categories":{"description":"The terms assigned to the post in the category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tags":{"description":"The terms assigned to the post in the post_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"ld_lesson_category":{"description":"The terms assigned to the post in the ld_lesson_category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"ld_lesson_tag":{"description":"The terms assigned to the post in the ld_lesson_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"materials_enabled":{"default":false,"description":"Supplemental Materials Enabled","type":"boolean","required":false},"materials":{"default":"","description":"Supplemental Materials","type":"string","format":"html","required":false},"video_enabled":{"default":false,"description":"Lesson Video Progression Enabled","type":"boolean","required":false},"video_url":{"default":"","description":"Lesson Video Progression URL","type":"text","required":false},"video_shown":{"default":"BEFORE","description":"Lesson Video Shown before or after sub-steps","type":"string","enum":["BEFORE","AFTER"],"required":false},"video_auto_complete":{"default":false,"description":"Lesson Video Auto-complete","type":"boolean","required":false},"video_auto_complete_delay":{"default":0,"description":"Lesson Video Completion Delay (seconds).","type":"integer","required":false},"video_show_complete_button":{"default":false,"description":"Lesson Video Show Mark Complete Button","type":"boolean","required":false},"video_auto_start":{"default":false,"description":"Lesson Video Autostart","type":"boolean","required":false},"video_show_controls":{"default":false,"description":"Lesson Video Controls Display. YouTube and local videos only","type":"boolean","required":false},"video_focus_pause":{"default":false,"description":"Video Pause on Window Unfocused","type":"boolean","required":false},"video_resume":{"default":false,"description":"Video Resume","type":"boolean","required":false},"assignment_upload_enabled":{"default":false,"description":"Lesson Assignment Uploads Enabled","type":"boolean","required":false},"assignment_upload_limit_extensions":{"default":"","description":"Lesson Assignment Allowed file extensions. Comma separated pdf, xls, zip","type":"text","required":false},"assignment_upload_limit_size":{"default":"","description":"Lesson Assignment Upload size limit. Max per server is 100M ","type":"text","required":false},"assignment_points_enabled":{"default":false,"description":"Lesson Assignment Points Enabled","type":"boolean","required":false},"assignment_points_amount":{"default":0,"description":"Lesson Assignment Points Amount","type":"integer","required":false},"assignment_auto_approve":{"default":true,"description":"Lesson Assignment Auto-approve Enabled","type":"boolean","required":false},"assignment_upload_limit_count":{"default":0,"description":"Lesson Assignment Upload Count Limit.","type":"integer","required":false},"assignment_deletion_enabled":{"default":false,"description":"Lesson Assignment Allow File Deletion.","type":"boolean","required":false},"forced_timer_enabled":{"default":false,"description":"Lesson Time Enabled","type":"boolean","required":false},"forced_timer_amount":{"default":0,"description":"Lesson Timer Amount.","type":"integer","required":false},"course":{"default":0,"description":"Associated Course","type":"integer","required":false},"is_sample":{"default":false,"description":"Sample Lesson","type":"boolean","required":false},"visible_type":{"default":"","description":"Available Release Schedule","type":"string","enum":["","visible_after","visible_after_specific_date"],"required":false},"visible_after":{"default":0,"description":"Visible After X day(s)","type":"integer","required":false},"visible_after_specific_date":{"default":"","description":"Visible After Specific Date (YYYY-MM-DD)","type":"date","required":false},"is_external":{"default":false,"description":"External Lesson","type":"boolean","required":false},"external_type":{"default":"virtual","description":"Type","type":"string","enum":["virtual","in-person"],"required":false},"external_require_attendance":{"default":"","description":"Require Attendance","type":"string","enum":["","yes"],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/ldlms\/v2\/sfwd-lessons"}]}},"\/ldlms\/v2\/sfwd-lessons\/(?P<id>[\\d]+)":{"namespace":"ldlms\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Lesson ID","type":"integer","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"Lesson ID","type":"integer","required":true},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","graded","not_graded","hidden"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"categories":{"description":"The terms assigned to the post in the category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tags":{"description":"The terms assigned to the post in the post_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"ld_lesson_category":{"description":"The terms assigned to the post in the ld_lesson_category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"ld_lesson_tag":{"description":"The terms assigned to the post in the ld_lesson_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"materials_enabled":{"description":"Supplemental Materials Enabled","type":"boolean","required":false},"materials":{"description":"Supplemental Materials","type":"string","format":"html","required":false},"video_enabled":{"description":"Lesson Video Progression Enabled","type":"boolean","required":false},"video_url":{"description":"Lesson Video Progression URL","type":"text","required":false},"video_shown":{"description":"Lesson Video Shown before or after sub-steps","type":"string","enum":["BEFORE","AFTER"],"required":false},"video_auto_complete":{"description":"Lesson Video Auto-complete","type":"boolean","required":false},"video_auto_complete_delay":{"description":"Lesson Video Completion Delay (seconds).","type":"integer","required":false},"video_show_complete_button":{"description":"Lesson Video Show Mark Complete Button","type":"boolean","required":false},"video_auto_start":{"description":"Lesson Video Autostart","type":"boolean","required":false},"video_show_controls":{"description":"Lesson Video Controls Display. YouTube and local videos only","type":"boolean","required":false},"video_focus_pause":{"description":"Video Pause on Window Unfocused","type":"boolean","required":false},"video_resume":{"description":"Video Resume","type":"boolean","required":false},"assignment_upload_enabled":{"description":"Lesson Assignment Uploads Enabled","type":"boolean","required":false},"assignment_upload_limit_extensions":{"description":"Lesson Assignment Allowed file extensions. Comma separated pdf, xls, zip","type":"text","required":false},"assignment_upload_limit_size":{"description":"Lesson Assignment Upload size limit. Max per server is 100M ","type":"text","required":false},"assignment_points_enabled":{"description":"Lesson Assignment Points Enabled","type":"boolean","required":false},"assignment_points_amount":{"description":"Lesson Assignment Points Amount","type":"integer","required":false},"assignment_auto_approve":{"description":"Lesson Assignment Auto-approve Enabled","type":"boolean","required":false},"assignment_upload_limit_count":{"description":"Lesson Assignment Upload Count Limit.","type":"integer","required":false},"assignment_deletion_enabled":{"description":"Lesson Assignment Allow File Deletion.","type":"boolean","required":false},"forced_timer_enabled":{"description":"Lesson Time Enabled","type":"boolean","required":false},"forced_timer_amount":{"description":"Lesson Timer Amount.","type":"integer","required":false},"course":{"description":"Associated Course","type":"integer","required":false},"is_sample":{"description":"Sample Lesson","type":"boolean","required":false},"visible_type":{"description":"Available Release Schedule","type":"string","enum":["","visible_after","visible_after_specific_date"],"required":false},"visible_after":{"description":"Visible After X day(s)","type":"integer","required":false},"visible_after_specific_date":{"description":"Visible After Specific Date (YYYY-MM-DD)","type":"date","required":false},"is_external":{"description":"External Lesson","type":"boolean","required":false},"external_type":{"description":"Type","type":"string","enum":["virtual","in-person"],"required":false},"external_require_attendance":{"description":"Require Attendance","type":"string","enum":["","yes"],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"args":{"id":{"description":"Lesson ID","type":"integer","required":true},"force":{"type":"boolean","default":false,"description":"Whether to bypass trash and force deletion.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/ldlms\/v2\/sfwd-topic":{"namespace":"ldlms\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"menu_order":{"description":"Limit result set to posts with a specific menu_order value.","type":"integer","required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"title","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title","menu_order","rand","menu_order"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","acf-disabled","graded","not_graded","hidden","any"],"type":"string"},"required":false},"tax_relation":{"description":"Limit result set based on relationship between multiple taxonomies.","type":"string","enum":["AND","OR"],"required":false},"ld_topic_category":{"description":"Limit result set to items with specific terms assigned in the ld_topic_category taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"ld_topic_category_exclude":{"description":"Limit result set to items except those with specific terms assigned in the ld_topic_category taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false}},"additionalProperties":false}],"required":false},"ld_topic_tag":{"description":"Limit result set to items with specific terms assigned in the ld_topic_tag taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"ld_topic_tag_exclude":{"description":"Limit result set to items except those with specific terms assigned in the ld_topic_tag taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]}},"additionalProperties":false}],"required":false},"course":{"description":"Limit results to be within a specific Course. Required for non-admin users.","type":"integer","required":false},"lesson":{"description":"Limit results to be within a specific Lesson. Must be used with Course parameter.","type":"integer","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","graded","not_graded","hidden"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"ld_topic_category":{"description":"The terms assigned to the post in the ld_topic_category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"ld_topic_tag":{"description":"The terms assigned to the post in the ld_topic_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"materials_enabled":{"default":false,"description":"Supplemental Materials Enabled","type":"boolean","required":false},"materials":{"default":"","description":"Supplemental Materials","type":"string","format":"html","required":false},"video_enabled":{"default":false,"description":"Topic Video Progression Enabled","type":"boolean","required":false},"video_url":{"default":"","description":"Topic Video Progression URL","type":"text","required":false},"video_shown":{"default":"BEFORE","description":"Topic Video Shown before or after sub-steps","type":"string","enum":["BEFORE","AFTER"],"required":false},"video_auto_complete":{"default":false,"description":"Topic Video Auto-complete","type":"boolean","required":false},"video_auto_complete_delay":{"default":0,"description":"Topic Video Completion Delay (seconds).","type":"integer","required":false},"video_show_complete_button":{"default":false,"description":"Topic Video Show Mark Complete Button","type":"boolean","required":false},"video_auto_start":{"default":false,"description":"Topic Video Autostart","type":"boolean","required":false},"video_show_controls":{"default":false,"description":"Topic Video Controls Display. YouTube and local videos only","type":"boolean","required":false},"video_focus_pause":{"default":false,"description":"Video Pause on Window Unfocused","type":"boolean","required":false},"video_resume":{"default":false,"description":"Video Resume","type":"boolean","required":false},"assignment_upload_enabled":{"default":false,"description":"Topic Assignment Uploads Enabled","type":"boolean","required":false},"assignment_upload_limit_extensions":{"default":"","description":"Topic Assignment Allowed file extensions. Comma separated pdf, xls, zip","type":"text","required":false},"assignment_upload_limit_size":{"default":"","description":"Topic Assignment Upload size limit. Max per server is 100M ","type":"text","required":false},"assignment_points_enabled":{"default":false,"description":"Topic Assignment Points Enabled","type":"boolean","required":false},"assignment_points_amount":{"default":0,"description":"Topic Assignment Points Amount","type":"integer","required":false},"assignment_auto_approve":{"default":true,"description":"Topic Assignment Auto-approve Enabled","type":"boolean","required":false},"assignment_upload_limit_count":{"default":0,"description":"Topic Assignment Upload Count Limit.","type":"integer","required":false},"assignment_deletion_enabled":{"default":false,"description":"Topic Assignment Allow File Deletion.","type":"boolean","required":false},"forced_timer_enabled":{"default":false,"description":"Topic Time Enabled","type":"boolean","required":false},"forced_timer_amount":{"default":0,"description":"Topic Timer Amount.","type":"integer","required":false},"course":{"default":0,"description":"Associated Course","type":"integer","required":false},"lesson":{"default":0,"description":"Associated Lesson","type":"integer","required":false},"visible_type":{"default":"","description":"Available Release Schedule","type":"string","enum":["","visible_after","visible_after_specific_date"],"required":false},"visible_after":{"default":0,"description":"Visible After X day(s)","type":"integer","required":false},"visible_after_specific_date":{"default":"","description":"Visible After Specific Date (YYYY-MM-DD)","type":"date","required":false},"is_external":{"default":false,"description":"External Topic","type":"boolean","required":false},"external_type":{"default":"virtual","description":"Type","type":"string","enum":["virtual","in-person"],"required":false},"external_require_attendance":{"default":"","description":"Require Attendance","type":"string","enum":["","yes"],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/ldlms\/v2\/sfwd-topic"}]}},"\/ldlms\/v2\/sfwd-topic\/(?P<id>[\\d]+)":{"namespace":"ldlms\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Topic ID","type":"integer","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"Topic ID","type":"integer","required":true},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","graded","not_graded","hidden"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"ld_topic_category":{"description":"The terms assigned to the post in the ld_topic_category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"ld_topic_tag":{"description":"The terms assigned to the post in the ld_topic_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"materials_enabled":{"description":"Supplemental Materials Enabled","type":"boolean","required":false},"materials":{"description":"Supplemental Materials","type":"string","format":"html","required":false},"video_enabled":{"description":"Topic Video Progression Enabled","type":"boolean","required":false},"video_url":{"description":"Topic Video Progression URL","type":"text","required":false},"video_shown":{"description":"Topic Video Shown before or after sub-steps","type":"string","enum":["BEFORE","AFTER"],"required":false},"video_auto_complete":{"description":"Topic Video Auto-complete","type":"boolean","required":false},"video_auto_complete_delay":{"description":"Topic Video Completion Delay (seconds).","type":"integer","required":false},"video_show_complete_button":{"description":"Topic Video Show Mark Complete Button","type":"boolean","required":false},"video_auto_start":{"description":"Topic Video Autostart","type":"boolean","required":false},"video_show_controls":{"description":"Topic Video Controls Display. YouTube and local videos only","type":"boolean","required":false},"video_focus_pause":{"description":"Video Pause on Window Unfocused","type":"boolean","required":false},"video_resume":{"description":"Video Resume","type":"boolean","required":false},"assignment_upload_enabled":{"description":"Topic Assignment Uploads Enabled","type":"boolean","required":false},"assignment_upload_limit_extensions":{"description":"Topic Assignment Allowed file extensions. Comma separated pdf, xls, zip","type":"text","required":false},"assignment_upload_limit_size":{"description":"Topic Assignment Upload size limit. Max per server is 100M ","type":"text","required":false},"assignment_points_enabled":{"description":"Topic Assignment Points Enabled","type":"boolean","required":false},"assignment_points_amount":{"description":"Topic Assignment Points Amount","type":"integer","required":false},"assignment_auto_approve":{"description":"Topic Assignment Auto-approve Enabled","type":"boolean","required":false},"assignment_upload_limit_count":{"description":"Topic Assignment Upload Count Limit.","type":"integer","required":false},"assignment_deletion_enabled":{"description":"Topic Assignment Allow File Deletion.","type":"boolean","required":false},"forced_timer_enabled":{"description":"Topic Time Enabled","type":"boolean","required":false},"forced_timer_amount":{"description":"Topic Timer Amount.","type":"integer","required":false},"course":{"description":"Associated Course","type":"integer","required":false},"lesson":{"description":"Associated Lesson","type":"integer","required":false},"visible_type":{"description":"Available Release Schedule","type":"string","enum":["","visible_after","visible_after_specific_date"],"required":false},"visible_after":{"description":"Visible After X day(s)","type":"integer","required":false},"visible_after_specific_date":{"description":"Visible After Specific Date (YYYY-MM-DD)","type":"date","required":false},"is_external":{"description":"External Topic","type":"boolean","required":false},"external_type":{"description":"Type","type":"string","enum":["virtual","in-person"],"required":false},"external_require_attendance":{"description":"Require Attendance","type":"string","enum":["","yes"],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"args":{"id":{"description":"Topic ID","type":"integer","required":true},"force":{"type":"boolean","default":false,"description":"Whether to bypass trash and force deletion.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/ldlms\/v2\/sfwd-quiz":{"namespace":"ldlms\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"menu_order":{"description":"Limit result set to posts with a specific menu_order value.","type":"integer","required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"title","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title","menu_order","rand","menu_order"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","acf-disabled","graded","not_graded","hidden","any"],"type":"string"},"required":false},"course":{"description":"Limit results to be within a specific Course. Required for non-admin users.","type":"integer","required":false},"lesson":{"description":"Limit results to be within a specific Lesson. Pass zero to show global Course Quizzes. Must be used with Course parameter.","type":"integer","required":false},"topic":{"description":"Limit results to be within a specific Topic. Must be used with Course parameter.","type":"integer","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","graded","not_graded","hidden"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"course":{"default":0,"description":"Associated Course","type":"integer","required":false},"lesson":{"default":0,"description":"Associated Lesson","type":"integer","required":false},"visible_type":{"default":"","description":"Availability Release Schedule. Empty means immediately available, &quot;visible_after&quot; means available X days after enrollment, &quot;visible_after_specific_date&quot; means available on a specific date.","type":"string","enum":["","visible_after","visible_after_specific_date"],"required":false},"visible_after":{"default":0,"description":"Released X day(s) after course enrollment","type":"integer","required":false},"visible_after_specific_date":{"default":"","description":"Available after a specific date as a unix timestamp","type":"integer","required":false},"is_external":{"default":false,"description":"Whether the quiz takes place in a virtual setting (e.g, Zoom) or in-person outside of LearnDash.","type":"boolean","required":false},"external_type":{"default":"virtual","description":"The type of external quiz. \"virtual\" means the quiz takes place in a virtual setting (e.g, Zoom). \"in-person\" means the quiz takes place in-person.","type":"string","enum":["virtual","in-person"],"required":false},"external_require_attendance":{"default":"","description":"Whether attendance is required for the external quiz.","type":"string","enum":["","yes"],"required":false},"prerequisites":{"default":[],"description":"The quiz prerequisites for this quiz.","type":"array","items":{"type":"integer","uniqueItems":true},"required":false},"registered_users_only":{"default":false,"description":"Only logged-in users can take this quiz","type":"boolean","required":false},"passing_percentage":{"default":0,"description":"Quiz Passing Score Percentage","type":"float","required":false},"certificate":{"default":0,"description":"Quiz Certificate","type":"integer","required":false},"certificate_award_threshold":{"default":0,"description":"Quiz certificate threshold percentage to earn the certificate as a decimal. The Quiz Certificate value must be set for this to take effect.","type":"float","minimum":0,"maximum":100,"required":false},"quiz_resume":{"default":false,"description":"Whether the Quiz can be saved and resumed later.","type":"boolean","required":false},"quiz_resume_cookie_send_timer":{"default":20,"description":"Save Quiz resume cookie data to the server every x seconds.","type":"integer","required":false},"retry_restrictions_enabled":{"default":false,"description":"Whether the Quiz can be retaken only a certain number of times.","type":"boolean","required":false},"retry_repeats":{"default":"","description":"Number of repeats allowed. blank is unlimited, 0 is 1 repeats, 1 is 2 repeats, etc.","type":"string","required":false},"answer_all_questions_enabled":{"default":false,"description":"Whether all Questions are required to complete the Quiz.","type":"boolean","required":false},"time_limit_enabled":{"default":false,"description":"Time Limit Enabled","type":"boolean","required":false},"time_limit_time":{"default":0,"description":"Automatically submit after x seconds. Requires the &quot;Time Limit Enabled&quot; setting to be enabled.","type":"integer","required":false},"materials_enabled":{"default":false,"description":"Supplemental Materials Enabled","type":"boolean","required":false},"materials":{"default":"","description":"Supplemental Materials","type":"string","format":"html","required":false},"auto_start":{"default":false,"description":"Whether the quiz starts automatically, without the \"Start quiz\" button","type":"boolean","required":false},"quiz_modus":{"default":"single","description":"The display mode of the quiz. \"single\" means one question at a time, \"multiple\" means all questions at once.","type":"string","enum":["single","multiple"],"required":false},"review_table_enabled":{"default":false,"description":"Whether the question overview table is enabled.","type":"boolean","required":false},"summary_hide":{"default":false,"description":"Whether the quiz summary is enabled in the question overview table.","type":"boolean","required":false},"skip_question_disabled":{"default":false,"description":"Whether the questions can be skipped. Must use the \"One Question at a time\" and \"Display results after each submitted answer\" settings in the Question Display setting.","type":"boolean","required":false},"custom_sorting":{"default":false,"description":"Custom Question Ordering","type":"boolean","required":false},"sort_categories":{"default":false,"description":"Sort questions by category.","type":"boolean","required":false},"question_random":{"default":false,"description":"Randomize question order.","type":"boolean","required":false},"show_max_question":{"default":false,"description":"Whether to only display subset of questions. Randomize question order must be enabled.","type":"boolean","required":false},"show_points":{"default":false,"description":"Whether to display the point value for each question when taking the quiz.","type":"boolean","required":false},"show_category":{"default":false,"description":"Whether to display the category for each question when taking the quiz.","type":"boolean","required":false},"hide_question_position_overview":{"default":false,"description":"Whether to show the position of each question when taking the quiz.","type":"boolean","required":false},"hide_question_numbering":{"default":false,"description":"Whether to show the number for each question when taking the quiz.","type":"boolean","required":false},"numbered_answer":{"default":false,"description":"Whether to show the number for each question answer when taking the quiz.","type":"boolean","required":false},"answer_random":{"default":false,"description":"Whether to randomize the answers for each question when taking the quiz.","type":"boolean","required":false},"title_hidden":{"default":false,"description":"Whether to show the title for the quiz above the quiz when taking it.","type":"boolean","required":false},"restart_button_hide":{"default":true,"description":"Whether to show the \"Restart Quiz\" button on the Results page.","type":"boolean","required":false},"show_average_result":{"default":false,"description":"Whether to show the average score of all users who took the Quiz on the results page.","type":"boolean","required":false},"show_category_score":{"default":false,"description":"Whether to show the score achieved for each Question category on the results page.","type":"boolean","required":false},"hide_result_points":{"default":true,"description":"Whether to show the overall Quiz score on the results page.","type":"boolean","required":false},"hide_result_correct_question":{"default":true,"description":"Whether to show the number of correctly answered Questions on the results page.","type":"boolean","required":false},"hide_result_quiz_time":{"default":true,"description":"Whether to show the time spent on the Quiz on the results page.","type":"boolean","required":false},"custom_answer_feedback":{"default":true,"description":"Whether to show custom answer feedback for each Question on the results page.","type":"boolean","required":false},"hide_answer_message_box":{"default":true,"description":"Whether to show the correct \/ incorrect messages for each Question on the results page. Requires the \"Custom Answer Feedback\" setting to be enabled.","type":"boolean","required":false},"disabled_answer_mark":{"default":true,"description":"Whether to show the correct \/ incorrect answer marks for each Question on the results page. Requires the \"Custom Answer Feedback\" setting to be enabled.","type":"boolean","required":false},"view_question_button_hidden":{"default":true,"description":"Whether to show the \"View Questions\" button on the results page. Requires the \"Custom Answer Feedback\" setting to be enabled.","type":"boolean","required":false},"toplist_enabled":{"default":false,"description":"Whether the leaderboard is enabled.","type":"boolean","required":false},"toplist_data_add_permissions":{"default":"1","description":"Who can apply to the leaderboard. 1 is all users, 2 is registered users only, 3 is anonymous users only.","type":"string","enum":["1","2","3"],"required":false},"toplist_data_add_multiple":{"default":false,"description":"Whether users can apply more than once to the leaderboard.","type":"boolean","required":false},"toplist_data_add_automatic":{"default":false,"description":"Whether users are added automatically to the leaderboard.","type":"boolean","required":false},"toplist_data_show_limit":{"default":10,"description":"The number of entries to display on the leaderboard.","type":"integer","required":false},"toplist_data_sort":{"default":"1","description":"The sort order of the leaderboard. 1 is best user, 2 is newest entry, 3 is oldest entry.","type":"string","enum":["1","2","3"],"required":false},"toplist_data_showin_enabled":{"default":false,"description":"Whether the leaderboard is displayed on the results page.","type":"boolean","required":false},"statistics_enabled":{"default":true,"description":"Whether statistics are enabled.","type":"boolean","required":false},"view_profile_statistics_enabled":{"default":true,"description":"Whether the front-end profile display is enabled for statistics.","type":"boolean","required":false},"statistics_ip_lock_enabled":{"default":false,"description":"Whether statistics are protected from spam by checking the IP address.","type":"boolean","required":false},"email_enabled":{"default":false,"description":"Whether email notifications are enabled.","type":"boolean","required":false},"email_admin_enabled":{"default":false,"description":"Whether admin email notifications are enabled.","type":"boolean","required":false},"email_user_enabled":{"default":false,"description":"Whether user email notifications are enabled.","type":"boolean","required":false},"toplist_data_add_delay":{"default":1,"description":"The delay in minutes before a user can add more data to the leaderboard.","type":"integer","required":false},"toplist_data_shown":{"default":"1","description":"The location of the leaderboard on the results page. 1 is below the result text, 2 is in a button.","type":"string","enum":["1","2"],"required":false},"statistics_ip_lock":{"default":0,"description":"How often statistics will be saved in minutes from the same IP. The \"statistics_ip_lock_enabled\" setting must be enabled for this to take effect.","type":"integer","required":false},"email_notification":{"default":"2","description":"Which users should cause the admin to receive an email notification on quiz completion. \"2\" is all users, \"1\" is registered users only.","type":"string","enum":["2","1"],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/ldlms\/v2\/sfwd-quiz"}]}},"\/ldlms\/v2\/sfwd-quiz\/(?P<id>[\\d]+)":{"namespace":"ldlms\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Quiz ID","type":"integer","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"Quiz ID","type":"integer","required":true},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","graded","not_graded","hidden"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"course":{"description":"Associated Course","type":"integer","required":false},"lesson":{"description":"Associated Lesson","type":"integer","required":false},"visible_type":{"description":"Availability Release Schedule. Empty means immediately available, &quot;visible_after&quot; means available X days after enrollment, &quot;visible_after_specific_date&quot; means available on a specific date.","type":"string","enum":["","visible_after","visible_after_specific_date"],"required":false},"visible_after":{"description":"Released X day(s) after course enrollment","type":"integer","required":false},"visible_after_specific_date":{"description":"Available after a specific date as a unix timestamp","type":"integer","required":false},"is_external":{"description":"Whether the quiz takes place in a virtual setting (e.g, Zoom) or in-person outside of LearnDash.","type":"boolean","required":false},"external_type":{"description":"The type of external quiz. \"virtual\" means the quiz takes place in a virtual setting (e.g, Zoom). \"in-person\" means the quiz takes place in-person.","type":"string","enum":["virtual","in-person"],"required":false},"external_require_attendance":{"description":"Whether attendance is required for the external quiz.","type":"string","enum":["","yes"],"required":false},"prerequisites":{"description":"The quiz prerequisites for this quiz.","type":"array","items":{"type":"integer","uniqueItems":true},"required":false},"registered_users_only":{"description":"Only logged-in users can take this quiz","type":"boolean","required":false},"passing_percentage":{"description":"Quiz Passing Score Percentage","type":"float","required":false},"certificate":{"description":"Quiz Certificate","type":"integer","required":false},"certificate_award_threshold":{"description":"Quiz certificate threshold percentage to earn the certificate as a decimal. The Quiz Certificate value must be set for this to take effect.","type":"float","minimum":0,"maximum":100,"required":false},"quiz_resume":{"description":"Whether the Quiz can be saved and resumed later.","type":"boolean","required":false},"quiz_resume_cookie_send_timer":{"description":"Save Quiz resume cookie data to the server every x seconds.","type":"integer","required":false},"retry_restrictions_enabled":{"description":"Whether the Quiz can be retaken only a certain number of times.","type":"boolean","required":false},"retry_repeats":{"description":"Number of repeats allowed. blank is unlimited, 0 is 1 repeats, 1 is 2 repeats, etc.","type":"string","required":false},"answer_all_questions_enabled":{"description":"Whether all Questions are required to complete the Quiz.","type":"boolean","required":false},"time_limit_enabled":{"description":"Time Limit Enabled","type":"boolean","required":false},"time_limit_time":{"description":"Automatically submit after x seconds. Requires the &quot;Time Limit Enabled&quot; setting to be enabled.","type":"integer","required":false},"materials_enabled":{"description":"Supplemental Materials Enabled","type":"boolean","required":false},"materials":{"description":"Supplemental Materials","type":"string","format":"html","required":false},"auto_start":{"description":"Whether the quiz starts automatically, without the \"Start quiz\" button","type":"boolean","required":false},"quiz_modus":{"description":"The display mode of the quiz. \"single\" means one question at a time, \"multiple\" means all questions at once.","type":"string","enum":["single","multiple"],"required":false},"review_table_enabled":{"description":"Whether the question overview table is enabled.","type":"boolean","required":false},"summary_hide":{"description":"Whether the quiz summary is enabled in the question overview table.","type":"boolean","required":false},"skip_question_disabled":{"description":"Whether the questions can be skipped. Must use the \"One Question at a time\" and \"Display results after each submitted answer\" settings in the Question Display setting.","type":"boolean","required":false},"custom_sorting":{"description":"Custom Question Ordering","type":"boolean","required":false},"sort_categories":{"description":"Sort questions by category.","type":"boolean","required":false},"question_random":{"description":"Randomize question order.","type":"boolean","required":false},"show_max_question":{"description":"Whether to only display subset of questions. Randomize question order must be enabled.","type":"boolean","required":false},"show_points":{"description":"Whether to display the point value for each question when taking the quiz.","type":"boolean","required":false},"show_category":{"description":"Whether to display the category for each question when taking the quiz.","type":"boolean","required":false},"hide_question_position_overview":{"description":"Whether to show the position of each question when taking the quiz.","type":"boolean","required":false},"hide_question_numbering":{"description":"Whether to show the number for each question when taking the quiz.","type":"boolean","required":false},"numbered_answer":{"description":"Whether to show the number for each question answer when taking the quiz.","type":"boolean","required":false},"answer_random":{"description":"Whether to randomize the answers for each question when taking the quiz.","type":"boolean","required":false},"title_hidden":{"description":"Whether to show the title for the quiz above the quiz when taking it.","type":"boolean","required":false},"restart_button_hide":{"description":"Whether to show the \"Restart Quiz\" button on the Results page.","type":"boolean","required":false},"show_average_result":{"description":"Whether to show the average score of all users who took the Quiz on the results page.","type":"boolean","required":false},"show_category_score":{"description":"Whether to show the score achieved for each Question category on the results page.","type":"boolean","required":false},"hide_result_points":{"description":"Whether to show the overall Quiz score on the results page.","type":"boolean","required":false},"hide_result_correct_question":{"description":"Whether to show the number of correctly answered Questions on the results page.","type":"boolean","required":false},"hide_result_quiz_time":{"description":"Whether to show the time spent on the Quiz on the results page.","type":"boolean","required":false},"custom_answer_feedback":{"description":"Whether to show custom answer feedback for each Question on the results page.","type":"boolean","required":false},"hide_answer_message_box":{"description":"Whether to show the correct \/ incorrect messages for each Question on the results page. Requires the \"Custom Answer Feedback\" setting to be enabled.","type":"boolean","required":false},"disabled_answer_mark":{"description":"Whether to show the correct \/ incorrect answer marks for each Question on the results page. Requires the \"Custom Answer Feedback\" setting to be enabled.","type":"boolean","required":false},"view_question_button_hidden":{"description":"Whether to show the \"View Questions\" button on the results page. Requires the \"Custom Answer Feedback\" setting to be enabled.","type":"boolean","required":false},"toplist_enabled":{"description":"Whether the leaderboard is enabled.","type":"boolean","required":false},"toplist_data_add_permissions":{"description":"Who can apply to the leaderboard. 