{"id":99493,"date":"2026-10-16T00:41:10","date_gmt":"2026-10-16T00:41:10","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=99493"},"modified":"2026-10-20T23:23:46","modified_gmt":"2026-10-20T23:23:46","slug":"surinkimas-pagal-uzsakyma","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/lt\/istekliai\/surinkimas-pagal-uzsakyma\/","title":{"rendered":"Surinkimas pagal u\u017esakym\u0105: nuo paruo\u0161t\u0173 dali\u0173 iki surinkimo laiku"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Surinkimas pagal u\u017esakym\u0105: nuo paruo\u0161t\u0173 dali\u0173 iki surinkimo laiku<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/lt\/\">Prad\u017eia<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/\">I\u0161tekliai<\/a> &raquo; Surinkimas pagal u\u017esakym\u0105: nuo paruo\u0161t\u0173 dali\u0173 iki surinkimo laiku<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Numatomas skaitymo laikas: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> minut\u0117s<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Surinkimas pagal u\u017esakym\u0105 (ATO) \u2013 tai b\u016bdas, kai standartiniai komponentai ar mazgai laikomi paruo\u0161ti, o galutinis gaminys surenkamas tik gavus kliento u\u017esakym\u0105. Skirtingiems variantams bendras dalis paruo\u0161iate i\u0161 anksto, bet dar nepanaudojate j\u0173 konkretiems galutini\u0173 gamini\u0173 variantams surinkti.<\/p>\n\n\n<p>Taip klientams galima suteikti daugiau pasirinkimo ir sutrumpinti laukim\u0105, palyginti su gamyba nuo pat prad\u017ei\u0173. Ta\u010diau tur\u0117ti visas dalis dar nerei\u0161kia tur\u0117ti laisv\u0105 surinkimo viet\u0105. Kad u\u017esakytas gaminys gal\u0117t\u0173 i\u0161keliauti i\u0161 gamyklos, vis tiek reikia darbuotoj\u0173, \u012frangos, o da\u017enai ir bandym\u0173 paj\u0117gum\u0173.<\/p>\n\n\n<p>Tod\u0117l gamybos planuotojui ATO rei\u0161kia dvi susijusias u\u017eduotis: u\u017etikrinti reikiam\u0173 moduli\u0173 atsargas ir kliento pasirinktam deriniui numatyti realiai \u012fgyvendinam\u0105 viet\u0105 gamybos tvarkara\u0161tyje. SkyPlanner APS atlieka \u0161iuos planavimo skai\u010diavimus ir padeda paruo\u0161tus komponentus \u012ftraukti \u012f suderint\u0105 surinkimo plan\u0105, u\u017euot sudarius dar vien\u0105 eil\u0119, kuri\u0105 tekt\u0173 pertvarkyti rankomis.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kaip veikia surinkimas pagal u\u017esakym\u0105<\/h2>\n\n\n<p>ATO atskiria darbus, atliekamus pagal numatom\u0105 paklaus\u0105, nuo darb\u0173 konkre\u010diam klientui. Dar negav\u0119 u\u017esakymo perkate komponentus arba gaminate standartinius modulius. Gav\u0119 u\u017esakym\u0105 parenkate reikiam\u0105 derin\u012f, j\u012f surenkate, atliekate reikiamus bandymus ar patikras ir paruo\u0161iate i\u0161si\u0173sti.<\/p>\n\n\n<p>Skirtingiems gaminiams bendr\u0173 komponent\u0173 atsargos sudaro rib\u0105 tarp dviej\u0173 proceso dali\u0173: iki jos pasiruo\u0161imas vyksta pagal paklausos prognozes, o u\u017e jos darbai atliekami pagal konkret\u0173 kliento u\u017esakym\u0105. Tai vadinamasis kliento u\u017esakymo atsiejimo ta\u0161kas. \u010cia svarbus ne sand\u0117lis, pilnas vis\u0173 galim\u0173 gatav\u0173 gamini\u0173 konfig\u016bracij\u0173, o siauresnis komponent\u0173 asortimentas, i\u0161 kurio galima surinkti kelias konfig\u016bracijas.<\/p>\n\n\n<p>\u012esivaizduokite gamintoj\u0105, tiekiant\u012f modulinius siurbli\u0173 agregatus. Klientai renkasi i\u0161 patvirtint\u0173 siurbli\u0173, varikli\u0173 ir valdymo moduli\u0173 derini\u0173. Gamintojas laiko \u0161i\u0173 komponent\u0173 atsargas ir, gav\u0119s u\u017esakym\u0105, surenka pasirinkt\u0105 derin\u012f ant standartinio pagrindo. Dar lieka atlikti galutinius sujungimus, bandymus ir supakuoti.<\/p>\n\n\n<p>Tai ir yra ATO. Ta\u010diau jei tam pa\u010diam gamintojui pirmiausia reikia suprojektuoti visi\u0161kai nauj\u0105 siurbimo sistem\u0105, tokio u\u017esakymo pob\u016bdis jau kitoks. Vien to, kad naudojamos bendros dalys, nepakanka, kad kiekvien\u0105 individualiai pritaikyt\u0105 gamin\u012f b\u016bt\u0173 galima laikyti surenkamu pagal u\u017esakym\u0105.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Kuo surinkimas pagal u\u017esakym\u0105 skiriasi nuo gamybos pagal u\u017esakym\u0105 ir gamybos \u012f sand\u0117l\u012f<\/h3>\n\n\n<p>Ai\u0161kiausias skirtumas \u2013 kas jau paruo\u0161ta tuo metu, kai klientas pateikia u\u017esakym\u0105.