{"id":99755,"date":"2026-10-16T07:53:34","date_gmt":"2026-10-16T07:53:34","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=99755"},"modified":"2026-10-16T10:12:25","modified_gmt":"2026-10-16T10:12:25","slug":"capable-to-promise","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/lt\/istekliai\/capable-to-promise\/","title":{"rendered":"Capable to Promise: patikrinkite u\u017esakym\u0105 prie\u0161 \u012fsipareigodami"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Capable to Promise: patikrinkite u\u017esakym\u0105 prie\u0161 \u012fsipareigodami<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/lt\/\">Prad\u017eia<\/a> &raquo; <a href=\"\/lt\/istekliai\/\">I\u0161tekliai<\/a> &raquo; Capable to Promise: patikrinkite u\u017esakym\u0105 prie\u0161 \u012fsipareigodami<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Numatomas skaitymo laikas: <\/span><span class=\"yoast-reading-time__reading-time\">7<\/span><span class=\"yoast-reading-time__time-unit\"> minut\u0117s<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Capable to promise (CTP) \u2013 tai metodas, padedantis patikrinti, ar galite pagaminti pageidaujam\u0105 kiek\u012f ir kada tai \u012fmanoma, \u012fvertinus tiek med\u017eiag\u0173 prieinamum\u0105, tiek darbui reikalingus gamybos paj\u0117gumus. Kai preki\u0173 negalima tiesiog i\u0161si\u0173sti i\u0161 sand\u0117lio, \u0161is metodas suteikia pardavimo komandai pagrind\u0105 \u012fsipareigoti d\u0117l pristatymo termino.<\/p>\n\n\n<p>Svarbiausia tai patikrinti dar prie\u0161 sutinkant priimti u\u017esakym\u0105. Kliento pageidaujama data parodo, koks terminas pad\u0117t\u0173 gauti u\u017esakym\u0105. \u012eprastas u\u017esakymo \u012fvykdymo laikas parodo, kiek paprastai u\u017etrunkate. Ta\u010diau nei vienas, nei kitas nepasako, ar \u0161i\u0105 konkre\u010di\u0105 u\u017eduot\u012f gal\u0117site atlikti kartu su darbais, kuriuos jau \u012fsipareigojote atlikti.<\/p>\n\n\n<p>SkyPlanner APS padeda tai patikrinti pasitelkus preliminari\u0173 u\u017esakym\u0173 funkcij\u0105 \u201eJob Prospects\u201c: galite modeliuoti realias galim\u0173 u\u017esakym\u0173 pristatymo datas dar prie\u0161 \u012fsipareigodami juos pagaminti. \u012etraukite numatomus darbus \u012f esam\u0105 gamybos grafik\u0105, per\u017ei\u016br\u0117kite planuojam\u0105 j\u0173 u\u017ebaigimo laik\u0105 ir greta suplanuotus darbus Gantt diagramoje. U\u017euot i\u0161 naujo d\u0117lioj\u0119 \u012frengini\u0173 darb\u0173 eiles, kad atsakytum\u0117te pardavimo komandai, galite sutelkti d\u0117mes\u012f \u012f pasi\u016blym\u0105, kur\u012f j\u016bs\u0173 gamykla paj\u0117gi \u012fvykdyti.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kuo skiriasi capable to promise ir available to promise?<\/h2>\n\n\n<p>Available to promise (ATP) padeda nustatyti, kiek preki\u0173 galima pasi\u016blyti naujam u\u017esakymui, \u012fvertinus jau esam\u0105 paklaus\u0105. Galima atsi\u017evelgti ne tik \u012f \u0161iandien sand\u0117lyje esan\u010dias atsargas, kuri\u0173 dar ne\u012fsipareigota tiekti, bet ir \u012f prekes, kurias planuojama gauti.<\/p>\n\n\n<p>CTP papildomai \u012fvertina gamybos galimybes: jei gatav\u0173 gamini\u0173 n\u0117ra, ar galite juos pagaminti per reikiam\u0105 laik\u0105, naudodami prieinamas med\u017eiagas ir paj\u0117gumus?<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Klausimas<\/th><th>Available to promise (ATP)<\/th><th>Capable to promise (CTP)<\/th><\/tr><\/thead><tbody><tr><td>Kuo grind\u017eiamas atsakymas?