{"id":96562,"date":"2026-10-08T07:20:14","date_gmt":"2026-10-08T07:20:14","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=96562"},"modified":"2026-10-08T10:45:53","modified_gmt":"2026-10-08T10:45:53","slug":"smed","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/lt\/istekliai\/smed\/","title":{"rendered":"SMED: ma\u017einkite paruo\u0161imo laik\u0105 protingesne u\u017eduo\u010di\u0173 seka"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">SMED: ma\u017einkite paruo\u0161imo laik\u0105 protingesne u\u017eduo\u010di\u0173 seka<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/lt\/\">Prad\u017eia<\/a> &raquo; <a href=\"\/lt\/istekliai\/\">I\u0161tekliai<\/a> &raquo; SMED: ma\u017einkite paruo\u0161imo laik\u0105 protingesne u\u017eduo\u010di\u0173 seka<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Numatomas skaitymo laikas: <\/span><span class=\"yoast-reading-time__reading-time\">9<\/span><span class=\"yoast-reading-time__time-unit\"> minutes<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Turim\u0105 laik\u0105 ma\u0161ina gali skirti arba detal\u0117ms gaminti, arba pasiruo\u0161ti kitai u\u017eduo\u010diai. Kai perderinimai suryja per daug to laiko, svarb\u016bs du skirtingi klausimai: ar komanda gali sutrumpinti kiekvien\u0105 perderinim\u0105 ir ar planuotojas gali dalies pakeitim\u0173 i\u0161vengti geresne u\u017eduo\u010di\u0173 seka?<\/p>\n\n\n<p>Pirm\u0105j\u012f klausim\u0105 sprend\u017eia SMED, antr\u0105j\u012f \u2013 pana\u0161umu gr\u012fstas sekos sudarymas. Taikykite juos kartu, bet j\u0173 poveik\u012f matuokite atskirai, kad trumpesnio sustojimo nesupainiotum\u0117te su perderinimu, kurio i\u0161 viso nebereik\u0117jo.<\/p>\n\n\n<h2 class=\"wp-block-heading\">K\u0105 kei\u010dia SMED ir k\u0105 kei\u010dia u\u017eduo\u010di\u0173 seka<\/h2>\n\n\n<p>Gamyboje paruo\u0161imas, arba perderinimas, \u2013 tai \u012frangos parengimas pereiti nuo vieno gaminio ar detal\u0117s gamybos prie kito. Jis gali apimti \u012franki\u0173 keitim\u0105, \u012ftais\u0173 paruo\u0161im\u0105, nustatym\u0173 koregavim\u0105 ir kito gaminio gamybos i\u0161vedim\u0105 \u012f priimtin\u0105 lyg\u012f.<\/p>\n\n\n<p>SMED \u2013 tai Single-Minute Exchange of Die santrumpa. Lean Enterprise Institute apib\u016bdina j\u012f kaip perderinimo laiko ma\u017einimo metod\u0105: vidinis paruo\u0161imas atskiriamas nuo i\u0161orinio, o tinkami vidiniai veiksmai paver\u010diami i\u0161oriniu darbu. Pavadinimas nurodo viena\u017eenklio minu\u010di\u0173 skai\u010diaus tiksl\u0105, t. y. trumpiau nei 10 minu\u010di\u0173. Tai nerei\u0161kia, kad kiekvienas perderinimas trunka vien\u0105 minut\u0119, ir n\u0117ra garantuotas rezultatas.<\/p>\n\n\n<p>Praktinis skirtumas paprastas:<\/p>\n\n\n<ul class=\"wp-block-list\"><li>SMED sutrumpina darbus, kuri\u0173 reikia b\u016btinam perderinimui atlikti.<\/li><li>U\u017eduo\u010di\u0173 sekos sudarymas leid\u017eia i\u0161vengti pasikartojan\u010di\u0173 pasirinktos savyb\u0117s keitim\u0173, nes pana\u0161ios u\u017eduotys sudedamos greta.<\/li><\/ul>\n\n\n<p>Net gerai sudarytam tvarkara\u0161\u010diui vis tiek reikia tikr\u0173 perderinim\u0173. Reikia paruo\u0161ti \u012frankius, teisingai nustatyti \u012frang\u0105, o kitas gaminys turi atitikti kokyb\u0117s reikalavimus.<\/p>\n\n\n<h2 class=\"wp-block-heading\">I\u0161matuokite paruo\u0161imo laik\u0105 prie\u0161 keisdami proces\u0105<\/h2>\n\n\n<p>Prad\u0117kite nuo vieno pasikartojan\u010dio perderinimo, kur\u012f komanda gali steb\u0117ti nuo prad\u017eios iki pabaigos. Prie\u0161 spr\u0119sdami, kuriuos veiksmus keisti, u\u017efiksuokite dabartin\u012f metod\u0105.<\/p>\n\n\n<p>Naudokite nuosekli\u0105 matavimo rib\u0105. Vorne LeanProduction SMED vadove perderinimo laikas matuojamas nuo paskutin\u0117s geros ankstesnio gaminio detal\u0117s, pagamintos visu gamybos grei\u010diu, iki pirmos geros kito gaminio detal\u0117s, pagamintos visu gamybos grei\u010diu. Ma\u0161inos paleidimas dar nerei\u0161kia perderinimo pabaigos, jei priimtina gamyba dar nesugr\u012f\u017eo.