{"id":111232,"date":"2026-10-27T16:31:21","date_gmt":"2026-10-27T16:31:21","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=111232"},"modified":"2026-10-27T16:32:19","modified_gmt":"2026-10-27T16:32:19","slug":"atsargu-padengimas","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/lt\/istekliai\/atsargu-padengimas\/","title":{"rendered":"Atsarg\u0173 padengimas gamyboje: ar atsarg\u0173 pakaks?"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Atsarg\u0173 padengimas gamyboje: ar atsarg\u0173 pakaks?<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/lt\/\">Prad\u017eia<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/\">I\u0161tekliai<\/a> &raquo; Atsarg\u0173 padengimas gamyboje: ar atsarg\u0173 pakaks?<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Numatomas skaitymo laikas: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> minut\u0117s<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Atsarg\u0173 ataskaita rodo, kad komponent\u0173 pakaks septynioms darbo dienoms. Kitas pristatymas numatytas penktadien\u012f. Ta\u010diau ketvirtadienio gamybos u\u017esakymo prad\u0117ti negalima: jam tr\u016bksta reikiamo kiekio.<\/p>\n\n\n<p>Prie\u0161taravimo \u010dia n\u0117ra: septynios dienos pagal vidutin\u012f suvartojim\u0105 dar nerei\u0161kia, kad atsarg\u0173 pakaks konkretiems gamykloje vykdomiems u\u017esakymams. Didel\u0117 partija, d\u0117l kokyb\u0117s patikros sulaikytos atsargos ar kitoms reikm\u0117ms jau paskirtos med\u017eiagos gali pakeisti rezultat\u0105.<\/p>\n\n\n<p>Atsarg\u0173 padengimo vertinimas padeda pasteb\u0117ti \u0161\u012f tr\u016bkum\u0105 dar prie\u0161 jam sukeliant prastov\u0105. Gamyboje svarbus konkretus klausimas: <strong>kuriam b\u016bsimam poreikiui atsarg\u0173 jau nebeu\u017eteks ir ar iki to laiko gausime gamybai tinkam\u0105 papildom\u0105 kiek\u012f?<\/strong> SkyPlanner APS susieja med\u017eiag\u0173 prieinamum\u0105 su gamybos grafiku, tod\u0117l rinkdamiesi sprendim\u0105 galite atsi\u017evelgti ne tik \u012f atsargas, bet ir \u012f \u012frengini\u0173 paj\u0117gumus bei \u012fsipareigotus pristatymo terminus.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kas yra atsarg\u0173 padengimas gamyboje?<\/h2>\n\n\n<p>Atsarg\u0173 padengimas parodo, kiek laiko nustatyto atsarg\u0173 kiekio pakaks poreikiui patenkinti. Jis da\u017enai i\u0161rei\u0161kiamas dienomis arba savait\u0117mis. Gamyboje \u0161is poreikis gali reik\u0161ti komponentus ar \u017ealiavas, kuri\u0173 reik\u0117s b\u016bsimoms gamybos u\u017eduotims, o ne klientams parduodamus gatavus gaminius.<\/p>\n\n\n<p>Turi b\u016bti ai\u0161ku, kokiu pagrindu \u0161is rodiklis apskai\u010diuotas. Vieno komponento atsarg\u0173 padengimas vienoje gamykloje n\u0117ra tas pats, kas visos \u012fmon\u0117s atsarg\u0173 rodiklis. Skiriasi ir skai\u010diavimas vien pagal jau turimas atsargas bei skai\u010diavimas, \u012f kur\u012f \u012ftraukiami numatomi gavimai.<\/p>\n\n\n<p>Kai suvartojimas pastovus, greitam \u012fver\u010diui naudokite formul\u0119:<\/p>\n\n\n<p><strong>Atsarg\u0173 padengimas = gamybai tinkam\u0173 atsarg\u0173 kiekis \u00f7 per dien\u0105 suvartojamas kiekis<\/strong><\/p>\n\n\n<p>Naudokite suderintus matavimo vienetus ir vienod\u0105 laiko skai\u010diavimo pagrind\u0105. Jei gamybai tinkam\u0173 atsarg\u0173 yra 420 komponent\u0173, o vidutini\u0161kai per darbo dien\u0105 suvartojama 60 komponent\u0173, j\u0173 tur\u0117t\u0173 pakakti septynioms darbo dienoms. Nelyginkite \u0161io \u012fver\u010dio tiesiogiai su tiek\u0117jo u\u017esakymo \u012fvykdymo laiku, nurodytu kalendorin\u0117mis dienomis, prie\u0161 tai nesuderin\u0119 kalendori\u0173.