<\/td><td>Atsargomis, kuri\u0173 dar ne\u012fsipareigota tiekti, ir planuojamu tiekimu<\/td><td>Med\u017eiag\u0173 prieinamumu ir gamybai reikalingais paj\u0117gumais<\/td><\/tr><tr><td>K\u0105 padeda pasi\u016blyti pardavimo komandai?<\/td><td>Kiek\u012f ir termin\u0105, pagr\u012fstus turimomis atsargomis ir prek\u0117mis, kurias numatoma gauti<\/td><td>Kiek\u012f ir termin\u0105, kuriuos galima u\u017etikrinti papildomai gaminant<\/td><\/tr><tr><td>Kada \u0161is skirtumas svarbus?<\/td><td>Kai galima tiekti sand\u0117lyje esan\u010dias arba numatomas gauti prekes<\/td><td>Kai u\u017esakym\u0105 dar reikia pagaminti ar surinkti naudojant bendrus gamybos i\u0161teklius<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>ATP naudingas, kai u\u017esakym\u0105 galite \u012fvykdyti naudodami turimas atsargas ir prekes, kurias numatoma gauti. CTP ypa\u010d vertingas taikant <a href=\"\/lt\/istekliai\/gamyba-pagal-uzsakyma\/\">gamyb\u0105 pagal u\u017esakym\u0105<\/a> ir <a href=\"\/lt\/istekliai\/surinkimas-pagal-uzsakyma\/\">surinkim\u0105 pagal u\u017esakym\u0105<\/a>: pri\u0117mus u\u017esakym\u0105 atsiranda nauj\u0173 darb\u0173, kuriems reikia rasti vietos gamybos tvarkara\u0161tyje.<\/p>\n\n\n<p>Net jei turite visus komponentus, tai dar nerei\u0161kia, kad turite laisv\u0173 paj\u0117gum\u0173 jiems surinkti. Lygiai taip pat gatav\u0173 gamini\u0173 atsarg\u0173 tr\u016bkumas nerei\u0161kia, kad turite atsisakyti kliento u\u017esakymo. CTP padeda rasti galimyb\u0119, kurios neatskleid\u017eia n\u0117 viena i\u0161 \u0161i\u0173 prielaid\u0173.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Naujas \u012fsipareigojimas gali kelti pavoj\u0173 ankstesniam<\/h2>\n\n\n<p>\u012esivaizduokite, kad pagal u\u017esakymus dirbanti mechaninio apdirbimo \u012fmon\u0117 rengia pasi\u016blym\u0105 velen\u0173 ir tvirtinimo plok\u0161\u010di\u0173 komplektui. Med\u017eiag\u0173 yra, o pardavimo komanda nor\u0117t\u0173 pasi\u016blyti i\u0161siuntim\u0105 penktadien\u012f.<\/p>\n\n\n<p>Velenus galima nutekinti ir patikrinti iki ketvirtadienio. Ta\u010diau plok\u0161tes reikia frezuoti apdirbimo centre, kuris jau u\u017eimtas patvirtintais u\u017esakymais. Pagal dabartin\u0119 darb\u0173 eil\u0119 jos bus baigtos tik kit\u0105 savait\u0119.<\/p>\n\n\n<p>U\u017esakymas n\u0117ra paruo\u0161tas vien d\u0117l to, kad baigtas lengviausiai pagaminamas gaminys. Jei klientui reikia viso komplekto, jo i\u0161siuntimo laik\u0105 lemia plok\u0161t\u0117s. Vien atsarg\u0173 patikra neparodyt\u0173 eil\u0117s prie frezavimo stakli\u0173, o \u012fprastas u\u017esakymo \u012fvykdymo laikas neatspind\u0117t\u0173 dabartin\u0117s j\u0173 apkrovos.<\/p>\n\n\n<p>Perk\u0117lus plok\u0161tes \u012f eil\u0117s prad\u017ei\u0105, galb\u016bt pavykt\u0173 jas i\u0161si\u0173sti penktadien\u012f, ta\u010diau d\u0117l to gal\u0117t\u0173 v\u0117luoti jau esamo kliento u\u017esakymas. Tai n\u0117ra laisvi paj\u0117gumai. Tai sprendimas, kuriam \u012fsipareigojimui teikti pirmenyb\u0119.<\/p>\n\n\n<p>Tod\u0117l naudinga CTP patikra kartu atsako \u012f du klausimus: <strong>kada galima baigti \u0161\u012f u\u017esakym\u0105 ir kaip jo \u012ftraukimas \u012f tvarkara\u0161t\u012f paveiks darbus, kuriuos jau \u012fsipareigojote atlikti?<\/strong> Matydami abu atsakymus, galite gauti nauj\u0105 u\u017esakym\u0105 ir i\u0161 anksto \u017einoti jo kain\u0105, o ne su\u017einoti j\u0105 tik po patvirtinimo.