1 is all users, 2 is registered users only, 3 is anonymous users only.","type":"string","enum":["1","2","3"],"required":false},"toplist_data_add_multiple":{"description":"Whether users can apply more than once to the leaderboard.","type":"boolean","required":false},"toplist_data_add_automatic":{"description":"Whether users are added automatically to the leaderboard.","type":"boolean","required":false},"toplist_data_show_limit":{"description":"The number of entries to display on the leaderboard.","type":"integer","required":false},"toplist_data_sort":{"description":"The sort order of the leaderboard. 1 is best user, 2 is newest entry, 3 is oldest entry.","type":"string","enum":["1","2","3"],"required":false},"toplist_data_showin_enabled":{"description":"Whether the leaderboard is displayed on the results page.","type":"boolean","required":false},"statistics_enabled":{"description":"Whether statistics are enabled.","type":"boolean","required":false},"view_profile_statistics_enabled":{"description":"Whether the front-end profile display is enabled for statistics.","type":"boolean","required":false},"statistics_ip_lock_enabled":{"description":"Whether statistics are protected from spam by checking the IP address.","type":"boolean","required":false},"email_enabled":{"description":"Whether email notifications are enabled.","type":"boolean","required":false},"email_admin_enabled":{"description":"Whether admin email notifications are enabled.","type":"boolean","required":false},"email_user_enabled":{"description":"Whether user email notifications are enabled.","type":"boolean","required":false},"toplist_data_add_delay":{"description":"The delay in minutes before a user can add more data to the leaderboard.","type":"integer","required":false},"toplist_data_shown":{"description":"The location of the leaderboard on the results page. 1 is below the result text, 2 is in a button.","type":"string","enum":["1","2"],"required":false},"statistics_ip_lock":{"description":"How often statistics will be saved in minutes from the same IP. The \"statistics_ip_lock_enabled\" setting must be enabled for this to take effect.","type":"integer","required":false},"email_notification":{"description":"Which users should cause the admin to receive an email notification on quiz completion. \"2\" is all users, \"1\" is registered users only.","type":"string","enum":["2","1"],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"args":{"id":{"description":"Quiz ID","type":"integer","required":true},"force":{"type":"boolean","default":false,"description":"Whether to bypass trash and force deletion.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/ldlms\/v2\/sfwd-essays":{"namespace":"ldlms\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"any","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["graded","not_graded"],"type":"string"},"required":false},"course":{"description":"Filter by Course ID","type":"integer","required":false},"lesson":{"description":"Filter by Lesson ID","type":"integer","default":0,"required":false},"topic":{"description":"Filter by Topic ID","type":"integer","default":0,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/ldlms\/v2\/sfwd-essays"}]}},"\/ldlms\/v2\/sfwd-essays\/(?P<id>[\\d]+)":{"namespace":"ldlms\/v2","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Submitted Essay ID","type":"integer","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"Submitted Essay ID","type":"integer","required":true},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","graded","not_graded","hidden"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"course":{"description":"Course ID","type":"integer","required":false},"lesson":{"description":"Lesson ID","type":"integer","required":false},"topic":{"description":"Topic ID","type":"integer","required":false},"points_max":{"description":"Essay Points Maximum","type":"float","required":false},"points_awarded":{"description":"Essay Points Awarded","type":"float","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/ldlms\/v2\/sfwd-question":{"namespace":"ldlms\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"menu_order":{"description":"Limit result set to posts with a specific menu_order value.","type":"integer","required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title","menu_order"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","acf-disabled","graded","not_graded","hidden","any"],"type":"string"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","graded","not_graded","hidden"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"quiz":{"default":"","description":"Quiz ID.","type":"integer","required":false},"question_type":{"default":"single","description":"The type of question. Options include: 'single' (Single choice), 'multiple' (Multiple choice), 'free_answer' (Free choice), 'sort_answer' (Sorting choice), 'matrix_sort_answer' (Matrix Sorting choice), 'cloze_answer' (Fill in the blank), 'assessment_answer' (Assessment), 'essay' (Essay \/ Open Answer).","type":"string","enum":["single","multiple","free_answer","sort_answer","matrix_sort_answer","cloze_answer","assessment_answer","essay"],"required":false},"points_total":{"default":0,"description":"Total Points amount","type":"integer","required":false},"points_per_answer":{"default":false,"description":"Different points for each answer","type":"boolean","required":false},"points_show_in_message":{"default":false,"description":"Show reached points in the correct\/incorrect message? Requires &quot;Different points for each answer&quot; to be enabled.","type":"boolean","required":false},"points_diff_modus":{"default":false,"description":"Whether different points can be awarded for each answer. Requires &quot;Different points for each answer&quot; to be enabled and for the Question Type to be &quot;single&quot;.","type":"boolean","required":false},"disable_correct":{"default":false,"description":"Disable the distinction between correct and incorrect answers. Requires &quot;points_diff_modus&quot; to be enabled.","type":"boolean","required":false},"correct_message":{"description":"Message shown when Question is correct.","type":"string","required":false},"incorrect_message":{"description":"Message shown when Question is incorrect. Cannot be used when the &quot;Same correct and incorrect message text&quot; setting is enabled.","type":"string","required":false},"correct_same":{"default":false,"description":"Whether to use the same correct and incorrect message text for this Question.","type":"boolean","required":false},"hints_enabled":{"default":false,"description":"Activate hint for this Question.","type":"boolean","required":false},"hints_message":{"description":"Hint message.","type":"string","required":false},"answers":{"description":"Question answer sets.","type":"array","items":{"type":"object","properties":{"_answer":{"type":"string","description":"The answer text."},"_html":{"type":"boolean","description":"Whether the HTML is allowed in the answer or not"},"_points":{"type":"integer","description":"The number of points that can be obtained from the answer. Only used if \"points_per_answer\" is enabled for the Question."},"_correct":{"type":"boolean","description":"Whether the answer is correct."},"_sortString":{"type":"string","description":"Sort String. Only used for the \"matrix_sort_answer\" Question type. This is the draggable element that you match with the \"_answer\" field."},"_sortStringHtml":{"type":"boolean","description":"Whether HTML is enabled for _sortString. Only used for the \"matrix_sort_answer\" Question type."},"_graded":{"type":"boolean","description":"Whether the answer can be graded or not."},"_gradingProgression":{"type":"string","description":"Determines how should the answer to this question be marked and graded upon submission. Only applies to the \"essay\" question type","enum":["not-graded-none","not-graded-full","graded-full"]},"_gradedType":{"type":"string","description":"Determines how a user can submit answer. Only applies to the \"essay\" Question type","enum":["text","upload"]}}},"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/ldlms\/v2\/sfwd-question"}]}},"\/ldlms\/v2\/sfwd-question\/(?P<id>[\\d]+)":{"namespace":"ldlms\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Question ID","type":"integer","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"Question ID","type":"integer","required":true},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","graded","not_graded","hidden"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"quiz":{"description":"Quiz ID.","type":"integer","required":false},"question_type":{"description":"The type of question. Options include: 'single' (Single choice), 'multiple' (Multiple choice), 'free_answer' (Free choice), 'sort_answer' (Sorting choice), 'matrix_sort_answer' (Matrix Sorting choice), 'cloze_answer' (Fill in the blank), 'assessment_answer' (Assessment), 'essay' (Essay \/ Open Answer).","type":"string","enum":["single","multiple","free_answer","sort_answer","matrix_sort_answer","cloze_answer","assessment_answer","essay"],"required":false},"points_total":{"description":"Total Points amount","type":"integer","required":false},"points_per_answer":{"description":"Different points for each answer","type":"boolean","required":false},"points_show_in_message":{"description":"Show reached points in the correct\/incorrect message? Requires &quot;Different points for each answer&quot; to be enabled.","type":"boolean","required":false},"points_diff_modus":{"description":"Whether different points can be awarded for each answer. Requires &quot;Different points for each answer&quot; to be enabled and for the Question Type to be &quot;single&quot;.","type":"boolean","required":false},"disable_correct":{"description":"Disable the distinction between correct and incorrect answers. Requires &quot;points_diff_modus&quot; to be enabled.","type":"boolean","required":false},"correct_message":{"description":"Message shown when Question is correct.","type":"string","required":false},"incorrect_message":{"description":"Message shown when Question is incorrect. Cannot be used when the &quot;Same correct and incorrect message text&quot; setting is enabled.","type":"string","required":false},"correct_same":{"description":"Whether to use the same correct and incorrect message text for this Question.","type":"boolean","required":false},"hints_enabled":{"description":"Activate hint for this Question.","type":"boolean","required":false},"hints_message":{"description":"Hint message.","type":"string","required":false},"answers":{"description":"Question answer sets.","type":"array","items":{"type":"object","properties":{"_answer":{"type":"string","description":"The answer text."},"_html":{"type":"boolean","description":"Whether the HTML is allowed in the answer or not"},"_points":{"type":"integer","description":"The number of points that can be obtained from the answer. Only used if \"points_per_answer\" is enabled for the Question."},"_correct":{"type":"boolean","description":"Whether the answer is correct."},"_sortString":{"type":"string","description":"Sort String. Only used for the \"matrix_sort_answer\" Question type. This is the draggable element that you match with the \"_answer\" field."},"_sortStringHtml":{"type":"boolean","description":"Whether HTML is enabled for _sortString. Only used for the \"matrix_sort_answer\" Question type."},"_graded":{"type":"boolean","description":"Whether the answer can be graded or not."},"_gradingProgression":{"type":"string","description":"Determines how should the answer to this question be marked and graded upon submission. Only applies to the \"essay\" question type","enum":["not-graded-none","not-graded-full","graded-full"]},"_gradedType":{"type":"string","description":"Determines how a user can submit answer. Only applies to the \"essay\" Question type","enum":["text","upload"]}}},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"args":{"id":{"description":"Question ID","type":"integer","required":true},"force":{"type":"boolean","default":false,"description":"Whether to bypass trash and force deletion.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/ldlms\/v2\/sfwd-assignment":{"namespace":"ldlms\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"any","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["graded","not_graded"],"type":"string"},"required":false},"course":{"description":"Filter by Course ID","type":"integer","required":false},"lesson":{"description":"Filter by Lesson ID","type":"integer","default":0,"required":false},"topic":{"description":"Filter by Topic ID","type":"integer","default":0,"required":false},"approved_status":{"default":"","description":"Filter by Assignment Approved Status. \"approved\" will show only approved assignments, \"not_approved\" will show only not approved assignments, \"\" will show all assignments.","type":"string","enum":["","approved","not_approved"],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/ldlms\/v2\/sfwd-assignment"}]}},"\/ldlms\/v2\/sfwd-assignment\/(?P<id>[\\d]+)":{"namespace":"ldlms\/v2","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Assignment ID","type":"integer","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"Assignment ID","type":"integer","required":true},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","graded","not_graded","hidden"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"course":{"description":"Course ID","type":"integer","required":false},"lesson":{"description":"Lesson ID","type":"integer","required":false},"topic":{"description":"Topic ID","type":"integer","required":false},"approved_status":{"description":"Assignment Approved Status","type":"string","enum":["","approved","not_approved"],"required":false},"points_enabled":{"description":"Assignment Points Enabled","type":"boolean","required":false},"points_max":{"description":"Assignment Points Maximum","type":"integer","required":false},"points_awarded":{"description":"Assignment Points Awarded","type":"integer","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/ldlms\/v2\/groups":{"namespace":"ldlms\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"title","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title","rand","menu_order"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","acf-disabled","graded","not_graded","hidden","any"],"type":"string"},"required":false},"tax_relation":{"description":"Limit result set based on relationship between multiple taxonomies.","type":"string","enum":["AND","OR"],"required":false},"categories":{"description":"Limit result set to items with specific terms assigned in the categories taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"categories_exclude":{"description":"Limit result set to items except those with specific terms assigned in the categories taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false}},"additionalProperties":false}],"required":false},"tags":{"description":"Limit result set to items with specific terms assigned in the tags taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"tags_exclude":{"description":"Limit result set to items except those with specific terms assigned in the tags taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]}},"additionalProperties":false}],"required":false},"ld_group_category":{"description":"Limit result set to items with specific terms assigned in the ld_group_category taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"ld_group_category_exclude":{"description":"Limit result set to items except those with specific terms assigned in the ld_group_category taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false}},"additionalProperties":false}],"required":false},"ld_group_tag":{"description":"Limit result set to items with specific terms assigned in the ld_group_tag taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"ld_group_tag_exclude":{"description":"Limit result set to items except those with specific terms assigned in the ld_group_tag taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]}},"additionalProperties":false}],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","graded","not_graded","hidden"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"categories":{"description":"The terms assigned to the post in the category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tags":{"description":"The terms assigned to the post in the post_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"ld_group_category":{"description":"The terms assigned to the post in the ld_group_category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"ld_group_tag":{"description":"The terms assigned to the post in the ld_group_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"materials_enabled":{"default":false,"description":"Supplemental Materials Enabled","type":"boolean","required":false},"materials":{"default":"","description":"Supplemental Materials","type":"string","format":"html","required":false},"certificate":{"default":0,"description":"Group Certificate","type":"integer","required":false},"disable_content_table":{"default":false,"description":"Group Content","type":"boolean","required":false},"courses_per_page_enabled":{"default":false,"description":"Custom Group Courses Pagination Enabled. This setting will not take effect if Modern Group Pages are enabled.","type":"boolean","required":false},"courses_per_page_custom":{"default":0,"description":"Courses per page. Requires the &quot;courses_per_page_enabled&quot; setting to be enabled.","type":"integer","required":false},"group_courses_order_enabled":{"default":false,"description":"Custom Group Courses Order Enabled. This must be enabled when setting a custom order.","type":"boolean","required":false},"courses_orderby":{"default":"","description":"Custom Group Courses Order By. This must be set when setting a custom order.","type":"string","enum":["","title","date","menu_order"],"required":false},"courses_order":{"default":"","description":"Custom Group Courses Order Direction.","type":"string","enum":["","ASC","DESC"],"required":false},"price_type":{"default":"closed","description":"Group Price Type","type":"string","enum":["closed","free","paynow","subscribe"],"required":false},"price_type_paynow_price":{"default":"","description":"Pay Now Group Price","type":"string","required":false},"group_price_type_paynow_enrollment_url":{"default":"","description":"Pay Now group Enrollment URL","type":"string","required":false},"price_type_subscribe_price":{"default":"","description":"Subscribe Group Price","type":"string","required":false},"trial_price":{"default":"","description":"Group Trial Price","type":"string","required":false},"group_price_type_subscribe_enrollment_url":{"default":"","description":"Pay Now group Enrollment URL","type":"string","required":false},"price_type_closed_price":{"default":"","description":"Closed Group Price","type":"string","required":false},"price_type_closed_custom_button_url":{"default":"","description":"Closed Group Button URL","type":"string","required":false},"group_start_date":{"default":"0","description":"Start Date in RFC3339 format. IMPORTANT: LLMs must ALWAYS ask for the user&#039;s timezone if not explicitly provided - do not assume UTC. If the user does not specify a timezone, stop and ask them before proceeding. The user&#039;s timezone must be included with the date for accuracy (e.g., &#039;2025-12-01T04:30:00-05:00&#039; for EST). Setting this to &#039;0&#039; will clear the date.","type":"string","required":false},"group_end_date":{"default":"0","description":"End Date in RFC3339 format. IMPORTANT: LLMs must ALWAYS ask for the user&#039;s timezone if not explicitly provided - do not assume UTC. If the user does not specify a timezone, stop and ask them before proceeding. The user&#039;s timezone must be included with the date for accuracy (e.g., &#039;2025-12-01T04:30:00-05:00&#039; for EST). Setting this to &#039;0&#039; will clear the date.","type":"string","required":false},"group_seats_limit":{"default":0,"description":"The maximum number of students allowed in the group. 0 means no limit. Admins can enroll students even if the limit is reached.","type":"integer","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/ldlms\/v2\/groups"}]}},"\/ldlms\/v2\/groups\/(?P<id>[\\d]+)":{"namespace":"ldlms\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Group ID","type":"integer","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"Group ID","type":"integer","required":true},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","graded","not_graded","hidden"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"categories":{"description":"The terms assigned to the post in the category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tags":{"description":"The terms assigned to the post in the post_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"ld_group_category":{"description":"The terms assigned to the post in the ld_group_category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"ld_group_tag":{"description":"The terms assigned to the post in the ld_group_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"materials_enabled":{"description":"Supplemental Materials Enabled","type":"boolean","required":false},"materials":{"description":"Supplemental Materials","type":"string","format":"html","required":false},"certificate":{"description":"Group Certificate","type":"integer","required":false},"disable_content_table":{"description":"Group Content","type":"boolean","required":false},"courses_per_page_enabled":{"description":"Custom Group Courses Pagination Enabled. This setting will not take effect if Modern Group Pages are enabled.","type":"boolean","required":false},"courses_per_page_custom":{"description":"Courses per page. Requires the &quot;courses_per_page_enabled&quot; setting to be enabled.","type":"integer","required":false},"group_courses_order_enabled":{"description":"Custom Group Courses Order Enabled. This must be enabled when setting a custom order.","type":"boolean","required":false},"courses_orderby":{"description":"Custom Group Courses Order By. This must be set when setting a custom order.","type":"string","enum":["","title","date","menu_order"],"required":false},"courses_order":{"description":"Custom Group Courses Order Direction.","type":"string","enum":["","ASC","DESC"],"required":false},"price_type":{"description":"Group Price Type","type":"string","enum":["closed","free","paynow","subscribe"],"required":false},"price_type_paynow_price":{"description":"Pay Now Group Price","type":"string","required":false},"group_price_type_paynow_enrollment_url":{"description":"Pay Now group Enrollment URL","type":"string","required":false},"price_type_subscribe_price":{"description":"Subscribe Group Price","type":"string","required":false},"trial_price":{"description":"Group Trial Price","type":"string","required":false},"group_price_type_subscribe_enrollment_url":{"description":"Pay Now group Enrollment URL","type":"string","required":false},"price_type_closed_price":{"description":"Closed Group Price","type":"string","required":false},"price_type_closed_custom_button_url":{"description":"Closed Group Button URL","type":"string","required":false},"group_start_date":{"description":"Start Date in RFC3339 format. IMPORTANT: LLMs must ALWAYS ask for the user&#039;s timezone if not explicitly provided - do not assume UTC. If the user does not specify a timezone, stop and ask them before proceeding. The user&#039;s timezone must be included with the date for accuracy (e.g., &#039;2025-12-01T04:30:00-05:00&#039; for EST). Setting this to &#039;0&#039; will clear the date.","type":"string","required":false},"group_end_date":{"description":"End Date in RFC3339 format. IMPORTANT: LLMs must ALWAYS ask for the user&#039;s timezone if not explicitly provided - do not assume UTC. If the user does not specify a timezone, stop and ask them before proceeding. The user&#039;s timezone must be included with the date for accuracy (e.g., &#039;2025-12-01T04:30:00-05:00&#039; for EST). Setting this to &#039;0&#039; will clear the date.","type":"string","required":false},"group_seats_limit":{"description":"The maximum number of students allowed in the group. 0 means no limit. Admins can enroll students even if the limit is reached.","type":"integer","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"args":{"id":{"description":"Group ID","type":"integer","required":true},"force":{"type":"boolean","default":false,"description":"Whether to bypass trash and force deletion.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/ldlms\/v2\/groups\/(?P<id>[\\d]+)\/courses":{"namespace":"ldlms\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Group ID","type":"integer","required":true},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"menu_order":{"description":"Limit result set to posts with a specific menu_order value.","type":"integer","required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"title","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title","menu_order","rand","menu_order"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","acf-disabled","graded","not_graded","hidden","any"],"type":"string"},"required":false},"tax_relation":{"description":"Limit result set based on relationship between multiple taxonomies.","type":"string","enum":["AND","OR"],"required":false},"categories":{"description":"Limit result set to items with specific terms assigned in the categories taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"categories_exclude":{"description":"Limit result set to items except those with specific terms assigned in the categories taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false}},"additionalProperties":false}],"required":false},"tags":{"description":"Limit result set to items with specific terms assigned in the tags taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"tags_exclude":{"description":"Limit result set to items except those with specific terms assigned in the tags taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]}},"additionalProperties":false}],"required":false},"ld_course_category":{"description":"Limit result set to items with specific terms assigned in the ld_course_category taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"ld_course_category_exclude":{"description":"Limit result set to items except those with specific terms assigned in the ld_course_category taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false}},"additionalProperties":false}],"required":false},"ld_course_tag":{"description":"Limit result set to items with specific terms assigned in the ld_course_tag taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"ld_course_tag_exclude":{"description":"Limit result set to items except those with specific terms assigned in the ld_course_tag taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]}},"additionalProperties":false}],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"Group ID","type":"integer","required":true},"course_ids":{"description":"Course IDs to add to Group.","type":"array","items":{"type":"integer"},"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"args":{"id":{"description":"Group ID","type":"integer","required":true},"course_ids":{"description":"Course IDs to remove from Group.","type":"array","items":{"type":"integer"},"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/ldlms\/v2\/groups\/(?P<id>[\\d]+)\/leaders":{"namespace":"ldlms\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Group ID","type":"integer","required":true},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"default":"asc","description":"Order sort attribute ascending or descending.","enum":["asc","desc"],"type":"string","required":false},"orderby":{"default":"name","description":"Sort collection by user attribute.","enum":["id","include","name","registered_date","slug","include_slugs","email","url"],"type":"string","required":false},"slug":{"description":"Limit result set to users with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"roles":{"description":"Limit result set to users matching at least one specific role provided. Accepts csv list or single role.","type":"array","items":{"type":"string"},"required":false},"capabilities":{"description":"Limit result set to users matching at least one specific capability provided. Accepts csv list or single capability.","type":"array","items":{"type":"string"},"required":false},"who":{"description":"Limit result set to users who are considered authors.","type":"string","enum":["authors"],"required":false},"has_published_posts":{"description":"Limit result set to users who have published posts.","type":["boolean","array"],"items":{"type":"string","enum":{"post":"post","page":"page","attachment":"attachment","nav_menu_item":"nav_menu_item","wp_block":"wp_block","wp_template":"wp_template","wp_template_part":"wp_template_part","wp_global_styles":"wp_global_styles","wp_navigation":"wp_navigation","wp_font_family":"wp_font_family","wp_font_face":"wp_font_face","sfwd-courses":"sfwd-courses","sfwd-lessons":"sfwd-lessons","sfwd-topic":"sfwd-topic","sfwd-quiz":"sfwd-quiz","sfwd-question":"sfwd-question","ld-exam":"ld-exam","groups":"groups","docs":"docs","gp_elements":"gp_elements","spectra-popup":"spectra-popup","betterdocs_faq":"betterdocs_faq"}},"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["email","name","id","username","slug"],"type":"string"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"Group ID","type":"integer","required":true},"user_ids":{"description":"Group Leader User IDs to enroll into Group","type":"array","items":{"type":"integer"},"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"args":{"id":{"description":"Group ID","type":"integer","required":true},"user_ids":{"description":"Group Leader User IDs to remove from Group","type":"array","items":{"type":"integer"},"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/ldlms\/v2\/groups\/(?P<id>[\\d]+)\/users":{"namespace":"ldlms\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Group ID","type":"integer","required":true},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"default":"asc","description":"Order sort attribute ascending or descending.","enum":["asc","desc"],"type":"string","required":false},"orderby":{"default":"name","description":"Sort collection by user attribute.","enum":["id","include","name","registered_date","slug","include_slugs","email","url"],"type":"string","required":false},"slug":{"description":"Limit result set to users with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"roles":{"description":"Limit result set to users matching at least one specific role provided. Accepts csv list or single role.","type":"array","items":{"type":"string"},"required":false},"capabilities":{"description":"Limit result set to users matching at least one specific capability provided. Accepts csv list or single capability.","type":"array","items":{"type":"string"},"required":false},"who":{"description":"Limit result set to users who are considered authors.","type":"string","enum":["authors"],"required":false},"has_published_posts":{"description":"Limit result set to users who have published posts.","type":["boolean","array"],"items":{"type":"string","enum":{"post":"post","page":"page","attachment":"attachment","nav_menu_item":"nav_menu_item","wp_block":"wp_block","wp_template":"wp_template","wp_template_part":"wp_template_part","wp_global_styles":"wp_global_styles","wp_navigation":"wp_navigation","wp_font_family":"wp_font_family","wp_font_face":"wp_font_face","sfwd-courses":"sfwd-courses","sfwd-lessons":"sfwd-lessons","sfwd-topic":"sfwd-topic","sfwd-quiz":"sfwd-quiz","sfwd-question":"sfwd-question","ld-exam":"ld-exam","groups":"groups","docs":"docs","gp_elements":"gp_elements","spectra-popup":"spectra-popup","betterdocs_faq":"betterdocs_faq"}},"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["email","name","id","username","slug"],"type":"string"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"Group ID","type":"integer","required":true},"user_ids":{"description":"User IDs to enroll into Group.","type":"array","items":{"type":"integer"},"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"args":{"id":{"description":"Group ID","type":"integer","required":true},"user_ids":{"description":"User IDs to remove from Group.","type":"array","items":{"type":"integer"},"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/ldlms\/v2\/users\/(?P<id>[\\d]+)\/courses":{"namespace":"ldlms\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"User ID","type":"integer","required":true},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"menu_order":{"description":"Limit result set to posts with a specific menu_order value.","type":"integer","required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"title","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title","menu_order","rand","menu_order"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","acf-disabled","graded","not_graded","hidden","any"],"type":"string"},"required":false},"tax_relation":{"description":"Limit result set based on relationship between multiple taxonomies.","type":"string","enum":["AND","OR"],"required":false},"categories":{"description":"Limit result set to items with specific terms assigned in the categories taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"categories_exclude":{"description":"Limit result set to items except those with specific terms assigned in the categories taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false}},"additionalProperties":false}],"required":false},"tags":{"description":"Limit