{"id":29582,"date":"2023-11-11T15:48:29","date_gmt":"2023-11-11T15:48:29","guid":{"rendered":"https:\/\/skyplanner.ai\/istekliai\/gamybos-planuotojo-atlyginimas-latvijoje-2023-m\/"},"modified":"2026-06-19T21:09:40","modified_gmt":"2026-06-19T21:09:40","slug":"gamybos-planuotojo-atlyginimas-latvijoje-2026-m","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/lt\/istekliai\/gamybos-planuotojo-atlyginimas-latvijoje-2026-m\/","title":{"rendered":"Gamybos planuotojo atlyginimas Latvijoje 2026 m."},"content":{"rendered":"<div class=\"gb-container gb-container-bf558a89 article-main-content-container\">\n<div class=\"gb-container gb-container-f0fd57d0\">\n<div class=\"gb-container gb-container-31dfeab3\"><div class=\"gb-inside-container\">\n\n<p>Vidutinis gamybos planuotojo atlyginimas Latvijoje 2026 metais yra apie 18 804 \u20ac per metus, arba apie 1 567 \u20ac per m\u0117nes\u012f neatskai\u010dius mokes\u010di\u0173. \u0160is atlyginimas atspindi j\u0173 darbo svarb\u0105 ir reikalingus \u012fg\u016bd\u017eius. Vis d\u0117lto atminkite, kad tikslus atlyginimas gali keistis priklausomai nuo planuotojo i\u0161silavinimo, vietos Latvijoje, kurioje jie dirba, ir \u012fmon\u0117s, kurioje jie dirba, tipo.<\/p>\n\n<\/div><\/div>\n\n\n<p>Latvijos gamybos sektorius auga ir demonstruoja tvirt\u0105 pozicij\u0105 Europos rinkose. Latvija \u017einoma d\u0117l savo ekstensyvios mi\u0161kininkyst\u0117s, naujovi\u0161kos elektronikos ir auk\u0161tos kokyb\u0117s maisto produkt\u0173 gamybos; \u0161i \u0161alis taip pat i\u0161siskiria farmacijos, tekstil\u0117s ir \u017eali\u0173j\u0173 technologij\u0173 srityse. D\u0117l savo strategin\u0117s pad\u0117ties Latvija jungia Rytus ir Vakarus, taip didindama savo pramon\u0117s konkurencin\u012f prana\u0161um\u0105. \u0160is augimas skatina kvalifikuot\u0173 gamybos planuotoj\u0173, kuri\u0173 kompetencija u\u017etikrina skland\u0173 pramon\u0117s rat\u0173 sukim\u0105si, poreik\u012f. Vykstant \u0161iai pa\u017eangai, i\u0161kyla esminis klausimas: Kokie atlyginimai \u0161iemet Latvijoje mokami gamybos planuotojams?    <\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Kompensacijos gamybos planuotojams Latvijoje<\/h2>\n\n\n\n<p>Gamybos planuotojai yra labai svarb\u016bs siekiant u\u017etikrinti skland\u0173 darb\u0105 Latvijos gamybos sektoriuje. Vidutini\u0161kai \u0161ie specialistai <strong>per metus<\/strong> u\u017edirba apie <strong>18 804 eurus<\/strong>, t. y. apie <strong>1567 eurus per m\u0117nes\u012f, <\/strong>neatskai\u010dius mokes\u010di\u0173. Toks pajam\u0173 lygis atspindi j\u0173 gyvybi\u0161kai svarb\u0173 vaidmen\u012f valdant gamybos linijas. Ta\u010diau tiksli suma, kuri\u0105 gamybos planuotojas gauna namo, gali skirtis, nes tai priklauso nuo jo i\u0161silavinimo, Latvijos regiono ir \u012fmon\u0117s, kurioje jis dirba.<\/p>\n\n\n\n<p>Specialistai turi ne tik suprasti galim\u0105 u\u017edarb\u012f, bet ir palyginti j\u012f su pragyvenimo i\u0161laidomis Latvijoje. Bendras vidutinis atlyginimas \u0161alyje siekia apie <strong><strong>1560<\/strong> eur\u0173 per m\u0117nes\u012f<\/strong> neatskai\u010dius mokes\u010di\u0173 ir leid\u017eia susidaryti nuomon\u0119 apie bendr\u0105 ekonomin\u0119 pad\u0117t\u012f. Nors pragyvenimo i\u0161laidos Latvijoje yra vidutin\u0117s Europos mastu, jos turi \u012ftakos bet kokio atlyginimo grynajai vertei. Tod\u0117l specialistai tur\u0117t\u0173 \u012fvertinti savo galimas pajamas atsi\u017evelgdami \u012f vietos i\u0161laidas b\u016bstui, komunalin\u0117ms paslaugoms, maistui ir transportui.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Lyginamosios pajamos: Baltijos \u0161ali\u0173 perspektyva<\/h2>\n\n\n\n<p>Palyginus su kaimynin\u0117mis Baltijos \u0161alimis, Latvijos gamybos planuotoj\u0173 atlyginimai yra \u012fdomus palyginimas. Pavyzd\u017eiui, Baltijos \u0161ali\u0173 trejeto nar\u0117s Estija ir Lietuva u\u017e pana\u0161ias pareigas gauna skirting\u0105 atlyg\u012f. <\/p>\n\n\n\n<p><a href=\"\/lt\/istekliai\/gamybos-planuotojo-atlyginimas-estijoje-2026-m\/\">Gamybos planuotojo atlyginimas Estijoje<\/a> gali b\u016bti \u0161iek tiek didesnis, atsi\u017evelgiant \u012f \u0161alies ekonominius rodiklius ir pragyvenimo lyg\u012f, pana\u0161us \u012f Latvijos atlyginim\u0105. <a href=\"\/lt\/istekliai\/gamybos-planuotojo-atlyginimas-lietuvoje-2026-m\/\">Gamybos planuotojo atlyginimas Lietuvoje<\/a> paprastai vir\u0161ija atlyginim\u0105 Latvijoje, atsi\u017evelgiant \u012f subtilius, ta\u010diau reik\u0161mingus ekonominius skirtumus tarp \u0161i\u0173 dviej\u0173 kaimynini\u0173 \u0161ali\u0173. Nors j\u0173 finansin\u0117 aplinka glaud\u017eiai susijusi, Lietuvoje \u0161ios srities specialistams da\u017enai mokamas didelis atlygis.