{"id":96097,"date":"2026-10-04T04:30:32","date_gmt":"2026-10-04T04:30:32","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=96097"},"modified":"2026-10-19T14:42:42","modified_gmt":"2026-10-19T14:42:42","slug":"gamybos-plano-sablonas","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/lt\/istekliai\/gamybos-plano-sablonas\/","title":{"rendered":"Gamybos plano \u0161ablonas: kaip sutalpinti darbus \u012f tvarkara\u0161t\u012f"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Gamybos plano \u0161ablonas: kaip sutalpinti darbus \u012f tvarkara\u0161t\u012f<\/h1>\n\n\n<p>Gamybos plano \u0161ablone kiekvienam u\u017esakymui atsiranda vieta lape. Sunkiau atsakyti, ar jam yra vietos gamykloje: ar tuo metu laisvos tinkamos stakl\u0117s ir reikiamas operatorius, ar darb\u0105 pavyks atlikti pakankamai anksti, kad likt\u0173 laiko kitai operacijai ir pristatymui klientui.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-template.csv\">Atsisi\u0173skite gamybos plano \u0161ablon\u0105 (CSV failas, skirtas Excel)<\/a>. Tai paprastas gamybos pavyzdys, kur\u012f galite pritaikyti savo darbui: kiekvienai operacijai skirta atskira eilut\u0117. Toliau pateiktoje lentel\u0117je matomos dvi pavyzdin\u0117s u\u017eduotys, o faile nurodytas ne tik laikas, bet ir visa data.<\/p>\n\n\n<figure class=\"wp-block-table\"><table>\n<thead>\n<tr>\n<th>U\u017esakymas \/ operacija<\/th>\n<th>Stakl\u0117s \/ operatorius<\/th>\n<th style=\"text-align: right;\">Derinimas, min<\/th>\n<th style=\"text-align: right;\">Apdorojimas, min<\/th>\n<th>Prad\u017eia<\/th>\n<th>Pabaiga<\/th>\n<th>Terminas<\/th>\n<th>B\u016bsena<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>A \/ A-10<\/td>\n<td>M1 \/ O1<\/td>\n<td style=\"text-align: right;\">30<\/td>\n<td style=\"text-align: right;\">120<\/td>\n<td>08:00<\/td>\n<td>10:30<\/td>\n<td>12:00<\/td>\n<td>Suplanuota<\/td>\n<\/tr>\n<tr>\n<td>B \/ B-10<\/td>\n<td>M1 \/ O1<\/td>\n<td style=\"text-align: right;\">15<\/td>\n<td style=\"text-align: right;\">180<\/td>\n<td>10:30<\/td>\n<td>13:45<\/td>\n<td>16:00<\/td>\n<td>Suplanuota<\/td>\n<\/tr>\n<\/tbody>\n<\/table><\/figure>\n\n\n<p>\u0160is \u0161ablonas pad\u0117s suprasti, koki\u0173 pradini\u0173 duomen\u0173 reikia, ir i\u0161bandyti paprast\u0105 darb\u0173 sek\u0105. Jei gamybos planas turi i\u0161likti naudingas atsirandant naujiems u\u017esakymams, v\u0117luojant darbams ir kei\u010diantis paj\u0117gumams, tvarkara\u0161\u010diui apskai\u010diuoti naudokite SkyPlanner APS. Skai\u010diuokl\u0117je galite parodyti pasirinkt\u0105 darb\u0173 prad\u017eios laik\u0105, o SkyPlanner sud\u0117lioja operacijas pagal turimus paj\u0117gumus.<\/p>\n\n\n<h2 class=\"wp-block-heading\">K\u0105 tur\u0117t\u0173 parodyti gamybos plano \u0161ablonas?<\/h2>\n\n\n<p>Gamybos tvarkara\u0161tyje nurodoma, kokie darbai, kada ir kokiais i\u0161tekliais bus atliekami. Kiekvienai operacijai jis tur\u0117t\u0173 atsakyti \u012f keturis klausimus:<\/p>\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Kas bus atliekama?<\/strong> Nurodykite u\u017esakym\u0105 ir konkre\u010di\u0105 operacij\u0105, ne vien gaminio pavadinim\u0105.<\/li>\n<li><strong>Kur galima atlikti darb\u0105?<\/strong> Nurodykite stakles arba darbo centr\u0105 ir darbui reikalingus \u017emones.<\/li>\n<li><strong>Kada galima atlikti darb\u0105?<\/strong> Atsi\u017evelkite \u012f derinimo ir apdorojimo trukm\u0119, darbo laikotarpius ir visk\u0105, kas turi b\u016bti paruo\u0161ta i\u0161 anksto.<\/li>\n<li><strong>Ar darbas bus baigtas laiku?<\/strong> Palyginkite gaut\u0105 pabaigos laik\u0105 su operacijos u\u017ebaigimo terminu ir \u012fvertinkite iki i\u0161siuntimo likusius darbus.