{"id":111604,"date":"2026-10-28T00:43:16","date_gmt":"2026-10-28T00:43:16","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=111604"},"modified":"2026-10-28T00:44:08","modified_gmt":"2026-10-28T00:44:08","slug":"mtm-metodas","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/lt\/istekliai\/mtm-metodas\/","title":{"rendered":"MTM metodas: planuokite darb\u0105 prie\u0161 prad\u0117dami gamyb\u0105"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">MTM metodas: planuokite darb\u0105 prie\u0161 prad\u0117dami gamyb\u0105<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/lt\/\">Prad\u017eia<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/\">I\u0161tekliai<\/a> &raquo; MTM metodas: planuokite darb\u0105 prie\u0161 prad\u0117dami gamyb\u0105<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Numatomas skaitymo laikas: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> minut\u0117s<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Naujas mazgas jau paruo\u0161tas gamybai planuoti, ta\u010diau jo dar niekas negamino tiek kart\u0173, kad b\u016bt\u0173 galima patikimai nustatyti vidutin\u0119 darbo trukm\u0119. Vis tiek reikia palyginti darbo centr\u0173 i\u0161d\u0117stymo variantus, \u012fvertinti darbo kr\u016bv\u012f ir nuspr\u0119sti, ar pakaks paj\u0117gum\u0173 pirmiesiems u\u017esakymams.<\/p>\n\n\n<p>MTM metodas leid\u017eia analizuoti rankinio darbo metod\u0105 dar neprasid\u0117jus \u012fprastai gamybai. U\u017euot lauk\u0119, kol sukaupsite atlikt\u0173 u\u017eduo\u010di\u0173 duomen\u0173, laik\u0105 nustatote pagal apibr\u0117\u017etus judesius ir nustatytus j\u0173 laiko duomenis. Pirmiausia svarbus pats darbo metodas: trumpesn\u0117 trukm\u0117 naudinga tik tada, kai ji atitinka darb\u0105, kur\u012f \u017emon\u0117s i\u0161 ties\u0173 gali atlikti saugiai ir teisingai.<\/p>\n\n\n<p>Kai \u0161is laikas patvirtinamas naudoti planavimui, SkyPlanner APS padeda j\u012f pritaikyti prakti\u0161kai. Planavimui skirtas dirbtinis intelektas Arcturus \u012ftraukia operacij\u0173 trukmes \u012f bendr\u0105 gamybos grafik\u0105. Taip patobulintas darbo metodas tampa pagrindu geriau pagr\u012fstam planui, o ne lieka atskiru skai\u010diumi in\u017einerin\u0117je dokumentacijoje.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kas yra MTM metodas?<\/h2>\n\n\n<p>MTM \u2013 tai i\u0161 anksto nustatytomis judesi\u0173 trukm\u0117mis pagr\u012fsta sistema, skirta rankiniam darbui apra\u0161yti, analizuoti ir vertinti. Analitikas suskaido apibr\u0117\u017et\u0105 darbo metod\u0105 \u012f judesius arba proceso elementus, taiko atitinkamus laiko duomenis bei taisykles ir nustato \u0161io darbo metodo trukm\u0119 esant atskaitiniam darbo tempui.<\/p>\n\n\n<p>I\u0161samioje MTM-1 analiz\u0117je nagrin\u0117jami tokie judesiai kaip siekimas, sugriebimas, perk\u0117limas, pad\u0117ties nustatymas ir paleidimas. Svarbios ir s\u0105lygos: paimti lengvai pasiekiam\u0105 detal\u0119 n\u0117ra tas pats, kas atsirinkti ir tinkamai pad\u0117ti sud\u0117ting\u0105 komponent\u0105. MTM ai\u0161kiai i\u0161skiria \u0161iuos skirtumus, u\u017euot pasl\u0117p\u0119s juos bendrame trukm\u0117s \u012fvertyje.<\/p>\n\n\n<p>MTM laiko vert\u0117s i\u0161rei\u0161kiamos laiko matavimo vienetais TMU. Vienas TMU lygus 0,036 sekund\u0117s, taigi 1 000 TMU lygu 36 sekund\u0117ms. TMU yra laiko vienetas, o ne efektyvumo procentas.<\/p>\n\n\n<p>Svarbus ir atskaitinis darbo tempas. Taikant MTM, nematuojamas grei\u010diausio operatoriaus laikas, kad v\u0117liau b\u016bt\u0173 paskelbtas norma. MTM laiko duomenys jau yra pagr\u012fsti apibr\u0117\u017etu darbo tempu. Netaikykite papildomo darbo tempo vertinimo, b\u016bdingo chronometra\u017eui, vien tod\u0117l, kad jis buvo taikytas kitame tyrime.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kada rinktis MTM, o ne kit\u0105 laiko nustatymo metod\u0105?