<\/p>\n\n\n<p>\u0160is \u012fvertis padeda atsirinkti med\u017eiagas, kurioms reikia d\u0117mesio. Kai suvartojimas priklauso nuo u\u017esakymo, ver\u010diau skai\u010diuokite b\u016bsim\u0105 padengim\u0105 pagal konkre\u010dioms datoms numatytus poreikius. Didel\u0117mis partijomis naudojamas komponentas i\u0161 sand\u0117lio i\u0161duodamas ne taip tolygiai, kaip leist\u0173 manyti dienos vidurkis.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Atsarg\u0173 padengimas n\u0117ra atsarg\u0173 apyvartumas ar DIO<\/h3>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/atsargu-apyvartumas\/\">Atsarg\u0173 apyvartumas<\/a> ir atsarg\u0173 laikymo trukm\u0117 dienomis, arba DIO, apib\u016bdina atsarg\u0173 jud\u0117jim\u0105 ar laikymo trukm\u0119 pagal tam tikro laikotarpio finansinius duomenis. Jie padeda \u012fvertinti atsarg\u0173 valdym\u0105, ta\u010diau neatsako planuotojui, ar ketvirtadienio u\u017eduo\u010diai bus prieinamas konkretus komponentas.<\/p>\n\n\n<p>\u0160iam sprendimui naudokite tos pa\u010dios prek\u0117s kiekius ir datas, kada j\u0173 reik\u0117s. Nedalykite komponent\u0173 kiekio i\u0161 parduot\u0173 preki\u0173 savikainos ir nemanykite, kad istorinis atsarg\u0173 laikymo dien\u0173 rodiklis patvirtina, jog med\u017eiagos bus paruo\u0161tos b\u016bsimai gamybai.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Prad\u0117kite nuo atsarg\u0173, kurias gamyba i\u0161 tikr\u0173j\u0173 gali naudoti<\/h2>\n\n\n<p>Prie\u0161 skai\u010diuodami atsarg\u0173 padengim\u0105, patikrinkite ir suderinkite pradin\u012f likut\u012f. \u012e faktin\u012f kiek\u012f gali patekti med\u017eiagos, kurios yra sand\u0117lyje, ta\u010diau j\u0173 negalima naudoti vertinamiems darbams.<\/p>\n\n\n<p>Atskirai \u012fvertinkite keturias kategorijas:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Turimos atsargos:<\/strong> atitinkamoje vietoje u\u017eregistruotas faktinis kiekis.<\/li><li><strong>Naudoti negalimos atsargos:<\/strong> d\u0117l kokyb\u0117s patikros sulaikytos, pa\u017eeistos, pasibaigusio galiojimo ar u\u017eduoties specifikacijos neatitinkan\u010dios med\u017eiagos.<\/li><li><strong>Rezervuotos atsargos:<\/strong> kitiems darbams paskirtos med\u017eiagos, kuri\u0173 paskyrimo b\u016btina paisyti skai\u010diuojant.<\/li><li><strong>Numatomi gavimai:<\/strong> kiekiai, kurie gali tapti prieinami v\u0117liau, o ne jau turimos atsargos.<\/li><\/ul>\n\n\n<p>Svarbiausia u\u017etikrinti, kad pradinis likutis ir poreiki\u0173 s\u0105ra\u0161as der\u0117t\u0173 tarpusavyje. Jei rezervuotas kiekis jau atimtas i\u0161 pradinio liku\u010dio, v\u0117liau to paties poreikio dar kart\u0105 neatimkite. Ir atvirk\u0161\u010diai: jei pradedate nuo gamybai tinkam\u0173 atsarg\u0173 prie\u0161 rezervavim\u0105, \u012ftraukite dar nepatenkintus poreikius, kuriems tos atsargos bus sunaudotos.<\/p>\n\n\n<p>Pavyzd\u017eiui, kai sistema rodo \u201elaisvas atsargas\u201c, patikrinkite, kokie kiekiai jau atimti skai\u010diuojant \u0161\u012f rodikl\u012f. Jei i\u0161 liku\u010dio, kuriame ne\u012fvykdyt\u0173 u\u017esakym\u0173 kiekiai jau atimti, dar kart\u0105 atimsite visus tokius u\u017esakymus, gausite tariam\u0105 tr\u016bkum\u0105.<\/p>\n\n\n<p>Taip pat atskirkite \u012fsp\u0117jim\u0105 d\u0117l <a href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/saugos-atsargos\/\">saugos atsarg\u0173<\/a> nuo faktinio med\u017eiag\u0173 tr\u016bkumo. Liku\u010diui nukritus \u017eemiau nustatyto rezervo, veiksm\u0173 gali prireikti dar prie\u0161 pritr\u016bkstant med\u017eiag\u0173 kuriai nors u\u017eduo\u010diai. Nurodykite, iki kurio momento skai\u010diuojamas atsarg\u0173 padengimas: iki rezervo ribos pasiekimo ar iki poreikio, kurio atsargomis patenkinti nebepavyks.