<\/li>\n<\/ul>\n\n\n<p>\u0160is paskutinis skirtumas svarbus. Baigta mechaninio apdorojimo operacija dar nerei\u0161kia, kad u\u017esakym\u0105 galima i\u0161si\u0173sti, jei po jos dar reikia surinkti, patikrinti ar supakuoti gamin\u012f. Kiekvienai operacijai nustatykite tok\u012f u\u017ebaigimo termin\u0105, kad likt\u0173 laiko v\u0117lesniems darbams.<\/p>\n\n\n<p>Savaitinis gamybos kieki\u0173 planas naudingas, ta\u010diau jis atsako \u012f kit\u0105 klausim\u0105. <a href=\"\/lt\/istekliai\/master-production-schedule\/\">Pagrindiniame gamybos plane<\/a> nurodoma, koki\u0173 gatav\u0173 gamini\u0173 ir kada reikia. \u0160is \u0161ablonas skirtas \u017eemesniam planavimo lygmeniui \u2013 konkre\u010dioms operacijoms, kurioms reikia t\u0173 pa\u010di\u0173 stakli\u0173 ir operatori\u0173 laiko. <a href=\"\/lt\/istekliai\/kas-yra-gamybos-planavimas\/\">Gamybos tvarkara\u0161\u010di\u0173 sudarymo vadove<\/a> paai\u0161kinama, kaip i\u0161 \u0161i\u0173 pradini\u0173 duomen\u0173 sudaroma \u012fgyvendinama darb\u0173 seka.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Vertinkite pavyzd\u012f kaip paj\u0117gum\u0173 rezervavim\u0105<\/h2>\n\n\n<p>\u012esivaizduokite cech\u0105, kuriame dvi u\u017eduotys laukia t\u0173 pa\u010di\u0173 stakli\u0173 M1 ir to paties operatoriaus O1. Med\u017eiagos abiem u\u017eduotims paruo\u0161tos. Stakl\u0117s ir operatorius gali dirbti be pertraukos nuo 08:00 iki 16:00, o prie\u0161 abi operacijas einantys darbai jau baigti.<\/p>\n\n\n<p>U\u017eduo\u010diai A rezervuojama 30 minu\u010di\u0173 derinimui ir 120 minu\u010di\u0173 apdorojimui. Iki 10:30 \u0161ie i\u0161tekliai u\u017eimti. Tada u\u017eduo\u010diai B rezervuojama 15 minu\u010di\u0173 derinimui ir 180 minu\u010di\u0173 apdorojimui; ji baigiama 13:45. U\u017eduo\u010di\u0173 laikas nesutampa, ir abi baigiamos iki nurodyt\u0173 termin\u0173.<\/p>\n\n\n<p>Tokia seka \u012fgyvendinama, nes tenkinamos jos prielaidos. Jei 11:00 operatoriaus O1 reikia prie kit\u0173 stakli\u0173, B eilut\u0117je nurodyto paskyrimo \u012fvykdyti nebe\u012fmanoma, nors M1 teb\u0117ra laisvos. Jei numatyta piet\u0173 pertrauka, nebelieka vientiso darbo laikotarpio. Jei tai tarpin\u0117s operacijos, v\u0117lesniems etapams taip pat reik\u0117s atskir\u0173 paj\u0117gum\u0173.<\/p>\n\n\n<p>Lentel\u0117s vert\u0117 slypi ne jos spalvose. Svarbu tai, kad kiekviena eilut\u0117 rezervuoja dal\u012f laiko, kuriuo atitinkamas i\u0161teklius gali dirbti.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Pritaikykite \u0161ablon\u0105 nepamir\u0161dami apribojim\u0173<\/h2>\n\n\n<p>Atidarykite CSV fail\u0105 programoje Excel ir i\u0161saugokite darbin\u0119 kopij\u0105 kaip Excel darbaknyg\u0119. Jei visi duomenys rodomi viename stulpelyje, importuodami fail\u0105 pasirinkite kablel\u012f kaip skirtuk\u0105. Atsisi\u0173stame CSV faile pateiktos pavyzdin\u0117s reik\u0161m\u0117s, o ne automatinis tvarkara\u0161\u010dio sudarymo modelis.<\/p>\n\n\n<p>Pavyzdyje naudojama <strong>2026 m. spalio 5 d.<\/strong> data. Pakeiskite j\u0105 tikrosiomis darbo datomis ir patikrinkite, ar stulpeliuose \u201ePrad\u017eia\u201c, \u201ePabaiga\u201c ir \u201eTerminas\u201c \u012fra\u0161ytos tikros skai\u010diuokl\u0117s datos ir laiko reik\u0161m\u0117s, o ne importuotas tekstas. Rodykite ir dat\u0105, ir laik\u0105, kitaip rytojaus 08:00 gali atrodyti kaip \u0161iandienos.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Kiekvienai operacijai nurodykite identifikatori\u0173 ir laiko skai\u010diavimo pagrind\u0105<\/h3>\n\n\n<p>Vietoje A ir B \u012fra\u0161ykite savo u\u017esakym\u0173 ir operacij\u0173 identifikatorius. Jei u\u017esakymui reikia pjovimo, lenkimo ir suvirinimo, \u0161ioms operacijoms skirkite atskiras eilutes. J\u0173 sek\u0105 nustato <a href=\"\/lt\/istekliai\/gamybos-marsrutas\/\">technologinis mar\u0161rutas<\/a>, o ne tai, kuri eilut\u0117 skai\u010diuokl\u0117je eina toliau.