{"id":98084,"date":"2026-10-15T00:12:46","date_gmt":"2026-10-15T00:12:46","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=98084"},"modified":"2026-10-15T01:53:39","modified_gmt":"2026-10-15T01:53:39","slug":"gamybos-ciklo-laikas","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/lt\/istekliai\/gamybos-ciklo-laikas\/","title":{"rendered":"Gamybos ciklo laikas: i\u0161matuokite ir planuokite"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Gamybos ciklo laikas: i\u0161matuokite ir planuokite<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/lt\/\">Prad\u017eia<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/\">I\u0161tekliai<\/a> &raquo; Gamybos ciklo laikas: i\u0161matuokite ir planuokite<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Numatomas skaitymo laikas: <\/span><span class=\"yoast-reading-time__reading-time\">9<\/span><span class=\"yoast-reading-time__time-unit\"> minutes<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Mechaninio apdirbimo operacijai numatytos dvi minut\u0117s vienai detalei, bet partija vis tiek nuolat baigiama v\u0117liau, nei planuota. Gal ciklas trunka ilgiau, nei tik\u0117tasi? Gal \u012f numatyt\u0105 trukm\u0119 ne\u012fskai\u010diuotas detali\u0173 \u012fd\u0117jimas? O gal paruo\u0161imo laikas paskirstytas pagal klaiding\u0105 detali\u0173 skai\u010di\u0173 partijoje?<\/p>\n\n\n<p>Gamybos ciklo laikas padeda atsakyti \u012f \u0161iuos klausimus. <strong>Operacijos lygmeniu ciklo laikas \u2013 tai i\u0161matuota trukm\u0117, per kuri\u0105 pagaminama detal\u0117 arba atliekamas vienas pasikartojantis proceso ciklas.<\/strong> Jis parodo, kaip darbas vyksta i\u0161 tikr\u0173j\u0173, o ne kaip greitai tikit\u0117s j\u012f atlikti.<\/p>\n\n\n<p>Planuotojui tai naudinga ne tik ie\u0161kant, kur sutaupyti kelias sekundes. Patikimi operacij\u0173 trukm\u0117s duomenys suteikia tvarkara\u0161\u010diui tvirtesn\u012f pagrind\u0105. Pagal \u0161ias trukmes SkyPlanner apskai\u010diuoja, kada darbus galima atlikti turimais gamybos i\u0161tekliais. Taip galite sudaryti cecho realyb\u0119 atitinkant\u012f plan\u0105, u\u017euot nuolat tais\u0119 plan\u0105, paremt\u0105 pasenusiais trukm\u0117s \u012fver\u010diais.<\/p>\n\n\n<h2 class=\"wp-block-heading\">K\u0105 parodo gamybos ciklo laikas?<\/h2>\n\n\n<p>Ciklo laikas gali apib\u016bdinti stakli\u0173 darb\u0105, pasikartojan\u010dius operatoriaus veiksmus arba interval\u0105 tarp gamybos linijoje pagamint\u0173 vienet\u0173. Stakli\u0173 ciklas gali b\u016bti matuojamas nuo vieno ciklo paleidimo signalo iki kito. Operatoriaus ciklas gali apimti detal\u0117s \u012fd\u0117jim\u0105, pagalbinius veiksmus apdirbimo metu, detal\u0117s i\u0161\u0117mim\u0105 ir gr\u012f\u017eim\u0105 \u012f t\u0105 pa\u010di\u0105 pradin\u0119 pad\u0117t\u012f.<\/p>\n\n\n<p>\u0160ios trukm\u0117s neb\u016btinai sutampa. Jei operatorius aptarnauja daugiau nei vienas stakles, jo darbo laik\u0105 ir stakli\u0173 u\u017eimtum\u0105 reikia vertinti atskirai. Jei keli darbo centrai dirba lygiagre\u010diai, intervalas tarp pagamint\u0173 vienet\u0173 n\u0117ra tas pats, kas laikas, per kur\u012f vienas vienetas pereina vis\u0105 linij\u0105.<\/p>\n\n\n<p>Taip pat pasitaiko, kad <strong>gamybos ciklo laiku vadinama visa gamybos trukm\u0117<\/strong> \u2013 nuo perdavimo \u012f gamybos cech\u0105 iki gamybos, surinkimo ir bandym\u0173 pabaigos. \u0160is platesnis rodiklis gali apimti apdirbim\u0105, patikr\u0105, perve\u017eim\u0105 ir laukim\u0105 eil\u0117se. Jis naudingas vertinant gamybos sraut\u0105, ta\u010diau tai n\u0117ra vienos detal\u0117s apdirbimo stakl\u0117mis laikas, kur\u012f galima dauginti i\u0161 u\u017esakymo kiekio.