{"id":43049,"date":"2024-09-25T12:23:33","date_gmt":"2024-09-25T12:23:33","guid":{"rendered":"https:\/\/skyplanner.ai\/istekliai\/uzkirskite-kelia-klientu-nepasitenkinimui-naudojant-aps-sistema\/"},"modified":"2026-03-21T18:37:38","modified_gmt":"2026-03-21T18:37:38","slug":"isvenkite-klientu-nepasitenkinimo-su-aps-sistema","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/lt\/istekliai\/isvenkite-klientu-nepasitenkinimo-su-aps-sistema\/","title":{"rendered":"I\u0161venkite klient\u0173 nepasitenkinimo naudodami APS sistem\u0105"},"content":{"rendered":"<div class=\"gb-container gb-container-bf558a89 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\" id=\"h-prevent-customer-dissatisfaction-with-an-aps-system\">U\u017ekirskite keli\u0105 klient\u0173 nepasitenkinimui naudojant APS sistem\u0105<\/h1>\n\n\n<div class=\"gb-container gb-container-e8026af9\">\n\n<p>Prad\u017eia \u00bb I\u0161tekliai \u00bb I\u0161venkite klient\u0173 nepasitenkinimo naudodami APS sistem\u0105<\/p>\n\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" viewbox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Numatoma skaitymo trukm\u0117: <\/span><span class=\"yoast-reading-time__reading-time\">13<\/span><span class=\"yoast-reading-time__time-unit\"> minu\u010di\u0173<\/span><\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-f0fd57d0\">\n<div class=\"gb-container gb-container-31dfeab3\"><div class=\"gb-inside-container\">\n\n<p class=\"has-text-align-left\"><strong>Klient\u0173 nepasitenkinimas yra tada, kai klientas jau\u010diasi nusivyl\u0119s ar nusivyl\u0119s \u012fmone d\u0117l v\u0117lavimo, prasto aptarnavimo, nekokybi\u0161k\u0173 produkt\u0173 ar nei\u0161sipild\u017eiusi\u0173 l\u016bkes\u010di\u0173.<\/strong><\/p>\n\n<\/div><\/div>\n\n\n<p>Klient\u0173 lojalumas yra trapus.\nKai jis pa\u017eeid\u017eiamas, \u012fmon\u0117ms gali b\u016bti sunku i\u0161laikyti klientus ir suma\u017einti j\u0173 pasitraukim\u0105.\nKlient\u0173 nepasitenkinimas da\u017enai kyla d\u0117l v\u0117lavimo, prasto aptarnavimo ar nei\u0161sipild\u017eiusi\u0173 l\u016bkes\u010di\u0173, ir tai gali tur\u0117ti rimtos \u012ftakos j\u016bs\u0173 verslui.  <\/p>\n\n\n\n<p>Klient\u0173 pasitenkinimui ir i\u0161laikymui reikia pastang\u0173; tai ne\u012fvyksta stebuklingai ar atsitiktinai.\nJ\u016bs\u0173 procesai turi b\u016bti veiksmingi, komanda &#8211; aktyvi, o gamyba &#8211; gerai organizuota.\nSkaitykite toliau ir su\u017einokite, kaip suma\u017einti klient\u0173 nepasitenkinim\u0105 ir pl\u0117sti versl\u0105.  <\/p>\n\n\n\t\t\t\t<div class=\"wp-block-uagb-table-of-contents uagb-toc__align-left uagb-toc__columns-1  uagb-block-3df69bf8      \"\n\t\t\t\t\tdata-scroll= \"1\"\n\t\t\t\t\tdata-offset= \"30\"\n\t\t\t\t\tstyle=\"\"\n\t\t\t\t>\n\t\t\t\t<div class=\"uagb-toc__wrap\">\n\t\t\t\t\t\t<div class=\"uagb-toc__title\">\n\t\t\t\t\t\t\tTable Of Contents\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"uagb-toc__list-wrap \">\n\t\t\t\t\t\t<ol class=\"uagb-toc__list\"><li class=\"uagb-toc__list\"><a href=\"#u\u017ekirskite-keli\u0105-klient\u0173-nepasitenkinimui-naudojant-aps-sistem\u0105\" class=\"uagb-toc-link__trigger\">U\u017ekirskite keli\u0105 klient\u0173 nepasitenkinimui naudojant APS sistem\u0105<\/a><ul class=\"uagb-toc__list\"><li class=\"uagb-toc__list\"><a href=\"#kas-yra-klient\u0173-nepasitenkinimas\" class=\"uagb-toc-link__trigger\">Kas yra klient\u0173 nepasitenkinimas?<\/a><li class=\"uagb-toc__list\"><li class=\"uagb-toc__list\"><a href=\"#nepatenkint\u0173-klient\u0173-tipai\" class=\"uagb-toc-link__trigger\">Nepatenkint\u0173 klient\u0173 tipai<\/a><li class=\"uagb-toc__list\"><li class=\"uagb-toc__list\"><a href=\"#kas-gali-suma\u017einti-klient\u0173-pasitenkinim\u0105\" class=\"uagb-toc-link__trigger\">Kas gali suma\u017einti klient\u0173 pasitenkinim\u0105?<\/a><li class=\"uagb-toc__list\"><li class=\"uagb-toc__list\"><a href=\"#kaip-padidinti-pasitenkinim\u0105-ir-i\u0161laikyti-darbuotojus\" class=\"uagb-toc-link__trigger\">Kaip padidinti pasitenkinim\u0105 ir i\u0161laikyti darbuotojus<\/a><li class=\"uagb-toc__list\"><li class=\"uagb-toc__list\"><a href=\"#aps-ir-klient\u0173-pasitenkinimas\" class=\"uagb-toc-link__trigger\">APS ir klient\u0173 pasitenkinimas<\/a><li class=\"uagb-toc__list\"><li class=\"uagb-toc__list\"><a href=\"#skyplanner-i\u0161manusis-tvarkara\u0161\u010di\u0173-sudarymas-siekiant-suma\u017einti-klient\u0173-nepasitenkinim\u0105\" class=\"uagb-toc-link__trigger\">&quot;SkyPlanner&quot;: I\u0161manusis tvarkara\u0161\u010di\u0173 sudarymas siekiant suma\u017einti klient\u0173 nepasitenkinim\u0105<\/a><\/ul><\/ol>\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\n\n\n<h2 class=\"wp-block-heading\" id=\"h-what-is-customer-dissatisfaction\">Kas yra klient\u0173 nepasitenkinimas?