<\/p>\n\n\n<p>\u201eApdorojimas, min\u201c rei\u0161kia <strong>bendr\u0105 visos partijos apdorojimo trukm\u0119<\/strong>. Jei turite vieno vieneto apdorojimo trukm\u0117s \u012fvert\u012f, prie\u0161 \u012fra\u0161ydami padauginkite j\u012f i\u0161 kiekio. \u201eDerinimas, min\u201c \u2013 papildomas laikas, kuriuo stakl\u0117s yra u\u017eimtos. Nepasl\u0117pkite jo nepaai\u0161kintoje bendroje trukm\u0117je ir ne\u012fskai\u010diuokite du kartus.<\/p>\n\n\n<p>Jei operacija atliekama be pertraukos, F2 langelyje \u012fra\u0161yt\u0105 fiksuot\u0105 pabaigos reik\u0161m\u0119 pakeiskite \u0161ia formule ir nukopijuokite j\u0105 \u012f \u017eemiau esan\u010dius langelius:<\/p>\n\n\n<p><code>=E2+(C2+D2)\/1440<\/code><\/p>\n\n\n<p>Formul\u0117 prie prad\u017eios laiko prideda derinimo ir apdorojimo minutes. Ji neparenka prad\u017eios laiko, neapsaugo nuo sutapimo su kita u\u017eduotimi ir neperkelia darb\u0173 \u012f kit\u0105 laik\u0105, kai pamaina nedirba. \u0160ioje skai\u010diuokl\u0117je tokius tvarkara\u0161\u010dio sprendimus vis dar priimate j\u016bs.<\/p>\n\n\n<h3 class=\"wp-block-heading\">U\u017efiksuokite, kas turi b\u016bti paruo\u0161ta prie\u0161 pradedant darb\u0105<\/h3>\n\n\n<p>\u0160alia operacij\u0173 s\u0105ra\u0161o laikykite kiekvien\u0173 stakli\u0173 ir operatoriaus darbo laikotarpius su datomis. Pa\u017eym\u0117kite pertraukas, technin\u0119 prie\u017ei\u016br\u0105 ir kitus laikotarpius, kai jie negali dirbti. Jei stakli\u0173 ir operatori\u0173 paskyrimus reikia tikrinti atskirai, i\u0161skirkite juos \u012f atskirus stulpelius.<\/p>\n\n\n<p>Keli\u0173 etap\u0173 u\u017esakymams prid\u0117kite stulpel\u012f \u201eAnkstesn\u0117 operacija\u201c ir \u012fra\u0161ykite jame ankstesn\u0117s operacijos identifikatori\u0173. Jei darbo prad\u017eia priklauso nuo med\u017eiag\u0173 pristatymo, prid\u0117kite informacij\u0105, kada med\u017eiagos bus paruo\u0161tos. Eilut\u0117je nurodyt\u0105 operacij\u0105 galima planuoti tik tada, kai paruo\u0161ta viskas, ko jai reikia, ir baigti ankstesni darbai.<\/p>\n\n\n<p>Jei operacijos negalima pertraukti, jai reikia vientiso darbo laikotarpio, pakankamo derinimui ir apdorojimui. Jei operacij\u0105 galima pertraukti, paprasta pabaigos laiko formul\u0117 neapskai\u010diuos, kada ji bus baigta dirbant per kelis atskirus laikotarpius. Tam reikia atskiro skai\u010diavimo, kuriame b\u016bt\u0173 atsi\u017evelgiama \u012f darbo kalendori\u0173.<\/p>\n\n\n<p>\u010cia \u0161ablonas pradeda atskleisti tikr\u0105j\u0105 planavimo u\u017eduot\u012f: reikia ne \u012fvesti daugiau eilu\u010di\u0173, o patikrinti, kaip jose nurodyti darbai veikia vieni kitus.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Patikrinkite plan\u0105 pakeisdami vien\u0105 prielaid\u0105<\/h2>\n\n\n<p>Prie\u0161 pasikliaudami skai\u010diuokl\u0117je sudarytu tvarkara\u0161\u010diu, patikrinkite, kas nutinka pasikeitus gamybos s\u0105lygoms.<\/p>\n\n\n<p>Tarkime, A baigta 10:30, ta\u010diau stakl\u0117s M1 negali dirbti nuo 10:30 iki 13:00. U\u017eduotis B dar neprad\u0117ta. Jai reikalingos 195 derinimo ir apdorojimo minut\u0117s dabar reik\u0161t\u0173 pabaig\u0105 16:15, jei darbas vykt\u0173 be pertraukos.<\/p>\n\n\n<p>Toks pabaigos laikas vir\u0161ija ir darbo laikotarpio pabaig\u0105 16:00, ir B termin\u0105 16:00. Tai persp\u0117jimas, o ne patvirtintas naujas tvarkara\u0161tis. Pakeitus B prad\u017eios laik\u0105 langelyje, problema i\u0161ry\u0161k\u0117jo, bet nebuvo i\u0161spr\u0119sta.