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Patikrinkite b\u016bsim\u0105 u\u017esakym\u0105 su SkyPlanner<\/h2>\n\n\n<p>SkyPlanner padeda atsakyti \u012f \u0161\u012f klausim\u0105 sudarydama darb\u0173 tvarkara\u0161t\u012f. Jos dirbtiniu intelektu paremtas planavimo variklis Arcturus apskai\u010diuoja operacij\u0173 laik\u0105 pagal j\u016bs\u0173 nustatytus <a href=\"\/lt\/istekliai\/kas-yra-gamybos-planavimas\/\">gamybos i\u0161teklius, priklausomybes ir prioritetus<\/a>. U\u017euot rankiniu b\u016bdu planav\u0119 kiekvien\u0105 operacij\u0105, matote apskai\u010diuot\u0105 tvarkara\u0161t\u012f.<\/p>\n\n\n<p>Sprend\u017eiant, ar galima \u012fsipareigoti d\u0117l u\u017esakymo, veiksm\u0173 seka paprasta.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Suplanuokite b\u016btent tuos darbus, kuriuos si\u016blo pardavimo komanda<\/h3>\n\n\n<p>Sukurkite u\u017esakym\u0105 ir pa\u017eym\u0117kite si\u016blomas jo pozicijas kaip preliminarias. \u012eveskite pageidaujamus gaminius, j\u0173 kiekius ir reikiamas gamybos operacijas, u\u017euot tikrin\u0119 bendrin\u0119 vidutin\u0117s trukm\u0117s u\u017eduot\u012f. Suplanuokite darbus ir, prie\u0161 patvirtindami plan\u0105, per\u017ei\u016br\u0117kite si\u016blom\u0105 j\u0173 viet\u0105 grafike. Taip galite \u012fvertinti reali\u0105 u\u017ebaigimo dat\u0105, kol u\u017esakymas dar preliminarus, o pardavimas nepatvirtintas.<\/p>\n\n\n<p>Svarb\u016bs tie pradiniai duomenys, kurie gali pakeisti atsakym\u0105: kokie i\u0161tekliai gali atlikti darbus, kiek trunka operacijos ir paruo\u0161imas, kokios darbo pamainos, kada bus paruo\u0161tos med\u017eiagos ir kokie u\u017esakymai jau naudoja paj\u0117gumus. Kai \u012fjungtas planavimas atsi\u017evelgiant \u012f med\u017eiagas, Arcturus \u012f skai\u010diavimus \u012ftraukia ir med\u017eiag\u0173 prieinamum\u0105.<\/p>\n\n\n<p>M\u016bs\u0173 mechaninio apdirbimo \u012fmon\u0117s pavyzdyje tai rei\u0161kia, kad reikia suplanuoti ir velen\u0173, ir plok\u0161\u010di\u0173 gamyb\u0105. Ne\u012ftraukus ilgiau trunkan\u010dio gamybos mar\u0161ruto, si\u016bloma data atrodyt\u0173 patraukli, ta\u010diau viso u\u017esakymo iki jos \u012fvykdyti nepavykt\u0173.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Vertinkite u\u017ebaigimo laikus, ne vien pageidaujam\u0105 termin\u0105<\/h3>\n\n\n<p>Suplanav\u0119 preliminar\u0173 u\u017esakym\u0105, per\u017ei\u016br\u0117kite kiekvienos jo pozicijos lauk\u0105 \u201ePlanuojamas pabaigos laikas\u201c. V\u0117liausiai u\u017ebaigiamos pozicijos laikas parodo, kada, esant dabartiniam apkrovimui, bus baigta viso u\u017esakymo gamyba. \u0160iuo laiku galite remtis \u017ead\u0117dami viso u\u017esakymo pristatymo dat\u0105.<\/p>\n\n\n<p>Nepainiokite \u0161io rezultato su data, kada klientas gaus prekes. Prid\u0117kite patikrai, pakavimui, i\u0161siuntimui ar transportavimui reikaling\u0105 laik\u0105, jei jis dar ne\u012ftrauktas \u012f plan\u0105. Pardavimo ir gamybos komandos turi ai\u0161kiai sutarti, ar si\u016bloma data rei\u0161kia paruo\u0161im\u0105 atsiimti, i\u0161siuntim\u0105, ar pristatym\u0105.<\/p>\n\n\n<p>Tuo ir skiriasi pageidaujamos datos \u012fvedimas nuo patikrinimo, ar gamyba gali jos laikytis. U\u017e \u012fsipareigojim\u0105 klientui atsakote j\u016bs, o SkyPlanner pateikia tvarkara\u0161tyje apskai\u010diuotus u\u017ebaigimo laikus, kuriais galite pagr\u012fsti patikim\u0105 pa\u017ead\u0105.