<\/h2>\n\n\n<p>MTM ypa\u010d naudingas projektuojant rankin\u012f darb\u0105: kuriant nauj\u0105 gamin\u012f, kei\u010diant tvirtinimo \u012ftais\u0105, komponent\u0173 pateikim\u0105 darbo vietoje ar renkantis vien\u0105 i\u0161 dviej\u0173 surinkimo sek\u0173. Galite palyginti reikiam\u0105 darb\u0105 dar prie\u0161 apsispr\u0119sdami, kur\u012f metod\u0105 taikyti.<\/p>\n\n\n<p>Ta\u010diau tai nerei\u0161kia, kad MTM tinka kiekvienam su laiku susijusiam klausimui. Rinkit\u0117s duomenis pagal sprendim\u0105, kur\u012f reikia priimti:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>MTM:<\/strong> Kiek laiko tur\u0117t\u0173 reik\u0117ti dirbant \u0161iuo apibr\u0117\u017etu rankinio darbo metodu? Naudinga projektuojant ir lyginant darb\u0105, kol dar nesukaupta pakankamai gamybos duomen\u0173.<\/li><li><strong><a href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/darbo-laiko-normavimas\/\">Darbo laiko tyrimas chronometru<\/a>:<\/strong> Kiek laiko trunka stebimi darbo elementai nurodytomis s\u0105lygomis ir koki\u0105 pagr\u012fst\u0105 laiko norm\u0105 galima nustatyti? Naudinga, kai operacija jau atliekama ir j\u0105 galima tirti.<\/li><li><strong><a href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/momentiniu-stebejimu-metodas\/\">Momentini\u0173 steb\u0117jim\u0173 metodas<\/a>:<\/strong> Kokia laiko dalis skiriama surinkimui, paruo\u0161imui, laukimui ar kitoms veikloms? Naudinga norint suprasti, kaip pasiskirsto darbo laikotarpis, o ne matuoti kiekvieno trumpo judesio trukm\u0119.<\/li><li><strong><a href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/gamybos-operaciju-laiko-apskaita\/\">U\u017eduo\u010di\u0173 laiko apskaita<\/a>:<\/strong> Kas i\u0161 tikr\u0173j\u0173 vyko vykdant konkret\u0173 u\u017esakym\u0105 ar operacij\u0105? Naudinga per\u017ei\u016brint gamybos patirt\u012f ir ai\u0161kinantis nukrypimus nuo plano.<\/li><\/ul>\n\n\n<p>\u0160ie metodai gali papildyti vienas kit\u0105. MTM analiz\u0117 leid\u017eia nustatyti si\u016blomo darbo metodo trukm\u0119, o v\u0117lesni gamybos steb\u0117jimai gali atskleisti praleist\u0105 element\u0105 ar pasikeitusias s\u0105lygas. Ta\u010diau u\u017eregistruot\u0173 darbo valand\u0173 vidurkis, \u012f kur\u012f patenka ir med\u017eiag\u0173 laukimas, n\u0117ra tas pats, kas i\u0161 anksto nustatyta rankinio darbo apimtis.<\/p>\n\n\n<p>Automatinio \u012frenginio ciklo trukm\u0119, kuri\u0105 lemia pats procesas, nustatykite atskirai. MTM gali apra\u0161yti operatoriaus atliekam\u0105 pakrovim\u0105, i\u0161krovim\u0105 ir kitus veiksmus su gaminiu, ta\u010diau \u012frenginio pjovimo programos ar b\u016btinos kiet\u0117jimo trukm\u0117s nepaver\u010dia rankos judesiu.<\/p>\n\n\n<h2 class=\"wp-block-heading\">MTM-1, MTM-2 ir MTM-UAS: pasirinkite tinkam\u0105 detalumo lyg\u012f<\/h2>\n\n\n<p>MTM apima kelias skirtingo detalumo sistemas. Nuo pasirinkimo priklauso ir tai, k\u0105 apra\u0161ys analiz\u0117, ir kiek darbo reik\u0117s jai parengti.<\/p>\n\n\n<p><strong>MTM-1<\/strong> nagrin\u0117ja pagrindinius judesius. \u0160i sistema tinka i\u0161samiai trump\u0173, pasikartojan\u010di\u0173 rankinio darbo veiksm\u0173 analizei, kai projektuojant darb\u0105 svarbios atskir\u0173 judesi\u0173 atlikimo s\u0105lygos.<\/p>\n\n\n<p><strong>MTM-2<\/strong> sujungia pagrindinius judesius \u012f stambesnes grupes. Darbus, kuriems \u0161i sistema tinka, galima analizuoti ma\u017eiau detaliai, nefiksuojant kiekvieno MTM-1 judesio atskirai.<\/p>\n\n\n<p><strong>MTM-UAS<\/strong> (Universal Analyzing System \u2013 universalioji analiz\u0117s sistema) naudoja stambesnius proceso elementus ir yra siejama su gamyba partijomis. Tai n\u0117ra tiesiog kitas MTM-1 pavadinimas.<\/p>\n\n\n<p>Sistem\u0105 rinkit\u0117s kartu su specialiai parengtu analitiku, atsi\u017evelgdami \u012f proces\u0105, jo pasikartojim\u0105 bei kintamum\u0105 ir sprendim\u0105, kuriam bus naudojami rezultatai. Didesnis detalumas vertingas tada, kai gali pakeisti t\u0105 sprendim\u0105. Norint teisingai taikyti pasirinkt\u0105 sistem\u0105, reikia atitinkamo mokymo, aktuali\u0173 duomen\u0173 ir taisykli\u0173 \u2013 bendro pob\u016bd\u017eio vadovas j\u0173 nepakei\u010dia.