{"id":112561,"date":"2026-10-29T11:53:40","date_gmt":"2026-10-29T11:53:40","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=112561"},"modified":"2026-10-29T12:26:00","modified_gmt":"2026-10-29T12:26:00","slug":"misriu-modeliu-surinkimo-seka","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/lt\/istekliai\/misriu-modeliu-surinkimo-seka\/","title":{"rendered":"Mi\u0161ri\u0173 modeli\u0173 surinkimo seka: pasirinkite tinkam\u0105 eili\u0161kum\u0105"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Mi\u0161ri\u0173 modeli\u0173 surinkimo seka: pasirinkite tinkam\u0105 eili\u0161kum\u0105<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/lt\/\">Prad\u017eia<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/\">I\u0161tekliai<\/a> &raquo; Mi\u0161ri\u0173 modeli\u0173 surinkimo seka: pasirinkite tinkam\u0105 eili\u0161kum\u0105<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Numatomas skaitymo laikas: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> minut\u0117s<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Pamainai suplanuotas reikiamas kiekvieno modelio kiekis, ta\u010diau linija vis stoja. Vienas po kito atkeliauja trys gaminiai, kuriems reikia daug laid\u0173 montavimo darb\u0173. Operatorius nesp\u0117ja, o paprastesni gaminiai, kuriuos surenkant b\u016bt\u0173 galima u\u017ebaigti susikaupusius darbus, eil\u0117je dar toli.<\/p>\n\n\n<p>Dienos modeli\u0173 kiekiai ir santykis tinkami. J\u0173 eili\u0161kumas \u2013 ne.<\/p>\n\n\n<p>Mi\u0161ri\u0173 modeli\u0173 surinkimo seka nusako, kokia tvarka skirtingi gaminio variantai patenka \u012f surinkimo linij\u0105, kad postuose b\u016bt\u0173 \u012fmanoma atlikti skirtingos apimties darbus. Tinkama seka ne tik tolygiai kaitalioja modelius: ji u\u017etikrina, kad kiekviename riboto paj\u0117gumo poste darbai ir susikaupusio j\u0173 liku\u010dio u\u017ebaigimas keist\u0173si fizi\u0161kai \u012fgyvendinama tvarka.<\/p>\n\n\n<p>\u0160i\u0105 sek\u0105 taip pat reikia \u012ftraukti \u012f bendr\u0105 gamyklos plan\u0105. SkyPlanner APS sujungia atskiriems variantams b\u016bdingas operacijas, med\u017eiag\u0173 prieinamum\u0105 ir bendrus i\u0161teklius \u012f vien\u0105 <a href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/kas-yra-gamybos-planavimas\/\">gamybos grafik\u0105<\/a>. Taip suma\u017e\u0117ja rankinio darbo derinant surinkimo s\u0105ra\u0161\u0105 su atskiromis bandym\u0173 ir darbo centr\u0173 u\u017eduo\u010di\u0173 eil\u0117mis.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Subalansuotas modeli\u0173 santykis dar nerei\u0161kia, kad seka tinkama<\/h2>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/heijunka\/\">Gamybos i\u0161lyginimas<\/a>, arba heijunka, padeda i\u0161lyginti gamybos apimt\u012f ir modeli\u0173 santyk\u012f per pasirinkt\u0105 laikotarp\u012f. <a href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/gamybos-linijos-balansavimas\/\">Gamybos linijos balansavimas<\/a> paskirsto darbo elementus postams. O parenkant mi\u0161ri\u0173 modeli\u0173 surinkimo sek\u0105 nustatoma, kokia tvarka konkret\u016bs gaminiai jud\u0117s per taip organizuot\u0105 linij\u0105.<\/p>\n\n\n<p>\u0160ie sprendimai papildo vienas kit\u0105, bet atsako \u012f skirtingus klausimus. Tai, kad kiekvien\u0105 pamain\u0105 pagaminami reikiami modeli\u0173 kiekiai, dar neparodo, ar du sud\u0117tingi gaminiai gali eiti vienas po kito. Priimtina vidutin\u0117 darbo trukm\u0117 poste neatskleid\u017eia, kiek nebaigt\u0173 darb\u0173 jame susikaups, kol atkeliaus paprastesnis gaminys.<\/p>\n\n\n<p>\u0160is skirtumas svarbus, nes darbo kr\u016bvis priklauso nuo konkretaus posto. Variantui su papildomais laidais surinkti gali reik\u0117ti daug darbo, nors j\u012f i\u0161bandyti galima greitai. Kit\u0105 variant\u0105 gali b\u016bti paprasta surinkti, ta\u010diau jam reik\u0117s ilgesnio bandymo. Modeli\u0173 kaitaliojimas padeda tik tada, kai faktin\u0117s j\u0173 apkrovos atskiruose postuose papildo viena kit\u0105.<\/p>\n\n\n<p>Prad\u0117kite nuo kiekvieno modelio darb\u0173 apimties kiekviename poste, o ne nuo vieno bendro viso gaminio sud\u0117tingumo \u012fvertinimo.