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Skai\u010diuokite b\u016bsim\u0105 atsarg\u0173 padengim\u0105 pagal numatytas u\u017eduotis<\/h2>\n\n\n<p>Kai med\u017eiagos poreikis gamyboje kinta, vertinkite poreikius chronologine tvarka. Prad\u0117kite nuo patikrinto gamybai tinkam\u0173 atsarg\u0173 liku\u010dio, kiekvien\u0105 \u012ftraukt\u0105 poreik\u012f atimkite tuo metu, kai med\u017eiagos reik\u0117s, o gavim\u0105 prid\u0117kite tik tada, kai numatoma, kad gaut\u0105 kiek\u012f jau bus galima naudoti.<\/p>\n\n\n<p>Likutis kiekvienu momentu prognozuojamas taip:<\/p>\n\n\n<p><strong>Prognozuojamas likutis = pradinis gamybai tinkam\u0173 atsarg\u0173 kiekis + iki to momento gauti ir naudoti tinkami kiekiai \u2212 iki to momento \u012ftraukti poreikiai<\/strong><\/p>\n\n\n<p>Raskite pirm\u0105j\u012f poreik\u012f, kurio turimu kiekiu negalite visi\u0161kai patenkinti. B\u016btent \u0161is momentas svarbus siekiant i\u0161vengti tr\u016bkumo, net jei d\u0117l v\u0117lesnio gavimo savait\u0117s pabaigos likutis atrodo pakankamas.<\/p>\n\n\n<p>Remkit\u0117s data, kada reik\u0117s med\u017eiagos, o ne automati\u0161kai u\u017ebaigto u\u017esakymo i\u0161siuntimo data. Pirktinio ruo\u0161inio, kur\u012f antradien\u012f reikia apdirbti, negalima laukti iki penktadienio, kai bus i\u0161siun\u010diamas surinktas gaminys.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Pavyzdys: pagal vidurk\u012f atsarg\u0173 pakaks septynioms dienoms, bet ketvirtadien\u012f j\u0173 pritr\u016bks<\/h3>\n\n\n<p>\u012esivaizduokime gamintoj\u0105, kuris pirmadienio ryt\u0105 tikrina vieno perkamo komponento atsargas. Fakti\u0161kai sand\u0117lyje yra 600 vienet\u0173. I\u0161 j\u0173 100 sulaikyta d\u0117l kokyb\u0117s patikros, o 80 paskirta kitiems, \u012f \u0161\u012f pavyzd\u012f ne\u012ftrauktiems darbams. Taigi toliau nurodytoms u\u017eduotims pradinis gamybai tinkamas likutis yra 420 vienet\u0173.<\/p>\n\n\n<p>\u012etrauktoms u\u017eduotims pirmadien\u012f reikia 120 vienet\u0173, antradien\u012f \u2013 180, o ketvirtadien\u012f \u2013 160. \u0160is poreikis dar neatimtas i\u0161 pradinio 420 vienet\u0173 liku\u010dio. Numatoma gauti 200 pirkt\u0173 vienet\u0173, kuriuos bus galima naudoti penktadienio ryt\u0105.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Plano momentas<\/th><th>Poreikis arba gautas naudoti tinkamas kiekis<\/th><th>Prognozuojamas likutis<\/th><\/tr><\/thead><tbody><tr><td>Pirmadienio prad\u017eia<\/td><td>Pradin\u0117s gamybai tinkamos atsargos<\/td><td>420 vienet\u0173<\/td><\/tr><tr><td>Pirmadienio u\u017eduotis<\/td><td>Reikia 120 vienet\u0173<\/td><td>300 vienet\u0173<\/td><\/tr><tr><td>Antradienio u\u017eduotis<\/td><td>Reikia 180 vienet\u0173<\/td><td>120 vienet\u0173<\/td><\/tr><tr><td>Ketvirtadienio u\u017eduotis<\/td><td>Reikia 160 vienet\u0173<\/td><td>Tr\u016bksta 40 vienet\u0173<\/td><\/tr><tr><td>Penktadienio gavimas<\/td><td>Galima naudoti 200 vienet\u0173<\/td><td>160 vienet\u0173 patenkinus visus nurodytus poreikius<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Pagal pastarojo laikotarpio vidurk\u012f \u2013 60 vienet\u0173 per darbo dien\u0105 \u2013 atrodo, kad pradinio liku\u010dio pakaks septynioms darbo dienoms. Ta\u010diau konkre\u010dios u\u017eduotys atskleid\u017eia skubesn\u0119 problem\u0105: ketvirtadienio poreikiui patenkinti tr\u016bksta 40 vienet\u0173. Penktadien\u012f gautas kiekis \u0161io poreikio laiku nepatenkins.<\/p>\n\n\n<p>Paskutin\u0117 eilut\u0117 yra planavimo prognoz\u0117, o ne teiginys, kad gamybai galima i\u0161duoti neigiam\u0105 atsarg\u0173 kiek\u012f. Joje daroma prielaida, kad ketvirtadien\u012f nepatenkintas poreikis vis tiek tur\u0117s b\u016bti patenkintas. Perk\u0117lus u\u017eduot\u012f, kartu turi keistis ir faktinis med\u017eiagos poreikio laikas bei u\u017ebaigimo data.