<\/p>\n\n\n<p>Galite ie\u0161koti kit\u0173 tinkam\u0173 stakli\u0173 ir laisvo operatoriaus, svarstyti patvirtint\u0105 darbo laiko prat\u0119sim\u0105 arba kit\u0105 sutart\u0105 pristatymo termin\u0105. Ta\u010diau perk\u0117lus B kitur reikia patikrinti ir ten jau suplanuotus darbus. Jei po B eina kita operacija, gali tekti pakeisti ir jos prad\u017ei\u0105.<\/p>\n\n\n<p>Tuo aritmetika ir skiriasi nuo <a href=\"\/lt\/istekliai\/ribotu-pajegumu-planavimas\/\">ribot\u0173 paj\u0117gum\u0173 planavimo<\/a>. Aritmetika apskai\u010diuoja, kada darbas b\u016bt\u0173 baigtas pagal pasirinkt\u0105 paskyrim\u0105. Sudarant tvarkara\u0161t\u012f darbui randamas laikas ir vieta nevir\u0161ijant turim\u0173 paj\u0117gum\u0173.<\/p>\n\n\n<p>Prie\u0161 pateikdami skai\u010diuokl\u0117je parengt\u0105 plan\u0105 vykdyti, patikrinkite, ar nesutampa darb\u0173 laikas toms pa\u010dioms stakl\u0117ms ir operatoriams, ar paruo\u0161tos med\u017eiagos, baigtos ankstesn\u0117s operacijos, ar laikomasi darbo laikotarpi\u0173 ir u\u017ebaigimo termin\u0173. I\u0161saugokite faktin\u012f atlikt\u0173 darb\u0173 laik\u0105 ir ai\u0161kiai pa\u017eym\u0117kite patvirtint\u0105 plano versij\u0105, kad gamybos ceche neb\u016bt\u0173 vadovaujamasi pasenusia kopija.<\/p>\n\n\n<p>\u0160iame pavyzdyje tokius patikrinimus atlikti nesunku. Ta\u010diau nuolat besikei\u010dian\u010dioje gamykloje juos kartoti visiems paveiktiems u\u017esakymams \u2013 darbas, kur\u012f norisi patik\u0117ti tvarkara\u0161\u010dio sudarymo programai. Platesniame <a href=\"\/lt\/istekliai\/excel-gamybos-planavimo-issukiai-skyplanner-aps-alternatyva\/\">gamybos planavimo su Excel i\u0161\u0161\u016bki\u0173 vadove<\/a> aptariama, kod\u0117l \u0161i plano prie\u017ei\u016bros na\u0161ta auga.<\/p>\n\n\n<h2 class=\"wp-block-heading\">SkyPlanner sud\u0117lioja darbus, o j\u016bs valdote plan\u0105<\/h2>\n\n\n<p>Sudarydama tvarkara\u0161t\u012f, SkyPlanner atsi\u017evelgia \u012f j\u016bs\u0173 darbo centrus, pamainas, operatorius, prioritetus ir med\u017eiagas. J\u016bs apibr\u0117\u017eiate gamybos i\u0161teklius ir operacij\u0173 duomenis, o tvarkara\u0161\u010dius sudarantis dirbtinis intelektas Arcturus apskai\u010diuoja darb\u0173 sek\u0105 pagal nustatytus paj\u0117gumus ir priklausomybes. Rezultatas rodomas Gantt laiko juostoje: kiekvienas darbo centras turi savo darb\u0173 eil\u0119, o susij\u0119 proceso etapai sujungti ry\u0161iais.<\/p>\n\n\n<p>Sustojus M1, \u012fra\u0161ote laikotarp\u012f, kuriuo stakl\u0117s negali dirbti, ir perskai\u010diuojate tvarkara\u0161t\u012f. Arcturus sud\u0117lioja darbus taip, kad jie neb\u016bt\u0173 suplanuoti tuo metu neprieinamiems i\u0161tekliams, atsi\u017evelgdamas \u012f j\u016bs\u0173 nustatytas i\u0161tekli\u0173 alternatyvas ir apribojimus. Tada galite per\u017ei\u016br\u0117ti rezultat\u0105 ir matyti, kuri\u0173 u\u017esakym\u0173 u\u017ebaigimui reikia d\u0117mesio, u\u017euot patys sek\u0119 kiekvien\u0105 paskesn\u012f pakeitim\u0105 skai\u010diuokl\u0117s eilut\u0117se.<\/p>\n\n\n<p>\u012ejungus planavim\u0105 pagal med\u017eiag\u0173 prieinamum\u0105, \u012f \u0161\u012f skai\u010diavim\u0105 galima \u012ftraukti ir tai, kada med\u017eiagos bus paruo\u0161tos. U\u017eraktai apsaugo darbus, kuri\u0173 nenorite perkelti, o i\u0161 anksto nustatyti prioritetai nurodo, kuri\u0173 \u012fsipareigojim\u0173 svarbiausia laikytis. <strong>Prioritetus nustatote j\u016bs, o dirbtinis intelektas j\u0173 laikosi.<\/strong> Kad \u0161ie sprendimai b\u016bt\u0173 \u012fgyvendinti, jums nereikia kiekvienos u\u017eduoties i\u0161d\u0117styti atskirai.