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Nustatykite, kok\u012f kr\u016bv\u012f kiekvienas postas i\u0161 ties\u0173 gali \u012fveikti<\/h2>\n\n\n<p>Kiekvienam aktualiam variantui u\u017efiksuokite, kokius darbus reikia atlikti kiekviename riboto paj\u0117gumo poste. \u012etraukite \u012fprastus gaminio tvarkymo veiksmus ir patikras, darbus, priklausan\u010dius nuo pasirinktos komplektacijos, bei perderinimus, kuriems turi \u012ftakos prie\u0161 tai gamintas modelis. Atskirai nurodykite \u012frenginio veikimo be operatoriaus laik\u0105 ir darbus, kuriems operatorius b\u016btinas: nuo to, kiek \u0161ie laikai persidengia, priklauso reikiami paj\u0117gumai.<\/p>\n\n\n<p>Remkit\u0117s reprezentatyviomis trukm\u0117mis, nustatytomis pagal apibr\u0117\u017et\u0105 metod\u0105. Grei\u010diausias steb\u0117tas ciklas n\u0117ra tinkamas pagrindas sekai, kuri\u0105 komanda tur\u0117s kartoti vis\u0105 dien\u0105.<\/p>\n\n\n<p>Tada nustatykite planuojam\u0105 interval\u0105 tarp gamini\u0173 atvykimo \u012f post\u0105. \u0160is gamini\u0173 paleidimo intervalas yra laikas, kuriuo remiamasi tikrinant sek\u0105. Pagal klient\u0173 paklaus\u0105 nustatytas takto laikas nusako reikiam\u0105 gamybos temp\u0105, o planuojant faktin\u012f darbo interval\u0105 dar reikia atsi\u017evelgti \u012f gamybos nuostolius ir laiko rezerv\u0105 susikaupusiems darbams u\u017ebaigti.<\/p>\n\n\n<p>Galiausiai sutarkite, kas vyksta, kai gaminiui reikia daugiau laiko, nei numato \u0161is intervalas:<\/p>\n\n\n<ul class=\"wp-block-list\"><li>Linijoje, kurioje gaminiai perkeliami grie\u017etai nustatytais \u017eingsniais, darbus gali b\u016bti privaloma u\u017ebaigti iki kito perk\u0117limo. V\u0117liau atkeliausiantis paprastesnis gaminys nekompensuos jau praleisto perk\u0117limo.<\/li><li>Nuolat judan\u010dioje linijoje operatoriui gali b\u016bti patvirtinta darbo zona, leid\u017eianti t\u0119sti darb\u0105 ilgiau nei vien\u0105 nominal\u0173 interval\u0105. Vis tiek b\u016btina paisyti prieigos, vaik\u0161\u010diojimo, tarpusavio trukdymo ir ribos, u\u017e kurios gaminys i\u0161eina i\u0161 posto.<\/li><li>Linijoje su tarpiniais kaupikliais, kurios postai ne taip glaud\u017eiai susieti, prie posto gali laikinai susidaryti eil\u0117, o v\u0117liau jis gali j\u0105 apdoroti. Patikrinkite ir eil\u0119 prie\u0161 post\u0105, ir rizik\u0105, kad gretimi postai liks be darbo arba bus u\u017eblokuoti.<\/li><\/ul>\n\n\n<p>Susikaupusiems darbams u\u017ebaigti numatykite tik tiek laiko, kiek i\u0161 ties\u0173 leid\u017eia fizinis procesas. Tai nerei\u0161kia, kad galima praleisti patikr\u0105, tik\u0117tis greitesnio operatoriaus darbo ar pasitelkti \u017emog\u0173, kuris jau paskirtas kitur.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Pavyzdys: tas pats modeli\u0173 santykis, bet labai skirtingos did\u017eiausios apkrovos<\/h2>\n\n\n<p>\u012esivaizduokime linij\u0105, \u012f kuri\u0105 kas 60 sekund\u017ei\u0173 paleid\u017eiamas vienas gaminys. Joje pagaminama po tris A ir B variant\u0173 gaminius. Dviejuose postuose taikomos \u0161ios supaprastintos darb\u0173 trukm\u0117s:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Variantas<\/th><th>1 postas<\/th><th>2 postas<\/th><\/tr><\/thead><tbody><tr><td>A<\/td><td>78 sekund\u0117s<\/td><td>42 sekund\u0117s<\/td><\/tr><tr><td>B<\/td><td>42 sekund\u0117s<\/td><td>78 sekund\u0117s<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Esant tokiam modeli\u0173 santykiui, kiekviename poste vienam gaminiui vidutini\u0161kai tenka 60 sekund\u017ei\u0173 darbo. Komanda lygina du eili\u0161kumus: <strong>A A A B B B<\/strong> ir <strong>A B A B A B<\/strong>.<\/p>\n\n\n<p>\u0160iame pavyzdyje tarkime, kad kiekvienas postas turi savo operatori\u0173, gamini\u0173 eili\u0161kumas nesikei\u010dia, o fizinis linijos i\u0161d\u0117stymas leid\u017eia ribot\u0105 darb\u0173 dal\u012f perkelti \u012f kit\u0105 interval\u0105. Trukm\u0117s pastovios, papildom\u0173 perderinim\u0173 ar pertr\u016bki\u0173 n\u0117ra. Tikriname atskiro posto darbo kr\u016bv\u012f, o ne modeliuojame visos linijos veikim\u0105.<\/p>\n\n\n<p>Steb\u0117kite, kiek nebaigto darbo lieka kiekvien\u0105 kart\u0105 atvykstant kitam gaminiui:<\/p>\n\n\n<p><strong>Kitas nebaigto darbo likutis = didesn\u0117 i\u0161 dviej\u0173 reik\u0161mi\u0173: nulis arba (ankstesnis nebaigto darbo likutis + \u0161io gaminio darbo trukm\u0117 \u2212 paleidimo intervalas).