<\/p>\n\n\n<p>Dabar pirkim\u0173 skyriui galima pateikti tiksl\u0173 pra\u0161ym\u0105: iki ketvirtadienio operacijos, kuriai reikia \u0161io komponento, gauti bent tr\u016bkstamus 40 naudoti tinkam\u0173 vienet\u0173 arba suderinti kit\u0105 gamybos plan\u0105. Teiginys \u201eatsarg\u0173 turime septynioms dienoms\u201c tokios skubos neperteikt\u0173.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Papildom\u0105 kiek\u012f \u012ftraukite tada, kai j\u012f bus galima naudoti<\/h2>\n\n\n<p>Pirkimo u\u017esakymas gali padengti b\u016bsim\u0105 kiekio tr\u016bkum\u0105, bet nei\u0161spr\u0119sti laiko problemos. Patikrinkite, ar numatyta data rei\u0161kia atvykim\u0105 prie gamyklos vart\u0173, u\u017ebaigt\u0105 pri\u0117mim\u0105, ar leidim\u0105 naudoti med\u017eiag\u0105 gamyboje. Pri\u0117mimas, patikra ir vidinis transportavimas gali lemti laiko tarp\u0105 tarp \u0161i\u0173 \u012fvyki\u0173.<\/p>\n\n\n<p>Kritinei u\u017eduo\u010diai net ir planavimo dienomis gali nepakakti. Ketvirtadien\u012f v\u0117lai numatytas pristatymas nepad\u0117s atlikti ketvirtadienio ryto operacijos. Planuokite tiksliau, jei \u0161is skirtumas turi \u012ftakos sprendimui.<\/p>\n\n\n<p>Ai\u0161kiai atskirkite du vaizdus: kokius poreikius patenkina vien dabartin\u0117s naudoti tinkamos atsargos ir kokius poreikius galima patenkinti pagal plan\u0105, \u012ftraukus patikimai numatomus papildymus. Taip matysite ir priklausomyb\u0119 nuo atsarg\u0173 papildymo, ir v\u0117lavimo pasekmes.<\/p>\n\n\n<p>Jei atsarg\u0173 pakanka viso nagrin\u0117to laikotarpio poreikiams, nurodykite \u201eporeikiai padengti iki planavimo horizonto pabaigos\u201c. Tai nerei\u0161kia, kad atsarg\u0173 u\u017eteks neribotam laikui. Kai suvartojimas nenumatytas, dalyba i\u0161 nulio taip pat nesuteikia prasmingo pagrindo sprendimui d\u0117l atsarg\u0173 papildymo.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Kokio atsarg\u0173 padengimo pakanka?<\/h3>\n\n\n<p>Vieno tikslinio rodiklio, tinkan\u010dio visoms gamybos med\u017eiagoms, n\u0117ra. Reikiama atsarga priklauso nuo papildymo trukm\u0117s, svyravim\u0173, med\u017eiagos svarbos, tinkamumo naudoti termino ir tr\u016bkumo pasekmi\u0173.<\/p>\n\n\n<p>Pirmiausia verta patikrinti, ar naudoti tinkam\u0173 med\u017eiag\u0173 pakaks poreikiams iki tol, kol bus galima naudoti kit\u0105 patikimai numatom\u0105 papildym\u0105, i\u0161laikant atsarg\u0173 politikoje nustatyt\u0105 rezerv\u0105. Pigiam komponentui, d\u0117l kurio gali sustoti visas surinkimas, gali reik\u0117ti daugiau d\u0117mesio nei gerokai brangesnei, bet lengvai pakei\u010diamai detalei.<\/p>\n\n\n<p>Nepirkite daugiau kiekvienos med\u017eiagos vien tam, kad pagerintum\u0117te atsarg\u0173 padengimo rodikl\u012f. I\u0161siai\u0161kinkite, ar matom\u0105 rizik\u0105 kelia tikras tiekimo tr\u016bkumas, netiksl\u016bs atsarg\u0173 duomenys, pasen\u0119 poreikiai ar nereali numatomo gavimo data.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Pasirinkite veiksmus, kurie pad\u0117t\u0173 i\u0161vengti gamybos ir pristatymo sutrikim\u0173<\/h2>\n\n\n<p>Nustat\u0119 pirm\u0105j\u012f poreik\u012f, kuriam med\u017eiag\u0173 nepakanka, nuspr\u0119skite, koks pakeitimas pad\u0117t\u0173 j\u012f patenkinti. Pavyzdyje ankstesnis dalies kiekio pristatymas gal\u0117t\u0173 pa\u0161alinti 40 vienet\u0173 tr\u016bkum\u0105. Kitais atvejais gali prireikti patvirtintos pakaitin\u0117s med\u017eiagos, pakeisti partijos dyd\u012f arba u\u017eduo\u010di\u0173 sek\u0105.<\/p>\n\n\n<p>Kiekvienas pasirinkimas turi pasekmi\u0173 gamybai. Pakaitinei med\u017eiagai b\u016btinas atitinkamas techninis patvirtinimas. Gaminant ma\u017eesn\u0117mis partijomis gali padaug\u0117ti derinimo darb\u0173. Paankstinus kit\u0105 u\u017esakym\u0105, \u012frenginys gali likti u\u017eimtas, ta\u010diau gali v\u0117luoti u\u017esakymas klientui, kurio med\u017eiag\u0105 i\u0161 prad\u017ei\u0173 buvo numatyta apdoroti tuo laiku.