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Strategija<\/th><th>Kas paruo\u0161ta iki u\u017esakymo<\/th><th>Pagrindiniai darbai gavus u\u017esakym\u0105<\/th><\/tr><\/thead><tbody><tr><td><a href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/gamyba-i-sandeli\/\">Gamyba \u012f sand\u0117l\u012f (MTS)<\/a><\/td><td>Gatavi gaminiai, pagaminti pagal numatom\u0105 paklaus\u0105<\/td><td>Atrinkti turimus gaminius i\u0161 sand\u0117lio, supakuoti ir i\u0161si\u0173sti<\/td><\/tr><tr><td>Surinkimas pagal u\u017esakym\u0105 (ATO)<\/td><td>Standartiniai komponentai ar mazgai<\/td><td>Surinkti pasirinkt\u0105 derin\u012f, i\u0161bandyti ir paruo\u0161ti i\u0161si\u0173sti<\/td><\/tr><tr><td><a href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/gamyba-pagal-uzsakyma\/\">Gamyba pagal u\u017esakym\u0105 (MTO)<\/a><\/td><td>Parengta konstrukcija ir gamybos mar\u0161rutas; gali b\u016bti laikomos kai kuri\u0173 med\u017eiag\u0173 atsargos<\/td><td>Pagaminti u\u017esakyt\u0105 gamin\u012f atliekant visas reikiamas operacijas<\/td><\/tr><tr><td><a href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/projektavimas-ir-gamyba-pagal-uzsakyma\/\">Projektavimas ir gamyba pagal u\u017esakym\u0105 (ETO)<\/a><\/td><td>Pakartotinai pritaikomos \u017einios ir galb\u016bt standartin\u0117s dalys<\/td><td>Suprojektuoti konkre\u010diam klientui skirt\u0105 sprendim\u0105, tada j\u012f pagaminti<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p><a href=\"\/lt\/istekliai\/konfiguravimas-pagal-uzsakyma\/\">Konfig\u016bravimas pagal u\u017esakym\u0105 (CTO)<\/a> rei\u0161kia, kad gaminys pasirenkamas i\u0161 i\u0161 anksto nustatyt\u0173, tarpusavyje suderinam\u0173 variant\u0173. O surinkimas pagal u\u017esakym\u0105 (ATO) nusako, kaip gavus u\u017esakym\u0105 i\u0161 paruo\u0161t\u0173 komponent\u0173 surenkamas galutinis gaminys. \u0160ie b\u016bdai gali b\u016bti taikomi kartu: klientas gali sukonfig\u016bruoti siurblio agregat\u0105, kur\u012f gamykla v\u0117liau surenka pagal u\u017esakym\u0105.<\/p>\n\n\n<p>\u0160ie skirtumai padeda suprasti procesus, ta\u010diau neb\u016btina visai \u012fmonei priskirti vien\u0105 strategij\u0105. Galite laikyti paklausi\u0173 standartini\u0173 agregat\u0173 atsargas, sunkiau prognozuojamus derinius surinkti pagal u\u017esakym\u0105, o specialios paskirties sprendimus projektuoti atskirai.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kada ATO yra tinkama gamybos strategija?<\/h2>\n\n\n<p>ATO patraukliausias tada, kai klientai nori \u012fvairov\u0117s, ta\u010diau didel\u0119 gaminio dal\u012f galima standartizuoti. Ekonomin\u0117 \u0161io b\u016bdo nauda priklauso nuo to, ar i\u0161 komponent\u0173 asortimento, kur\u012f nesunku valdyti, galima pasi\u016blyti verslui verting\u0105 galutini\u0173 gamini\u0173 \u012fvairov\u0119.<\/p>\n\n\n<p>\u012evertinkite keturias s\u0105lygas:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Skirtingiems variantams i\u0161 ties\u0173 naudojami tie patys komponentai.<\/strong> Varikl\u012f ar valdymo modul\u012f galima naudoti kelioms galutini\u0173 gamini\u0173 konfig\u016bracijoms, o ne laikyti sand\u0117lyje tik vienam variantui, kur\u012f vargu ar kas u\u017esakys.<\/li><li><strong>Deriniai jau apibr\u0117\u017eti.<\/strong> In\u017einieriai yra nustat\u0119, kurie komponentai dera tarpusavyje ir kaip pasirinktas gaminys surenkamas bei tikrinamas.<\/li><li><strong>Likusius darbus galima atlikti per klientui priimtin\u0105 pristatymo laik\u0105.<\/strong> Surinkimas, laukimas eil\u0117se, bandymai ir paruo\u0161imas i\u0161si\u0173sti telpa \u012f laik\u0105, kur\u012f klientas sutinka laukti.<\/li><li><strong>Komponent\u0173 paklausa pakankamai prognozuojama, kad b\u016bt\u0173 galima papildyti atsargas.<\/strong> Neb\u016btina tiksliai numatyti kiekvieno galutinio derinio paklausos, ta\u010diau vis tiek reikia pagr\u012fsto jiems naudojam\u0173 dali\u0173 tiekimo plano.<\/li><\/ul>\n\n\n<p>Taip suma\u017e\u0117ja rizika i\u0161 anksto pagaminti ne t\u0105 galutin\u012f variant\u0105, kurio reik\u0117s klientui. U\u017euot surink\u0119 konkret\u0173 siurblio ir variklio derin\u012f ir tik\u0117j\u0119si j\u012f parduoti, galimyb\u0119 pasirinkti i\u0161laikote iki pat u\u017esakymo gavimo. Skirtingiems gaminiams bendri moduliai gali suma\u017einti investicijas \u012f gatav\u0173 gamini\u0173 atsargas, kartu leisdami klientui pasirinkti tinkam\u0105 gamin\u012f.