<\/strong><\/p>\n\n\n<p>Prad\u0117kite nuo jau likusi\u0173 nebaigt\u0173 darb\u0173, o ne savaime nuo nulio. Niekada neperkelkite neigiamo liku\u010dio \u012f ateit\u012f kaip laiko atsargos: laisvo laiko iki gaminio atvykimo negalima panaudoti tam b\u016bsimam gaminiui surinkti.<\/p>\n\n\n<p>Jei 1 poste i\u0161 prad\u017ei\u0173 n\u0117ra nebaigt\u0173 darb\u0173, gaminant sugrupuotus modelius po kiekvieno intervalo lieka atitinkamai <strong>18, 36, 54, 36, 18 ir 0 sekund\u017ei\u0173<\/strong> darbo. Kaitaliojant modelius lieka <strong>18, 0, 18, 0, 18 ir 0 sekund\u017ei\u0173<\/strong>.<\/p>\n\n\n<p>Vidurkis nepasikeit\u0117, bet did\u017eiausias likutis pasikeit\u0117:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Vertinamas eili\u0161kumas<\/th><th>Did\u017eiausias nebaigto darbo likutis 1 poste<\/th><th>Did\u017eiausias nebaigto darbo likutis 2 poste<\/th><\/tr><\/thead><tbody><tr><td>A A A B B B<\/td><td>54 sekund\u0117s<\/td><td>54 sekund\u0117s<\/td><\/tr><tr><td>A B A B A B<\/td><td>18 sekund\u017ei\u0173<\/td><td>18 sekund\u017ei\u0173<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Tarkime, komanda fizin\u0117mis s\u0105lygomis patikrino ir patvirtino, kad kiekviename poste leid\u017eiamas ne didesnis kaip 24 sekund\u017ei\u0173 nebaigto darbo likutis. Sugrupuot\u0173 modeli\u0173 seka \u0161i\u0105 rib\u0105 vir\u0161ija, o kaitaliojam\u0173 modeli\u0173 seka, esant nurodytoms prielaidoms, jos nevir\u0161ija. \u0160i 24 sekund\u017ei\u0173 riba yra i\u0161galvota \u0161io pavyzd\u017eio s\u0105lyga, o ne rekomenduojamas rezervas kitoms linijoms.<\/p>\n\n\n<p>2 postas taip pat parodo, kod\u0117l svarbi sekos pabaiga. Jei i\u0161 prad\u017ei\u0173 nebaigt\u0173 darb\u0173 n\u0117ra, kaitaliojam\u0173 modeli\u0173 sekos paskutinio B intervalo pabaigoje dar lieka 18 sekund\u017ei\u0173 darbo. Jei seka kartojama, dirbant su kitu A gaminiu pakanka laisvo laiko \u0161iam liku\u010diui u\u017ebaigti. Jei tuo gamyba baigiasi, likusiems darbams vis tiek reikia laiko. Pamainos pabaiga j\u0173 nepanaikina.<\/p>\n\n\n<p>Abiejuose postuose vidutin\u0117 darbo trukm\u0117 tiksliai atitinka paleidimo interval\u0105, tod\u0117l \u0161iame pavyzdyje n\u0117ra vidutinio paj\u0117gum\u0173 rezervo trikd\u017eiams kompensuoti. Esant pastovioms trukm\u0117ms, kaitaliojam\u0173 modeli\u0173 seka yra geresnis kandidatas, bet tai ne\u012frodo, kad gamybos tempas bus atsparus trikd\u017eiams. Prie\u0161 j\u0105 patvirtindami, linijoje patikrinkite faktinius trukmi\u0173 svyravimus, gamini\u0173 perk\u0117lim\u0105 ir galimybes u\u017ebaigti susikaupusius darbus.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Parinkdami sek\u0105 \u012fvertinkite kiekvien\u0105 riboto paj\u0117gumo post\u0105<\/h2>\n\n\n<p>Vis\u0173 post\u0173 patikroms naudokite t\u0105 pat\u012f nustatyta tvarka i\u0161d\u0117styt\u0105 gamini\u0173 s\u0105ra\u0161\u0105. Kiekviename poste palyginkite did\u017eiausi\u0105 susikaupus\u012f darb\u0173 likut\u012f su leistina jo riba ir \u012fsitikinkite, kad postas pakankamai da\u017enai u\u017ebaigia susikaupusius darbus, kad gal\u0117t\u0173 dirbti toliau. \u012etraukite ankstesnio gamybos laikotarpio nebaigtus darbus ir \u012fvertinkite pasikartojan\u010di\u0173 sek\u0173 sand\u016br\u0105.<\/p>\n\n\n<p>Sek\u0105 naudinga rinktis tokia tvarka:<\/p>\n\n\n<p>1. <strong>Nepameskite i\u0161 aki\u0173 reikiam\u0173 kieki\u0173 ir \u012fsipareigojim\u0173.<\/strong> Negerinkite apkrovos kreiv\u0117s tyliai i\u0161braukdami daug darbo reikalaujan\u010dius gaminius ar nukeldami kliento u\u017esakym\u0105 u\u017e sutarto pristatymo laikotarpio rib\u0173.<\/p>\n\n\n<p>2. <strong>Nustatykite, kurios gamini\u0173 sekos labiausiai apkrauna darbo centrus.<\/strong> Ie\u0161kokite ne tik i\u0161 eil\u0117s pasikartojan\u010di\u0173 vienod\u0173 modeli\u0173 kod\u0173, bet ir vienas po kito einan\u010di\u0173 gamini\u0173 su daug darbo reikalaujan\u010diomis komplektacijos parinktimis. Skirtingi variantai gali tur\u0117ti t\u0105 pa\u010di\u0105 daug darbo reikalaujan\u010di\u0105 parinkt\u012f.<\/p>\n\n\n<p>3. <strong>Ten, kur reikia u\u017ebaigti susikaupus\u012f darb\u0105, \u012fterpkite i\u0161 ties\u0173 ma\u017eiau darbo reikalaujan\u010dius gaminius.