{"id":7112,"date":"2022-09-01T11:45:00","date_gmt":"2022-09-01T11:45:00","guid":{"rendered":"https:\/\/skyplanner.ai\/?page_id=7112"},"modified":"2026-10-10T11:59:03","modified_gmt":"2026-10-10T11:59:03","slug":"mes-sistema-kas-tai-yra-ir-ka-ji-daro","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/lt\/istekliai\/mes-sistema-kas-tai-yra-ir-ka-ji-daro\/","title":{"rendered":"MES sistema: kas tai ir k\u0105 ji daro"},"content":{"rendered":"<div class=\"gb-container gb-container-3df1db73 no-overflow\"><div class=\"gb-inside-container\">\n<div class=\"gb-container gb-container-d55bc3f3\"><div class=\"gb-inside-container\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-8557534f special-color\">\n<div class=\"gb-grid-column gb-grid-column-fb47f507\"><div class=\"gb-container gb-container-fb47f507 special-color\">\n\n<p class=\"special-color\"><\/p>\n\n\n\n<p class=\"special-color\"><\/p>\n\n\n\n<p class=\"special-color\"><\/p>\n\n\n\n<p class=\"special-color\"><\/p>\n\n\n\n<p class=\"special-color\"><\/p>\n\n\n\n<p class=\"special-color\"><\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-fc5995b1 gb-headline-text\"><strong>MES sistema<\/strong><\/h4>\n\n\n\n<p class=\"special-color has-contrast-color has-base-3-background-color has-text-color has-background\"><strong><a href=\"\/lt\/istekliai\/mes-ir-erp-kuo-skiriasi\/\">MES ir ERP: kuo skiriasi<\/a><\/strong><br><br><strong><a href=\"\/lt\/istekliai\/mes-erp-integracijos-galia\/\">MES ir ERP integracija<\/a><\/strong><br><br><a href=\"\/lt\/istekliai\/mes-funkciju-privalumai\/\"><strong>MES galimyb\u0117s<\/strong><\/a><br>\u00b7 <a href=\"\/lt\/istekliai\/mes-gamybos-stebejimas\/\">Gamybos steb\u0117sena<\/a><br>\u00b7 <a href=\"\/lt\/istekliai\/mes-kokybes-kontrole-gamyboje\/\">Kokyb\u0117s kontrol\u0117<\/a><br>\u00b7 <a href=\"\/lt\/istekliai\/mes-atsargu-optimizavimas\/\">Atsarg\u0173 optimizavimas<\/a><br>\u00b7 <a href=\"\/lt\/istekliai\/mes-duomenu-srautu-valdymas\/\">Duomen\u0173 sraut\u0173 valdymas<\/a><br>\u00b7<a href=\"\/lt\/istekliai\/mes-gamybos-analize\/\"> Gamybos analitika<\/a><br>\u00b7<a href=\"\/lt\/istekliai\/mes-gamybos-stebejimas-2\/\"> Gamybos sekimas<\/a><br><br><strong><a href=\"\/lt\/istekliai\/mes-sprendimai-kaip-issirinkti-tinkama\/\">MES sprendimai<\/a><\/strong><br>\u00b7<a href=\"\/lt\/istekliai\/debesijos-pagrindu-veikianti-mes\/\"> Debesijos MES<\/a><br>\u00b7 <a href=\"\/lt\/istekliai\/vietoje-veikianti-mes\/\">Vietinis (on-premises) MES<\/a><br>\u00b7 <a href=\"\/lt\/istekliai\/mes-smulkiajam-verslui\/\">MES ma\u017eam verslui<\/a><br>\u00b7 <a href=\"\/lt\/istekliai\/ai-valdomas-mes\/\">Dirbtinio intelekto valdomas MES<\/a><br>\u00b7 <a href=\"\/lt\/istekliai\/imoniu-mes\/\">MES stambioms \u012fmon\u0117ms<\/a><br>\u00b7<a href=\"\/lt\/istekliai\/konkrecios-pramones-sakos-mes\/\"> Konkre\u010diai pramon\u0117s \u0161akai skirtas MES<\/a><\/p>\n\n<\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-8526f60b\"><div class=\"gb-container gb-container-8526f60b front-head\"><div class=\"gb-inside-container\">\n<div class=\"gb-container gb-container-93641464\"><div class=\"gb-inside-container\">\n<div class=\"yoast-breadcrumbs\"><span><span><a href=\"https:\/\/skyplanner.ai\/lt\/\">Home<\/a><\/span> \u00bb <span><a href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/\">Straipsniai<\/a><\/span> \u00bb <span class=\"breadcrumb_last\" aria-current=\"page\">MES sistema: kas tai ir k\u0105 ji daro<\/span><\/span><\/div>\n<\/div><\/div>\n\n<div class=\"gb-container gb-container-26760224\"><div class=\"gb-inside-container\">\n\n<h1 class=\"wp-block-heading has-text-align-left has-text-color\" id=\"h-mes-system-what-it-is-and-what-it-does\" style=\"color:#1f1f33\">MES sistema: kas tai ir k\u0105 ji daro<\/h1>\n\n<\/div><\/div>\n\n<div class=\"gb-container gb-container-3112db8f\"><div class=\"gb-inside-container\">\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Numatomas skaitymo laikas: <\/span><span class=\"yoast-reading-time__reading-time\">13<\/span><span class=\"yoast-reading-time__time-unit\"> minut\u0117s<\/span><\/p>\n\n<\/div><\/div>\n\n<div class=\"gb-container gb-container-6986ace5\"><div class=\"gb-inside-container\">\n\n<p class=\"has-text-align-left\">Kai gamyboje prad\u0117ta diegti automatizacij\u0105, atsirado ir gamybos vykdymo sistemos (angl. Manufacturing Execution System, MES) s\u0105voka. MES buvo skirta automatizuotoms sistemoms valdyti, kad gamyklos veikt\u0173 skland\u017eiai: ji supaprastindavo procesus, sekdavo juos gamybos metu ir automati\u0161kai dokumentuodavo \u012fvykius.<\/p>\n\n\n\n<p>B\u0117gant laikui \u012fmon\u0117s rado nauj\u0173 \u0161io \u012frankio panaudojimo b\u016bd\u0173. Augant individualizuot\u0173 gamini\u0173 paklausai, procesus reik\u0117jo supaprastinti, kad jie veikt\u0173 efektyviau, o&nbsp;<a href=\"\/lt\/\" target=\"_blank\" rel=\"noreferrer noopener\">gamybos planavim\u0105<\/a>&nbsp;\u2013 optimizuoti. \u010cia MES pasirod\u0117 es\u0105s puikus \u012frankis.<\/p>\n\n\n\t\t\t\t<div class=\"wp-block-uagb-table-of-contents uagb-toc__align-left uagb-toc__columns-1  uagb-block-613f9f62      \"\n\t\t\t\t\tdata-scroll= \"1\"\n\t\t\t\t\tdata-offset= \"30\"\n\t\t\t\t\tstyle=\"\"\n\t\t\t\t>\n\t\t\t\t<div class=\"uagb-toc__wrap\">\n\t\t\t\t\t\t<div class=\"uagb-toc__title\">\n\t\t\t\t\t\t\tTable Of Contents\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"uagb-toc__list-wrap \">\n\t\t\t\t\t\t<ol class=\"uagb-toc__list\"><li class=\"uagb-toc__list\"><a href=\"#tldr-trumpai\" class=\"uagb-toc-link__trigger\">TL;DR \u2013 trumpai<\/a><li class=\"uagb-toc__list\"><a href=\"#kas-yra-mes\" class=\"uagb-toc-link__trigger\">Kas yra MES?