<\/p>\n\n\n<p>Praktin\u0117 taisykl\u0117 paprasta: prie\u0161 naudodami skai\u010di\u0173, ai\u0161kiai apibr\u0117\u017ekite, kok\u012f interval\u0105 jis apima. \u0160iame vadove daugiausia d\u0117mesio skiriama operacijos ir vieneto gamybos trukmei kaip gamybos planavimo duomenims.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Rodiklis<\/th><th>\u012e kok\u012f klausim\u0105 atsako<\/th><th>\u012eprastas matavimo vienetas<\/th><\/tr><\/thead><tbody><tr><td>Operacijos ciklo laikas<\/td><td>Kiek trunka pasikartojanti operacija?<\/td><td>Sekund\u0117s arba minut\u0117s vienam ciklui ar vienetui<\/td><\/tr><tr><td><a href=\"\/lt\/istekliai\/kaip-optimizuoti-gamybos-laika\/\">Gamybos u\u017esakymo \u012fvykdymo laikas<\/a><\/td><td>Per kiek laiko gaminys pereina nustatyt\u0105 gamybos mar\u0161rut\u0105, \u012fskaitant laukim\u0105?<\/td><td>Bendra trukm\u0117 valandomis arba dienomis<\/td><\/tr><tr><td>Takto laikas<\/td><td>Kokiu tempu reikia gaminti, kad b\u016bt\u0173 patenkinta klient\u0173 paklausa?<\/td><td>Turimas gamybos laikas vienam reikiamam vienetui<\/td><\/tr><tr><td>Gamybos na\u0161umas<\/td><td>Kiek produkcijos pagaminama per nustatyt\u0105 laikotarp\u012f?<\/td><td>Vienetai per valand\u0105 arba dien\u0105<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Takto laikas nusako reikalaujam\u0105 gamybos temp\u0105 ir apskai\u010diuojamas pagal paklaus\u0105. Ciklo laikas nustatomas matuojant proces\u0105. <a href=\"\/lt\/istekliai\/gamybos-pralaidumas\/\">Gamybos pralaidumas rodo, kiek produkcijos pagaminama per laiko vienet\u0105<\/a>. Atskiriant \u0161ias s\u0105vokas i\u0161vengiama da\u017enos klaidos \u2013 detali\u0173 skai\u010dius per minut\u0119 nesupainiojamas su minu\u010di\u0173 skai\u010diumi vienai detalei pagaminti.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kaip apskai\u010diuoti gamybos ciklo laik\u0105<\/h2>\n\n\n<p>Steb\u0117dami pavien\u012f cikl\u0105, i\u0161 jo pabaigos laiko atimkite prad\u017eios laik\u0105. Kiekvieno steb\u0117jimo metu prad\u017ei\u0105 ir pabaig\u0105 fiksuokite pagal tuos pa\u010dius \u012fvykius.<\/p>\n\n\n<p>Kai per vien\u0105 operacij\u0105 pakartotinai gaminamas tas pats gaminys, apskai\u010diuokite vidutin\u012f laik\u0105 vienam vienetui:<\/p>\n\n\n<p><strong>Vidutinis ciklo laikas vienam vienetui = i\u0161matuotas gamybos laikas \u00f7 per t\u0105 laik\u0105 pagamint\u0173 vienet\u0173 skai\u010dius<\/strong><\/p>\n\n\n<p>Gautas rezultatas \u2013 laikas vienam vienetui. Atvirk\u0161tinis skai\u010diavimas parodo gamybos na\u0161um\u0105:<\/p>\n\n\n<p><strong>Gamybos na\u0161umas = pagamint\u0173 vienet\u0173 skai\u010dius \u00f7 i\u0161matuotas gamybos laikas<\/strong><\/p>\n\n\n<p>Apgalvotai pasirinkite matavimo laikotarp\u012f. Matuojant vykstant\u012f cikl\u0105, atskirai u\u017efiksuoti sustojimai ne\u012fskai\u010diuojami. Jei imamas visas steb\u0117jimo laikotarpis su sustojimais, gaunamas faktinis vidutinis intervalas tarp per t\u0105 laik\u0105 pagamint\u0173 vienet\u0173. Abu rodikliai gali b\u016bti naudingi, ta\u010diau jie atsako \u012f skirtingus klausimus. Prie\u0161 lygindami rezultat\u0105 su esama norma, u\u017era\u0161ykite, kur\u012f b\u016bd\u0105 taik\u0117te.<\/p>\n\n\n<p>Svarbu ir tai, kok\u012f vienet\u0173 skai\u010di\u0173 naudojate. Jei yra broko, dalydami i\u0161 vis\u0173 pagamint\u0173 detali\u0173 skai\u010diaus gausite kitok\u012f rezultat\u0105 nei dalydami tik i\u0161 priimt\u0173 tinkam\u0173 detali\u0173 skai\u010diaus. Jei rodiklis apskai\u010diuotas pagal tinkam\u0105 produkcij\u0105, taip j\u012f ir pa\u017eym\u0117kite. Kokyb\u0117s nuostoliai neturi nepastebimai pakeisti to, k\u0105 vadinate stakli\u0173 ciklo laiku.