<\/p>\n\n\n<p>Greta bendros trukm\u0117s u\u017efiksuokite:<\/p>\n\n\n<ul class=\"wp-block-list\"><li>kiekvien\u0105 veiksm\u0105, jo trukm\u0119 ir tai, kas j\u012f atlieka;<\/li><li>kitai u\u017eduo\u010diai reikalingus \u012frankius, med\u017eiagas ir \u012ftaisus;<\/li><li>laik\u0105, praleist\u0105 ie\u0161kant, laukiant, derinant ar taisant pirm\u0105sias detales;<\/li><li>veiksmus, kuriems reikia sustabdytos \u012frangos, ir veiksmus, kuriuos galima saugiai atlikti jai veikiant.<\/li><\/ul>\n\n\n<p>Nepamir\u0161kite i\u0161orinio paruo\u0161imo. Perk\u0117lus veiksm\u0105 u\u017e sustojimo rib\u0173, galima atlaisvinti ma\u0161inos laik\u0105, bet tam veiksmui reikalingas darbas nedingsta. Naudingas pradinis rodiklis skiria \u012frangos sustojim\u0105 nuo bendro komandos paruo\u0161imo darbo.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Taikykite SMED, kad sutrumpintum\u0117te kiekvien\u0105 perderinim\u0105<\/h2>\n\n\n<p>Perderinim\u0105 i\u0161nagrin\u0117kite kartu su j\u012f atliekan\u010diais \u017emon\u0117mis. Tikslas \u2013 pasikartojantis, saugus metodas, o ne greitesnis paleidimas, paliekantis kokyb\u0117s problem\u0173 kitam operatoriui.<\/p>\n\n\n<h3 class=\"wp-block-heading\">1. Atskirkite vidinius ir i\u0161orinius paruo\u0161imo veiksmus<\/h3>\n\n\n<p>Vidiniam paruo\u0161imui \u012franga turi b\u016bti sustabdyta. I\u0161orin\u012f paruo\u0161im\u0105 galima atlikti jai veikiant.<\/p>\n\n\n<p>Steb\u0117kite vis\u0105 perderinim\u0105 ir suskaidykite j\u012f \u012f atskirus veiksmus. Kiekvien\u0105 veiksm\u0105 klasifikuokite pagal tai, kam i\u0161 tikr\u0173j\u0173 reikia sustojimo, o ne manykite, kad viskas, kas dabar daroma sustojus, ten ir turi b\u016bti daroma.<\/p>\n\n\n<p>Pavyzd\u017eiui, kito \u012frankio paie\u0161ka \u0161iandien gali vykti jau sustojus ma\u0161inai. Tai neb\u016btinai rei\u0161kia, kad ie\u0161koti reikia sustabdytos ma\u0161inos. O sumontuoto \u012frankio nu\u0117mimui, prie\u0161ingai, gali reik\u0117ti sustabdyti \u012frang\u0105 ir u\u017etikrinti jos saugum\u0105.<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. Perkelkite tinkam\u0105 paruo\u0161im\u0105 u\u017e sustojimo rib\u0173<\/h3>\n\n\n<p>Kit\u0105 u\u017eduot\u012f paruo\u0161kite dar nebaigus einamosios, kai tai saugu ir prakti\u0161ka. LeanProduction vadove kaip b\u016bdai perkelti paruo\u0161im\u0105 u\u017e sustojimo rib\u0173 minimi \u012franki\u0173 ir med\u017eiag\u0173 surinkimas, detali\u0173 patikra ir papildomo \u012ftaiso paruo\u0161imas.<\/p>\n\n\n<p>Patikrinkite, ar reikiami daiktai yra vietoje ir paruo\u0161ti naudoti. Jei \u012ftais\u0105 galima paruo\u0161ti atskirai, \u012fvertinkite, ar taip suma\u017e\u0117ja darbo, atliekamo ma\u0161inai stovint.<\/p>\n\n\n<p>Neapeikite apsaug\u0173, izoliavimo proced\u016br\u0173 ar b\u016btin\u0173 kokyb\u0117s patikr\u0173. Veiksmas tinka i\u0161oriniam paruo\u0161imui tik tada, kai komanda gali j\u012f saugiai atlikti nesutrikdydama veikian\u010dios gamybos.<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. Supaprastinkite likus\u012f vidin\u012f darb\u0105<\/h3>\n\n\n<p>Per\u017ei\u016br\u0117kite veiksmus, kuriems vis dar reikia sustojimo. Pagerinkite \u012franki\u0173 prieinamum\u0105, standartizuokite sek\u0105 ir suma\u017einkite nereikaling\u0105 derinim\u0105. Tvirtinimo pakeitimus ar lygiagret\u0173 darb\u0105 vertinkite pagal gamyklos \u012frangos ir saugos reikalavimus.<\/p>\n\n\n<p>I\u0161bandykite pakeist\u0105 metod\u0105 atlikdami vis\u0105 perderinim\u0105, \u012fskaitant sugr\u012f\u017eim\u0105 \u012f priimtin\u0105 gamyb\u0105. Dokumentuokite sek\u0105, kad patobulinimas nepriklausyt\u0173 nuo to, ar vienas operatorius prisimena neformal\u0173 trumpesn\u012f keli\u0105.