<\/strong> Po kiekvieno pakeitimo i\u0161 naujo patikrinkite visus paveiktus darbo centrus. Pagerinus laid\u0173 montavimo darb\u0173 sek\u0105, bandymo darbo centre gali susidaryti nepriimtina apkrovos seka.<\/p>\n\n\n<p>4. <strong>\u012egyvendinamas sekas palyginkite pagal likusias s\u0105naudas.<\/strong> \u012evertinkite perderinimus, komponent\u0173 pateikim\u0105 \u012f darbo vietas ir pristatymo terminus. Ma\u017eiausias perderinim\u0173 skai\u010dius n\u0117ra geriausias rezultatas, jei d\u0117l to linija nuolat stoja.<\/p>\n\n\n<p>5. <strong>Pasirinkt\u0105 sek\u0105 patikrinkite \u012fprastas darbo s\u0105lygas atitinkan\u010dioje aplinkoje.<\/strong> Kartu su linijoje dirban\u010diais \u017emon\u0117mis \u012fvertinkite standartizuot\u0105 darb\u0105, kokyb\u0119, ergonomik\u0105 ir faktin\u0119 erdv\u0119 susikaupusiam darbui u\u017ebaigti.<\/p>\n\n\n<p>Jei taikote komplektacijos parinkties taisykl\u0119, suformuluokite j\u0105 ai\u0161kiai. \u201eBet kurioje keturi\u0173 i\u0161 eil\u0117s einan\u010di\u0173 gamini\u0173 grup\u0117je \u0161i\u0105 parinkt\u012f gali tur\u0117ti ne daugiau kaip du gaminiai\u201c \u2013 tai slankiojo lango taisykl\u0117, o ne dienos procentin\u0117 dalis. Patikrinkite persidengian\u010dius langus ir s\u0105ra\u0161\u0173 sand\u016bras. Tokia taisykl\u0117 gali b\u016bti naudingas gamybos apribojimas, ta\u010diau ji turi atspind\u0117ti prakti\u0161kai patvirtint\u0105 darbo centro geb\u0117jim\u0105 u\u017ebaigti susikaupus\u012f darb\u0105, o ne pakeisti \u0161io geb\u0117jimo vertinim\u0105.<\/p>\n\n\n<p>Jei esant reikiamam modeli\u0173 deriniui vidutinei darbo apkrovai jau reikia daugiau laiko, nei darbo centras turi, gamini\u0173 perrikiavimas tr\u016bkstam\u0173 paj\u0117gum\u0173 nesukurs. Tobulinkite darbo metod\u0105, tinkamus darbus perkelkite kitur, pagr\u012fstai didinkite paj\u0117gumus arba keiskite gamybos temp\u0105 ir \u012fsipareigojimus. Sekos parinkimas padeda valdyti apkrovos svyravimus, bet nesuma\u017eina darbo kiekio.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Suderinkite variant\u0173 gamybos plan\u0105 su visos gamyklos darbu<\/h2>\n\n\n<p>Surinkimo linijai tinkama seka vis tiek gali nepasiteisinti, jei tr\u016bksta jai reikaling\u0173 dali\u0173 arba bendras bandymo \u012frenginys u\u017eimtas kitu u\u017esakymu. Jei \u0161ias s\u0105lygas tvarkote atskiruose s\u0105ra\u0161uose, kaskart pasikeitus modeli\u0173 deriniui ar pristatymui tenka visk\u0105 derinti i\u0161 naujo.<\/p>\n\n\n<p>B\u016btent tam rekomenduojame SkyPlanner. U\u017euot planav\u0119 pagal suvidurkint\u0105 gamin\u012f, kuris paslepia papildom\u0105 darb\u0105, apibr\u0117\u017ekite tikruosius variant\u0173 proceso \u017eingsnius, j\u0173 trukm\u0119, tinkamus darbo centrus ir priklausomybes. Arcturus, SkyPlanner dirbtinio intelekto planavimo variklis, suplanuoja \u0161ias operacijas pagal nustatytas pamainas, paj\u0117gumus ir planuotojo parinktus prioritetus. Ganto diagramoje matyti, kaip suplanuoti darbai paskirstyti i\u0161tekliams.<\/p>\n\n\n<p>Bendrame bandymo darbo centre tikroji varianto bandymo operacija planuojama kartu su kitais u\u017esakymais, kuriems reikia tos pa\u010dios \u012frangos. Taip i\u0161vengiama situacijos, kai surinkimo padaliniui pa\u017eadamas vienas bandymo laikas, o kitas padalinys savo eil\u0117je tam pa\u010diam \u012frenginiui numato nesuderinam\u0105 laik\u0105. Galite \u012fvertinti poveik\u012f darb\u0173 u\u017ebaigimo laikui ir nuspr\u0119sti, ar keisti prioritet\u0105, naudoti kit\u0105 tinkam\u0105 i\u0161tekli\u0173, ar skirti daugiau paj\u0117gum\u0173.<\/p>\n\n\n<p>\u012ejungus planavim\u0105, kuriame atsi\u017evelgiama \u012f med\u017eiagas, Arcturus, apskai\u010diuodamas prad\u017eios laik\u0105, taip pat \u012fvertina sistemoje tvarkomus atsarg\u0173 ir numatom\u0173 siunt\u0173 duomenis. Tod\u0117l pasikeitus\u012f komponento gavimo laik\u0105 galima vertinti kartu su likusiu gamybos mar\u0161rutu, u\u017euot taisius atskir\u0105 med\u017eiag\u0173 s\u0105ra\u0161\u0105 jau sudarius paj\u0117gum\u0173 plan\u0105.