<\/p>\n\n\n<p>Nauda \u2013 ne vien tvarkingesnis u\u017esakym\u0173 s\u0105ra\u0161as, o planas, kuriuo galite naudotis kei\u010diantis pad\u0117\u010diai gamykloje. Savo d\u0117mes\u012f skiriate gamybos sprendimams: ar didinti paj\u0117gumus, keisti prioritet\u0105, ar tartis su klientu d\u0117l termino. \u0160iems sprendimams reikalingus tvarkara\u0161\u010dio skai\u010diavimus atlieka SkyPlanner.<\/p>\n\n\n<p><a href=\"\/lt\/funkcijos\/\">Susipa\u017einkite su SkyPlanner tvarkara\u0161\u010di\u0173 sudarymo funkcijomis<\/a> ir su\u017einokite, kaip \u0161iame darbe padeda Gantt diagrama, i\u0161tekli\u0173 prieinamumo duomenys ir automatinis tvarkara\u0161\u010di\u0173 sudarymas.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kas pasikeit\u0117 UTU atsisakius planavimo su Excel<\/h2>\n\n\n<p>UTU gamykla Ulviloje gamina elektros skydus ir skirstomuosius \u012frenginius. Iki SkyPlanner \u012fdiegimo skyriai planavo darbus atskirose, rankiniu b\u016bdu atnaujinamose Excel skai\u010diuokl\u0117se. ERP sistemoje atlikti darb\u0173 sekos pakeitimai ne visada pasiekdavo gamybos cech\u0105, o realius paj\u0117gumus buvo sunku \u012fvertinti.<\/p>\n\n\n<p>Problema buvo ne vien tr\u016bkstamas stulpelis. Reik\u0117jo u\u017etikrinti, kad darbus atliekantys \u017emon\u0117s vadovaut\u0173si aktualiais u\u017esakym\u0173 duomenimis ir numatyta gamybos seka.<\/p>\n\n\n<p>UTU pasirinko SkyPlanner pereidama prie Oracle NetSuite. \u012emon\u0117je \u012fdiegta SkyPlanner susieta su NetSuite ir darbo u\u017emokes\u010dio sistema, o gamyklos linijos bei skyriai sujungti \u012f vien\u0105 sistem\u0105. Komanda ypa\u010d vertina dirbtiniu intelektu pagr\u012fsto tvarkara\u0161\u010di\u0173 sudarymo ir Gantt laiko juostos derin\u012f: darb\u0173 seka, paj\u0117gumai ir pa\u017eanga matomi vienoje vietoje.<\/p>\n\n\n<p>UTU teigimu, <strong>rankiniam skai\u010diuokli\u0173 atnaujinimui sutaupoma apie dvi valandas per savait\u0119<\/strong>, o atnaujinta darb\u0173 eil\u0117 montuotojus pasiekia per kelias sekundes. Tai praktin\u0117 nauda pereinant nuo \u0161ablono prie sistemos: ma\u017eiau pastang\u0173 kopijoms atnaujinti ir ai\u0161kesn\u0117 darb\u0173 seka juos atliekantiems \u017emon\u0117ms.<\/p>\n\n\n<p><a href=\"\/lt\/klientu-istorijos\/utu\/\">Skaitykite apie UTU patirt\u012f pereinant nuo Excel prie SkyPlanner<\/a>.<\/p>\n\n\n<h2 class=\"wp-block-heading\">I\u0161saugokite naudingus pradinius duomenis. Nebeperdarin\u0117kite tvarkara\u0161\u010dio.<\/h2>\n\n\n<p>\u0160ablonas padeda nustatyti, koki\u0173 duomen\u0173 reikia tvarkara\u0161\u010diui sudaryti: operacij\u0173, j\u0173 trukm\u0117s, i\u0161tekli\u0173, j\u0173 prieinamumo ir reikiam\u0173 u\u017ebaigimo termin\u0173. Norint panaudoti \u0161iuos duomenis, neb\u016btina nuolat perskai\u010diuoti j\u0173 tarpusavio priklausomybi\u0173 programoje Excel.<\/p>\n\n\n<p><strong>SkyPlanner integruojama su bet kuria ERP ar MES sistema per atvir\u0105 REST API.<\/strong> Geresniam tvarkara\u0161\u010di\u0173 sudarymui galite pasitelkti jau naudojamas sistemas, o prioritetus ir toliau nustatote bei gamybos sprendimus priimate j\u016bs.<\/p>\n\n\n<p><a href=\"\/lt\/susisiekite-su-pardavejais\/\">U\u017esisakykite SkyPlanner demonstracij\u0105<\/a> ir jai pasirinkite \u012fprast\u0105 u\u017esakymo technologin\u012f mar\u0161rut\u0105 bei neseniai atlikt\u0105 tvarkara\u0161\u010dio pakeitim\u0105. \u0160ie pavyzd\u017eiai pad\u0117s aptarti, kaip b\u016bt\u0173 galima sudaryti j\u016bs\u0173 darb\u0173 tvarkara\u0161t\u012f, kai reikia derinti \u012frengini\u0173 ir darbuotoj\u0173 u\u017eimtum\u0105 su u\u017esakym\u0173 terminais. Arba <a href=\"\/lt\/bandymas\/\">i\u0161bandykite SkyPlanner su demonstraciniais duomenimis<\/a> ir per\u017ei\u016br\u0117kite tvarkara\u0161t\u012f Gantt diagramoje prie\u0161 planuodami, kaip sistem\u0105 pritaikysite savo gamybai.