{"id":11998,"date":"2023-06-27T15:00:23","date_gmt":"2023-06-27T15:00:23","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=11998"},"modified":"2026-06-19T20:09:59","modified_gmt":"2026-06-19T20:09:59","slug":"informacijos-apie-gamini-valdymas-raktas-i-pardavimu-didinima","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/lt\/istekliai\/informacijos-apie-gamini-valdymas-raktas-i-pardavimu-didinima\/","title":{"rendered":"Informacijos apie gamin\u012f valdymas: Raktas \u012f pardavim\u0173 didinim\u0105"},"content":{"rendered":"<div class=\"gb-container gb-container-bf558a89\">\n\n<h1 class=\"wp-block-heading\" id=\"h-product-information-management-the-key-to-boosting-sales\">Informacijos apie gamin\u012f valdymas: Raktas \u012f pardavim\u0173 didinim\u0105<\/h1>\n\n\n<div class=\"gb-container gb-container-e8026af9\">\n\n<p><a href=\"https:\/\/skyplanner.ai\/lt\/\">Pagrindinis<\/a> \u00bb <a href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/\">\u0160altiniai<\/a> \u00bb Informacijos apie gamin\u012f valdymas: Raktas \u012f pardavim\u0173 didinim\u0105<\/p>\n\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" viewbox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Numatoma skaitymo trukm\u0117: <\/span><span class=\"yoast-reading-time__reading-time\">19<\/span><span class=\"yoast-reading-time__time-unit\"> minu\u010di\u0173<\/span><\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-f0fd57d0\">\n\n<p>\u012esivaizduokite, kad nar\u0161ote vie\u0161bu\u010di\u0173 u\u017esakymo svetain\u0117je. Internete ie\u0161kote vie\u0161bu\u010dio, kuris puikiai tikt\u0173 j\u016bs\u0173 atostogoms, ir aptikote vie\u0161but\u012f, kuris gali jums tikti. Paspaud\u0119 vie\u0161bu\u010dio puslap\u012f nerandate nei kambari\u0173 nuotrauk\u0173, nei patogum\u0173 apra\u0161ym\u0173, nei ankstesni\u0173 sve\u010di\u0173 atsiliepim\u0173. K\u0105 darote? Tik\u0117tina, kad greitai pereisite \u012f kit\u0105 vie\u0161but\u012f s\u0105ra\u0161e. Pagrindin\u0117 prie\u017eastis yra ta, kad priimant sprendim\u0105 pirkti labai svarbu tur\u0117ti tiksli\u0105 ir i\u0161sami\u0105 informacij\u0105 apie produkt\u0105.<\/p>\n\n\n\n<p>Tas pats pasakytina ir apie bet kok\u012f e. prekybos versl\u0105. Nesvarbu, ar parduodate automobilius, ar golfo lazdas, norint parduoti, labai svarbu potencialiems klientams pateikti i\u0161sami\u0105 ir tiksli\u0105 informacij\u0105 apie gamin\u012f. \u010cia praver\u010dia informacijos apie gamin\u012f valdymo programin\u0117 \u012franga.<\/p>\n\n\n\n<div class=\"wp-block-uagb-advanced-heading uagb-block-28d680c9\"><h2 class=\"uagb-heading-text\">TL;DR<\/h2><\/div>\n\n\n\n<p><strong>Produkt\u0173 informacijos valdymas <\/strong>(PIM) &#8211; tai galingas programin\u0117s \u012frangos sprendimas, kuris centralizuoja, organizuoja ir supaprastina produkt\u0173 duomenis visuose kanaluose. Ji u\u017etikrina informacijos apie gaminius kokyb\u0119 ir nuoseklum\u0105, gerina pardavimus, ma\u017eina nesusikalb\u0117jim\u0105 ir skatina klient\u0173 pasitik\u0117jim\u0105. PIM integruojamas su tokiomis sistemomis kaip ERP ir CRM, optimizuojant rinkodaros ir pardavimo pastangas. Be to, ji pagerina SEO, nes informacija apie gamin\u012f strukt\u016brizuojama naudojant tinkamus rakta\u017eod\u017eius. PIM bendradarbiavimas su &#8222;pa\u017eangus planavimas ir tvarkara\u0161\u010di\u0173 sudarymas&#8221; (APS) palengvina nesugadint\u0173 ir \u012ftikinam\u0173 produkt\u0173 duomen\u0173 pateikim\u0105, kartu optimizuojant tiekimo grandin\u0117s valdym\u0105. \u0160is duetas gerokai padidina konkurencingum\u0105, efektyvum\u0105 ir na\u0161um\u0105. Nesvarbu, ar dirbate ma\u017emenin\u0117s prekybos, gamybos, sveikatos prie\u017ei\u016bros, automobili\u0173 pramon\u0117s, ar svetingumo srityje, PIM yra nepakei\u010diamas \u012frankis \u012fvairiems produkt\u0173 duomenims tvarkyti, tod\u0117l tai yra protinga investicija \u012fmon\u0117ms, siekian\u010dioms u\u017eimti auk\u0161\u010diausi\u0105 viet\u0105 \u0161iuolaikin\u0117je konkurencingoje rinkoje.<\/p>\n\n\n\n<div class=\"wp-block-uagb-advanced-heading uagb-block-f78abfe4\"><h2 class=\"uagb-heading-text\">Kas yra informacijos apie gamin\u012f valdymas?  <\/h2><\/div>\n\n\n<div class=\"gb-container gb-container-51461b32\"><div class=\"gb-inside-container\">\n\n<p><strong>Informacijos apie gamin\u012f valdymas (PIM) &#8211; tai programin\u0117s \u012frangos sprendimas, kuriuo informacija apie gamin\u012f valdoma ir perduodama visais kanalais.<\/strong><\/p>\n\n<\/div><\/div>\n\n\n<p>  Ji leid\u017eia \u012fmon\u0117ms centralizuoti, tvarkyti ir praturtinti savo produkt\u0173 duomenis vienoje saugioje vietoje. Naudodamos PIM \u012fmon\u0117s gali lengvai kurti, tvarkyti ir platinti informacij\u0105 apie gaminius klientams, tiek\u0117jams ir partneriams.<\/p>\n\n\n<div class=\"gb-container gb-container-4d075437\"><div class=\"gb-inside-container\">\n\n<p><strong><strong>&#8222;Product Information Management&#8221; &#8211; tai galingas programin\u0117s \u012frangos sprendimas, kuris yra centrin\u0117 duomen\u0173 apie gaminius kaupimo, tvarkymo ir praturtinimo saugykla.