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kaip MTM analiz\u0117s rezultatus paversti planavimui tinkamu laiku<\/h2>\n\n\n<p>Naudingas rezultatas \u2013 ne vien trukm\u0117. Tai dokumentuotas darbo metodas ir laikas, kurio reik\u0161m\u0119 supras ir kitas planuotojas.<\/p>\n\n\n<h3 class=\"wp-block-heading\">1. Apibr\u0117\u017ekite darb\u0105 ir jo s\u0105lygas<\/h3>\n\n\n<p>Pasirinkite gaminio variant\u0105, operacij\u0105 ir darbo metodo redakcij\u0105. Apra\u0161ykite \u012frankius, tvirtinimo \u012ftais\u0105, komponent\u0173 pateikim\u0105, darbo sek\u0105, kokyb\u0117s patikras ir tai, kas \u017eymi darbo prad\u017ei\u0105 bei pabaig\u0105. Nurodykite, ar analizuojamas vienas gaminys, vienas ciklas, ar partija.<\/p>\n\n\n<p>\u012etraukite \u017emones, kurie atlieka arba atliks \u0161\u012f darb\u0105. Jie gali pasteb\u0117ti nepatog\u0173 siekimo judes\u012f, b\u016btin\u0105 patikr\u0105 ar taros keitim\u0105, kuri\u0173 tvarkingame br\u0117\u017einyje nesimato. Darbo metode i\u0161laikykite saugaus darbo ir gaminio kokyb\u0117s u\u017etikrinimo veiksmus: pa\u0161alin\u0119 b\u016btin\u0105 darb\u0105, metodo nepatobulinsite.<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. I\u0161analizuokite sek\u0105 pagal pasirinkt\u0105 sistem\u0105<\/h3>\n\n\n<p>Specialiai parengtas analitikas apra\u0161o darb\u0105, naudodamas tinkamus proceso elementus ir atsi\u017evelgdamas \u012f j\u0173 trukm\u0119 lemian\u010dias s\u0105lygas. Analiz\u0117je b\u016btina \u012fvertinti tai, kas i\u0161 tikr\u0173j\u0173 vyksta, \u012fskaitant darb\u0105, atliekam\u0105 tik nustatytais intervalais.<\/p>\n\n\n<p>Laikykit\u0117s sistemos taisykli\u0173, taikom\u0173 veiksm\u0173 sekai ir vienu metu atliekamiems veiksmams. Vienu metu judan\u010di\u0173 dviej\u0173 rank\u0173 judesi\u0173 trukmi\u0173 neb\u016btinai galima sud\u0117ti kaip dviej\u0173 vienas po kito einan\u010di\u0173 laiko interval\u0173. Taip pat negalima i\u0161galvoti judesio trukm\u0117s vien tam, kad b\u016bt\u0173 u\u017epildyta nei\u0161samaus darbo metodo apra\u0161o spraga.<\/p>\n\n\n<p>Atskirkite paruo\u0161im\u0105 nuo pasikartojan\u010dio darbo. Vien\u0105 kart\u0105 visai partijai atliekamas tvirtinimo \u012ftaiso paruo\u0161imas neturi b\u016bti \u012fskai\u010diuotas kaip kiekvieno gaminio paruo\u0161imo u\u017eduotis.<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. Lyginkite darbo metodus, o ne vien bendr\u0105 trukm\u0119<\/h3>\n\n\n<p>Remdamiesi analize ai\u0161kinkit\u0117s, kod\u0117l vienas metodas reikalauja ma\u017eiau darbo. Ar komponentus b\u016bt\u0173 galima pateikti visada vienodai orientuotus? Ar tvirtinimo \u012ftaisas leist\u0173 i\u0161vengti pakartotinio pad\u0117ties keitimo? Ar pakeitus sek\u0105 b\u016bt\u0173 galima atsisakyti dalies veiksm\u0173 su gaminiu, i\u0161laikant patikr\u0105?<\/p>\n\n\n<p>Alternatyvas lyginkite taikydami tas pa\u010dias analiz\u0117s ribas ir kokyb\u0117s reikalavimus. Jei metodas atrodo greitesnis tik tod\u0117l, kad atsarg\u0173 papildymas ar patikra liko u\u017e analiz\u0117s rib\u0173, darbo neb\u016btinai suma\u017e\u0117jo. B\u016btent \u010dia MTM tampa darbo projektavimo priemone, o ne vien formaliai atrodan\u010diu \u012fver\u010diu.<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. Nustatykite, k\u0105 apima patvirtinta trukm\u0117<\/h3>\n\n\n<p>Prie\u0161 vadindami rezultat\u0105 gamybos laiko norma, patikrinkite, kokiu pagrindu nustatytas laikas. Nustatykite pasikartojan\u010dius pagalbinius darbus ir tai, kaip turi b\u016bti \u012fvertinti asmeniniai poreikiai, poilsis bei nei\u0161vengiami u\u017edelsimai. U\u017efiksuokite, kokie laiko priedai \u012ftraukti ir kaip jie apskai\u010diuoti; nesivadovaukite prielaida, kad visais atvejais tinka vienodas procentas.