<\/p>\n\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Gamybos plano \u0161ablonas: kaip sutalpinti darbus \u012f tvarkara\u0161t\u012f Gamybos plano \u0161ablone kiekvienam u\u017esakymui atsiranda vieta lape. Sunkiau atsakyti, ar jam yra vietos gamykloje: ar tuo metu laisvos tinkamos stakl\u0117s ir reikiamas operatorius, ar darb\u0105 pavyks atlikti pakankamai anksti, kad likt\u0173 laiko kitai operacijai ir pristatymui klientui. Atsisi\u0173skite gamybos plano \u0161ablon\u0105 (CSV failas, skirtas Excel). Tai &#8230; <a title=\"Gamybos plano \u0161ablonas: kaip sutalpinti darbus \u012f tvarkara\u0161t\u012f\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/gamybos-plano-sablonas\/\" aria-label=\"Read more about Gamybos plano \u0161ablonas: kaip sutalpinti darbus \u012f tvarkara\u0161t\u012f\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":97779,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2532,301],"tags":[],"class_list":["post-96097","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-ir-planavimas","category-istekliai","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Gamybos plano \u0161ablonas: kaip sutalpinti darbus \u012f tvarkara\u0161t\u012f<\/title>\n<meta name=\"description\" content=\"Atsisi\u0173skite Excel gamybos plano \u0161ablon\u0105, su\u017einokite, kaip sutalpinti darbus \u012f tvarkara\u0161t\u012f ir kaip SkyPlanner tvarko plan\u0105 kei\u010diantis gamybai.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/gamybos-plano-sablonas\/\" \/>\n<meta property=\"og:locale\" content=\"lt_LT\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Gamybos plano \u0161ablonas: kaip sutalpinti darbus \u012f tvarkara\u0161t\u012f\" \/>\n<meta property=\"og:description\" content=\"Atsisi\u0173skite Excel gamybos plano \u0161ablon\u0105, su\u017einokite, kaip sutalpinti darbus \u012f tvarkara\u0161t\u012f ir kaip SkyPlanner tvarko plan\u0105 kei\u010diantis gamybai.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lt\/istekliai\/gamybos-plano-sablonas\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-04T04:30:32+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-19T14:42:42+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-template-hero-2.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"9 minut\u0117s\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/gamybos-plano-sablonas\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/gamybos-plano-sablonas\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Gamybos plano \u0161ablonas: kaip sutalpinti darbus \u012f tvarkara\u0161t\u012f\",\"datePublished\":\"2026-10-04T04:30:32+00:00\",\"dateModified\":\"2026-10-19T14:42:42+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/gamybos-plano-sablonas\\\/\"},\"wordCount\":1852,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/gamybos-plano-sablonas\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-schedule-template-hero-2.png\",\"articleSection\":[\"APS ir planavimas\",\"i\u0161tekliai\"],\"inLanguage\":\"lt-LT\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/gamybos-plano-sablonas\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/gamybos-plano-sablonas\\\/\",\"name\":\"Gamybos plano \u0161ablonas: kaip sutalpinti darbus \u012f tvarkara\u0161t\u012f\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/gamybos-plano-sablonas\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/gamybos-plano-sablonas\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-schedule-template-hero-2.png\",\"datePublished\":\"2026-10-04T04:30:32+00:00\",\"dateModified\":\"2026-10-19T14:42:42+00:00\",\"description\":\"Atsisi\u0173skite Excel gamybos plano \u0161ablon\u0105, su\u017einokite, kaip sutalpinti darbus \u012f tvarkara\u0161t\u012f ir kaip SkyPlanner tvarko plan\u0105 kei\u010diantis gamybai.