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Per\u017ei\u016br\u0117kite kitus \u012fsipareigojimus<\/h3>\n\n\n<p><a href=\"\/lt\/istekliai\/ganto-diagrama-gamybos-planavimui\/\">Gantt diagramoje<\/a> per\u017ei\u016br\u0117kite si\u016blomus darbus kartu su esamais u\u017esakymais. Jei pakei\u010diate naujo u\u017esakymo prioritet\u0105, kad j\u012f baigtum\u0117te anks\u010diau, perskai\u010diuokite tvarkara\u0161t\u012f ir prie\u0161 patvirtindami pasi\u016blym\u0105 patikrinkite, kokie kiti darbai pasislinko.<\/p>\n\n\n<p>J\u016bs nustatote prioritetus ir galite u\u017erakinti pasirinktus tvarkara\u0161\u010dio sprendimus, kad jie nesikeist\u0173. Arcturus atlieka skai\u010diavimus laikydamasis \u0161i\u0173 nurodym\u0173. Taip aptardami u\u017esakym\u0105 galite spr\u0119sti, ar verta j\u012f priimti skubos tvarka, u\u017euot rankiniu b\u016bdu perd\u0117lioj\u0119 eiles vien tam, kad i\u0161siai\u0161kintum\u0117te, kokius darbus jis i\u0161stumt\u0173.<\/p>\n\n\n<p>SkyPlanner integruojama su bet kuria ERP ar MES sistema per <a href=\"\/lt\/integracijos\/\">atvir\u0105 REST API<\/a>. Galite toliau naudoti turim\u0105 u\u017esakym\u0173 valdymo sistem\u0105 ir susieti j\u0105 su gamybos tvarkara\u0161\u010diu, reikalingu \u0161iems sprendimams d\u0117l pristatymo priimti.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Paverskite rezultat\u0105 pasi\u016blymu, o ne vien atsakymu \u201etaip\u201c arba \u201ene\u201c<\/h2>\n\n\n<p>Jei pageidaujam\u0105 kiek\u012f galima pagaminti iki pra\u0161omos datos be nepriimtino poveikio esamiems darbams, turite tvirtesn\u012f pagrind\u0105 patvirtinti u\u017esakym\u0105. Jei ne, naudingiau pasi\u016blyti alternatyv\u0105, kuri\u0105 klientas gal\u0117t\u0173 pasirinkti.<\/p>\n\n\n<p>\u012esivaizduojamo mechaninio apdirbimo u\u017esakymo atveju gal\u0117tum\u0117te:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Pasi\u016blyti vis\u0105 u\u017esakym\u0105 pristatyti v\u0117liau.<\/strong> Nekeiskite esam\u0173 \u012fsipareigojim\u0173 ir pasi\u016blykite dat\u0105, pagr\u012fst\u0105 ilgiau trunkan\u010diu plok\u0161\u010di\u0173 gamybos mar\u0161rutu.<\/li><li><strong>Aptarti pristatym\u0105 dalimis.<\/strong> Jei klientas gali naudoti velenus atskirai, pasi\u016blykite juos pristatyti pirmiau, o plok\u0161tes \u2013 v\u0117liau. Prie\u0161 numatydami papildomus krovos ir transportavimo darbus, \u012fsitikinkite, kad dalin\u0117 siunta klientui naudinga.<\/li><li><strong>\u012evertinti ankstesn\u0119 dat\u0105 pakeitus plan\u0105.<\/strong> Gali pad\u0117ti patvirtinta papildoma pamaina ar kitas tinkamas gamybos i\u0161teklius. Prie\u0161 si\u016blydami ankstesn\u0119 dat\u0105, atnaujinkite duomenis apie numatomus paj\u0117gumus ir perskai\u010diuokite tvarkara\u0161t\u012f.<\/li><li><strong>Ai\u0161kiai susitarti, k\u0105 teks atid\u0117ti pakeitus prioritetus.<\/strong> Jei vadovyb\u0117 nusprend\u017eia \u0161\u012f u\u017esakym\u0105 paankstinti, nustatykite, kuriuos \u012fsipareigojimus tai paveiks, ir apgalvotai spr\u0119skite, kaip valdyti pasekmes.<\/li><\/ul>\n\n\n<p>Tai komerciniai sprendimai, o ne vien tvarkara\u0161\u010dio pakeitimai. Skubus u\u017esakymas, d\u0117l kurio atsiranda \u012f kain\u0105 ne\u012ftraukt\u0173 vir\u0161valand\u017ei\u0173, brangesnio transportavimo ar darbo sutrikim\u0173, gali b\u016bti ma\u017eiau pelningas, nei atrodo. Patikrin\u0119 prie\u0161 priimdami u\u017esakym\u0105, turite galimyb\u0119 \u012fskai\u010diuoti papildomas s\u0105naudas arba susitarti d\u0117l tinkamesn\u0117s datos.