<\/p>\n\n\n<p>Pertraukimus, kuri\u0173 galima i\u0161vengti, ai\u0161kiai i\u0161skirkite kaip spr\u0119stinas problemas. Tr\u016bkstamo komponento laukimas neturi nepastebimai tapti kiekvienos siekimo ir sugriebimo sekos dalimi. Kita vertus, jei \u012f planuojam\u0105 trukm\u0119 ne\u012ftraukiamas pagr\u012fstai b\u016btinas pasikartojantis darbas, atrodys, kad nauj\u0105 metod\u0105 \u012f grafik\u0105 sutalpinti lengviau, nei yra i\u0161 tikr\u0173j\u0173.<\/p>\n\n\n<h3 class=\"wp-block-heading\">5. Patikrinkite metod\u0105 ir patvirtinkite j\u012f naudoti<\/h3>\n\n\n<p>Prie\u0161 prad\u0117dami taikyti si\u016blom\u0105 metod\u0105, patikrinkite, ar darbus galima atlikti numatyta \u012franga, pasirinktu b\u016bdu pateikiant med\u017eiagas ir laikantis kokyb\u0117s reikalavim\u0173. Kai turite bandomosios ar pradin\u0117s gamybos duomen\u0173, i\u0161nagrin\u0117kite skirtumus, palyginti su pana\u0161iais darbais. \u012eg\u016bd\u017ei\u0173 \u012fgijimas, pakeistas tvirtinimo \u012ftaisas ir \u012f analiz\u0119 ne\u012ftrauktas elementas reikalauja skirting\u0173 sprendim\u0173.<\/p>\n\n\n<p>I\u0161saugokite analiz\u0119, informacij\u0105 apie naudot\u0105 sistem\u0105, metodo redakcij\u0105, prielaidas, \u012ftrauktus laiko priedus, patvirtinim\u0105 ir \u012fsigaliojimo dat\u0105. Pasikeitus metodui ar jo taikymo s\u0105lygoms, per\u017ei\u016br\u0117kite nustatyt\u0105 laik\u0105. Tikslas \u2013 ne neribotai i\u0161laikyti \u012fsp\u016bding\u0105 skai\u010di\u0173, o u\u017etikrinti patikim\u0105 ry\u0161\u012f tarp atliekamo darbo ir plano.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Pavyzdys: geresnis surinkimo metodas pats savaime grafiko nesudaro<\/h2>\n\n\n<p>\u012esivaizduokite rankinio surinkimo darbo viet\u0105, \u012f kuri\u0105 detal\u0117s atkeliauja \u012fvairiai pasuktos. Pagal si\u016blom\u0105 metod\u0105 naudojamas patobulintas detali\u0173 pateikimo pad\u0117klas ir pad\u0117ties nustatymo \u012ftaisas, tod\u0117l suma\u017e\u0117ja detali\u0173 atrinkimo ir j\u0173 pad\u0117ties keitimo darb\u0173. Komanda patikrina metod\u0105 ir patvirtina jo taikym\u0105.<\/p>\n\n\n<p>Tarkime, planavimui naudojamas laikas d\u0117l to sutrump\u0117ja nuo dviej\u0173 iki pusantros minut\u0117s vienam vienetui. Tai iliustraciniai patvirtinti planavimo duomenys, o ne vert\u0117s i\u0161 MTM duomen\u0173 kortel\u0117s. Tarkime, vienas \u017emogus vienoje darbo vietoje visus veiksmus atlieka nuosekliai, tuo pat metu nevyksta \u012frenginio ciklas, o laiko priedai suderinti su nustatytomis trukm\u0117mis ir darbo kalendoriumi.<\/p>\n\n\n<p>120 vienet\u0173 u\u017esakymui, kai paruo\u0161imo laikas nesikei\u010dia ir sudaro 30 minu\u010di\u0173:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Ankstesnis metodas:<\/strong> 120 \u00d7 2 minut\u0117s + 30 minu\u010di\u0173 = 270 minu\u010di\u0173, arba keturios su puse valandos.<\/li><li><strong>Naujas metodas:<\/strong> 120 \u00d7 1,5 minut\u0117s + 30 minu\u010di\u0173 = 210 minu\u010di\u0173, arba trys su puse valandos.<\/li><\/ul>\n\n\n<p>\u0160ioje darbo vietoje u\u017esakymui reikia viena valanda ma\u017eiau. Taip atlaisvinama nauding\u0173 paj\u0117gum\u0173, ta\u010diau tai savaime nerei\u0161kia, kad u\u017esakymas bus i\u0161si\u0173stas valanda anks\u010diau. Surinktam gaminiui vis tiek gali tekti laukti bandym\u0173 stendo, kitai operacijai reikalingi i\u0161tekliai gali b\u016bti u\u017eimti kitu u\u017esakymu, o atsilaisvinusi valanda gali nesutapti su laikotarpiu, kurio reikia kitai u\u017eduo\u010diai.<\/p>\n\n\n<p>Tod\u0117l kitas \u017eingsnis \u2013 ne \u201epaankstinti pristatym\u0105 viena valanda\u201c, o \u201eperskai\u010diuoti, kaip \u0161\u012f u\u017esakym\u0105 ir kitus darbus atlikti turimais i\u0161tekliais\u201c. \u0160\u012f skai\u010diavim\u0105 u\u017e jus atlieka SkyPlanner.