<\/p>\n\n\n<p>Kai stakl\u0117s per vien\u0105 cikl\u0105 pagamina kelias detales, svarbus dar vienas skirtumas: <strong>sekund\u0117s vienam stakli\u0173 ciklui n\u0117ra sekund\u0117s vienai detalei<\/strong>. Kad gautum\u0117te vidutin\u012f laik\u0105 vienai detalei, ciklo trukm\u0119 padalykite i\u0161 per cikl\u0105 pagaminam\u0173 detali\u0173 skai\u010diaus. Ta\u010diau planuodami i\u0161tekliaus u\u017eimtum\u0105 i\u0161laikykite tikr\u0105j\u0105 visos partijos ciklo trukm\u0119.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Mechaninio apdirbimo pavyzdys: paruo\u0161im\u0105 skai\u010diuokite atskirai<\/h2>\n\n\n<p>\u012esivaizduokite apdirbimo centr\u0105, kuriame vienu metu gaminama viena detal\u0117. Per 120 minu\u010di\u0173 steb\u0117jimo pagaminama 60 detali\u0173; \u012f \u0161\u012f laik\u0105 \u012feina \u012fprastas j\u0173 \u012fd\u0117jimas ir i\u0161\u0117mimas. \u0160iame pavyzdyje n\u0117ra nei sustojim\u0173, nei brokuot\u0173 detali\u0173. Atskirai atliekamas paruo\u0161imas trunka 30 minu\u010di\u0173.<\/p>\n\n\n<p>Vidutin\u0117 operacijos trukm\u0117 vienai detalei:<\/p>\n\n\n<p><strong>120 minu\u010di\u0173 \u00f7 60 detali\u0173 = 2 minut\u0117s vienai detalei<\/strong><\/p>\n\n\n<p>Tai atitinka <strong>30 detali\u0173 per valand\u0105 steb\u0117tos gamybos metu<\/strong>. Ta\u010diau tai nerei\u0161kia, kad toks na\u0161umas pasiekiamas vykdant vis\u0105 u\u017esakym\u0105, \u012fskaitant paruo\u0161im\u0105.<\/p>\n\n\n<p>\u0160ios operacijos paruo\u0161imas ir gamyba nuosekliai u\u017eima t\u0105 pat\u012f i\u0161tekli\u0173 ir nepersidengia, tod\u0117l planuojama trukm\u0117 apskai\u010diuojama taip:<\/p>\n\n\n<p><strong>Operacijos trukm\u0117 = paruo\u0161imo laikas + kiekis \u00d7 laikas vienai detalei<\/strong><\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>U\u017esakymo kiekis<\/th><th>Paruo\u0161imas<\/th><th>Pasikartojanti gamyba<\/th><th>Bendra operacijos trukm\u0117<\/th><\/tr><\/thead><tbody><tr><td>60 detali\u0173<\/td><td>30 minu\u010di\u0173<\/td><td>120 minu\u010di\u0173<\/td><td>150 minu\u010di\u0173<\/td><\/tr><tr><td>120 detali\u0173<\/td><td>30 minu\u010di\u0173<\/td><td>240 minu\u010di\u0173<\/td><td>270 minu\u010di\u0173<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Jei paruo\u0161im\u0105 \u012ftrauksite \u012f bendr\u0105 vidutin\u012f pirmosios partijos laik\u0105 vienai detalei, \u0161is vidurkis netiks antrosios partijos trukmei apskai\u010diuoti. <a href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/smed\/\">Atskirai skai\u010diuodami paruo\u0161imo ir pasikartojan\u010dio darbo laik\u0105<\/a>, gal\u0117site keisti kiek\u012f ne\u012fskai\u010diuodami to paties paruo\u0161imo du kartus.<\/p>\n\n\n<p>Ta pati taisykl\u0117 galioja ir atvirk\u0161\u010diai: neprid\u0117kite paruo\u0161imo dar kart\u0105, jei jis jau \u012ftrauktas \u012f numatyt\u0105 trukm\u0119. Krosniai ar kitam partiniam procesui, kurio trukm\u0117 nekinta nevir\u0161ijant leid\u017eiamo partijos dyd\u017eio, naudokite visos partijos trukm\u0119, o ne dauginkite kaitinimo ciklo laik\u0105 i\u0161 partijos vienet\u0173 skai\u010diaus.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Rinkite steb\u0117jim\u0173 duomenis, kuriuos gal\u0117site naudoti planuodami<\/h2>\n\n\n<p>Kad darbo laiko tyrimas b\u016bt\u0173 naudingas planavimui, neb\u016btina jo paversti dideliu tobulinimo projektu. Prad\u0117kite nuo operacijos, kurios faktin\u0117 trukm\u0117 nuolat neatitinka plano.