<\/p>\n\n\n<p>Perderinim\u0173 ma\u017einimas ir susikaupusio darbo u\u017ebaigimas \u2013 skirtingi tikslai. SkyPlanner grupavimo pagal savyb\u0119 funkcija gali teikti pirmenyb\u0119 vienas po kito atliekamiems darbams, turintiems pasirinkt\u0105 bendr\u0105 savyb\u0119, kad suma\u017e\u0117t\u0173 perderinim\u0173. Tai n\u0117ra tas pats, kas atskirti daug darbo reikalaujan\u010dias komplektacijos parinktis: visi pana\u0161\u016bs darbai gali smarkiai apkrauti t\u0105 pat\u012f surinkimo darbo centr\u0105. Grupuokite ten, kur tai naudinga tikrajam procesui, ta\u010diau nelaikykite grupavimo \u012frodymu, kad linija sp\u0117s u\u017ebaigti susikaupus\u012f darb\u0105.<\/p>\n\n\n<p>Jei nustatytu ritmu veikian\u010dioje linijoje taikomi komplektacijos parink\u010di\u0173 skai\u010diaus slankiajame lange arba konvejerio darbo zonos apribojimai, \u0161ias tikslias taisykles \u012ftraukite \u012f planavimo sprendimo projekt\u0105 ir patvirtinkite, kaip jos bus atvaizduojamos bei tikrinamos. Pirmiau apra\u0161ytas atskiro darbo centro apkrovos patikrinimas ir suderintas gamyklos grafikas atlieka skirtingas funkcijas. Reikia ir fizi\u0161kai \u012fgyvendinamos gamini\u0173 sekos, ir realaus j\u0105 vykdan\u010di\u0173 i\u0161tekli\u0173 prieinamumo.<\/p>\n\n\n<p>Kai artimiausi darbai jau patikrinti ir paruo\u0161ti, SkyPlanner slankiojo laikotarpio u\u017erakinimo funkcija gali apsaugoti nustatyto artimiausio laikotarpio darbus nuo perplanavimo, kol kit\u0173 darb\u0173 grafikas perskai\u010diuojamas. \u0160\u012f laikotarp\u012f pasirinkite pagal pasiruo\u0161imo ir reagavimo poreikius. Jei i\u0161 ties\u0173 ko nors tr\u016bksta, sprendim\u0105 vis tiek reik\u0117s priimti: eil\u0117s u\u017erakinimas tr\u016bkstam\u0173 dali\u0173 nepar\u016bpins.<\/p>\n\n\n<p>Taip pat galite naudotis savo DI asistentu (pavyzd\u017eiui, Claude, ChatGPT arba Microsoft Copilot), prijungtu prie SkyPlanner per MCP. \u0160i jungtis leid\u017eia asistentui naudotis SkyPlanner funkcijomis. Apra\u0161ykite, k\u0105 reikia pakeisti gamybos plane. Asistentas pasitelks savo \u017einias apie SkyPlanner ir atitinkamas funkcijas, tad re\u010diau reik\u0117s patiems atlikti kiekvien\u0105 veiksm\u0105 sistemoje.<\/p>\n\n\n\n<p>Taip ma\u017eiau laiko tenka skirti modeli\u0173 deriniui, surinkimo operacijoms, bandymams ir likusiai gamybai i\u0161 naujo suderinti. J\u016bs nustatote gamybos prioritetus ir apsaugote darbus, d\u0117l kuri\u0173 jau \u012fsipareigota, o Arcturus apskai\u010diuoja tarpusavyje susiet\u0105 grafik\u0105.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Pateikite linijai vien\u0105 aktuali\u0105 plano versij\u0105<\/h2>\n\n\n<p>Seka taip pat turi pasiekti \u017emones, kurie pagal j\u0105 dirba. Paskutin\u0119 minut\u0119 sukeitus gaminius vietomis gali pasikeisti atskiro darbo centro apkrova, komponent\u0173 pateikimas ir tolesni\u0173 operacij\u0173 laikas, net jei modeli\u0173 kiekiai nesikei\u010dia. Prie\u0161 paskelbdami pakeist\u0105 sek\u0105 dar kart\u0105 patikrinkite \u0161\u012f poveik\u012f ir ai\u0161kiai nurodykite, kuria versija turi vadovautis gamyba.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/lt\/klientu-istorijos\/utu\/\">Suomijos elektros skyd\u0173 ir skirstom\u0173j\u0173 \u012frengini\u0173 gamintoja UTU<\/a> anks\u010diau planavo darbus atskirose padalini\u0173 skai\u010diuokl\u0117se. ERP sistemoje pakeista gamybos seka ne visada pasiekdavo gamybos cech\u0105, o realius paj\u0117gumus buvo sunku matyti.<\/p>\n\n\n<p>Sujungusi SkyPlanner su Oracle NetSuite, UTU savo Ulvilos gamyklos linijas ir padalinius \u012ftrauk\u0117 \u012f vien\u0105 planavimo sistem\u0105. Komanda i\u0161skiria planavim\u0105 pasitelkiant DI, Ganto diagram\u0105 ir paj\u0117gum\u0173 matomum\u0105 bei teigia, kad atnaujinta darb\u0173 eil\u0117 linijoje dirban\u010dius montuotojus pasiekia per kelias sekundes.<\/p>\n\n\n<p>\u0160i patirtis parodo bendros ir aktualios darb\u0173 eil\u0117s vert\u0119. Mi\u0161ri\u0173 modeli\u0173 gamyboje tok\u012f matomum\u0105 derinkite su darbo centr\u0173 patikromis: komandai reikia patvirtintos sekos, o ne vien naujausio s\u0105ra\u0161o su teisingais kiekiais.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Suderinkite artimiausio mi\u0161ri\u0173 modeli\u0173 gamybos laikotarpio darbus<\/h2>\n\n\n<p>Pasirinkite modeli\u0173 sek\u0105, kuri leist\u0173 darbo centrams u\u017ebaigti susikaupus\u012f darb\u0105, o tikr\u0105sias jos operacijas \u012ftraukite \u012f bendr\u0105 plan\u0105 su susijusiais i\u0161tekliais ir kitais u\u017esakymais. Tai praktin\u0117 SkyPlanner APS paskirtis: planuoti gamyklos darbus atsi\u017evelgiant \u012f variantus, ma\u017eiau derinti eiles rankiniu b\u016bdu ir ai\u0161kiai valdyti prioritetus bei artimiausius darbus.