<\/h2>\n\n\n\n<p><strong>Klient\u0173 nepasitenkinimas yra tada, kai klientas jau\u010diasi nusivyl\u0119s ar nusivyl\u0119s \u012fmone d\u0117l v\u0117lavimo, prasto aptarnavimo, nekokybi\u0161k\u0173 produkt\u0173 ar nei\u0161sipild\u017eiusi\u0173 l\u016bkes\u010di\u0173<\/strong>.\nJei norite, kad klientai sugr\u012f\u017et\u0173 ir pasilikt\u0173, turite rasti \u0161i\u0173 problem\u0173 sprendim\u0105.\nNegalite j\u0173 ignoruoti ir apsimesti, kad \u0161ios problemos i\u0161nyks pa\u010dios, arba tik\u0117tis, kad j\u016bs\u0173 produkcija stebuklingai pager\u0117s.\nPrivalote tai padaryti!   <\/p>\n\n\n\n<p><strong>Apskritai klient\u0173 nepasitenkinimas<\/strong> <strong>atsiranda, kai \u012fmon\u0117 nepatenkina klient\u0173 poreiki\u0173 ar l\u016bkes\u010di\u0173, tod\u0117l jie nusivilia ir gali prarasti pasitik\u0117jim\u0105.<\/strong> Jis gali kilti d\u0117l l\u0117to pristatymo, blogo klient\u0173 aptarnavimo arba produkt\u0173, kurie neatitinka to, kas buvo pa\u017ead\u0117ta.\nTai rimta problema, nes nepatenkinti klientai yra daug ma\u017eiau link\u0119 pasilikti. <\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Nepatenkint\u0173 klient\u0173 tipai<\/h2>\n\n\n\n<p>Kalbant apie klient\u0173 nepasitenkinim\u0105, labai svarbu suprasti, kad ne visi nepatenkinti klientai yra vienodi, nes skirtingos situacijos sukelia skirtingus nusivylimo tipus, o j\u0173 \u017einojimas padeda \u012fmon\u0117ms veiksmingai spr\u0119sti kiekvien\u0105 situacij\u0105.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Tylusis nepatenkintas klientas<\/h4>\n\n\n\n<p>Toks klientas nei\u0161rei\u0161kia savo nusivylimo, su kuriuo gal\u0117jo susidurti, bet tyliai i\u0161eina ir niekada nebegr\u012f\u017eta.\nNet jei jie tiesiogiai nesiskund\u017eia, j\u0173 nepasitenkinim\u0105 matysite i\u0161 j\u0173 veiksm\u0173, pavyzd\u017eiui, jie daugiau i\u0161 j\u016bs\u0173 nepirks arba nerekomenduos j\u016bs\u0173 \u012fmon\u0117s. <\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Balsingas nepatenkintas klientas<\/h4>\n\n\n\n<p>Kitaip nei tylieji klientai, \u0161ie klientai atvirai skund\u017eiasi, kai yra nepatenkinti, pateikdami tiesioginius skundus, neigiamus atsiliepimus arba socialin\u0117je \u017einiasklaidoje.\nNors jie gali kelti sunkum\u0173, jie suteikia jums galimyb\u0119 spr\u0119sti j\u0173 problemas ir tobul\u0117ti. <\/p>\n\n\n\n<h4 class=\"wp-block-heading\">L\u0117tinis skundikas<\/h4>\n\n\n\n<p>\u0160is klientas visada atrodo nepatenkintas, kad ir k\u0105 darytum\u0117te.\nPaprastai jie randa d\u0117l ko sk\u0173stis.\nNors j\u0173 skundai gali atrodyti pertekliniai ar priblo\u0161kiantys, j\u0173 nagrin\u0117jimas vis tiek gali pad\u0117ti pagerinti aptarnavim\u0105 ir u\u017ekirsti keli\u0105 tolesn\u0117ms j\u0173 ir kit\u0173 klient\u0173 problemoms.  <\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Sutrik\u0119s klientas<\/h4>\n\n\n\n<p>Kartais klientai b\u016bna nepatenkinti ne d\u0117l to, kad produktas ar paslauga yra blogi, o d\u0117l nesusipratim\u0173 ar informacijos tr\u016bkumo.\nTokio tipo klientai gali ne\u017einoti, kaip teisingai naudoti gamin\u012f, arba neteisingai suprasti, k\u0105 jie gavo.\nAi\u0161kus bendravimas ir gera pagalba nuo pat prad\u017ei\u0173 gali pad\u0117ti i\u0161vengti \u0161i\u0173 r\u016bpes\u010di\u0173 ir juos i\u0161spr\u0119sti.  <\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Kainai jautrus klientas<\/h4>\n\n\n\n<p>\u0160iems klientams svarbiausia yra vert\u0117.\nJie tikisi auk\u0161tos kokyb\u0117s produkt\u0173 ir paslaug\u0173 ir lygina kainas su konkurent\u0173 kainomis.\nJei jiems atrodo, kad jie moka per daug, jie i\u0161rei\u0161kia savo nepasitenkinim\u0105.  <\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Nenuoseklus nepatenkintas klientas<\/h4>\n\n\n\n<p>\u0160ie klientai yra nenusp\u0117jami, bet su jais galima susitvarkyti.\nVien\u0105 dien\u0105 jie b\u016bna patenkinti, kit\u0105 &#8211; ne.