<\/p>\n\n\n<p>Matuokite dar kart\u0105 pagal t\u0105 pa\u010di\u0105 rib\u0105 kaip ir pradin\u012f rodikl\u012f. Steb\u0117jimus saugokite kartu su dokumentuotu metodu ir pagal juos atnaujinkite paruo\u0161imo laiko prielaidas gamybos planavime.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Ma\u017einkite i\u0161vengiamus perderinimus geresne u\u017eduo\u010di\u0173 seka<\/h2>\n\n\n<p>Kai ai\u0161ku, koki\u0173 perderinimo darb\u0173 b\u016btinai reikia, i\u0161nagrin\u0117kite, kokia tvarka u\u017eduotys patenka \u012f ma\u0161in\u0105. Pana\u0161umas gali priklausyti nuo med\u017eiagos, spalvos ar matmen\u0173, o ne vien nuo bendro gaminio kodo.<\/p>\n\n\n<p>Pavyzd\u017eiui, imkime u\u017eduotis, kuriose kaitaliojamos dvi med\u017eiagos. Sugrupavus vienos med\u017eiagos u\u017eduotis, o po j\u0173 \u2013 kitos, galima i\u0161vengti pasikartojan\u010di\u0173 med\u017eiag\u0173 keitim\u0173. Tai sekos sudarymo pavyzdys, o ne kliento rezultatas ar pa\u017eadas, kad visi paruo\u0161imai i\u0161nyks.<\/p>\n\n\n<p>Pasirinkite pana\u0161umo savyb\u0119, kuri tame darbo centre tikrai veikia paruo\u0161im\u0105. Dvi tos pa\u010dios med\u017eiagos u\u017eduotys vis tiek gali reikalauti skirting\u0173 \u012franki\u0173 ar nustatym\u0173. Sugrupavus jas, kiti perderinimo darb\u0173 \u0161altiniai nedingsta.<\/p>\n\n\n<p>Tod\u0117l SMED ir sekos sudarymui reikia skirting\u0173 rodikli\u0173. Trumpesnis atskiras sustojimas rodo perderinimo metodo patobulinim\u0105. Re\u010diau kei\u010diama pasirinkta savyb\u0117 rodo sekos patobulinim\u0105. Abu gali pad\u0117ti, bet nei vienas atskirai ne\u012frodo, kad visas gamybos planas yra geresnis.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Sprend\u017eiant neu\u017emir\u0161kite termin\u0173 ir realiai turim\u0173 paj\u0117gum\u0173<\/h2>\n\n\n<p>Ilga pana\u0161i\u0173 u\u017eduo\u010di\u0173 serija gali sutaupyti paruo\u0161imo laiko ir vis tiek b\u016bti klaidingas gamybos sprendimas. Ji gali nustumti skub\u0173 u\u017esakym\u0105 atgal arba priklausyti nuo med\u017eiagos, kurios nebus, kai serija tur\u0117s prasid\u0117ti.<\/p>\n\n\n<p>Palyginkite galim\u0105 paruo\u0161imo laiko naud\u0105 su <a href=\"\/lt\/istekliai\/gamyba-pagal-uzsakyma\/\">u\u017esakym\u0173 \u012fvykdymo terminais<\/a>, med\u017eiag\u0173 prieinamumu ir realiai panaudojamais darbo centr\u0173 paj\u0117gumais. Prie\u0161 keisdami eil\u0117s tvark\u0105, nuspr\u0119skite, kurie prioritetai svarb\u016bs esamai apkrovai.<\/p>\n\n\n<p>SkyPlanner Dynamic Priorities apima tokius veiksnius kaip u\u017esakymo \u012fvykdymo laikas, \u012fvykdymo data, kliento svarba ir trukm\u0117. Prioritetus nustato planuotojai; dirbtinis intelektas, sudarydamas tvarkara\u0161t\u012f, j\u0173 laikosi. Pana\u0161umas yra planavimo pageidavimas, kur\u012f reikia suderinti su likusia gamyba, o ne nurodymas sugrupuoti kiekvien\u0105 pana\u0161i\u0105 u\u017eduot\u012f nepaisant pasekmi\u0173.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Nustatykite pana\u0161umu gr\u012fst\u0105 sekos sudarym\u0105 SkyPlanner<\/h2>\n\n\n<p>SkyPlanner leid\u017eia grupuoti u\u017eduotis pagal darbo centro savyb\u0119, pavyzd\u017eiui, spalv\u0105, matmenis ar med\u017eiag\u0105. Dokumentuoti pana\u0161umo nustatymai apjungia savyb\u0117s pasirinkim\u0105, skirting\u0173 u\u017eduo\u010di\u0173 paruo\u0161imo laik\u0105 ir prioriteto svor\u012f i\u0161 eil\u0117s einan\u010dioms pana\u0161ioms u\u017eduotims.<\/p>\n\n\n<p>\u0160\u012f b\u016bd\u0105 nustatykite taip:<\/p>\n\n\n<p>1. Suteikite veiksniui \u201eAllow similar jobs\u201c svarb\u0105 skiltyje \u201eDynamic Priorities\u201c.<\/p>\n\n\n<p>2. Atidarykite darbo centro nustatymus ir \u012fjunkite \u201eAllow similarity\u201c.<\/p>\n\n\n<p>3. Laukelyje \u201eSetup time for differing jobs (min)\u201c nurodykite laik\u0105, reikaling\u0105 pereiti tarp skirting\u0173 savybi\u0173.<\/p>\n\n\n<p>4. Laukelyje \u201eType of similar jobs\u201c pasirinkite savyb\u0119.<\/p>\n\n\n<p>5. Nustatykite prioriteto svor\u012f \u201eSimilar jobs in succession\u201c.