result set to items with specific terms assigned in the tags taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"tags_exclude":{"description":"Limit result set to items except those with specific terms assigned in the tags taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]}},"additionalProperties":false}],"required":false},"ld_course_category":{"description":"Limit result set to items with specific terms assigned in the ld_course_category taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"ld_course_category_exclude":{"description":"Limit result set to items except those with specific terms assigned in the ld_course_category taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false}},"additionalProperties":false}],"required":false},"ld_course_tag":{"description":"Limit result set to items with specific terms assigned in the ld_course_tag taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"ld_course_tag_exclude":{"description":"Limit result set to items except those with specific terms assigned in the ld_course_tag taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]}},"additionalProperties":false}],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"User ID","type":"integer","required":true},"course_ids":{"description":"Course IDs to add to User.","type":"array","items":{"type":"integer"},"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"args":{"id":{"description":"User ID","type":"integer","required":true},"course_ids":{"description":"Course IDs to remove from User.","type":"array","items":{"type":"integer"},"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/ldlms\/v2\/users\/(?P<id>[\\d]+)\/courses\/(?P<course>[\\d]+)":{"namespace":"ldlms\/v2","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"User ID","type":"integer","required":true},"course":{"description":"Course ID","type":"integer","required":true},"enrolled_at":{"description":"The enrollment date for the Course.","type":"string","format":"date-time","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/ldlms\/v2\/users\/(?P<id>[\\d]+)\/groups":{"namespace":"ldlms\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"User ID","type":"integer","required":true},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"title","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title","rand","menu_order"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","acf-disabled","graded","not_graded","hidden","any"],"type":"string"},"required":false},"tax_relation":{"description":"Limit result set based on relationship between multiple taxonomies.","type":"string","enum":["AND","OR"],"required":false},"categories":{"description":"Limit result set to items with specific terms assigned in the categories taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"categories_exclude":{"description":"Limit result set to items except those with specific terms assigned in the categories taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false}},"additionalProperties":false}],"required":false},"tags":{"description":"Limit result set to items with specific terms assigned in the tags taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"tags_exclude":{"description":"Limit result set to items except those with specific terms assigned in the tags taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]}},"additionalProperties":false}],"required":false},"ld_group_category":{"description":"Limit result set to items with specific terms assigned in the ld_group_category taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"ld_group_category_exclude":{"description":"Limit result set to items except those with specific terms assigned in the ld_group_category taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false}},"additionalProperties":false}],"required":false},"ld_group_tag":{"description":"Limit result set to items with specific terms assigned in the ld_group_tag taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"ld_group_tag_exclude":{"description":"Limit result set to items except those with specific terms assigned in the ld_group_tag taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]}},"additionalProperties":false}],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"User ID","type":"integer","required":true},"group_ids":{"description":"Group IDs to add to User.","type":"array","items":{"type":"integer"},"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"args":{"id":{"description":"User ID","type":"integer","required":true},"group_ids":{"description":"Group IDs to remove from User.","type":"array","items":{"type":"integer"},"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/ldlms\/v2\/users\/(?P<id>[\\d]+)\/course-progress":{"namespace":"ldlms\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"User ID","type":"integer","required":true},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view"],"default":"view","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/ldlms\/v2\/users\/(?P<id>[\\d]+)\/course-progress\/(?P<course>[\\d]+)":{"namespace":"ldlms\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"User ID","type":"integer","required":true},"course":{"description":"Course ID","type":"integer","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/ldlms\/v2\/users\/(?P<id>[\\d]+)\/course-progress\/(?P<course>[\\d]+)\/steps":{"namespace":"ldlms\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"User ID","type":"integer","required":true},"course":{"description":"Course ID","type":"integer","required":true},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/ldlms\/v2\/users\/(?P<id>[\\d]+)\/course-progress\/(?P<course>[\\d]+)\/exam":{"namespace":"ldlms\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"User ID","type":"integer","required":true},"course":{"description":"Course ID","type":"integer","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/ldlms\/v2\/users\/(?P<id>[\\d]+)\/quiz-progress":{"namespace":"ldlms\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"User ID","type":"integer","required":true},"quiz":{"description":"Limit results to be within a specific Quiz.","type":"integer","required":false},"course":{"description":"Limit results to be within a specific Course.","type":"integer","required":false},"lesson":{"description":"Limit results to be within a specific Lesson. Pass zero to show global Course Quizzes. Must be used with Course parameter.","type":"integer","required":false},"topic":{"description":"Limit results to be within a specific Topic. Must be used with Course parameter.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"orderby":{"default":"taken","enum":["taken","title","id","date"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/ldlms\/v2\/sfwd-quiz\/(?P<quiz>[\\d]+)\/statistics":{"namespace":"ldlms\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"quiz":{"description":"Filter by Quiz ID","type":"integer","required":true},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","quiz","user"],"required":false},"user":{"description":"Filter by User ID","type":"integer","required":false},"after":{"description":"Limit response items after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"before":{"description":"Limit response to items before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/ldlms\/v2\/sfwd-quiz\/(?P<quiz>[\\d]+)\/statistics\/(?P<statistic>[\\d]+)":{"namespace":"ldlms\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"quiz":{"description":"Quiz ID.","type":"integer","required":true},"statistic":{"description":"Quiz Statistic ID.","type":"integer","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/ldlms\/v2\/sfwd-quiz\/(?P<quiz>[\\d]+)\/statistics\/(?P<statistic>[\\d]+)\/questions":{"namespace":"ldlms\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"quiz":{"description":"Quiz ID.","type":"integer","required":true},"statistic":{"description":"Quiz Statistic ID.","type":"integer","required":true},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/ldlms\/v2\/sfwd-quiz\/(?P<quiz>[\\d]+)\/statistics\/(?P<statistic>[\\d]+)\/questions\/(?P<id>[\\w-]+)":{"namespace":"ldlms\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"quiz":{"description":"Quiz ID.","type":"integer","required":true},"statistic":{"description":"Quiz Statistic ID.","type":"integer","required":true},"id":{"description":"Quiz Statistic Question ID (Statistics ID + &quot;_&quot; + Question ID)","type":"text","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/ldlms\/v2\/sfwd-quiz\/(?P<quiz>[\\d]+)\/form-entries":{"namespace":"ldlms\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed"],"default":"view","required":false},"user":{"description":"User ID","type":"integer","default":0,"required":false},"quiz":{"description":"Quiz ID","type":"integer","default":0,"required":false},"order":{"description":"Order","type":"string","default":"DESC","enum":["ASC","DESC"],"required":false},"orderby":{"description":"Order by","type":"string","default":"date","enum":["date"],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/ldlms\/v2\/echo":{"namespace":"ldlms\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/ldlms\/v2\/echo"}]}},"\/ldlms\/v2\/price-types":{"namespace":"ldlms\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/ldlms\/v2\/price-types"}]}},"\/ldlms\/v2\/price-types\/(?P<slug>[\\w-]+)":{"namespace":"ldlms\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"slug":{"description":"An alphanumeric identifier for the price type.","type":"string","required":true},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/ldlms\/v2\/question-types":{"namespace":"ldlms\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/ldlms\/v2\/question-types"}]}},"\/ldlms\/v2\/question-types\/(?P<slug>[\\w-]+)":{"namespace":"ldlms\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"slug":{"description":"An alphanumeric slug for the question type","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/ldlms\/v2\/progress-status":{"namespace":"ldlms\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/ldlms\/v2\/progress-status"}]}},"\/ldlms\/v2\/progress-status\/(?P<slug>[\\w-]+)":{"namespace":"ldlms\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"slug":{"description":"An alphanumeric identifier for the progress status.","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/ldlms\/v2\/exams":{"namespace":"ldlms\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title","rand","menu_order"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","acf-disabled","graded","not_graded","hidden","any"],"type":"string"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","graded","not_graded","hidden"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"inline_featured_image":{"type":"boolean","title":"","description":"","default":false},"_uag_custom_page_level_css":{"type":"string","title":"","description":"","default":""},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/ldlms\/v2\/exams"}]}},"\/ldlms\/v2\/exams\/(?P<id>[\\d]+)":{"namespace":"ldlms\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Challenge Exam ID","type":"integer","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"Challenge Exam ID","type":"integer","required":true},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","graded","not_graded","hidden"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"inline_featured_image":{"type":"boolean","title":"","description":"","default":false},"_uag_custom_page_level_css":{"type":"string","title":"","description":"","default":""},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"args":{"id":{"description":"Challenge Exam ID","type":"integer","required":true},"force":{"type":"boolean","default":false,"description":"Whether to bypass trash and force deletion.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/learndash\/v1":{"namespace":"learndash\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"learndash\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/learndash\/v1"}]}},"\/learndash\/v1\/manifest":{"namespace":"learndash\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/learndash\/v1\/manifest"}]}},"\/learndash\/v1\/manifest\/detail\/(?P<method>get|post|put|patch|delete|options|head)\/(?P<path>.+)":{"namespace":"learndash\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"method":{"type":"string","description":"The type of HTTP method.","enum":["get","post","put","patch","delete","options","head"],"required":true},"path":{"type":"string","description":"The URL safe base64 encoded path relative to \/wp-json to get schema details for.","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/learndash\/v1\/manifest\/component\/(?P<component>[\\w-]+)":{"namespace":"learndash\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"component":{"type":"string","description":"The component to fetch the schema for.","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/learndash\/v1\/docs\/openapi":{"namespace":"learndash\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/learndash\/v1\/docs\/openapi"}]}},"\/learndash\/v1\/profile\/remove-card":{"namespace":"learndash\/v1","methods":["DELETE"],"endpoints":[{"methods":["DELETE"],"args":{"card_id":{"type":"string","description":"The ID of the card to remove.","required":true},"gateway_id":{"type":"string","description":"The ID of the payment gateway.","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/learndash\/v1\/profile\/remove-card"}]}},"\/learndash\/v1\/progress-status":{"namespace":"learndash\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/learndash\/v1\/progress-status"}]}},"\/learndash\/v1\/progress-status\/(?P<post_type>[\\w-]+)":{"namespace":"learndash\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/learndash\/v1\/progress-status\/(?P<post_type>[\\w-]+)\/(?P<slug>[\\w-]+)":{"namespace":"learndash\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/learndash\/v1\/commerce\/paypal\/onboarding\/access_token":{"namespace":"learndash\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"shared_id":{"type":"string","description":"The shared ID from PayPal onboarding.","required":true},"auth_code":{"type":"string","description":"The authorization code from PayPal onboarding.","required":true},"is_sandbox":{"type":"boolean","default":false,"description":"Whether to use the sandbox environment.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/learndash\/v1\/commerce\/paypal\/onboarding\/access_token"}]}},"\/learndash\/v1\/commerce\/paypal\/onboarding\/disconnect":{"namespace":"learndash\/v1","methods":["DELETE"],"endpoints":[{"methods":["DELETE"],"args":{"confirm_disconnect":{"type":"boolean","default":false,"description":"Whether to confirm the disconnect.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/learndash\/v1\/commerce\/paypal\/onboarding\/disconnect"}]}},"\/learndash\/v1\/commerce\/paypal\/onboarding\/reconnect":{"namespace":"learndash\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"is_sandbox":{"type":"boolean","default":false,"description":"Whether to use the sandbox environment.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/learndash\/v1\/commerce\/paypal\/onboarding\/reconnect"}]}},"\/learndash\/v1\/commerce\/paypal\/onboarding\/signup_url":{"namespace":"learndash\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"account_country":{"type":"string","default":"US","description":"The country code of the account to sign up.","enum":["AF","AX","AL","DZ","AS","AD","AO","AI","AQ","AG","AR","AM","AW","AU","AT","AZ","BS","BH","BD","BB","BY","BE","BZ","BJ","BM","BT","BO","BQ","BA","BW","BV","BR","IO","BN","BG","BF","BI","KH","CM","CA","CV","KY","CF","TD","CL","CN","CX","CC","CO","KM","CG","CD","CK","CR","CI","HR","CU","CW","CY","CZ","DK","DJ","DM","DO","EC","EG","SV","GQ","ER","EE","ET","FK","FO","FJ","FI","FR","GF","PF","TF","GA","GM","GE","DE","GH","GI","GR","GL","GD","GP","GU","GT","GG","GN","GW","GY","HT","HM","HN","HK","HU","IS","IN","ID","IR","IQ","IE","IM","IL","IT","JM","JP","JE","JO","KZ","KE","KI","KP","KR","KW","KG","LA","LV","LB","LS","LR","LY","LI","LT","LU","MO","MK","MG","MW","MY","MV","ML","MT","MH","MQ","MR","MU","YT","MX","FM","MD","MC","MN","ME","MS","MA","MZ","MM","NA","NR","NP","NL","NC","NZ","NI","NE","NG","NU","NF","MP","NO","OM","PK","PW","PS","PA","PG","PY","PE","PH","PN","PL","PT","PR","QA","RE","RO","RU","RW","BL","SH","KN","LC","MF","PM","VC","WS","SM","ST","SA","SN","RS","SC","SL","SG","SX","SK","SI","SB","SO","ZA","GS","SS","ES","LK","SD","SR","SJ","SZ","SE","CH","SY","TW","TJ","TZ","TH","TL","TG","TK","TO","TT","TN","TR","TM","TC","TV","UG","UA","AE","GB","UM","US","UY","UZ","VU","VA","VE","VN","VG","VI","WF","EH","YE","ZM","ZW"],"required":false},"is_sandbox":{"type":"boolean","default":false,"description":"Whether to use the sandbox environment.","required":false},"is_setup_wizard":{"type":"boolean","default":false,"description":"Whether the request is from the setup wizard.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/learndash\/v1\/commerce\/paypal\/onboarding\/signup_url"}]}},"\/learndash\/v1\/commerce\/paypal\/payments\/cancel":{"namespace":"learndash\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"order_id":{"type":"string","description":"The PayPal order ID to cancel.","required":true},"user_id":{"type":"integer","description":"The user ID to cancel the PayPal order for.","required":true},"is_sandbox":{"type":"boolean","default":false,"description":"Whether to use the sandbox environment.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/learndash\/v1\/commerce\/paypal\/payments\/cancel"}]}},"\/learndash\/v1\/commerce\/paypal\/payments\/capture":{"namespace":"learndash\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"order_id":{"type":"string","description":"The PayPal order ID to capture.","required":true},"payer_id":{"type":"string","default":"","description":"The PayPal payer ID.","required":false},"is_sandbox":{"type":"boolean","default":false,"description":"Whether to use the sandbox environment.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/learndash\/v1\/commerce\/paypal\/payments\/capture"}]}},"\/learndash\/v1\/commerce\/paypal\/payments\/cards":{"namespace":"learndash\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"user_id":{"type":"integer","description":"User ID to retrieve cards for.","required":true},"customer_id":{"type":"string","description":"PayPal customer ID to validate against the user.","required":true},"is_sandbox":{"type":"boolean","default":false,"description":"Whether to use the sandbox environment.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/learndash\/v1\/commerce\/paypal\/payments\/cards"}]}},"\/learndash\/v1\/commerce\/paypal\/payments\/confirm":{"namespace":"learndash\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"order_id":{"type":"string","description":"The PayPal order ID to confirm.","required":true},"user_id":{"type":"integer","description":"The PayPal user ID for the payment confirmation.","required":true},"is_sandbox":{"type":"boolean","default":false,"description":"Whether to use the sandbox environment.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/learndash\/v1\/commerce\/paypal\/payments\/confirm"}]}},"\/learndash\/v1\/commerce\/paypal\/payments\/order":{"namespace":"learndash\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"products":{"type":"array","description":"Array of product IDs to purchase.","items":{"type":"integer"},"required":true},"user_id":{"type":"integer","description":"User ID of the customer.","required":true},"use_card_fields":{"type":"boolean","default":false,"description":"Whether to use the card fields.","required":false},"save_payment_method":{"type":"boolean","default":false,"description":"Whether to save the payment method for future use.","required":false},"customer_id":{"type":"string","default":"","description":"The PayPal customer ID to use for the payment.","required":false},"vault_id":{"type":"string","default":"","description":"The PayPal vault ID to use for the payment.","required":false},"is_sandbox":{"type":"boolean","default":false,"description":"Whether to use the sandbox environment.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/learndash\/v1\/commerce\/paypal\/payments\/order"}]}},"\/learndash\/v1\/commerce\/paypal\/payments\/payment-token":{"namespace":"learndash\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"token_id":{"type":"string","description":"The PayPal setup token ID.","required":true},"user_id":{"type":"integer","description":"User ID to associate the payment token with.","required":true},"product_id":{"type":"integer","default":0,"description":"Product ID for the payment.","required":false},"is_sandbox":{"type":"boolean","default":false,"description":"Whether to use the sandbox environment.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/learndash\/v1\/commerce\/paypal\/payments\/payment-token"}]}},"\/learndash\/v1\/commerce\/paypal\/payments\/setup-token":{"namespace":"learndash\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"product_id":{"type":"integer","default":0,"description":"Product ID for the setup token.","required":false},"user_id":{"type":"integer","description":"User ID of the customer.","required":true},"use_card_fields":{"type":"boolean","default":false,"description":"Whether to use the card fields.","required":false},"is_sandbox":{"type":"boolean","default":false,"description":"Whether to use the sandbox environment.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/learndash\/v1\/commerce\/paypal\/payments\/setup-token"}]}},"\/learndash\/v1\/commerce\/paypal\/payments\/start-trial":{"namespace":"learndash\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"user_id":{"type":"integer","description":"The user ID for the trial.","required":true},"product_id":{"type":"integer","description":"The product ID for the trial.","required":true},"token_id":{"type":"string","description":"The PayPal token ID.","required":true},"customer_id":{"type":"string","description":"The PayPal customer ID.","required":true},"type":{"type":"string","description":"The payment type.","enum":["paypal","card"],"required":true},"is_sandbox":{"type":"boolean","default":false,"description":"Whether to use the sandbox environment.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/learndash\/v1\/commerce\/paypal\/payments\/start-trial"}]}},"\/learndash\/v1\/commerce\/paypal\/webhook":{"namespace":"learndash\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/learndash\/v1\/commerce\/paypal\/webhook"}]}},"\/learndash\/v1\/commerce\/paypal-standard\/migration\/setup-token":{"namespace":"learndash\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"user_id":{"type":"integer","description":"User ID of the customer.","required":true},"is_sandbox":{"type":"boolean","default":false,"description":"Whether to use the sandbox environment.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/learndash\/v1\/commerce\/paypal-standard\/migration\/setup-token"}]}},"\/learndash\/v1\/commerce\/paypal-standard\/migration\/payment-token":{"namespace":"learndash\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"token_id":{"type":"string","description":"The PayPal setup token ID.","required":true},"user_id":{"type":"integer","description":"User ID to associate the payment token with.","required":true},"is_sandbox":{"type":"boolean","default":false,"description":"Whether to use the sandbox environment.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/learndash\/v1\/commerce\/paypal-standard\/migration\/payment-token"}]}},"\/wpml\/tm\/v1":{"namespace":"wpml\/tm\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wpml\/tm\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wpml\/tm\/v1"}]}},"\/wpml\/tm\/v1\/ate\/jobs\/store":{"namespace":"wpml\/tm\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_job_id":{"type":"string","required":true},"ate_job_data":{"type":"array","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wpml\/tm\/v1\/ate\/jobs\/store"}]}},"\/wpml\/tm\/v1\/xliff\/fetch\/(?P<jobId>\\d+)":{"namespace":"wpml\/tm\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wpml\/tm\/v1\/ams\/register_manager":{"namespace":"wpml\/tm\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wpml\/tm\/v1\/ams\/register_manager"}]}},"\/wpml\/tm\/v1\/ams\/synchronize\/translators":{"namespace":"wpml\/tm\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wpml\/tm\/v1\/ams\/synchronize\/translators"}]}},"\/wpml\/tm\/v1\/ams\/synchronize\/managers":{"namespace":"wpml\/tm\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wpml\/tm\/v1\/ams\/synchronize\/managers"}]}},"\/wpml\/tm\/v1\/ams\/status":{"namespace":"wpml\/tm\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wpml\/tm\/v1\/ams\/status"}]}},"\/wpml\/tm\/v1\/ams\/console":{"namespace":"wpml\/tm\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wpml\/tm\/v1\/ams\/console"}]}},"\/wpml\/tm\/v1\/ams\/engines":{"namespace":"wpml\/tm\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wpml\/tm\/v1\/ams\/engines"}]}},"\/wpml\/tm\/v1\/ate\/jobs":{"namespace":"wpml\/tm\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wpml\/tm\/v1\/ate\/jobs"}]}},"\/wpml\/tm\/v1\/ate\/jobs\/(?P<ateJobId>\\d+)":{"namespace":"wpml\/tm\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wpml\/tm\/v1\/jobs":{"namespace":"wpml\/tm\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"local_job_ids":{"type":"string","required":false},"scope":{"type":"string","required":false},"id":{"type":"integer","required":false},"title":{"type":"string","required":false},"source_language":{"type":"string","required":false},"target_language":{"type":"string","required":false},"status":{"type":"string","required":false},"needs_update":{"type":"string","required":false},"limit":{"type":"integer","required":false},"offset":{"type":"integer","required":false},"sorting":{"required":false},"translated_by":{"type":"string","required":false},"sent_from":{"type":"string","required":false},"sent_to":{"type":"string","required":false},"deadline_from":{"type":"string","required":false},"deadline_to":{"type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wpml\/tm\/v1\/jobs"}]}},"\/wpml\/tm\/v1\/jobs\/assign":{"namespace":"wpml\/tm\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"jobId":{"required":true},"type":{"required":false},"translatorId":{"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wpml\/tm\/v1\/jobs\/assign"}]}},"\/wpml\/tm\/v1\/jobs\/cancel":{"namespace":"wpml\/tm\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wpml\/tm\/v1\/jobs\/cancel"}]}},"\/wpml\/tm\/v1\/tp\/xliff\/download\/(?P<job_id>\\d+)\/(?P<job_type>\\w+)":{"namespace":"wpml\/tm\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"job_id":{"required":true},"job_type":{"required":true},"json":{"type":"boolean","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wpml\/tm\/v1\/tp\/apply-translations":{"namespace":"wpml\/tm\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wpml\/tm\/v1\/tp\/apply-translations"}]}},"\/wpml\/tm\/v1\/tp\/batches\/sync":{"namespace":"wpml\/tm\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"batchId":{"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wpml\/tm\/v1\/tp\/batches\/sync"}]}},"\/wpml\/tm\/v1\/tp\/batches\/status":{"namespace":"wpml\/tm\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wpml\/tm\/v1\/tp\/batches\/status"}]}},"\/wpml\/tm\/v1\/ate\/jobs\/sync":{"namespace":"wpml\/tm\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"lockKey":{"type":"string","required":false},"ateToken":{"type":"string","required":false},"page":{"type":"int","required":false},"numberOfPages":{"type":"int","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wpml\/tm\/v1\/ate\/jobs\/sync"}]}},"\/wpml\/tm\/v1\/ate\/jobs\/download":{"namespace":"wpml\/tm\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wpml\/tm\/v1\/ate\/jobs\/download"}]}},"\/wpml\/tm\/v1\/ate\/jobs\/retry":{"namespace":"wpml\/tm\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wpml\/tm\/v1\/ate\/jobs\/retry"}]}},"\/wpml\/tm\/v1\/ate\/jobs\/receive\/(?P<wpmlJobId>\\d+)":{"namespace":"wpml\/tm\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpmlJobId":{"type":"int","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wpml\/tm\/v1\/ate\/jobs\/(?P<ateJobId>\\d+)\/fix":{"namespace":"wpml\/tm\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wpml\/ate\/v1":{"namespace":"wpml\/ate\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wpml\/ate\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wpml\/ate\/v1"}]}},"\/wpml\/ate\/v1\/ate\/proxy":{"namespace":"wpml\/ate\/v1","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET","POST","PUT","PATCH","DELETE"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wpml\/ate\/v1\/ate\/proxy"}]}},"\/wpml\/st\/v1\/import_mo_strings":{"namespace":"wpml\/st\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"plugins":{"type":"array","required":false},"themes":{"type":"array","required":false},"other":{"type":"array","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wpml\/st\/v1\/import_mo_strings"}]}},"\/wpml\/st\/v1\/pre_generate_mo_files":{"namespace":"wpml\/st\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wpml\/st\/v1\/pre_generate_mo_files"}]}},"\/wpml\/st\/v1\/settings":{"namespace":"wpml\/st\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"group":{"required":true},"key":{"required":true},"data":{"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wpml\/st\/v1\/settings"}]}},"\/wpml\/v1\/updates":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wpml\/v1\/updates"}]}},"\/wpml\/v1\/troubleshooting\/posthog":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wpml\/v1\/troubleshooting\/posthog"}]}},"\/wpml\/v1\/item-sections\/populated":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wpml\/v1\/item-sections\/populated"}]}},"\/wpml\/v1\/posts":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wpml\/v1\/posts"}]}},"\/wpml\/v1\/posts\/count":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wpml\/v1\/posts\/count"}]}},"\/wpml\/v1\/send-to-translation\/validate-translation-options":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wpml\/v1\/send-to-translation\/validate-translation-options"}]}},"\/wpml\/v1\/send-to-translation\/default-batch-name":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wpml\/v1\/send-to-translation\/default-batch-name"}]}},"\/wpml\/v1\/send-to-translation\/validate-batch-name":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wpml\/v1\/send-to-translation\/validate-batch-name"}]}},"\/wpml\/v1\/set-review-translation-option":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wpml\/v1\/set-review-translation-option"}]}},"\/wpml\/v1\/posts\/hierarchical":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wpml\/v1\/posts\/hierarchical"}]}},"\/wpml\/v1\/posts\/taxonomies":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wpml\/v1\/posts\/taxonomies"}]}},"\/wpml\/v1\/posts\/terms":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wpml\/v1\/posts\/terms"}]}},"\/wpml\/v1\/translate-everything\/enable":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wpml\/v1\/translate-everything\/enable"}]}},"\/wpml\/v1\/translate-everything\/disable":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wpml\/v1\/translate-everything\/disable"}]}},"\/wpml\/v1\/cancelallautomaticjobs":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wpml\/v1\/cancelallautomaticjobs"}]}},"\/wpml\/v1\/getuntranslatedtypescount":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wpml\/v1\/getuntranslatedtypescount"}]}},"\/wpml\/v1\/save-translator-note":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wpml\/v1\/save-translator-note"}]}},"\/wpml\/v1\/credits":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wpml\/v1\/credits"}]}},"\/wpml\/v1\/translation-proxy\/commit-batch":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wpml\/v1\/translation-proxy\/commit-batch"}]}},"\/wpml\/v1\/tranlsation-proxy\/getlastpickedup":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wpml\/v1\/tranlsation-proxy\/getlastpickedup"}]}},"\/wpml\/v1\/translation-proxy\/getRemoteJobsCount":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wpml\/v1\/translation-proxy\/getRemoteJobsCount"}]}},"\/wpml\/v1\/gettranslationstatus":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wpml\/v1\/gettranslationstatus"}]}},"\/wpml\/v1\/getlocaltranslatorbyid":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wpml\/v1\/getlocaltranslatorbyid"}]}},"\/wpml\/v1\/reloadremotetranslationservice":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wpml\/v1\/reloadremotetranslationservice"}]}},"\/wpml\/v1\/gettranslationeditortype":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wpml\/v1\/gettranslationeditortype"}]}},"\/wpml\/v1\/translate-existing-content":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wpml\/v1\/translate-existing-content"}]}},"\/wpml\/v1\/get-needs-update-count-created-in-cte":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wpml\/v1\/get-needs-update-count-created-in-cte"}]}},"\/wpml\/v1\/get-engines":{"namespace":"wpml\/v1","methods":["GET","GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wpml\/v1\/get-engines"}]}},"\/wpml\/v1\/website-contexts":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wpml\/v1\/website-contexts"}]}},"\/wpml\/v1\/has-posts-using-native-editor":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wpml\/v1\/has-posts-using-native-editor"}]}},"\/wpml\/v1\/get-credits-per-word":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wpml\/v1\/get-credits-per-word"}]}},"\/wpml\/v1\/get-words-to-translate-for-items":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wpml\/v1\/get-words-to-translate-for-items"}]}},"\/wpml\/v1\/get-words-to-translate-for-types":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wpml\/v1\/get-words-to-translate-for-types"}]}},"\/wpml\/v1\/save-automatic-translation-settings":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wpml\/v1\/save-automatic-translation-settings"}]}},"\/wpml\/v1\/getlocaltranslators":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wpml\/v1\/getlocaltranslators"}]}},"\/wpml\/v1\/account-balances":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wpml\/v1\/account-balances"}]}},"\/wpml\/v1\/glossary-count":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wpml\/v1\/glossary-count"}]}},"\/wpml\/v1\/enable-ate":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wpml\/v1\/enable-ate"}]}},"\/wpml\/v1\/get-dismissed-notices":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wpml\/v1\/get-dismissed-notices"}]}},"\/wpml\/v1\/minimum-requirements":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wpml\/v1\/minimum-requirements"}]}},"\/wpml\/v1\/rest\/status":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wpml\/v1\/rest\/status"}]}},"\/wpml\/v1\/dismiss-notice":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wpml\/v1\/dismiss-notice"}]}},"\/wpml\/v1\/dismiss-notice-per-user":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wpml\/v1\/dismiss-notice-per-user"}]}},"\/wpml\/v1\/cancel-jobs":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wpml\/v1\/cancel-jobs"}]}},"\/wpml\/v1\/unsolvable-jobs":{"namespace":"wpml\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wpml\/v1\/unsolvable-jobs"}]}},"\/wpml\/v1\/resend-unsolvable-jobs":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wpml\/v1\/resend-unsolvable-jobs"}]}},"\/wpml\/v1\/wpml\/posthog\/capture-event":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wpml\/v1\/wpml\/posthog\/capture-event"}]}},"\/wpml\/v1\/capture\/event":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wpml\/v1\/capture\/event"}]}},"\/wpml\/v1\/wpml-proxy\/status":{"namespace":"wpml\/v1","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wpml\/v1\/wpml-proxy\/status"}]}},"\/wpml\/v1\/wpml-content-stats":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wpml\/v1\/wpml-content-stats"}]}},"\/wpml\/v1\/wpml-ph-make-external-request":{"namespace":"wpml\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wpml\/v1\/wpml-ph-make-external-request"}]}},"\/spectra\/v1":{"namespace":"spectra\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"spectra\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/spectra\/v1"}]}},"\/spectra\/v1\/all_taxonomy":{"namespace":"spectra\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/spectra\/v1\/all_taxonomy"}]}},"\/spectra\/v1\/editor":{"namespace":"spectra\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/spectra\/v1\/editor"}]}},"\/spectra\/v1\/check-custom-fields-support":{"namespace":"spectra\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/spectra\/v1\/check-custom-fields-support"}]}},"\/uag\/v1":{"namespace":"uag\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"uag\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/uag\/v1"}]}},"\/uag\/v1\/admin\/commonsettings":{"namespace":"uag\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/uag\/v1\/admin\/commonsettings"}]}},"\/yoast\/v1\/redirects":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"origin":{"type":"string","description":"The