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Gr\u012fskite \u012fsipareigojimus dabartine apkrova<\/h2>\n\n\n<p>Vakaryk\u0161\u010diu tvarkara\u0161\u010diu pagr\u012fsto pasi\u016blymo gali nebepavykti \u012fgyvendinti pri\u0117mus kit\u0105 u\u017esakym\u0105 ar v\u0117luojant med\u017eiag\u0173 pristatymui. Jei iki kliento patvirtinimo pasikei\u010dia prielaidos, kuriomis pagr\u012fsta data, dar kart\u0105 patikrinkite b\u016bsim\u0105 u\u017esakym\u0105.<\/p>\n\n\n<p>Suplanuoti preliminar\u016bs u\u017esakymai \u012fskai\u010diuojami \u012f planuojam\u0105 apkrov\u0105 ir rezervuoja paj\u0117gumus. Taip pardavimo komanda gali atsi\u017evelgti \u012f galimus u\u017esakymus, u\u017euot kiekvien\u0105 pasi\u016blym\u0105 grindusi tuo pa\u010diu tariamai laisvu laiku. Susitarkite, kuriuos preliminarius u\u017esakymus \u012ftraukti \u012f grafik\u0105, kas juos pri\u017ei\u016br\u0117s ir kada nepriimtas pasi\u016blymas tur\u0117t\u0173 nustoti veikti plan\u0105. Klientui patvirtinus u\u017esakym\u0105, panaikinkite preliminaraus u\u017esakymo \u017eym\u0105 ir suplanuokite darbus kaip patvirtint\u0105 u\u017esakym\u0105. Taip pasi\u016blymas ir gamybos \u012fsipareigojimas lieka susieti, o pasen\u0119 pasi\u016blymai neu\u017ego\u017eia i\u0161 tikr\u0173j\u0173 laisv\u0173 paj\u0117gum\u0173.<\/p>\n\n\n<p>Prisi\u0117m\u0119 \u012fsipareigojim\u0105, nuolat atnaujinkite prioritetus ir informacij\u0105 apie i\u0161tekli\u0173 bei med\u017eiag\u0173 prieinamum\u0105. Skai\u010diavimais pagr\u012fstas pa\u017eadas naudingas tada, kai tikrinate realias b\u016bsimas gamybos s\u0105lygas, o ne remiat\u0117s planu, kuriame daroma prielaida, kad visos pamainos ir pristatymai vyks taip, kaip tik\u0117tasi i\u0161 prad\u017ei\u0173.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Tikslesnis pristatymo dat\u0173 nustatymas kasdieniame darbe<\/h2>\n\n\n<p>Suomijos mechaninio apdirbimo paslaug\u0173 \u012fmon\u0117 Eskomatic anks\u010diau darb\u0173 eiles daugiausia tvark\u0117 rankiniu b\u016bdu senesn\u0117je ERP ir gamybos valdymo sistemoje. Susidaryti bendr\u0105 vaizd\u0105 u\u017etrukdavo, o d\u0117l ribotos informacijos apie med\u017eiagas j\u0173 tr\u016bkumas kartais gal\u0117jo paai\u0161k\u0117ti tik prie\u0161 pat pradedant u\u017eduot\u012f.<\/p>\n\n\n<p>Prad\u0117jusi naudoti SkyPlanner, komanda gavo vaizd\u017ei\u0105 darb\u0173 eil\u0119 Gantt diagramoje ir automatin\u012f apkrovos planavim\u0105, susiet\u0105 su esamais ERP duomenimis. <a href=\"\/lt\/klientu-istorijos\/eskomatic\/\">Eskomatic teigimu<\/a>, ai\u0161kiau matoma gamybos apkrova leid\u017eia lengviau nustatyti realius pristatymo terminus ir klientams nurodyti tikslesnes datas. Gamybos planavimo vadovas Tommi M\u00e4nnist\u00f6 pristatymo dat\u0173 nustatym\u0105 i\u0161skiria kaip ypa\u010d stipri\u0105 sistemos pus\u0119 kasdieniame darbe.<\/p>\n\n\n<p>Tai praktin\u0117 prie\u017eastis \u0161iai problemai spr\u0119sti rinktis SkyPlanner: pardavimo komandai pateikiate suplanuotais darbais pagr\u012fst\u0105 atsakym\u0105, o planuotojui nebereikia jo i\u0161 naujo skai\u010diuoti rankiniu b\u016bdu.