<\/p>\n\n\n<p>SkyPlanner per atvir\u0105 REST API integruojama su bet kuria ERP ar MES sistema. Galite i\u0161laikyti savo u\u017esakym\u0173 valdymo sistem\u0105 ir susieti jos gamybos duomenis su suderintu grafiku.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/lt\/susisiekite-su-pardavejais\/\">U\u017esisakykite SkyPlanner pristatym\u0105<\/a> ir jam paruo\u0161kite kelis realius variantus, j\u0173 operacij\u0173 trukm\u0119 darbo centruose, med\u017eiag\u0173 duomenis, bendro i\u0161tekliaus naudojimo konflikt\u0105 bei visus privalomus sekos apribojimus. Pagal \u0161iuos duomenis \u012fvertinkite planavimo konfig\u016bracij\u0105 ir tai, kaip modeli\u0173 derinio pakeitimas veikia likusi\u0105 gamyb\u0105. Jei pirmiausia norite susipa\u017einti savaranki\u0161kai, <a href=\"https:\/\/skyplanner.ai\/lt\/bandymas\/\">i\u0161bandykite SkyPlanner<\/a> su demonstraciniais duomenimis arba pasinaudokite SkyPlanner asistente esan\u010diu darbo prad\u017eios vedliu, kuriame jums pad\u0117s DI.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Mi\u0161ri\u0173 modeli\u0173 surinkimo seka: pasirinkite tinkam\u0105 eili\u0161kum\u0105 Prad\u017eia &raquo; I\u0161tekliai &raquo; Mi\u0161ri\u0173 modeli\u0173 surinkimo seka: pasirinkite tinkam\u0105 eili\u0161kum\u0105 Pamainai suplanuotas reikiamas kiekvieno modelio kiekis, ta\u010diau linija vis stoja. Vienas po kito atkeliauja trys gaminiai, kuriems reikia daug laid\u0173 montavimo darb\u0173. Operatorius nesp\u0117ja, o paprastesni gaminiai, kuriuos surenkant b\u016bt\u0173 galima u\u017ebaigti susikaupusius darbus, eil\u0117je dar toli. &#8230; <a title=\"Mi\u0161ri\u0173 modeli\u0173 surinkimo seka: pasirinkite tinkam\u0105 eili\u0161kum\u0105\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/misriu-modeliu-surinkimo-seka\/\" aria-label=\"Read more about Mi\u0161ri\u0173 modeli\u0173 surinkimo seka: pasirinkite tinkam\u0105 eili\u0161kum\u0105\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":112610,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2532,301],"tags":[],"class_list":["post-112561","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-ir-planavimas","category-istekliai","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Mi\u0161ri\u0173 modeli\u0173 surinkimo seka: pasirinkite tinkam\u0105 eili\u0161kum\u0105<\/title>\n<meta name=\"description\" content=\"Tinkamas dienos modeli\u0173 santykis neapsaugo nuo posto perkrovos. Tikrinkite sek\u0105, numatykite laiko likusiems darbams ir derinkite su gamybos grafiku.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/misriu-modeliu-surinkimo-seka\/\" \/>\n<meta property=\"og:locale\" content=\"lt_LT\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Mi\u0161ri\u0173 modeli\u0173 surinkimo seka: pasirinkite tinkam\u0105 eili\u0161kum\u0105\" \/>\n<meta property=\"og:description\" content=\"Tinkamas dienos modeli\u0173 santykis neapsaugo nuo posto perkrovos. Tikrinkite sek\u0105, numatykite laiko likusiems darbams ir derinkite su gamybos grafiku.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lt\/istekliai\/misriu-modeliu-surinkimo-seka\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-29T11:53:40+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-29T12:26:00+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/mixed-model-sequencing-hero-1.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1774\" \/>\n\t<meta property=\"og:image:height\" content=\"887\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"12 minu\u010di\u0173\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/misriu-modeliu-surinkimo-seka\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/misriu-modeliu-surinkimo-seka\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Mi\u0161ri\u0173 modeli\u0173 surinkimo seka: pasirinkite tinkam\u0105 eili\u0161kum\u0105\",\"datePublished\":\"2026-10-29T11:53:40+00:00\",\"dateModified\":\"2026-10-29T12:26:00+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/misriu-modeliu-surinkimo-seka\\\/\"},\"wordCount\":2323,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/misriu-modeliu-surinkimo-seka\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/mixed-model-sequencing-hero-1.png\",\"articleSection\":[\"APS