origin to redirect","required":true},"target":{"type":"string","description":"The redirect target","required":false},"type":{"type":"integer","description":"The redirect type","required":true},"ignore_warning":{"type":"boolean","description":"Whether to ignore warnings","default":false,"required":false},"format":{"description":"The format of the redirect to create.","type":"string","enum":["plain","regex"],"default":"plain","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/yoast\/v1\/redirects"}]}},"\/yoast\/v1\/redirects\/delete":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"origin":{"type":"string","description":"The origin to redirect","required":true},"target":{"type":"string","description":"The redirect target","required":false},"type":{"type":"string","description":"The redirect format","required":false},"ignore_warning":{"type":"boolean","description":"Whether to ignore warnings","default":false,"required":false},"format":{"description":"The format of the redirect to create.","type":"string","enum":["plain","regex"],"default":"plain","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/yoast\/v1\/redirects\/delete"}]}},"\/yoast\/v1\/redirects\/list":{"namespace":"yoast\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"format":{"description":"The format of the redirects to retrieve.","type":"string","enum":["plain","regex"],"default":"plain","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/yoast\/v1\/redirects\/list"}]}},"\/yoast\/v1\/redirects\/update":{"namespace":"yoast\/v1","methods":["PUT"],"endpoints":[{"methods":["PUT"],"args":{"old_origin":{"type":"string","description":"The origin to redirect (old)","required":true},"old_target":{"type":"string","description":"The redirect target (old)","required":false},"old_type":{"type":"integer","description":"The redirect type (old)","required":true},"new_origin":{"type":"string","description":"The origin to redirect (new)","required":true},"new_target":{"type":"string","description":"The redirect target (new)","required":false},"new_type":{"type":"integer","description":"The redirect type (new)","required":true},"ignore_warning":{"type":"boolean","description":"Whether to ignore warnings","default":false,"required":false},"format":{"description":"The format of the redirects to retrieve.","type":"string","enum":["plain","regex"],"default":"plain","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/yoast\/v1\/redirects\/update"}]}},"\/yoast\/v1\/redirects\/settings":{"namespace":"yoast\/v1","methods":["GET","PUT"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["PUT"],"args":{"disable_php_redirect":{"description":"Whether to disable PHP-based redirects and use .htaccess instead.","type":"string","enum":["on","off"],"required":true},"separate_file":{"description":"Whether to write redirects into a separate file instead of .htaccess.","type":"string","enum":["on","off"],"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/yoast\/v1\/redirects\/settings"}]}},"\/yoast\/v1\/redirects\/undo-for-object":{"namespace":"yoast\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"obj_id":{"type":"int","description":"The id of the post or term","required":true},"obj_type":{"type":"string","description":"The object type: post or term","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/yoast\/v1\/redirects\/undo-for-object"}]}},"\/generatepress\/v1":{"namespace":"generatepress\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"generatepress\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/generatepress\/v1"}]}},"\/generatepress\/v1\/reset":{"namespace":"generatepress\/v1","methods":["POST","PUT","PATCH"],"endpoints":[{"methods":["POST","PUT","PATCH"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/generatepress\/v1\/reset"}]}},"\/betterdocs":{"namespace":"betterdocs","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"betterdocs","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/betterdocs"}]}},"\/betterdocs\/faq\/sample_data":{"namespace":"betterdocs","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/betterdocs\/faq\/sample_data"}]}},"\/betterdocs\/faq\/posts\/(?P<type>\\S+)":{"namespace":"betterdocs","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/betterdocs\/faq\/create_category":{"namespace":"betterdocs","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/betterdocs\/faq\/create_category"}]}},"\/betterdocs\/faq\/update_category":{"namespace":"betterdocs","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/betterdocs\/faq\/update_category"}]}},"\/betterdocs\/faq\/delete_category":{"namespace":"betterdocs","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/betterdocs\/faq\/delete_category"}]}},"\/betterdocs\/faq\/create_post":{"namespace":"betterdocs","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/betterdocs\/faq\/create_post"}]}},"\/betterdocs\/faq\/update_post":{"namespace":"betterdocs","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/betterdocs\/faq\/update_post"}]}},"\/betterdocs\/faq\/delete_post":{"namespace":"betterdocs","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/betterdocs\/faq\/delete_post"}]}},"\/betterdocs\/faq\/category_status":{"namespace":"betterdocs","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/betterdocs\/faq\/category_status"}]}},"\/betterdocs\/faq\/category_order":{"namespace":"betterdocs","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/betterdocs\/faq\/category_order"}]}},"\/betterdocs\/faq\/update_order_by_category":{"namespace":"betterdocs","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/betterdocs\/faq\/update_order_by_category"}]}},"\/betterdocs\/faq\/uncategorised":{"namespace":"betterdocs","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/betterdocs\/faq\/uncategorised"}]}},"\/betterdocs\/faq\/category_search":{"namespace":"betterdocs","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"title":{"type":"string","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/betterdocs\/faq\/category_search"}]}},"\/betterdocs\/glossary\/sample_data":{"namespace":"betterdocs","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/betterdocs\/glossary\/sample_data"}]}},"\/betterdocs\/glossary\/posts\/(?P<type>\\S+)":{"namespace":"betterdocs","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/betterdocs\/glossary\/create_glossary":{"namespace":"betterdocs","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/betterdocs\/glossary\/create_glossary"}]}},"\/betterdocs\/glossary\/update_glossary":{"namespace":"betterdocs","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/betterdocs\/glossary\/update_glossary"}]}},"\/betterdocs\/glossary\/delete_glossary":{"namespace":"betterdocs","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/betterdocs\/glossary\/delete_glossary"}]}},"\/betterdocs\/glossary\/glossary_status":{"namespace":"betterdocs","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/betterdocs\/glossary\/glossary_status"}]}},"\/betterdocs\/glossary\/glossaries_order":{"namespace":"betterdocs","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/betterdocs\/glossary\/glossaries_order"}]}},"\/betterdocs\/glossary\/update_order_by_glossary":{"namespace":"betterdocs","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/betterdocs\/glossary\/update_order_by_glossary"}]}},"\/betterdocs\/glossary\/glossary_search":{"namespace":"betterdocs","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"title":{"type":"string","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/betterdocs\/glossary\/glossary_search"}]}},"\/betterdocs\/glossary\/glossary_count":{"namespace":"betterdocs","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/betterdocs\/glossary\/glossary_count"}]}},"\/betterdocs\/glossary\/get_glossaries":{"namespace":"betterdocs","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/betterdocs\/glossary\/get_glossaries"}]}},"\/betterdocs-pro\/v1":{"namespace":"betterdocs-pro\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"betterdocs-pro\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/betterdocs-pro\/v1"}]}},"\/betterdocs-pro\/v1\/license\/activate":{"namespace":"betterdocs-pro\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"license_key":{"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/betterdocs-pro\/v1\/license\/activate"}]}},"\/betterdocs-pro\/v1\/license\/deactivate":{"namespace":"betterdocs-pro\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/betterdocs-pro\/v1\/license\/deactivate"}]}},"\/betterdocs-pro\/v1\/license\/submit-otp":{"namespace":"betterdocs-pro\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"license_key":{"required":true},"otp":{"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/betterdocs-pro\/v1\/license\/submit-otp"}]}},"\/betterdocs-pro\/v1\/license\/resend-otp":{"namespace":"betterdocs-pro\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"license_key":{"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/betterdocs-pro\/v1\/license\/resend-otp"}]}},"\/betterdocs-pro\/v1\/license\/get-license":{"namespace":"betterdocs-pro\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/betterdocs-pro\/v1\/license\/get-license"}]}},"\/betterdocs\/v1\/overview":{"namespace":"betterdocs\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/betterdocs\/v1\/overview"}]}},"\/betterdocs\/v1\/feedbacks":{"namespace":"betterdocs\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/betterdocs\/v1\/feedbacks"}]}},"\/betterdocs\/v1\/feedbacks\/(?P<type>\\S+)":{"namespace":"betterdocs\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/betterdocs\/v1\/search\/(?P<type>\\S+)":{"namespace":"betterdocs\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/betterdocs\/v1\/leading_docs":{"namespace":"betterdocs\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/betterdocs\/v1\/leading_docs"}]}},"\/betterdocs\/v1\/leading_docs\/(?P<type>\\S+)":{"namespace":"betterdocs\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/betterdocs\/v1\/leading(?P<type>\\S+)":{"namespace":"betterdocs\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/betterdocs\/v1\/docs_order":{"namespace":"betterdocs\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"orderby":{"required":false},"order":{"required":false},"per_page":{"required":false},"doc_category":{"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/betterdocs\/v1\/docs_order"}]}},"\/betterdocs\/v1\/knowledge_base":{"namespace":"betterdocs\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/betterdocs\/v1\/knowledge_base"}]}},"\/betterdocs\/v1\/doc_category":{"namespace":"betterdocs\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"orderby":{"required":false},"order":{"required":false},"per_page":{"required":false},"doc_category":{"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/betterdocs\/v1\/doc_category"}]}},"\/betterdocs\/v1\/ask":{"namespace":"betterdocs\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/betterdocs\/v1\/ask"}]}},"\/betterdocs\/v1\/feedback":{"namespace":"betterdocs\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/betterdocs\/v1\/feedback"}]}},"\/betterdocs\/v1\/plugin_info":{"namespace":"betterdocs\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/betterdocs\/v1\/plugin_info"}]}},"\/betterdocs\/v1\/popular_search_keyword":{"namespace":"betterdocs\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/betterdocs\/v1\/popular_search_keyword"}]}},"\/learndashCourseReviews\/v1":{"namespace":"learndashCourseReviews\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"learndashCourseReviews\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/learndashCourseReviews\/v1"}]}},"\/learndashCourseReviews\/v1\/addReview\/(?P<course_id>\\d+)":{"namespace":"learndashCourseReviews\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/ld-propanel\/v1":{"namespace":"ld-propanel\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"ld-propanel\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/ld-propanel\/v1"}]}},"\/ld-propanel\/v1\/gutenberg-get-posts":{"namespace":"ld-propanel\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"s":{"required":true},"post_type":{"required":true},"offset":{"required":false},"per_page":{"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/ld-propanel\/v1\/gutenberg-get-posts"}]}},"\/ld-propanel\/v1\/gutenberg-get-post":{"namespace":"ld-propanel\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"id":{"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/ld-propanel\/v1\/gutenberg-get-post"}]}},"\/ld-propanel\/v1\/gutenberg-get-users":{"namespace":"ld-propanel\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"s":{"required":true},"offset":{"required":false},"per_page":{"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/ld-propanel\/v1\/gutenberg-get-users"}]}},"\/ld-propanel\/v1\/gutenberg-get-user":{"namespace":"ld-propanel\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"id":{"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/ld-propanel\/v1\/gutenberg-get-user"}]}},"\/otgs\/installer\/v1":{"namespace":"otgs\/installer\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"otgs\/installer\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/otgs\/installer\/v1"}]}},"\/otgs\/installer\/v1\/push\/fetch-subscription":{"namespace":"otgs\/installer\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/otgs\/installer\/v1\/push\/fetch-subscription"}]}},"\/zipwp-images\/v1":{"namespace":"zipwp-images\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"zipwp-images\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/zipwp-images\/v1"}]}},"\/zipwp-images\/v1\/images":{"namespace":"zipwp-images\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"keywords":{"type":"string","required":true},"per_page":{"type":"string","required":false},"page":{"type":"string","required":false},"orientation":{"type":"string","required":false},"engine":{"type":"string","required":false},"filter":{"type":"string","required":false},"color":{"type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/zipwp-images\/v1\/images"}]}},"\/nps-survey\/v1":{"namespace":"nps-survey\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"nps-survey\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/nps-survey\/v1"}]}},"\/nps-survey\/v1\/rating":{"namespace":"nps-survey\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/nps-survey\/v1\/rating"}]}},"\/nps-survey\/v1\/dismiss-nps-survey":{"namespace":"nps-survey\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/nps-survey\/v1\/dismiss-nps-survey"}]}},"\/zipwp\/v1":{"namespace":"zipwp\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"zipwp\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/zipwp\/v1"}]}},"\/zipwp\/v1\/search-category":{"namespace":"zipwp\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"keyword":{"type":"string","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/zipwp\/v1\/search-category"}]}},"\/zipwp\/v1\/site-languages":{"namespace":"zipwp\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/zipwp\/v1\/site-languages"}]}},"\/gutenberg-templates\/v1":{"namespace":"gutenberg-templates\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"gutenberg-templates\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/gutenberg-templates\/v1"}]}},"\/gutenberg-templates\/v1\/categories":{"namespace":"gutenberg-templates\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/gutenberg-templates\/v1\/categories"}]}},"\/gutenberg-templates\/v1\/description":{"namespace":"gutenberg-templates\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"business_name":{"type":"string","required":true},"business_description":{"type":"string","required":false},"category":{"type":"string","required":false},"language_name":{"type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/gutenberg-templates\/v1\/description"}]}},"\/gutenberg-templates\/v1\/page-description":{"namespace":"gutenberg-templates\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"business_name":{"type":"string","required":true},"business_description":{"type":"string","required":false},"page_name":{"type":"string","required":true},"page_description":{"type":"string","required":false},"category":{"type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/gutenberg-templates\/v1\/page-description"}]}},"\/gutenberg-templates\/v1\/keywords":{"namespace":"gutenberg-templates\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"business_name":{"type":"string","required":true},"business_description":{"type":"string","required":false},"category":{"type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/gutenberg-templates\/v1\/keywords"}]}},"\/gutenberg-templates\/v1\/images":{"namespace":"gutenberg-templates\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"keywords":{"type":"string","required":true},"per_page":{"type":"integer","required":false},"page":{"type":"integer","required":false},"orientation":{"type":"string","required":false},"engine":{"type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/gutenberg-templates\/v1\/images"}]}},"\/gutenberg-templates\/v1\/settings":{"namespace":"gutenberg-templates\/v1","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"key":{"type":"string","required":true},"value":{"type":"boolean","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/gutenberg-templates\/v1\/settings"}]}},"\/gutenberg-templates\/v1\/favorite":{"namespace":"gutenberg-templates\/v1","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"type":{"type":"string","required":true},"block_id":{"type":"integer","required":true},"status":{"type":"boolean","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/gutenberg-templates\/v1\/favorite"}]}},"\/gutenberg-templates\/v1\/do-it-later":{"namespace":"gutenberg-templates\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/gutenberg-templates\/v1\/do-it-later"}]}},"\/gutenberg-templates\/v1\/pages-onboarding":{"namespace":"gutenberg-templates\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/gutenberg-templates\/v1\/pages-onboarding"}]}},"\/gutenberg-templates\/v1\/revoke-access":{"namespace":"gutenberg-templates\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/gutenberg-templates\/v1\/revoke-access"}]}},"\/gutenberg-templates\/v1\/blocks":{"namespace":"gutenberg-templates\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/gutenberg-templates\/v1\/blocks"}]}},"\/gutenberg-templates\/v1\/setup":{"namespace":"gutenberg-templates\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/gutenberg-templates\/v1\/setup"}]}},"\/gutenberg-templates\/v1\/sites":{"namespace":"gutenberg-templates\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/gutenberg-templates\/v1\/sites"}]}},"\/wpforms\/v1":{"namespace":"wpforms\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wpforms\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wpforms\/v1"}]}},"\/wpforms\/v1\/forms":{"namespace":"wpforms\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wpforms\/v1\/forms"}]}},"\/wpforms\/v1\/themes":{"namespace":"wpforms\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wpforms\/v1\/themes"}]}},"\/wpforms\/v1\/themes\/custom":{"namespace":"wpforms\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wpforms\/v1\/themes\/custom"}]}},"\/wpforms\/v1\/stock-photos\/install":{"namespace":"wpforms\/v1","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wpforms\/v1\/stock-photos\/install"}]}},"\/wp\/v2":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wp\/v2","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2"}]}},"\/wp\/v2\/posts":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title","rand","menu_order"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","acf-disabled","graded","not_graded","hidden","any"],"type":"string"},"required":false},"tax_relation":{"description":"Limit result set based on relationship between multiple taxonomies.","type":"string","enum":["AND","OR"],"required":false},"categories":{"description":"Limit result set to items with specific terms assigned in the categories taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"categories_exclude":{"description":"Limit result set to items except those with specific terms assigned in the categories taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false}},"additionalProperties":false}],"required":false},"tags":{"description":"Limit result set to items with specific terms assigned in the tags taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"tags_exclude":{"description":"Limit result set to items except those with specific terms assigned in the tags taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]}},"additionalProperties":false}],"required":false},"sticky":{"description":"Limit result set to items that are sticky.","type":"boolean","required":false},"ignore_sticky":{"description":"Whether to ignore sticky posts or not.","type":"boolean","default":true,"required":false},"format":{"description":"Limit result set to items assigned one or more given formats.","type":"array","uniqueItems":true,"items":{"enum":["standard","aside","chat","gallery","link","image","quote","status","video","audio"],"type":"string"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","graded","not_graded","hidden"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"format":{"description":"The format for the post.","type":"string","enum":["standard","aside","chat","gallery","link","image","quote","status","video","audio"],"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"inline_featured_image":{"type":"boolean","title":"","description":"","default":false},"_uag_custom_page_level_css":{"type":"string","title":"","description":"","default":""},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"sticky":{"description":"Whether or not the post should be treated as sticky.","type":"boolean","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"categories":{"description":"The terms assigned to the post in the category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tags":{"description":"The terms assigned to the post in the post_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/posts"}]}},"\/wp\/v2\/posts\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"excerpt_length":{"description":"Override the default excerpt length.","type":"integer","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","graded","not_graded","hidden"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"format":{"description":"The format for the post.","type":"string","enum":["standard","aside","chat","gallery","link","image","quote","status","video","audio"],"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"inline_featured_image":{"type":"boolean","title":"","description":"","default":false},"_uag_custom_page_level_css":{"type":"string","title":"","description":"","default":""},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"sticky":{"description":"Whether or not the post should be treated as sticky.","type":"boolean","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"categories":{"description":"The terms assigned to the post in the category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tags":{"description":"The terms assigned to the post in the post_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/posts\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/posts\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/posts\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","graded","not_graded","hidden"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"format":{"description":"The format for the post.","type":"string","enum":["standard","aside","chat","gallery","link","image","quote","status","video","audio"],"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"inline_featured_image":{"type":"boolean","title":"","description":"","default":false},"_uag_custom_page_level_css":{"type":"string","title":"","description":"","default":""},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"sticky":{"description":"Whether or not the post should be treated as sticky.","type":"boolean","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"categories":{"description":"The terms assigned to the post in the category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tags":{"description":"The terms assigned to the post in the post_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/posts\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/pages":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"menu_order":{"description":"Limit result set to posts with a specific menu_order value.","type":"integer","required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title","menu_order","rand","menu_order"],"required":false},"parent":{"description":"Limit result set to items with particular parent IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"parent_exclude":{"description":"Limit result set to all items except those of a particular parent ID.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","acf-disabled","graded","not_graded","hidden","any"],"type":"string"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","graded","not_graded","hidden"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"parent":{"description":"The ID for the parent of the post.","type":"integer","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"inline_featured_image":{"type":"boolean","title":"","description":"","default":false},"_uag_custom_page_level_css":{"type":"string","title":"","description":"","default":""},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pages"}]}},"\/wp\/v2\/pages\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"excerpt_length":{"description":"Override the default excerpt length.","type":"integer","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","graded","not_graded","hidden"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"parent":{"description":"The ID for the parent of the post.","type":"integer","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"inline_featured_image":{"type":"boolean","title":"","description":"","default":false},"_uag_custom_page_level_css":{"type":"string","title":"","description":"","default":""},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/pages\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/pages\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/pages\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","graded","not_graded","hidden"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"inline_featured_image":{"type":"boolean","title":"","description":"","default":false},"_uag_custom_page_level_css":{"type":"string","title":"","description":"","default":""},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/pages\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/media":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"parent":{"description":"Limit result set to items with particular parent IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"parent_exclude":{"description":"Limit result set to all items except those of a particular parent ID.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"inherit","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["inherit","private","trash"],"type":"string"},"required":false},"media_type":{"default":null,"description":"Limit result set to attachments of a particular media type or media types.","type":"array","items":{"type":"string","enum":["image","video","text","application","audio"]},"required":false},"mime_type":{"default":null,"description":"Limit result set to attachments of a particular MIME type or MIME types.","type":"array","items":{"type":"string"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","graded","not_graded","hidden"],"required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"inline_featured_image":{"type":"boolean","title":"","description":"","default":false},"_uag_custom_page_level_css":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"alt_text":{"description":"Alternative text to display when attachment is not displayed.","type":"string","required":false},"caption":{"description":"The attachment caption.","type":"object","properties":{"raw":{"description":"Caption for the attachment, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML caption for the attachment, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"description":"The attachment description.","type":"object","properties":{"raw":{"description":"Description for the attachment, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML description for the attachment, transformed for display.","type":"string","context":["view","edit"],"readonly":true}},"required":false},"post":{"description":"The ID for the associated post of the attachment.","type":"integer","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media"}]}},"\/wp\/v2\/media\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","graded","not_graded","hidden"],"required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"inline_featured_image":{"type":"boolean","title":"","description":"","default":false},"_uag_custom_page_level_css":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"alt_text":{"description":"Alternative text to display when attachment is not displayed.","type":"string","required":false},"caption":{"description":"The attachment caption.","type":"object","properties":{"raw":{"description":"Caption for the attachment, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML caption for the attachment, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"description":"The attachment description.","type":"object","properties":{"raw":{"description":"Description for the attachment, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML description for the attachment, transformed for display.","type":"string","context":["view","edit"],"readonly":true}},"required":false},"post":{"description":"The ID for the associated post of the attachment.","type":"integer","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/media\/(?P<id>[\\d]+)\/post-process":{"namespace":"wp\/v2","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"id":{"description":"Unique identifier for the attachment.","type":"integer","required":false},"action":{"type":"string","enum":["create-image-subsizes"],"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/media\/(?P<id>[\\d]+)\/edit":{"namespace":"wp\/v2","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"src":{"description":"URL to the edited image file.","type":"string","format":"uri","required":true},"modifiers":{"description":"Array of image edits.","type":"array","minItems":1,"items":{"description":"Image edit.","type":"object","required":["type","args"],"oneOf":[{"title":"Flip","properties":{"type":{"description":"Flip type.","type":"string","enum":["flip"]},"args":{"description":"Flip arguments.","type":"object","required":["flip"],"properties":{"flip":{"description":"Flip direction.","type":"object","required":["horizontal","vertical"],"properties":{"horizontal":{"description":"Whether to flip in the horizontal direction.","type":"boolean"},"vertical":{"description":"Whether to flip in the vertical direction.","type":"boolean"}}}}}}},{"title":"Rotation","properties":{"type":{"description":"Rotation type.","type":"string","enum":["rotate"]},"args":{"description":"Rotation arguments.","type":"object","required":["angle"],"properties":{"angle":{"description":"Angle to rotate clockwise in degrees.","type":"number"}}}}},{"title":"Crop","properties":{"type":{"description":"Crop type.","type":"string","enum":["crop"]},"args":{"description":"Crop arguments.","type":"object","required":["left","top","width","height"],"properties":{"left":{"description":"Horizontal position from the left to begin the crop as a percentage of the image width.","type":"number"},"top":{"description":"Vertical position from the top to begin the crop as a percentage of the image height.","type":"number"},"width":{"description":"Width of the crop as a percentage of the image width.","type":"number"},"height":{"description":"Height of the crop as a percentage of the image height.","type":"number"}}}}}]},"required":false},"rotation":{"description":"The amount to rotate the image clockwise in degrees. DEPRECATED: Use `modifiers` instead.","type":"integer","minimum":0,"exclusiveMinimum":true,"maximum":360,"exclusiveMaximum":true,"required":false},"x":{"description":"As a percentage of the image, the x position to start the crop from. DEPRECATED: Use `modifiers` instead.","type":"number","minimum":0,"maximum":100,"required":false},"y":{"description":"As a percentage of the image, the y position to start the crop from. DEPRECATED: Use `modifiers` instead.","type":"number","minimum":0,"maximum":100,"required":false},"width":{"description":"As a percentage of the image, the width to crop the image to. DEPRECATED: Use `modifiers` instead.","type":"number","minimum":0,"maximum":100,"required":false},"height":{"description":"As a percentage of the image, the height to crop the image to. DEPRECATED: Use `modifiers` instead.","type":"number","minimum":0,"maximum":100,"required":false},"caption":{"description":"The attachment caption.","type":"object","properties":{"raw":{"description":"Caption for the attachment, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML caption for the attachment, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"description":"The attachment description.","type":"object","properties":{"raw":{"description":"Description for the attachment, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML description for the attachment, transformed for display.","type":"string","context":["view","edit"],"readonly":true}},"required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"post":{"description":"The ID for the associated post of the attachment.","type":"integer","required":false},"alt_text":{"description":"Alternative text to display when attachment is not displayed.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/menu-items":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":100,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"menu_order","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title","menu_order"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","acf-disabled","graded","not_graded","hidden","any"],"type":"string"},"required":false},"tax_relation":{"description":"Limit result set based on relationship between multiple taxonomies.","type":"string","enum":["AND","OR"],"required":false},"menus":{"description":"Limit result set to items with specific terms assigned in the menus taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"menus_exclude":{"description":"Limit result set to items except those with specific terms assigned in the menus taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]}},"additionalProperties":false}],"required":false},"menu_order":{"description":"Limit result set to posts with a specific menu_order value.","type":"integer","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"title":{"description":"The title for the object.","type":["string","object"],"properties":{"raw":{"description":"Title for the object, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the object, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"type":{"default":"custom","description":"The family of objects originally represented, such as \"post_type\" or \"taxonomy\".","type":"string","enum":["taxonomy","post_type","post_type_archive","custom"],"required":false},"status":{"default":"publish","description":"A named status for the object.