<\/a><li class=\"uagb-toc__list\"><a href=\"#mes-funkcijos\" class=\"uagb-toc-link__trigger\">MES funkcijos<\/a><li class=\"uagb-toc__list\"><a href=\"#mes-galimyb\u0117s\" class=\"uagb-toc-link__trigger\">MES galimyb\u0117s<\/a><li class=\"uagb-toc__list\"><a href=\"#mes-sprendimai\" class=\"uagb-toc-link__trigger\">MES sprendimai<\/a><li class=\"uagb-toc__list\"><a href=\"#patarimai-kaip-pasirinkti-tinkam\u0105-sprendim\u0105\" class=\"uagb-toc-link__trigger\">Patarimai, kaip pasirinkti tinkam\u0105 sprendim\u0105<\/a><li class=\"uagb-toc__list\"><a href=\"#mes-ir-erp\" class=\"uagb-toc-link__trigger\">MES ir ERP<\/a><li class=\"uagb-toc__list\"><a href=\"#mes-naudojimo-privalumai\" class=\"uagb-toc-link__trigger\">MES naudojimo privalumai<\/a><li class=\"uagb-toc__list\"><a href=\"#b\u016bsimi-mes-taikymo-b\u016bdai\" class=\"uagb-toc-link__trigger\">B\u016bsimi MES taikymo b\u016bdai<\/a><li class=\"uagb-toc__list\"><a href=\"#pakelkite-savo-\u012fmon\u0117s-proces\u0173-valdym\u0105-\u012f-nauj\u0105-lyg\u012f\" class=\"uagb-toc-link__trigger\">Pakelkite savo \u012fmon\u0117s proces\u0173 valdym\u0105 \u012f nauj\u0105 lyg\u012f!<\/a><li class=\"uagb-toc__list\"><a href=\"#da\u017eniausiai-u\u017eduodami-klausimai\" class=\"uagb-toc-link__trigger\">Da\u017eniausiai u\u017eduodami klausimai<\/a><\/ol>\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\n<\/div><\/div>\n\n<div class=\"gb-container gb-container-b0f6164d\"><div class=\"gb-inside-container\">\n\n<h2 class=\"gb-headline gb-headline-a28df297 gb-headline-text\">TL;DR \u2013 trumpai<\/h2>\n\n\n\n<p>Gamybos vykdymo sistema (MES) stebi ir dokumentuoja gamyb\u0105 ceche, kad komanda tur\u0117t\u0173 aktuali\u0105 informacij\u0105 apie u\u017eduotis, med\u017eiagas ir kokyb\u0119. ERP skirta verslo planavimui, o MES padeda vykdyti gamyb\u0105. ISA-95 apibr\u0117\u017eia modelius ir terminij\u0105, skirtus informacijos mainams tarp gamybos valdymo ir \u012fmon\u0117s verslo funkcij\u0173; tai n\u0117ra privalom\u0173 MES funkcij\u0173 s\u0105ra\u0161as. \u0160iuolaikin\u0117s MES sistemos leid\u017eia steb\u0117ti gamyb\u0105, sekti atsargas ir analizuoti gamybos duomenis. Sujungus MES su SkyPlanner APS, galima sudaryti gamybos tvarkara\u0161\u010dius pagal gamybos duomenis ir planuotojo nustatytus prioritetus.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-what-is-mes\">Kas yra MES?<\/h2>\n\n\n<div class=\"gb-container gb-container-ce737323\"><div class=\"gb-inside-container\">\n\n<p><strong>Gamybos vykdymo sistema (MES) \u2013 tai programin\u0117 \u012franga, kuri stebi, dokumentuoja ir padeda vykdyti gamyb\u0105 ceche. Ji renka duomenis i\u0161 operatori\u0173, \u012frengini\u0173 ir prijungt\u0173 sistem\u0173, kad komanda gal\u0117t\u0173 sekti u\u017eduo\u010di\u0173 eig\u0105, med\u017eiag\u0173 naudojim\u0105 ir kokyb\u0119.<\/strong><\/p>\n\n<\/div><\/div>\n\n\n<p class=\"has-text-align-left\">MES ir ERP atlieka viena kit\u0105 papildan\u010dias funkcijas. ERP padeda valdyti verslo procesus, pavyzd\u017eiui, u\u017esakymus, pirkimus ir finansus, o MES teikia i\u0161samesn\u0119 informacij\u0105 apie gamybos vykdym\u0105. Integracija leid\u017eia abiem sistemoms keistis gamybos reikalavimais ir rezultatais.<\/p>\n\n\n\n<p>MES \u2013 tai integruota jutikli\u0173 ir programin\u0117s \u012frangos sistema, kuri seka \u012frang\u0105, med\u017eiagas ir darbuotojus. Ji parodo proces\u0173 siaur\u0105sias vietas, padeda i\u0161 anksto planuoti \u012frangos technin\u0119 prie\u017ei\u016br\u0105, taip pat gali pateikti pagal u\u017esakym\u0105 pritaikytas instrukcijas darbuotojams ir \u012frangai. Taip procesai i\u0161lieka skland\u016bs, o planavimas tampa patikimesnis.<\/p>\n\n\n\n<p>Kol MES dar buvo k\u016bdikyst\u0117je, jos apibr\u0117\u017eimas buvo gana laisvas. MES buvo galima pavadinti beveik bet kok\u012f proceso sekimo, dokumentavimo ar valdymo b\u016bd\u0105. D\u0117l to kildavo problem\u0173 valdant MES ir kit\u0173 sistem\u0173 s\u0105sajas.<\/p>\n\n\n\n<p><a href=\"https:\/\/www.isa.org\/standards-and-publications\/isa-standards\/isa-standards-committees\/isa95\">ISA-95<\/a> apibr\u0117\u017eia modelius, terminij\u0105 ir informacijos mainus, skirtus gamybos valdymui integruoti su \u012fmon\u0117s verslo funkcijomis. \u0160io standarto integracijos sritis skiriasi nuo ankstesni\u0173 MES funkcij\u0173 modeli\u0173, kuriuos suk\u016br\u0117 <a href=\"https:\/\/mesa.org\/topics-resources\/mesa-model\/\">MESA<\/a>. Toliau ap\u017evelgiamos \u012fprastos MES funkcijos, o ne i\u0161vardijami privalomi ISA-95 reikalavimai:<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-mes-functions\">MES funkcijos<\/h2>\n\n\n\n<ol class=\"wp-block-list\">\n<li>Duomen\u0173 rinkimas<\/li>\n\n\n\n<li>Kokyb\u0117s kontrol\u0117<\/li>\n\n\n\n<li>Tvarkara\u0161\u010di\u0173 sudarymas<\/li>\n\n\n\n<li>Veiklos rezultat\u0173 analiz\u0117<\/li>\n\n\n\n<li>Gamini\u0173 srautas<\/li>\n\n\n\n<li>Kilm\u0117s sekimas ir atsekamumas<\/li>\n\n\n\n<li>Proces\u0173 valdymas<\/li>\n\n\n\n<li>I\u0161tekli\u0173 valdymas<\/li>\n\n\n\n<li>Personalo valdymas<\/li>\n\n\n\n<li>Technin\u0117s prie\u017ei\u016bros valdymas<\/li>\n\n\n\n<li>Dokument\u0173 valdymas<\/li>\n<\/ol>\n\n\n\n<p>Konkre\u010dios MES funkcijos priklauso nuo pasirinkto produkto ir jo \u012fdiegimo. Apibr\u0117\u017ekite, kuri sistema atsakinga u\u017e kiekvien\u0105 u\u017eduot\u012f ir kaip duomenys perduodami tarp MES, ERP ir tvarkara\u0161\u010di\u0173 sudarymo programin\u0117s \u012frangos, pavyzd\u017eiui, APS.<\/p>\n\n\n\n<h2 class=\"gb-headline gb-headline-ca25f6c8 gb-headline-text\">MES galimyb\u0117s<\/h2>\n\n\n\n<p>Gilindamiesi \u012f \u0161i\u0105 sistem\u0105, susiduriame su naujesniu ir \u012fdomiu aspektu \u2013&nbsp;<a href=\"\/lt\/istekliai\/mes-funkciju-privalumai\/\">MES galimyb\u0117mis<\/a>. Norint suprasti \u0161io \u012frankio niuansus, labai svarbu atskirti MES funkcij\u0105 nuo MES galimyb\u0117s.<\/p>\n\n\n\n<p>Paprastai tariant, MES funkcija \u2013 tai pagrindin\u0117s operacijos ar u\u017eduotys, kurias sistema gali atlikti. \u0160ios funkcijos sudaro MES sistemos pagrind\u0105. O galimyb\u0117s i\u0161ry\u0161kina konkre\u010dius sistemos \u012frankius ar geb\u0117jimus, kurie praple\u010dia jos funkcin\u012f potencial\u0105. Nagrin\u0117dami MES sistemas, i\u0161skyr\u0117me \u0161e\u0161ias i\u0161siskirian\u010dias naujovi\u0161kas galimybes:<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong><a href=\"\/lt\/istekliai\/mes-gamybos-stebejimas\/\">Gamybos steb\u0117sena<\/a><\/strong>: \u0161i galimyb\u0117 suteikia realaus laiko prie\u017ei\u016br\u0105 gamybos procesui ir padeda u\u017etikrinti, kad viskas veikt\u0173 skland\u017eiai ir efektyviai. Steb\u0117dami gamyb\u0105, gamybos planuotojai gauna labai verting\u0173 \u012f\u017evalg\u0173 ir prireikus gali koreguoti planus.