ir planavimas\",\"i\u0161tekliai\"],\"inLanguage\":\"lt-LT\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/misriu-modeliu-surinkimo-seka\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/misriu-modeliu-surinkimo-seka\\\/\",\"name\":\"Mi\u0161ri\u0173 modeli\u0173 surinkimo seka: pasirinkite tinkam\u0105 eili\u0161kum\u0105\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/misriu-modeliu-surinkimo-seka\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/misriu-modeliu-surinkimo-seka\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/mixed-model-sequencing-hero-1.png\",\"datePublished\":\"2026-10-29T11:53:40+00:00\",\"dateModified\":\"2026-10-29T12:26:00+00:00\",\"description\":\"Tinkamas dienos modeli\u0173 santykis neapsaugo nuo posto perkrovos. Tikrinkite sek\u0105, numatykite laiko likusiems darbams ir derinkite su gamybos grafiku.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/misriu-modeliu-surinkimo-seka\\\/#breadcrumb\"},\"inLanguage\":\"lt-LT\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/misriu-modeliu-surinkimo-seka\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"lt-LT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/misriu-modeliu-surinkimo-seka\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/mixed-model-sequencing-hero-1.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/mixed-model-sequencing-hero-1.png\",\"width\":1774,\"height\":887,\"caption\":\"Open rectangular frames and rounded cylinders alternate on an assembly conveyor beside a connected second lane.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/misriu-modeliu-surinkimo-seka\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Mi\u0161ri\u0173 modeli\u0173 surinkimo seka: pasirinkite tinkam\u0105 eili\u0161kum\u0105\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lt-LT\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lt-LT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lt-LT\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Mi\u0161ri\u0173 modeli\u0173 surinkimo seka: pasirinkite tinkam\u0105 eili\u0161kum\u0105","description":"Tinkamas dienos modeli\u0173 santykis neapsaugo nuo posto perkrovos. Tikrinkite sek\u0105, numatykite laiko likusiems darbams ir derinkite su gamybos grafiku.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lt\/istekliai\/misriu-modeliu-surinkimo-seka\/","og_locale":"lt_LT","og_type":"article","og_title":"Mi\u0161ri\u0173 modeli\u0173 surinkimo seka: pasirinkite tinkam\u0105 eili\u0161kum\u0105","og_description":"Tinkamas dienos modeli\u0173 santykis neapsaugo nuo posto perkrovos. Tikrinkite sek\u0105, numatykite laiko likusiems darbams ir derinkite su gamybos grafiku.","og_url":"https:\/\/skyplanner.ai\/lt\/istekliai\/misriu-modeliu-surinkimo-seka\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-29T11:53:40+00:00","article_modified_time":"2026-10-29T12:26:00+00:00","og_image":[{"width":1774,"height":887,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/mixed-model-sequencing-hero-1.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Jussi M\u00e4ntyl\u00e4","Est. reading time":"12 minu\u010di\u0173"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/misriu-modeliu-surinkimo-seka\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/misriu-modeliu-surinkimo-seka\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Mi\u0161ri\u0173 modeli\u0173 surinkimo seka: pasirinkite tinkam\u0105 eili\u0161kum\u0105","datePublished":"2026-10-29T11:53:40+00:00","dateModified":"2026-10-29T12:26:00+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/misriu-modeliu-surinkimo-seka\/"},"wordCount":2323,"publisher":{"@id":"https:\/\/skyplanner.ai\/lt\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/misriu-modeliu-surinkimo-seka\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/mixed-model-sequencing-hero-1.png","articleSection":["APS ir planavimas","i\u0161tekliai"],"inLanguage":"lt-LT"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/misriu-modeliu-surinkimo-seka\/","url":"https:\/\/skyplanner.ai\/lt\/istekliai\/misriu-modeliu-surinkimo-seka\/","name":"Mi\u0161ri\u0173 