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","graded","not_graded","hidden"],"required":false},"parent":{"default":0,"description":"The ID for the parent of the object.","type":"integer","minimum":0,"required":false},"attr_title":{"description":"Text for the title attribute of the link element for this menu item.","type":"string","required":false},"classes":{"description":"Class names for the link element of this menu item.","type":"array","items":{"type":"string"},"required":false},"description":{"description":"The description of this menu item.","type":"string","required":false},"menu_order":{"default":1,"description":"The DB ID of the nav_menu_item that is this item's menu parent, if any, otherwise 0.","type":"integer","minimum":1,"required":false},"object":{"description":"The type of object originally represented, such as \"category\", \"post\", or \"attachment\".","type":"string","required":false},"object_id":{"default":0,"description":"The database ID of the original object this menu item represents, for example the ID for posts or the term_id for categories.","type":"integer","minimum":0,"required":false},"target":{"description":"The target attribute of the link element for this menu item.","type":"string","enum":["_blank",""],"required":false},"url":{"description":"The URL to which this menu item points.","type":"string","format":"uri","required":false},"xfn":{"description":"The XFN relationship expressed in the link of this menu item.","type":"array","items":{"type":"string"},"required":false},"menus":{"description":"The terms assigned to the object in the nav_menu taxonomy.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"inline_featured_image":{"type":"boolean","title":"","description":"","default":false},"_uag_custom_page_level_css":{"type":"string","title":"","description":"","default":""}},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/menu-items"}]}},"\/wp\/v2\/menu-items\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"title":{"description":"The title for the object.","type":["string","object"],"properties":{"raw":{"description":"Title for the object, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the object, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"type":{"description":"The family of objects originally represented, such as \"post_type\" or \"taxonomy\".","type":"string","enum":["taxonomy","post_type","post_type_archive","custom"],"required":false},"status":{"description":"A named status for the object.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","graded","not_graded","hidden"],"required":false},"parent":{"description":"The ID for the parent of the object.","type":"integer","minimum":0,"required":false},"attr_title":{"description":"Text for the title attribute of the link element for this menu item.","type":"string","required":false},"classes":{"description":"Class names for the link element of this menu item.","type":"array","items":{"type":"string"},"required":false},"description":{"description":"The description of this menu item.","type":"string","required":false},"menu_order":{"description":"The DB ID of the nav_menu_item that is this item's menu parent, if any, otherwise 0.","type":"integer","minimum":1,"required":false},"object":{"description":"The type of object originally represented, such as \"category\", \"post\", or \"attachment\".","type":"string","required":false},"object_id":{"description":"The database ID of the original object this menu item represents, for example the ID for posts or the term_id for categories.","type":"integer","minimum":0,"required":false},"target":{"description":"The target attribute of the link element for this menu item.","type":"string","enum":["_blank",""],"required":false},"url":{"description":"The URL to which this menu item points.","type":"string","format":"uri","required":false},"xfn":{"description":"The XFN relationship expressed in the link of this menu item.","type":"array","items":{"type":"string"},"required":false},"menus":{"description":"The terms assigned to the object in the nav_menu taxonomy.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"inline_featured_image":{"type":"boolean","title":"","description":"","default":false},"_uag_custom_page_level_css":{"type":"string","title":"","description":"","default":""}},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/menu-items\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the object.","type":"integer","minimum":0,"required":false},"title":{"description":"The title for the object.","type":["string","object"],"properties":{"raw":{"description":"Title for the object, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the object, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"type":{"description":"The family of objects originally represented, such as \"post_type\" or \"taxonomy\".","type":"string","enum":["taxonomy","post_type","post_type_archive","custom"],"required":false},"status":{"description":"A named status for the object.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","graded","not_graded","hidden"],"required":false},"attr_title":{"description":"Text for the title attribute of the link element for this menu item.","type":"string","required":false},"classes":{"description":"Class names for the link element of this menu item.","type":"array","items":{"type":"string"},"required":false},"description":{"description":"The description of this menu item.","type":"string","required":false},"menu_order":{"description":"The DB ID of the nav_menu_item that is this item's menu parent, if any, otherwise 0.","type":"integer","minimum":1,"required":false},"object":{"description":"The type of object originally represented, such as \"category\", \"post\", or \"attachment\".","type":"string","required":false},"object_id":{"description":"The database ID of the original object this menu item represents, for example the ID for posts or the term_id for categories.","type":"integer","minimum":0,"required":false},"target":{"description":"The target attribute of the link element for this menu item.","type":"string","enum":["_blank",""],"required":false},"url":{"description":"The URL to which this menu item points.","type":"string","format":"uri","required":false},"xfn":{"description":"The XFN relationship expressed in the link of this menu item.","type":"array","items":{"type":"string"},"required":false},"menus":{"description":"The terms assigned to the object in the nav_menu taxonomy.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"inline_featured_image":{"type":"boolean","title":"","description":"","default":false},"_uag_custom_page_level_css":{"type":"string","title":"","description":"","default":""}},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/menu-items\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/blocks":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","acf-disabled","graded","not_graded","hidden","any"],"type":"string"},"required":false},"tax_relation":{"description":"Limit result set based on relationship between multiple taxonomies.","type":"string","enum":["AND","OR"],"required":false},"wp_pattern_category":{"description":"Limit result set to items with specific terms assigned in the wp_pattern_category taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"wp_pattern_category_exclude":{"description":"Limit result set to items except those with specific terms assigned in the wp_pattern_category taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]}},"additionalProperties":false}],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","graded","not_graded","hidden"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["view","edit"]}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"inline_featured_image":{"type":"boolean","title":"","description":"","default":false},"_uag_custom_page_level_css":{"type":"string","title":"","description":"","default":""},"wp_pattern_sync_status":{"type":"string","title":"","description":"","default":"","enum":["partial","unsynced"]},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"wp_pattern_category":{"description":"The terms assigned to the post in the wp_pattern_category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/blocks"}]}},"\/wp\/v2\/blocks\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"excerpt_length":{"description":"Override the default excerpt length.","type":"integer","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","graded","not_graded","hidden"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["view","edit"]}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"inline_featured_image":{"type":"boolean","title":"","description":"","default":false},"_uag_custom_page_level_css":{"type":"string","title":"","description":"","default":""},"wp_pattern_sync_status":{"type":"string","title":"","description":"","default":"","enum":["partial","unsynced"]},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"wp_pattern_category":{"description":"The terms assigned to the post in the wp_pattern_category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/blocks\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/blocks\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/blocks\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","graded","not_graded","hidden"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["view","edit"]}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"inline_featured_image":{"type":"boolean","title":"","description":"","default":false},"_uag_custom_page_level_css":{"type":"string","title":"","description":"","default":""},"wp_pattern_sync_status":{"type":"string","title":"","description":"","default":"","enum":["partial","unsynced"]},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"wp_pattern_category":{"description":"The terms assigned to the post in the wp_pattern_category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/blocks\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/templates\/(?P<parent>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The id of a template","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/templates\/(?P<parent>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The id of a template","type":"string","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The id of a template","type":"string","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/templates\/(?P<id>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"slug":{"description":"Unique slug identifying the template.","type":"string","minLength":1,"pattern":"[a-zA-Z0-9_\\%-]+","required":false},"theme":{"description":"Theme identifier for the template.","type":"string","required":false},"type":{"description":"Type of template.","type":"string","required":false},"content":{"description":"Content of template.","type":["object","string"],"properties":{"raw":{"description":"Content for the template, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the template.","type":"integer","context":["edit"],"readonly":true}},"required":false},"title":{"description":"Title of template.","type":["object","string"],"properties":{"raw":{"description":"Title for the template, as it exists in the database.","type":"string","context":["view","edit","embed"]},"rendered":{"description":"HTML title for the template, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"description":"Description of template.","type":"string","required":false},"status":{"description":"Status of template.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","graded","not_graded","hidden"],"required":false},"author":{"description":"The ID for the author of the template.","type":"integer","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/templates\/(?P<parent>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The id of a template","type":"string","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/templates":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wp_id":{"description":"Limit to the specified post id.","type":"integer","required":false},"area":{"description":"Limit to the specified template part area.","type":"string","required":false},"post_type":{"description":"Post type to get the templates for.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"args":{"slug":{"description":"Unique slug identifying the template.","type":"string","minLength":1,"pattern":"[a-zA-Z0-9_\\%-]+","required":true},"theme":{"description":"Theme identifier for the template.","type":"string","required":false},"type":{"description":"Type of template.","type":"string","required":false},"content":{"default":"","description":"Content of template.","type":["object","string"],"properties":{"raw":{"description":"Content for the template, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the template.","type":"integer","context":["edit"],"readonly":true}},"required":false},"title":{"default":"","description":"Title of template.","type":["object","string"],"properties":{"raw":{"description":"Title for the template, as it exists in the database.","type":"string","context":["view","edit","embed"]},"rendered":{"description":"HTML title for the template, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"default":"","description":"Description of template.","type":"string","required":false},"status":{"default":"publish","description":"Status of template.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","graded","not_graded","hidden"],"required":false},"author":{"description":"The ID for the author of the template.","type":"integer","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/templates"}]}},"\/wp\/v2\/templates\/lookup":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"slug":{"description":"The slug of the template to get the fallback for","type":"string","required":true},"is_custom":{"description":"Indicates if a template is custom or part of the template hierarchy","type":"boolean","required":false},"template_prefix":{"description":"The template prefix for the created template. This is used to extract the main template type, e.g. in `taxonomy-books` extracts the `taxonomy`","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/templates\/lookup"}]}},"\/wp\/v2\/templates\/(?P<id>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"slug":{"description":"Unique slug identifying the template.","type":"string","minLength":1,"pattern":"[a-zA-Z0-9_\\%-]+","required":false},"theme":{"description":"Theme identifier for the template.","type":"string","required":false},"type":{"description":"Type of template.","type":"string","required":false},"content":{"description":"Content of template.","type":["object","string"],"properties":{"raw":{"description":"Content for the template, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the template.","type":"integer","context":["edit"],"readonly":true}},"required":false},"title":{"description":"Title of template.","type":["object","string"],"properties":{"raw":{"description":"Title for the template, as it exists in the database.","type":"string","context":["view","edit","embed"]},"rendered":{"description":"HTML title for the template, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"description":"Description of template.","type":"string","required":false},"status":{"description":"Status of template.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","graded","not_graded","hidden"],"required":false},"author":{"description":"The ID for the author of the template.","type":"integer","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/template-parts\/(?P<parent>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The id of a template","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/template-parts\/(?P<parent>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The id of a template","type":"string","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The id of a template","type":"string","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/template-parts\/(?P<id>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"slug":{"description":"Unique slug identifying the template.","type":"string","minLength":1,"pattern":"[a-zA-Z0-9_\\%-]+","required":false},"theme":{"description":"Theme identifier for the template.","type":"string","required":false},"type":{"description":"Type of template.","type":"string","required":false},"content":{"description":"Content of template.","type":["object","string"],"properties":{"raw":{"description":"Content for the template, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the template.","type":"integer","context":["edit"],"readonly":true}},"required":false},"title":{"description":"Title of template.","type":["object","string"],"properties":{"raw":{"description":"Title for the template, as it exists in the database.","type":"string","context":["view","edit","embed"]},"rendered":{"description":"HTML title for the template, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"description":"Description of template.","type":"string","required":false},"status":{"description":"Status of template.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","graded","not_graded","hidden"],"required":false},"author":{"description":"The ID for the author of the template.","type":"integer","required":false},"area":{"description":"Where the template part is intended for use (header, footer, etc.)","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/template-parts\/(?P<parent>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The id of a template","type":"string","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/template-parts":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wp_id":{"description":"Limit to the specified post id.","type":"integer","required":false},"area":{"description":"Limit to the specified template part area.","type":"string","required":false},"post_type":{"description":"Post type to get the templates for.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"args":{"slug":{"description":"Unique slug identifying the template.","type":"string","minLength":1,"pattern":"[a-zA-Z0-9_\\%-]+","required":true},"theme":{"description":"Theme identifier for the template.","type":"string","required":false},"type":{"description":"Type of template.","type":"string","required":false},"content":{"default":"","description":"Content of template.","type":["object","string"],"properties":{"raw":{"description":"Content for the template, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the template.","type":"integer","context":["edit"],"readonly":true}},"required":false},"title":{"default":"","description":"Title of template.","type":["object","string"],"properties":{"raw":{"description":"Title for the template, as it exists in the database.","type":"string","context":["view","edit","embed"]},"rendered":{"description":"HTML title for the template, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"default":"","description":"Description of template.","type":"string","required":false},"status":{"default":"publish","description":"Status of template.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","graded","not_graded","hidden"],"required":false},"author":{"description":"The ID for the author of the template.","type":"integer","required":false},"area":{"description":"Where the template part is intended for use (header, footer, etc.)","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/template-parts"}]}},"\/wp\/v2\/template-parts\/lookup":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"slug":{"description":"The slug of the template to get the fallback for","type":"string","required":true},"is_custom":{"description":"Indicates if a template is custom or part of the template hierarchy","type":"boolean","required":false},"template_prefix":{"description":"The template prefix for the created template. This is used to extract the main template type, e.g. in `taxonomy-books` extracts the `taxonomy`","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/template-parts\/lookup"}]}},"\/wp\/v2\/template-parts\/(?P<id>([^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)[\\\/\\w%-]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"slug":{"description":"Unique slug identifying the template.","type":"string","minLength":1,"pattern":"[a-zA-Z0-9_\\%-]+","required":false},"theme":{"description":"Theme identifier for the template.","type":"string","required":false},"type":{"description":"Type of template.","type":"string","required":false},"content":{"description":"Content of template.","type":["object","string"],"properties":{"raw":{"description":"Content for the template, as it exists in the database.","type":"string","context":["view","edit"]},"block_version":{"description":"Version of the content block format used by the template.","type":"integer","context":["edit"],"readonly":true}},"required":false},"title":{"description":"Title of template.","type":["object","string"],"properties":{"raw":{"description":"Title for the template, as it exists in the database.","type":"string","context":["view","edit","embed"]},"rendered":{"description":"HTML title for the template, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"description":{"description":"Description of template.","type":"string","required":false},"status":{"description":"Status of template.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","graded","not_graded","hidden"],"required":false},"author":{"description":"The ID for the author of the template.","type":"integer","required":false},"area":{"description":"Where the template part is intended for use (header, footer, etc.)","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"args":{"id":{"description":"The id of a template","type":"string","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/global-styles\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/global-styles\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the global styles revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the global styles revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/global-styles\/themes\/(?P<stylesheet>[\\\/\\s%\\w\\.\\(\\)\\[\\]\\@_\\-]+)\/variations":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":false},"args":{"stylesheet":{"description":"The theme identifier","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/global-styles\/themes\/(?P<stylesheet>[^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":false},"args":{"stylesheet":{"description":"The theme identifier","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/global-styles\/(?P<id>[\\\/\\d+]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":false},"args":{"id":{"description":"ID of global styles config.","type":"integer","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":false},"args":{"styles":{"description":"Global styles.","type":["object"],"required":false},"settings":{"description":"Global settings.","type":["object"],"required":false},"title":{"description":"Title of the global styles variation.","type":["object","string"],"properties":{"raw":{"description":"Title for the global styles variation, as it exists in the database.","type":"string","context":["view","edit","embed"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/navigation":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","acf-disabled","graded","not_graded","hidden","any"],"type":"string"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","graded","not_graded","hidden"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit","embed"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit","embed"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit","embed"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/navigation"}]}},"\/wp\/v2\/navigation\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","graded","not_graded","hidden"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit","embed"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit","embed"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit","embed"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/navigation\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/navigation\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/navigation\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","graded","not_graded","hidden"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit","embed"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit","embed"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit","embed"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/navigation\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/font-families":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"id","enum":["id","include"],"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"args":{"theme_json_version":{"description":"Version of the theme.json schema used for the typography settings.","type":"integer","default":3,"minimum":2,"maximum":3,"required":false},"font_family_settings":{"description":"font-family declaration in theme.json format, encoded as a string.","type":"string","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/font-families"}]}},"\/wp\/v2\/font-families\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"theme_json_version":{"description":"Version of the theme.json schema used for the typography settings.","type":"integer","default":3,"minimum":2,"maximum":3,"required":false},"font_family_settings":{"description":"font-family declaration in theme.json format, encoded as a string.","type":"string","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/font-families\/(?P<font_family_id>[\\d]+)\/font-faces":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"font_family_id":{"description":"The ID for the parent font family of the font face.","type":"integer","required":true},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"id","enum":["id","include"],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"args":{"font_family_id":{"description":"The ID for the parent font family of the font face.","type":"integer","required":true},"theme_json_version":{"description":"Version of the theme.json schema used for the typography settings.","type":"integer","default":3,"minimum":2,"maximum":3,"required":false},"font_face_settings":{"description":"font-face declaration in theme.json format, encoded as a string.","type":"string","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/font-families\/(?P<font_family_id>[\\d]+)\/font-faces\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"font_family_id":{"description":"The ID for the parent font family of the font face.","type":"integer","required":true},"id":{"description":"Unique identifier for the font face.","type":"integer","required":true},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"args":{"font_family_id":{"description":"The ID for the parent font family of the font face.","type":"integer","required":true},"id":{"description":"Unique identifier for the font face.","type":"integer","required":true},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/sfwd-courses":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"menu_order":{"description":"Limit result set to posts with a specific menu_order value.","type":"integer","required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"title","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title","menu_order","rand","menu_order"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","acf-disabled","graded","not_graded","hidden","any"],"type":"string"},"required":false},"tax_relation":{"description":"Limit result set based on relationship between multiple taxonomies.","type":"string","enum":["AND","OR"],"required":false},"categories":{"description":"Limit result set to items with specific terms assigned in the categories taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"categories_exclude":{"description":"Limit result set to items except those with specific terms assigned in the categories taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false}},"additionalProperties":false}],"required":false},"tags":{"description":"Limit result set to items with specific terms assigned in the tags taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"tags_exclude":{"description":"Limit result set to items except those with specific terms assigned in the tags taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]}},"additionalProperties":false}],"required":false},"ld_course_category":{"description":"Limit result set to items with specific terms assigned in the ld_course_category taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"ld_course_category_exclude":{"description":"Limit result set to items except those with specific terms assigned in the ld_course_category taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false}},"additionalProperties":false}],"required":false},"ld_course_tag":{"description":"Limit result set to items with specific terms assigned in the ld_course_tag taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"ld_course_tag_exclude":{"description":"Limit result set to items except those with specific terms assigned in the ld_course_tag taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]}},"additionalProperties":false}],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","graded","not_graded","hidden"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"categories":{"description":"The terms assigned to the post in the category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tags":{"description":"The terms assigned to the post in the post_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"ld_course_category":{"description":"The terms assigned to the post in the ld_course_category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"ld_course_tag":{"description":"The terms assigned to the post in the ld_course_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"course_materials":{"description":"Course Materials","type":"html","required":false},"course_price_type":{"default":"open","description":"Course Price Type","type":"string","enum":["open","closed","free","buynow","subscribe"],"required":false},"custom_button_label":{"description":"Custom Button Label","type":"text","required":false},"custom_button_url":{"description":"Custom Button URL","type":"text","required":false},"course_price":{"description":"Course Price","type":"text","required":false},"course_prerequisite_enabled":{"default":false,"description":"Enable Course Prerequisites","type":"boolean","required":false},"course_prerequisite":{"default":[],"description":"Course Prerequisites","type":"array","required":false},"course_prerequisite_compare":{"default":"ANY","description":"Course Prerequisites Compare","type":"string","enum":["ANY","ALL"],"required":false},"course_points_enabled":{"description":"Enable Course Points","type":"boolean","required":false},"course_points":{"description":"Course Points","type":"number","required":false},"course_points_access":{"description":"Course Points Access","type":"number","required":false},"course_disable_lesson_progression":{"default":0,"description":"Disable Lesson Progression","type":"boolean","required":false},"expire_access":{"description":"Expire Access","type":"boolean","required":false},"expire_access_days":{"description":"Expire Access After (days)","type":"number","required":false},"expire_access_delete_progress":{"description":"Delete Course and Quiz Data After Expiration","type":"boolean","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/sfwd-courses"}]}},"\/wp\/v2\/sfwd-courses\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","graded","not_graded","hidden"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"categories":{"description":"The terms assigned to the post in the category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tags":{"description":"The terms assigned to the post in the post_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"ld_course_category":{"description":"The terms assigned to the post in the ld_course_category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"ld_course_tag":{"description":"The terms assigned to the post in the ld_course_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"course_materials":{"description":"Course Materials","type":"html","required":false},"course_price_type":{"description":"Course Price Type","type":"string","enum":["open","closed","free","buynow","subscribe"],"required":false},"custom_button_label":{"description":"Custom Button Label","type":"text","required":false},"custom_button_url":{"description":"Custom Button URL","type":"text","required":false},"course_price":{"description":"Course Price","type":"text","required":false},"course_prerequisite_enabled":{"description":"Enable Course Prerequisites","type":"boolean","required":false},"course_prerequisite":{"description":"Course Prerequisites","type":"array","required":false},"course_prerequisite_compare":{"description":"Course Prerequisites Compare","type":"string","enum":["ANY","ALL"],"required":false},"course_points_enabled":{"description":"Enable Course Points","type":"boolean","required":false},"course_points":{"description":"Course Points","type":"number","required":false},"course_points_access":{"description":"Course Points Access","type":"number","required":false},"course_disable_lesson_progression":{"description":"Disable Lesson Progression","type":"boolean","required":false},"expire_access":{"description":"Expire Access","type":"boolean","required":false},"expire_access_days":{"description":"Expire Access After (days)","type":"number","required":false},"expire_access_delete_progress":{"description":"Delete Course and Quiz Data After Expiration","type":"boolean","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/sfwd-courses\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/sfwd-courses\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/sfwd-courses\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","graded","not_graded","hidden"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"categories":{"description":"The terms assigned to the post in the category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tags":{"description":"The terms assigned to the post in the post_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"ld_course_category":{"description":"The terms assigned to the post in the ld_course_category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"ld_course_tag":{"description":"The terms assigned to the post in the ld_course_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"course_materials":{"description":"Course Materials","type":"html","required":false},"course_price_type":{"description":"Course Price Type","type":"string","enum":["open","closed","free","buynow","subscribe"],"required":false},"custom_button_label":{"description":"Custom Button Label","type":"text","required":false},"custom_button_url":{"description":"Custom Button URL","type":"text","required":false},"course_price":{"description":"Course Price","type":"text","required":false},"course_prerequisite_enabled":{"description":"Enable Course Prerequisites","type":"boolean","required":false},"course_prerequisite":{"description":"Course Prerequisites","type":"array","required":false},"course_prerequisite_compare":{"description":"Course Prerequisites Compare","type":"string","enum":["ANY","ALL"],"required":false},"course_points_enabled":{"description":"Enable Course Points","type":"boolean","required":false},"course_points":{"description":"Course Points","type":"number","required":false},"course_points_access":{"description":"Course Points