<\/li>\n\n\n\n<li><a href=\"\/lt\/istekliai\/mes-kokybes-kontrole-gamyboje\/\"><strong>Kokyb\u0117s kontrol\u0117 gamyboje<\/strong>:<\/a> Patikima MES sistema ne tik stebi gamyb\u0105, bet ir leid\u017eia i\u0161samiai vertinti gaminam\u0173 produkt\u0173 kokyb\u0119. Ji registruoja kokyb\u0117s patikras ir pa\u017eymi nukrypimus, kad komanda gal\u0117t\u0173 imtis veiksm\u0173 pagal nustatytus standartus.<\/li>\n\n\n\n<li><strong><a href=\"\/lt\/istekliai\/mes-atsargu-optimizavimas\/\">Atsarg\u0173 optimizavimas<\/a><\/strong>: Atsarg\u0173 valdymas yra beveik toks pat svarbus kaip pati gamyba. MES sistemos seka med\u017eiag\u0173 jud\u0117jim\u0105 ir sunaudojim\u0105, kad komanda gal\u0117t\u0173 nustatyti atsarg\u0173 tr\u016bkum\u0105 ir pertekli\u0173.<\/li>\n\n\n\n<li><strong><a href=\"\/lt\/istekliai\/mes-duomenu-srautu-valdymas\/\">Duomen\u0173 sraut\u0173 valdymas<\/a><\/strong>: skaitmeniniame am\u017eiuje duomenys yra svarbiausia, tod\u0117l j\u0173 sraut\u0173 valdymas tampa esminis. MES sistema su \u0161ia galimybe u\u017etikrina skland\u0173 duomen\u0173 perdavim\u0105, saugojim\u0105 ir prieig\u0105, o sprendimus priimti tampa lengviau.<\/li>\n\n\n\n<li><strong><a href=\"\/lt\/istekliai\/mes-gamybos-analize\/\">Gamybos analitika<\/a><\/strong>: gilindamosi \u012f duomenis, MES sistemos gali i\u0161gauti svarbi\u0105 analitik\u0105. Remdamiesi ja, gamybos planuotojai gali pasteb\u0117ti d\u0117sningumus, prognozuoti tendencijas ir priimti pagr\u012fstus sprendimus.<\/li>\n\n\n\n<li><strong><a href=\"\/lt\/istekliai\/mes-gamybos-stebejimas-2\/\">Gamybos sekimas<\/a><\/strong>: paskutin\u0117, bet jokiu b\u016bdu ne ma\u017eiau svarbi galimyb\u0117. Ji leid\u017eia ai\u0161kiai matyti, kurioje gamybos linijos vietoje yra kiekvienas gaminys, taigi galima geriau paskirstyti i\u0161teklius ir didinti efektyvum\u0105.<\/li>\n<\/ol>\n\n\n\n<p>Pa\u017evelkime \u012f vien\u0105 i\u0161 \u0161i\u0173 galimybi\u0173, kad viskas b\u016bt\u0173 ai\u0161kiau. Gamybos steb\u0117sena suteikia i\u0161sami\u0105 gamybos proceso ap\u017evalg\u0105. \u012esivaizduokite j\u0105 kaip budr\u0173 sargybin\u012f: ji aktyviai aptinka nukrypimus, galim\u0105 neefektyvum\u0105 ir sistemos gedim\u0173 po\u017eymius. <\/p>\n\n\n\n<p>Teikdama pa\u010dius naujausius duomenis, gamybos steb\u0117sena u\u017etikrina, kad gamybos planuotojai visada b\u016bt\u0173 informuoti, tod\u0117l gali greitai reaguoti ir prireikus tobulinti procesus.<br><br>MES sistem\u0173 pasaulis toliau vystosi ir si\u016blo vis sud\u0117tingesnius \u012frankius bei galimybes. Sekdami naujoves ir b\u016bdami informuoti, gamybos planuotojai gali i\u0161naudoti vis\u0105 \u0161i\u0173 sistem\u0173 potencial\u0105 ir nukreipti savo veikl\u0105 \u0161viesesn\u0117s ateities link.<\/p>\n\n\n<div class=\"gb-container gb-container-0a56c9fa sticky\"><div class=\"gb-inside-container\">\n<div class=\"gb-container gb-container-eed176fc\"><div class=\"gb-inside-container\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-1b2f16ae\">\n<div class=\"gb-grid-column gb-grid-column-be655727\"><div class=\"gb-container gb-container-be655727\"><div class=\"gb-inside-container\">\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"685\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png\" alt=\"SkyPlanner APS \u2013 gamybos planavimo ir tvarkara\u0161\u010di\u0173 sudarymo produkto vaizdas i\u0161 priekio\" class=\"wp-image-4339\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-300x201.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-768x514.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1536x1027.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-2048x1370.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<\/div><\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-0821f9a0\"><div class=\"gb-container gb-container-0821f9a0\"><div class=\"gb-inside-container\">\n\n<h4 class=\"wp-block-heading mobile-text-center\" id=\"h-advanced-production-planning-with-ai-skyplanner-aps\" style=\"font-size:24px\">Pa\u017eangus gamybos planavimas su dirbtiniu intelektu \u2013 SkyPlanner APS<\/h4>\n\n\n\n<p class=\"mobile-text-center\">Su\u017einokite daugiau apie m\u016bs\u0173 po\u017ei\u016br\u012f \u012f gamybos planavim\u0105 ir optimizavim\u0105, pasitelkiant dirbtinio intelekto galias.<\/p>\n\n\n<div class=\"gb-button-wrapper gb-button-wrapper-690cb95e\">\n\n<a class=\"gb-button gb-button-7b87a903 gb-button-text\" href=\"\/lt\/\" aria-label=\"U\u017esisakyti demonstracij\u0105\">Gamybos planavimas su dirbtiniu intelektu<\/a>\n\n<\/div>\n<\/div><\/div><\/div>\n<\/div>\n<\/div><\/div>\n<\/div><\/div>\n<\/div><\/div>\n\n<div class=\"gb-container gb-container-1794ec07\"><div class=\"gb-inside-container\">\n\n<h2 class=\"gb-headline gb-headline-3a1286ae gb-headline-text\">MES sprendimai<\/h2>\n\n\n\n<p>Pla\u010diame MES sistem\u0173 lauke yra \u012fvairi\u0173 <a href=\"\/lt\/istekliai\/mes-sprendimai-kaip-issirinkti-tinkama\/\">MES sprendim\u0173<\/a>, skirt\u0173 skirtingiems veiklos i\u0161\u0161\u016bkiams spr\u0119sti. Kiekvienas turi savit\u0105 vert\u0119 \u2013 nuo supaprastint\u0173 debesijos sistem\u0173 galimybi\u0173 iki specializuot\u0173 konkre\u010diai pramon\u0117s \u0161akai skirt\u0173 MES pasi\u016blym\u0173. Ap\u017evelkime \u0161ias parinktis kartu ir i\u0161siai\u0161kinkime, kaip kiekviena j\u0173 gali geriausiai patenkinti j\u016bs\u0173 \u012fmon\u0117s gamybos poreikius.<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong><a href=\"\/lt\/istekliai\/debesijos-pagrindu-veikianti-mes\/\">Debesijos MES<\/a><\/strong>: veikia debesijoje, tod\u0117l prie jo galima prisijungti i\u0161 bet kurios vietos, kur yra interneto ry\u0161ys. Jis lankstus ir da\u017enai pareikalauja ma\u017eesni\u0173 pradini\u0173 i\u0161laid\u0173. Ta\u010diau priklauso nuo stabilaus interneto ry\u0161io.<\/li>\n\n\n\n<li><strong><a href=\"\/lt\/istekliai\/vietoje-veikianti-mes\/\">Vietinis (on-premises) MES<\/a><\/strong>: \u0161i sistema diegiama j\u016bs\u0173 \u012fmon\u0117s \u012frangoje ir serveriuose. Nors gali prireikti didesn\u0117s pradin\u0117s investicijos, ji gali suteikti daugiau duomen\u0173 kontrol\u0117s ir b\u016bti pritaikyta j\u016bs\u0173 \u012fmon\u0117s poreikiams.