<\/strong> <\/strong><\/p>\n\n<\/div><\/div>\n\n\n<p>Tai tarsi labai gerai organizuota biblioteka, kurioje kaupiama visa informacija apie gaminius ir kuri yra pasiekiama i\u0161 bet kurio j\u016bs\u0173 organizacijos skyriaus.<\/p>\n\n\n\n<h3 class=\"gb-headline gb-headline-1c690393 gb-headline-text\">PIM programin\u0117s \u012frangos tikslai<\/h3>\n\n\n\n<p>Pagrindinis PIM programin\u0117s \u012frangos tikslas &#8211; pagerinti duomen\u0173 kokyb\u0119 ir nuoseklum\u0105. Taip u\u017etikrinama, kad visi produkto duomenys b\u016bt\u0173 tiksl\u016bs, i\u0161sam\u016bs ir nuosekliai rodomi visuose j\u016bs\u0173 kanaluose &#8211; nuo e. parduotuv\u0117s svetain\u0117s iki ma\u017emenin\u0117s prekybos partneri\u0173. Papras\u010diau tariant, PIM &#8211; tai siekis, kad j\u016bs\u0173 produkt\u0173 duomenys dirbt\u0173 jums sunkiau ir i\u0161maniau.<\/p>\n\n\n\n<p>PIM sistema puikiai veikia kartu su <a href=\"https:\/\/skyplanner.ai\/lt\/\">i\u0161pl\u0117stiniu planavimu ir tvarkara\u0161\u010di\u0173 sudarymu<\/a>. APS optimizuoja tiekimo grandin\u0117s valdym\u0105, o PIM u\u017etikrina, kad j\u016bs\u0173 produkt\u0173 duomenys b\u016bt\u0173 nepriekai\u0161tingi ir \u012ftikinami. \u0160is galingas duetas gali palengvinti j\u016bs\u0173 \u012fmon\u0117s darbo kr\u016bv\u012f, padidinti pardavimus ir padidinti verslo konkurencingum\u0105.<\/p>\n\n\n\n<div class=\"wp-block-uagb-advanced-heading uagb-block-e527ca84\"><h2 class=\"uagb-heading-text\">Kaip veikia informacijos apie gamin\u012f valdymas?<\/h2><\/div>\n\n\n\n<p>PIM programin\u0117 \u012franga integruojama su kitomis \u012fmon\u0117s sistemomis, pavyzd\u017eiui, ERP, CRM ir e. prekybos platformomis. Tai leid\u017eia rinkodaros, pardavimo ir kit\u0173 skyri\u0173 komandoms lengvai pasiekti ir tvarkyti informacij\u0105 apie gamin\u012f, u\u017etikrinant, kad ji b\u016bt\u0173 nuosekli ir naujausia visuose kanaluose.<\/p>\n\n\n\n<p>Rinkodaros komandos gali naudoti PIM produkt\u0173 katalogams kurti ir skelbti, o pardavim\u0173 komandos gali gauti tiksli\u0105 informacij\u0105 apie produktus, kad gal\u0117t\u0173 geriau aptarnauti klientus. Centralizuota vis\u0173 produkt\u0173 duomen\u0173 vieta taip pat padeda i\u0161vengti duomen\u0173 &#8222;silos\u0173&#8221; ir pagerinti duomen\u0173 kokyb\u0119.<\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-f7e777f3\">\n<div class=\"gb-container gb-container-0a56c9fa sticky\"><div class=\"gb-inside-container\">\n<div class=\"gb-container gb-container-eed176fc\"><div class=\"gb-inside-container\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-1b2f16ae\">\n<div class=\"gb-grid-column gb-grid-column-be655727\"><div class=\"gb-container gb-container-be655727\"><div class=\"gb-inside-container\">\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"685\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png\" alt=\"SkyPlanner APS - Production planning and scheduling product image straight view\" class=\"wp-image-4339\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-300x201.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-768x514.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1536x1027.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-2048x1370.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<\/div><\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-0821f9a0\"><div class=\"gb-container gb-container-0821f9a0\"><div class=\"gb-inside-container\">\n\n<h4 class=\"wp-block-heading mobile-text-center\" id=\"h-advanced-production-planning-with-ai-skyplanner-aps\" style=\"font-size:24px\">Advanced production planning with AI &#8211; SkyPlanner APS<\/h4>\n\n\n\n<p class=\"mobile-text-center\">Read more about our approach to production planning and optimization leveraging the power of AI.<\/p>\n\n\n<div class=\"gb-button-wrapper gb-button-wrapper-690cb95e\">\n\n<a class=\"gb-button gb-button-7b87a903 gb-button-text\" href=\"https:\/\/skyplanner.ai\/\" aria-label=\"Book a demo\">Production planning with AI<\/a>\n\n<\/div>\n<\/div><\/div><\/div>\n<\/div>\n<\/div><\/div>\n<\/div><\/div>\n<\/div>\n\n<div class=\"gb-container gb-container-33d6b196\">\n\n<div class=\"wp-block-uagb-advanced-heading uagb-block-b7d778cd\"><h2 class=\"uagb-heading-text\">Informacijos apie gamin\u012f valdymo privalumai<\/h2><\/div>\n\n\n\n<p>Produkt\u0173 informacijos valdymo programin\u0117 \u012franga turi daug privalum\u0173, \u012fskaitant \u0161iuos:<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-6e432ccd gb-headline-text\">Padid\u0117j\u0119 pardavimai<\/h4>\n\n\n\n<p>Tai labai svarbi nauda, kuri\u0105 \u012fmon\u0117 gauna \u012fsigijusi PIM sistem\u0105.Klientams pateikdami tiksli\u0105 ir i\u0161sami\u0105 informacij\u0105 apie gamin\u012f, galite sukurti pasitik\u0117jim\u0105 savo prek\u0117s \u017eenklu ir padidinti pardavimus. Pavyzd\u017eiui, jei klientas nori \u012fsigyti b\u0117gimo bateli\u0173 por\u0105, tur\u0117dami i\u0161sami\u0105 informacij\u0105 apie bateli\u0173 savybes, med\u017eiagas ir dyd\u017eius, galite pad\u0117ti jam priimti sprendim\u0105 d\u0117l pirkimo.  <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-cf7b2c83 gb-headline-text\">Ma\u017eiau nesusikalb\u0117jimo<\/h4>\n\n\n\n<p>Turint centralizuot\u0105 vis\u0173 gamini\u0173 duomen\u0173 viet\u0105, PIM suma\u017eina nesusikalb\u0117jimo tarp skyri\u0173 rizik\u0105. \u0160is valdymas gali pagerinti bendradarbiavim\u0105 ir supaprastinti darbo eig\u0105.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-47087fb2 gb-headline-text\">Didesnis klient\u0173 pasitik\u0117jimas<\/h4>\n\n\n\n<p>Pateikdamos tiksli\u0105 ir i\u0161sami\u0105 informacij\u0105 apie gamin\u012f, \u012fmon\u0117s gali sustiprinti klient\u0173 pasitik\u0117jim\u0105 ir lojalum\u0105. Klient\u0173 pasitik\u0117jimas j\u016bs\u0173 prek\u0117s \u017eenklu sustipr\u0117ja, kai jie mato t\u0105 pa\u010di\u0105 informacij\u0105 apie gamin\u012f visuose kanaluose. Nuoseklumas sukuria \u012fmon\u0117s patikimum\u0105.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-22bcec0a gb-headline-text\">Geresnis bendradarbiavimas<\/h4>\n\n\n\n<p>Turint bendr\u0105 produkto duomen\u0173 \u0161altin\u012f, skyri\u0173 bendradarbiavimas tampa sklandesnis ir efektyvesnis.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-d419205a gb-headline-text\">Didesnis na\u0161umas<\/h4>\n\n\n\n<p>Automatizavus duomen\u0173 valdym\u0105, PIM gali atlaisvinti j\u016bs\u0173 bendradarbi\u0173 laik\u0105, kad jie gal\u0117t\u0173 sutelkti d\u0117mes\u012f \u012f strategines u\u017eduotis, ir taip padidinti bendr\u0105 produktyvum\u0105.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-a3cac4b8 gb-headline-text\">Konkurencingumo didinimas<\/h4>\n\n\n\n<p>Naudodamos toki\u0105 priemon\u0119 kaip PIM programin\u0117 \u012franga, \u012fmon\u0117s gali i\u0161likti priekyje teikdamos tiksli\u0105, i\u0161sami\u0105 ir \u012ftikinam\u0105 informacij\u0105 apie produktus potencialiems klientams. Tai gali pad\u0117ti padidinti pardavimus ir padidinti \u012fmon\u0117s konkurencingum\u0105.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-8ee545f9 gb-headline-text\">Pagerintas pateikimo rinkai laikas<\/h4>\n\n\n\n<p>PIM programin\u0117 \u012franga gali pad\u0117ti bendrov\u0117ms greitai ir lengvai prad\u0117ti gaminti naujus produktus, nes suteikia supaprastint\u0105 informacijos apie produktus valdymo proces\u0105. \u0160i pagalba gali pad\u0117ti sutrumpinti pateikimo rinkai laik\u0105 ir aplenkti konkurentus.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-459944a1 gb-headline-text\">SEO optimizavimas<\/h4>\n\n\n\n<p>PIM programin\u0117 \u012franga gali pad\u0117ti optimizuoti paie\u0161kos sistemas (SEO), nes u\u017etikrina, kad informacija apie gaminius b\u016bt\u0173 tinkamai strukt\u016brizuota ir b\u016bt\u0173 naudojami tinkami rakta\u017eod\u017eiai. Tokiu b\u016bdu PIM gali padidinti \u012fmon\u0117s svetain\u0117s matomum\u0105 ir lankytoj\u0173 sraut\u0105.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-3f74df66 gb-headline-text\">Suma\u017eintas produkt\u0173 gr\u0105\u017einimas<\/h4>\n\n\n\n<p>Kai klientai gauna tiksli\u0105 informacij\u0105 apie gamin\u012f, jie re\u010diau gr\u0105\u017eina gamin\u012f d\u0117l klaidingos informacijos. I\u0161vengdamos \u0161i\u0173 nesusipratim\u0173, PIM gali pad\u0117ti \u012fmon\u0117ms sutaupyti laiko ir pinig\u0173.  <\/p>\n\n\n\n<p>\u0160ie ir kiti privalumai gali pad\u0117ti PIM sistemai sutrumpinti<a href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/kaip-optimizuoti-gamybos-laika\/\"> gamybos trukm\u0119 <\/a>, nes ji pagerina duomen\u0173 tikslum\u0105, skatina bendradarbiavim\u0105, supaprastina informacijos apie gamin\u012f valdym\u0105, pagerina atsarg\u0173 valdym\u0105 ir efektyviau valdo kelis pardavimo kanalus.<\/p>\n\n\n\n<div class=\"wp-block-uagb-image uagb-block-478ebab5 wp-block-uagb-image--layout-default wp-block-uagb-image--effect-static wp-block-uagb-image--align-none\"><figure class=\"wp-block-uagb-image__figure\"><img decoding=\"async\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-1024x536.png\" alt=\"\" class=\"uag-image-6463\" width=\"1024\" height=\"536\" title=\"\" loading=\"lazy\" role=\"img\"><\/figure><\/div>\n\n\n\n<div class=\"wp-block-uagb-advanced-heading uagb-block-8322962f\"><h2 class=\"uagb-heading-text\">\u017dvilgsnis i\u0161 ar\u010diau: Penkios pramon\u0117s \u0161akos, kurioms naudingas PIM<\/h2><\/div>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Ma\u017emenin\u0117 prekyba<\/strong>: PIM u\u017etikrina nuosekl\u0173 produkt\u0173 pateikim\u0105 fizin\u0117se ir internetin\u0117se parduotuv\u0117se, didina klient\u0173 patirt\u012f ir pardavimus.<\/li>\n\n\n\n<li><strong>Gamyba<\/strong>: PIM supaprastina dalijim\u0105si duomenimis su tiek\u0117jais ir platintojais, taip padidindamas gamybos pramon\u0117s efektyvum\u0105.<\/li>\n\n\n\n<li><strong>Sveikatos prie\u017ei\u016bra<\/strong>: Sveikatos prie\u017ei\u016bros paslaug\u0173 teik\u0117jams PIM padeda valdyti daugyb\u0119 medicinini\u0173 produkt\u0173 ir \u012frangos, u\u017etikrina tiksl\u0173 sekim\u0105 ir pacient\u0173 saugum\u0105.<\/li>\n\n\n\n<li><strong>Automobiliai<\/strong>: PIM gerina klient\u0173 automobili\u0173 konfig\u016bravimo patirt\u012f, skatindamas pardavimus internetu automobili\u0173 pramon\u0117je.