<\/p>\n\n\n<p>6. I\u0161saugokite nustatymus ir perskai\u010diuokite tvarkara\u0161t\u012f.<\/p>\n\n\n<p>Naudokite i\u0161matuot\u0105 paruo\u0161imo laiko prielaid\u0105, atitinkan\u010di\u0105 darbo centr\u0105 ir pasirinkt\u0105 savyb\u0119. \u0160is nustatymas padeda sudaryti sek\u0105 atsi\u017evelgiant \u012f paruo\u0161im\u0105, bet nepagreitina fizinio \u012frankio ar med\u017eiagos keitimo. \u0160io darbo gerinimas ir toliau priklauso nuo perderinimo metodo bei gamybos komandos.<\/p>\n\n\n<p>Sutaupytas paruo\u0161imo laikas turi der\u0117ti su likusiu planu. SkyPlanner <a href=\"\/lt\/\">gamybos tvarkara\u0161\u010di\u0173 sudarymo programa<\/a> gamybos tvarkara\u0161t\u012f sudaro pagal j\u016bs\u0173 nustatytus prioritetus. SkyPlanner per atvir\u0105 REST API integruojasi su bet kuria ERP ar MES sistema, tod\u0117l integracija gali <a href=\"\/lt\/istekliai\/kas-yra-gamybos-planavimas\/\">susieti gamybos tvarkara\u0161\u010di\u0173 sudarym\u0105<\/a> su sistemomis, kuriose saugomi j\u016bs\u0173 gamybos duomenys.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Patikrinkite, ar naujas planas gerina gamyb\u0105<\/h2>\n\n\n<p>Pakeit\u0119 metod\u0105 ar sek\u0105, palyginkite faktin\u012f perderinim\u0173 skai\u010di\u0173 ir j\u0173 sunaudojam\u0105 gamybos sustojimo laik\u0105 pana\u0161ios apkrovos laikotarpiais. Taip pat patikrinkite u\u017esakym\u0173 \u012fvykdym\u0105 ir sugr\u012f\u017eim\u0105 \u012f priimtin\u0105 gamyb\u0105 po kiekvieno perderinimo.<\/p>\n\n\n<p>U\u017eduokite tris klausimus:<\/p>\n\n\n<ul class=\"wp-block-list\"><li>Ar b\u016btini perderinimai sutrump\u0117jo, taikant t\u0105 pa\u010di\u0105 matavimo rib\u0105?<\/li><li>Ar nauja seka leido i\u0161vengti pasirinktos savyb\u0117s keitim\u0173?<\/li><li>Ar plane i\u0161laikyta reikiama pusiausvyra tarp \u012fvykdymo dat\u0173, turim\u0173 med\u017eiag\u0173 ir paj\u0117gum\u0173?<\/li><\/ul>\n\n\n<p>Ma\u017eiau perderinim\u0173 nepakanka, jei u\u017esakymai tiesiog v\u0117luoja arba blog\u0117ja paleidimo kokyb\u0117. Pakeist\u0105 metod\u0105 laikykite dokumentuot\u0105, o planavime naudojam\u0105 paruo\u0161imo laik\u0105 atnaujinkite ger\u0117jant matavimams. Tai gamybos vertinimo procesas, o ne teiginys, kad SkyPlanner automati\u0161kai matuoja perderinimo laik\u0105.<\/p>\n\n\n<p>Nor\u0117dami aptarti pana\u0161umu gr\u012fst\u0105 tvarkara\u0161\u010di\u0173 sudarym\u0105 savo gamyboje, <a href=\"\/lt\/susisiekite-su-pardavejais\/\">u\u017esisakykite demonstracij\u0105<\/a>. Atsine\u0161kite savyb\u0119, d\u0117l kurios tenka keisti nustatymus, i\u0161matuot\u0105 perderinimo laik\u0105 ir svarbiausius \u012fvykdymo dat\u0173 prioritetus.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Da\u017enai u\u017eduodami klausimai<\/h2>\n\n\n<h3 class=\"wp-block-heading\">Kas yra SMED gamyboje?<\/h3>\n\n\n<p>SMED \u2013 tai \u012frangos perderinimo laiko ma\u017einimo metodas. Jis atskiria vidinius veiksmus, kuriems reikia sustabdytos \u012frangos, nuo i\u0161orini\u0173, kuriuos galima atlikti \u012frangai veikiant. Komanda perkelia tinkam\u0105 paruo\u0161im\u0105 u\u017e sustojimo rib\u0173 ir supaprastina likus\u012f darb\u0105.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Ar SMED rei\u0161kia, kad kiekvienas perderinimas trunka vien\u0105 minut\u0119?<\/h3>\n\n\n<p>Ne. Single-Minute Exchange of Die rei\u0161kia viena\u017eenklio minu\u010di\u0173 skai\u010diaus tiksl\u0105, t. y. trumpiau nei 10 minu\u010di\u0173. Jis ne\u017eada vienos minut\u0117s perderinimo ir negarantuoja, kad kiekvienas procesas \u0161\u012f tiksl\u0105 pasieks.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Kaip matuoti paruo\u0161imo ar perderinimo laik\u0105?<\/h3>\n\n\n<p>Visada taikykite t\u0105 pa\u010di\u0105 matavimo rib\u0105: nuo paskutin\u0117s geros ankstesnio gaminio detal\u0117s, pagamintos visu gamybos grei\u010diu, iki pirmos geros kito gaminio detal\u0117s, pagamintos visu gamybos grei\u010diu. Fiksuokite ne tik bendr\u0105 trukm\u0119, bet ir atskir\u0173 darb\u0173 laik\u0105. Nebaikite matuoti paleidus ma\u0161in\u0105, jei dar negaminama tinkama produkcija.