<\/li>\n\n\n\n<li><strong><a href=\"\/lt\/istekliai\/mes-smulkiajam-verslui\/\">MES ma\u017eam verslui<\/a><\/strong>: \u0161ios sistemos specialiai pritaikytos ma\u017eesn\u0117ms \u012fmon\u0117ms, tod\u0117l paprastai yra paprastesn\u0117s ir ekonomi\u0161kesn\u0117s. Jos orientuojasi \u012f esmines galimybes, kuri\u0173 reikia ma\u017eam verslui, neapkraudamos sud\u0117tingu funkcionalumu.<\/li>\n\n\n\n<li><strong><a href=\"\/lt\/istekliai\/ai-valdomas-mes\/\">Dirbtinio intelekto valdomas MES<\/a><\/strong>: pasitelkiant dirbtin\u012f intelekt\u0105, \u0161ios sistemos gali prognozuoti tendencijas, automatizuoti u\u017eduotis ir optimizuoti procesus. Tai puikus pasirinkimas \u012fmon\u0117ms, norin\u010dioms i\u0161likti inovacij\u0173 prie\u0161akyje.<\/li>\n\n\n\n<li><strong><a href=\"\/lt\/istekliai\/imoniu-mes\/\">MES stambioms \u012fmon\u0117ms<\/a><\/strong>: sukurtas dideliam verslui su sud\u0117tingais poreikiais, \u0161is sprendimas si\u016blo pla\u010dias galimybes, gali apdoroti didelius duomen\u0173 kiekius ir skland\u017eiai integruotis su kitomis \u012fmon\u0117s sistemomis.<\/li>\n\n\n\n<li><strong><a href=\"\/lt\/istekliai\/konkrecios-pramones-sakos-mes\/\">Konkre\u010diai pramon\u0117s \u0161akai skirtas MES<\/a><\/strong>: \u0161ie sprendimai pritaikyti tam tikroms pramon\u0117s \u0161akoms, pavyzd\u017eiui, farmacijai ar automobili\u0173 gamybai. Juose i\u0161 anksto yra t\u0173 sektori\u0173 specifikai skirt\u0173 \u012franki\u0173 ir galimybi\u0173.<\/li>\n<\/ol>\n\n\n\n<p>Tinkamo MES sprendimo pasirinkimas gali lemti j\u016bs\u0173 gamybos proceso efektyvum\u0105 ir s\u0117km\u0119.<\/p>\n\n\n\n<h2 class=\"gb-headline gb-headline-3cf0e0d5 gb-headline-text\">Patarimai, kaip pasirinkti tinkam\u0105 sprendim\u0105<\/h2>\n\n\n\n<p>I\u0161 tokios \u012fvairov\u0117s pasirinkti geriausi\u0105 MES sistem\u0105 i\u0161 prad\u017ei\u0173 gali atrodyti bauginan\u010diai. Svarbu, kad pasirinkta sistema atitikt\u0173 j\u016bs\u0173 \u012fmon\u0117s veiklos poreikius ir ateities tikslus. \u0160ie vertingi patarimai pad\u0117s priimti \u0161\u012f svarb\u0173 sprendim\u0105:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Supraskite savo poreikius<\/strong>: prie\u0161 apsispr\u0119sdami, apibr\u0117\u017ekite konkre\u010dius \u012fmon\u0117s reikalavimus. Ar jums reikia sud\u0117tingo funkcionalumo, ar pakanka pagrindini\u0173 dalyk\u0173?<\/li>\n\n\n\n<li><strong>Biud\u017eetas<\/strong>: nors svarbu gauti j\u016bs\u0173 poreikius atitinkan\u010di\u0105 sistem\u0105, ne ma\u017eiau svarbu \u012fvertinti, kiek esate pasireng\u0119 investuoti.<\/li>\n\n\n\n<li><strong>Ple\u010diamumas<\/strong>: galvokite ilgalaik\u0117je perspektyvoje. Rinkit\u0117s MES sistem\u0105, kuri gali augti kartu su j\u016bs\u0173 \u012fmone.<\/li>\n\n\n\n<li><strong>Integracija<\/strong>: \u012fsitikinkite, kad gamybos vykdymo sistema gerai integruojasi su kita j\u016bs\u0173 naudojama programine \u012franga.<\/li>\n\n\n\n<li><strong>Patogumas naudoti<\/strong>: sistema, kurioje sunku susigaudyti, gali stabdyti darbo na\u0161um\u0105. Rinkit\u0117s intuityvi\u0105 ir patogi\u0105 naudoti.<\/li>\n\n\n\n<li><strong>Palaikymas ir mokymai<\/strong>: pasitikrinkite, ar tiek\u0117jas si\u016blo pakankam\u0105 palaikym\u0105 ir mokymus, kad j\u016bs\u0173 komanda gal\u0117t\u0173 susipa\u017einti su sistema.<\/li>\n<\/ul>\n\n\n\n<p>Nors MES sistem\u0173 pasirinkimas didelis, tinkamas bus tas, kuris geriausiai atitinka unikalius j\u016bs\u0173 \u012fmon\u0117s poreikius ir augimo planus.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-mes-and-erp\">MES ir ERP<\/h2>\n\n\n\n<p>Gilinantis \u012f pramonin\u0117s programin\u0117s \u012frangos subtilybes, da\u017enai kyla diskusija \u201e<a href=\"\/lt\/istekliai\/mes-ir-erp-kuo-skiriasi\/\">MES ar ERP<\/a>\u201c, ir nesunku suprasti kod\u0117l.<\/p>\n\n\n\n<p class=\"has-text-align-left\">MES ir&nbsp;<a href=\"\/lt\/istekliai\/gamybos-erp-issamus-vadovas\/\" target=\"_blank\" rel=\"noreferrer noopener\">ERP<\/a>&nbsp;da\u017enai tenka paai\u0161kinti, nes sunku pasakyti, kur baigiasi viena sistema ir prasideda kita. Abi sistemos i\u0161 dalies atlieka tas pa\u010dias funkcijas, o kai kuriais papras\u010diausiais atvejais MES i\u0161 viso nereikia. Vis d\u0117lto vien su ERP gamyklos veikl\u0105 optimizuoti gali b\u016bti sunku.<\/p>\n\n\n\n<p>ERP (Enterprise Resource Planning) \u2013 tai programin\u0117 \u012franga, skirta valdyti vis\u0105 \u012fmon\u0119. Ji siekia integruoti ir valdyti visas \u012fmon\u0117s veiklos sritis. ERP veikia kaip nuolat atnaujinama \u012fvyki\u0173 duomen\u0173 baz\u0117 visuose lygmenyse. \u0160i\u0105 informacij\u0105 galima rankiniu arba automatiniu b\u016bdu naudoti i\u0161tekliams, kuri\u0173 reikia optimaliai veiklai, valdyti.<\/p>\n\n\n\n<p>Tuo tarpu MES nei\u0161eina u\u017e gamyklos rib\u0173. Pagrindin\u0117 \u0161ios priemon\u0117s u\u017eduotis \u2013 \u012fvertinti, koki\u0173 i\u0161tekli\u0173 (\u017ealiav\u0173, personalo, \u012frangos) turima ir kaip juos panaudoti, kad u\u017esakyta produkcija b\u016bt\u0173 pagaminta optimaliai. Tai apima <a href=\"\/lt\/istekliai\/kas-yra-gamybos-planavimas\/\">gamybos tvarkara\u0161\u010di\u0173 sudarym\u0105<\/a>, \u012frangos prie\u017ei\u016br\u0105, atsarg\u0173 kontrol\u0119, kokyb\u0117s kontrol\u0119, dokumentavim\u0105 ir kita.<\/p>\n\n\n\n<p>Idealiu atveju ERP, remdamasi rinkos prognoze, gali numatyti b\u016bsim\u0105 tam tikr\u0173 produkt\u0173 paklaus\u0105 ir \u0161i\u0105 informacij\u0105 perduoti MES. Tuomet MES gali pritaikyti gamyb\u0105 prie ERP poreiki\u0173. Gamybos vykdymo sistema (MES) gali optimaliai ir automati\u0161kai skirti daugiau i\u0161tekli\u0173 labai paklausiems produktams gaminti. Taip ERP ir MES gali skland\u017eiai veikti kartu.<\/p>\n\n\n\n<p>Nors ERP <em>galima <\/em>naudoti net smulkiausioms gamybos proceso detal\u0117ms valdyti, \u0161i\u0105 u\u017eduot\u012f da\u017enai geriausia palikti MES sistemai. Idealiu atveju ERP programin\u0117 \u012franga tvarko tai, kas patenka \u012f gamykl\u0105 ir kas i\u0161 jos i\u0161eina, o MES \u2013 visk\u0105, kas vyksta gamyklos viduje.