<\/li>\n\n\n\n<li><strong>Svetingumas<\/strong>: Vie\u0161bu\u010diai, naudodami PIM, gali tvarkyti informacij\u0105 apie kambarius, j\u0173 prieinamum\u0105 ir patogumus, taip pagerindami sve\u010di\u0173 rezervavimo patirt\u012f.<\/li>\n<\/ol>\n\n\n\n<div class=\"wp-block-uagb-advanced-heading uagb-block-56af90d9\"><h2 class=\"uagb-heading-text\">PIM palyginimas su produkto duomen\u0173 valdymu (PDM)<\/h2><\/div>\n\n\n\n<p>Nors PIM ir <a href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/produkto-duomenu-valdymas-pdm\/\">produkto duomen\u0173 valdymas <\/a>(PDM) gali atrodyti pana\u0161\u016bs, yra esminis skirtumas. PIM yra orientuotas \u012f klientus, nes susij\u0119s su produkto duomen\u0173 rinkodaros ir pardavimo aspektais. Kita vertus, PDM yra labiau techninio pob\u016bd\u017eio, jame daugiausia d\u0117mesio skiriama gaminio projektavimui ir gamybos procesui.<\/p>\n\n\n\n<div class=\"wp-block-uagb-advanced-heading uagb-block-8c622e6e\"><h2 class=\"uagb-heading-text\">Koki\u0105 informacij\u0105 tvarko PIM?<\/h2><\/div>\n\n\n\n<p>Dabar, kai jau \u017einome PIM ir PDM skirtumus, sutelkime d\u0117mes\u012f \u012f tai, koki\u0105 informacij\u0105 tvarko PIM programin\u0117 \u012franga. Informacijos apie gamin\u012f valdymas (PIM) apima daugyb\u0119 su gaminiu susijusi\u0173 duomen\u0173 ir u\u017etikrina, kad visa su gaminiu susijusi informacija b\u016bt\u0173 konsoliduota, sutvarkyta ir atnaujinta. Tai apima, bet neapsiriboja:<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Esminiai produkto duomenys<\/strong>: Tai pagrindiniai identifikatoriai ir deskriptoriai, tokie kaip produkt\u0173 pavadinimai, produkt\u0173 ID, SKU (atsarg\u0173 saugojimo vienetai), apra\u0161ymai, kategorijos ir kainos.<\/li>\n\n\n\n<li><strong>Technin\u0117s specifikacijos<\/strong>: Priklausomai nuo gaminio, gali b\u016bti technin\u0117s specifikacijos, pvz., dydis, svoris, med\u017eiaga, ilgaam\u017ei\u0161kumas, energijos suvartojimas ir kitos konkre\u010diam gaminiui b\u016bdingos savyb\u0117s.<\/li>\n\n\n\n<li><strong>\u017diniasklaidos failai<\/strong>: Tai apima vis\u0105 su gaminiu susijusi\u0105 vaizdin\u0119 ir garsin\u0119 informacij\u0105, pavyzd\u017eiui, paveiksl\u0117lius, vaizdo \u012fra\u0161us, garso failus ir PDF dokumentus.<\/li>\n\n\n\n<li><strong>Tiek\u0117jo duomenys<\/strong>: Duomenys apie tiek\u0117j\u0105, \u012fskaitant pavadinim\u0105, kontaktin\u0119 informacij\u0105 ir atitinkamas s\u0105lygas.<\/li>\n\n\n\n<li><strong>Logistin\u0117 informacija<\/strong>: Duomenys, susij\u0119 su gaminio saugojimu, pakavimu ir siuntimu, pvz., matmenys, svoris, saugojimo instrukcijos ir siuntimo b\u016bdai.<\/li>\n\n\n\n<li><strong>Pardavimo informacija<\/strong>: I\u0161sami informacija apie turimas atsargas, pardavimo kanalus ir b\u016bsimas akcijas ar nuolaidas.<\/li>\n\n\n\n<li><strong>Klient\u0173 atsiliepimai ir vertinimai<\/strong>: Tai apima naudotoj\u0173 sukurt\u0105 turin\u012f, kuris potencialiems klientams gali b\u016bti lemiamas veiksnys.<\/li>\n<\/ol>\n\n\n\n<div class=\"wp-block-uagb-advanced-heading uagb-block-6687e2b7\"><h2 class=\"uagb-heading-text\">Ateities tendencijos PIM gamybos pramon\u0117je<\/h2><\/div>\n\n\n\n<p>Kaip ir daugelyje kit\u0173, gamybos pramon\u0117je vyksta didel\u0117s permainos, kurias lemia technologin\u0117 pa\u017eanga. I\u0161nagrin\u0117kime kelet\u0105 nauj\u0173 tendencij\u0173 gamini\u0173 informacijos valdymo (PIM) srityje, kurios pakeis gamybos kra\u0161tovaizd\u012f.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">I\u0161manioji duomen\u0173 analiz\u0117<\/h4>\n\n\n\n<p>Ateinan\u010diais metais PIM sistemos bus tarsi j\u016bs\u0173 asmeninis duomen\u0173 detektyvas. Jie per\u017evelgs visus faktus ir skai\u010dius ir susidarys bendr\u0105 vaizd\u0105. Tur\u0117dami ma\u0161ininio mokymosi \u012franki\u0173 rinkin\u012f, jie pateiks \u012f\u017evalg\u0173 ir pasi\u016blym\u0173, o duomenys taps galingu \u012frankiu efektyvumui didinti ir pa\u017eangesniems sprendimams priimti.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Partneryst\u0117 su IoT<\/h4>\n\n\n\n<p>\u012esivaizduokite, kad j\u016bs\u0173 gamyklos ma\u0161inos gal\u0117t\u0173 kalb\u0117ti. K\u0105 jie pasakyt\u0173? Daikt\u0173 interneto (DI) d\u0117ka netrukus tai su\u017einosime. Varikliams prad\u0117jus rinkti duomenis ir jais dalytis, PIM sistemos bus skirtos \u0161iai informacijai tvarkyti ir interpretuoti. Tai pad\u0117s geriau sekti, kontroliuoti kokyb\u0119 ir valdyti atsargas &#8211; ateities gamykloje i\u0161 ties\u0173 bus galima steb\u0117ti puls\u0105.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Labiau susietas pasaulis<\/h4>\n\n\n\n<p>Gamybos ateitis &#8211; tai vieta, kur visi ir viskas yra susij\u0119. PIM sistemos atliks svarb\u0173 vaidmen\u012f, nes pad\u0117s dalytis duomenimis su tiek\u0117jais, platintojais ir net klientais. Toks ry\u0161ys pagerins tiekimo grandin\u0117s operacijas ir padidins klient\u0173 patirt\u012f &#8211; tai abipusiai naudinga!