<\/p>\n\n\n<p>Ilgiau trunkan\u010dius darbus atlikus i\u0161 anksto, klientui gali tekti laukti trumpiau nei tuo atveju, jei \u0161ios operacijos b\u016bt\u0173 pradedamos tik po pardavimo. Standartiniai moduliai leid\u017eia taikyti pasikartojan\u010dius pirkimo, gamybos ir kokyb\u0117s patikros procesus, o konkre\u010diam u\u017esakymui skirti darbai sutelkiami proceso pabaigoje.<\/p>\n\n\n<p>Ta\u010diau atsarg\u0173 rizika ne i\u0161nyksta, o persikelia kitur. Naujesniu pakeistas valdymo modulis vis tiek gali pasenti. Staigus vieno variklio paklausos \u0161uolis gali u\u017elaikyti keli\u0173 gamini\u0173 variant\u0173 gamyb\u0105. Be to, sunku greitai pristatyti plat\u0173 gamini\u0173 asortiment\u0105, jei kiekvienam pasirinkimui reikia skirtingos ir ilgos bandym\u0173 proced\u016bros.<\/p>\n\n\n<p>Jei klientams b\u016btinas neatid\u0117liotinas i\u0161siuntimas, populiariausiems gaminiams gali labiau tikti gatav\u0173 gamini\u0173 atsargos. Jei beveik kiekvienam u\u017esakymui reikia naujo projektavimo arba unikali\u0173 dali\u0173, kuri\u0173 tiekimas trunka ilgai, i\u0161ankstinis pasiruo\u0161imas pagal ATO suteikia ma\u017eesn\u012f prana\u0161um\u0105. Rinkit\u0117s \u0161\u012f b\u016bd\u0105 toms gamini\u0173 \u0161eimoms, kuri\u0173 bendros dalys i\u0161 ties\u0173 leid\u017eia dal\u012f darb\u0173 atlikti dar neprasid\u0117jus kliento laukimui.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kod\u0117l pristatymas gali v\u0117luoti net turint visas dalis<\/h2>\n\n\n<p>Gr\u012f\u017ekime prie \u012fsivaizduojamo siurbli\u0173 agregat\u0173 gamintojo. Reikiamas siurblys, variklis ir valdymo modulis yra sand\u0117lyje. Surinkimo tvarkara\u0161tyje yra laisvas laikas, tad u\u017esakymas atrodo nesud\u0117tingas.<\/p>\n\n\n<p>Ta\u010diau surinkt\u0105 agregat\u0105 reikia i\u0161bandyti bandym\u0173 stende, kuris jau u\u017eimtas kitais u\u017esakymais. Anks\u010diau baigus surinkim\u0105, eil\u0117 tik persikelia \u012f bandym\u0173 etap\u0105. Klientas negali naudoti nei\u0161bandyto agregato, tod\u0117l surinkimo pabaigos data n\u0117ra pristatymo data.<\/p>\n\n\n<p>Dabar \u012fsivaizduokite, kad keli klientai pasirenka variant\u0105, kur\u012f i\u0161bandyti trunka ilgiau. U\u017esakym\u0173 skai\u010dius gali likti toks pat, ta\u010diau bandym\u0173 stendo apkrova padid\u0117ja. Tvarkara\u0161tyje, kuriame visoms konfig\u016bracijoms taikomas vienas vidutinis u\u017esakymo \u012fvykdymo laikas, \u0161is pokytis gali likti nepasteb\u0117tas.<\/p>\n\n\n<p>Tod\u0117l svarbu klausti ne vien \u201eAr turime dalis?\u201c, o \u201eKada gal\u0117sime atlikti visas likusias \u0161io derinio operacijas kartu su darbais, kuriuos jau \u012fsipareigojome atlikti?\u201c<\/p>\n\n\n<p>Tam reikia bendro vaizdo, apiman\u010dio med\u017eiag\u0173 parengt\u012f, operacij\u0173 sek\u0105 ir bendrus paj\u0117gumus. SkyPlanner \u0161ias operacijas \u012ftraukia \u012f t\u0105 pat\u012f gamybos tvarkara\u0161t\u012f, tod\u0117l bandym\u0173 eil\u0119 pamatote dar tada, kai galite pakeisti plan\u0105 arba aptarti kit\u0105 pristatymo dat\u0105.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Planuokite ir komponent\u0173 atsarg\u0173 papildym\u0105, ir surinkimo u\u017esakym\u0173 vykdym\u0105<\/h2>\n\n\n<p>Veiksmingas ATO procesas susieja komponent\u0173 atsarg\u0173 papildym\u0105 su klient\u0173 u\u017esakym\u0173 planavimu. Tobulinant tik vien\u0105 i\u0161 \u0161i\u0173 dali\u0173, kita vis tiek gali lemti pristatymo v\u0117lavim\u0105.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Papildykite t\u0173 moduli\u0173 atsargas, kuri\u0173 i\u0161 ties\u0173 reikia gaminamam asortimentui<\/h3>\n\n\n<p>Bendr\u0173 komponent\u0173 poreik\u012f planuokite susumav\u0119 j\u0173 paklaus\u0105 visuose galutini\u0173 gamini\u0173 variantuose. Pagal sutart\u0105 atsarg\u0173 valdymo politik\u0105 per\u017ei\u016br\u0117kite naudoti tinkamas atsargas, dar ne\u012fvykdytus tiekimo u\u017esakymus ir numatom\u0105 sunaudojim\u0105, \u012fskaitant patvirtintus u\u017esakymus. Kai kliento u\u017esakymas pakei\u010dia dal\u012f prognozuotos paklausos, ne\u012fskai\u010diuokite to paties poreikio antr\u0105 kart\u0105.