<\/p>\n\n\n<p>Tod\u0117l atsarg\u0173 padengimo vertinimas turi b\u016bti susietas su <a href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/kas-yra-gamybos-planavimas\/\">gamybos tvarkara\u0161\u010di\u0173 sudarymu<\/a>, o ne baigtis vien pirkimo veiksmu. Net jei tiek\u0117jas skubiai pristato tr\u016bkstamas detales, numatytas laikas prie \u012frenginio jau gali b\u016bti prarastas, o tolesni\u0173 darb\u0173 gali nebepavykti atlikti iki i\u0161siuntimo.<\/p>\n\n\n<p>Kartu patikrinkite abu dalykus: <strong>ar med\u017eiaga bus paruo\u0161ta naudoti ir ar likusius darbus dar bus galima u\u017ebaigti laiku?<\/strong> Taip i\u0161vengsite situacijos, kai vien atsarg\u0173 po\u017ei\u016briu pagr\u012fstas sprendimas nepastebimai sukelia kit\u0105 pristatymo problem\u0105.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Sudarykite \u012fgyvendinam\u0105 SkyPlanner tvarkara\u0161t\u012f pagal med\u017eiag\u0173 prieinamum\u0105<\/h2>\n\n\n<p>SkyPlanner APS, sudarydama tvarkara\u0161t\u012f, kartu \u012fvertina med\u017eiagas, perkam\u0173 med\u017eiag\u0173 gavimo datas, darbo centrus, pamainas, prioritetus ir operacij\u0173 priklausomybes. \u012ejungus taisykl\u0119 \u201eAtsi\u017evelgti \u012f med\u017eiagas\u201c, SkyPlanner, planuodama u\u017eduotis, tikrina joms nurodyt\u0173 med\u017eiag\u0173 prieinamum\u0105.<\/p>\n\n\n<p>Taip sprendimas d\u0117l med\u017eiag\u0173 nelieka vien atskirame atsarg\u0173 s\u0105ra\u0161e. Arcturus, SkyPlanner dirbtinis intelektas, skirtas gamybos tvarkara\u0161\u010diams sudaryti, apskai\u010diuoja tvarkara\u0161t\u012f pagal \u012fvestus med\u017eiag\u0173 prieinamumo duomenis ir nustatytus paj\u0117gumus. Gantt laiko juostoje matoma gauta darb\u0173 seka padeda \u012fvertinti poveik\u012f pristatymams, neperd\u0117liojant kiekvieno \u012frenginio darb\u0173 eil\u0117s rankiniu b\u016bdu.<\/p>\n\n\n<p>Pirkimo u\u017esakymuose nurodytos datos \u0161iame plane turi praktin\u0119 reik\u0161m\u0119. SkyPlanner pirkimo u\u017esakyme \u012fvest\u0105 pristatymo dat\u0105 laiko numatoma med\u017eiagos prieinamumo data. Med\u017eiagai atvykus ir pirkimo u\u017esakym\u0105 pa\u017eym\u0117jus kaip \u201ePristatyta\u201c, atsarg\u0173 likutis atnaujinamas. Taigi numatomas tiekimas ir jau gautos atsargos i\u0161lieka atskirti.<\/p>\n\n\n<p>Gr\u012f\u017ekime prie ketvirtadienio tr\u016bkumo. Jei med\u017eiagos numatomos gauti penktadien\u012f, \u012fveskite \u0161i\u0105 gavimo informacij\u0105 ir perskai\u010diuokite tvarkara\u0161t\u012f. Per\u017ei\u016br\u0117kite, kur dabar tarp kit\u0173 u\u017esakym\u0173 galima \u012fterpti paveikt\u0105 darb\u0105 ir po jo einan\u010dias operacijas. Jei pirkim\u0173 skyriui pavyksta susitarti d\u0117l ankstesnio pristatymo, \u012fvertinkite tvarkara\u0161t\u012f pagal atnaujint\u0105 med\u017eiag\u0173 prieinamum\u0105, u\u017euot man\u0119, kad pradinis klientui pa\u017ead\u0117tas pristatymo terminas automati\u0161kai v\u0117l tapo pasiekiamas.<\/p>\n\n\n<p>J\u016bs nustatote prioritetus, o Arcturus apskai\u010diuoja tvarkara\u0161t\u012f. Taip planavimo ir pirkim\u0173 komandos turi bendr\u0105 pagrind\u0105 sprendimui pasirinkti ir ma\u017eiau laiko skiria atsarg\u0173 s\u0105ra\u0161ams bei atskiriems \u012frengini\u0173 planams derinti.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Kas pasikeit\u0117 Eskomatic \u012fmon\u0117je<\/h3>\n\n\n<p>Pagal sutartis mechaninio apdirbimo paslaugas teikian\u010dioje \u012fmon\u0117je Eskomatic darb\u0173 eil\u0117s daugiausia buvo sudaromos rankiniu b\u016bdu, o ankstesn\u0117 gamybos valdymo aplinka nesuteik\u0117 pakankamai ai\u0161kaus med\u017eiag\u0173 prieinamumo vaizdo. Tr\u016bkumas gal\u0117jo paai\u0161k\u0117ti likus per ma\u017eai laiko iki suplanuotos u\u017eduoties prad\u017eios, kai galimybi\u0173 reaguoti jau beveik nebeb\u016bdavo.