{"id":96591,"date":"2026-10-08T07:53:30","date_gmt":"2026-10-08T07:53:30","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=96591"},"modified":"2026-10-19T14:43:24","modified_gmt":"2026-10-19T14:43:24","slug":"gamyba-pagal-uzsakyma","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/lt\/istekliai\/gamyba-pagal-uzsakyma\/","title":{"rendered":"Gamyba pagal u\u017esakym\u0105: ma\u017eiau gatavos produkcijos atsarg\u0173, patikimesni pristatymo pa\u017eadai"},"content":{"rendered":"<div class=\"gb-container gb-container-mto01 article-main-content-container\">\n<div class=\"gb-container gb-container-mto01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Gamyba pagal u\u017esakym\u0105: ma\u017eiau gatavos produkcijos atsarg\u0173, patikimesni pristatymo pa\u017eadai<\/h1>\n\n<div class=\"gb-container gb-container-mto02\">\n<div class=\"gb-container gb-container-mto02\">\n\n<p><a href=\"\/lt\/\">Prad\u017eia<\/a> &raquo; <a href=\"\/lt\/istekliai\/\">I\u0161tekliai<\/a> &raquo; Gamyba pagal u\u017esakym\u0105: ma\u017eiau gatavos produkcijos atsarg\u0173, patikimesni pristatymo pa\u017eadai<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__descriptive-text\">Numatomas skaitymo laikas: <\/span><span class=\"yoast-reading-time__reading-time\">8<\/span><span class=\"yoast-reading-time__time-unit\"> minut\u0117s<\/span><\/p>\n\n<\/div>\n<\/div>\n<div class=\"gb-container gb-container-mto03\">\n<div class=\"gb-container gb-container-mto03\">\n\n<p>Klientas u\u017esako tokio dyd\u017eio korpus\u0105, kok\u012f parduodate retai. Prad\u0117ti j\u012f gaminti tik gavus u\u017esakym\u0105 yra prasminga: taip sand\u0117lio neu\u017epildote gamini\u0173 variantais, kuriems galb\u016bt niekada neatsiras pirk\u0117jo. Ta\u010diau klientas vis tiek nori \u017einoti pristatymo dat\u0105, o apdailai reikalingi paj\u0117gumai jau u\u017eimti.<\/p>\n\n\n<p>Tai pagrindinis kompromisas, kur\u012f tenka priimti renkantis <strong>gamyb\u0105 pagal u\u017esakym\u0105<\/strong>. I\u0161 anksto pagaminate ma\u017eiau gatavos produkcijos atsarg\u0173, ta\u010diau klientai laukia, kol j\u0173 u\u017esakymai pereis visus gamybos etapus. S\u0117km\u0117 priklauso nuo to, ar \u017einote, kokius u\u017esakymus paj\u0117gsite \u012ftraukti \u012f gamyb\u0105, o ne vien kokius gaminius galite pagaminti.<\/p>\n\n\n<p>SkyPlanner padeda prakti\u0161kai valdyti \u0161\u012f kompromis\u0105. Gamybos tvarkara\u0161\u010dius sudarantis dirbtinis intelektas Arcturus apskai\u010diuoja gamybos sek\u0105, atsi\u017evelgdamas \u012f j\u016bs\u0173 paj\u0117gumus, med\u017eiagas ir prioritetus. Sudaryt\u0105 plan\u0105 matote Gantt laiko juostoje, tod\u0117l galite \u012fsipareigoti d\u0117l pristatymo ai\u0161kiau matydami laukian\u010dius darbus.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kas yra gamyba pagal u\u017esakym\u0105?<\/h2>\n\n\n<p>Gamyba pagal u\u017esakym\u0105 (MTO) \u2013 tai gamybos strategija, kai gamyba pradedama gavus kliento u\u017esakym\u0105. U\u017euot gamin\u0119 gatav\u0105 produkcij\u0105 pagal prognozuojam\u0105 paklaus\u0105 ir pardav\u0119 j\u0105 i\u0161 sand\u0117lio, pagaminate kliento u\u017esakyt\u0105 kiek\u012f pagal jo nurodyt\u0105 specifikacij\u0105.<\/p>\n\n\n<p>Gaminys neb\u016btinai turi b\u016bti naujas, vienintelis toks gaminys. Gamintojas gali naudoti jau turim\u0105 konstrukcij\u0105, med\u017eiag\u0173 \u017einiara\u0161t\u012f ir technologin\u012f mar\u0161rut\u0105, o gav\u0119s u\u017esakym\u0105 pagaminti reikiamo dyd\u017eio ir apdailos gaminius arba u\u017esakyt\u0105 j\u0173 kiek\u012f. Esminis po\u017eymis \u2013 <strong>kas paskatina prad\u0117ti gamyb\u0105<\/strong>, o ne gaminio unikalumas.