<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Personalizavimo poreikio tenkinimas<\/h4>\n\n\n\n<p>Klientai pradeda reikalauti produkt\u0173, kurie b\u016bt\u0173 pritaikyti j\u0173 poreikiams. Tai rei\u0161kia, kad reikia valdyti vis daugiau produkt\u0173 variant\u0173. Ta\u010diau nesijaudinkite &#8211; b\u016bsimos PIM sistemos pad\u0117s u\u017etikrinti, kad teisinga informacija b\u016bt\u0173 visada prieinama, kad ir kokia \u012fvairi b\u016bt\u0173 produkt\u0173 pasi\u016bla.<\/p>\n\n\n\n<div class=\"wp-block-uagb-advanced-heading uagb-block-d843a325\"><h2 class=\"uagb-heading-text\">Sumaniai investuokite \u012f savo \u012fmon\u0119!  <\/h2><\/div>\n\n\n\n<p>Taigi, \u0161ios tendencijos leid\u017eia tik\u0117tis \u012fdomios PIM ateities gamyboje. Ta\u010diau kod\u0117l \u012fmon\u0117s tur\u0117t\u0173 apsvarstyti galimyb\u0119 investuoti \u012f PIM dabar?<\/p>\n\n\n\n<p>Investicijos \u012f PIM programin\u0119 \u012frang\u0105 gali pad\u0117ti j\u016bs\u0173 verslui i\u0161likti konkurencingam \u0161iuolaikiniame spar\u010diai besivystan\u010diame pasaulyje, ypa\u010d e. prekybos sektoriuje. PIM programin\u0117 \u012franga padeda pagerinti klient\u0173 patirt\u012f, padidinti pardavimus ir supaprastinti darbo eig\u0105, tod\u0117l j\u016bs\u0173 \u012fmon\u0117 tampa konkurencingesn\u0117.<\/p>\n\n\n\n<p>Be to, PIM programin\u0117 \u012franga puikiai dera su i\u0161pl\u0117stinio planavimo ir tvarkara\u0161\u010di\u0173 sudarymo (APS) sistemomis, kurios gali pad\u0117ti \u012fmonei optimizuoti gamybos planavim\u0105 ir tvarkara\u0161\u010di\u0173 sudarym\u0105, tod\u0117l padid\u0117ja efektyvumas ir pelningumas.<strong> <\/strong>Sujungus PIM ir <a href=\"https:\/\/skyplanner.ai\/lt\/sprendimai\/\">&#8222;Skyplanner&#8221; APS<\/a>, j\u016bs\u0173 \u012fmon\u0117 gali \u012fgyti konkurencin\u012f prana\u0161um\u0105 ir priimti geriau pagr\u012fstus sprendimus d\u0117l produkt\u0173 k\u016brimo, gamybos ir platinimo.<\/p>\n\n\n\n<p>M\u016bs\u0173 kvalifikuoti specialistai pasireng\u0119 jums pad\u0117ti! <a href=\"https:\/\/skyplanner.ai\/lt\/susisiekite-su-pardavejais\/\">Susisiekite su mumis<\/a> ir prad\u0117kite didinti pardavimus.<\/p>\n\n\n\n<div class=\"wp-block-uagb-image uagb-block-9c0944e7 wp-block-uagb-image--layout-default wp-block-uagb-image--effect-static wp-block-uagb-image--align-none\"><figure class=\"wp-block-uagb-image__figure\"><img decoding=\"async\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Solutions-header-mobiili.png\" alt=\"SkyPlanner APS Gamybos planavimo problem\u0173 sprendimai\" class=\"uag-image-2090\" width=\"693\" height=\"467\" title=\"\" loading=\"lazy\" role=\"img\"><\/figure><\/div>\n\n\n\n<div class=\"wp-block-uagb-advanced-heading uagb-block-0002acb1\"><h2 class=\"uagb-heading-text\">Da\u017enai u\u017eduodami klausimai (DUK)<\/h2><\/div>\n\n\n\n<p>\u0160iame segmente gilinamasi \u012f da\u017eniausiai u\u017eduodamus klausimus apie informacijos apie gamin\u012f valdym\u0105 ir paai\u0161kinama, kaip &#8222;Skyplanner&#8221; i\u0161pl\u0117stin\u0117 planavimo sistema gali sustiprinti j\u016bs\u0173 versl\u0105.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-03444469 gb-headline-text\">Kas yra produkto informacijos valdymas (PIM)?<\/h4>\n\n\n\n<p>Produkt\u0173 informacijos valdymas (PIM) &#8211; tai programin\u0117s \u012frangos sprendimas, padedantis \u012fmon\u0117ms centralizuoti, tvarkyti ir praturtinti produkt\u0173 duomenis saugioje vietoje. \u0160i sistema leid\u017eia \u012fmon\u0117ms veiksmingai valdyti ir platinti informacij\u0105 apie gaminius \u012fvairiais kanalais, gerinant duomen\u0173 kokyb\u0119, nuoseklum\u0105 ir prieinamum\u0105 organizacijoje.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-00f65c2b gb-headline-text\">Kokie yra pagrindiniai PIM programin\u0117s \u012frangos tikslai?<\/h4>\n\n\n\n<p>Pagrindinis PIM programin\u0117s \u012frangos tikslas &#8211; pagerinti duomen\u0173 kokyb\u0119 ir nuoseklum\u0105 visuose kanaluose. Taip u\u017etikrinamas tikslus ir nuoseklus produkt\u0173 duomen\u0173 rodymas visur &#8211; nuo j\u016bs\u0173 e. parduotuv\u0117s svetain\u0117s iki ma\u017emenin\u0117s prekybos partneri\u0173.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-3071c882 gb-headline-text\">Kaip veikia PIM?<\/h4>\n\n\n\n<p>PIM programin\u0117 \u012franga integruojama su kitomis \u012fmon\u0117s sistemomis, pavyzd\u017eiui, ERP, CRM ir e. prekybos platformomis, tod\u0117l \u012fvair\u016bs skyriai gali naudotis informacija apie gaminius ir j\u0105 tvarkyti. Tai padeda u\u017etikrinti produkt\u0173 duomen\u0173 nuoseklum\u0105 ir aktualum\u0105 visuose kanaluose.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-9defef99 gb-headline-text\">Kokie yra PIM programin\u0117s \u012frangos naudojimo privalumai?<\/h4>\n\n\n\n<p>Tai padeda padidinti pardavimus, suma\u017einti nesusikalb\u0117jim\u0105, padidinti klient\u0173 pasitik\u0117jim\u0105, pagerinti bendradarbiavim\u0105, padidinti na\u0161um\u0105, suteikti konkurencin\u012f prana\u0161um\u0105, pagerinti laik\u0105, reikaling\u0105 rinkai pateikti, optimizuoti SEO ir suma\u017einti produkt\u0173 gr\u0105\u017einim\u0105.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-439bc29c gb-headline-text\">Kokioms pramon\u0117s \u0161akoms gali b\u016bti naudingas PIM?