modeli\u0173 surinkimo seka: pasirinkite tinkam\u0105 eili\u0161kum\u0105","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lt\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/misriu-modeliu-surinkimo-seka\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/misriu-modeliu-surinkimo-seka\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/mixed-model-sequencing-hero-1.png","datePublished":"2026-10-29T11:53:40+00:00","dateModified":"2026-10-29T12:26:00+00:00","description":"Tinkamas dienos modeli\u0173 santykis neapsaugo nuo posto perkrovos. Tikrinkite sek\u0105, numatykite laiko likusiems darbams ir derinkite su gamybos grafiku.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/misriu-modeliu-surinkimo-seka\/#breadcrumb"},"inLanguage":"lt-LT","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lt\/istekliai\/misriu-modeliu-surinkimo-seka\/"]}]},{"@type":"ImageObject","inLanguage":"lt-LT","@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/misriu-modeliu-surinkimo-seka\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/mixed-model-sequencing-hero-1.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/mixed-model-sequencing-hero-1.png","width":1774,"height":887,"caption":"Open rectangular frames and rounded cylinders alternate on an assembly conveyor beside a connected second lane."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/misriu-modeliu-surinkimo-seka\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lt\/"},{"@type":"ListItem","position":2,"name":"Mi\u0161ri\u0173 modeli\u0173 surinkimo seka: pasirinkite tinkam\u0105 eili\u0161kum\u0105"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lt\/#website","url":"https:\/\/skyplanner.ai\/lt\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lt\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lt\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lt-LT"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lt\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lt\/","logo":{"@type":"ImageObject","inLanguage":"lt-LT","@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"lt-LT","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/mixed-model-sequencing-hero-1.png",1774,887,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/mixed-model-sequencing-hero-1-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/mixed-model-sequencing-hero-1-300x150.png",300,150,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/mixed-model-sequencing-hero-1-768x384.png",768,384,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/mixed-model-sequencing-hero-1-1024x512.png",1024,512,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/mixed-model-sequencing-hero-1-1536x768.png",1536,768,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/mixed-model-sequencing-hero-1.png",1774,887,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/mixed-model-sequencing-hero-1-360x180.png",360,180,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lt\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Mi\u0161ri\u0173 modeli\u0173 surinkimo seka: pasirinkite tinkam\u0105 eili\u0161kum\u0105 Prad\u017eia &raquo; I\u0161tekliai &raquo; Mi\u0161ri\u0173 modeli\u0173 surinkimo seka: pasirinkite tinkam\u0105 eili\u0161kum\u0105 Pamainai suplanuotas reikiamas kiekvieno modelio kiekis, ta\u010diau linija vis stoja. Vienas po kito atkeliauja trys gaminiai, kuriems reikia daug laid\u0173 montavimo darb\u0173. Operatorius nesp\u0117ja, o paprastesni gaminiai, kuriuos surenkant b\u016bt\u0173 galima u\u017ebaigti susikaupusius darbus, eil\u0117je dar toli.&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/posts\/112561","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/comments?post=112561"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/posts\/112561\/revisions"}],"predecessor-version":[{"id":112678,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/posts\/112561\/revisions\/112678"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/media\/112610"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/media?parent=112561"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/categories?post=112561"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/tags?post=112561"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}