<\/p>\n\n\n<p>\u012esivaizduokite lak\u0161tinio metalo gamini\u0173 \u012fmon\u0119, si\u016blan\u010di\u0105 \u012fvairi\u0173 matmen\u0173 ir apdailos \u012frangos korpusus. Ji sand\u0117lyje laiko da\u017enai naudojam\u0105 lak\u0161tin\u0119 med\u017eiag\u0105, ta\u010diau korpus\u0105 pradeda pjauti, lenkti ir apdailinti tik gavusi kliento u\u017esakym\u0105. Tai MTO: \u017ealiav\u0173 atsargas galima laikyti sand\u0117lyje, nors gatav\u0173 korpus\u0173 atsarg\u0173 n\u0117ra.<\/p>\n\n\n<p>Gamybos strategijas lengviau atskirti paklausus, k\u0105 dar reikia atlikti gavus u\u017esakym\u0105:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Strategija<\/th><th>Darbai, pradedami gavus kliento u\u017esakym\u0105<\/th><th>Pagrindinis planavimo klausimas<\/th><\/tr><\/thead><tbody><tr><td>Gamyba \u012f sand\u0117l\u012f (MTS)<\/td><td>Surinkti siunt\u0105 ir i\u0161si\u0173sti pagal numatom\u0105 paklaus\u0105 pagamint\u0105 gatav\u0105 gamin\u012f<\/td><td>Koki\u0173 gatav\u0173 gamini\u0173 atsargas tur\u0117tume laikyti ir kokiais kiekiais?<\/td><\/tr><tr><td><a href=\"\/lt\/istekliai\/surinkimas-pagal-uzsakyma\/\">Surinkimas pagal u\u017esakym\u0105 (ATO)<\/a><\/td><td>Surinkti gatav\u0105 gamin\u012f i\u0161 paruo\u0161t\u0173 komponent\u0173 ar mazg\u0173<\/td><td>Ar turime reikiam\u0173 komponent\u0173 ir surinkimo paj\u0117gum\u0173?<\/td><\/tr><tr><td>Gamyba pagal u\u017esakym\u0105 (MTO)<\/td><td>Pagaminti u\u017esakyt\u0105 gamin\u012f pagal turim\u0105 konstrukcij\u0105 ir technologin\u012f mar\u0161rut\u0105<\/td><td>Kada gamyboje gal\u0117sime atlikti visas reikiamas operacijas?<\/td><\/tr><tr><td><a href=\"\/lt\/istekliai\/projektavimas-ir-gamyba-pagal-uzsakyma\/\">Projektavimas ir gamyba pagal u\u017esakym\u0105 (ETO)<\/a><\/td><td>Suprojektuoti gamin\u012f arba parengti jo technin\u012f sprendim\u0105, tada j\u012f pagaminti<\/td><td>Kada bus parengtas projektas ir koki\u0173 darb\u0173 jam \u012fgyvendinti reik\u0117s?<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>MTO taip pat n\u0117ra tas pats, kas gamyba pagal skirtingus technologinius mar\u0161rutus (job shop). MTO nusako u\u017esakymo vaidmen\u012f pradedant gamyb\u0105, o job shop \u2013 gamybos aplink\u0105, kurioje u\u017eduotys gali jud\u0117ti skirtingais technologiniais mar\u0161rutais ir naudoti bendrus i\u0161teklius. Gamykla gali atitikti abu modelius. Apie toki\u0173 mar\u0161rut\u0173 planavimo i\u0161\u0161\u016bkius skaitykite m\u016bs\u0173 <a href=\"\/lt\/istekliai\/vienetine-ir-mazu-seriju-gamyba\/\">job shop gamybos tvarkara\u0161\u010di\u0173 sudarymo vadove<\/a>.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kada verta rinktis gamyb\u0105 pagal u\u017esakym\u0105?<\/h2>\n\n\n<p>MTO patraukli tada, kai laikyti vis\u0173 gatav\u0173 gamini\u0173 variant\u0173 atsargas b\u016bt\u0173 brangu, atskir\u0173 variant\u0173 paklausa yra netolygi, o klientai sutinka laukti, kol gaminiai bus pagaminti. Taip galite si\u016blyti platesn\u012f asortiment\u0105, i\u0161 anksto negamindami vis\u0173 galim\u0173 gamini\u0173.<\/p>\n\n\n<p>Nauda geriausiai matoma vertinant gatavos produkcijos atsargas: ma\u017eiau gamini\u0173 lieka neparduot\u0173 d\u0117l klaidingai numatyto asortimento. Gamyba susiejama su konkre\u010diu kliento u\u017esakymu, kuriame gali b\u016bti nurodyti reikiami matmenys, med\u017eiaga ar apdaila.<\/p>\n\n\n<p>U\u017e tai tenka mok\u0117ti ilgesniu u\u017esakymo \u012fvykdymo laiku. Taikant MTS, gaminys jau gali b\u016bti paruo\u0161tas i\u0161si\u0173sti. Taikant MTO, \u012f kliento laukimo laik\u0105 \u012feina ir gamyba, ir laukimas eil\u0117se tarp operacij\u0173. Gaunami u\u017esakymai taip pat gali sukurti netolyg\u0173 darbo kr\u016bv\u012f: po ramios savait\u0117s gali ateiti keli u\u017esakymai, kuriems reikia to paties i\u0161tekliaus.<\/p>\n\n\n<p><strong>MTO nerei\u0161kia, kad atsarg\u0173 visai nereikia ar kad bendrosios s\u0105naudos savaime suma\u017e\u0117s.