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Naudokite patvirtint\u0105 metodo laik\u0105 planuodami su SkyPlanner<\/h2>\n\n\n<p>SkyPlanner leid\u017eia nustatyti operacijos trukm\u0119 nurodant laik\u0105 vienam vienetui, gamybos spart\u0105 arba fiksuot\u0105 laik\u0105. Paruo\u0161imo ir sutvarkymo po operacijos laikai \u012fvedami atskirai. Tod\u0117l \u0161iame vien rankinio darbo pavyzdyje patvirtintas planavimo laikas vienam vienetui ir partijos paruo\u0161imo laikas gali likti atskiri, net ir kei\u010diantis u\u017esakymo kiekiui.<\/p>\n\n\n<p>Pirmiausia patikrinkite, kokius i\u0161teklius ir kuriam laikui reikia rezervuoti. \u017dmogaus darbo s\u0105naudos, \u012frenginio u\u017eimtumas ir visa operacijos trukm\u0117 yra skirtingi rodikliai. Jei \u012frenginys veikia, kol operatorius ruo\u0161ia kit\u0105 detal\u0119, sud\u0117jus vis\u0173 veiksm\u0173 trukmes \u012frenginys gali b\u016bti rezervuotas per ilgam. Vertinant tik rankin\u012f darb\u0105, galima ne\u012ftraukti laiko, kai \u012franga dar negali b\u016bti naudojama kitai u\u017eduo\u010diai. Susiekite metod\u0105 su i\u0161tekliais, kuri\u0173 i\u0161 tikr\u0173j\u0173 reikia operacijai.<\/p>\n\n\n<p>Taip pat suderinkite trukmei taikomus laiko priedus su darbo kalendoriumi. Jei pertrauka jau ne\u012fskai\u010diuota \u012f turimus paj\u0117gumus, j\u0173 nereik\u0117t\u0173 dar kart\u0105 ma\u017einti taikant laiko pried\u0105 tai pa\u010diai pertraukai. I\u0161saugokite patvirtint\u0105 tyrimo dokumentacij\u0105 ir u\u017efiksuokite, kaip jos duomenys paver\u010diami planavimo duomenimis.<\/p>\n\n\n<p>Arcturus planuoja operacijas pagal j\u0173 trukmes ir sukonfig\u016bruotus darbo centrus, pamainas, priklausomybes bei prioritetus. Ganto diagramoje matyti, kaip darbai dera tarpusavyje. Prad\u0117dami taikyti patvirtint\u0105 metodo pakeitim\u0105, atnaujinkite susijusius planavimo duomenis ir <a href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/kas-yra-gamybos-planavimas\/\">perskai\u010diuokite grafik\u0105<\/a>, kad pamatytum\u0117te poveik\u012f tolesn\u0117ms operacijoms ir kitiems d\u0117l t\u0173 pa\u010di\u0173 i\u0161tekli\u0173 konkuruojantiems u\u017esakymams.<\/p>\n\n\n<p>Po kiekvieno pakeitimo nebereikia rankiniu b\u016bdu i\u0161 naujo sudarin\u0117ti atskir\u0173 darb\u0173 eili\u0173. Dar svarbiau \u2013 planuodami b\u016bsimus darbus galite naudoti pagr\u012fst\u0105 naujo metodo laik\u0105, dar netur\u0117dami ilgos atlikt\u0173 u\u017eduo\u010di\u0173 istorijos. J\u016bs sprend\u017eiate, kur\u012f metod\u0105 patvirtinti ir kuriems \u012fsipareigojimams teikti pirmenyb\u0119, o SkyPlanner apskai\u010diuoja bendr\u0105 susiet\u0173 darb\u0173 grafik\u0105.<\/p>\n\n\n<p>V\u0117liau faktiniai gamybos duomenys suteikia papildom\u0173 \u012frodym\u0173. SkyPlanner taip pat leid\u017eia apskai\u010diuoti operacij\u0173 trukm\u0117s \u012fver\u010dius pagal ankstesnius laiko apskaitos \u012fra\u0161us. \u0160\u012f duomen\u0173 \u0161altin\u012f atskirkite nuo MTM: vienu atveju trukm\u0117 vertinama pagal u\u017efiksuotus gamybos duomenis, kitu \u2013 apibr\u0117\u017etas rankinio darbo metodas vertinamas remiantis i\u0161 anksto nustatytais duomenimis.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Kod\u0117l svarbus bendras grafikas<\/h3>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/lt\/klientu-istorijos\/utu\/\">Suomijos elektros skyd\u0173 ir skirstymo \u012frangos gamintoja UTU<\/a> anks\u010diau darbus planavo atskirose padalini\u0173 skai\u010diuokl\u0117se. ERP sistemoje pakeista darb\u0173 seka ne visada pasiekdavo gamybos cech\u0105, o \u012fvertinti realius paj\u0117gumus buvo sunku.<\/p>\n\n\n<p>Sujungusi SkyPlanner su Oracle NetSuite, UTU \u012ftrauk\u0117 Ulvilos gamyklos linijas ir padalinius \u012f vien\u0105 sistem\u0105. Komandos teigimu, atnaujinta darb\u0173 eil\u0117 montuotojus pasiekia per kelias sekundes, o projekt\u0173 pristatymai planuojami tiksliau. \u0160i patirtis parodo, kod\u0117l verta vis\u0105 darbo kr\u016bv\u012f \u012ftraukti \u012f bendr\u0105 plan\u0105, u\u017euot palikus kiekvienam padaliniui derinti savo darb\u0173 eil\u0119.