<\/p>\n\n\n\n<p>MES ir ERP sistem\u0173 integravimas \u2013 ne tik patogumo reikalas, o strateginis \u017eingsnis, galintis i\u0161 esm\u0117s pakeisti \u012fmon\u0117s veikl\u0105. Kai \u0161ios dvi galingos sistemos sinchronizuojamos, gaunamas vieningas gamybos operacij\u0173 ir verslo proces\u0173 vaizdas, tod\u0117l sprendimai grind\u017eiami i\u0161samiais realaus laiko duomenimis. Tokia integracija pa\u0161alina pasikartojan\u010dias u\u017eduotis, u\u017epildo informacijos spragas ir didina bendr\u0105 efektyvum\u0105.<\/p>\n\n\n\n<p><a href=\"\/lt\/istekliai\/mes-erp-integracijos-galia\/\" target=\"_blank\" rel=\"noreferrer noopener\">MES ir ERP integracija<\/a>&nbsp;suteikia viening\u0105, nuosekl\u0173 vaizd\u0105, tod\u0117l \u012fmon\u0117s tampa lankstesn\u0117s, grei\u010diau reaguoja ir yra konkurencingesn\u0117s.&nbsp;<\/p>\n\n<\/div><\/div>\n\n<div class=\"gb-container gb-container-68ae52c7\"><div class=\"gb-inside-container\">\n\n<h2 class=\"wp-block-heading\" id=\"h-benefits-of-using-mes\">MES naudojimo privalumai<\/h2>\n\n\n\n<p class=\"has-text-align-left\">Gamybos vykdymo sistema renka gamybos duomenis i\u0161 prijungt\u0173 \u012frengini\u0173, operatori\u0173 ir kit\u0173 sistem\u0173 bei pateikia juos komandai. Vadovai gali naudotis \u0161ia informacija, kad nustatyt\u0173 v\u0117lavimus ir nuspr\u0119st\u0173, k\u0105 keisti. Gamybos veiklos, med\u017eiag\u0173 naudojimo ir kokyb\u0117s patikr\u0173 \u012fra\u0161ai padeda kontroliuoti kokyb\u0119 ir atsargas.<\/p>\n\n\n<div class=\"gb-container gb-container-7f408084\"><div class=\"gb-inside-container\">\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"720\" height=\"560\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Shapes-old-production-planning-1.png\" alt=\"SkyPlanner APS \u2013 gamybos planavimas\" class=\"wp-image-2061\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Shapes-old-production-planning-1.png 720w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Shapes-old-production-planning-1-300x233.png 300w\" sizes=\"(max-width: 720px) 100vw, 720px\" \/><\/figure>\n\n<\/div><\/div>\n\n\n<p><a href=\"\/lt\/istekliai\/kaip-optimizuoti-gamybos-laika\/\" target=\"_blank\" rel=\"noreferrer noopener\">Siekiant s\u0117km\u0117s, b\u016btina optimizuoti lead time<\/a>. MES sistema padeda tai daryti, nes leid\u017eia matyti u\u017eduo\u010di\u0173 eig\u0105 ir v\u0117lavimus. Pasikeitus u\u017esakymui, aktual\u016bs gamybos \u012fra\u0161ai padeda komandai \u012fvertinti, kurios operacijos dar liko ir ar pakeitim\u0105 \u012fmanoma \u012fgyvendinti. Poveikis lead time priklauso nuo turim\u0173 paj\u0117gum\u0173, med\u017eiag\u0173 ir jau atlikt\u0173 darb\u0173; pritaikymas individualiems poreikiams neapsieina be trikd\u017ei\u0173.<\/p>\n\n\n\n<p>MES gali perduoti gamybos rezultatus \u012f ERP, kad verslo duomenys atitikt\u0173 veikl\u0105 gamybos ceche. ERP valdo verslo procesus, o MES teikia i\u0161samius duomenis apie gamybos vykdym\u0105. \u0160ios sistemos papildo viena kit\u0105 ir yra susiejamos per integracij\u0105.<\/p>\n\n<\/div><\/div>\n\n<div class=\"gb-container gb-container-87005d77\"><div class=\"gb-inside-container\">\n\n<h2 class=\"wp-block-heading\" id=\"h-future-applications-of-manufacturing-execution-system\">B\u016bsimi MES taikymo b\u016bdai<\/h2>\n\n\n\n<p class=\"has-text-align-left\">Ateityje MES sprendimai gali susieti gamybos \u012fra\u0161us su analitika ir dirbtiniu intelektu, kad pad\u0117t\u0173 komandoms atpa\u017einti d\u0117sningumus ir reaguoti \u012f poky\u010dius. Prognozavimo priemones reikia vertinti pagal faktinius gamybos duomenis ir sprendimus, kuriuos jos turi pad\u0117ti priimti.<\/p>\n\n\n\n<p>Dirbtiniu intelektu gr\u012fstas gamybos tvarkara\u0161\u010di\u0173 sudarymas jau prakti\u0161kai taikomas kartu su MES. SkyPlanner APS sistemoje planuotojai nustato prioritetus ir apribojimus, o Arcturus apskai\u010diuoja tvarkara\u0161t\u012f pagal gamybos duomenis, paj\u0117gumus ir med\u017eiagas. \u0160ios taisykl\u0117s ir u\u017eraktai leid\u017eia planuotojams i\u0161laikyti kontrol\u0119. Tai tvarkara\u0161\u010di\u0173 sudarymo automatizavimas, o ne savaranki\u0161kas viso verslo valdymas.<\/p>\n\n<\/div><\/div>\n\n<div class=\"gb-container gb-container-c6c85bb5\"><div class=\"gb-inside-container\">\n\n<h2 class=\"wp-block-heading\" id=\"h-take-your-company-s-process-management-to-the-next-level\">Pakelkite savo \u012fmon\u0117s proces\u0173 valdym\u0105 \u012f nauj\u0105 lyg\u012f!<\/h2>\n\n\n\n<p class=\"has-text-align-left\">Integravus MES sistem\u0105 su <a href=\"\/lt\/\">APS sistema, pavyzd\u017eiui, SkyPlanner<\/a>, gamybos vykdymo duomenys susiejami su tvarkara\u0161\u010di\u0173 sudarymu. <a href=\"\/lt\/funkcijos\/\">SkyPlanner APS<\/a> per savo atvir\u0105 REST API integruojasi su bet kuria ERP ar MES sistema ir naudoja \u0161iuos duomenis planavimui pagal gamybos planuotoj\u0173 nustatytus prioritetus.<\/p>\n\n\n\n<p>Pasikeitus u\u017esakymams, paj\u0117gumams ar gamybos eigai, SkyPlanner APS pasitelkia Arcturus ir perskai\u010diuoja tvarkara\u0161t\u012f pagal planuotojo taisykles bei prioritetus. \u012ejungus Autopilot, poky\u010diai gali inicijuoti automatin\u012f tvarkara\u0161\u010dio perskai\u010diavim\u0105, o taisykl\u0117s ir u\u017eraktai lieka galioti. Gantt laiko juostoje matomos skirtingoms darbo vietoms suplanuotos u\u017eduotys, tod\u0117l komanda gali matyti atnaujint\u0105 plan\u0105.<\/p>\n\n\n\n<p>Ar norite savo veikloje i\u0161naudoti kartu veikian\u010di\u0173 <a href=\"\/lt\/istekliai\/pazangus-planavimas-ir-tvarkarasciu-sudarymas\/\">MES ir APS<\/a> galimybes? <a href=\"\/lt\/susisiekite-su-pardavejais\/\">Susisiekite su mumis ir su\u017einokite daugiau!<\/a><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"302\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-1024x302.png\" alt=\"SkyPlanner APS \u2013 gamybos problem\u0173 sprendimai\" class=\"wp-image-4232\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-1024x302.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-300x88.