<\/p>\n\n\n<p>Ypa\u010d daug d\u0117mesio skirkite da\u017enai naudojamiems moduliams, kuri\u0173 tiekimas ar gamyba trunka ilgai. Tr\u016bkstama nebrangi jungtis gali sustabdyti brangaus gaminio surinkim\u0105 lygiai taip pat, kaip tr\u016bkstamas variklis. Tr\u016bkumus vertinkite pagal j\u0173 poveik\u012f viso u\u017esakymo \u012fvykdymui, o ne vien pagal komponent\u0173 vert\u0119.<\/p>\n\n\n<p>Jei modulius gaminate patys, skirkite paj\u0117gum\u0173 ir j\u0173 atsargoms papildyti. Standartini\u0173 pagrind\u0173 partija gali konkuruoti su konkretiems klientams skirtais darbais d\u0117l mechaninio apdirbimo ar patikros paj\u0117gum\u0173. Jei atsarg\u0173 papildymo darbai nuolat nustumiami tvarkara\u0161tyje, galiausiai galutinio surinkimo etape ima tr\u016bkti dali\u0173.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Patikrinkite, kuriuos komponentus galima naudoti konkre\u010diam u\u017esakymui<\/h3>\n\n\n<p>Pagal kliento pasirinkimus nustatykite reikiamus komponent\u0173 kiekius ir operacijas. Tikrinkite, kurias dalis galima panaudoti \u0161iam u\u017esakymui, o ne vien tai, ar jos yra kur nors sand\u0117lyje. Galimyb\u0119 jas naudoti lemia jau prisiimti \u012fsipareigojimai, d\u0117l patikros sulaikytos dalys ir numatomi pristatymai.<\/p>\n\n\n<p>Atskirkite numatomus gauti komponentus nuo jau gaut\u0173 atsarg\u0173. Jei modulis dar tik u\u017esakytas, surinkimo planas priklauso nuo jo pristatymo. Pasikeitus tiek\u0117jo nurodytai pristatymo datai, gamybos grafik\u0105 reikia atnaujinti, kol komanda dar neprad\u0117jo ruo\u0161tis darbui, kurio negal\u0117s prad\u0117ti. Prie\u0161 perduodami u\u017esakym\u0105 surinkti, <a href=\"\/lt\/istekliai\/komplektavimas-gamyboje\/\">sukomplektuokite ir patikrinkite jam reikalingas dalis<\/a> bei ai\u0161kiai pa\u017eym\u0117kite visus tr\u016bkumus.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Suplanuokite vis\u0105 likus\u012f gamybos mar\u0161rut\u0105<\/h3>\n\n\n<p>\u012etraukite surinkim\u0105, nuo konfig\u016bracijos priklausan\u010dius darbus, bandymus, patikr\u0105 ir pakavim\u0105, jei j\u0173 reikia. Atsi\u017evelkite \u012f faktinius apdorojimo ir paruo\u0161imo reikalavimus, tinkamus darbo centrus, pamainas ir operatori\u0173 u\u017eimtum\u0105. Apskai\u010diuot\u0105 gamybos pabaig\u0105 palyginkite su reikiamu i\u0161siuntimo terminu, o transportavimui skirt\u0105 laik\u0105 numatykite atskirai.<\/p>\n\n\n<p>\u0160iuos darbus planuokite kartu su kitais u\u017esakymais ir susijusiais atsarg\u0173 papildymo darbais. Net jei abiem u\u017esakymams pakanka komponent\u0173, tai nerei\u0161kia, kad abu gali vienu metu i\u0161skirtinai naudotis tuo pa\u010diu bandym\u0173 stendu.<\/p>\n\n\n<p>Jei darbai netelpa \u012f tvarkara\u0161t\u012f, \u012fvertinkite realias i\u0161eitis: patvirtint\u0105 alternatyv\u0173 darbo centr\u0105, papildomus paj\u0117gumus, prioriteto pakeitim\u0105 ar v\u0117lesn\u012f \u012fsipareigojimo termin\u0105. Prie\u0161 laikydami skubaus u\u017esakymo problem\u0105 i\u0161spr\u0119sta, patikrinkite poveik\u012f kitiems klientams.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Perplanuokite pasikeitus pareng\u010diai ar paj\u0117gumams<\/h3>\n\n\n<p>D\u0117l v\u0117luojan\u010dio komponento u\u017esakymas gali prarasti jam numatyt\u0105 surinkimo laik\u0105. T\u0105 laik\u0105 gali u\u017eimti kitas u\u017esakymas, tod\u0117l galutinis pristatymo v\u0117lavimas neb\u016btinai bus toks pat kaip tiek\u0117jo v\u0117lavimas. Reikia perskai\u010diuoti ir tolesni\u0173 operacij\u0173 sek\u0105.<\/p>\n\n\n<p>Tas pats galioja sutrikus bandym\u0173 stendo darbui ar suma\u017e\u0117jus pamainos paj\u0117gumams. Kiekvienos eil\u0117s atnaujinimas rankomis atima planavimo laik\u0105 ir trukdo \u012fvertinti pasekmes visoje gamykloje. Tokiais atvejais automatinis SkyPlanner tvarkara\u0161\u010di\u0173 sudarymas tampa ypa\u010d vertingas.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Derinkite komponent\u0173 prieinamum\u0105 su surinkimo paj\u0117gumais naudodami SkyPlanner<\/h2>\n\n\n<p>SkyPlanner sujungia darbo centrus, pamainas, operatorius, med\u017eiagas ir prioritetus \u012f vien\u0105 gamybos plan\u0105. J\u016bs nustatote gaminio proceso etapus, j\u0173 trukm\u0119 ir reikiamus i\u0161teklius. Planavimo dirbtinis intelektas Arcturus apskai\u010diuoja darb\u0173 sek\u0105 pagal nustatytus paj\u0117gumus, priklausomybes ir taisykles.