\nJ\u0173 nepasitenkinimas paprastai kyla d\u0117l nedideli\u0173, specifini\u0173 problem\u0173 arba produkto ar paslaugos kokyb\u0117s poky\u010di\u0173.\nRaktas \u012f tai, kaip i\u0161laikyti juos laimingus?\nU\u017etikrinkite, kad viskas i\u0161likt\u0173 patikima ir nuoseklu.    <\/p>\n\n\n\n<p>Kiekvienam nepatenkinto kliento tipui reikalingas individualus po\u017ei\u016bris.\nGreitas ir veiksmingas j\u0173 problem\u0173 sprendimas padeda atkurti pasitik\u0117jim\u0105, padidinti klient\u0173 pasitenkinim\u0105 ir j\u0173 i\u0161laikym\u0105.\nKai \u012fmon\u0117s supranta, kod\u0117l klientai yra nusivyl\u0119, jos gali nepatenkintus klientus paversti lojaliais.  <\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Kas gali suma\u017einti klient\u0173 pasitenkinim\u0105?<\/h2>\n\n\n\n<p>I\u0161skaidykime.\nTai yra pagrindin\u0117s prie\u017eastys, d\u0117l kuri\u0173 klientai nusivilia, o jas su\u017einoj\u0119 gal\u0117site su jomis elgtis kaip profesionalai. <\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>V\u0117luojantys pristatymai<\/strong>: Kai klientai laiku negauna savo produkt\u0173, tai i\u0161 karto tampa raudona v\u0117liava.\nV\u0117luojantys pristatymai sukelia nusivylim\u0105, o niekam nepatinka laukti ilgiau, nei tik\u0117tasi. <\/li>\n\n\n\n<li><strong>Prasta produkto kokyb\u0117<\/strong>: Jei gaminys neatitinka kliento l\u016bkes\u010di\u0173, turite problem\u0173.\nD\u0117l kokyb\u0117s problem\u0173 klientai praranda pasitik\u0117jim\u0105 j\u016bs\u0173 verslu. <\/li>\n\n\n\n<li><strong>Blogas klient\u0173 aptarnavimas<\/strong>: Grubus arba nepadedantis aptarnavimas &#8211; greitas b\u016bdas prarasti klientus.\n\u017dmon\u0117s tikisi draugi\u0161kos ir veiksmingos pagalbos, o jos negav\u0119 ie\u0161kos kit\u0173 paslaug\u0173. <\/li>\n\n\n\n<li><strong>Nenuosekli patirtis<\/strong>: Klientai nori vienodai geros patirties kiekvien\u0105 kart\u0105, kai bendrauja su j\u016bs\u0173 \u012fmone.\nJie prad\u0117s ie\u0161koti alternatyv\u0173, jei vien\u0105 kart\u0105 gaus puik\u0173 aptarnavim\u0105, o kit\u0105 kart\u0105 &#8211; prast\u0105. <\/li>\n\n\n\n<li><strong>Neai\u0161kus bendravimas<\/strong>: Klientai turi \u017einoti, kas vyksta su j\u0173 u\u017esakymais ar paslaugomis.\nJei jie jau\u010diasi palikti ne\u017einioje, j\u0173 nepasitenkinimas augs. <\/li>\n\n\n\n<li><strong>Didel\u0117s kainos be vert\u0117s<\/strong>: Klientai neprie\u0161tarauja mok\u0117ti daugiau, jei mano, kad gauna vert\u0119.\nTa\u010diau jie jausis apgauti, jei kaina neatitiks kokyb\u0117s. <\/li>\n\n\n\n<li><strong>Sud\u0117tingi procesai<\/strong>: Klientai praras kantryb\u0119, jei bus per sunku pateikti u\u017esakym\u0105 ar i\u0161spr\u0119sti problem\u0105.\nPasir\u016bpinkite, kad viskas b\u016bt\u0173 paprasta, arba jie ras kit\u0105 \u012fmon\u0119, kuri tai daro. <\/li>\n\n\n\n<li><strong>L\u016bkes\u010di\u0173 nepateisinimas<\/strong>: Klientai jau\u010diasi nusivyl\u0119, kai produktas ar paslauga neatitinka pa\u017ead\u0173.\nB\u016bkite ai\u0161k\u016bs, nusistatykite realius l\u016bkes\u010dius ir anksti pa\u0161alinkite bet kokias abejones. <\/li>\n<\/ul>\n\n\n\n<p>U\u017ekirsdami keli\u0105 \u0161ioms problemoms ir jas spr\u0119sdami, pastebimai padidinsite klient\u0173 pasitenkinim\u0105.<\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-f7e777f3\">\n<div class=\"gb-container gb-container-0a56c9fa sticky\"><div class=\"gb-inside-container\">\n<div class=\"gb-container gb-container-eed176fc\"><div class=\"gb-inside-container\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-1b2f16ae\">\n<div class=\"gb-grid-column gb-grid-column-be655727\"><div class=\"gb-container gb-container-be655727\"><div class=\"gb-inside-container\">\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"685\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png\" alt=\"SkyPlanner APS - Production planning and scheduling product image straight view\" class=\"wp-image-4339\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-300x201.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-768x514.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1536x1027.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-2048x1370.