<\/p>\n\n\n<p>Apibr\u0117\u017ekite gamin\u012f, operacij\u0105, jai tinkamas stakles ir darbo metod\u0105. Su darb\u0105 atliekan\u010diais \u017emon\u0117mis sutarkite, pagal kokius \u012fvykius fiksuosite prad\u017ei\u0105 ir pabaig\u0105. U\u017era\u0161ykite kiek\u012f ir steb\u0117kite pakankamai pasikartojim\u0173, kad matytum\u0117te, ar trukm\u0117 stabili, ar smarkiai svyruoja. Paruo\u0161im\u0105, sustojimus, brok\u0105 ir ne\u012fprast\u0105 taisym\u0105 registruokite taip, kad juos b\u016bt\u0173 galima atskirti.<\/p>\n\n\n<p>Tada lyginkite tik palyginamus duomenis. Skirtumus gali lemti kita med\u017eiaga, programa, \u012frankis, operatoriaus darbo metodas ar stakl\u0117s. Ceche, kuriame gaminama daug skirting\u0173 gamini\u0173, bendras nevienod\u0173 gamini\u0173 vidurkis gali daugiau pasl\u0117pti nei atskleisti. Grei\u010diausias steb\u0117tas ciklas yra naudingas tobulinimo orientyras, bet savaime dar n\u0117ra realisti\u0161ka planavimo norma.<\/p>\n\n\n<p>Paklauskite operatoriaus, koki\u0173 darb\u0173 \u0161is skai\u010dius neapima. Med\u017eiagos atsine\u0161imas, pirmosios detal\u0117s patikra ar tvirtinimo \u012ftaiso valymas gali b\u016bti b\u016btini darbai, nors stakli\u0173 ekrane rodomas pjovimo laikas j\u0173 neapima. J\u0173 nepaisant, darbai nei\u0161nyksta \u2013 tvarkara\u0161tyje jiems tiesiog numatoma per ma\u017eai laiko.<\/p>\n\n\n<p>Galiausiai nuspr\u0119skite, kur apskaityti kiekvien\u0105 laiko nuostol\u012f. Jei matavimas neapima pamainos pertrauk\u0173, atsi\u017evelkite \u012f jas nustatydami turim\u0105 darbo laik\u0105. Jei faktin\u0117je trukm\u0117je jau numatyta laiko pasikartojantiems sustojimams, tos pa\u010dios atsargos neprid\u0117kite dar kart\u0105 kitur. Taip i\u0161matuota trukm\u0117 tampa nuosekliu planavimo pagrindu, o ne dar vienu optimistiniu skai\u010diumi.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Trumpinkite cikl\u0105 nepamir\u0161dami viso u\u017esakymo<\/h2>\n\n\n<p>Ciklo laiko matavimas parodo, kur verta ie\u0161koti problem\u0173. Jei daug laiko u\u017eima pagalbiniai veiksmai, galb\u016bt verta patobulinti tvirtinimo \u012ftaisus, prieig\u0105 prie \u012franki\u0173 ar med\u017eiag\u0173 pateikim\u0105. Jei cikl\u0173 trukm\u0117 svyruoja, gali reik\u0117ti stabilesnio darbo metodo arba technin\u0117s prie\u017ei\u016bros. Ilg\u0105 paruo\u0161im\u0105 reikia analizuoti atskirai, o ne pasl\u0117pti didinant laik\u0105 vienai detalei.<\/p>\n\n\n<p>Pirmenyb\u0119 teikite operacijai, kuri riboja reikiam\u0173 u\u017esakym\u0173 \u012fvykdym\u0105. Sutrumpinus laik\u0105 labai apkrautoje siaurojoje vietoje, galima atlaisvinti verting\u0173 gamybos paj\u0117gum\u0173. Tiek pat laiko sutaupius prie i\u0161tekliaus, kuris turi daug laisv\u0173 paj\u0117gum\u0173, u\u017esakymo baigimo data gali nepasikeisti, jei kitos operacijos vis dar negalima prad\u0117ti.<\/p>\n\n\n<p>Tod\u0117l tobulinimas ir tvarkara\u0161\u010di\u0173 sudarymas turi eiti i\u0161vien. <strong>Spartesn\u0117 operacija pakei\u010dia darbui reikaling\u0105 laik\u0105, o <a href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/kas-yra-gamybos-planavimas\/\">gamybos tvarkara\u0161tis<\/a> parodo, kur t\u0105 laik\u0105 galima panaudoti.<\/strong> Patobulin\u0119 metod\u0105, atnaujinkite atitinkam\u0105 planuojam\u0105 trukm\u0119 ir \u012fvertinkite pasikeitusi\u0105 darb\u0173 sek\u0105, u\u017euot man\u0119, kad visus u\u017esakymus pristatysite tiek pat anks\u010diau.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Naudokite i\u0161matuotas trukmes geresniam planui sudaryti su SkyPlanner<\/h2>\n\n\n<p>SkyPlanner leid\u017eia apra\u0161yti proceso \u017eingsn\u012f pasirenkant skai\u010diavimo b\u016bd\u0105 <strong>\u201eLaikas vienetui\u201c, \u201eVienetai per laiko vienet\u0105\u201c arba \u201eFiksuota trukm\u0117\u201c<\/strong>, o paruo\u0161imo laik\u0105 nurodyti atskirai. Taip galite tinkamai apra\u0161yti tiek atskiros detal\u0117s mechanin\u012f apdirbim\u0105, tiek pagal na\u0161um\u0105 skai\u010diuojam\u0105 gamybos \u017eingsn\u012f ar fiksuotos trukm\u0117s partin\u012f proces\u0105.