<\/p>\n\n\n<p>Siurblio agregato pavyzdyje surinkimas ir bandymas tampa tarpusavyje susietomis operacijomis, o ne atskir\u0173 padalini\u0173 nustatytomis datomis. <a href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/ganto-diagrama-gamybos-planavimui\/\">Gantt laiko juostoje<\/a> matyti, kuriame darbo centre atliekama u\u017eduotis, kokios kitos u\u017eduotys naudoja tuos pa\u010dius i\u0161teklius ir kada j\u0105 numatoma baigti. Galite \u012fvertinti, ar i\u0161 paruo\u0161t\u0173 dali\u0173 agregatas bus u\u017ebaigtas laiku, o ne tik matyti u\u017eimt\u0105 surinkimo komand\u0105.<\/p>\n\n\n<p>Kai \u012fjungtas planavimas atsi\u017evelgiant \u012f med\u017eiag\u0173 prieinamum\u0105, Arcturus, apskai\u010diuodamas prad\u017eios laik\u0105, taip pat \u012fvertina turimas atsargas ir atvykstan\u010dias med\u017eiagas. Pirkimo u\u017esakymuose nurodytos pristatymo datos rodo, kada tikimasi gauti med\u017eiagas; patvirtinus gavim\u0105, atsargos atnaujinamos. Jei tiek\u0117jas pakei\u010dia pristatymo dat\u0105, atnaujinkite \u0161iuos duomenis ir perskai\u010diuokite plan\u0105, u\u017euot toliau planav\u0119 surinkim\u0105 pagal ankstesn\u0119 prielaid\u0105.<\/p>\n\n\n<p>Kai tarpiniai gaminiai gaminami vykdant u\u017esakym\u0105, SkyPlanner leid\u017eia nustatyti gamybos priklausomybes, kad j\u0173 gamyb\u0105 b\u016bt\u0173 suplanuota u\u017ebaigti prie\u0161 pradedant pagrindinio gaminio surinkim\u0105. Sand\u0117lyje laikomus komponentus galima susieti kaip med\u017eiagas. Kai \u012fjungtas planavimas atsi\u017evelgiant \u012f med\u017eiag\u0173 prieinamum\u0105, \u012fvertinamas ir \u0161i\u0173 komponent\u0173 prieinamumas, ir dar neatliktos operacijos.<\/p>\n\n\n<p>J\u016bs nustatote prioritetus ir u\u017erakinimu apsaugote priimtus planavimo sprendimus. Arcturus atlieka skai\u010diavimus laikydamasis \u0161i\u0173 nurodym\u0173. Gav\u0119 skub\u0173 u\u017esakym\u0105 ar pasikeitus paj\u0117gumams, ma\u017eiau laiko skiriate darbo centr\u0173 u\u017eduo\u010di\u0173 eil\u0117ms pertvarkyti ir daugiau \u2013 sprendimams, kuriuos pristatymo \u012fsipareigojimus b\u016btina i\u0161laikyti.<\/p>\n\n\n<p>Tai taip pat padeda veiksmingiau i\u0161naudoti turimus paj\u0117gumus. Galite atskirti u\u017eduotis, kurioms tr\u016bksta komponent\u0173, nuo t\u0173, kurios laukia, kol atsilaisvins surinkimo vieta ar bandym\u0173 stendas, ir spr\u0119sti b\u016btent t\u0105 paj\u0117gum\u0173 ar med\u017eiag\u0173 tr\u016bkumo problem\u0105, nuo kurios i\u0161 ties\u0173 priklauso darb\u0173 u\u017ebaigimas. Papildomai nupirktos dalys nesuma\u017eins eil\u0117s prie perkrauto bandym\u0173 stendo.<\/p>\n\n\n<p>SkyPlanner integruojasi su bet kuria ERP ar MES sistema per <a href=\"https:\/\/skyplanner.ai\/lt\/integracijos\/\">atvir\u0105j\u0105 REST API<\/a>. Panaudokite esamus u\u017esakym\u0173, gamini\u0173 ir gamybos duomenis detaliam planavimui, neatsisakydami sistem\u0173, kuriomis jau valdote savo veikl\u0105. Norint geriau planuoti surinkim\u0105, neb\u016btina prad\u0117ti nuo ERP sistemos keitimo.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Kaip KJH-Comp susiejo dali\u0173 parengt\u012f su gamybos planavimu<\/h3>\n\n\n<p>Suomijos \u012fmon\u0117 KJH-Comp, pagal sutartis gaminanti lak\u0161tinio metalo gaminius, gamina suvirintas konstrukcijas ir visi\u0161kai surinktus bei i\u0161bandytus gaminius. Anks\u010diau C9000 ERP sistema ir skai\u010diuokl\u0117s rod\u0117 tik apytikr\u0119 savaitin\u0119 apkrov\u0105, o konkre\u010dios dienos darbai \u012frenginiams vis dar b\u016bdavo skirstomi rankiniu b\u016bdu. Du meistrai paj\u0117gum\u0173 planavimui skirdavo kiekvienas bent pus\u0119 savo darbo laiko.<\/p>\n\n\n<p>\u012ediegus SkyPlanner, u\u017esakymai ir toliau \u012fvedami \u012f esam\u0105 ERP sistem\u0105, o planavimas atsi\u017evelgiant \u012f ribotus paj\u0117gumus ir u\u017eduo\u010di\u0173 priskyrimas \u012frenginiams vyksta automati\u0161kai. KJH-Comp \u012fdiegtame sprendime prie\u0161 suvirinim\u0105 numatytas dali\u0173 sukomplektavimo etapas: prie\u0161 \u012ftraukiant u\u017eduot\u012f \u012f eil\u0119 patikrinama, ar paruo\u0161tos visos reikalingos dalys, \u012fskaitant perkamas. Anks\u010diau tai b\u016bdavo tikrinama rankiniu b\u016bdu.<\/p>\n\n\n<p>\u012emon\u0117s teigimu, u\u017e planavim\u0105 vietoje dviej\u0173 meistr\u0173 tapo atsakingas vienas, o kitam buvo paskirti kiti darbai. \u012emon\u0117 taip pat nurodo, kad paj\u0117gum\u0173 trukd\u017eius dabar pastebi anks\u010diau. Surinkimo planuotojui \u010dia svarbiausia s\u0105saja: dali\u0173 parengt\u012f ir realisti\u0161k\u0105 gamybos sek\u0105 reikia vertinti kartu. <a href=\"https:\/\/skyplanner.ai\/lt\/klientu-istorijos\/kjh-comp\/\">KJH-Comp atsiliepime apie SkyPlanner<\/a> parodoma, kaip \u0161is pokytis atrodo praktikoje.