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<\/div><\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-0821f9a0\"><div class=\"gb-container gb-container-0821f9a0\"><div class=\"gb-inside-container\">\n\n<h4 class=\"wp-block-heading mobile-text-center\" id=\"h-advanced-production-planning-with-ai-skyplanner-aps\" style=\"font-size:24px\">Advanced production planning with AI &#8211; SkyPlanner APS<\/h4>\n\n\n\n<p class=\"mobile-text-center\">Read more about our approach to production planning and optimization leveraging the power of AI.<\/p>\n\n\n<div class=\"gb-button-wrapper gb-button-wrapper-690cb95e\">\n\n<a class=\"gb-button gb-button-7b87a903 gb-button-text\" href=\"https:\/\/skyplanner.ai\/\" aria-label=\"Book a demo\">Production planning with AI<\/a>\n\n<\/div>\n<\/div><\/div><\/div>\n<\/div>\n<\/div><\/div>\n<\/div><\/div>\n<\/div>\n\n\n<h2 class=\"wp-block-heading\" id=\"h-how-to-increase-satisfaction-and-retention\">Kaip padidinti pasitenkinim\u0105 ir i\u0161laikyti darbuotojus<\/h2>\n\n\n\n<p>Jei norite, kad klientai likt\u0173, turite \u012fd\u0117ti darbo.\nPateikiame kelet\u0105 proting\u0173 strategij\u0173, kaip padidinti klient\u0173 lojalum\u0105: <\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Ai\u0161kiai ir da\u017enai bendraukite<\/h4>\n\n\n\n<p>Klientai visada tur\u0117t\u0173 jaustis informuoti.\nPateikite naujausi\u0105 informacij\u0105 apie j\u0173 u\u017esakymus, informuokite apie bet kokius pakeitimus ir greitai reaguokite \u012f jiems r\u016bpimus klausimus.\nKlientai labiau link\u0119 susitaikyti su v\u0117lavimais, jei i\u0161 anksto jiems apie tai pasakysite ir pasi\u016blysite ger\u0105 klient\u0173 aptarnavim\u0105.\nAi\u0161kus bendravimas rodo, kad jums r\u016bpi, ir stiprina pasitik\u0117jim\u0105.   <\/p>\n\n\n\n<h4 class=\"wp-block-heading\">U\u017etikrinkite nuosekli\u0105 kokyb\u0119<\/h4>\n\n\n\n<p>\u017dmon\u0117s kiekvien\u0105 kart\u0105 pirkdami i\u0161 j\u016bs\u0173 tikisi tokios pat geros kokyb\u0117s.\nPasir\u016bpinkite, kad j\u016bs\u0173 gamybos procesas b\u016bt\u0173 patikimas ir produktai visada atitikt\u0173 l\u016bkes\u010dius.\nTaip i\u0161vengsite nepasitenkinimo ir klientai sugr\u012f\u0161.  <\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Supaprastinkite proces\u0105<\/h4>\n\n\n\n<p>Neapsunkinkite klient\u0173.\nNesvarbu, ar tai b\u016bt\u0173 u\u017esakymas, pagalbos pra\u0161ymas, ar problemos sprendimas, procesas tur\u0117t\u0173 b\u016bti kuo paprastesnis.\nSud\u0117tingi procesai vargina klientus, o nusivyl\u0119 klientai nesilieka.  <\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Apmokykite savo komand\u0105 orientuotis \u012f klientus<\/h4>\n\n\n\n<p>J\u016bs\u0173 komanda tur\u0117t\u0173 b\u016bti draugi\u0161ka, kompetentinga ir pasirengusi spr\u0119sti problemas.\nPuikiai aptarnaujami klientai jau\u010diasi vertinami ir yra daug didesn\u0117 tikimyb\u0117, kad liks lojal\u016bs.\nReguliar\u016bs mokymai u\u017etikrina, kad j\u016bs\u0173 komanda gal\u0117t\u0173 veiksmingai spr\u0119sti klient\u0173 problemas.  <\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Nustatykite realius l\u016bkes\u010dius<\/h4>\n\n\n\n<p>I\u0161 anksto pasakykite, k\u0105 galite pateikti.\nJei numatote v\u0117lavim\u0105, pasakykite apie tai klientams i\u0161 anksto.\nAi\u0161k\u016bs ir real\u016bs l\u016bkes\u010diai padeda i\u0161vengti nusivylim\u0173 ir stiprina pasitik\u0117jim\u0105.  <\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Papra\u0161ykite atsiliepim\u0173<\/h4>\n\n\n\n<p>Klientams patinka \u017einoti, kad j\u0173 nuomon\u0117 yra svarbi.\nReguliariai pra\u0161ykite atsiliepim\u0173 apie j\u0173 patirt\u012f ir naudokite \u0161i\u0105 informacij\u0105 paslaugoms tobulinti.\nTaip parodysite, kad \u012fsiklausote ir visada siekiate tobul\u0117ti.  <\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Apdovanokite lojalius klientus<\/h4>\n\n\n\n<p>Parodykite d\u0117kingum\u0105 klientams, kurie lieka su jumis.\nSi\u016blydami nuolaidas, specialius pasi\u016blymus ar asmenin\u012f d\u0117mes\u012f, padidinsite klient\u0173 i\u0161laikym\u0105 ir leisite jiems jaustis vertinamiems. <\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Pasirinkite tinkamus \u012frankius<\/h4>\n\n\n\n<p>Pasikliovimas <a href=\"https:\/\/skyplanner.ai\/resources\/excel-production-planning-challenges-and-the-superior-alternative-skyplanner-aps\/\">rankiniu planavimu<\/a> veda prie klaid\u0173, v\u0117lavim\u0173 ir nusivylusi\u0173 klient\u0173. Tinkami \u012frankiai, pavyzd\u017eiui, <a href=\"https:\/\/skyplanner.ai\/resources\/advanced-planning-and-scheduling\/\">APS sistema (pa\u017eangus planavimas ir tvarkara\u0161\u010di\u0173 sudarymas)<\/a>, <a href=\"https:\/\/skyplanner.ai\/resources\/what-is-erp\/\">ERP (Enterprise Resource Planning)<\/a> arba CRM (Customer Relationship Management) sistema, leid\u017eia visk\u0105 atlikti efektyviau. \u0160ios sistemos supaprastina komunikacij\u0105, valdo grafikus ir laiku patenkina klient\u0173 poreikius.