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-768x226.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-1536x452.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-2048x603.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<h2 class=\"gb-headline gb-headline-907bb0ac gb-headline-text\">Da\u017eniausiai u\u017eduodami klausimai<\/h2>\n\n\n\n<p>\u010cia pateikiame da\u017eniausiai u\u017eduodamus klausimus apie gamybos vykdymo sistemas (MES), kad gal\u0117tum\u0117te giliau susipa\u017einti su \u0161ia svarbia \u0161iuolaikini\u0173 gamybos proces\u0173 dalimi. \u0160ie atsakymai i\u0161samiai ap\u017evelgia MES sistem\u0105 \u2013 nuo pagrindinio apibr\u0117\u017eimo iki skirtum\u0173 nuo kit\u0173 sistem\u0173, pavyzd\u017eiui, ERP. Nesvarbu, ar domina jos funkcijos, \u0161iuolaikini\u0173 MES sistem\u0173 galimyb\u0117s, ar raidos subtilyb\u0117s \u2013 \u0161iame skyriuje rasite atsakymus. <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-6030632f gb-headline-text\">Kas yra gamybos vykdymo sistema (MES)?<\/h4>\n\n\n\n<p>Gamybos vykdymo sistema \u2013 tai programin\u0117 \u012franga, kuri stebi, dokumentuoja ir padeda vykdyti gamyb\u0105 ceche. Ji renka duomenis i\u0161 operatori\u0173, \u012frengini\u0173 ir prijungt\u0173 sistem\u0173, kad b\u016bt\u0173 galima matyti u\u017eduo\u010di\u0173 eig\u0105, med\u017eiag\u0173 naudojim\u0105 ir kokyb\u0119.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-60855819 gb-headline-text\">Kuo MES skiriasi nuo ERP?<\/h4>\n\n\n\n<p>ERP (Enterprise Resource Planning) skirta valdyti vis\u0105 versl\u0105, integruojant ir tvarkant visas jo sritis, o MES koncentruojasi b\u016btent \u012f veikl\u0105 gamyklos aplinkoje ir optimizuoja i\u0161teklius bei procesus.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-357c70af gb-headline-text\">Kokios yra pagrindin\u0117s MES sistemos funkcijos?<\/h4>\n\n\n\n<p>Prie pagrindini\u0173 \u0161ios sistemos funkcij\u0173 priskiriamas duomen\u0173 surinkimas, kokyb\u0117s kontrol\u0117, tvarkara\u0161\u010di\u0173 sudarymas, veiklos rezultat\u0173 analiz\u0117, produkt\u0173 srautas, i\u0161tekli\u0173 valdymas ir kita.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-33cf3c20 gb-headline-text\">Kokias funkcijas si\u016blo \u0161iuolaikin\u0117s MES sistemos?<\/h4>\n\n\n\n<p>\u0160iuolaikin\u0117s MES sistemos si\u016blo tokias funkcijas kaip realaus laiko gamybos steb\u0117jimas, gamybos kokyb\u0117s kontrol\u0117, atsarg\u0173 optimizavimas, duomen\u0173 sraut\u0173 valdymas, gamybos analitika ir gamybos sekimas.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-68c7368f gb-headline-text\">Kaip laikui b\u0117gant keit\u0117si MES apibr\u0117\u017eimas?<\/h4>\n\n\n\n<p>MES funkcij\u0173 modeliai laikui b\u0117gant pad\u0117jo apra\u0161yti gamybos vykdymo veiklas. MESA yra paskelbusi kelis gamybos \u012fmon\u0117ms skirtus modelius. ISA-95 skirtas gamybos valdymo ir \u012fmon\u0117s verslo funkcij\u0173 integracijai, taikant bendrus modelius, terminij\u0105 ir informacijos mainus; tai n\u0117ra nekintamas privalom\u0173 MES funkcij\u0173 s\u0105ra\u0161as.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-457889a7 gb-headline-text\">Koki\u0173 tip\u0173 MES sprendim\u0173 yra?<\/h4>\n\n\n\n<p>MES sprendimai gali b\u016bti debesijos arba \u012fdiegiami \u012fmon\u0117s viduje (on-premises), pritaikyti ma\u017eoms \u012fmon\u0117ms, grind\u017eiami dirbtiniu intelektu, skirti stambioms \u012fmon\u0117ms arba konkre\u010dioms pramon\u0117s \u0161akoms, pavyzd\u017eiui, farmacijai.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-834d5e64 gb-headline-text\">Kuo verslui naudinga MES integracija su kitomis sistemomis?<\/h4>\n\n\n\n<p>MES teikia gamybos vykdymo duomenis, o APS apskai\u010diuoja tvarkara\u0161t\u012f. SkyPlanner APS per savo atvir\u0105 REST API jungiasi su bet kuria ERP ar MES sistema. Arcturus sudaro darb\u0173 tvarkara\u0161t\u012f pagal gamybos duomenis ir planuotojo nustatytus prioritetus, o gautas planas rodomas Gantt laiko juostoje.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-4e467a7a gb-headline-text\">Kaip MES prisitaikys ateityje?<\/h4>\n\n\n\n<p>MES gali vis da\u017eniau susieti gamybos \u012fra\u0161us su analitika ir dirbtiniu intelektu paremtomis priemon\u0117mis. Vienas jau prakti\u0161kai taikom\u0173 sprendim\u0173 \u2013 gamybos tvarkara\u0161\u010di\u0173 sudarymas naudojant APS kartu su MES: planuotojai nustato prioritetus, o tvarkara\u0161\u010dio sudarymo variklis perskai\u010diuoja plan\u0105 pasikeitus gamybai. Automatinis tvarkara\u0161\u010di\u0173 sudarymas ir toliau vykdomas pagal planuotojo nustatytas taisykles ir apribojimus.<\/p>\n\n<\/div><\/div>\n\n<div class=\"gb-container gb-container-fb4bc7a3 sticky\"><div class=\"gb-inside-container\">\n<div class=\"gb-container gb-container-f791a09c\"><div class=\"gb-inside-container\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-ff11cdab\">\n<div class=\"gb-grid-column gb-grid-column-525e141f\"><div class=\"gb-container gb-container-525e141f\"><div class=\"gb-inside-container\">\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"588\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Tilted-PNG-1024x588.png\" alt=\"SkyPlanner APS \u2013 gamybos planavimo ir tvarkara\u0161\u010di\u0173 sudarymo vaizdas\" class=\"wp-image-4273\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Tilted-PNG-1024x588.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Tilted-PNG-300x172.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Tilted-PNG-768x441.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Tilted-PNG-1536x882.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Tilted-PNG-2048x1175.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<\/div><\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-279cad58\"><div class=\"gb-container gb-container-279cad58\"><div class=\"gb-inside-container\">\n\n<h4 class=\"wp-block-heading mobile-text-center\" id=\"h-skyrocket-your-production-with-skyplanner-aps\" style=\"font-size:24px\">Paspartinkite gamyb\u0105 su SkyPlanner APS<\/h4>\n\n\n\n<p class=\"mobile-text-center\">U\u017esisakykite demonstracij\u0105 su m\u016bs\u0173 technikos komanda ir pamatykite, kaip SkyPlanner APS veikia realiame gyvenime.