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kitam surinkimo u\u017esakymui parenkite \u012fgyvendinam\u0105 plan\u0105<\/h2>\n\n\n<p>ATO pasiteisina tada, kai bendri komponentai suteikia klientams prasming\u0105 pasirinkim\u0105, o jums nereikia sand\u0117liuoti vis\u0173 galim\u0173 gatavo gaminio derini\u0173. I\u0161laikykite \u0161\u012f prana\u0161um\u0105: darbus gavus u\u017esakym\u0105 planuokite taip pat kruop\u0161\u010diai, kaip atsargas iki jo.<\/p>\n\n\n<p>Rinkit\u0117s SkyPlanner, kai u\u017esakym\u0173, kuriems jau paruo\u0161ti komponentai, surinkimo komand\u0173 ir v\u0117lesni\u0173 operacij\u0173 i\u0161tekli\u0173 derinimas tampa kasdiene perplanavimo na\u0161ta. Arcturus apskai\u010diuoja plan\u0105, Gantt rodinyje ai\u0161kiai matomos jo pasekm\u0117s, o prioritetus ir toliau nustatote j\u016bs.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/lt\/susisiekite-su-pardavejais\/\">U\u017esisakykite SkyPlanner demonstracij\u0105<\/a> ir jai paruo\u0161kite informacij\u0105 apie vien\u0105 tipi\u0161k\u0105 surinkimo u\u017esakym\u0105, jam reikalingus komponentus ir i\u0161tekli\u0173, d\u0117l kurio da\u017eniausiai v\u0117luojama u\u017ebaigti u\u017esakym\u0105. Prid\u0117kite dar vien\u0105 u\u017esakym\u0105, konkuruojant\u012f d\u0117l to paties i\u0161tekliaus. Tai bus konkretus pagrindas parodyti, kaip SkyPlanner gali sutrumpinti perplanavimui skiriam\u0105 laik\u0105 ir pad\u0117ti lengviau \u012fvertinti pristatymo datas.<\/p>\n\n\n<p>Pirmiausia nor\u0117tum\u0117te susipa\u017einti savaranki\u0161kai? <a href=\"https:\/\/skyplanner.ai\/lt\/bandymas\/\">I\u0161bandykite SkyPlanner su demonstraciniais duomenimis<\/a> ir pamatykite, kaip operacijos ir paj\u0117gumai suderinami viename tvarkara\u0161tyje.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Surinkimas pagal u\u017esakym\u0105: nuo paruo\u0161t\u0173 dali\u0173 iki surinkimo laiku Prad\u017eia &raquo; I\u0161tekliai &raquo; Surinkimas pagal u\u017esakym\u0105: nuo paruo\u0161t\u0173 dali\u0173 iki surinkimo laiku Surinkimas pagal u\u017esakym\u0105 (ATO) \u2013 tai b\u016bdas, kai standartiniai komponentai ar mazgai laikomi paruo\u0161ti, o galutinis gaminys surenkamas tik gavus kliento u\u017esakym\u0105. Skirtingiems variantams bendras dalis paruo\u0161iate i\u0161 anksto, bet dar nepanaudojate j\u0173 &#8230; <a title=\"Surinkimas pagal u\u017esakym\u0105: nuo paruo\u0161t\u0173 dali\u0173 iki surinkimo laiku\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/surinkimas-pagal-uzsakyma\/\" aria-label=\"Read more about Surinkimas pagal u\u017esakym\u0105: nuo paruo\u0161t\u0173 dali\u0173 iki surinkimo laiku\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":99529,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2532,301],"tags":[],"class_list":["post-99493","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-ir-planavimas","category-istekliai","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Surinkimas pagal u\u017esakym\u0105: nuo paruo\u0161t\u0173 dali\u0173 iki surinkimo laiku<\/title>\n<meta name=\"description\" content=\"Surinkimas pagal u\u017esakym\u0105: pasirinkimas be vis\u0173 gatav\u0173 variant\u0173 atsarg\u0173. Kada jis tinka ir kaip SkyPlanner sieja paruo\u0161tas dalis su surinkimo paj\u0117gumais.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/surinkimas-pagal-uzsakyma\/\" \/>\n<meta property=\"og:locale\" content=\"lt_LT\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Surinkimas pagal u\u017esakym\u0105: nuo paruo\u0161t\u0173 dali\u0173 iki surinkimo laiku\" \/>\n<meta property=\"og:description\" content=\"Surinkimas pagal u\u017esakym\u0105: pasirinkimas be vis\u0173 gatav\u0173 variant\u0173 atsarg\u0173. Kada jis tinka ir kaip SkyPlanner sieja paruo\u0161tas dalis su surinkimo paj\u0117gumais.