<\/p>\n\n\n<p><a href=\"\/lt\/susisiekite-su-pardavejais\/\">U\u017esisakykite SkyPlanner pristatym\u0105<\/a> ir pasiruo\u0161kite aptarti b\u016bsim\u0105 u\u017esakym\u0105, pageidaujam\u0105 jo dat\u0105 bei gamybos i\u0161tekli\u0173, kuris grei\u010diausiai j\u012f stabdyt\u0173. Per pokalb\u012f i\u0161siai\u0161kinkite, kaip gal\u0117tum\u0117te patikrinti pasi\u016blymo suderinamum\u0105 su esamais \u012fsipareigojimais dar prie\u0161 j\u012f patvirtindami. Jei pirmiausia norite susipa\u017einti savaranki\u0161kai, <a href=\"\/lt\/bandymas\/\">i\u0161bandykite SkyPlanner su demonstraciniais duomenimis<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Capable to Promise: patikrinkite u\u017esakym\u0105 prie\u0161 \u012fsipareigodami Prad\u017eia &raquo; I\u0161tekliai &raquo; Capable to Promise: patikrinkite u\u017esakym\u0105 prie\u0161 \u012fsipareigodami Capable to promise (CTP) \u2013 tai metodas, padedantis patikrinti, ar galite pagaminti pageidaujam\u0105 kiek\u012f ir kada tai \u012fmanoma, \u012fvertinus tiek med\u017eiag\u0173 prieinamum\u0105, tiek darbui reikalingus gamybos paj\u0117gumus. Kai preki\u0173 negalima tiesiog i\u0161si\u0173sti i\u0161 sand\u0117lio, \u0161is metodas suteikia &#8230; <a title=\"Capable to Promise: patikrinkite u\u017esakym\u0105 prie\u0161 \u012fsipareigodami\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/capable-to-promise\/\" aria-label=\"Read more about Capable to Promise: patikrinkite u\u017esakym\u0105 prie\u0161 \u012fsipareigodami\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":99840,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2532,301],"tags":[],"class_list":["post-99755","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-ir-planavimas","category-istekliai","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Capable to Promise: patikrinkite u\u017esakym\u0105 prie\u0161 \u012fsipareigodami<\/title>\n<meta name=\"description\" content=\"Ar naujas u\u017esakymas nev\u0117lins kit\u0173? Su capable to promise ir SkyPlanner patikrinkite gamybos paj\u0117gumus prie\u0161 patvirtindami pristatymo dat\u0105.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/capable-to-promise\/\" \/>\n<meta property=\"og:locale\" content=\"lt_LT\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Capable to Promise: patikrinkite u\u017esakym\u0105 prie\u0161 \u012fsipareigodami\" \/>\n<meta property=\"og:description\" content=\"Ar naujas u\u017esakymas nev\u0117lins kit\u0173? Su capable to promise ir SkyPlanner patikrinkite gamybos paj\u0117gumus prie\u0161 patvirtindami pristatymo dat\u0105.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lt\/istekliai\/capable-to-promise\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-16T07:53:34+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-16T10:12:25+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1536\" \/>\n\t<meta property=\"og:image:height\" content=\"864\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"9 minut\u0117s\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/capable-to-promise\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/capable-to-promise\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Capable to Promise: patikrinkite u\u017esakym\u0105 prie\u0161 \u012fsipareigodami\",\"datePublished\":\"2026-10-16T07:53:34+00:00\",\"dateModified\":\"2026-10-16T10:12:25+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/capable-to-promise\\\/\"},\"wordCount\":1774,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/capable-to-promise\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/capable-to-promise-hero-1.png\",\"articleSection\":[\"APS ir planavimas\",\"i\u0161tekliai\"],\"inLanguage\":\"lt-LT\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/capable-to-promise\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/capable-to-promise\\\/\",\"name\":\"Capable to Promise: patikrinkite