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">APS ir klient\u0173 pasitenkinimas<\/h2>\n\n\n\n<p>APS programin\u0117 \u012franga ne tik pagerina pristatymo laik\u0105, bet ir u\u017etikrina kokyb\u0119 organizuodama vis\u0105 gamybos proces\u0105 j\u016bs\u0173 \u012fmon\u0117je.\nTvirtas gamybos planavimas padeda i\u0161vengti i\u0161tekli\u0173 perkrovos ir i\u0161laikyti produkt\u0173 kokyb\u0119. <\/p>\n\n\n\n<p>Naudodami <a href=\"https:\/\/skyplanner.ai\/resources\/aps-software-features\/\">APS<\/a> funkcijas, galite i\u0161vengti siaur\u0173 viet\u0173, identifikuodami galimas planavimo problemas dar prie\u0161 joms atsirandant, o tai rei\u0161kia ma\u017eiau galvos skausm\u0173, netik\u0117tum\u0173 ir sklandesn\u0119 veikl\u0105. Pagerintas bendravimas tarp padalini\u0173 taip pat u\u017etikrina, kad visi b\u016bt\u0173 tame pa\u010diame puslapyje, ma\u017einant nesusipratimus, kurie gal\u0117t\u0173 sukelti klient\u0173 nepasitenkinim\u0105.<\/p>\n\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/resources\/aps-system-benefits\/\">APS<\/a> privalumai per\u017eengia pristatymo dat\u0173 ribas. J\u016bs optimizuosite turimus i\u0161teklius ir paj\u0117gumus savo versle, ma\u017einsite prastov\u0105 ir i\u0161vengsite neefektyvumo. Tai lemia patikimesn\u0119 gamyb\u0105, kuri\u0105 pasteb\u0117s j\u016bs\u0173 klientai.<\/p>\n\n\n\n<p>Laiku pristatydami kokybi\u0161kus produktus ir palaikydami veiksming\u0105 bendravim\u0105, stipriname pasitik\u0117jim\u0105 ir didiname klient\u0173 pasitenkinim\u0105 bei j\u0173 i\u0161laikym\u0105.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-skyplanner-smart-scheduling-to-reduce-customer-dissatisfaction\">&#8222;SkyPlanner&#8221;: I\u0161manusis tvarkara\u0161\u010di\u0173 sudarymas siekiant suma\u017einti klient\u0173 nepasitenkinim\u0105<\/h2>\n\n\n\n<p>Mes \u017einome, kad j\u016bs\u0173 gamybos planavimo poreikiai yra unikal\u016bs, ir SkyPlanner <a href=\"https:\/\/skyplanner.ai\/features\/\">APS<\/a> yra pilnas unikali\u0173 funkcij\u0173, kurios pad\u0117s jums optimizuoti gamybos ciklus, pagerinti paj\u0117gum\u0173 ir atsarg\u0173 valdym\u0105 ir u\u017etikrinti skland\u0173 vis\u0173 proces\u0173 veikim\u0105. Mes taip pat si\u016blome pritaikymo paslaugas pagal j\u016bs\u0173 specifinius gamybos reikalavimus.<\/p>\n\n\n\n<p>Kas i\u0161skiria SkyPlanner gamybos planavim\u0105 ir grafik\u0173 sudarym\u0105? Sugedus ma\u0161inai ar i\u0161kilus netik\u0117tai problemai, m\u016bs\u0173 AI galimyb\u0117mis pagr\u012fstas planavimo \u012frankis gali i\u0161 naujo optimizuoti j\u016bs\u0173 gamybos plan\u0105 vienu paspaudimu, i\u0161laikant daugum\u0105 u\u017esakym\u0173 pagal grafik\u0105. Reikia skubaus u\u017esakymo? N\u0117ra problema! Naudokite m\u016bs\u0173 greitojo kelio funkcij\u0105, kad suteiktum\u0117te prioritet\u0105 skubiems u\u017edaviniams, tvarkydami svarbiausius darbus pirmiausia. \u0160is geb\u0117jimas yra centrinis agentinio gamybos planavimo aspektas, kai reoptimizavimas vyksta automati\u0161kai vis\u0105 par\u0105.<\/p> You can also adjust dynamic priorities to decide what matters most on the fly.\n\n\n\n<p>Pasiruo\u0161\u0119 perimti gamybos kontrol\u0119 kaip niekad anks\u010diau? <a href=\"https:\/\/skyplanner.ai\/contact-sales\/\">U\u017esiregistruoti demonstracijai<\/a> su mumis \u0161iandien ir \u012fsitikinkite, kaip SkyPlanner gali transformuoti j\u016bs\u0173 veikl\u0105 ir d\u017eiuginti klientus!