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lt\/istekliai\/surinkimas-pagal-uzsakyma\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-16T00:41:10+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-20T23:23:46+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/assemble-to-order-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1942\" \/>\n\t<meta property=\"og:image:height\" content=\"809\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"12 minu\u010di\u0173\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/surinkimas-pagal-uzsakyma\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/surinkimas-pagal-uzsakyma\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Surinkimas pagal u\u017esakym\u0105: nuo paruo\u0161t\u0173 dali\u0173 iki surinkimo laiku\",\"datePublished\":\"2026-10-16T00:41:10+00:00\",\"dateModified\":\"2026-10-20T23:23:46+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/surinkimas-pagal-uzsakyma\\\/\"},\"wordCount\":2429,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/surinkimas-pagal-uzsakyma\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/assemble-to-order-hero.png\",\"articleSection\":[\"APS ir planavimas\",\"i\u0161tekliai\"],\"inLanguage\":\"lt-LT\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/surinkimas-pagal-uzsakyma\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/surinkimas-pagal-uzsakyma\\\/\",\"name\":\"Surinkimas pagal u\u017esakym\u0105: nuo paruo\u0161t\u0173 dali\u0173 iki surinkimo laiku\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/surinkimas-pagal-uzsakyma\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/surinkimas-pagal-uzsakyma\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/assemble-to-order-hero.png\",\"datePublished\":\"2026-10-16T00:41:10+00:00\",\"dateModified\":\"2026-10-20T23:23:46+00:00\",\"description\":\"Surinkimas pagal u\u017esakym\u0105: pasirinkimas be vis\u0173 gatav\u0173 variant\u0173 atsarg\u0173. Kada jis tinka ir kaip SkyPlanner sieja paruo\u0161tas dalis su surinkimo paj\u0117gumais.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/surinkimas-pagal-uzsakyma\\\/#breadcrumb\"},\"inLanguage\":\"lt-LT\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/surinkimas-pagal-uzsakyma\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"lt-LT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/surinkimas-pagal-uzsakyma\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/assemble-to-order-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/assemble-to-order-hero.png\",\"width\":1942,\"height\":809},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/surinkimas-pagal-uzsakyma\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Surinkimas pagal u\u017esakym\u0105: nuo paruo\u0161t\u0173 dali\u0173 iki surinkimo laiku\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lt-LT\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lt-LT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lt-LT\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Surinkimas pagal u\u017esakym\u0105: nuo paruo\u0161t\u0173 dali\u0173 iki surinkimo laiku","description":"Surinkimas pagal u\u017esakym\u0105: pasirinkimas be vis\u0173 gatav\u0173 variant\u0173 atsarg\u0173. Kada jis tinka ir kaip SkyPlanner sieja paruo\u0161tas dalis su surinkimo paj\u0117gumais.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lt\/istekliai\/surinkimas-pagal-uzsakyma\/","og_locale":"lt_LT","og_type":"article","og_title":"Surinkimas pagal u\u017esakym\u0105: nuo paruo\u0161t\u0173 dali\u0173 iki surinkimo laiku","og_description":"Surinkimas pagal u\u017esakym\u0105: pasirinkimas be vis\u0173 gatav\u0173 variant\u0173 atsarg\u0173. Kada jis tinka ir kaip SkyPlanner sieja paruo\u0161tas dalis su surinkimo paj\u0117gumais.","og_url":"https:\/\/skyplanner.ai\/lt\/istekliai\/surinkimas-pagal-uzsakyma\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-16T00:41:10+00:00","article_modified_time":"2026-10-20T23:23:46+00:00","og_image":[{"width":1942,"height":809,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/assemble-to-order-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Jussi M\u00e4ntyl\u00e4","Est. reading time":"12 minu\u010di\u0173"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/surinkimas-pagal-uzsakyma\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/surinkimas-pagal-uzsakyma\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Surinkimas pagal u\u017esakym\u0105: nuo paruo\u0161t\u0173 dali\u0173 iki surinkimo laiku","datePublished":"2026-10-16T00:41:10+00:00","dateModified":"2026-10-20T23:23:46+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/surinkimas-pagal-uzsakyma\/"},"wordCount":2429,"publisher":{"@id":"https:\/\/skyplanner.ai\/lt\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/surinkimas-pagal-uzsakyma\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/assemble-to-order-hero.png","articleSection":["APS