<\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-f7e777f3\">\n<div class=\"gb-container gb-container-0a56c9fa sticky\"><div class=\"gb-inside-container\">\n<div class=\"gb-container gb-container-eed176fc\"><div class=\"gb-inside-container\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-1b2f16ae\">\n<div class=\"gb-grid-column gb-grid-column-be655727\"><div class=\"gb-container gb-container-be655727\"><div class=\"gb-inside-container\">\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"685\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png\" alt=\"SkyPlanner APS - Production planning and scheduling product image straight view\" class=\"wp-image-4339\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-300x201.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-768x514.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1536x1027.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-2048x1370.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<\/div><\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-0821f9a0\"><div class=\"gb-container gb-container-0821f9a0\"><div class=\"gb-inside-container\">\n\n<h4 class=\"wp-block-heading mobile-text-center\" id=\"h-advanced-production-planning-with-ai-skyplanner-aps\" style=\"font-size:24px\">Advanced production planning with AI &#8211; SkyPlanner APS<\/h4>\n\n\n\n<p class=\"mobile-text-center\">Read more about our approach to production planning and optimization leveraging the power of AI.<\/p>\n\n\n<div class=\"gb-button-wrapper gb-button-wrapper-690cb95e\">\n\n<a class=\"gb-button gb-button-7b87a903 gb-button-text\" href=\"https:\/\/skyplanner.ai\/\" aria-label=\"Book a demo\">Production planning with AI<\/a>\n\n<\/div>\n<\/div><\/div><\/div>\n<\/div>\n<\/div><\/div>\n<\/div><\/div>\n<\/div>\n\n<div class=\"gb-container gb-container-33d6b196\">\n\n<h2 class=\"wp-block-heading\">Gamybos planuotojo darbo u\u017emokest\u012f lemiantys veiksniai Latvijoje<\/h2>\n\n\n\n<h4 class=\"wp-block-heading\">\u0160vietimas<\/h4>\n\n\n\n<p>Gamybos planuotojo i\u0161silavinimas turi didel\u0119 \u012ftak\u0105 jo u\u017edarbio galimyb\u0117ms. Latvijoje asmenys, turintys auk\u0161tesn\u012f i\u0161silavinim\u0105, pavyzd\u017eiui, verslo administravimo, in\u017einerijos ar tiekimo grandin\u0117s valdymo bakalauro ar magistro laipsn\u012f, paprastai gauna didesn\u012f atlyginim\u0105. Special\u016bs mokymai gali pad\u0117ti planuotojams geriau suprasti gamybos procesus ir i\u0161tekli\u0173 valdym\u0105, tod\u0117l jie taps vertingesni darbdaviams.  <\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Patirtis<\/h4>\n\n\n\n<p>Kaip ir daugelyje kit\u0173 profesij\u0173, nustatant atlyginim\u0105 labai svarbus vaidmuo tenka patir\u010diai. Gamybos planuotojai, turintys keleri\u0173 met\u0173 darbo patirt\u012f \u0161ioje srityje, da\u017enai turi galimyb\u0119 der\u0117tis d\u0117l didesnio atlyginimo. Patyr\u0119 specialistai yra sukaup\u0119 s\u0117kmingo projekt\u0173 valdymo ir problem\u0173 sprendimo patirties, kuri gali b\u016bti tiesiogiai naudinga \u012fmonei.  <\/p>\n\n\n\n<h4 class=\"wp-block-heading\">\u012eg\u016bd\u017eiai<\/h4>\n\n\n\n<p>Konkret\u016bs gamybos planuotojo \u012fg\u016bd\u017eiai gali tur\u0117ti tiesiogin\u0117s \u012ftakos jo atlyginimui. Pavyzd\u017eiui, labai pageidautina tur\u0117ti patirties naudojant i\u0161pl\u0117stinio planavimo ir tvarkara\u0161\u010di\u0173 sudarymo (APS) sistemas arba <a href=\"\/lt\/istekliai\/kas-yra-erp\/\">ERP sistemas<\/a>, mok\u0117ti analizuoti duomenis ir optimizuoti darbo eig\u0105. Planavimo specialistai, kurie nuolat atnaujina savo \u012fg\u016bd\u017eius, ypa\u010d naudodamiesi naujomis technologijomis, grei\u010diausiai tai atsispind\u0117s j\u0173 atlyginime.  <\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Vieta<\/h4>\n\n\n\n<p>Latvijoje, kaip ir daugelyje kit\u0173 \u0161ali\u0173, atlyginimai gali skirtis priklausomai nuo vietov\u0117s. Pavyzd\u017eiui, gamybos planuotojai, dirbantys did\u017eiuosiuose miestuose, pavyzd\u017eiui, sostin\u0117je ir ekonomikos centre Rygoje, gali gauti geresnius atlyginimus nei j\u0173 kolegos ma\u017eesniuose miestuose, pavyzd\u017eiui, Daugpilyje. Didesni pragyvenimo ka\u0161tai didesniuose miestuose da\u017enai lemia didesnius atlyginimus.  <\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Bendrov\u0117s dydis<\/h4>\n\n\n\n<p>Didesn\u0117s \u012fmon\u0117s paprastai turi daugiau i\u0161tekli\u0173, tod\u0117l gali pasi\u016blyti didesnius atlyginimus nei ma\u017eesn\u0117s \u012fmon\u0117s. Gamybos planuotojas, dirbantis didel\u0117je tarptautin\u0117je korporacijoje Latvijoje, gali u\u017edirbti didesn\u012f atlyginim\u0105 nei dirbantis ma\u017eoje ir vidutin\u0117je \u012fmon\u0117je (MV\u012e). <\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Bendrov\u0117s tipas<\/h4>\n\n\n\n<p>Pramon\u0117 ar sektorius, kuriame veikia \u012fmon\u0117, taip pat gali tur\u0117ti \u012ftakos gamybos planuotojo darbo u\u017emokes\u010diui. Dirbantys didel\u0117s mar\u017eos pramon\u0117s \u0161akose, pavyzd\u017eiui, farmacijos ar automobili\u0173 gamybos, gali gauti didesn\u012f darbo u\u017emokest\u012f d\u0117l didesnio finansinio na\u0161umo ir gamybos proces\u0173 sud\u0117tingumo. <\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Gamybos planuotojo vaidmuo ir pareigos<\/h2>\n\n\n\n<p>Gamybos planuotojas sudaro \u012fmon\u0117s gamybos grafik\u0105, u\u017etikrindamas, kad gamybos procesai vykt\u0173 efektyviai ir veiksmingai. Jie derina med\u017eiag\u0173 i\u0161teklius, darbo j\u0117gos ir \u012frangos grafikus, kad b\u016bt\u0173 laikomasi gamybos tiksl\u0173 ir termin\u0173. Kai kurios j\u0173 pareigos:  <\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Gamybos tvarkara\u0161\u010di\u0173 rengimas<\/strong>: Planavimo specialistai sudaro i\u0161samius gamybos grafikus, derindami juos su klient\u0173 poreikiais ir paj\u0117gum\u0173 apribojimais. Tai rei\u0161kia, kad reikia \u012fvertinti, nustatyti prioritetus ir gamybos eili\u0161kum\u0105, siekiant kuo didesnio efektyvumo. <\/li>\n\n\n\n<li><strong>Atsarg\u0173 valdymas<\/strong>: Jie pri\u017ei\u016bri atsarg\u0173 lyg\u012f, kad b\u016bt\u0173 i\u0161vengta atsarg\u0173 pertekliaus ar tr\u016bkumo. Tai apima med\u017eiag\u0173 u\u017esakym\u0105, naudojimo steb\u0117jim\u0105 ir u\u017esakym\u0173 koregavim\u0105 atsi\u017evelgiant \u012f paklaus\u0105 ir gamybos poky\u010dius. <\/li>\n\n\n\n<li><strong>Koordinavimas su departamentais<\/strong>: Gamybos planuotojai palaiko ry\u0161ius su \u012fvairiais skyriais, pvz., pirkim\u0173, sand\u0117lio ir pardavim\u0173, kad b\u016bt\u0173 u\u017etikrintas nuoseklus gamybos procesas.<\/li>\n\n\n\n<li><strong>Gamybos pa\u017eangos steb\u0117jimas<\/strong>: Jie stebi gamybos eig\u0105, nustato v\u0117lavimus ar problemas ir prireikus \u012fgyvendina korekcines priemones.<\/li>\n\n\n\n<li><strong>Kokyb\u0117s kontrol\u0117<\/strong>: Nors gamybos planuotojai n\u0117ra tiesiogiai atsakingi u\u017e kokyb\u0117s kontrol\u0119, jie turi \u012ftraukti kokyb\u0117s patikrinimus \u012f gamybos grafik\u0105 ir u\u017etikrinti, kad gaminiai atitikt\u0173 reikiamus standartus.<\/li>\n\n\n\n<li><strong>Nuolatinis tobulinimas<\/strong>: Planuotojai taip pat dalyvauja nuolatinio tobulinimo iniciatyvose, analizuodami gamybos duomenis, kad nustatyt\u0173 sritis, kuriose galima padidinti efektyvum\u0105.<\/li>\n<\/ol>\n\n\n\n<h2 class=\"wp-block-heading\">Gamybos planuotojui reikalingi \u012fg\u016bd\u017eiai<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Analitiniai \u012fg\u016bd\u017eiai<\/strong>: Duomen\u0173 supratimas ir geras j\u0173 panaudojimas yra labai svarb\u016bs siekiant pagerinti gamybos b\u016bd\u0105.<\/li>\n\n\n\n<li><strong>Bendravimo \u012fg\u016bd\u017eiai<\/strong>: Ai\u0161kus bendravimas yra b\u016btinas norint koordinuoti veiksmus su komandos nariais ir vadovyb\u0117s ataskaitomis.