<\/p>\n\n\n<div class=\"gb-button-wrapper gb-button-wrapper-4efb82ec\">\n\n<a class=\"gb-button gb-button-89b98570 gb-button-text\" href=\"\/lt\/susisiekite-su-pardavejais\/\" aria-label=\"U\u017esisakyti demonstracij\u0105\">U\u017esisakyti demonstracij\u0105<\/a>\n\n<\/div>\n<\/div><\/div><\/div>\n<\/div>\n<\/div><\/div>\n<\/div><\/div>\n\n\n<hr class=\"wp-block-separator has-text-color has-base-color has-css-opacity has-base-background-color has-background\"\/>\n\n<\/div><\/div><\/div>\n<\/div>\n<\/div><\/div>\n<\/div><\/div>","protected":false},"excerpt":{"rendered":"","protected":false},"author":2,"featured_media":7052,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[301,2688],"tags":[],"class_list":["post-7112","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-istekliai","category-mes-sistemos","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>MES sistema: kas tai ir k\u0105 daro | SkyPlanner APS<\/title>\n<meta name=\"description\" content=\"MES (gamybos vykdymo sistema) \u2013 integruota jutikli\u0173 ir programin\u0117s \u012frangos sistema, kuri stebi, dokumentuoja ir valdo gamyb\u0105.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/mes-sistema-kas-tai-yra-ir-ka-ji-daro\/\" \/>\n<meta property=\"og:locale\" content=\"lt_LT\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"MES sistema: kas tai ir k\u0105 ji daro\" \/>\n<meta property=\"og:description\" content=\"MES (gamybos vykdymo sistema) \u2013 integruota jutikli\u0173 ir programin\u0117s \u012frangos sistema, kuri stebi, dokumentuoja ir valdo gamyb\u0105.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lt\/istekliai\/mes-sistema-kas-tai-yra-ir-ka-ji-daro\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2022-09-01T11:45:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-10T11:59:03+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/09\/MES-What-it-is-and-what-it-does-header-image.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1920\" \/>\n\t<meta property=\"og:image:height\" content=\"1280\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Jesse Sinisalo\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jesse Sinisalo\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"13 minu\u010di\u0173\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/mes-sistema-kas-tai-yra-ir-ka-ji-daro\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/mes-sistema-kas-tai-yra-ir-ka-ji-daro\\\/\"},\"author\":{\"name\":\"Jesse Sinisalo\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/person\\\/eb1bfd6abe95a50b4a9ba1a081cce2dd\"},\"headline\":\"MES sistema: kas tai ir k\u0105 ji daro\",\"datePublished\":\"2022-09-01T11:45:00+00:00\",\"dateModified\":\"2026-10-10T11:59:03+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/mes-sistema-kas-tai-yra-ir-ka-ji-daro\\\/\"},\"wordCount\":2600,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/mes-sistema-kas-tai-yra-ir-ka-ji-daro\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/09\\\/MES-What-it-is-and-what-it-does-header-image.jpg\",\"articleSection\":[\"i\u0161tekliai\",\"MES sistemos\"],\"inLanguage\":\"lt-LT\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/mes-sistema-kas-tai-yra-ir-ka-ji-daro\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/mes-sistema-kas-tai-yra-ir-ka-ji-daro\\\/\",\"name\":\"MES sistema: kas tai ir k\u0105 daro | SkyPlanner APS\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/mes-sistema-kas-tai-yra-ir-ka-ji-daro\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/mes-sistema-kas-tai-yra-ir-ka-ji-daro\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/09\\\/MES-What-it-is-and-what-it-does-header-image.jpg\",\"datePublished\":\"2022-09-01T11:45:00+00:00\",\"dateModified\":\"2026-10-10T11:59:03+00:00\",\"description\":\"MES (gamybos vykdymo sistema) \u2013 integruota jutikli\u0173 ir programin\u0117s \u012frangos sistema, kuri stebi, dokumentuoja ir valdo gamyb\u0105.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/mes-sistema-kas-tai-yra-ir-ka-ji-daro\\\/#breadcrumb\"},\"inLanguage\":\"lt-LT\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/mes-sistema-kas-tai-yra-ir-ka-ji-daro\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"lt-LT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/mes-sistema-kas-tai-yra-ir-ka-ji-daro\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/09\\\/MES-What-it-is-and-what-it-does-header-image.jpg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/09\\\/MES-What-it-is-and-what-it-does-header-image.jpg\",\"width\":1920,\"height\":1280,\"caption\":\"MES - What it is and what it does header image\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/mes-sistema-kas-tai-yra-ir-ka-ji-daro\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Straipsniai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"MES sistema: kas tai ir k\u0105 ji daro\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lt-LT\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lt-LT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/person\\\/eb1bfd6abe95a50b4a9ba1a081cce2dd\",\"name\":\"Jesse Sinisalo\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lt-LT\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f7fad7e89e1bc7e7f7a68406782bb2f01302bf59af6e67593343971c8f70786a?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f7fad7e89e1bc7e7f7a68406782bb2f01302bf59af6e67593343971c8f70786a?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f7fad7e89e1bc7e7f7a68406782bb2f01302bf59af6e67593343971c8f70786a?s=96&d=mm&r=g\",\"caption\":\"Jesse Sinisalo\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"MES sistema: kas tai ir k\u0105 daro | SkyPlanner APS","description":"MES (gamybos vykdymo sistema) \u2013 integruota jutikli\u0173 ir programin\u0117s \u012frangos sistema, kuri stebi, dokumentuoja ir valdo gamyb\u0105.