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Nuo pagr\u012fstos darbo trukm\u0117s pagal pasirinkt\u0105 metod\u0105 iki patikimo gamybos plano<\/h2>\n\n\n<p>Naudokite MTM, kai rankin\u012f darb\u0105 reikia suprojektuoti ir pagr\u012fsti dar prie\u0161 sukaupiant tam reikalingus gamybos istorijos duomenis. O kai patvirtint\u0105 laik\u0105 reikia realisti\u0161kai \u012ftraukti \u012f u\u017esakym\u0173 vykdymo plan\u0105, rinkit\u0117s SkyPlanner. Pagr\u012fstas metodas parodo, ko reikia darbui atlikti, o ribot\u0173 paj\u0117gum\u0173 planavimas \u2013 kur ir kada t\u0105 darb\u0105 galima atlikti.<\/p>\n\n\n<p>SkyPlanner integruojama su bet kuria ERP ar MES sistema per atvir\u0105 REST API, tod\u0117l geresn\u012f gamybos planavim\u0105 galite gr\u012fsti jau turimais gamybos duomenimis.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/lt\/susisiekite-su-pardavejais\/\">U\u017esisakykite SkyPlanner demonstracij\u0105<\/a> ir pasiruo\u0161kite vien\u0105 patvirtint\u0105 darbo trukm\u0119 pagal pasirinkt\u0105 metod\u0105, atitinkam\u0105 operacij\u0173 mar\u0161rut\u0105 bei kitus u\u017esakymus, kuriems reikia t\u0173 pa\u010di\u0173 paj\u0117gum\u0173. Pamatykite, kaip metodo pakeitimas veikia gamybos plan\u0105 ir pristatymo datas, o ne tik vienos operacijos trukm\u0119. Jei pirmiausia norite patyrin\u0117ti patys, <a href=\"https:\/\/skyplanner.ai\/lt\/bandymas\/\">i\u0161bandykite SkyPlanner su demonstraciniais duomenimis<\/a> arba naudokit\u0117s asistento prad\u017eios vedliu, kuriame pasitelkiamas dirbtinis intelektas.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>MTM metodas: planuokite darb\u0105 prie\u0161 prad\u0117dami gamyb\u0105 Prad\u017eia &raquo; I\u0161tekliai &raquo; MTM metodas: planuokite darb\u0105 prie\u0161 prad\u0117dami gamyb\u0105 Naujas mazgas jau paruo\u0161tas gamybai planuoti, ta\u010diau jo dar niekas negamino tiek kart\u0173, kad b\u016bt\u0173 galima patikimai nustatyti vidutin\u0119 darbo trukm\u0119. Vis tiek reikia palyginti darbo centr\u0173 i\u0161d\u0117stymo variantus, \u012fvertinti darbo kr\u016bv\u012f ir nuspr\u0119sti, ar pakaks paj\u0117gum\u0173 &#8230; <a title=\"MTM metodas: planuokite darb\u0105 prie\u0161 prad\u0117dami gamyb\u0105\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/mtm-metodas\/\" aria-label=\"Read more about MTM metodas: planuokite darb\u0105 prie\u0161 prad\u0117dami gamyb\u0105\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":111623,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2560,301],"tags":[],"class_list":["post-111604","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-gamybos-efektyvumas","category-istekliai","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>MTM metodas: planuokite darb\u0105 prie\u0161 prad\u0117dami gamyb\u0105<\/title>\n<meta name=\"description\" content=\"Kiek truks darbas nauju rankinio darbo metodu? Su\u017einokite, kaip MTM nustato laik\u0105 iki gamybos, o SkyPlanner patvirtint\u0105 laik\u0105 paver\u010dia \u012fgyvendinamu grafiku.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/mtm-metodas\/\" \/>\n<meta property=\"og:locale\" content=\"lt_LT\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"MTM metodas: planuokite darb\u0105 prie\u0161 prad\u0117dami gamyb\u0105\" \/>\n<meta property=\"og:description\" content=\"Kiek truks darbas nauju rankinio darbo metodu? Su\u017einokite, kaip MTM nustato laik\u0105 iki gamybos, o SkyPlanner patvirtint\u0105 laik\u0105 paver\u010dia \u012fgyvendinamu grafiku.