<\/strong> Vis tiek gali reik\u0117ti \u017ealiav\u0173, perkam\u0173 dali\u0173 ir nebaigtos gamybos atsarg\u0173. Gaminant ma\u017eomis partijomis, gali tekti da\u017enai perderinti \u012frang\u0105. Jei klientams prekes reikia i\u0161si\u0173sti nedelsiant ir jie nuolat perka t\u0105 pat\u012f standartin\u012f gamin\u012f, <a href=\"\/lt\/istekliai\/gamyba-i-sandeli\/\">\u0161io gaminio gamyba \u012f sand\u0117l\u012f<\/a> gali b\u016bti tinkamesnis pasirinkimas.<\/p>\n\n\n<p>Neb\u016btina visoje gamykloje taikyti vieno modelio. Standartini\u0173 gamini\u0173 atsargas galite laikyti sand\u0117lyje, o variantus, kuri\u0173 paklaus\u0105 sunkiau prognozuoti, gaminti pagal u\u017esakym\u0105. <a href=\"\/lt\/istekliai\/master-production-schedule\/\">Pagrindinis gamybos planas<\/a> padeda susieti \u0161\u012f platesn\u012f asortiment\u0105 su darbais, kuriuos reikia atlikti gamyboje.<\/p>\n\n\n<h2 class=\"wp-block-heading\">U\u017esakymui reikia vietos tvarkara\u0161tyje, ne vien \u012fvykdymo datos<\/h2>\n\n\n<p>Gr\u012f\u017ekime prie \u012fsivaizduojamo korpus\u0173 gamintojo. Naujam u\u017esakymui reikia pjovimo, lenkimo ir apdailos operacij\u0173. Med\u017eiaga paruo\u0161ta, pjovimo paj\u0117gum\u0173 yra, tod\u0117l pardavim\u0173 komanda nor\u0117t\u0173 pa\u017ead\u0117ti greit\u0105 \u012fvykdym\u0105. Ta\u010diau apdailos paj\u0117gumai jau skirti kit\u0173 klient\u0173 u\u017esakymams.<\/p>\n\n\n<p>I\u0161 karto prad\u0117jus pjauti \u0161is konfliktas nei\u0161nyks. Gali tiesiog atsirasti dar viena detal\u0117, laukianti apdailos. Svarbu i\u0161siai\u0161kinti, ar pavyks laiku atlikti <strong>visas technologinio mar\u0161ruto operacijas<\/strong> kartu su u\u017esakymais, d\u0117l kuri\u0173 jau esate \u012fsipareigoj\u0119.<\/p>\n\n\n<p>Kiekvienam naujam u\u017esakymui surinkite \u0161i\u0105 informacij\u0105:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Reikalingi darbai:<\/strong> tiksli specifikacija, kiekis, operacij\u0173 seka, apdorojimo ir \u012frengini\u0173 derinimo trukm\u0117.<\/li><li><strong>Darbams tinkami i\u0161tekliai:<\/strong> tinkami darbo centrai, darbo pamainos, operatoriai ir visi reikalingi \u012frankiai.<\/li><li><strong>Med\u017eiag\u0173 prieinamumas:<\/strong> turimos atsargos ir numatomas perkam\u0173 med\u017eiag\u0173 ar komponent\u0173 prieinamumas.<\/li><li><strong>Esami \u012fsipareigojimai:<\/strong> operacijos, kurioms jau reikia t\u0173 pa\u010di\u0173 i\u0161tekli\u0173, ir j\u0173 prioritetai.<\/li><li><strong>Laikas iki pristatymo:<\/strong> laikas likusiems gamybos etapams, patikrai, pakavimui ir, jei reikia, transportavimui.<\/li><\/ul>\n\n\n<p><a href=\"\/lt\/istekliai\/gamybos-uzsakymu-valdymas\/\">Gamybos u\u017esakyme<\/a> pateikiama u\u017eduo\u010diai atlikti reikalinga informacija. <a href=\"\/lt\/istekliai\/kas-yra-gamybos-planavimas\/\">Sudarant gamybos tvarkara\u0161\u010dius<\/a> \u0161ie darbai susiejami su turimu laiku. Vien pageidaujama \u012fvykdymo data neatstoja nei vieno, nei kito.<\/p>\n\n\n<p>Jei u\u017esakymo ne\u012fmanoma \u012fvykdyti iki pageidaujamos datos, vis tiek turite priimti sprendim\u0105. Gali pad\u0117ti kitas tinkamas darbo centras, pakeista pamaina ar prioritetas. Kitu atveju susitarkite d\u0117l v\u0117lesn\u0117s datos, kol klientas dar neprad\u0117jo remtis ne\u012fvykdomu pa\u017eadu. Jei keliems u\u017esakymams reikalinga operacija nuolat stabdo pristatymus, i\u0161analizuokite <a href=\"\/lt\/istekliai\/siauroji-vieta\/\">gamybos siaur\u0105j\u0105 viet\u0105<\/a>, u\u017euot siunt\u0119 \u012f jos eil\u0119 dar daugiau darb\u0173.<\/p>\n\n\n<h2 class=\"wp-block-heading\">J\u016bs nustatote prioritetus, o SkyPlanner apskai\u010diuoja plan\u0105<\/h2>\n\n\n<p>Sunkiausia ne vien\u0105 kart\u0105 patikrinti \u0161iuos duomenis, o i\u0161laikyti j\u0173 s\u0105sajas, kai ateina nauji u\u017esakymai, kei\u010diasi med\u017eiag\u0173 pristatymo datos ir gamyba trunka ilgiau nei planuota. Kai kiekviena u\u017eduotis rankiniu b\u016bdu perkeliama i\u0161 vieno \u012frenginio eil\u0117s \u012f kit\u0105, planuotojas turi ne tik priimti sprendimus, bet ir nuolat atnaujinti skai\u010diavimus.