u\u017esakym\u0105 prie\u0161 \u012fsipareigodami\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/capable-to-promise\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/capable-to-promise\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/capable-to-promise-hero-1.png\",\"datePublished\":\"2026-10-16T07:53:34+00:00\",\"dateModified\":\"2026-10-16T10:12:25+00:00\",\"description\":\"Ar naujas u\u017esakymas nev\u0117lins kit\u0173? Su capable to promise ir SkyPlanner patikrinkite gamybos paj\u0117gumus prie\u0161 patvirtindami pristatymo dat\u0105.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/capable-to-promise\\\/#breadcrumb\"},\"inLanguage\":\"lt-LT\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/capable-to-promise\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"lt-LT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/capable-to-promise\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/capable-to-promise-hero-1.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/capable-to-promise-hero-1.png\",\"width\":1536,\"height\":864,\"caption\":\"Turned shafts await a mounting plate beside a milling machine before the complete order can ship.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/capable-to-promise\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Capable to Promise: patikrinkite u\u017esakym\u0105 prie\u0161 \u012fsipareigodami\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lt-LT\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lt-LT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lt-LT\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Capable to Promise: patikrinkite u\u017esakym\u0105 prie\u0161 \u012fsipareigodami","description":"Ar naujas u\u017esakymas nev\u0117lins kit\u0173? Su capable to promise ir SkyPlanner patikrinkite gamybos paj\u0117gumus prie\u0161 patvirtindami pristatymo dat\u0105.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lt\/istekliai\/capable-to-promise\/","og_locale":"lt_LT","og_type":"article","og_title":"Capable to Promise: patikrinkite u\u017esakym\u0105 prie\u0161 \u012fsipareigodami","og_description":"Ar naujas u\u017esakymas nev\u0117lins kit\u0173? Su capable to promise ir SkyPlanner patikrinkite gamybos paj\u0117gumus prie\u0161 patvirtindami pristatymo dat\u0105.","og_url":"https:\/\/skyplanner.ai\/lt\/istekliai\/capable-to-promise\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-16T07:53:34+00:00","article_modified_time":"2026-10-16T10:12:25+00:00","og_image":[{"width":1536,"height":864,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Jussi M\u00e4ntyl\u00e4","Est. reading time":"9 minut\u0117s"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/capable-to-promise\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/capable-to-promise\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Capable to Promise: patikrinkite u\u017esakym\u0105 prie\u0161 \u012fsipareigodami","datePublished":"2026-10-16T07:53:34+00:00","dateModified":"2026-10-16T10:12:25+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/capable-to-promise\/"},"wordCount":1774,"publisher":{"@id":"https:\/\/skyplanner.ai\/lt\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/capable-to-promise\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1.png","articleSection":["APS ir planavimas","i\u0161tekliai"],"inLanguage":"lt-LT"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/capable-to-promise\/","url":"https:\/\/skyplanner.ai\/lt\/istekliai\/capable-to-promise\/","name":"Capable