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lt\/istekliai\/mtm-metodas\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-28T00:43:16+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-28T00:44:08+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1774\" \/>\n\t<meta property=\"og:image:height\" content=\"887\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"11 minu\u010di\u0173\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/mtm-metodas\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/mtm-metodas\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"MTM metodas: planuokite darb\u0105 prie\u0161 prad\u0117dami gamyb\u0105\",\"datePublished\":\"2026-10-28T00:43:16+00:00\",\"dateModified\":\"2026-10-28T00:44:08+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/mtm-metodas\\\/\"},\"wordCount\":2194,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/mtm-metodas\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/methods-time-measurement-hero.png\",\"articleSection\":[\"Gamybos efektyvumas\",\"i\u0161tekliai\"],\"inLanguage\":\"lt-LT\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/mtm-metodas\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/mtm-metodas\\\/\",\"name\":\"MTM metodas: planuokite darb\u0105 prie\u0161 prad\u0117dami gamyb\u0105\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/mtm-metodas\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/mtm-metodas\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/methods-time-measurement-hero.png\",\"datePublished\":\"2026-10-28T00:43:16+00:00\",\"dateModified\":\"2026-10-28T00:44:08+00:00\",\"description\":\"Kiek truks darbas nauju rankinio darbo metodu? Su\u017einokite, kaip MTM nustato laik\u0105 iki gamybos, o SkyPlanner patvirtint\u0105 laik\u0105 paver\u010dia \u012fgyvendinamu grafiku.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/mtm-metodas\\\/#breadcrumb\"},\"inLanguage\":\"lt-LT\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/mtm-metodas\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"lt-LT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/mtm-metodas\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/methods-time-measurement-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/methods-time-measurement-hero.png\",\"width\":1774,\"height\":887,\"caption\":\"Loose assembly parts contrast with oriented parts and a locating fixture in an MTM method comparison.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/mtm-metodas\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"MTM metodas: planuokite darb\u0105 prie\u0161 prad\u0117dami gamyb\u0105\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lt-LT\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lt-LT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lt-LT\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"MTM metodas: planuokite darb\u0105 prie\u0161 prad\u0117dami gamyb\u0105","description":"Kiek truks darbas nauju rankinio darbo metodu? Su\u017einokite, kaip MTM nustato laik\u0105 iki gamybos, o SkyPlanner patvirtint\u0105 laik\u0105 paver\u010dia \u012fgyvendinamu grafiku.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lt\/istekliai\/mtm-metodas\/","og_locale":"lt_LT","og_type":"article","og_title":"MTM metodas: planuokite darb\u0105 prie\u0161 prad\u0117dami gamyb\u0105","og_description":"Kiek truks darbas nauju rankinio darbo metodu? Su\u017einokite, kaip MTM nustato laik\u0105 iki gamybos, o SkyPlanner patvirtint\u0105 laik\u0105 paver\u010dia \u012fgyvendinamu grafiku.","og_url":"https:\/\/skyplanner.ai\/lt\/istekliai\/mtm-metodas\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-28T00:43:16+00:00","article_modified_time":"2026-10-28T00:44:08+00:00","og_image":[{"width":1774,"height":887,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Jussi M\u00e4ntyl\u00e4","Est. reading time":"11 minu\u010di\u0173"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/mtm-metodas\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/mtm-metodas\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"MTM metodas: planuokite darb\u0105 prie\u0161 prad\u0117dami gamyb\u0105","datePublished":"2026-10-28T00:43:16+00:00","dateModified":"2026-10-28T00:44:08+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/mtm-metodas\/"},"wordCount":2194,"publisher":{"@id":"https:\/\/skyplanner.ai\/lt\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/mtm-metodas\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero.png","articleSection":["Gamybos