Access","type":"number","required":false},"course_disable_lesson_progression":{"description":"Disable Lesson Progression","type":"boolean","required":false},"expire_access":{"description":"Expire Access","type":"boolean","required":false},"expire_access_days":{"description":"Expire Access After (days)","type":"number","required":false},"expire_access_delete_progress":{"description":"Delete Course and Quiz Data After Expiration","type":"boolean","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/sfwd-courses\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/sfwd-lessons":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"menu_order":{"description":"Limit result set to posts with a specific menu_order value.","type":"integer","required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"title","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title","menu_order","rand","menu_order"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","acf-disabled","graded","not_graded","hidden","any"],"type":"string"},"required":false},"tax_relation":{"description":"Limit result set based on relationship between multiple taxonomies.","type":"string","enum":["AND","OR"],"required":false},"categories":{"description":"Limit result set to items with specific terms assigned in the categories taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"categories_exclude":{"description":"Limit result set to items except those with specific terms assigned in the categories taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false}},"additionalProperties":false}],"required":false},"tags":{"description":"Limit result set to items with specific terms assigned in the tags taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"tags_exclude":{"description":"Limit result set to items except those with specific terms assigned in the tags taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]}},"additionalProperties":false}],"required":false},"ld_lesson_category":{"description":"Limit result set to items with specific terms assigned in the ld_lesson_category taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"ld_lesson_category_exclude":{"description":"Limit result set to items except those with specific terms assigned in the ld_lesson_category taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false}},"additionalProperties":false}],"required":false},"ld_lesson_tag":{"description":"Limit result set to items with specific terms assigned in the ld_lesson_tag taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"ld_lesson_tag_exclude":{"description":"Limit result set to items except those with specific terms assigned in the ld_lesson_tag taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]}},"additionalProperties":false}],"required":false},"course":{"description":"Limit results to be within a specific Course. Required for non-admin users.","type":"integer","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","graded","not_graded","hidden"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"categories":{"description":"The terms assigned to the post in the category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tags":{"description":"The terms assigned to the post in the post_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"ld_lesson_category":{"description":"The terms assigned to the post in the ld_lesson_category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"ld_lesson_tag":{"description":"The terms assigned to the post in the ld_lesson_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"lesson_materials":{"description":"Lesson Materials","type":"html","required":false},"forced_lesson_time":{"default":"","description":"Forced Lesson Timer","type":"text","required":false},"lesson_assignment_upload":{"default":0,"description":"Upload Assignment","type":"boolean","required":false},"auto_approve_assignment":{"default":"on","description":"Auto Approve Assignment","type":"boolean","required":false},"assignment_upload_limit_count":{"default":"1","description":"Limit number of uploaded files","type":"number","required":false},"lesson_assignment_deletion_enabled":{"default":0,"description":"Allow Student to Delete own Assignment(s)","type":"boolean","required":false},"lesson_assignment_points_enabled":{"default":0,"description":"Award Points for Assignment","type":"boolean","required":false},"lesson_assignment_points_amount":{"default":0,"description":"Set Number of Points for Assignment","type":"number","required":false},"assignment_upload_limit_extensions":{"default":"","description":"Allowed File Extensions","type":"text","required":false},"assignment_upload_limit_size":{"default":"","description":"Allowed File Size","type":"text","required":false},"visible_after":{"default":0,"description":"Make Lesson visible X Days After Sign-up","type":"number","required":false},"visible_after_specific_date":{"description":"Make Lesson Visible on Specific Date","type":"wp_date_selector","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/sfwd-lessons"}]}},"\/wp\/v2\/sfwd-lessons\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","graded","not_graded","hidden"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"categories":{"description":"The terms assigned to the post in the category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tags":{"description":"The terms assigned to the post in the post_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"ld_lesson_category":{"description":"The terms assigned to the post in the ld_lesson_category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"ld_lesson_tag":{"description":"The terms assigned to the post in the ld_lesson_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"lesson_materials":{"description":"Lesson Materials","type":"html","required":false},"forced_lesson_time":{"description":"Forced Lesson Timer","type":"text","required":false},"lesson_assignment_upload":{"description":"Upload Assignment","type":"boolean","required":false},"auto_approve_assignment":{"description":"Auto Approve Assignment","type":"boolean","required":false},"assignment_upload_limit_count":{"description":"Limit number of uploaded files","type":"number","required":false},"lesson_assignment_deletion_enabled":{"description":"Allow Student to Delete own Assignment(s)","type":"boolean","required":false},"lesson_assignment_points_enabled":{"description":"Award Points for Assignment","type":"boolean","required":false},"lesson_assignment_points_amount":{"description":"Set Number of Points for Assignment","type":"number","required":false},"assignment_upload_limit_extensions":{"description":"Allowed File Extensions","type":"text","required":false},"assignment_upload_limit_size":{"description":"Allowed File Size","type":"text","required":false},"visible_after":{"description":"Make Lesson visible X Days After Sign-up","type":"number","required":false},"visible_after_specific_date":{"description":"Make Lesson Visible on Specific Date","type":"wp_date_selector","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/sfwd-lessons\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/sfwd-lessons\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/sfwd-lessons\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","graded","not_graded","hidden"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"categories":{"description":"The terms assigned to the post in the category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tags":{"description":"The terms assigned to the post in the post_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"ld_lesson_category":{"description":"The terms assigned to the post in the ld_lesson_category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"ld_lesson_tag":{"description":"The terms assigned to the post in the ld_lesson_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"lesson_materials":{"description":"Lesson Materials","type":"html","required":false},"forced_lesson_time":{"description":"Forced Lesson Timer","type":"text","required":false},"lesson_assignment_upload":{"description":"Upload Assignment","type":"boolean","required":false},"auto_approve_assignment":{"description":"Auto Approve Assignment","type":"boolean","required":false},"assignment_upload_limit_count":{"description":"Limit number of uploaded files","type":"number","required":false},"lesson_assignment_deletion_enabled":{"description":"Allow Student to Delete own Assignment(s)","type":"boolean","required":false},"lesson_assignment_points_enabled":{"description":"Award Points for Assignment","type":"boolean","required":false},"lesson_assignment_points_amount":{"description":"Set Number of Points for Assignment","type":"number","required":false},"assignment_upload_limit_extensions":{"description":"Allowed File Extensions","type":"text","required":false},"assignment_upload_limit_size":{"description":"Allowed File Size","type":"text","required":false},"visible_after":{"description":"Make Lesson visible X Days After Sign-up","type":"number","required":false},"visible_after_specific_date":{"description":"Make Lesson Visible on Specific Date","type":"wp_date_selector","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/sfwd-lessons\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/sfwd-topic":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"menu_order":{"description":"Limit result set to posts with a specific menu_order value.","type":"integer","required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"title","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title","menu_order","rand","menu_order"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","acf-disabled","graded","not_graded","hidden","any"],"type":"string"},"required":false},"tax_relation":{"description":"Limit result set based on relationship between multiple taxonomies.","type":"string","enum":["AND","OR"],"required":false},"ld_topic_category":{"description":"Limit result set to items with specific terms assigned in the ld_topic_category taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"ld_topic_category_exclude":{"description":"Limit result set to items except those with specific terms assigned in the ld_topic_category taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false}},"additionalProperties":false}],"required":false},"ld_topic_tag":{"description":"Limit result set to items with specific terms assigned in the ld_topic_tag taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"ld_topic_tag_exclude":{"description":"Limit result set to items except those with specific terms assigned in the ld_topic_tag taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]}},"additionalProperties":false}],"required":false},"course":{"description":"Limit results to be within a specific Course. Required for non-admin users.","type":"integer","required":false},"lesson":{"description":"Limit results to be within a specific Lesson. Must be used with Course parameter.","type":"integer","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","graded","not_graded","hidden"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"ld_topic_category":{"description":"The terms assigned to the post in the ld_topic_category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"ld_topic_tag":{"description":"The terms assigned to the post in the ld_topic_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"topic_materials":{"description":"Topic Materials","type":"html","required":false},"forced_lesson_time":{"default":"","description":"Forced Topic Timer","type":"text","required":false},"lesson_assignment_upload":{"default":0,"description":"Upload Assignment","type":"boolean","required":false},"auto_approve_assignment":{"default":"on","description":"Auto Approve Assignment","type":"boolean","required":false},"assignment_upload_limit_count":{"default":"1","description":"Limit number of uploaded files","type":"number","required":false},"lesson_assignment_points_enabled":{"default":0,"description":"Award Points for Assignment","type":"boolean","required":false},"lesson_assignment_points_amount":{"default":0,"description":"Set Number of Points for Assignment","type":"number","required":false},"assignment_upload_limit_extensions":{"default":"","description":"Allowed File Extensions","type":"text","required":false},"assignment_upload_limit_size":{"default":"","description":"Allowed File Size","type":"text","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/sfwd-topic"}]}},"\/wp\/v2\/sfwd-topic\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","graded","not_graded","hidden"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"ld_topic_category":{"description":"The terms assigned to the post in the ld_topic_category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"ld_topic_tag":{"description":"The terms assigned to the post in the ld_topic_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"topic_materials":{"description":"Topic Materials","type":"html","required":false},"forced_lesson_time":{"description":"Forced Topic Timer","type":"text","required":false},"lesson_assignment_upload":{"description":"Upload Assignment","type":"boolean","required":false},"auto_approve_assignment":{"description":"Auto Approve Assignment","type":"boolean","required":false},"assignment_upload_limit_count":{"description":"Limit number of uploaded files","type":"number","required":false},"lesson_assignment_points_enabled":{"description":"Award Points for Assignment","type":"boolean","required":false},"lesson_assignment_points_amount":{"description":"Set Number of Points for Assignment","type":"number","required":false},"assignment_upload_limit_extensions":{"description":"Allowed File Extensions","type":"text","required":false},"assignment_upload_limit_size":{"description":"Allowed File Size","type":"text","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/sfwd-topic\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/sfwd-topic\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/sfwd-topic\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","graded","not_graded","hidden"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"ld_topic_category":{"description":"The terms assigned to the post in the ld_topic_category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"ld_topic_tag":{"description":"The terms assigned to the post in the ld_topic_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"topic_materials":{"description":"Topic Materials","type":"html","required":false},"forced_lesson_time":{"description":"Forced Topic Timer","type":"text","required":false},"lesson_assignment_upload":{"description":"Upload Assignment","type":"boolean","required":false},"auto_approve_assignment":{"description":"Auto Approve Assignment","type":"boolean","required":false},"assignment_upload_limit_count":{"description":"Limit number of uploaded files","type":"number","required":false},"lesson_assignment_points_enabled":{"description":"Award Points for Assignment","type":"boolean","required":false},"lesson_assignment_points_amount":{"description":"Set Number of Points for Assignment","type":"number","required":false},"assignment_upload_limit_extensions":{"description":"Allowed File Extensions","type":"text","required":false},"assignment_upload_limit_size":{"description":"Allowed File Size","type":"text","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/sfwd-topic\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/sfwd-quiz":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"menu_order":{"description":"Limit result set to posts with a specific menu_order value.","type":"integer","required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"title","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title","menu_order","rand","menu_order"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","acf-disabled","graded","not_graded","hidden","any"],"type":"string"},"required":false},"course":{"description":"Limit results to be within a specific Course. Required for non-admin users.","type":"integer","required":false},"lesson":{"description":"Limit results to be within a specific Lesson. Pass zero to show global Course Quizzes. Must be used with Course parameter.","type":"integer","required":false},"topic":{"description":"Limit results to be within a specific Topic. Must be used with Course parameter.","type":"integer","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","graded","not_graded","hidden"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"quiz_materials":{"description":"Quiz Materials","type":"html","required":false},"threshold":{"default":"0.8","description":"Certificate Threshold","type":"text","required":false},"passingpercentage":{"default":"80","description":"Passing Percentage","type":"text","required":false},"certificate":{"default":"","description":"Associated Certificate","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/sfwd-quiz"}]}},"\/wp\/v2\/sfwd-quiz\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","graded","not_graded","hidden"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"quiz_materials":{"description":"Quiz Materials","type":"html","required":false},"threshold":{"description":"Certificate Threshold","type":"text","required":false},"passingpercentage":{"description":"Passing Percentage","type":"text","required":false},"certificate":{"description":"Associated Certificate","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/sfwd-quiz\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/sfwd-quiz\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/sfwd-quiz\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","graded","not_graded","hidden"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"quiz_materials":{"description":"Quiz Materials","type":"html","required":false},"threshold":{"description":"Certificate Threshold","type":"text","required":false},"passingpercentage":{"description":"Passing Percentage","type":"text","required":false},"certificate":{"description":"Associated Certificate","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/sfwd-quiz\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/sfwd-question":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"menu_order":{"description":"Limit result set to posts with a specific menu_order value.","type":"integer","required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title","menu_order"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","acf-disabled","graded","not_graded","hidden","any"],"type":"string"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","graded","not_graded","hidden"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"quiz":{"default":"","description":"Quiz ID.","type":"integer","required":false},"question_type":{"default":"single","description":"The type of question. Options include: 'single' (Single choice), 'multiple' (Multiple choice), 'free_answer' (Free choice), 'sort_answer' (Sorting choice), 'matrix_sort_answer' (Matrix Sorting choice), 'cloze_answer' (Fill in the blank), 'assessment_answer' (Assessment), 'essay' (Essay \/ Open Answer).","type":"string","enum":["single","multiple","free_answer","sort_answer","matrix_sort_answer","cloze_answer","assessment_answer","essay"],"required":false},"points_total":{"default":0,"description":"Total Points amount","type":"integer","required":false},"points_per_answer":{"default":false,"description":"Different points for each answer","type":"boolean","required":false},"points_show_in_message":{"default":false,"description":"Show reached points in the correct\/incorrect message? Requires &quot;Different points for each answer&quot; to be enabled.","type":"boolean","required":false},"points_diff_modus":{"default":false,"description":"Whether different points can be awarded for each answer. Requires &quot;Different points for each answer&quot; to be enabled and for the Question Type to be &quot;single&quot;.","type":"boolean","required":false},"disable_correct":{"default":false,"description":"Disable the distinction between correct and incorrect answers. Requires &quot;points_diff_modus&quot; to be enabled.","type":"boolean","required":false},"correct_message":{"description":"Message shown when Question is correct.","type":"string","required":false},"incorrect_message":{"description":"Message shown when Question is incorrect. Cannot be used when the &quot;Same correct and incorrect message text&quot; setting is enabled.","type":"string","required":false},"correct_same":{"default":false,"description":"Whether to use the same correct and incorrect message text for this Question.","type":"boolean","required":false},"hints_enabled":{"default":false,"description":"Activate hint for this Question.","type":"boolean","required":false},"hints_message":{"description":"Hint message.","type":"string","required":false},"answers":{"description":"Question answer sets.","type":"array","items":{"type":"object","properties":{"_answer":{"type":"string","description":"The answer text."},"_html":{"type":"boolean","description":"Whether the HTML is allowed in the answer or not"},"_points":{"type":"integer","description":"The number of points that can be obtained from the answer. Only used if \"points_per_answer\" is enabled for the Question."},"_correct":{"type":"boolean","description":"Whether the answer is correct."},"_sortString":{"type":"string","description":"Sort String. Only used for the \"matrix_sort_answer\" Question type. This is the draggable element that you match with the \"_answer\" field."},"_sortStringHtml":{"type":"boolean","description":"Whether HTML is enabled for _sortString. Only used for the \"matrix_sort_answer\" Question type."},"_graded":{"type":"boolean","description":"Whether the answer can be graded or not."},"_gradingProgression":{"type":"string","description":"Determines how should the answer to this question be marked and graded upon submission. Only applies to the \"essay\" question type","enum":["not-graded-none","not-graded-full","graded-full"]},"_gradedType":{"type":"string","description":"Determines how a user can submit answer. Only applies to the \"essay\" Question type","enum":["text","upload"]}}},"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/sfwd-question"}]}},"\/wp\/v2\/sfwd-question\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","graded","not_graded","hidden"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"quiz":{"description":"Quiz ID.","type":"integer","required":false},"question_type":{"description":"The type of question. Options include: 'single' (Single choice), 'multiple' (Multiple choice), 'free_answer' (Free choice), 'sort_answer' (Sorting choice), 'matrix_sort_answer' (Matrix Sorting choice), 'cloze_answer' (Fill in the blank), 'assessment_answer' (Assessment), 'essay' (Essay \/ Open Answer).","type":"string","enum":["single","multiple","free_answer","sort_answer","matrix_sort_answer","cloze_answer","assessment_answer","essay"],"required":false},"points_total":{"description":"Total Points amount","type":"integer","required":false},"points_per_answer":{"description":"Different points for each answer","type":"boolean","required":false},"points_show_in_message":{"description":"Show reached points in the correct\/incorrect message? Requires &quot;Different points for each answer&quot; to be enabled.","type":"boolean","required":false},"points_diff_modus":{"description":"Whether different points can be awarded for each answer. Requires &quot;Different points for each answer&quot; to be enabled and for the Question Type to be &quot;single&quot;.","type":"boolean","required":false},"disable_correct":{"description":"Disable the distinction between correct and incorrect answers. Requires &quot;points_diff_modus&quot; to be enabled.","type":"boolean","required":false},"correct_message":{"description":"Message shown when Question is correct.","type":"string","required":false},"incorrect_message":{"description":"Message shown when Question is incorrect. Cannot be used when the &quot;Same correct and incorrect message text&quot; setting is enabled.","type":"string","required":false},"correct_same":{"description":"Whether to use the same correct and incorrect message text for this Question.","type":"boolean","required":false},"hints_enabled":{"description":"Activate hint for this Question.","type":"boolean","required":false},"hints_message":{"description":"Hint message.","type":"string","required":false},"answers":{"description":"Question answer sets.","type":"array","items":{"type":"object","properties":{"_answer":{"type":"string","description":"The answer text."},"_html":{"type":"boolean","description":"Whether the HTML is allowed in the answer or not"},"_points":{"type":"integer","description":"The number of points that can be obtained from the answer. Only used if \"points_per_answer\" is enabled for the Question."},"_correct":{"type":"boolean","description":"Whether the answer is correct."},"_sortString":{"type":"string","description":"Sort String. Only used for the \"matrix_sort_answer\" Question type. This is the draggable element that you match with the \"_answer\" field."},"_sortStringHtml":{"type":"boolean","description":"Whether HTML is enabled for _sortString. Only used for the \"matrix_sort_answer\" Question type."},"_graded":{"type":"boolean","description":"Whether the answer can be graded or not."},"_gradingProgression":{"type":"string","description":"Determines how should the answer to this question be marked and graded upon submission. Only applies to the \"essay\" question type","enum":["not-graded-none","not-graded-full","graded-full"]},"_gradedType":{"type":"string","description":"Determines how a user can submit answer. Only applies to the \"essay\" Question type","enum":["text","upload"]}}},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/sfwd-question\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/sfwd-question\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/sfwd-question\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","graded","not_graded","hidden"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"quiz":{"description":"Quiz ID.","type":"integer","required":false},"question_type":{"description":"The type of question. Options include: 'single' (Single choice), 'multiple' (Multiple choice), 'free_answer' (Free choice), 'sort_answer' (Sorting choice), 'matrix_sort_answer' (Matrix Sorting choice), 'cloze_answer' (Fill in the blank), 'assessment_answer' (Assessment), 'essay' (Essay \/ Open Answer).","type":"string","enum":["single","multiple","free_answer","sort_answer","matrix_sort_answer","cloze_answer","assessment_answer","essay"],"required":false},"points_total":{"description":"Total Points amount","type":"integer","required":false},"points_per_answer":{"description":"Different points for each answer","type":"boolean","required":false},"points_show_in_message":{"description":"Show reached points in the correct\/incorrect message? Requires &quot;Different points for each answer&quot; to be enabled.","type":"boolean","required":false},"points_diff_modus":{"description":"Whether different points can be awarded for each answer. Requires &quot;Different points for each answer&quot; to be enabled and for the Question Type to be &quot;single&quot;.","type":"boolean","required":false},"disable_correct":{"description":"Disable the distinction between correct and incorrect answers. Requires &quot;points_diff_modus&quot; to be enabled.","type":"boolean","required":false},"correct_message":{"description":"Message shown when Question is correct.","type":"string","required":false},"incorrect_message":{"description":"Message shown when Question is incorrect. Cannot be used when the &quot;Same correct and incorrect message text&quot; setting is enabled.","type":"string","required":false},"correct_same":{"description":"Whether to use the same correct and incorrect message text for this Question.","type":"boolean","required":false},"hints_enabled":{"description":"Activate hint for this Question.","type":"boolean","required":false},"hints_message":{"description":"Hint message.","type":"string","required":false},"answers":{"description":"Question answer sets.","type":"array","items":{"type":"object","properties":{"_answer":{"type":"string","description":"The answer text."},"_html":{"type":"boolean","description":"Whether the HTML is allowed in the answer or not"},"_points":{"type":"integer","description":"The number of points that can be obtained from the answer. Only used if \"points_per_answer\" is enabled for the Question."},"_correct":{"type":"boolean","description":"Whether the answer is correct."},"_sortString":{"type":"string","description":"Sort String. Only used for the \"matrix_sort_answer\" Question type. This is the draggable element that you match with the \"_answer\" field."},"_sortStringHtml":{"type":"boolean","description":"Whether HTML is enabled for _sortString. Only used for the \"matrix_sort_answer\" Question type."},"_graded":{"type":"boolean","description":"Whether the answer can be graded or not."},"_gradingProgression":{"type":"string","description":"Determines how should the answer to this question be marked and graded upon submission. Only applies to the \"essay\" question type","enum":["not-graded-none","not-graded-full","graded-full"]},"_gradedType":{"type":"string","description":"Determines how a user can submit answer. Only applies to the \"essay\" Question type","enum":["text","upload"]}}},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/sfwd-question\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/ld-exam":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title","rand","menu_order"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","acf-disabled","graded","not_graded","hidden","any"],"type":"string"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","graded","not_graded","hidden"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"inline_featured_image":{"type":"boolean","title":"","description":"","default":false},"_uag_custom_page_level_css":{"type":"string","title":"","description":"","default":""},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/ld-exam"}]}},"\/wp\/v2\/ld-exam\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","graded","not_graded","hidden"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"inline_featured_image":{"type":"boolean","title":"","description":"","default":false},"_uag_custom_page_level_css":{"type":"string","title":"","description":"","default":""},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/ld-exam\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/ld-exam\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/ld-exam\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","graded","not_graded","hidden"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"inline_featured_image":{"type":"boolean","title":"","description":"","default":false},"_uag_custom_page_level_css":{"type":"string","title":"","description":"","default":""},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/ld-exam\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/groups":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"title","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title","rand","menu_order"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","acf-disabled","graded","not_graded","hidden","any"],"type":"string"},"required":false},"tax_relation":{"description":"Limit result set based on relationship between multiple taxonomies.","type":"string","enum":["AND","OR"],"required":false},"categories":{"description":"Limit result set to items with specific terms assigned in the categories taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"categories_exclude":{"description":"Limit result set to items except those with specific terms assigned in the categories taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false}},"additionalProperties":false}],"required":false},"tags":{"description":"Limit result set to items with specific terms assigned in the tags taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"tags_exclude":{"description":"Limit result set to items except those with specific terms assigned in the tags taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]}},"additionalProperties":false}],"required":false},"ld_group_category":{"description":"Limit result set to items with specific terms assigned in the ld_group_category taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"ld_group_category_exclude":{"description":"Limit result set to items except those with specific terms assigned in the ld_group_category taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false}},"additionalProperties":false}],"required":false},"ld_group_tag":{"description":"Limit result set to items with specific terms assigned in the ld_group_tag taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"ld_group_tag_exclude":{"description":"Limit result set to items except those with specific terms assigned in the ld_group_tag taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]}},"additionalProperties":false}],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","graded","not_graded","hidden"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"categories":{"description":"The terms assigned to the post in the category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tags":{"description":"The terms assigned to the post in the post_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"ld_group_category":{"description":"The terms assigned to the post in the ld_group_category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"ld_group_tag":{"description":"The terms assigned to the post in the ld_group_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/groups"}]}},"\/wp\/v2\/groups\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","graded","not_graded","hidden"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"categories":{"description":"The terms assigned to the post in the category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tags":{"description":"The terms assigned to the post in the post_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"ld_group_category":{"description":"The terms assigned to the post in the ld_group_category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"ld_group_tag":{"description":"The terms assigned to the post in the ld_group_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/groups\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/groups\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/groups\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","graded","not_graded","hidden"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"categories":{"description":"The terms assigned to the post in the category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"tags":{"description":"The terms assigned to the post in the post_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"ld_group_category":{"description":"The terms assigned to the post in the ld_group_category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"ld_group_tag":{"description":"The terms assigned to the post in the ld_group_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/groups\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/docs":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title","menu_order","rand","menu_order"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","acf-disabled","graded","not_graded","hidden","any"],"type":"string"},"required":false},"tax_relation":{"description":"Limit result set based on relationship between multiple taxonomies.","type":"string","enum":["AND","OR"],"required":false},"doc_category":{"description":"Limit result set to items with specific terms assigned in the doc_category taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"doc_category_exclude":{"description":"Limit result set to items except those with specific terms assigned in the doc_category taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false}},"additionalProperties":false}],"required":false},"doc_tag":{"description":"Limit result set to