<\/p>\n\n\n<div class=\"gb-container gb-container-92545123\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-0a61546f\">\n<div class=\"gb-grid-column gb-grid-column-e4183086\"><div class=\"gb-container gb-container-e4183086\">\n\n<\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-84ccbb5d\"><div class=\"gb-container gb-container-84ccbb5d\">\n\n<\/div><\/div>\n<\/div>\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>U\u017ekirskite keli\u0105 klient\u0173 nepasitenkinimui naudojant APS sistem\u0105 Prad\u017eia \u00bb I\u0161tekliai \u00bb I\u0161venkite klient\u0173 nepasitenkinimo naudodami APS sistem\u0105 Klient\u0173 nepasitenkinimas yra tada, kai klientas jau\u010diasi nusivyl\u0119s ar nusivyl\u0119s \u012fmone d\u0117l v\u0117lavimo, prasto aptarnavimo, nekokybi\u0161k\u0173 produkt\u0173 ar nei\u0161sipild\u017eiusi\u0173 l\u016bkes\u010di\u0173. Klient\u0173 lojalumas yra trapus. Kai jis pa\u017eeid\u017eiamas, \u012fmon\u0117ms gali b\u016bti sunku i\u0161laikyti klientus ir suma\u017einti j\u0173 pasitraukim\u0105. Klient\u0173 &#8230; <a title=\"I\u0161venkite klient\u0173 nepasitenkinimo naudodami APS sistem\u0105\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/isvenkite-klientu-nepasitenkinimo-su-aps-sistema\/\" aria-label=\"Read more about I\u0161venkite klient\u0173 nepasitenkinimo naudodami APS sistem\u0105\">Read more<\/a><\/p>\n","protected":false},"author":6,"featured_media":42376,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2532,301],"tags":[],"class_list":["post-43049","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-ir-planavimas","category-istekliai","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>I\u0161venkite klient\u0173 nepasitenkinimo naudodami APS sistem\u0105 &#8211; SkyPlanner<\/title>\n<meta name=\"description\" content=\"Klient\u0173 nepasitenkinimas \u2013 tai b\u016bsena, kai klientas jau\u010dia nusivylim\u0105 \u012fmone d\u0117l v\u0117lavim\u0173, prasto aptarnavimo ar nei\u0161pildyt\u0173 l\u016bkes\u010di\u0173.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/isvenkite-klientu-nepasitenkinimo-su-aps-sistema\/\" \/>\n<meta property=\"og:locale\" content=\"lt_LT\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"I\u0161venkite klient\u0173 nepasitenkinimo naudodami APS sistem\u0105\" \/>\n<meta property=\"og:description\" content=\"Klient\u0173 nepasitenkinimas \u2013 tai b\u016bsena, kai klientas jau\u010dia nusivylim\u0105 \u012fmone d\u0117l v\u0117lavim\u0173, prasto aptarnavimo ar nei\u0161pildyt\u0173 l\u016bkes\u010di\u0173.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lt\/istekliai\/isvenkite-klientu-nepasitenkinimo-su-aps-sistema\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2024-09-25T12:23:33+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-03-21T18:37:38+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/09\/Prevent-Customer-Dissatisfaction.png\" \/>\n\t<meta property=\"og:image:width\" content=\"2000\" \/>\n\t<meta property=\"og:image:height\" content=\"1333\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"SkyPlanner\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"13 minu\u010di\u0173\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/isvenkite-klientu-nepasitenkinimo-su-aps-sistema\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/isvenkite-klientu-nepasitenkinimo-su-aps-sistema\\\/\"},\"author\":{\"name\":\"SkyPlanner\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\"},\"headline\":\"I\u0161venkite klient\u0173 nepasitenkinimo naudodami APS sistem\u0105\",\"datePublished\":\"2024-09-25T12:23:33+00:00\",\"dateModified\":\"2026-03-21T18:37:38+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/isvenkite-klientu-nepasitenkinimo-su-aps-sistema\\\/\"},\"wordCount\":1629,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/isvenkite-klientu-nepasitenkinimo-su-aps-sistema\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2024\\\/09\\\/Prevent-Customer-Dissatisfaction.png\",\"articleSection\":[\"APS ir planavimas\",\"i\u0161tekliai\"],\"inLanguage\":\"lt-LT\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/isvenkite-klientu-nepasitenkinimo-su-aps-sistema\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/isvenkite-klientu-nepasitenkinimo-su-aps-sistema\\\/\",\"name\":\"I\u0161venkite klient\u0173 nepasitenkinimo naudodami APS sistem\u0105 &#8211; SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/isvenkite-klientu-nepasitenkinimo-su-aps-sistema\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/isvenkite-klientu-nepasitenkinimo-su-aps-sistema\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2024\\\/09\\\/Prevent-Customer-Dissatisfaction.png\",\"datePublished\":\"2024-09-25T12:23:33+00:00\",\"dateModified\":\"2026-03-21T18:37:38+00:00\",\"description\":\"Klient\u0173 nepasitenkinimas \u2013 tai b\u016bsena, kai klientas jau\u010dia nusivylim\u0105 \u012fmone d\u0117l v\u0117lavim\u0173, prasto aptarnavimo ar nei\u0161pildyt\u0173 l\u016bkes\u010di\u0173.