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Kuo skiriasi vidinis ir i\u0161orinis paruo\u0161imas?<\/h3>\n\n\n<p>Vidin\u012f paruo\u0161im\u0105 galima atlikti tik sustabd\u017eius \u012frang\u0105. I\u0161orin\u012f paruo\u0161im\u0105 galima atlikti jai veikiant. Perkeliant paruo\u0161imo darbus u\u017e sustojimo laiko rib\u0173, b\u016btina laikytis \u012frangos saugos reikalavim\u0173 ir neapeiti reikiam\u0173 kokyb\u0117s patikr\u0173.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Ar u\u017eduo\u010di\u0173 sekos planavimas gali pakeisti SMED?<\/h3>\n\n\n<p>Ne. Sugrupavus pana\u0161ias u\u017eduotis, sekos planavimas gali pad\u0117ti i\u0161vengti dalies pasikartojan\u010di\u0173 savyb\u0117s keitim\u0173. SMED gerina fizin\u012f likusi\u0173 perderinim\u0173 darb\u0105. Abu metodai turi der\u0117ti su gamybos planu.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Kaip SkyPlanner padeda suma\u017einti nereikalingus paruo\u0161imus?<\/h3>\n\n\n<p>Naudodami SkyPlanner planuotojai gali pasirinkti darbo centro pana\u0161umo savyb\u0119, nustatyti skirting\u0173 u\u017eduo\u010di\u0173 paruo\u0161imo laik\u0105 ir prioritetuose suteikti svor\u012f i\u0161 eil\u0117s einan\u010dioms pana\u0161ioms u\u017eduotims. Tai padeda planuoti u\u017eduo\u010di\u0173 sek\u0105 atsi\u017evelgiant \u012f paruo\u0161im\u0105. Pats savaime ma\u0161inos fizini\u0173 perderinimo darb\u0173 jis netrumpina.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Ar pana\u0161ias u\u017eduotis visada reikia vykdyti i\u0161 eil\u0117s?<\/h3>\n\n\n<p>Ne. Planuotojai taip pat turi atsi\u017evelgti \u012f \u012fvykdymo terminus, med\u017eiagas ir paj\u0117gumus. Pana\u0161ias u\u017eduotis verta grupuoti tada, kai paruo\u0161imo nauda dera su \u0161iais prioritetais ir d\u0117l to nereikia atid\u0117ti svarbesni\u0173 darb\u0173.<\/p>\n\n<\/div>\n<\/div>\n\n<script type=\"application\/ld+json\">{\"@context\":\"https:\/\/schema.org\",\"@type\":\"FAQPage\",\"mainEntity\":[{\"@type\":\"Question\",\"name\":\"What is SMED in manufacturing?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"SMED is a method for reducing equipment changeover time. It separates internal tasks, which require stopped equipment, from external tasks, which can happen while equipment runs. The team moves suitable preparation outside the stoppage and simplifies the remaining work.\"}},{\"@type\":\"Question\",\"name\":\"Does SMED mean every changeover takes one minute?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"No. Single-Minute Exchange of Die refers to a target of single-digit minutes, or less than 10 minutes. It does not promise a one-minute changeover or guarantee that every process reaches that target.\"}},{\"@type\":\"Question\",\"name\":\"How do you measure setup or changeover time?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Use a consistent boundary from the last good part of the previous product at full production speed to the first good part of the next product at full production speed. Record the individual tasks as well as the total time. Do not stop measuring at machine restart if acceptable production has not returned.\"}},{\"@type\":\"Question\",\"name\":\"What is the difference between internal and external setup?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Internal setup requires the equipment to be stopped. External setup can be performed while it runs. Moving preparation outside the stoppage must respect the equipment's safety requirements and must not bypass necessary quality checks.\"}},{\"@type\":\"Question\",\"name\":\"Can job sequencing replace SMED?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"No. Sequencing can avoid some repeated property changes by grouping similar jobs. SMED improves the physical work of the changeovers that remain. Both need to fit the production plan.