<\/p>\n\n\n<p><a href=\"\/lt\/\">SkyPlanner APS<\/a> perima \u0161iuos tvarkara\u0161\u010dio skai\u010diavimus. J\u016bs apibr\u0117\u017eiate darbo centrus, pamainas, operatorius, med\u017eiagas ir prioritetus, o kiekvienam gaminiui nurodote technologines operacijas bei j\u0173 trukm\u0119. Arcturus sudaro darb\u0173 tvarkara\u0161t\u012f pagal nustatytus paj\u0117gumus ir priklausomybes. Gantt rodinyje matoma darb\u0173 seka visuose darbo centruose, tod\u0117l galite sekti korpuso gamyb\u0105 nuo pjovimo iki apdailos, u\u017euot tikrin\u0119 atskiras eiles.<\/p>\n\n\n<p>Korpus\u0173 gamybos pavyzdyje tai rei\u0161kia, kad apdailos darbo kr\u016bvis \u012f plan\u0105 \u012ftraukiamas nuo pat prad\u017ei\u0173. Jei skubiam u\u017esakymui reikia teikti pirmenyb\u0119, pakei\u010diate prioritet\u0105 ir perskai\u010diuojate tvarkara\u0161t\u012f. Prie\u0161 patvirtindami nauj\u0105 \u012fsipareigojim\u0105, per\u017ei\u016brite, kada dabar bus baigti kiti u\u017esakymai. Nauda \u2013 ne vien greitesnis atsakymas vienam klientui: matote ir tai, k\u0105 \u0161is atsakymas rei\u0161kia jau laukiantiems klientams.<\/p>\n\n\n<p>Tvarkara\u0161\u010di\u0173 sudarymas atsi\u017evelgiant \u012f med\u017eiagas leid\u017eia \u012f tuos pa\u010dius skai\u010diavimus \u012ftraukti dar vien\u0105 da\u017en\u0105 MTO problem\u0105. Kai \u0161i taisykl\u0117 \u012fjungta, Arcturus atsi\u017evelgia \u012f med\u017eiag\u0173 prieinamum\u0105, u\u017euot planav\u0119s darbus taip, tarsi visos med\u017eiagos jau b\u016bt\u0173 paruo\u0161tos. Pirkimo u\u017esakym\u0173 pristatymo datos nurodo numatom\u0105 prieinamum\u0105, o patvirtinus, kad med\u017eiagos pristatytos, atsargos atnaujinamos. Svarbu nuolat atnaujinti \u0161ias datas, nes tiek\u0117jo v\u0117lavimas gali pakeisti tai, kokius darbus galima atlikti toliau.<\/p>\n\n\n<p>Prioritetus ir toliau nustatote j\u016bs, o u\u017erakinimais apsaugote priimtus tvarkara\u0161\u010dio sprendimus. Arcturus skai\u010diuoja laikydamasis \u0161i\u0173 nurodym\u0173. Jis negali sukurti tr\u016bkstam\u0173 fizini\u0173 paj\u0117gum\u0173, ta\u010diau gali suteikti ai\u0161kesn\u012f pagrind\u0105 nuspr\u0119sti, ar keisti plan\u0105, ar klientui duot\u0105 pa\u017ead\u0105.<\/p>\n\n\n<p>SkyPlanner per atvir\u0105 REST API integruojasi su bet kuria ERP ar MES sistema. Esamus u\u017esakym\u0173 ir gamybos duomenis galite susieti su tvarkara\u0161\u010diu, tod\u0117l norint geriau planuoti MTO neb\u016btina prad\u0117ti nuo ERP keitimo.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kas pasikeit\u0117 \u012fmon\u0117je Fredman Operations ai\u0161kiau matant paj\u0117gumus<\/h2>\n\n\n<p>Fredman Operations gamina saugiam s\u0105ly\u010diui su maistu skirtus virtuv\u0117s ir pakavimo sprendimus. Augant u\u017esakym\u0173 apimtims, \u012fmonei reik\u0117jo ai\u0161kiau matyti savo paj\u0117gumus. Darbo kortel\u0117s i\u0161 L7 ERP \u012f LTR gamybos valdymo sistem\u0105 buvo perkeliamos rankiniu b\u016bdu, o planuotojas nustatydavo u\u017eduo\u010di\u0173 prioritetus tiksliai nematydamas, kada atsilaisvins \u012frenginiai ar kokie yra pamain\u0173 paj\u0117gumai. Skubus tvarkara\u0161\u010dio keitimas gal\u0117jo u\u017etrukti valand\u0105 ar ilgiau.<\/p>\n\n\n<p>\u012emon\u0117 pasirinko SkyPlanner d\u0117l ai\u0161kaus bendro Gantt rodinio ir prijung\u0117 savo L7 bei LTR sistemas. \u012erenginiai, laisvi ir u\u017eimti paj\u0117gumai bei u\u017eduo\u010di\u0173 eiga tapo matomi vienoje vietoje. Gamybos darbuotojai gal\u0117jo matyti planuojam\u0105 darb\u0173 prad\u017eios ir pabaigos laik\u0105, o pardavim\u0173 komanda tur\u0117jo tvirtesn\u012f pagrind\u0105 \u012fsipareigoti d\u0117l pristatymo.