<\/li>\n\n\n\n<li><strong>Problem\u0173 sprendimo geb\u0117jimai<\/strong>: Geb\u0117jimas greitai spr\u0119sti gamybos problemas, kad b\u016bt\u0173 kuo ma\u017eiau v\u0117luojama, reikalauja ger\u0173 problem\u0173 sprendimo \u012fg\u016bd\u017ei\u0173.<\/li>\n\n\n\n<li><strong>Laiko valdymas<\/strong>: Gamybos planuotojai turi efektyviai valdyti savo laik\u0105, kad gamybos grafikai b\u016bt\u0173 vykdomi laiku.<\/li>\n\n\n\n<li><strong>Technologinis i\u0161prusimas<\/strong>: nuolatinis naujausi\u0173 gamybos technologij\u0173 ir programin\u0117s \u012frangos \u017einojimas gali suteikti planuotojams prana\u0161um\u0105 valdant sud\u0117tingas gamybos sistemas.<\/li>\n<\/ul>\n\n\n\n<p>Kiekvienas i\u0161 \u0161i\u0173 veiksni\u0173 ir \u012fg\u016bd\u017ei\u0173 rinkini\u0173 kartu apibr\u0117\u017eia bendrus gamybos planuotojo geb\u0117jimus ir atitinkamai jo vert\u0119 Latvijos gamybos sektoriuje.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"536\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-1024x536.png\" alt=\"\" class=\"wp-image-6463\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-1024x536.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-300x157.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-768x402.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-1536x804.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-2048x1072.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">APS ir gamybos planuotojai: S\u0117kmingas derinys  <\/h2>\n\n\n\n<p>Pa\u017eangi planavimo ir tvarkara\u0161\u010di\u0173 sudarymo sistema su dirbtiniu intelektu (DI), tokia kaip <a href=\"\/lt\/\">&#8222;Skyplanner&#8221;<\/a>, gali gerokai pagerinti gamybos planuotojo darb\u0105. \u0160tai kaip:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Paklausos prognozavimas<\/strong>: dirbtinis intelektas gali analizuoti duomen\u0173 istorij\u0105 ir tiksliau prognozuoti b\u016bsim\u0105 paklaus\u0105. Tai leid\u017eia gamybos planuotojams sudaryti tvarkara\u0161\u010dius, kurie geriau atitinka rinkos poreikius, ma\u017eina atliek\u0173 kiek\u012f ir didina klient\u0173 pasitenkinim\u0105. <\/li>\n\n\n\n<li><strong>I\u0161tekli\u0173 optimizavimas<\/strong>: Dirbtinio intelekto algoritmai gali optimizuoti med\u017eiag\u0173, ma\u0161in\u0173 ir darbo j\u0117gos naudojim\u0105. Dirbtinis intelektas, i\u0161nagrin\u0117j\u0119s daugyb\u0119 duomen\u0173, gali greitai rasti geriausi\u0105 med\u017eiag\u0173 ir laiko panaudojimo b\u016bd\u0105, o \u017emon\u0117ms prireikt\u0173 daugiau laiko, kad tai i\u0161siai\u0161kint\u0173. <\/li>\n\n\n\n<li><strong>Geresnis sprendim\u0173 pri\u0117mimas<\/strong>: Naudojant dirbtin\u012f intelekt\u0105, APS sistemos gali pateikti gamybos planuotojams \u012f\u017evalgas realiuoju laiku ir rekomendacijas, padedan\u010dias greitai priimti pagr\u012fstus sprendimus.<\/li>\n\n\n\n<li><strong>Prognozuojama technin\u0117 prie\u017ei\u016bra<\/strong>: dirbtinis intelektas gali numatyti, kada ma\u0161inos gali sugesti arba kada reik\u0117s atlikti technin\u0119 prie\u017ei\u016br\u0105, taip suma\u017eindamas prastov\u0173 laik\u0105. \u0160i prognozavimo galimyb\u0117 leid\u017eia planuotojams planuoti technin\u0119 prie\u017ei\u016br\u0105 ma\u017eiausiai trikdan\u010diu laiku. <\/li>\n\n\n\n<li><strong>Rizikos valdymas<\/strong>: dirbtinis intelektas gali nustatyti galim\u0105 rizik\u0105 gamybos procese &#8211; nuo tiekimo grandin\u0117s sutrikim\u0173 iki \u012frangos gedim\u0173. Toks numatymas leid\u017eia planuotojams aktyviai ma\u017einti rizik\u0105. <\/li>\n\n\n\n<li><strong>Nuolatinis tobulinimas<\/strong>: dirbtinio intelekto valdomos APS sistemos laikui b\u0117gant gali mokytis, nuolat tobulinti rekomendacijas ir taip u\u017etikrinti nuolatin\u012f proces\u0173 optimizavim\u0105.