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/isvenkite-klientu-nepasitenkinimo-su-aps-sistema\\\/#breadcrumb\"},\"inLanguage\":\"lt-LT\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/isvenkite-klientu-nepasitenkinimo-su-aps-sistema\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"lt-LT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/isvenkite-klientu-nepasitenkinimo-su-aps-sistema\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2024\\\/09\\\/Prevent-Customer-Dissatisfaction.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2024\\\/09\\\/Prevent-Customer-Dissatisfaction.png\",\"width\":2000,\"height\":1333,\"caption\":\"Prevent Customer Dissatisfaction. Image for illustrative purposes.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/isvenkite-klientu-nepasitenkinimo-su-aps-sistema\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"I\u0161venkite klient\u0173 nepasitenkinimo naudodami APS sistem\u0105\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lt-LT\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lt-LT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\",\"name\":\"SkyPlanner\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lt-LT\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"caption\":\"SkyPlanner\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"I\u0161venkite klient\u0173 nepasitenkinimo naudodami APS sistem\u0105 &#8211; SkyPlanner","description":"Klient\u0173 nepasitenkinimas \u2013 tai b\u016bsena, kai klientas jau\u010dia nusivylim\u0105 \u012fmone d\u0117l v\u0117lavim\u0173, prasto aptarnavimo ar nei\u0161pildyt\u0173 l\u016bkes\u010di\u0173.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lt\/istekliai\/isvenkite-klientu-nepasitenkinimo-su-aps-sistema\/","og_locale":"lt_LT","og_type":"article","og_title":"I\u0161venkite klient\u0173 nepasitenkinimo naudodami APS sistem\u0105","og_description":"Klient\u0173 nepasitenkinimas \u2013 tai b\u016bsena, kai klientas jau\u010dia nusivylim\u0105 \u012fmone d\u0117l v\u0117lavim\u0173, prasto aptarnavimo ar nei\u0161pildyt\u0173 l\u016bkes\u010di\u0173.","og_url":"https:\/\/skyplanner.ai\/lt\/istekliai\/isvenkite-klientu-nepasitenkinimo-su-aps-sistema\/","og_site_name":"SkyPlanner","article_published_time":"2024-09-25T12:23:33+00:00","article_modified_time":"2026-03-21T18:37:38+00:00","og_image":[{"width":2000,"height":1333,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/09\/Prevent-Customer-Dissatisfaction.png","type":"image\/png"}],"author":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Written by":"SkyPlanner","Est. reading time":"13 minu\u010di\u0173"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/isvenkite-klientu-nepasitenkinimo-su-aps-sistema\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/isvenkite-klientu-nepasitenkinimo-su-aps-sistema\/"},"author":{"name":"SkyPlanner","@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a"},"headline":"I\u0161venkite klient\u0173 nepasitenkinimo naudodami APS sistem\u0105","datePublished":"2024-09-25T12:23:33+00:00","dateModified":"2026-03-21T18:37:38+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/isvenkite-klientu-nepasitenkinimo-su-aps-sistema\/"},"wordCount":1629,"publisher":{"@id":"https:\/\/skyplanner.ai\/lt\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/isvenkite-klientu-nepasitenkinimo-su-aps-sistema\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/09\/Prevent-Customer-Dissatisfaction.png","articleSection":["APS ir planavimas","i\u0161tekliai"],"inLanguage":"lt-LT"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/isvenkite-klientu-nepasitenkinimo-su-aps-sistema\/","url":"https:\/\/skyplanner.ai\/lt\/istekliai\/isvenkite-klientu-nepasitenkinimo-su-aps-sistema\/","name":"I\u0161venkite klient\u0173 nepasitenkinimo naudodami APS sistem\u0105 &#8211; SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lt\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/isvenkite-klientu-nepasitenkinimo-su-aps-sistema\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/isvenkite-klientu-nepasitenkinimo-su-aps-sistema\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/09\/Prevent-Customer-Dissatisfaction.png","datePublished":"2024-09-25T12:23:33+00:00","dateModified":"2026-03-21T18:37:38+00:00","description":"Klient\u0173 nepasitenkinimas \u2013 tai b\u016bsena, kai klientas jau\u010dia nusivylim\u0105 \u012fmone d\u0117l v\u0117lavim\u0173, prasto aptarnavimo ar nei\u0161pildyt\u0173 l\u016bkes\u010di\u0173.