<\/h4>\n\n\n\n<p>PIM gali b\u016bti naudingas daugeliui pramon\u0117s \u0161ak\u0173, \u012fskaitant ma\u017emenin\u0119 prekyb\u0105, gamyb\u0105, sveikatos prie\u017ei\u016br\u0105, automobili\u0173 pramon\u0119 ir svetingum\u0105.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-7af29f6b gb-headline-text\">Kuo skiriasi PIM ir produkto duomen\u0173 valdymas (PDM)?<\/h4>\n\n\n\n<p>PIM daugiausia d\u0117mesio skiria produkto duomen\u0173 rinkodaros ir pardavimo aspektams, o PDM yra labiau techninio pob\u016bd\u017eio &#8211; jis skirtas produkto projektavimui ir gamybos procesui.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-5c6dfeda gb-headline-text\">Kokio tipo informacij\u0105 tvarko PIM?<\/h4>\n\n\n\n<p>PIM tvarko \u012fvairius su gaminiu susijusius duomenis, \u012fskaitant pagrindinius gaminio duomenis, technines specifikacijas, laikmenas, tiek\u0117j\u0173 duomenis, logistin\u0119 informacij\u0105, pardavimo informacij\u0105, klient\u0173 atsiliepimus ir vertinimus.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-c9416d2b gb-headline-text\">Kokios yra b\u016bsimos PIM tendencijos gamybos pramon\u0117je?<\/h4>\n\n\n\n<p>Ateities tendencijos apima pa\u017eangi\u0105 duomen\u0173 analiz\u0119, partneryst\u0119 su daikt\u0173 internetu, didesn\u012f ry\u0161\u012f ir personalizavimo poreikio tenkinim\u0105.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-5f432805 gb-headline-text\">Kod\u0117l \u012fmon\u0117 tur\u0117t\u0173 investuoti \u012f PIM?<\/h4>\n\n\n\n<p>Investicijos \u012f PIM gali pad\u0117ti \u012fmon\u0117ms i\u0161likti konkurencingoms, pagerinti klient\u0173 patirt\u012f, padidinti pardavimus ir supaprastinti darbo eig\u0105. Kartu su pa\u017eangiomis planavimo ir tvarkara\u0161\u010di\u0173 sudarymo (APS) sistemomis PIM taip pat gali optimizuoti gamybos planavim\u0105 ir tvarkara\u0161\u010di\u0173 sudarym\u0105, padidinti efektyvum\u0105 ir pelningum\u0105.<\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-92545123\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-0a61546f\">\n<div class=\"gb-grid-column gb-grid-column-e4183086\"><div class=\"gb-container gb-container-e4183086\">\n\n<\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-84ccbb5d\"><div class=\"gb-container gb-container-84ccbb5d\">\n\n<\/div><\/div>\n<\/div>\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Informacijos apie gamin\u012f valdymas: Raktas \u012f pardavim\u0173 didinim\u0105 Pagrindinis \u00bb \u0160altiniai \u00bb Informacijos apie gamin\u012f valdymas: Raktas \u012f pardavim\u0173 didinim\u0105 \u012esivaizduokite, kad nar\u0161ote vie\u0161bu\u010di\u0173 u\u017esakymo svetain\u0117je. Internete ie\u0161kote vie\u0161bu\u010dio, kuris puikiai tikt\u0173 j\u016bs\u0173 atostogoms, ir aptikote vie\u0161but\u012f, kuris gali jums tikti. Paspaud\u0119 vie\u0161bu\u010dio puslap\u012f nerandate nei kambari\u0173 nuotrauk\u0173, nei patogum\u0173 apra\u0161ym\u0173, nei ankstesni\u0173 sve\u010di\u0173 atsiliepim\u0173. &#8230; <a title=\"Informacijos apie gamin\u012f valdymas: Raktas \u012f pardavim\u0173 didinim\u0105\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/informacijos-apie-gamini-valdymas-raktas-i-pardavimu-didinima\/\" aria-label=\"Read more about Informacijos apie gamin\u012f valdymas: Raktas \u012f pardavim\u0173 didinim\u0105\">Read more<\/a><\/p>\n","protected":false},"author":6,"featured_media":11773,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[301],"tags":[],"class_list":["post-11998","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-istekliai","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Informacijos apie gamin\u012f valdymas: Raktas \u012f pardavim\u0173 didinim\u0105 &#8211; SkyPlanner<\/title>\n<meta name=\"description\" content=\"Informacijos apie gamin\u012f valdymas (PIM) - tai programin\u0117s \u012frangos sprendimas, kuriuo informacija apie gamin\u012f valdoma ir perduodama visais kanalais.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/informacijos-apie-gamini-valdymas-raktas-i-pardavimu-didinima\/\" \/>\n<meta property=\"og:locale\" content=\"lt_LT\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Informacijos apie gamin\u012f valdymas: Raktas \u012f pardavim\u0173 didinim\u0105\" \/>\n<meta property=\"og:description\" content=\"Informacijos apie gamin\u012f valdymas (PIM) - tai programin\u0117s \u012frangos sprendimas, kuriuo informacija apie gamin\u012f valdoma ir perduodama visais kanalais.