<\/p>\n\n\n<p>Ankstesni\u0173 gamybos laikotarpi\u0173 duomenys taip pat padeda tiksliau numatyti trukm\u0119. SkyPlanner gali pasi\u016blyti proceso \u017eingsnio trukm\u0119 pagal ankstesnes jo gamybos trukmes, o j\u016bs galite \u0161\u012f \u012fvert\u012f pasirinkti vietoj numatytosios reik\u0161m\u0117s. Tam reikia tinkam\u0173 ankstesn\u0117s gamybos duomen\u0173 \u2013 \u0161i galimyb\u0117 nepakei\u010dia b\u016btinyb\u0117s pirmiausia surinkti naudingus steb\u0117jim\u0173 duomenis.<\/p>\n\n\n<p>Taip sukuriamas prakti\u0161kas gr\u012f\u017etamasis ry\u0161ys: ceche u\u017efiksuojama, kiek trunka darbas, j\u016bs per\u017ei\u016brite trukm\u0119, o kitam planui jau galite naudoti tikslesnius duomenis. Nebereikia nuolat remtis norma, nustatyta dar prie\u0161 pasikei\u010diant \u012frankiams, darbo metodui ar gaminiui.<\/p>\n\n\n<p>Tuomet Arcturus, SkyPlanner dirbtinis intelektas tvarkara\u0161\u010diams sudaryti, suplanuoja operacijas pagal nustatytus darbo centr\u0173 paj\u0117gumus, priklausomybes ir prioritetus. <a href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/ganto-diagrama-gamybos-planavimui\/\">Gantt tvarkara\u0161tyje<\/a> matyti, kokie darbai suplanuoti j\u016bs\u0173 gamybos i\u0161tekliams. Skai\u010diuojant atsi\u017evelgiama \u012f patikslint\u0105 operacijos laik\u0105 ir kitus u\u017esakymus, kuriems reikia t\u0173 pa\u010di\u0173 turim\u0173 darbo valand\u0173.<\/p>\n\n\n<p>U\u017euot rankiniu b\u016bdu ilgin\u0119 juost\u0105 ir tais\u0119 visas paveiktas darb\u0173 eiles, galite leisti SkyPlanner perskai\u010diuoti tvarkara\u0161t\u012f ir per\u017ei\u016br\u0117ti, kas pasikeit\u0117. Prioritetus nustatote j\u016bs, o priimtus sprendimus apsaugote taisykl\u0117mis ir u\u017eraktais. Taip gaunate ne tik patikimesn\u0119 trukm\u0119, bet ir ai\u0161kiau matote, k\u0105 ji rei\u0161kia darbams, kuriuos \u012fsipareigojote atlikti.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Kaip tai atrodo intensyviai dirban\u010diame mechaninio apdirbimo ceche<\/h3>\n\n\n<p>Suomijos \u012fmon\u0117 <a href=\"https:\/\/skyplanner.ai\/lt\/klientu-istorijos\/eskomatic\/\">Eskomatic<\/a>, teikianti mechaninio apdirbimo paslaugas pagal u\u017esakym\u0105, gamino plat\u0173 gamini\u0173 asortiment\u0105 \u012fvairaus dyd\u017eio partijomis, o darb\u0173 eiles daugiausia sudarydavo rankiniu b\u016bdu. Prad\u0117jusi naudoti SkyPlanner, jos komanda gal\u0117jo ai\u0161kiau matyti darb\u0173 eil\u0119 ir automati\u0161kai planuoti apkrov\u0105. Pasak \u012fmon\u0117s, tai padeda lengviau nustatyti realius pristatymo terminus ir tiksliau juos nurodyti klientams.<\/p>\n\n\n<p>\u0160i patirtis parodo, koks \u017eingsnis laukia po matavimo: gamybos duomenis panaudoti ai\u0161kesniam kasdieniam planavimui ir pristatymo \u012fsipareigojimams nustatyti.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Panaudokite kito darbo laiko tyrimo rezultatus planavimui<\/h2>\n\n\n<p>Jei planuojama operacij\u0173 trukm\u0117 vis labiau skiriasi nuo faktin\u0117s, neapsiribokite skai\u010diaus pataisymu skai\u010diuokl\u0117je. Patikslint\u0105 trukm\u0119 naudokite tvarkara\u0161\u010di\u0173 sudarymo sistemoje, kuri gali parodyti jos poveik\u012f visam u\u017esakymo gamybos mar\u0161rutui ir likusiam darbo kr\u016bviui.