\"}},{\"@type\":\"Question\",\"name\":\"How does SkyPlanner help reduce unnecessary setups?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"SkyPlanner lets planners select a similarity property at a workstation, define setup time for differing jobs and weight consecutive similar jobs in the priorities. This supports setup-aware job sequencing. It does not shorten the machine's physical changeover work by itself.\"}},{\"@type\":\"Question\",\"name\":\"Should similar jobs always run together?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"No. Planners also need to consider completion dates, materials and capacity. Grouping similar jobs is useful when its preparation benefit fits those priorities, rather than delaying more important work.\"}}]}<\/script>\n\n","protected":false},"excerpt":{"rendered":"<p>SMED: ma\u017einkite paruo\u0161imo laik\u0105 protingesne u\u017eduo\u010di\u0173 seka Prad\u017eia &raquo; I\u0161tekliai &raquo; SMED: ma\u017einkite paruo\u0161imo laik\u0105 protingesne u\u017eduo\u010di\u0173 seka Turim\u0105 laik\u0105 ma\u0161ina gali skirti arba detal\u0117ms gaminti, arba pasiruo\u0161ti kitai u\u017eduo\u010diai. Kai perderinimai suryja per daug to laiko, svarb\u016bs du skirtingi klausimai: ar komanda gali sutrumpinti kiekvien\u0105 perderinim\u0105 ir ar planuotojas gali dalies pakeitim\u0173 i\u0161vengti geresne &#8230; <a title=\"SMED: ma\u017einkite paruo\u0161imo laik\u0105 protingesne u\u017eduo\u010di\u0173 seka\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/smed\/\" aria-label=\"Read more about SMED: ma\u017einkite paruo\u0161imo laik\u0105 protingesne u\u017eduo\u010di\u0173 seka\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":97039,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2532,301],"tags":[],"class_list":["post-96562","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-scheduling","category-istekliai","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.3) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>SMED: ma\u017einkite paruo\u0161imo laik\u0105 protingesne seka &#8211; SkyPlanner<\/title>\n<meta name=\"description\" content=\"Ma\u017einkite paruo\u0161imo laik\u0105 su SMED, grupuokite pana\u0161ias u\u017eduotis ir venkite nereikaling\u0173 perderinim\u0173. SkyPlanner padeda tai \u012ftraukti \u012f gamybos tvarkara\u0161t\u012f.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/smed\/\" \/>\n<meta property=\"og:locale\" content=\"lt_LT\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SMED: ma\u017einkite paruo\u0161imo laik\u0105 protingesne u\u017eduo\u010di\u0173 seka\" \/>\n<meta property=\"og:description\" content=\"Ma\u017einkite paruo\u0161imo laik\u0105 su SMED, grupuokite pana\u0161ias u\u017eduotis ir venkite nereikaling\u0173 perderinim\u0173. SkyPlanner padeda tai \u012ftraukti \u012f gamybos tvarkara\u0161t\u012f.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lt\/istekliai\/smed\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-08T07:20:14+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-08T10:45:53+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"9 minut\u0117s\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/smed\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/smed\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"SMED: ma\u017einkite paruo\u0161imo laik\u0105 protingesne u\u017eduo\u010di\u0173 seka\",\"datePublished\":\"2026-10-08T07:20:14+00:00\",\"dateModified\":\"2026-10-08T10:45:53+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/smed\\\/\"},\"wordCount\":1797,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/smed\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-setup-time-hero.png\",\"articleSection\":[\"APS &amp; Scheduling\",\"i\u0161tekliai\"],\"inLanguage\":\"lt-LT\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/smed\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/smed\\\/\",\"name\":\"SMED: ma\u017einkite paruo\u0161imo laik\u0105 protingesne seka &#8211; SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/smed\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/smed\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-setup-time-hero.png\",\"datePublished\":\"2026-10-08T07:20:14+00:00\",\"dateModified\":\"2026-10-08T10:45:53+00:00\",\"description\":\"Ma\u017einkite paruo\u0161imo laik\u0105 su SMED, grupuokite pana\u0161ias u\u017eduotis ir venkite nereikaling\u0173 perderinim\u0173. SkyPlanner padeda tai \u012ftraukti \u012f gamybos tvarkara\u0161t\u012f.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/smed\\\/#breadcrumb\"},\"inLanguage\":\"lt-LT\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/smed\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"lt-LT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/smed\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-setup-time-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-setup-time-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"Machining fixtures and a wrench prepared beside a workbench for a production changeover.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/smed\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"SMED: ma\u017einkite paruo\u0161imo laik\u0105 protingesne u\u017eduo\u010di\u0173 seka\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lt-LT\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lt-LT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skyplanner-aps\\\/\",\"https:\\\/\\\/www.youtube.com\\\/@SkyPlannerAPS\",\"https:\\\/\\\/www.capterra.com\\\/p\\\/265911\\\/SkyPlanner-APS\\\/\",\"https:\\\/\\\/www.trustradius.com\\\/products\\\/skyplanner-aps\\\/reviews\",\"https:\\\/\\\/www.saasworthy.com\\\/product\\\/skyplanner-aps\",\"https:\\\/\\\/sourceforge.net\\\/software\\\/product\\\/SkyPlanner-APS\\\/\",\"https:\\\/\\\/www.g2.com\\\/products\\\/skyplanner-aps\\\/\",\"https:\\\/\\\/www.getapp.com\\\/project-management-planning-software\\\/a\\\/skyplanner-aps\\\/\",\"https:\\\/\\\/www.softwareadvice.com\\\/cmms\\\/skyplanner-aps-profile\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lt-LT\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"SMED: ma\u017einkite paruo\u0161imo laik\u0105 protingesne seka &#8211; SkyPlanner","description":"Ma\u017einkite paruo\u0161imo laik\u0105 su SMED, grupuokite pana\u0161ias u\u017eduotis ir venkite nereikaling\u0173 perderinim\u0173. SkyPlanner padeda tai \u012ftraukti \u012f gamybos tvarkara\u0161t\u012f.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lt\/istekliai\/smed\/","og_locale":"lt_LT","og_type":"article","og_title":"SMED: ma\u017einkite paruo\u0161imo laik\u0105 protingesne u\u017eduo\u010di\u0173 seka","og_description":"Ma\u017einkite paruo\u0161imo laik\u0105 su SMED, grupuokite pana\u0161ias u\u017eduotis ir venkite nereikaling\u0173 perderinim\u0173. SkyPlanner padeda tai \u012ftraukti \u012f gamybos tvarkara\u0161t\u012f.","og_url":"https:\/\/skyplanner.ai\/lt\/istekliai\/smed\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-08T07:20:14+00:00","article_modified_time":"2026-10-08T10:45:53+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Jussi M\u00e4ntyl\u00e4","Est. reading time":"9 minut\u0117s"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/smed\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/smed\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"SMED: ma\u017einkite paruo\u0161imo laik\u0105 protingesne u\u017eduo\u010di\u0173 seka","datePublished":"2026-10-08T07:20:14+00:00","dateModified":"2026-10-08T10:45:53+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/smed\/"},"wordCount":1797,"publisher":{"@id":"https:\/\/skyplanner.ai\/lt\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/smed\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero.png","articleSection":["APS &amp; Scheduling","i\u0161tekliai"],"inLanguage":"lt-LT"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/smed\/","url":"https:\/\/skyplanner.ai\/lt\/istekliai\/smed\/","name":"SMED: ma\u017einkite paruo\u0161imo laik\u0105 protingesne seka &#8211; SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lt\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/smed\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/smed\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero.png","datePublished":"2026-10-08T07:20:14+00:00","dateModified":"2026-10-08T10:45:53+00:00","description":"Ma\u017einkite paruo\u0161imo laik\u0105 su SMED, grupuokite pana\u0161ias u\u017eduotis ir venkite nereikaling\u0173 perderinim\u0173. SkyPlanner padeda tai \u012ftraukti \u012f gamybos tvarkara\u0161t\u012f.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/smed\/#breadcrumb"},"inLanguage":"lt-LT","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lt\/istekliai\/smed\/"]}]},{"@type":"ImageObject","inLanguage":"lt-LT","@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/smed\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero.png","width":1672,"height":941,"caption":"Machining fixtures and a wrench prepared beside a workbench for a production changeover."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/smed\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lt\/"},{"@type":"ListItem","position":2,"name":"SMED: ma\u017einkite paruo\u0161imo laik\u0105 protingesne u\u017eduo\u010di\u0173 seka"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lt\/#website","url":"https:\/\/skyplanner.ai\/lt\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lt\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lt\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lt-LT"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lt\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lt\/","logo":{"@type":"ImageObject","inLanguage":"lt-LT","@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882","https:\/\/www.linkedin.com\/company\/skyplanner-aps\/","https:\/\/www.youtube.com\/@SkyPlannerAPS","https:\/\/www.capterra.com\/p\/265911\/SkyPlanner-APS\/","https:\/\/www.trustradius.com\/products\/skyplanner-aps\/reviews","https:\/\/www.saasworthy.com\/product\/skyplanner-aps","https:\/\/sourceforge.net\/software\/product\/SkyPlanner-APS\/","https:\/\/www.g2.com\/products\/skyplanner-aps\/","https:\/\/www.getapp.com\/project-management-planning-software\/a\/skyplanner-aps\/","https:\/\/www.softwareadvice.com\/cmms\/skyplanner-aps-profile\/"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"lt-LT","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lt\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"SMED: ma\u017einkite paruo\u0161imo laik\u0105 protingesne u\u017eduo\u010di\u0173 seka Prad\u017eia &raquo; I\u0161tekliai &raquo; SMED: ma\u017einkite paruo\u0161imo laik\u0105 protingesne u\u017eduo\u010di\u0173 seka Turim\u0105 laik\u0105 ma\u0161ina gali skirti arba detal\u0117ms gaminti, arba pasiruo\u0161ti kitai u\u017eduo\u010diai. Kai perderinimai suryja per daug to laiko, svarb\u016bs du skirtingi klausimai: ar komanda gali sutrumpinti kiekvien\u0105 perderinim\u0105 ir ar planuotojas gali dalies pakeitim\u0173 i\u0161vengti geresne&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/posts\/96562","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/comments?post=96562"}],"version-history":[{"count":2,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/posts\/96562\/revisions"}],"predecessor-version":[{"id":96761,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/posts\/96562\/revisions\/96761"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/media\/97039"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/media?parent=96562"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/categories?post=96562"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/tags?post=96562"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}