<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">Pramon\u0117s \u0161akos, kuriose \u012fdarbinami gamybos planuotojai Latvijoje<\/h2>\n\n\n\n<p>Latvijoje kelios pramon\u0117s \u0161akos aktyviai ie\u0161ko gamybos planuotoj\u0173 patirties. Kai kurie i\u0161 svarbiausi\u0173 sektori\u0173 yra \u0161ie: <\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Medienos apdirbimas ir mediena<\/strong>: Latvijoje klesti mi\u0161k\u0173 pramon\u0117, o medienos apdirbimas sudaro svarbi\u0105 gamybos sektoriaus dal\u012f. Gamybos planuotojai yra labai svarb\u016bs valdant sud\u0117tingus medienos gamybos procesus &#8211; nuo medienos ruo\u0161os iki gatavos produkcijos. <\/li>\n\n\n\n<li><strong>Elektronika ir elektros \u012franga<\/strong>: Latvijoje, kuri vis labiau \u012fsitvirtina Europos elektronikos rinkoje, reikalingi gamybos planuotojai, kurie gal\u0117t\u0173 valdyti sud\u0117tingus surinkimo ir platinimo grafikus.<\/li>\n\n\n\n<li><strong>Maistas ir g\u0117rimai<\/strong>: \u0160ioje pramon\u0117s \u0161akoje, \u012fskaitant dideles alaus daryklas, pieno ir konditerijos gamini\u0173 gamintojus, dirba gamybos planuotojai, kurie u\u017etikrina, kad greitai gendan\u010dios prek\u0117s b\u016bt\u0173 pristatytos laiku.<\/li>\n\n\n\n<li><strong>Vaistai<\/strong>: \u0160iame sektoriuje reikia grie\u017etai laikytis grafik\u0173 ir taisykli\u0173, tod\u0117l gamybos planuotojo vaidmuo tampa labai svarbus.<\/li>\n\n\n\n<li><strong>Automobiliai<\/strong>: Nors ir ma\u017eesnis nei kai kuriose kaimynin\u0117se \u0161alyse, automobili\u0173 sektorius, \u012fskaitant detali\u0173 gamyb\u0105, priklauso nuo planuotoj\u0173, kad jo veikla b\u016bt\u0173 sklandi.<\/li>\n\n\n\n<li><strong>Ma\u0161inos ir \u012franga<\/strong>: Latvijos ma\u0161in\u0173 sektorius aptarnauja ir vidaus, ir eksporto rinkas, tod\u0117l reikia kruop\u0161taus planavimo, kad b\u016bt\u0173 patenkinti \u012fvair\u016bs klient\u0173 poreikiai.<\/li>\n<\/ol>\n\n\n\n<h2 class=\"wp-block-heading\">Atlygis ne tik u\u017e atlyginim\u0105<\/h2>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Visapusi\u0161ka sveikatos prie\u017ei\u016bra<\/strong>: Latvija visiems darbuotojams, \u012fskaitant gamybos planuotojus, suteikia galimyb\u0119 gauti valstyb\u0117s finansuojam\u0105 sveikatos prie\u017ei\u016br\u0105, kuri apima profilaktin\u0119 prie\u017ei\u016br\u0105 ir gydym\u0105. Socialinio draudimo \u012fmokomis finansuojama \u0161i sistema ir u\u017etikrinama, kad sveikatos prie\u017ei\u016bros i\u0161laidos netapt\u0173 finansine na\u0161ta. <\/li>\n\n\n\n<li><strong>Pensij\u0173 planai<\/strong>: Gamybos planuotojai prisideda prie valstybin\u0117s pensij\u0173 sistemos, kuri skirta u\u017etikrinti stabilias pajamas i\u0161\u0117jus \u012f pensij\u0105. Taip pat yra galimybi\u0173 investuoti \u012f priva\u010dius pensij\u0173 fondus, kurie gali u\u017etikrinti didesn\u0119 gr\u0105\u017e\u0105 ir papildom\u0105 saugum\u0105 ateityje. <\/li>\n\n\n\n<li><strong>Profesinio tobul\u0117jimo galimyb\u0117s<\/strong>: Gamybos sektoriaus augimas suteikia gamybos planuotojams daugyb\u0119 galimybi\u0173 siekti karjeros per seminarus, sertifikavim\u0105 ir tolesn\u012f mokym\u0105si, kur\u012f da\u017enai remia darbdaviai.<\/li>\n\n\n\n<li><strong>Darbo ir asmeninio gyvenimo pusiausvyra<\/strong>: Latvijos darbdaviai pripa\u017e\u012fsta sveikos darbo ir asmeninio gyvenimo pusiausvyros svarb\u0105 ir paprastai si\u016blo tokias lengvatas kaip lankstus darbo grafikas, mokamos atostogos ir papildomos laisvos dienos asmeniniams reikalams, taip prisid\u0117dami prie bendro pasitenkinimo darbu.<\/li>\n\n\n\n<li><strong>Kult\u016brin\u0117 ir socialin\u0117 nauda<\/strong>: Gyvenimas Latvijoje suteikia galimyb\u0119 m\u0117gautis turtingu kult\u016briniu paveldu, kra\u0161tovaizd\u017eio gro\u017eiu ir socialine veikla. Gamybos planuotojai gali dalyvauti \u012fvairioje pramogin\u0117je veikloje ir renginiuose, b\u016bdinguose tik \u0161iam regionui, ir taip prisid\u0117ti prie visaver\u010dio asmeninio gyvenimo. <\/li>\n<\/ol>\n\n\n\n<h2 class=\"wp-block-heading\">Ar Latvija yra gera vieta gamybos planuotojams?  <\/h2>\n\n\n\n<p>Latvija &#8211; tai visapusi\u0161kas pasi\u016blymas gamybos planuotojams. Jie ne tik gauna konkurencing\u0105 atlyginim\u0105, bet ir \u012fvairias i\u0161mokas &#8211; nuo sveikatos prie\u017ei\u016bros iki pensij\u0173 sistem\u0173 &#8211; ir profesinio tobul\u0117jimo akcentavim\u0105, o tai sukuria patraukli\u0105 aplink\u0105.   <\/p>\n\n\n\n<p>Be to, d\u0117l gyvenimo kokyb\u0117s, pasi\u017eymin\u010dios stipriu bendruomeni\u0161kumo ir kult\u016brinio aktyvumo jausmu, taip pat nuolatinio mokymosi galimybi\u0173 Latvija yra strateginis pasirinkimas \u0161ios srities specialistams.<\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-92545123\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-0a61546f\">\n<div class=\"gb-grid-column gb-grid-column-e4183086\"><div class=\"gb-container gb-container-e4183086\">\n\n<\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-84ccbb5d\"><div class=\"gb-container gb-container-84ccbb5d\">\n\n<\/div><\/div>\n<\/div>\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Vidutinis gamybos planuotojo atlyginimas Latvijoje 2026 metais yra apie 18 804 \u20ac per metus, arba apie 1 567 \u20ac per m\u0117nes\u012f neatskai\u010dius mokes\u010di\u0173. \u0160is atlyginimas atspindi j\u0173 darbo svarb\u0105 ir reikalingus \u012fg\u016bd\u017eius. Vis d\u0117lto atminkite, kad tikslus atlyginimas gali keistis priklausomai nuo planuotojo i\u0161silavinimo, vietos Latvijoje, kurioje jie dirba, ir \u012fmon\u0117s, kurioje jie dirba, tipo. &#8230; <a title=\"Gamybos planuotojo atlyginimas Latvijoje 2026 m.\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/gamybos-planuotojo-atlyginimas-latvijoje-2026-m\/\" aria-label=\"Read more about Gamybos planuotojo atlyginimas Latvijoje 2026 m.\">Read more<\/a><\/p>\n","protected":false},"author":6,"featured_media":29453,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[301,2690],"tags":[],"class_list":["post-29582","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-istekliai","category-karjera-ir-atlyginimai","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Gamybos planuotojo atlyginimas Latvijoje 2026 m. \u2013 SkyPlanner<\/title>\n<meta name=\"description\" content=\"Vidutinis gamybos planuotojo atlyginimas Latvijoje 2026 m. - apie 18 804 EUR per metus, arba apie 1 567 EUR kas m\u0117nes\u012f prie\u0161 mokes\u010dius.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/gamybos-planuotojo-atlyginimas-latvijoje-2026-m\/\" \/>\n<meta property=\"og:locale\" content=\"lt_LT\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Gamybos planuotojo atlyginimas Latvijoje 2026 m.\" \/>\n<meta property=\"og:description\" content=\"Vidutinis gamybos planuotojo atlyginimas Latvijoje 2026 m. - apie 18 804 EUR per metus, arba apie 1 567 EUR kas m\u0117nes\u012f prie\u0161 mokes\u010dius.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lt\/istekliai\/gamybos-planuotojo-atlyginimas-latvijoje-2026-m\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2023-11-11T15:48:29+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-19T21:09:40+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/11\/Production-Planner-Latvia-1024x683.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"683\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"SkyPlanner\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"9 minut\u0117s\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/gamybos-planuotojo-atlyginimas-latvijoje-2026-m\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/gamybos-planuotojo-atlyginimas-latvijoje-2026-m\\\/\"},\"author\":{\"name\":\"SkyPlanner\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\"},\"headline\":\"Gamybos planuotojo atlyginimas Latvijoje 2026 m.\",\"datePublished\":\"2023-11-11T15:48:29+00:00\",\"dateModified\":\"2026-06-19T21:09:40+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/gamybos-planuotojo-atlyginimas-latvijoje-2026-m\\\/\"},\"wordCount\":1806,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/gamybos-planuotojo-atlyginimas-latvijoje-2026-m\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/11\\\/Production-Planner-Latvia.png\",\"articleSection\":[\"i\u0161tekliai\",\"Karjera ir atlyginimai\"],\"inLanguage\":\"lt-LT\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/gamybos-planuotojo-atlyginimas-latvijoje-2026-m\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/gamybos-planuotojo-atlyginimas-latvijoje-2026-m\\\/\",\"name\":\"Gamybos planuotojo atlyginimas Latvijoje 2026 m. \u2013 SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/gamybos-planuotojo-atlyginimas-latvijoje-2026-m\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/gamybos-planuotojo-atlyginimas-latvijoje-2026-m\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/11\\\/Production-Planner-Latvia.png\",\"datePublished\":\"2023-11-11T15:48:29+00:00\",\"dateModified\":\"2026-06-19T21:09:40+00:00\",\"description\":\"Vidutinis gamybos planuotojo atlyginimas Latvijoje 2026 m. - apie 18 804 EUR per metus, arba apie 1 567 EUR kas m\u0117nes\u012f prie\u0161 mokes\u010dius.