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lt\/istekliai\/informacijos-apie-gamini-valdymas-raktas-i-pardavimu-didinima\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2023-06-27T15:00:23+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-19T20:09:59+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/06\/Product-Information-Management-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1707\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"SkyPlanner\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"9 minut\u0117s\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/informacijos-apie-gamini-valdymas-raktas-i-pardavimu-didinima\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/informacijos-apie-gamini-valdymas-raktas-i-pardavimu-didinima\\\/\"},\"author\":{\"name\":\"SkyPlanner\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\"},\"headline\":\"Informacijos apie gamin\u012f valdymas: Raktas \u012f pardavim\u0173 didinim\u0105\",\"datePublished\":\"2023-06-27T15:00:23+00:00\",\"dateModified\":\"2026-06-19T20:09:59+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/informacijos-apie-gamini-valdymas-raktas-i-pardavimu-didinima\\\/\"},\"wordCount\":2159,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/informacijos-apie-gamini-valdymas-raktas-i-pardavimu-didinima\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/06\\\/Product-Information-Management-scaled.jpg\",\"articleSection\":[\"i\u0161tekliai\"],\"inLanguage\":\"lt-LT\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/informacijos-apie-gamini-valdymas-raktas-i-pardavimu-didinima\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/informacijos-apie-gamini-valdymas-raktas-i-pardavimu-didinima\\\/\",\"name\":\"Informacijos apie gamin\u012f valdymas: Raktas \u012f pardavim\u0173 didinim\u0105 &#8211; SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/informacijos-apie-gamini-valdymas-raktas-i-pardavimu-didinima\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/informacijos-apie-gamini-valdymas-raktas-i-pardavimu-didinima\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/06\\\/Product-Information-Management-scaled.jpg\",\"datePublished\":\"2023-06-27T15:00:23+00:00\",\"dateModified\":\"2026-06-19T20:09:59+00:00\",\"description\":\"Informacijos apie gamin\u012f valdymas (PIM) - tai programin\u0117s \u012frangos sprendimas, kuriuo informacija apie gamin\u012f valdoma ir perduodama visais kanalais.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/informacijos-apie-gamini-valdymas-raktas-i-pardavimu-didinima\\\/#breadcrumb\"},\"inLanguage\":\"lt-LT\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/informacijos-apie-gamini-valdymas-raktas-i-pardavimu-didinima\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"lt-LT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/informacijos-apie-gamini-valdymas-raktas-i-pardavimu-didinima\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/06\\\/Product-Information-Management-scaled.jpg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/06\\\/Product-Information-Management-scaled.jpg\",\"width\":2560,\"height\":1707,\"caption\":\"Product Information Management, PIM\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/informacijos-apie-gamini-valdymas-raktas-i-pardavimu-didinima\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Informacijos apie gamin\u012f valdymas: Raktas \u012f pardavim\u0173 didinim\u0105\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lt-LT\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lt-LT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\",\"name\":\"SkyPlanner\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lt-LT\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"caption\":\"SkyPlanner\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Informacijos apie gamin\u012f valdymas: Raktas \u012f pardavim\u0173 didinim\u0105 &#8211; SkyPlanner","description":"Informacijos apie gamin\u012f valdymas (PIM) - tai programin\u0117s \u012frangos sprendimas, kuriuo informacija apie gamin\u012f valdoma ir perduodama visais kanalais.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lt\/istekliai\/informacijos-apie-gamini-valdymas-raktas-i-pardavimu-didinima\/","og_locale":"lt_LT","og_type":"article","og_title":"Informacijos apie gamin\u012f valdymas: Raktas \u012f pardavim\u0173 didinim\u0105","og_description":"Informacijos apie gamin\u012f valdymas (PIM) - tai programin\u0117s \u012frangos sprendimas, kuriuo informacija apie gamin\u012f valdoma ir perduodama visais kanalais.","og_url":"https:\/\/skyplanner.ai\/lt\/istekliai\/informacijos-apie-gamini-valdymas-raktas-i-pardavimu-didinima\/","og_site_name":"SkyPlanner","article_published_time":"2023-06-27T15:00:23+00:00","article_modified_time":"2026-06-19T20:09:59+00:00","og_image":[{"width":2560,"height":1707,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/06\/Product-Information-Management-scaled.jpg","type":"image\/jpeg"}],"author":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Written by":"SkyPlanner","Est. reading time":"9 minut\u0117s"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/informacijos-apie-gamini-valdymas-raktas-i-pardavimu-didinima\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/informacijos-apie-gamini-valdymas-raktas-i-pardavimu-didinima\/"},"author":{"name":"SkyPlanner","@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a"},"headline":"Informacijos apie gamin\u012f valdymas: Raktas \u012f pardavim\u0173 didinim\u0105","datePublished":"2023-06-27T15:00:23+00:00","dateModified":"2026-06-19T20:09:59+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/informacijos-apie-gamini-valdymas-raktas-i-pardavimu-didinima\/"},"wordCount":2159,"publisher":{"@id":"https:\/\/skyplanner.ai\/lt\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/informacijos-apie-gamini-valdymas-raktas-i-pardavimu-didinima\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/06\/Product-Information-Management-scaled.jpg","articleSection":["i\u0161tekliai"],"inLanguage":"lt-LT"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/informacijos-apie-gamini-valdymas-raktas-i-pardavimu-didinima\/","url":"https:\/\/skyplanner.ai\/lt\/istekliai\/informacijos-apie-gamini-valdymas-raktas-i-pardavimu-didinima\/","name":"Informacijos