items with specific terms assigned in the doc_tag taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"doc_tag_exclude":{"description":"Limit result set to items except those with specific terms assigned in the doc_tag taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false}},"additionalProperties":false}],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","graded","not_graded","hidden"],"required":false},"password":{"description":"Holds the thumbnail URL of doc category","type":"string","format":"url","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"inline_featured_image":{"type":"boolean","title":"","description":"","default":false},"_uag_custom_page_level_css":{"type":"string","title":"","description":"","default":""},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"doc_category":{"description":"The terms assigned to the post in the doc_category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"doc_tag":{"description":"The terms assigned to the post in the doc_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"year_month":{"description":"Holds the thumbnail URL of doc category","type":"string","format":"url","required":false},"word_count":{"description":"Holds the thumbnail URL of doc category","type":"string","format":"url","required":false},"total_views":{"description":"Holds the thumbnail URL of doc category","type":"string","format":"url","required":false},"reactions":{"description":"Holds the thumbnail URL of doc category","type":"string","format":"url","required":false},"author_info":{"description":"Holds the thumbnail URL of doc category","type":"string","format":"url","required":false},"doc_category_info":{"description":"Holds the thumbnail URL of doc category","type":"string","format":"url","required":false},"doc_tag_info":{"description":"Holds the thumbnail URL of doc category","type":"string","format":"url","required":false},"knowledge_base_info":{"description":"Holds the thumbnail URL of doc category","type":"string","format":"url","required":false},"knowledge_base_slug":{"description":"Holds the thumbnail URL of doc category","type":"string","format":"url","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/docs"}]}},"\/wp\/v2\/docs\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"excerpt_length":{"description":"Override the default excerpt length.","type":"integer","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","graded","not_graded","hidden"],"required":false},"password":{"description":"Holds the thumbnail URL of doc category","type":"string","format":"url","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"inline_featured_image":{"type":"boolean","title":"","description":"","default":false},"_uag_custom_page_level_css":{"type":"string","title":"","description":"","default":""},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"doc_category":{"description":"The terms assigned to the post in the doc_category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"doc_tag":{"description":"The terms assigned to the post in the doc_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"year_month":{"description":"Holds the thumbnail URL of doc category","type":"string","format":"url","required":false},"word_count":{"description":"Holds the thumbnail URL of doc category","type":"string","format":"url","required":false},"total_views":{"description":"Holds the thumbnail URL of doc category","type":"string","format":"url","required":false},"reactions":{"description":"Holds the thumbnail URL of doc category","type":"string","format":"url","required":false},"author_info":{"description":"Holds the thumbnail URL of doc category","type":"string","format":"url","required":false},"doc_category_info":{"description":"Holds the thumbnail URL of doc category","type":"string","format":"url","required":false},"doc_tag_info":{"description":"Holds the thumbnail URL of doc category","type":"string","format":"url","required":false},"knowledge_base_info":{"description":"Holds the thumbnail URL of doc category","type":"string","format":"url","required":false},"knowledge_base_slug":{"description":"Holds the thumbnail URL of doc category","type":"string","format":"url","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/docs\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/docs\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/docs\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","graded","not_graded","hidden"],"required":false},"password":{"description":"Holds the thumbnail URL of doc category","type":"string","format":"url","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"inline_featured_image":{"type":"boolean","title":"","description":"","default":false},"_uag_custom_page_level_css":{"type":"string","title":"","description":"","default":""},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"doc_category":{"description":"The terms assigned to the post in the doc_category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"doc_tag":{"description":"The terms assigned to the post in the doc_tag taxonomy.","type":"array","items":{"type":"integer"},"required":false},"year_month":{"description":"Holds the thumbnail URL of doc category","type":"string","format":"url","required":false},"word_count":{"description":"Holds the thumbnail URL of doc category","type":"string","format":"url","required":false},"total_views":{"description":"Holds the thumbnail URL of doc category","type":"string","format":"url","required":false},"reactions":{"description":"Holds the thumbnail URL of doc category","type":"string","format":"url","required":false},"author_info":{"description":"Holds the thumbnail URL of doc category","type":"string","format":"url","required":false},"doc_category_info":{"description":"Holds the thumbnail URL of doc category","type":"string","format":"url","required":false},"doc_tag_info":{"description":"Holds the thumbnail URL of doc category","type":"string","format":"url","required":false},"knowledge_base_info":{"description":"Holds the thumbnail URL of doc category","type":"string","format":"url","required":false},"knowledge_base_slug":{"description":"Holds the thumbnail URL of doc category","type":"string","format":"url","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/docs\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/gp_elements":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"menu_order":{"description":"Limit result set to posts with a specific menu_order value.","type":"integer","required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title","menu_order"],"required":false},"parent":{"description":"Limit result set to items with particular parent IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"parent_exclude":{"description":"Limit result set to all items except those of a particular parent ID.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","acf-disabled","graded","not_graded","hidden","any"],"type":"string"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","graded","not_graded","hidden"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"parent":{"description":"The ID for the parent of the post.","type":"integer","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"inline_featured_image":{"type":"boolean","title":"","description":"","default":false},"_uag_custom_page_level_css":{"type":"string","title":"","description":"","default":""},"_generate_block_element_editor_width":{"type":"string","title":"","description":"","default":""},"_generate_block_element_editor_width_unit":{"type":"string","title":"","description":"","default":""},"_generate_block_type":{"type":"string","title":"","description":"","default":""},"_generate_hook":{"type":"string","title":"","description":"","default":""},"_generate_custom_hook":{"type":"string","title":"","description":"","default":""},"_generate_hook_priority":{"type":"string","title":"","description":"","default":""},"_generate_post_meta_location":{"type":"string","title":"","description":"","default":""},"_generate_post_loop_item_tagname":{"type":"string","title":"","description":"","default":""},"_generate_disable_primary_post_meta":{"type":"boolean","title":"","description":"","default":false},"_generate_disable_secondary_post_meta":{"type":"boolean","title":"","description":"","default":false},"_generate_disable_title":{"type":"boolean","title":"","description":"","default":false},"_generate_disable_featured_image":{"type":"boolean","title":"","description":"","default":false},"_generate_use_theme_post_container":{"type":"boolean","title":"","description":"","default":false},"_generate_use_archive_navigation_container":{"type":"boolean","title":"","description":"","default":false},"_generate_disable_post_navigation":{"type":"boolean","title":"","description":"","default":false},"_generate_disable_archive_navigation":{"type":"boolean","title":"","description":"","default":false},"_generate_post_loop_item_display":{"type":"string","title":"","description":"","default":""},"_generate_post_loop_item_display_tax":{"type":"string","title":"","description":"","default":""},"_generate_post_loop_item_display_term":{"type":"string","title":"","description":"","default":""},"_generate_post_loop_item_display_post_meta":{"type":"string","title":"","description":"","default":""},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/gp_elements"}]}},"\/wp\/v2\/gp_elements\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","graded","not_graded","hidden"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"parent":{"description":"The ID for the parent of the post.","type":"integer","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"inline_featured_image":{"type":"boolean","title":"","description":"","default":false},"_uag_custom_page_level_css":{"type":"string","title":"","description":"","default":""},"_generate_block_element_editor_width":{"type":"string","title":"","description":"","default":""},"_generate_block_element_editor_width_unit":{"type":"string","title":"","description":"","default":""},"_generate_block_type":{"type":"string","title":"","description":"","default":""},"_generate_hook":{"type":"string","title":"","description":"","default":""},"_generate_custom_hook":{"type":"string","title":"","description":"","default":""},"_generate_hook_priority":{"type":"string","title":"","description":"","default":""},"_generate_post_meta_location":{"type":"string","title":"","description":"","default":""},"_generate_post_loop_item_tagname":{"type":"string","title":"","description":"","default":""},"_generate_disable_primary_post_meta":{"type":"boolean","title":"","description":"","default":false},"_generate_disable_secondary_post_meta":{"type":"boolean","title":"","description":"","default":false},"_generate_disable_title":{"type":"boolean","title":"","description":"","default":false},"_generate_disable_featured_image":{"type":"boolean","title":"","description":"","default":false},"_generate_use_theme_post_container":{"type":"boolean","title":"","description":"","default":false},"_generate_use_archive_navigation_container":{"type":"boolean","title":"","description":"","default":false},"_generate_disable_post_navigation":{"type":"boolean","title":"","description":"","default":false},"_generate_disable_archive_navigation":{"type":"boolean","title":"","description":"","default":false},"_generate_post_loop_item_display":{"type":"string","title":"","description":"","default":""},"_generate_post_loop_item_display_tax":{"type":"string","title":"","description":"","default":""},"_generate_post_loop_item_display_term":{"type":"string","title":"","description":"","default":""},"_generate_post_loop_item_display_post_meta":{"type":"string","title":"","description":"","default":""},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/gp_elements\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/gp_elements\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/gp_elements\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","graded","not_graded","hidden"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"menu_order":{"description":"The order of the post in relation to other posts.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"inline_featured_image":{"type":"boolean","title":"","description":"","default":false},"_uag_custom_page_level_css":{"type":"string","title":"","description":"","default":""},"_generate_block_element_editor_width":{"type":"string","title":"","description":"","default":""},"_generate_block_element_editor_width_unit":{"type":"string","title":"","description":"","default":""},"_generate_block_type":{"type":"string","title":"","description":"","default":""},"_generate_hook":{"type":"string","title":"","description":"","default":""},"_generate_custom_hook":{"type":"string","title":"","description":"","default":""},"_generate_hook_priority":{"type":"string","title":"","description":"","default":""},"_generate_post_meta_location":{"type":"string","title":"","description":"","default":""},"_generate_post_loop_item_tagname":{"type":"string","title":"","description":"","default":""},"_generate_disable_primary_post_meta":{"type":"boolean","title":"","description":"","default":false},"_generate_disable_secondary_post_meta":{"type":"boolean","title":"","description":"","default":false},"_generate_disable_title":{"type":"boolean","title":"","description":"","default":false},"_generate_disable_featured_image":{"type":"boolean","title":"","description":"","default":false},"_generate_use_theme_post_container":{"type":"boolean","title":"","description":"","default":false},"_generate_use_archive_navigation_container":{"type":"boolean","title":"","description":"","default":false},"_generate_disable_post_navigation":{"type":"boolean","title":"","description":"","default":false},"_generate_disable_archive_navigation":{"type":"boolean","title":"","description":"","default":false},"_generate_post_loop_item_display":{"type":"string","title":"","description":"","default":""},"_generate_post_loop_item_display_tax":{"type":"string","title":"","description":"","default":""},"_generate_post_loop_item_display_term":{"type":"string","title":"","description":"","default":""},"_generate_post_loop_item_display_post_meta":{"type":"string","title":"","description":"","default":""},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/gp_elements\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/spectra-popup":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","acf-disabled","graded","not_graded","hidden","any"],"type":"string"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","graded","not_graded","hidden"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"inline_featured_image":{"type":"boolean","title":"","description":"","default":false},"_uag_custom_page_level_css":{"type":"string","title":"","description":"","default":""},"spectra-popup-type":{"type":"string","title":"","description":"","default":"unset"},"spectra-popup-enabled":{"type":"boolean","title":"","description":"","default":false},"spectra-popup-repetition":{"type":"number","title":"","description":"","default":1}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/spectra-popup"}]}},"\/wp\/v2\/spectra-popup\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","graded","not_graded","hidden"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"inline_featured_image":{"type":"boolean","title":"","description":"","default":false},"_uag_custom_page_level_css":{"type":"string","title":"","description":"","default":""},"spectra-popup-type":{"type":"string","title":"","description":"","default":"unset"},"spectra-popup-enabled":{"type":"boolean","title":"","description":"","default":false},"spectra-popup-repetition":{"type":"number","title":"","description":"","default":1}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/spectra-popup\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","graded","not_graded","hidden"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"inline_featured_image":{"type":"boolean","title":"","description":"","default":false},"_uag_custom_page_level_css":{"type":"string","title":"","description":"","default":""},"spectra-popup-type":{"type":"string","title":"","description":"","default":"unset"},"spectra-popup-enabled":{"type":"boolean","title":"","description":"","default":false},"spectra-popup-repetition":{"type":"number","title":"","description":"","default":1}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/spectra-popup\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/betterdocs_faq":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to posts published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_after":{"description":"Limit response to posts modified after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"author_exclude":{"description":"Ensure result set excludes posts assigned to specific authors.","type":"array","items":{"type":"integer"},"default":[],"required":false},"before":{"description":"Limit response to posts published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"modified_before":{"description":"Limit response to posts modified before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_semantics":{"description":"How to interpret the search input.","type":"string","enum":["exact"],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title"],"required":false},"parent":{"description":"Limit result set to items with particular parent IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"parent_exclude":{"description":"Limit result set to all items except those of a particular parent ID.","type":"array","items":{"type":"integer"},"default":[],"required":false},"search_columns":{"default":[],"description":"Array of column names to be searched.","type":"array","items":{"enum":["post_title","post_content","post_excerpt"],"type":"string"},"required":false},"slug":{"description":"Limit result set to posts with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"status":{"default":"publish","description":"Limit result set to posts assigned one or more statuses.","type":"array","items":{"enum":["publish","future","draft","pending","private","trash","auto-draft","inherit","request-pending","request-confirmed","request-failed","request-completed","acf-disabled","graded","not_graded","hidden","any"],"type":"string"},"required":false},"tax_relation":{"description":"Limit result set based on relationship between multiple taxonomies.","type":"string","enum":["AND","OR"],"required":false},"betterdocs_faq_category":{"description":"Limit result set to items with specific terms assigned in the betterdocs_faq_category taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false},"operator":{"description":"Whether items must be assigned all or any of the specified terms.","type":"string","enum":["AND","OR"],"default":"OR"}},"additionalProperties":false}],"required":false},"betterdocs_faq_category_exclude":{"description":"Limit result set to items except those with specific terms assigned in the betterdocs_faq_category taxonomy.","type":["object","array"],"oneOf":[{"title":"Term ID List","description":"Match terms with the listed IDs.","type":"array","items":{"type":"integer"}},{"title":"Term ID Taxonomy Query","description":"Perform an advanced term query.","type":"object","properties":{"terms":{"description":"Term IDs.","type":"array","items":{"type":"integer"},"default":[]},"include_children":{"description":"Whether to include child terms in the terms limiting the result set.","type":"boolean","default":false}},"additionalProperties":false}],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","graded","not_graded","hidden"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"parent":{"description":"The ID for the parent of the post.","type":"integer","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"inline_featured_image":{"type":"boolean","title":"","description":"","default":false},"_uag_custom_page_level_css":{"type":"string","title":"","description":"","default":""},"faq_open_by_default":{"type":"string","title":"","description":"","default":""},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"betterdocs_faq_category":{"description":"The terms assigned to the post in the betterdocs_faq_category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/betterdocs_faq"}]}},"\/wp\/v2\/betterdocs_faq\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"excerpt_length":{"description":"Override the default excerpt length.","type":"integer","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","graded","not_graded","hidden"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"parent":{"description":"The ID for the parent of the post.","type":"integer","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"inline_featured_image":{"type":"boolean","title":"","description":"","default":false},"_uag_custom_page_level_css":{"type":"string","title":"","description":"","default":""},"faq_open_by_default":{"type":"string","title":"","description":"","default":""},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"betterdocs_faq_category":{"description":"The terms assigned to the post in the betterdocs_faq_category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the post.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/betterdocs_faq\/(?P<parent>[\\d]+)\/revisions":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by object attribute.","type":"string","default":"date","enum":["date","id","include","relevance","slug","include_slugs","title"],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/betterdocs_faq\/(?P<parent>[\\d]+)\/revisions\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","DELETE"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"args":{"parent":{"description":"The ID for the parent of the revision.","type":"integer","required":false},"id":{"description":"Unique identifier for the revision.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as revisions do not support trashing.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/betterdocs_faq\/(?P<id>[\\d]+)\/autosaves":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"args":{"parent":{"description":"The ID for the parent of the post.","type":"integer","required":false},"date":{"description":"The date the post was published, in the site's timezone.","type":["string","null"],"format":"date-time","required":false},"date_gmt":{"description":"The date the post was published, as GMT.","type":["string","null"],"format":"date-time","required":false},"slug":{"description":"An alphanumeric identifier for the post unique to its type.","type":"string","required":false},"status":{"description":"A named status for the post.","type":"string","enum":["publish","future","draft","pending","private","acf-disabled","graded","not_graded","hidden"],"required":false},"password":{"description":"A password to protect access to the content and excerpt.","type":"string","required":false},"title":{"description":"The title for the post.","type":"object","properties":{"raw":{"description":"Title for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML title for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"content":{"description":"The content for the post.","type":"object","properties":{"raw":{"description":"Content for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the post, transformed for display.","type":"string","context":["view","edit"],"readonly":true},"block_version":{"description":"Version of the content block format used by the post.","type":"integer","context":["edit"],"readonly":true},"protected":{"description":"Whether the content is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"author":{"description":"The ID for the author of the post.","type":"integer","required":false},"excerpt":{"description":"The excerpt for the post.","type":"object","properties":{"raw":{"description":"Excerpt for the post, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML excerpt for the post, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true},"protected":{"description":"Whether the excerpt is protected with a password.","type":"boolean","context":["view","edit","embed"],"readonly":true}},"required":false},"featured_media":{"description":"The ID of the featured media for the post.","type":"integer","required":false},"comment_status":{"description":"Whether or not comments are open on the post.","type":"string","enum":["open","closed"],"required":false},"ping_status":{"description":"Whether or not the post can be pinged.","type":"string","enum":["open","closed"],"required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"inline_featured_image":{"type":"boolean","title":"","description":"","default":false},"_uag_custom_page_level_css":{"type":"string","title":"","description":"","default":""},"faq_open_by_default":{"type":"string","title":"","description":"","default":""},"footnotes":{"type":"string","title":"","description":"","default":""}},"required":false},"template":{"description":"The theme file to use to display the post.","type":"string","required":false},"betterdocs_faq_category":{"description":"The terms assigned to the post in the betterdocs_faq_category taxonomy.","type":"array","items":{"type":"integer"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/betterdocs_faq\/(?P<parent>[\\d]+)\/autosaves\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"parent":{"description":"The ID for the parent of the autosave.","type":"integer","required":false},"id":{"description":"The ID for the autosave.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/types":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/types"}]}},"\/wp\/v2\/types\/(?P<type>[\\w-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"type":{"description":"An alphanumeric identifier for the post type.","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/statuses":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/statuses"}]}},"\/wp\/v2\/statuses\/(?P<status>[\\w-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"status":{"description":"An alphanumeric identifier for the status.","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/taxonomies":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"type":{"description":"Limit results to taxonomies associated with a specific post type.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/taxonomies"}]}},"\/wp\/v2\/taxonomies\/(?P<taxonomy>[\\w-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"taxonomy":{"description":"An alphanumeric identifier for the taxonomy.","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/categories":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by term attribute.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"Whether to hide terms not assigned to any posts.","type":"boolean","default":false,"required":false},"parent":{"description":"Limit result set to terms assigned to a specific parent.","type":"integer","required":false},"post":{"description":"Limit result set to terms assigned to a specific post.","type":"integer","default":null,"required":false},"slug":{"description":"Limit result set to terms with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":true},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"parent":{"description":"The parent term ID.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/categories"}]}},"\/wp\/v2\/categories\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"parent":{"description":"The parent term ID.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as terms do not support trashing.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/tags":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by term attribute.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"Whether to hide terms not assigned to any posts.","type":"boolean","default":false,"required":false},"post":{"description":"Limit result set to terms assigned to a specific post.","type":"integer","default":null,"required":false},"slug":{"description":"Limit result set to terms with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":true},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/tags"}]}},"\/wp\/v2\/tags\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as terms do not support trashing.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/menus":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by term attribute.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"Whether to hide terms not assigned to any posts.","type":"boolean","default":false,"required":false},"post":{"description":"Limit result set to terms assigned to a specific post.","type":"integer","default":null,"required":false},"slug":{"description":"Limit result set to terms with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":true},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false},"locations":{"description":"The locations assigned to the menu.","type":"array","items":{"type":"string"},"required":false},"auto_add":{"description":"Whether to automatically add top level pages to this menu.","type":"boolean","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/menus"}]}},"\/wp\/v2\/menus\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false},"locations":{"description":"The locations assigned to the menu.","type":"array","items":{"type":"string"},"required":false},"auto_add":{"description":"Whether to automatically add top level pages to this menu.","type":"boolean","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as terms do not support trashing.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/wp_pattern_category":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by term attribute.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"Whether to hide terms not assigned to any posts.","type":"boolean","default":false,"required":false},"post":{"description":"Limit result set to terms assigned to a specific post.","type":"integer","default":null,"required":false},"slug":{"description":"Limit result set to terms with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":true},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/wp_pattern_category"}]}},"\/wp\/v2\/wp_pattern_category\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as terms do not support trashing.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/doc_category":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by term attribute.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count","doc_category_order"],"required":false},"hide_empty":{"description":"Whether to hide terms not assigned to any posts.","type":"boolean","default":false,"required":false},"parent":{"description":"Limit result set to terms assigned to a specific parent.","type":"integer","required":false},"post":{"description":"Limit result set to terms assigned to a specific post.","type":"integer","default":null,"required":false},"slug":{"description":"Limit result set to terms with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":true},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"parent":{"description":"The parent term ID.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false},"doc_category_order":{"description":"Holds the thumbnail URL of doc category","type":"string","format":"url","required":false},"thumbnail":{"description":"Holds the thumbnail URL of doc category","type":"string","format":"url","required":false},"handbookthumbnail":{"description":"Holds the thumbnail URL of doc category","type":"string","format":"url","required":false},"subcategories_count":{"description":"Holds the thumbnail URL of doc category","type":"string","format":"url","required":false},"total_docs_count":{"description":"Holds the thumbnail URL of doc category","type":"string","format":"url","required":false},"last_updated_time":{"description":"Holds the thumbnail URL of doc category","type":"string","format":"url","required":false},"knowledge_base":{"description":"Holds the thumbnail URL of doc category","type":"string","format":"url","required":false},"knowledge_base_ids":{"description":"Holds the thumbnail URL of doc category","type":"string","format":"url","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/doc_category"}]}},"\/wp\/v2\/doc_category\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"parent":{"description":"The parent term ID.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false},"doc_category_order":{"description":"Holds the thumbnail URL of doc category","type":"string","format":"url","required":false},"thumbnail":{"description":"Holds the thumbnail URL of doc category","type":"string","format":"url","required":false},"handbookthumbnail":{"description":"Holds the thumbnail URL of doc category","type":"string","format":"url","required":false},"subcategories_count":{"description":"Holds the thumbnail URL of doc category","type":"string","format":"url","required":false},"total_docs_count":{"description":"Holds the thumbnail URL of doc category","type":"string","format":"url","required":false},"last_updated_time":{"description":"Holds the thumbnail URL of doc category","type":"string","format":"url","required":false},"knowledge_base":{"description":"Holds the thumbnail URL of doc category","type":"string","format":"url","required":false},"knowledge_base_ids":{"description":"Holds the thumbnail URL of doc category","type":"string","format":"url","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as terms do not support trashing.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/doc_tag":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by term attribute.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"Whether to hide terms not assigned to any posts.","type":"boolean","default":false,"required":false},"parent":{"description":"Limit result set to terms assigned to a specific parent.","type":"integer","required":false},"post":{"description":"Limit result set to terms assigned to a specific post.","type":"integer","default":null,"required":false},"slug":{"description":"Limit result set to terms with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":true},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"parent":{"description":"The parent term ID.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/doc_tag"}]}},"\/wp\/v2\/doc_tag\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"parent":{"description":"The parent term ID.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as terms do not support trashing.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/betterdocs_faq_category":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by term attribute.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"Whether to hide terms not assigned to any posts.","type":"boolean","default":false,"required":false},"parent":{"description":"Limit result set to terms assigned to a specific parent.","type":"integer","required":false},"post":{"description":"Limit result set to terms assigned to a specific post.","type":"integer","default":null,"required":false},"slug":{"description":"Limit result set to terms with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":true},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"parent":{"description":"The parent term ID.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"order":{"type":"array","items":{"type":"string","title":"","description":"","default":""}},"status":{"type":"array","items":{"type":"string","title":"","description":"","default":""}},"_betterdocs_faq_order":{"type":"array","items":{"type":"string","title":"","description":"","default":""}},"faq_group_icon":{"type":"array","items":{"type":"string","title":"","description":"","default":""}}},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/betterdocs_faq_category"}]}},"\/wp\/v2\/betterdocs_faq_category\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"parent":{"description":"The parent term ID.