<\/p>\n\n\n<p>Fredman patirties apra\u0161yme nurodoma, kad suma\u017e\u0117jo vir\u0161valand\u017ei\u0173 ir \u012f tvarkara\u0161\u010dio poky\u010dius reaguojama grei\u010diau. MTO gamintojui \u010dia svarbiausia gamybos ir pardavim\u0173 s\u0105saja: pristatymo pa\u017ead\u0105 lengviau pagr\u012fsti, kai visi mato jam \u012fvykdyti reikalingus paj\u0117gumus. <a href=\"\/lt\/klientu-istorijos\/fredman-operations\/\">Skaitykite Fredman Operations kliento istorij\u0105<\/a>.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Pamatykite, kur tvarkara\u0161tyje tilpt\u0173 kitas j\u016bs\u0173 u\u017esakymas<\/h2>\n\n\n<p>Gamyba pagal u\u017esakym\u0105 padeda i\u0161vengti nereikaling\u0173 gatavos produkcijos atsarg\u0173 kaupimo. \u012egyvendinamas tvarkara\u0161tis padeda i\u0161vengti situacijos, kai \u0161i\u0105 atsarg\u0173 problem\u0105 pakei\u010dia susikaup\u0119 v\u0117luojantys klient\u0173 u\u017esakymai.<\/p>\n\n\n<p>Norite pamatyti, kaip SkyPlanner pad\u0117t\u0173 planuoti j\u016bs\u0173 gamyb\u0105? <a href=\"\/lt\/susisiekite-su-pardavejais\/\">U\u017esisakykite demonstracij\u0105<\/a>. Pasiruo\u0161kite aptarti tipin\u012f u\u017esakymo technologin\u012f mar\u0161rut\u0105, i\u0161tekli\u0173, kurio reikia daugumai u\u017esakym\u0173, ir nesen\u0105 pokyt\u012f, sutrikd\u017eius\u012f pristatymo terminus. \u0160ie pavyzd\u017eiai pad\u0117s mums parodyti, kaip Arcturus ir Gantt tvarkara\u0161tis gal\u0117t\u0173 palengvinti j\u016bs\u0173 kasdien\u012f planavim\u0105.<\/p>\n\n\n<p>Pirmiausia nor\u0117tum\u0117te susipa\u017einti savaranki\u0161kai? <a href=\"\/lt\/bandymas\/\">I\u0161bandykite SkyPlanner su demonstraciniais duomenimis<\/a> ir pamatykite, kaip tvarkara\u0161tyje u\u017esakymai derinami su turimais paj\u0117gumais.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Da\u017eniausiai u\u017eduodami klausimai<\/h2>\n\n\n<h3 class=\"wp-block-heading\">Ar gamyba pagal u\u017esakym\u0105 rei\u0161kia, kad kiekvienas gaminys projektuojamas individualiai?<\/h3>\n\n\n<p>Ne. Taikant MTO, gaminys gali b\u016bti gaminamas pagal jau parengt\u0105 projekt\u0105 ir technologin\u012f mar\u0161rut\u0105, ta\u010diau gamyba pradedama tik klientui pateikus u\u017esakym\u0105. Jei gavus u\u017esakym\u0105 taip pat pradedamas naujo gaminio projektavimas, tok\u012f model\u012f tiksliau vadinti projektavimu ir gamyba pagal u\u017esakym\u0105 (ETO).<\/p>\n\n\n<h3 class=\"wp-block-heading\">Ar pagal u\u017esakym\u0105 gaminanti \u012fmon\u0117 gali tur\u0117ti med\u017eiag\u0173 atsarg\u0173?<\/h3>\n\n\n<p>Taip. MTO nusako, kada pradedama gamyba, o ne draud\u017eia laikyti atsargas. \u012eprast\u0173 \u017ealiav\u0173 ir perkam\u0173 detali\u0173 atsargas galima kaupti, kad gamyb\u0105 b\u016bt\u0173 galima prad\u0117ti grei\u010diau. Galutinis gaminys gaminamas pagal kliento u\u017esakym\u0105, o ne pagal prognozuojam\u0105 gatav\u0173 gamini\u0173 paklaus\u0105.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Kod\u0117l gaminant pagal u\u017esakym\u0105 gali keistis pristatymo terminai?<\/h3>\n\n\n<p>Skirtingiems u\u017esakymams naudojami tie patys i\u0161tekliai. V\u0117luojan\u010dios med\u017eiagos, suma\u017e\u0117j\u0119 paj\u0117gumai ar pasikeit\u0119 prioritetai gali pastumti operacijos vykdymo laik\u0105 ir paveikti v\u0117lesnius darbus. Perskai\u010diavus tvarkara\u0161t\u012f, \u0161ios pasekm\u0117s tampa matomos, tod\u0117l planuotojas gali reaguoti ir prireikus atnaujinti klientams pa\u017ead\u0117tus terminus.<\/p>\n\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n\n<script type=\"application\/ld+json\">{\"@context\":\"https:\/\/schema.org\",\"@type\":\"FAQPage\",\"mainEntity\":[{\"@type\":\"Question\",\"name\":\"Does make to order mean every product is custom-designed?