<\/p>\n\n\n<p>\u012ediegus SkyPlanner, vaizdi darb\u0173 eil\u0117 Gantt diagramoje, automatizuotas apkrovos planavimas ir ai\u0161kiau matomi med\u017eiag\u0173 tr\u016bkumai palengvino kasdien\u012f planavim\u0105. <a href=\"https:\/\/skyplanner.ai\/lt\/klientu-istorijos\/eskomatic\/\">Eskomatic teigimu<\/a>, suma\u017e\u0117jo gamybos sustojim\u0173 d\u0117l tr\u016bkstam\u0173 med\u017eiag\u0173, o pristatymo datos nustatomos tiksliau.<\/p>\n\n\n<p>\u0160i patirtis rodo, kod\u0117l svarbu susieti med\u017eiag\u0173 prieinamum\u0105 su gamybos planu: planuotojai gali i\u0161 anksto spr\u0119sti, kaip tr\u016bkumas paveiks darbus ir \u012fsipareigojimus klientams, u\u017euot apie j\u012f su\u017einoj\u0119 tik prie \u012frenginio.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Pamatykite, k\u0105 j\u016bs\u0173 gamykloje pakeist\u0173 v\u0117luojan\u010dios med\u017eiagos<\/h2>\n\n\n<p>SkyPlanner per atvir\u0105 REST API integruojasi su bet kuria ERP ar MES sistema. Esamus u\u017esakym\u0173 ir med\u017eiag\u0173 duomenis galite susieti su gamybos tvarkara\u0161\u010di\u0173 sudarymu pagal ribotus paj\u0117gumus, u\u017euot atskirai pri\u017ei\u016br\u0117j\u0119 ir rankiniu b\u016bdu derin\u0119 darb\u0173 eiles.<\/p>\n\n\n<p>Kad SkyPlanner pristatymas b\u016bt\u0173 konkretus, pasiruo\u0161kite vieno svarbaus komponento, j\u012f naudojan\u010di\u0173 u\u017eduo\u010di\u0173 ir neseniai v\u0117lavusio atsarg\u0173 papildymo pavyzd\u012f. Papra\u0161ykite parodyti, kaip \u012fvesta gavimo data veikia bendr\u0105 tvarkara\u0161t\u012f ir pristatymo datas. Tai prakti\u0161kas b\u016bdas \u012fvertinti naud\u0105, neapsiribojant vien atsarg\u0173 padengimo rodikliu.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/lt\/susisiekite-su-pardavejais\/\">U\u017esisakykite SkyPlanner pristatym\u0105<\/a> ir aptarkite savo gamybos situacij\u0105 arba <a href=\"https:\/\/skyplanner.ai\/lt\/bandymas\/\">i\u0161bandykite SkyPlanner su demonstraciniais duomenimis<\/a>, jei pirmiausia norite susipa\u017einti su tvarkara\u0161\u010dio sudarymo eiga.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Atsarg\u0173 padengimas gamyboje: ar atsarg\u0173 pakaks? Prad\u017eia &raquo; I\u0161tekliai &raquo; Atsarg\u0173 padengimas gamyboje: ar atsarg\u0173 pakaks? Atsarg\u0173 ataskaita rodo, kad komponent\u0173 pakaks septynioms darbo dienoms. Kitas pristatymas numatytas penktadien\u012f. Ta\u010diau ketvirtadienio gamybos u\u017esakymo prad\u0117ti negalima: jam tr\u016bksta reikiamo kiekio. Prie\u0161taravimo \u010dia n\u0117ra: septynios dienos pagal vidutin\u012f suvartojim\u0105 dar nerei\u0161kia, kad atsarg\u0173 pakaks konkretiems gamykloje vykdomiems &#8230; <a title=\"Atsarg\u0173 padengimas gamyboje: ar atsarg\u0173 pakaks?\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/atsargu-padengimas\/\" aria-label=\"Read more about Atsarg\u0173 padengimas gamyboje: ar atsarg\u0173 pakaks?\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":111252,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2532,301],"tags":[],"class_list":["post-111232","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-ir-planavimas","category-istekliai","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Atsarg\u0173 padengimas gamyboje: ar atsarg\u0173 pakaks?<\/title>\n<meta name=\"description\" content=\"Raskite pirm\u0105j\u012f med\u017eiag\u0173 tr\u016bkum\u0105 prie\u0161 sustojant gamybai. Skai\u010diuokite atsarg\u0173 padengim\u0105 b\u016bsimoms u\u017eduotims, susiekite prieinamum\u0105 su SkyPlanner grafiku.