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/isvenkite-klientu-nepasitenkinimo-su-aps-sistema\/#breadcrumb"},"inLanguage":"lt-LT","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lt\/istekliai\/isvenkite-klientu-nepasitenkinimo-su-aps-sistema\/"]}]},{"@type":"ImageObject","inLanguage":"lt-LT","@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/isvenkite-klientu-nepasitenkinimo-su-aps-sistema\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/09\/Prevent-Customer-Dissatisfaction.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/09\/Prevent-Customer-Dissatisfaction.png","width":2000,"height":1333,"caption":"Prevent Customer Dissatisfaction. Image for illustrative purposes."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/isvenkite-klientu-nepasitenkinimo-su-aps-sistema\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lt\/"},{"@type":"ListItem","position":2,"name":"I\u0161venkite klient\u0173 nepasitenkinimo naudodami APS sistem\u0105"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lt\/#website","url":"https:\/\/skyplanner.ai\/lt\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lt\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lt\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lt-LT"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lt\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lt\/","logo":{"@type":"ImageObject","inLanguage":"lt-LT","@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a","name":"SkyPlanner","image":{"@type":"ImageObject","inLanguage":"lt-LT","@id":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","caption":"SkyPlanner"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/09\/Prevent-Customer-Dissatisfaction.png",2000,1333,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/09\/Prevent-Customer-Dissatisfaction-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/09\/Prevent-Customer-Dissatisfaction-300x200.png",300,200,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/09\/Prevent-Customer-Dissatisfaction-768x512.png",768,512,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/09\/Prevent-Customer-Dissatisfaction-1024x682.png",1024,682,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/09\/Prevent-Customer-Dissatisfaction-1536x1024.png",1536,1024,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/09\/Prevent-Customer-Dissatisfaction.png",2000,1333,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/09\/Prevent-Customer-Dissatisfaction.png",360,240,false]},"uagb_author_info":{"display_name":"SkyPlanner","author_link":"https:\/\/skyplanner.ai\/lt\/author\/bettina\/"},"uagb_comment_info":0,"uagb_excerpt":"U\u017ekirskite keli\u0105 klient\u0173 nepasitenkinimui naudojant APS sistem\u0105 Prad\u017eia \u00bb I\u0161tekliai \u00bb I\u0161venkite klient\u0173 nepasitenkinimo naudodami APS sistem\u0105 Klient\u0173 nepasitenkinimas yra tada, kai klientas jau\u010diasi nusivyl\u0119s ar nusivyl\u0119s \u012fmone d\u0117l v\u0117lavimo, prasto aptarnavimo, nekokybi\u0161k\u0173 produkt\u0173 ar nei\u0161sipild\u017eiusi\u0173 l\u016bkes\u010di\u0173. Klient\u0173 lojalumas yra trapus. Kai jis pa\u017eeid\u017eiamas, \u012fmon\u0117ms gali b\u016bti sunku i\u0161laikyti klientus ir suma\u017einti j\u0173 pasitraukim\u0105. Klient\u0173&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/posts\/43049","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/comments?post=43049"}],"version-history":[{"count":5,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/posts\/43049\/revisions"}],"predecessor-version":[{"id":87257,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/posts\/43049\/revisions\/87257"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/media\/42376"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/media?parent=43049"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/categories?post=43049"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/tags?post=43049"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}