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/gamybos-planuotojo-atlyginimas-latvijoje-2026-m\\\/#breadcrumb\"},\"inLanguage\":\"lt-LT\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/gamybos-planuotojo-atlyginimas-latvijoje-2026-m\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"lt-LT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/gamybos-planuotojo-atlyginimas-latvijoje-2026-m\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/11\\\/Production-Planner-Latvia.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/11\\\/Production-Planner-Latvia.png\",\"width\":4990,\"height\":3327,\"caption\":\"Production Planner Latvia\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/gamybos-planuotojo-atlyginimas-latvijoje-2026-m\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Gamybos planuotojo atlyginimas Latvijoje 2026 m.\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lt-LT\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lt-LT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\",\"name\":\"SkyPlanner\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lt-LT\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"caption\":\"SkyPlanner\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Gamybos planuotojo atlyginimas Latvijoje 2026 m. \u2013 SkyPlanner","description":"Vidutinis gamybos planuotojo atlyginimas Latvijoje 2026 m. - apie 18 804 EUR per metus, arba apie 1 567 EUR kas m\u0117nes\u012f prie\u0161 mokes\u010dius.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lt\/istekliai\/gamybos-planuotojo-atlyginimas-latvijoje-2026-m\/","og_locale":"lt_LT","og_type":"article","og_title":"Gamybos planuotojo atlyginimas Latvijoje 2026 m.","og_description":"Vidutinis gamybos planuotojo atlyginimas Latvijoje 2026 m. - apie 18 804 EUR per metus, arba apie 1 567 EUR kas m\u0117nes\u012f prie\u0161 mokes\u010dius.","og_url":"https:\/\/skyplanner.ai\/lt\/istekliai\/gamybos-planuotojo-atlyginimas-latvijoje-2026-m\/","og_site_name":"SkyPlanner","article_published_time":"2023-11-11T15:48:29+00:00","article_modified_time":"2026-06-19T21:09:40+00:00","og_image":[{"width":1024,"height":683,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/11\/Production-Planner-Latvia-1024x683.png","type":"image\/png"}],"author":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Written by":"SkyPlanner","Est. reading time":"9 minut\u0117s"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/gamybos-planuotojo-atlyginimas-latvijoje-2026-m\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/gamybos-planuotojo-atlyginimas-latvijoje-2026-m\/"},"author":{"name":"SkyPlanner","@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a"},"headline":"Gamybos planuotojo atlyginimas Latvijoje 2026 m.","datePublished":"2023-11-11T15:48:29+00:00","dateModified":"2026-06-19T21:09:40+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/gamybos-planuotojo-atlyginimas-latvijoje-2026-m\/"},"wordCount":1806,"publisher":{"@id":"https:\/\/skyplanner.ai\/lt\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/gamybos-planuotojo-atlyginimas-latvijoje-2026-m\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/11\/Production-Planner-Latvia.png","articleSection":["i\u0161tekliai","Karjera ir atlyginimai"],"inLanguage":"lt-LT"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/gamybos-planuotojo-atlyginimas-latvijoje-2026-m\/","url":"https:\/\/skyplanner.ai\/lt\/istekliai\/gamybos-planuotojo-atlyginimas-latvijoje-2026-m\/","name":"Gamybos planuotojo atlyginimas Latvijoje 2026 m. \u2013 SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lt\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/gamybos-planuotojo-atlyginimas-latvijoje-2026-m\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/gamybos-planuotojo-atlyginimas-latvijoje-2026-m\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/11\/Production-Planner-Latvia.png","datePublished":"2023-11-11T15:48:29+00:00","dateModified":"2026-06-19T21:09:40+00:00","description":"Vidutinis gamybos planuotojo atlyginimas Latvijoje 2026 m. - apie 18 804 EUR per metus, arba apie 1 567 EUR kas m\u0117nes\u012f prie\u0161 mokes\u010dius.