apie gamin\u012f valdymas: Raktas \u012f pardavim\u0173 didinim\u0105 &#8211; SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lt\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/informacijos-apie-gamini-valdymas-raktas-i-pardavimu-didinima\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/informacijos-apie-gamini-valdymas-raktas-i-pardavimu-didinima\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/06\/Product-Information-Management-scaled.jpg","datePublished":"2023-06-27T15:00:23+00:00","dateModified":"2026-06-19T20:09:59+00:00","description":"Informacijos apie gamin\u012f valdymas (PIM) - tai programin\u0117s \u012frangos sprendimas, kuriuo informacija apie gamin\u012f valdoma ir perduodama visais kanalais.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/informacijos-apie-gamini-valdymas-raktas-i-pardavimu-didinima\/#breadcrumb"},"inLanguage":"lt-LT","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lt\/istekliai\/informacijos-apie-gamini-valdymas-raktas-i-pardavimu-didinima\/"]}]},{"@type":"ImageObject","inLanguage":"lt-LT","@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/informacijos-apie-gamini-valdymas-raktas-i-pardavimu-didinima\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/06\/Product-Information-Management-scaled.jpg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/06\/Product-Information-Management-scaled.jpg","width":2560,"height":1707,"caption":"Product Information Management, PIM"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/informacijos-apie-gamini-valdymas-raktas-i-pardavimu-didinima\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lt\/"},{"@type":"ListItem","position":2,"name":"Informacijos apie gamin\u012f valdymas: Raktas \u012f pardavim\u0173 didinim\u0105"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lt\/#website","url":"https:\/\/skyplanner.ai\/lt\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lt\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lt\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lt-LT"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lt\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lt\/","logo":{"@type":"ImageObject","inLanguage":"lt-LT","@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a","name":"SkyPlanner","image":{"@type":"ImageObject","inLanguage":"lt-LT","@id":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","caption":"SkyPlanner"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/06\/Product-Information-Management-scaled.jpg",2560,1707,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/06\/Product-Information-Management-150x150.jpg",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/06\/Product-Information-Management-300x200.jpg",300,200,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/06\/Product-Information-Management-768x512.jpg",768,512,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/06\/Product-Information-Management-1024x683.jpg",1024,683,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/06\/Product-Information-Management-1536x1024.jpg",1536,1024,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/06\/Product-Information-Management-2048x1365.jpg",2048,1365,true],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/06\/Product-Information-Management-scaled.jpg",360,240,false]},"uagb_author_info":{"display_name":"SkyPlanner","author_link":"https:\/\/skyplanner.ai\/lt\/author\/bettina\/"},"uagb_comment_info":0,"uagb_excerpt":"Informacijos apie gamin\u012f valdymas: Raktas \u012f pardavim\u0173 didinim\u0105 Pagrindinis \u00bb \u0160altiniai \u00bb Informacijos apie gamin\u012f valdymas: Raktas \u012f pardavim\u0173 didinim\u0105 \u012esivaizduokite, kad nar\u0161ote vie\u0161bu\u010di\u0173 u\u017esakymo svetain\u0117je. Internete ie\u0161kote vie\u0161bu\u010dio, kuris puikiai tikt\u0173 j\u016bs\u0173 atostogoms, ir aptikote vie\u0161but\u012f, kuris gali jums tikti. Paspaud\u0119 vie\u0161bu\u010dio puslap\u012f nerandate nei kambari\u0173 nuotrauk\u0173, nei patogum\u0173 apra\u0161ym\u0173, nei ankstesni\u0173 sve\u010di\u0173 atsiliepim\u0173.&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/posts\/11998","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/comments?post=11998"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/posts\/11998\/revisions"}],"predecessor-version":[{"id":93299,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/posts\/11998\/revisions\/93299"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/media\/11773"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/media?parent=11998"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/categories?post=11998"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/tags?post=11998"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}