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/gamybos-plano-sablonas\\\/#breadcrumb\"},\"inLanguage\":\"lt-LT\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/gamybos-plano-sablonas\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"lt-LT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/gamybos-plano-sablonas\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-schedule-template-hero-2.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-schedule-template-hero-2.png\",\"width\":1672,\"height\":941,\"caption\":\"Two groups of components waiting for one machining resource in a manufacturing production schedule\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/gamybos-plano-sablonas\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Gamybos plano \u0161ablonas: kaip sutalpinti darbus \u012f tvarkara\u0161t\u012f\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lt-LT\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lt-LT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lt-LT\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Gamybos plano \u0161ablonas: kaip sutalpinti darbus \u012f tvarkara\u0161t\u012f","description":"Atsisi\u0173skite Excel gamybos plano \u0161ablon\u0105, su\u017einokite, kaip sutalpinti darbus \u012f tvarkara\u0161t\u012f ir kaip SkyPlanner tvarko plan\u0105 kei\u010diantis gamybai.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lt\/istekliai\/gamybos-plano-sablonas\/","og_locale":"lt_LT","og_type":"article","og_title":"Gamybos plano \u0161ablonas: kaip sutalpinti darbus \u012f tvarkara\u0161t\u012f","og_description":"Atsisi\u0173skite Excel gamybos plano \u0161ablon\u0105, su\u017einokite, kaip sutalpinti darbus \u012f tvarkara\u0161t\u012f ir kaip SkyPlanner tvarko plan\u0105 kei\u010diantis gamybai.","og_url":"https:\/\/skyplanner.ai\/lt\/istekliai\/gamybos-plano-sablonas\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-04T04:30:32+00:00","article_modified_time":"2026-10-19T14:42:42+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-template-hero-2.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Jussi M\u00e4ntyl\u00e4","Est. reading time":"9 minut\u0117s"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/gamybos-plano-sablonas\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/gamybos-plano-sablonas\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Gamybos plano \u0161ablonas: kaip sutalpinti darbus \u012f tvarkara\u0161t\u012f","datePublished":"2026-10-04T04:30:32+00:00","dateModified":"2026-10-19T14:42:42+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/gamybos-plano-sablonas\/"},"wordCount":1852,"publisher":{"@id":"https:\/\/skyplanner.ai\/lt\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/gamybos-plano-sablonas\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-template-hero-2.png","articleSection":["APS ir planavimas","i\u0161tekliai"],"inLanguage":"lt-LT"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/gamybos-plano-sablonas\/","url":"https:\/\/skyplanner.ai\/lt\/istekliai\/gamybos-plano-sablonas\/","name":"Gamybos plano \u0161ablonas: kaip sutalpinti darbus \u012f tvarkara\u0161t\u012f","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lt\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/gamybos-plano-sablonas\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/gamybos-plano-sablonas\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-template-hero-2.png","datePublished":"2026-10-04T04:30:32+00:00","dateModified":"2026-10-19T14:42:42+00:00","description":"Atsisi\u0173skite Excel gamybos plano \u0161ablon\u0105, su\u017einokite, kaip sutalpinti darbus \u012f tvarkara\u0161t\u012f ir kaip SkyPlanner tvarko plan\u0105 kei\u010diantis gamybai.