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"No. An MTO product can use an established design and production route, with manufacturing starting only after the customer places an order. If that order also triggers new product engineering, engineer to order is the more appropriate description.\"}},{\"@type\":\"Question\",\"name\":\"Can a make-to-order manufacturer keep materials in stock?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Yes. MTO describes when manufacturing is triggered, not a ban on inventory. Common raw materials and purchased parts can be stocked so production can start sooner. The finished product is made for a customer order rather than for forecast finished-goods demand.\"}},{\"@type\":\"Question\",\"name\":\"Why can make-to-order delivery dates change?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Orders share resources. A material delay, lost capacity or priority change can move an operation and affect later work. Recalculating the schedule makes those consequences visible so the planner can respond and update commitments when needed.\"}}]}<\/script>\n\n","protected":false},"excerpt":{"rendered":"<p>Gamyba pagal u\u017esakym\u0105: ma\u017eiau gatavos produkcijos atsarg\u0173, patikimesni pristatymo pa\u017eadai Prad\u017eia &raquo; I\u0161tekliai &raquo; Gamyba pagal u\u017esakym\u0105: ma\u017eiau gatavos produkcijos atsarg\u0173, patikimesni pristatymo pa\u017eadai Klientas u\u017esako tokio dyd\u017eio korpus\u0105, kok\u012f parduodate retai. Prad\u0117ti j\u012f gaminti tik gavus u\u017esakym\u0105 yra prasminga: taip sand\u0117lio neu\u017epildote gamini\u0173 variantais, kuriems galb\u016bt niekada neatsiras pirk\u0117jo. Ta\u010diau klientas vis tiek nori &#8230; <a title=\"Gamyba pagal u\u017esakym\u0105: ma\u017eiau gatavos produkcijos atsarg\u0173, patikimesni pristatymo pa\u017eadai\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/gamyba-pagal-uzsakyma\/\" aria-label=\"Read more about Gamyba pagal u\u017esakym\u0105: ma\u017eiau gatavos produkcijos atsarg\u0173, patikimesni pristatymo pa\u017eadai\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":97068,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2532,301],"tags":[],"class_list":["post-96591","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-ir-planavimas","category-istekliai","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Gamyba pagal u\u017esakym\u0105: ma\u017eiau atsarg\u0173, geresni pa\u017eadai &#8211; SkyPlanner<\/title>\n<meta name=\"description\" content=\"Gamyba pagal u\u017esakym\u0105 ma\u017eina gatavos produkcijos atsargas, bet kiekvienam u\u017esakymui reikia realios datos. SkyPlanner u\u017esakymus paver\u010dia \u012fgyvendinamu tvarkara\u0161\u010diu.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/gamyba-pagal-uzsakyma\/\" \/>\n<meta property=\"og:locale\" content=\"lt_LT\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Gamyba pagal u\u017esakym\u0105: ma\u017eiau gatavos produkcijos atsarg\u0173, patikimesni pristatymo pa\u017eadai\" \/>\n<meta property=\"og:description\" content=\"Gamyba pagal u\u017esakym\u0105 ma\u017eina gatavos produkcijos atsargas, bet kiekvienam u\u017esakymui reikia realios datos. SkyPlanner u\u017esakymus paver\u010dia \u012fgyvendinamu tvarkara\u0161\u010diu.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lt\/istekliai\/gamyba-pagal-uzsakyma\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-08T07:53:30+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-19T14:43:24+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"9 minut\u0117s\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/gamyba-pagal-uzsakyma\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/gamyba-pagal-uzsakyma\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Gamyba pagal u\u017esakym\u0105: ma\u017eiau gatavos produkcijos atsarg\u0173, patikimesni pristatymo