<\/p>\n\n\n<p>SkyPlanner per atvir\u0105 REST API integruojasi su bet kuria ERP ar MES sistema, tod\u0117l savo esamas sistemas galite susieti su SkyPlanner planavimo funkcijomis. Kurdami \u0161i\u0105 integracij\u0105 pasirinkite, kaip bus renkami ir perduodami gamybos trukm\u0117s duomenys.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/lt\/susisiekite-su-pardavejais\/\">U\u017esisakykite SkyPlanner pristatym\u0105<\/a> ir jam pasiruo\u0161kite: tur\u0117kite \u012fprast\u0105 gaminio gamybos mar\u0161rut\u0105, neseniai i\u0161matuot\u0105 operacijos laik\u0105 ir laiko norm\u0105, pagal kuri\u0105 \u0161iuo metu planuojate. Remdamiesi \u0161iais duomenimis gal\u0117site konkre\u010diai \u012fvertinti, kaip tikrovi\u0161kesn\u0117s trukm\u0117s gal\u0117t\u0173 pagerinti j\u016bs\u0173 gamybos tvarkara\u0161t\u012f. Jei pirmiausia norite patyrin\u0117ti patys, <a href=\"https:\/\/skyplanner.ai\/lt\/bandymas\/\">i\u0161bandykite SkyPlanner su demonstraciniais duomenimis<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Gamybos ciklo laikas: i\u0161matuokite ir planuokite Prad\u017eia &raquo; I\u0161tekliai &raquo; Gamybos ciklo laikas: i\u0161matuokite ir planuokite Mechaninio apdirbimo operacijai numatytos dvi minut\u0117s vienai detalei, bet partija vis tiek nuolat baigiama v\u0117liau, nei planuota. Gal ciklas trunka ilgiau, nei tik\u0117tasi? Gal \u012f numatyt\u0105 trukm\u0119 ne\u012fskai\u010diuotas detali\u0173 \u012fd\u0117jimas? O gal paruo\u0161imo laikas paskirstytas pagal klaiding\u0105 detali\u0173 skai\u010di\u0173 &#8230; <a title=\"Gamybos ciklo laikas: i\u0161matuokite ir planuokite\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/gamybos-ciklo-laikas\/\" aria-label=\"Read more about Gamybos ciklo laikas: i\u0161matuokite ir planuokite\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":98120,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2532,301],"tags":[],"class_list":["post-98084","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-scheduling","category-istekliai","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.3) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Gamybos ciklo laikas: i\u0161matuokite ir planuokite<\/title>\n<meta name=\"description\" content=\"Vien greitesni\u0173 stakli\u0173 nepakanka. Tiksliai matuokite gamybos ciklo laik\u0105 ir planuokite darbus su SkyPlanner pagal reali\u0105 operacij\u0173 trukm\u0119.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/gamybos-ciklo-laikas\/\" \/>\n<meta property=\"og:locale\" content=\"lt_LT\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Gamybos ciklo laikas: i\u0161matuokite ir planuokite\" \/>\n<meta property=\"og:description\" content=\"Vien greitesni\u0173 stakli\u0173 nepakanka. Tiksliai matuokite gamybos ciklo laik\u0105 ir planuokite darbus su SkyPlanner pagal reali\u0105 operacij\u0173 trukm\u0119.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lt\/istekliai\/gamybos-ciklo-laikas\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-15T00:12:46+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-15T01:53:39+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-cycle-time-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"9 minut\u0117s\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/gamybos-ciklo-laikas\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/gamybos-ciklo-laikas\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Gamybos ciklo laikas: i\u0161matuokite ir planuokite\",\"datePublished\":\"2026-10-15T00:12:46+00:00\",\"dateModified\":\"2026-10-15T01:53:39+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/gamybos-ciklo-laikas\\\/\"},\"wordCount\":1893,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/gamybos-ciklo-laikas\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/manufacturing-cycle-time-hero.png\",\"articleSection\":[\"APS &amp; Scheduling\",\"i\u0161tekliai\"],\"inLanguage\":\"lt-LT\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/gamybos-ciklo-laikas\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/gamybos-ciklo-laikas\\\/\",\"name\":\"Gamybos ciklo laikas: i\u0161matuokite ir planuokite\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/gamybos-ciklo-laikas\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/gamybos-ciklo-laikas\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/manufacturing-cycle-time-hero.png\",\"datePublished\":\"2026-10-15T00:12:46+00:00\",\"dateModified\":\"2026-10-15T01:53:39+00:00\",\"description\":\"Vien greitesni\u0173 stakli\u0173 nepakanka. Tiksliai matuokite gamybos ciklo laik\u0105 ir planuokite darbus su SkyPlanner pagal reali\u0105 operacij\u0173 trukm\u0119.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/gamybos-ciklo-laikas\\\/#breadcrumb\"},\"inLanguage\":\"lt-LT\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/gamybos-ciklo-laikas\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"lt-LT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/gamybos-ciklo-laikas\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/manufacturing-cycle-time-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/manufacturing-cycle-time-hero.png\",\"width\":1672,\"height\":941},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/gamybos-ciklo-laikas\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Gamybos ciklo laikas: i\u0161matuokite ir planuokite\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lt-LT\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lt-LT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lt-LT\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Gamybos ciklo laikas: i\u0161matuokite ir planuokite","description":"Vien greitesni\u0173 stakli\u0173 nepakanka. Tiksliai matuokite gamybos ciklo laik\u0105 ir planuokite darbus su SkyPlanner pagal reali\u0105 operacij\u0173 trukm\u0119.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lt\/istekliai\/gamybos-ciklo-laikas\/","og_locale":"lt_LT","og_type":"article","og_title":"Gamybos ciklo laikas: i\u0161matuokite ir planuokite","og_description":"Vien greitesni\u0173 stakli\u0173 nepakanka. Tiksliai matuokite gamybos ciklo laik\u0105 ir planuokite darbus su SkyPlanner pagal reali\u0105 operacij\u0173 trukm\u0119.","og_url":"https:\/\/skyplanner.ai\/lt\/istekliai\/gamybos-ciklo-laikas\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-15T00:12:46+00:00","article_modified_time":"2026-10-15T01:53:39+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-cycle-time-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Jussi M\u00e4ntyl\u00e4","Est. reading time":"9 minut\u0117s"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/gamybos-ciklo-laikas\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/gamybos-ciklo-laikas\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Gamybos ciklo laikas: i\u0161matuokite ir planuokite","datePublished":"2026-10-15T00:12:46+00:00","dateModified":"2026-10-15T01:53:39+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/gamybos-ciklo-laikas\/"},"wordCount":1893,"publisher":{"@id":"https:\/\/skyplanner.ai\/lt\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/gamybos-ciklo-laikas\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-cycle-time-hero.png","articleSection":["APS &amp; Scheduling","i\u0161tekliai"],"inLanguage":"lt-LT"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/gamybos-ciklo-laikas\/","url":"https:\/\/skyplanner.ai\/lt\/istekliai\/gamybos-ciklo-laikas\/","name":"Gamybos