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"order":{"type":"array","items":{"type":"string","title":"","description":"","default":""}},"status":{"type":"array","items":{"type":"string","title":"","description":"","default":""}},"_betterdocs_faq_order":{"type":"array","items":{"type":"string","title":"","description":"","default":""}},"faq_group_icon":{"type":"array","items":{"type":"string","title":"","description":"","default":""}}},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as terms do not support trashing.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/ld_course_category":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by term attribute.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"Whether to hide terms not assigned to any posts.","type":"boolean","default":false,"required":false},"parent":{"description":"Limit result set to terms assigned to a specific parent.","type":"integer","required":false},"post":{"description":"Limit result set to terms assigned to a specific post.","type":"integer","default":null,"required":false},"slug":{"description":"Limit result set to terms with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":true},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"parent":{"description":"The parent term ID.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/ld_course_category"}]}},"\/wp\/v2\/ld_course_category\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"parent":{"description":"The parent term ID.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as terms do not support trashing.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/ld_course_tag":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by term attribute.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"Whether to hide terms not assigned to any posts.","type":"boolean","default":false,"required":false},"post":{"description":"Limit result set to terms assigned to a specific post.","type":"integer","default":null,"required":false},"slug":{"description":"Limit result set to terms with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":true},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/ld_course_tag"}]}},"\/wp\/v2\/ld_course_tag\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as terms do not support trashing.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/ld_lesson_category":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by term attribute.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"Whether to hide terms not assigned to any posts.","type":"boolean","default":false,"required":false},"parent":{"description":"Limit result set to terms assigned to a specific parent.","type":"integer","required":false},"post":{"description":"Limit result set to terms assigned to a specific post.","type":"integer","default":null,"required":false},"slug":{"description":"Limit result set to terms with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":true},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"parent":{"description":"The parent term ID.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/ld_lesson_category"}]}},"\/wp\/v2\/ld_lesson_category\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"parent":{"description":"The parent term ID.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as terms do not support trashing.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/ld_lesson_tag":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by term attribute.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"Whether to hide terms not assigned to any posts.","type":"boolean","default":false,"required":false},"post":{"description":"Limit result set to terms assigned to a specific post.","type":"integer","default":null,"required":false},"slug":{"description":"Limit result set to terms with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":true},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/ld_lesson_tag"}]}},"\/wp\/v2\/ld_lesson_tag\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as terms do not support trashing.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/ld_topic_category":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by term attribute.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"Whether to hide terms not assigned to any posts.","type":"boolean","default":false,"required":false},"parent":{"description":"Limit result set to terms assigned to a specific parent.","type":"integer","required":false},"post":{"description":"Limit result set to terms assigned to a specific post.","type":"integer","default":null,"required":false},"slug":{"description":"Limit result set to terms with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":true},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"parent":{"description":"The parent term ID.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/ld_topic_category"}]}},"\/wp\/v2\/ld_topic_category\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"parent":{"description":"The parent term ID.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as terms do not support trashing.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/ld_topic_tag":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by term attribute.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"Whether to hide terms not assigned to any posts.","type":"boolean","default":false,"required":false},"post":{"description":"Limit result set to terms assigned to a specific post.","type":"integer","default":null,"required":false},"slug":{"description":"Limit result set to terms with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":true},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/ld_topic_tag"}]}},"\/wp\/v2\/ld_topic_tag\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as terms do not support trashing.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/ld_group_category":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by term attribute.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"Whether to hide terms not assigned to any posts.","type":"boolean","default":false,"required":false},"parent":{"description":"Limit result set to terms assigned to a specific parent.","type":"integer","required":false},"post":{"description":"Limit result set to terms assigned to a specific post.","type":"integer","default":null,"required":false},"slug":{"description":"Limit result set to terms with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":true},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"parent":{"description":"The parent term ID.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/ld_group_category"}]}},"\/wp\/v2\/ld_group_category\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"parent":{"description":"The parent term ID.","type":"integer","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as terms do not support trashing.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/ld_group_tag":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"asc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by term attribute.","type":"string","default":"name","enum":["id","include","name","slug","include_slugs","term_group","description","count"],"required":false},"hide_empty":{"description":"Whether to hide terms not assigned to any posts.","type":"boolean","default":false,"required":false},"post":{"description":"Limit result set to terms assigned to a specific post.","type":"integer","default":null,"required":false},"slug":{"description":"Limit result set to terms with one or more specific slugs.","type":"array","items":{"type":"string"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":true},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/ld_group_tag"}]}},"\/wp\/v2\/ld_group_tag\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"description":{"description":"HTML description of the term.","type":"string","required":false},"name":{"description":"HTML title for the term.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the term unique to its type.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":[],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the term.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Required to be true, as terms do not support trashing.","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/users\/me":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"username":{"description":"Login name for the user.","type":"string","required":false},"name":{"description":"Display name for the user.","type":"string","required":false},"first_name":{"description":"First name for the user.","type":"string","required":false},"last_name":{"description":"Last name for the user.","type":"string","required":false},"email":{"description":"The email address for the user.","type":"string","format":"email","required":false},"url":{"description":"URL of the user.","type":"string","format":"uri","required":false},"description":{"description":"Description of the user.","type":"string","required":false},"locale":{"description":"Locale for the user.","type":"string","enum":["","en_US","ar","az","cs_CZ","de_DE","el","es_ES","et","fr_FR","id_ID","it_IT","ja","ko_KR","lt_LT","nb_NO","pl_PL","pt_BR","pt_PT","sk_SK","sl_SI","sv_SE","th","tr_TR","uk","uz_UZ"],"required":false},"nickname":{"description":"The nickname for the user.","type":"string","required":false},"slug":{"description":"An alphanumeric identifier for the user.","type":"string","required":false},"roles":{"description":"Roles assigned to the user.","type":"array","items":{"type":"string"},"required":false},"password":{"description":"Password for the user (never included).","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"persisted_preferences":{"type":"object","title":"","description":"","default":[],"context":["edit"],"properties":{"_modified":{"description":"The date and time the preferences were updated.","type":"string","format":"date-time","readonly":false}},"additionalProperties":true},"generateblocks_onboarding":{"type":"object","title":"","description":"","default":[],"properties":{"insert_inner_container":{"type":"boolean"}},"additionalProperties":{"type":"boolean"}}},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"args":{"force":{"type":"boolean","default":false,"description":"Required to be true, as users do not support trashing.","required":false},"reassign":{"type":"integer","description":"Reassign the deleted user's posts and links to this user ID.","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/users\/me"}]}},"\/wp\/v2\/users\/(?P<user_id>(?:[\\d]+|me))\/application-passwords":{"namespace":"wp\/v2","methods":["GET","POST","DELETE"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"args":{"app_id":{"description":"A UUID provided by the application to uniquely identify it. It is recommended to use an UUID v5 with the URL or DNS namespace.","type":"string","oneOf":[{"type":"string","format":"uuid"},{"type":"string","enum":[""]}],"required":false},"name":{"description":"The name of the application password.","type":"string","minLength":1,"pattern":".*\\S.*","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/users\/(?P<user_id>(?:[\\d]+|me))\/application-passwords\/introspect":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/users\/(?P<user_id>(?:[\\d]+|me))\/application-passwords\/(?P<uuid>[\\w\\-]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"app_id":{"description":"A UUID provided by the application to uniquely identify it. It is recommended to use an UUID v5 with the URL or DNS namespace.","type":"string","oneOf":[{"type":"string","format":"uuid"},{"type":"string","enum":[""]}],"required":false},"name":{"description":"The name of the application password.","type":"string","minLength":1,"pattern":".*\\S.*","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/comments":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"after":{"description":"Limit response to comments published after a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"author":{"description":"Limit result set to comments assigned to specific user IDs. Requires authorization.","type":"array","items":{"type":"integer"},"required":false},"author_exclude":{"description":"Ensure result set excludes comments assigned to specific user IDs. Requires authorization.","type":"array","items":{"type":"integer"},"required":false},"author_email":{"default":null,"description":"Limit result set to that from a specific author email. Requires authorization.","format":"email","type":"string","required":false},"before":{"description":"Limit response to comments published before a given ISO8601 compliant date.","type":"string","format":"date-time","required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by comment attribute.","type":"string","default":"date_gmt","enum":["date","date_gmt","id","include","post","parent","type"],"required":false},"parent":{"default":[],"description":"Limit result set to comments of specific parent IDs.","type":"array","items":{"type":"integer"},"required":false},"parent_exclude":{"default":[],"description":"Ensure result set excludes specific parent IDs.","type":"array","items":{"type":"integer"},"required":false},"post":{"default":[],"description":"Limit result set to comments assigned to specific post IDs.","type":"array","items":{"type":"integer"},"required":false},"status":{"default":"approve","description":"Limit result set to comments assigned a specific status. Requires authorization.","type":"string","required":false},"type":{"default":"comment","description":"Limit result set to comments assigned a specific type. Requires authorization.","type":"string","required":false},"password":{"description":"The password for the post if it is password protected.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"args":{"author":{"description":"The ID of the user object, if author was a user.","type":"integer","required":false},"author_email":{"description":"Email address for the comment author.","type":"string","format":"email","required":false},"author_ip":{"description":"IP address for the comment author.","type":"string","format":"ip","required":false},"author_name":{"description":"Display name for the comment author.","type":"string","required":false},"author_url":{"description":"URL for the comment author.","type":"string","format":"uri","required":false},"author_user_agent":{"description":"User agent for the comment author.","type":"string","required":false},"content":{"description":"The content for the comment.","type":"object","properties":{"raw":{"description":"Content for the comment, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the comment, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"date":{"description":"The date the comment was published, in the site's timezone.","type":"string","format":"date-time","required":false},"date_gmt":{"description":"The date the comment was published, as GMT.","type":"string","format":"date-time","required":false},"parent":{"default":0,"description":"The ID for the parent of the comment.","type":"integer","required":false},"post":{"default":0,"description":"The ID of the associated post object.","type":"integer","required":false},"status":{"description":"State of the comment.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_wp_note_status":{"type":"string","title":"","description":"Note resolution status","default":"","enum":["resolved","reopen"]}},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/comments"}]}},"\/wp\/v2\/comments\/(?P<id>[\\d]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"Unique identifier for the comment.","type":"integer","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"password":{"description":"The password for the parent post of the comment (if the post is password protected).","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"id":{"description":"Unique identifier for the comment.","type":"integer","required":false},"author":{"description":"The ID of the user object, if author was a user.","type":"integer","required":false},"author_email":{"description":"Email address for the comment author.","type":"string","format":"email","required":false},"author_ip":{"description":"IP address for the comment author.","type":"string","format":"ip","required":false},"author_name":{"description":"Display name for the comment author.","type":"string","required":false},"author_url":{"description":"URL for the comment author.","type":"string","format":"uri","required":false},"author_user_agent":{"description":"User agent for the comment author.","type":"string","required":false},"content":{"description":"The content for the comment.","type":"object","properties":{"raw":{"description":"Content for the comment, as it exists in the database.","type":"string","context":["edit"]},"rendered":{"description":"HTML content for the comment, transformed for display.","type":"string","context":["view","edit","embed"],"readonly":true}},"required":false},"date":{"description":"The date the comment was published, in the site's timezone.","type":"string","format":"date-time","required":false},"date_gmt":{"description":"The date the comment was published, as GMT.","type":"string","format":"date-time","required":false},"parent":{"description":"The ID for the parent of the comment.","type":"integer","required":false},"post":{"description":"The ID of the associated post object.","type":"integer","required":false},"status":{"description":"State of the comment.","type":"string","required":false},"meta":{"description":"Meta fields.","type":"object","properties":{"_wp_note_status":{"type":"string","title":"","description":"Note resolution status","default":"","enum":["resolved","reopen"]}},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"args":{"id":{"description":"Unique identifier for the comment.","type":"integer","required":false},"force":{"type":"boolean","default":false,"description":"Whether to bypass Trash and force deletion.","required":false},"password":{"description":"The password for the parent post of the comment (if the post is password protected).","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/search":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"type":{"default":"post","description":"Limit results to items of an object type.","type":"string","enum":["post","term","post-format"],"required":false},"subtype":{"default":"any","description":"Limit results to items of one or more object subtypes.","type":"array","items":{"enum":["post","page","sfwd-courses","sfwd-lessons","sfwd-topic","sfwd-quiz","ld-exam","groups","docs","category","post_tag","doc_category","doc_tag","ld_course_category","ld_course_tag","ld_lesson_category","ld_lesson_tag","ld_topic_category","ld_topic_tag","ld_group_category","ld_group_tag","any"],"type":"string"},"required":false},"exclude":{"description":"Ensure result set excludes specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"include":{"description":"Limit result set to specific IDs.","type":"array","items":{"type":"integer"},"default":[],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/search"}]}},"\/wp\/v2\/block-renderer\/(?P<name>[a-z0-9-]+\/[a-z0-9-]+)":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET","POST"],"args":{"name":{"description":"Unique registered name for the block.","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["edit"],"default":"view","required":false},"attributes":{"description":"Attributes for the block.","type":"object","default":[],"required":false},"post_id":{"description":"ID of the post context.","type":"integer","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/block-types":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"namespace":{"description":"Block namespace.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/block-types"}]}},"\/wp\/v2\/block-types\/(?P<namespace>[a-zA-Z0-9_-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"namespace":{"description":"Block namespace.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/block-types\/(?P<namespace>[a-zA-Z0-9_-]+)\/(?P<name>[a-zA-Z0-9_-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"name":{"description":"Block name.","type":"string","required":false},"namespace":{"description":"Block namespace.","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/settings":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"title":{"title":"Title","description":"Site title.","type":"string","required":false},"description":{"title":"Tagline","description":"Site tagline.","type":"string","required":false},"url":{"title":"","description":"Site URL.","type":"string","format":"uri","required":false},"email":{"title":"","description":"This address is used for admin purposes, like new user notification.","type":"string","format":"email","required":false},"timezone":{"title":"","description":"A city in the same timezone as you.","type":"string","required":false},"date_format":{"title":"","description":"A date format for all date strings.","type":"string","required":false},"time_format":{"title":"","description":"A time format for all time strings.","type":"string","required":false},"start_of_week":{"title":"","description":"A day number of the week that the week should start on.","type":"integer","required":false},"language":{"title":"","description":"WordPress locale code.","type":"string","required":false},"use_smilies":{"title":"","description":"Convert emoticons like :-) and :-P to graphics on display.","type":"boolean","required":false},"default_category":{"title":"","description":"Default post category.","type":"integer","required":false},"default_post_format":{"title":"","description":"Default post format.","type":"string","required":false},"posts_per_page":{"title":"Maximum posts per page","description":"Blog pages show at most.","type":"integer","required":false},"show_on_front":{"title":"Show on front","description":"What to show on the front page","type":"string","required":false},"page_on_front":{"title":"Page on front","description":"The ID of the page that should be displayed on the front page","type":"integer","required":false},"page_for_posts":{"title":"","description":"The ID of the page that should display the latest posts","type":"integer","required":false},"default_ping_status":{"title":"","description":"Allow link notifications from other blogs (pingbacks and trackbacks) on new articles.","type":"string","enum":["open","closed"],"required":false},"default_comment_status":{"title":"Allow comments on new posts","description":"Allow people to submit comments on new posts.","type":"string","enum":["open","closed"],"required":false},"site_logo":{"title":"Logo","description":"Site logo.","type":"integer","required":false},"site_icon":{"title":"Icon","description":"Site icon.","type":"integer","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/settings"}]}},"\/wp\/v2\/themes":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"status":{"description":"Limit result set to themes assigned one or more statuses.","type":"array","items":{"enum":["active","inactive"],"type":"string"},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/themes"}]}},"\/wp\/v2\/themes\/(?P<stylesheet>[^\\\/:<>\\*\\?\"\\|]+(?:\\\/[^\\\/:<>\\*\\?\"\\|]+)?)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"stylesheet":{"description":"The theme's stylesheet. This uniquely identifies the theme.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/plugins":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"search":{"description":"Limit results to those matching a string.","type":"string","required":false},"status":{"description":"Limits results to plugins with the given status.","type":"array","items":{"type":"string","enum":["inactive","active"]},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"args":{"slug":{"type":"string","description":"WordPress.org plugin directory slug.","pattern":"[\\w\\-]+","required":true},"status":{"description":"The plugin activation status.","type":"string","enum":["inactive","active"],"default":"inactive","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/plugins"}]}},"\/wp\/v2\/plugins\/(?P<plugin>[^.\\\/]+(?:\\\/[^.\\\/]+)?)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"plugin":{"type":"string","pattern":"[^.\\\/]+(?:\\\/[^.\\\/]+)?","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"plugin":{"type":"string","pattern":"[^.\\\/]+(?:\\\/[^.\\\/]+)?","required":false},"status":{"description":"The plugin activation status.","type":"string","enum":["inactive","active"],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"plugin":{"type":"string","pattern":"[^.\\\/]+(?:\\\/[^.\\\/]+)?","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/sidebars":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/sidebars"}]}},"\/wp\/v2\/sidebars\/(?P<id>[\\w-]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"The id of a registered sidebar","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"args":{"widgets":{"description":"Nested widgets.","type":"array","items":{"type":["object","string"]},"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/widget-types":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/widget-types"}]}},"\/wp\/v2\/widget-types\/(?P<id>[a-zA-Z0-9_-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"id":{"description":"The widget type id.","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/widget-types\/(?P<id>[a-zA-Z0-9_-]+)\/encode":{"namespace":"wp\/v2","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"id":{"description":"The widget type id.","type":"string","required":true},"instance":{"description":"Current instance settings of the widget.","type":"object","required":false},"form_data":{"description":"Serialized widget form data to encode into instance settings.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/widget-types\/(?P<id>[a-zA-Z0-9_-]+)\/render":{"namespace":"wp\/v2","methods":["POST"],"endpoints":[{"methods":["POST"],"args":{"id":{"description":"The widget type id.","type":"string","required":true},"instance":{"description":"Current instance settings of the widget.","type":"object","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/widgets":{"namespace":"wp\/v2","methods":["GET","POST"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"sidebar":{"description":"The sidebar to return widgets for.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the widget.","type":"string","required":false},"id_base":{"description":"The type of the widget. Corresponds to ID in widget-types endpoint.","type":"string","required":false},"sidebar":{"default":"wp_inactive_widgets","description":"The sidebar the widget belongs to.","type":"string","required":true},"instance":{"description":"Instance settings of the widget, if supported.","type":"object","properties":{"encoded":{"description":"Base64 encoded representation of the instance settings.","type":"string","context":["edit"]},"hash":{"description":"Cryptographic hash of the instance settings.","type":"string","context":["edit"]},"raw":{"description":"Unencoded instance settings, if supported.","type":"object","context":["edit"]}},"required":false},"form_data":{"description":"URL-encoded form data from the widget admin form. Used to update a widget that does not support instance. Write only.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/widgets"}]}},"\/wp\/v2\/widgets\/(?P<id>[\\w\\-]+)":{"namespace":"wp\/v2","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET"],"allow_batch":{"v1":true},"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["POST","PUT","PATCH"],"allow_batch":{"v1":true},"args":{"id":{"description":"Unique identifier for the widget.","type":"string","required":false},"id_base":{"description":"The type of the widget. Corresponds to ID in widget-types endpoint.","type":"string","required":false},"sidebar":{"description":"The sidebar the widget belongs to.","type":"string","required":false},"instance":{"description":"Instance settings of the widget, if supported.","type":"object","properties":{"encoded":{"description":"Base64 encoded representation of the instance settings.","type":"string","context":["edit"]},"hash":{"description":"Cryptographic hash of the instance settings.","type":"string","context":["edit"]},"raw":{"description":"Unencoded instance settings, if supported.","type":"object","context":["edit"]}},"required":false},"form_data":{"description":"URL-encoded form data from the widget admin form. Used to update a widget that does not support instance. Write only.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}},{"methods":["DELETE"],"allow_batch":{"v1":true},"args":{"force":{"description":"Whether to force removal of the widget, or move it to the inactive sidebar.","type":"boolean","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp\/v2\/block-directory\/search":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"term":{"description":"Limit result set to blocks matching the search term.","type":"string","minLength":1,"required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/block-directory\/search"}]}},"\/wp\/v2\/pattern-directory\/patterns":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":100,"minimum":1,"maximum":100,"required":false},"search":{"description":"Limit results to those matching a string.","type":"string","minLength":1,"required":false},"category":{"description":"Limit results to those matching a category ID.","type":"integer","minimum":1,"required":false},"keyword":{"description":"Limit results to those matching a keyword ID.","type":"integer","minimum":1,"required":false},"slug":{"description":"Limit results to those matching a pattern (slug).","type":"array","required":false},"offset":{"description":"Offset the result set by a specific number of items.","type":"integer","required":false},"order":{"description":"Order sort attribute ascending or descending.","type":"string","default":"desc","enum":["asc","desc"],"required":false},"orderby":{"description":"Sort collection by post attribute.","type":"string","default":"date","enum":["author","date","id","include","modified","parent","relevance","slug","include_slugs","title","favorite_count"],"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/pattern-directory\/patterns"}]}},"\/wp\/v2\/block-patterns\/patterns":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/block-patterns\/patterns"}]}},"\/wp\/v2\/block-patterns\/categories":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/block-patterns\/categories"}]}},"\/wp-site-health\/v1":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wp-site-health\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp-site-health\/v1"}]}},"\/wp-site-health\/v1\/tests\/background-updates":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp-site-health\/v1\/tests\/background-updates"}]}},"\/wp-site-health\/v1\/tests\/loopback-requests":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp-site-health\/v1\/tests\/loopback-requests"}]}},"\/wp-site-health\/v1\/tests\/https-status":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp-site-health\/v1\/tests\/https-status"}]}},"\/wp-site-health\/v1\/tests\/dotorg-communication":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp-site-health\/v1\/tests\/dotorg-communication"}]}},"\/wp-site-health\/v1\/tests\/authorization-header":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp-site-health\/v1\/tests\/authorization-header"}]}},"\/wp-site-health\/v1\/directory-sizes":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp-site-health\/v1\/directory-sizes"}]}},"\/wp-site-health\/v1\/tests\/page-cache":{"namespace":"wp-site-health\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp-site-health\/v1\/tests\/page-cache"}]}},"\/wp-block-editor\/v1":{"namespace":"wp-block-editor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wp-block-editor\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp-block-editor\/v1"}]}},"\/wp-block-editor\/v1\/url-details":{"namespace":"wp-block-editor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"url":{"description":"The URL to process.","type":"string","format":"uri","required":true},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp-block-editor\/v1\/url-details"}]}},"\/wp\/v2\/menu-locations":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/menu-locations"}]}},"\/wp\/v2\/menu-locations\/(?P<location>[\\w-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"location":{"description":"An alphanumeric identifier for the menu location.","type":"string","required":false},"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp-block-editor\/v1\/export":{"namespace":"wp-block-editor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp-block-editor\/v1\/export"}]}},"\/wp-block-editor\/v1\/navigation-fallback":{"namespace":"wp-block-editor\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp-block-editor\/v1\/navigation-fallback"}]}},"\/wp\/v2\/font-collections":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":10,"minimum":1,"maximum":100,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/font-collections"}]}},"\/wp\/v2\/font-collections\/(?P<slug>[\\\/\\w-]+)":{"namespace":"wp\/v2","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp-abilities\/v1":{"namespace":"wp-abilities\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"namespace":{"default":"wp-abilities\/v1","required":false},"context":{"default":"view","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp-abilities\/v1"}]}},"\/wp-abilities\/v1\/categories":{"namespace":"wp-abilities\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":50,"minimum":1,"maximum":100,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp-abilities\/v1\/categories"}]}},"\/wp-abilities\/v1\/categories\/(?P<slug>[a-z0-9]+(?:-[a-z0-9]+)*)":{"namespace":"wp-abilities\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"slug":{"description":"Unique identifier for the ability category.","type":"string","pattern":"^[a-z0-9]+(?:-[a-z0-9]+)*$","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp-abilities\/v1\/abilities\/(?P<name>[a-zA-Z0-9\\-\\\/]+?)\/run":{"namespace":"wp-abilities\/v1","methods":["GET","POST","PUT","PATCH","DELETE"],"endpoints":[{"methods":["GET","POST","PUT","PATCH","DELETE"],"args":{"name":{"description":"Unique identifier for the ability.","type":"string","pattern":"^[a-zA-Z0-9\\-\\\/]+$","required":false},"input":{"description":"Input parameters for the ability execution.","type":["integer","number","boolean","string","array","object","null"],"default":null,"required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]},"\/wp-abilities\/v1\/abilities":{"namespace":"wp-abilities\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"context":{"description":"Scope under which the request is made; determines fields present in response.","type":"string","enum":["view","embed","edit"],"default":"view","required":false},"page":{"description":"Current page of the collection.","type":"integer","default":1,"minimum":1,"required":false},"per_page":{"description":"Maximum number of items to be returned in result set.","type":"integer","default":50,"minimum":1,"maximum":100,"required":false},"category":{"description":"Limit results to abilities in specific ability category.","type":"string","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp-abilities\/v1\/abilities"}]}},"\/wp-abilities\/v1\/abilities\/(?P<name>[a-zA-Z0-9\\-\\\/]+)":{"namespace":"wp-abilities\/v1","methods":["GET"],"endpoints":[{"methods":["GET"],"args":{"name":{"description":"Unique identifier for the ability.","type":"string","pattern":"^[a-zA-Z0-9\\-\\\/]+$","required":false},"wpml_language":{"type":"string","description":"WPML's language code","enum":["ar","zh-hans","cs","da","nl","en","et","fi","fr","de","el","hu","id","it","ja","ko","lv","lt","no","pl","pt-br","pt-pt","ro","sk","sl","es","sv","tr","uk"],"required":false}}}]}},"site_logo":4865,"site_icon":1849,"site_icon_url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-favicon.svg","_links":{"help":[{"href":"https:\/\/developer.wordpress.org\/rest-api\/"}],"wp:featuredmedia":[{"embeddable":true,"type":"site_logo","href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media\/4865"},{"embeddable":true,"type":"site_icon","href":"https:\/\/skyplanner.ai\/lv\/wp-json\/wp\/v2\/media\/1849"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}