pa\u017eadai\",\"datePublished\":\"2026-10-08T07:53:30+00:00\",\"dateModified\":\"2026-10-19T14:43:24+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/gamyba-pagal-uzsakyma\\\/\"},\"wordCount\":1886,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/gamyba-pagal-uzsakyma\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-make-to-order-hero.png\",\"articleSection\":[\"APS ir planavimas\",\"i\u0161tekliai\"],\"inLanguage\":\"lt-LT\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/gamyba-pagal-uzsakyma\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/gamyba-pagal-uzsakyma\\\/\",\"name\":\"Gamyba pagal u\u017esakym\u0105: ma\u017eiau atsarg\u0173, geresni pa\u017eadai &#8211; SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/gamyba-pagal-uzsakyma\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/gamyba-pagal-uzsakyma\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-make-to-order-hero.png\",\"datePublished\":\"2026-10-08T07:53:30+00:00\",\"dateModified\":\"2026-10-19T14:43:24+00:00\",\"description\":\"Gamyba pagal u\u017esakym\u0105 ma\u017eina gatavos produkcijos atsargas, bet kiekvienam u\u017esakymui reikia realios datos. SkyPlanner u\u017esakymus paver\u010dia \u012fgyvendinamu tvarkara\u0161\u010diu.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/gamyba-pagal-uzsakyma\\\/#breadcrumb\"},\"inLanguage\":\"lt-LT\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/gamyba-pagal-uzsakyma\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"lt-LT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/gamyba-pagal-uzsakyma\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-make-to-order-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-make-to-order-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"One custom housing waits while another occupies the finishing resource needed to complete both orders.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/gamyba-pagal-uzsakyma\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Gamyba pagal u\u017esakym\u0105: ma\u017eiau gatavos produkcijos atsarg\u0173, patikimesni pristatymo pa\u017eadai\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lt-LT\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lt-LT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lt-LT\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Gamyba pagal u\u017esakym\u0105: ma\u017eiau atsarg\u0173, geresni pa\u017eadai &#8211; SkyPlanner","description":"Gamyba pagal u\u017esakym\u0105 ma\u017eina gatavos produkcijos atsargas, bet kiekvienam u\u017esakymui reikia realios datos. SkyPlanner u\u017esakymus paver\u010dia \u012fgyvendinamu tvarkara\u0161\u010diu.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lt\/istekliai\/gamyba-pagal-uzsakyma\/","og_locale":"lt_LT","og_type":"article","og_title":"Gamyba pagal u\u017esakym\u0105: ma\u017eiau gatavos produkcijos atsarg\u0173, patikimesni pristatymo pa\u017eadai","og_description":"Gamyba pagal u\u017esakym\u0105 ma\u017eina gatavos produkcijos atsargas, bet kiekvienam u\u017esakymui reikia realios datos. SkyPlanner u\u017esakymus paver\u010dia \u012fgyvendinamu tvarkara\u0161\u010diu.","og_url":"https:\/\/skyplanner.ai\/lt\/istekliai\/gamyba-pagal-uzsakyma\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-08T07:53:30+00:00","article_modified_time":"2026-10-19T14:43:24+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Jussi M\u00e4ntyl\u00e4","Est. reading time":"9 minut\u0117s"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/gamyba-pagal-uzsakyma\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/gamyba-pagal-uzsakyma\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Gamyba pagal u\u017esakym\u0105: ma\u017eiau gatavos produkcijos atsarg\u0173, patikimesni pristatymo