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/atsargu-padengimas\/\" \/>\n<meta property=\"og:locale\" content=\"lt_LT\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Atsarg\u0173 padengimas gamyboje: ar atsarg\u0173 pakaks?\" \/>\n<meta property=\"og:description\" content=\"Raskite pirm\u0105j\u012f med\u017eiag\u0173 tr\u016bkum\u0105 prie\u0161 sustojant gamybai. Skai\u010diuokite atsarg\u0173 padengim\u0105 b\u016bsimoms u\u017eduotims, susiekite prieinamum\u0105 su SkyPlanner grafiku.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lt\/istekliai\/atsargu-padengimas\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-27T16:31:21+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-27T16:32:19+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"10 minu\u010di\u0173\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/atsargu-padengimas\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/atsargu-padengimas\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Atsarg\u0173 padengimas gamyboje: ar atsarg\u0173 pakaks?\",\"datePublished\":\"2026-10-27T16:31:21+00:00\",\"dateModified\":\"2026-10-27T16:32:19+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/atsargu-padengimas\\\/\"},\"wordCount\":2105,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/atsargu-padengimas\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/inventory-coverage-manufacturing-hero.png\",\"articleSection\":[\"APS ir planavimas\",\"i\u0161tekliai\"],\"inLanguage\":\"lt-LT\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/atsargu-padengimas\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/atsargu-padengimas\\\/\",\"name\":\"Atsarg\u0173 padengimas gamyboje: ar atsarg\u0173 pakaks?\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/atsargu-padengimas\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/atsargu-padengimas\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/inventory-coverage-manufacturing-hero.png\",\"datePublished\":\"2026-10-27T16:31:21+00:00\",\"dateModified\":\"2026-10-27T16:32:19+00:00\",\"description\":\"Raskite pirm\u0105j\u012f med\u017eiag\u0173 tr\u016bkum\u0105 prie\u0161 sustojant gamybai. Skai\u010diuokite atsarg\u0173 padengim\u0105 b\u016bsimoms u\u017eduotims, susiekite prieinamum\u0105 su SkyPlanner grafiku.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/atsargu-padengimas\\\/#breadcrumb\"},\"inLanguage\":\"lt-LT\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/atsargu-padengimas\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"lt-LT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/atsargu-padengimas\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/inventory-coverage-manufacturing-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/inventory-coverage-manufacturing-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"Held components behind a closed barrier and a small usable stock feeding assembly illustrate inventory coverage.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/atsargu-padengimas\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Atsarg\u0173 padengimas gamyboje: ar atsarg\u0173 pakaks?\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lt-LT\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lt-LT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lt-LT\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Atsarg\u0173 padengimas gamyboje: ar atsarg\u0173 pakaks?","description":"Raskite pirm\u0105j\u012f med\u017eiag\u0173 tr\u016bkum\u0105 prie\u0161 sustojant gamybai. Skai\u010diuokite atsarg\u0173 padengim\u0105 b\u016bsimoms u\u017eduotims, susiekite prieinamum\u0105 su SkyPlanner grafiku.