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/gamybos-plano-sablonas\/#breadcrumb"},"inLanguage":"lt-LT","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lt\/istekliai\/gamybos-plano-sablonas\/"]}]},{"@type":"ImageObject","inLanguage":"lt-LT","@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/gamybos-plano-sablonas\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-template-hero-2.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-template-hero-2.png","width":1672,"height":941,"caption":"Two groups of components waiting for one machining resource in a manufacturing production schedule"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/gamybos-plano-sablonas\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lt\/"},{"@type":"ListItem","position":2,"name":"Gamybos plano \u0161ablonas: kaip sutalpinti darbus \u012f tvarkara\u0161t\u012f"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lt\/#website","url":"https:\/\/skyplanner.ai\/lt\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lt\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lt\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lt-LT"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lt\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lt\/","logo":{"@type":"ImageObject","inLanguage":"lt-LT","@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"lt-LT","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-template-hero-2.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-template-hero-2-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-template-hero-2-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-template-hero-2-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-template-hero-2-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-template-hero-2-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-template-hero-2.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-template-hero-2-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lt\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Gamybos plano \u0161ablonas: kaip sutalpinti darbus \u012f tvarkara\u0161t\u012f Gamybos plano \u0161ablone kiekvienam u\u017esakymui atsiranda vieta lape. Sunkiau atsakyti, ar jam yra vietos gamykloje: ar tuo metu laisvos tinkamos stakl\u0117s ir reikiamas operatorius, ar darb\u0105 pavyks atlikti pakankamai anksti, kad likt\u0173 laiko kitai operacijai ir pristatymui klientui. Atsisi\u0173skite gamybos plano \u0161ablon\u0105 (CSV failas, skirtas Excel). Tai&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/posts\/96097","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/comments?post=96097"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/posts\/96097\/revisions"}],"predecessor-version":[{"id":96126,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/posts\/96097\/revisions\/96126"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/media\/97779"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/media?parent=96097"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/categories?post=96097"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/tags?post=96097"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}