ir planavimas","i\u0161tekliai"],"inLanguage":"lt-LT"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/surinkimas-pagal-uzsakyma\/","url":"https:\/\/skyplanner.ai\/lt\/istekliai\/surinkimas-pagal-uzsakyma\/","name":"Surinkimas pagal u\u017esakym\u0105: nuo paruo\u0161t\u0173 dali\u0173 iki surinkimo laiku","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lt\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/surinkimas-pagal-uzsakyma\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/surinkimas-pagal-uzsakyma\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/assemble-to-order-hero.png","datePublished":"2026-10-16T00:41:10+00:00","dateModified":"2026-10-20T23:23:46+00:00","description":"Surinkimas pagal u\u017esakym\u0105: pasirinkimas be vis\u0173 gatav\u0173 variant\u0173 atsarg\u0173. Kada jis tinka ir kaip SkyPlanner sieja paruo\u0161tas dalis su surinkimo paj\u0117gumais.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/surinkimas-pagal-uzsakyma\/#breadcrumb"},"inLanguage":"lt-LT","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lt\/istekliai\/surinkimas-pagal-uzsakyma\/"]}]},{"@type":"ImageObject","inLanguage":"lt-LT","@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/surinkimas-pagal-uzsakyma\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/assemble-to-order-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/assemble-to-order-hero.png","width":1942,"height":809},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/surinkimas-pagal-uzsakyma\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lt\/"},{"@type":"ListItem","position":2,"name":"Surinkimas pagal u\u017esakym\u0105: nuo paruo\u0161t\u0173 dali\u0173 iki surinkimo laiku"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lt\/#website","url":"https:\/\/skyplanner.ai\/lt\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lt\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lt\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lt-LT"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lt\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lt\/","logo":{"@type":"ImageObject","inLanguage":"lt-LT","@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"lt-LT","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/assemble-to-order-hero.png",1942,809,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/assemble-to-order-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/assemble-to-order-hero-300x125.png",300,125,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/assemble-to-order-hero-768x320.png",768,320,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/assemble-to-order-hero-1024x427.png",1024,427,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/assemble-to-order-hero-1536x640.png",1536,640,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/assemble-to-order-hero.png",1942,809,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/assemble-to-order-hero-360x150.png",360,150,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lt\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Surinkimas pagal u\u017esakym\u0105: nuo paruo\u0161t\u0173 dali\u0173 iki surinkimo laiku Prad\u017eia &raquo; I\u0161tekliai &raquo; Surinkimas pagal u\u017esakym\u0105: nuo paruo\u0161t\u0173 dali\u0173 iki surinkimo laiku Surinkimas pagal u\u017esakym\u0105 (ATO) \u2013 tai b\u016bdas, kai standartiniai komponentai ar mazgai laikomi paruo\u0161ti, o galutinis gaminys surenkamas tik gavus kliento u\u017esakym\u0105. Skirtingiems variantams bendras dalis paruo\u0161iate i\u0161 anksto, bet dar nepanaudojate j\u0173&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/posts\/99493","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/comments?post=99493"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/posts\/99493\/revisions"}],"predecessor-version":[{"id":99551,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/posts\/99493\/revisions\/99551"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/media\/99529"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/media?parent=99493"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/categories?post=99493"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/tags?post=99493"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}