ciklo laikas: i\u0161matuokite ir planuokite","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lt\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/gamybos-ciklo-laikas\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/gamybos-ciklo-laikas\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-cycle-time-hero.png","datePublished":"2026-10-15T00:12:46+00:00","dateModified":"2026-10-15T01:53:39+00:00","description":"Vien greitesni\u0173 stakli\u0173 nepakanka. Tiksliai matuokite gamybos ciklo laik\u0105 ir planuokite darbus su SkyPlanner pagal reali\u0105 operacij\u0173 trukm\u0119.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/gamybos-ciklo-laikas\/#breadcrumb"},"inLanguage":"lt-LT","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lt\/istekliai\/gamybos-ciklo-laikas\/"]}]},{"@type":"ImageObject","inLanguage":"lt-LT","@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/gamybos-ciklo-laikas\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-cycle-time-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-cycle-time-hero.png","width":1672,"height":941},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/gamybos-ciklo-laikas\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lt\/"},{"@type":"ListItem","position":2,"name":"Gamybos ciklo laikas: i\u0161matuokite ir planuokite"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lt\/#website","url":"https:\/\/skyplanner.ai\/lt\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lt\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lt\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lt-LT"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lt\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lt\/","logo":{"@type":"ImageObject","inLanguage":"lt-LT","@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"lt-LT","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-cycle-time-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-cycle-time-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-cycle-time-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-cycle-time-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-cycle-time-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-cycle-time-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-cycle-time-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-cycle-time-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lt\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Gamybos ciklo laikas: i\u0161matuokite ir planuokite Prad\u017eia &raquo; I\u0161tekliai &raquo; Gamybos ciklo laikas: i\u0161matuokite ir planuokite Mechaninio apdirbimo operacijai numatytos dvi minut\u0117s vienai detalei, bet partija vis tiek nuolat baigiama v\u0117liau, nei planuota. Gal ciklas trunka ilgiau, nei tik\u0117tasi? Gal \u012f numatyt\u0105 trukm\u0119 ne\u012fskai\u010diuotas detali\u0173 \u012fd\u0117jimas? O gal paruo\u0161imo laikas paskirstytas pagal klaiding\u0105 detali\u0173 skai\u010di\u0173&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/posts\/98084","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/comments?post=98084"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/posts\/98084\/revisions"}],"predecessor-version":[{"id":98148,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/posts\/98084\/revisions\/98148"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/media\/98120"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/media?parent=98084"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/categories?post=98084"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/tags?post=98084"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}