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lt\/istekliai\/mes-sistema-kas-tai-yra-ir-ka-ji-daro\/","og_locale":"lt_LT","og_type":"article","og_title":"MES sistema: kas tai ir k\u0105 ji daro","og_description":"MES (gamybos vykdymo sistema) \u2013 integruota jutikli\u0173 ir programin\u0117s \u012frangos sistema, kuri stebi, dokumentuoja ir valdo gamyb\u0105.","og_url":"https:\/\/skyplanner.ai\/lt\/istekliai\/mes-sistema-kas-tai-yra-ir-ka-ji-daro\/","og_site_name":"SkyPlanner","article_published_time":"2022-09-01T11:45:00+00:00","article_modified_time":"2026-10-10T11:59:03+00:00","og_image":[{"width":1920,"height":1280,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/09\/MES-What-it-is-and-what-it-does-header-image.jpg","type":"image\/jpeg"}],"author":"Jesse Sinisalo","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Jesse Sinisalo","Est. reading time":"13 minu\u010di\u0173"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/mes-sistema-kas-tai-yra-ir-ka-ji-daro\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/mes-sistema-kas-tai-yra-ir-ka-ji-daro\/"},"author":{"name":"Jesse Sinisalo","@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/person\/eb1bfd6abe95a50b4a9ba1a081cce2dd"},"headline":"MES sistema: kas tai ir k\u0105 ji daro","datePublished":"2022-09-01T11:45:00+00:00","dateModified":"2026-10-10T11:59:03+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/mes-sistema-kas-tai-yra-ir-ka-ji-daro\/"},"wordCount":2600,"publisher":{"@id":"https:\/\/skyplanner.ai\/lt\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/mes-sistema-kas-tai-yra-ir-ka-ji-daro\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/09\/MES-What-it-is-and-what-it-does-header-image.jpg","articleSection":["i\u0161tekliai","MES sistemos"],"inLanguage":"lt-LT"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/mes-sistema-kas-tai-yra-ir-ka-ji-daro\/","url":"https:\/\/skyplanner.ai\/lt\/istekliai\/mes-sistema-kas-tai-yra-ir-ka-ji-daro\/","name":"MES sistema: kas tai ir k\u0105 daro | SkyPlanner APS","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lt\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/mes-sistema-kas-tai-yra-ir-ka-ji-daro\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/mes-sistema-kas-tai-yra-ir-ka-ji-daro\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/09\/MES-What-it-is-and-what-it-does-header-image.jpg","datePublished":"2022-09-01T11:45:00+00:00","dateModified":"2026-10-10T11:59:03+00:00","description":"MES (gamybos vykdymo sistema) \u2013 integruota jutikli\u0173 ir programin\u0117s \u012frangos sistema, kuri stebi, dokumentuoja ir valdo gamyb\u0105.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/mes-sistema-kas-tai-yra-ir-ka-ji-daro\/#breadcrumb"},"inLanguage":"lt-LT","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lt\/istekliai\/mes-sistema-kas-tai-yra-ir-ka-ji-daro\/"]}]},{"@type":"ImageObject","inLanguage":"lt-LT","@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/mes-sistema-kas-tai-yra-ir-ka-ji-daro\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/09\/MES-What-it-is-and-what-it-does-header-image.jpg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/09\/MES-What-it-is-and-what-it-does-header-image.jpg","width":1920,"height":1280,"caption":"MES - What it is and what it does header image"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/mes-sistema-kas-tai-yra-ir-ka-ji-daro\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lt\/"},{"@type":"ListItem","position":2,"name":"Straipsniai","item":"https:\/\/skyplanner.ai\/lt\/istekliai\/"},{"@type":"ListItem","position":3,"name":"MES sistema: kas tai ir k\u0105 ji daro"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lt\/#website","url":"https:\/\/skyplanner.ai\/lt\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lt\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lt\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lt-LT"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lt\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lt\/","logo":{"@type":"ImageObject","inLanguage":"lt-LT","@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/person\/eb1bfd6abe95a50b4a9ba1a081cce2dd","name":"Jesse Sinisalo","image":{"@type":"ImageObject","inLanguage":"lt-LT","@id":"https:\/\/secure.gravatar.com\/avatar\/f7fad7e89e1bc7e7f7a68406782bb2f01302bf59af6e67593343971c8f70786a?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/f7fad7e89e1bc7e7f7a68406782bb2f01302bf59af6e67593343971c8f70786a?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/f7fad7e89e1bc7e7f7a68406782bb2f01302bf59af6e67593343971c8f70786a?s=96&d=mm&r=g","caption":"Jesse Sinisalo"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/09\/MES-What-it-is-and-what-it-does-header-image.jpg",1920,1280,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/09\/MES-What-it-is-and-what-it-does-header-image-150x150.jpg",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/09\/MES-What-it-is-and-what-it-does-header-image-300x200.jpg",300,200,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/09\/MES-What-it-is-and-what-it-does-header-image-768x512.jpg",768,512,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/09\/MES-What-it-is-and-what-it-does-header-image-1024x683.jpg",1024,683,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/09\/MES-What-it-is-and-what-it-does-header-image-1536x1024.jpg",1536,1024,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/09\/MES-What-it-is-and-what-it-does-header-image.jpg",1920,1280,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/09\/MES-What-it-is-and-what-it-does-header-image.jpg",360,240,false]},"uagb_author_info":{"display_name":"Jesse Sinisalo","author_link":"https:\/\/skyplanner.ai\/lt\/author\/jesse\/"},"uagb_comment_info":0,"uagb_excerpt":null,"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/posts\/7112","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/comments?post=7112"}],"version-history":[{"count":2,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/posts\/7112\/revisions"}],"predecessor-version":[{"id":93044,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/posts\/7112\/revisions\/93044"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/media\/7052"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/media?parent=7112"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/categories?post=7112"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/tags?post=7112"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}