pa\u017eadai","datePublished":"2026-10-08T07:53:30+00:00","dateModified":"2026-10-19T14:43:24+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/gamyba-pagal-uzsakyma\/"},"wordCount":1886,"publisher":{"@id":"https:\/\/skyplanner.ai\/lt\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/gamyba-pagal-uzsakyma\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero.png","articleSection":["APS ir planavimas","i\u0161tekliai"],"inLanguage":"lt-LT"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/gamyba-pagal-uzsakyma\/","url":"https:\/\/skyplanner.ai\/lt\/istekliai\/gamyba-pagal-uzsakyma\/","name":"Gamyba pagal u\u017esakym\u0105: ma\u017eiau atsarg\u0173, geresni pa\u017eadai &#8211; SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lt\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/gamyba-pagal-uzsakyma\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/gamyba-pagal-uzsakyma\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero.png","datePublished":"2026-10-08T07:53:30+00:00","dateModified":"2026-10-19T14:43:24+00:00","description":"Gamyba pagal u\u017esakym\u0105 ma\u017eina gatavos produkcijos atsargas, bet kiekvienam u\u017esakymui reikia realios datos. SkyPlanner u\u017esakymus paver\u010dia \u012fgyvendinamu tvarkara\u0161\u010diu.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/gamyba-pagal-uzsakyma\/#breadcrumb"},"inLanguage":"lt-LT","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lt\/istekliai\/gamyba-pagal-uzsakyma\/"]}]},{"@type":"ImageObject","inLanguage":"lt-LT","@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/gamyba-pagal-uzsakyma\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero.png","width":1672,"height":941,"caption":"One custom housing waits while another occupies the finishing resource needed to complete both orders."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/gamyba-pagal-uzsakyma\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lt\/"},{"@type":"ListItem","position":2,"name":"Gamyba pagal u\u017esakym\u0105: ma\u017eiau gatavos produkcijos atsarg\u0173, patikimesni pristatymo pa\u017eadai"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lt\/#website","url":"https:\/\/skyplanner.ai\/lt\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lt\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lt\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lt-LT"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lt\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lt\/","logo":{"@type":"ImageObject","inLanguage":"lt-LT","@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"lt-LT","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lt\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Gamyba pagal u\u017esakym\u0105: ma\u017eiau gatavos produkcijos atsarg\u0173, patikimesni pristatymo pa\u017eadai Prad\u017eia &raquo; I\u0161tekliai &raquo; Gamyba pagal u\u017esakym\u0105: ma\u017eiau gatavos produkcijos atsarg\u0173, patikimesni pristatymo pa\u017eadai Klientas u\u017esako tokio dyd\u017eio korpus\u0105, kok\u012f parduodate retai. Prad\u0117ti j\u012f gaminti tik gavus u\u017esakym\u0105 yra prasminga: taip sand\u0117lio neu\u017epildote gamini\u0173 variantais, kuriems galb\u016bt niekada neatsiras pirk\u0117jo. Ta\u010diau klientas vis tiek nori&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/posts\/96591","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/comments?post=96591"}],"version-history":[{"count":2,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/posts\/96591\/revisions"}],"predecessor-version":[{"id":96894,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/posts\/96591\/revisions\/96894"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/media\/97068"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/media?parent=96591"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/categories?post=96591"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/tags?post=96591"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}