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/gamybos-planuotojo-atlyginimas-latvijoje-2026-m\/#breadcrumb"},"inLanguage":"lt-LT","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lt\/istekliai\/gamybos-planuotojo-atlyginimas-latvijoje-2026-m\/"]}]},{"@type":"ImageObject","inLanguage":"lt-LT","@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/gamybos-planuotojo-atlyginimas-latvijoje-2026-m\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/11\/Production-Planner-Latvia.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/11\/Production-Planner-Latvia.png","width":4990,"height":3327,"caption":"Production Planner Latvia"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/gamybos-planuotojo-atlyginimas-latvijoje-2026-m\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lt\/"},{"@type":"ListItem","position":2,"name":"Gamybos planuotojo atlyginimas Latvijoje 2026 m."}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lt\/#website","url":"https:\/\/skyplanner.ai\/lt\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lt\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lt\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lt-LT"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lt\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lt\/","logo":{"@type":"ImageObject","inLanguage":"lt-LT","@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a","name":"SkyPlanner","image":{"@type":"ImageObject","inLanguage":"lt-LT","@id":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","caption":"SkyPlanner"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/11\/Production-Planner-Latvia.png",4990,3327,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/11\/Production-Planner-Latvia-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/11\/Production-Planner-Latvia-300x200.png",300,200,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/11\/Production-Planner-Latvia-768x512.png",768,512,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/11\/Production-Planner-Latvia-1024x683.png",1024,683,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/11\/Production-Planner-Latvia-1536x1024.png",1536,1024,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/11\/Production-Planner-Latvia-2048x1365.png",2048,1365,true],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/11\/Production-Planner-Latvia.png",360,240,false]},"uagb_author_info":{"display_name":"SkyPlanner","author_link":"https:\/\/skyplanner.ai\/lt\/author\/bettina\/"},"uagb_comment_info":0,"uagb_excerpt":"Vidutinis gamybos planuotojo atlyginimas Latvijoje 2026 metais yra apie 18 804 \u20ac per metus, arba apie 1 567 \u20ac per m\u0117nes\u012f neatskai\u010dius mokes\u010di\u0173. \u0160is atlyginimas atspindi j\u0173 darbo svarb\u0105 ir reikalingus \u012fg\u016bd\u017eius. Vis d\u0117lto atminkite, kad tikslus atlyginimas gali keistis priklausomai nuo planuotojo i\u0161silavinimo, vietos Latvijoje, kurioje jie dirba, ir \u012fmon\u0117s, kurioje jie dirba, tipo.&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/posts\/29582","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/comments?post=29582"}],"version-history":[{"count":2,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/posts\/29582\/revisions"}],"predecessor-version":[{"id":94465,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/posts\/29582\/revisions\/94465"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/media\/29453"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/media?parent=29582"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/categories?post=29582"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/tags?post=29582"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}