to Promise: patikrinkite u\u017esakym\u0105 prie\u0161 \u012fsipareigodami","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lt\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/capable-to-promise\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/capable-to-promise\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1.png","datePublished":"2026-10-16T07:53:34+00:00","dateModified":"2026-10-16T10:12:25+00:00","description":"Ar naujas u\u017esakymas nev\u0117lins kit\u0173? Su capable to promise ir SkyPlanner patikrinkite gamybos paj\u0117gumus prie\u0161 patvirtindami pristatymo dat\u0105.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/capable-to-promise\/#breadcrumb"},"inLanguage":"lt-LT","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lt\/istekliai\/capable-to-promise\/"]}]},{"@type":"ImageObject","inLanguage":"lt-LT","@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/capable-to-promise\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1.png","width":1536,"height":864,"caption":"Turned shafts await a mounting plate beside a milling machine before the complete order can ship."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/capable-to-promise\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lt\/"},{"@type":"ListItem","position":2,"name":"Capable to Promise: patikrinkite u\u017esakym\u0105 prie\u0161 \u012fsipareigodami"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lt\/#website","url":"https:\/\/skyplanner.ai\/lt\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lt\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lt\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lt-LT"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lt\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lt\/","logo":{"@type":"ImageObject","inLanguage":"lt-LT","@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"lt-LT","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1.png",1536,864,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1.png",1536,864,false],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1.png",1536,864,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lt\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Capable to Promise: patikrinkite u\u017esakym\u0105 prie\u0161 \u012fsipareigodami Prad\u017eia &raquo; I\u0161tekliai &raquo; Capable to Promise: patikrinkite u\u017esakym\u0105 prie\u0161 \u012fsipareigodami Capable to promise (CTP) \u2013 tai metodas, padedantis patikrinti, ar galite pagaminti pageidaujam\u0105 kiek\u012f ir kada tai \u012fmanoma, \u012fvertinus tiek med\u017eiag\u0173 prieinamum\u0105, tiek darbui reikalingus gamybos paj\u0117gumus. Kai preki\u0173 negalima tiesiog i\u0161si\u0173sti i\u0161 sand\u0117lio, \u0161is metodas suteikia&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/posts\/99755","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/comments?post=99755"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/posts\/99755\/revisions"}],"predecessor-version":[{"id":99878,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/posts\/99755\/revisions\/99878"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/media\/99840"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/media?parent=99755"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/categories?post=99755"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/tags?post=99755"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}