efektyvumas","i\u0161tekliai"],"inLanguage":"lt-LT"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/mtm-metodas\/","url":"https:\/\/skyplanner.ai\/lt\/istekliai\/mtm-metodas\/","name":"MTM metodas: planuokite darb\u0105 prie\u0161 prad\u0117dami gamyb\u0105","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lt\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/mtm-metodas\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/mtm-metodas\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero.png","datePublished":"2026-10-28T00:43:16+00:00","dateModified":"2026-10-28T00:44:08+00:00","description":"Kiek truks darbas nauju rankinio darbo metodu? Su\u017einokite, kaip MTM nustato laik\u0105 iki gamybos, o SkyPlanner patvirtint\u0105 laik\u0105 paver\u010dia \u012fgyvendinamu grafiku.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/mtm-metodas\/#breadcrumb"},"inLanguage":"lt-LT","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lt\/istekliai\/mtm-metodas\/"]}]},{"@type":"ImageObject","inLanguage":"lt-LT","@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/mtm-metodas\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero.png","width":1774,"height":887,"caption":"Loose assembly parts contrast with oriented parts and a locating fixture in an MTM method comparison."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/mtm-metodas\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lt\/"},{"@type":"ListItem","position":2,"name":"MTM metodas: planuokite darb\u0105 prie\u0161 prad\u0117dami gamyb\u0105"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lt\/#website","url":"https:\/\/skyplanner.ai\/lt\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lt\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lt\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lt-LT"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lt\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lt\/","logo":{"@type":"ImageObject","inLanguage":"lt-LT","@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"lt-LT","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero.png",1774,887,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero-300x150.png",300,150,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero-768x384.png",768,384,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero-1024x512.png",1024,512,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero-1536x768.png",1536,768,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero.png",1774,887,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero-360x180.png",360,180,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lt\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"MTM metodas: planuokite darb\u0105 prie\u0161 prad\u0117dami gamyb\u0105 Prad\u017eia &raquo; I\u0161tekliai &raquo; MTM metodas: planuokite darb\u0105 prie\u0161 prad\u0117dami gamyb\u0105 Naujas mazgas jau paruo\u0161tas gamybai planuoti, ta\u010diau jo dar niekas negamino tiek kart\u0173, kad b\u016bt\u0173 galima patikimai nustatyti vidutin\u0119 darbo trukm\u0119. Vis tiek reikia palyginti darbo centr\u0173 i\u0161d\u0117stymo variantus, \u012fvertinti darbo kr\u016bv\u012f ir nuspr\u0119sti, ar pakaks paj\u0117gum\u0173&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/posts\/111604","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/comments?post=111604"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/posts\/111604\/revisions"}],"predecessor-version":[{"id":111668,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/posts\/111604\/revisions\/111668"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/media\/111623"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/media?parent=111604"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/categories?post=111604"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/tags?post=111604"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}