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lt\/istekliai\/atsargu-padengimas\/","og_locale":"lt_LT","og_type":"article","og_title":"Atsarg\u0173 padengimas gamyboje: ar atsarg\u0173 pakaks?","og_description":"Raskite pirm\u0105j\u012f med\u017eiag\u0173 tr\u016bkum\u0105 prie\u0161 sustojant gamybai. Skai\u010diuokite atsarg\u0173 padengim\u0105 b\u016bsimoms u\u017eduotims, susiekite prieinamum\u0105 su SkyPlanner grafiku.","og_url":"https:\/\/skyplanner.ai\/lt\/istekliai\/atsargu-padengimas\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-27T16:31:21+00:00","article_modified_time":"2026-10-27T16:32:19+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Jussi M\u00e4ntyl\u00e4","Est. reading time":"10 minu\u010di\u0173"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/atsargu-padengimas\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/atsargu-padengimas\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Atsarg\u0173 padengimas gamyboje: ar atsarg\u0173 pakaks?","datePublished":"2026-10-27T16:31:21+00:00","dateModified":"2026-10-27T16:32:19+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/atsargu-padengimas\/"},"wordCount":2105,"publisher":{"@id":"https:\/\/skyplanner.ai\/lt\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/atsargu-padengimas\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero.png","articleSection":["APS ir planavimas","i\u0161tekliai"],"inLanguage":"lt-LT"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/atsargu-padengimas\/","url":"https:\/\/skyplanner.ai\/lt\/istekliai\/atsargu-padengimas\/","name":"Atsarg\u0173 padengimas gamyboje: ar atsarg\u0173 pakaks?","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lt\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/atsargu-padengimas\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/atsargu-padengimas\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero.png","datePublished":"2026-10-27T16:31:21+00:00","dateModified":"2026-10-27T16:32:19+00:00","description":"Raskite pirm\u0105j\u012f med\u017eiag\u0173 tr\u016bkum\u0105 prie\u0161 sustojant gamybai. Skai\u010diuokite atsarg\u0173 padengim\u0105 b\u016bsimoms u\u017eduotims, susiekite prieinamum\u0105 su SkyPlanner grafiku.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/atsargu-padengimas\/#breadcrumb"},"inLanguage":"lt-LT","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lt\/istekliai\/atsargu-padengimas\/"]}]},{"@type":"ImageObject","inLanguage":"lt-LT","@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/atsargu-padengimas\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero.png","width":1672,"height":941,"caption":"Held components behind a closed barrier and a small usable stock feeding assembly illustrate inventory coverage."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/atsargu-padengimas\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lt\/"},{"@type":"ListItem","position":2,"name":"Atsarg\u0173 padengimas gamyboje: ar atsarg\u0173 pakaks?"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lt\/#website","url":"https:\/\/skyplanner.ai\/lt\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lt\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lt\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lt-LT"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lt\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lt\/","logo":{"@type":"ImageObject","inLanguage":"lt-LT","@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"lt-LT","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lt\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Atsarg\u0173 padengimas gamyboje: ar atsarg\u0173 pakaks? Prad\u017eia &raquo; I\u0161tekliai &raquo; Atsarg\u0173 padengimas gamyboje: ar atsarg\u0173 pakaks? Atsarg\u0173 ataskaita rodo, kad komponent\u0173 pakaks septynioms darbo dienoms. Kitas pristatymas numatytas penktadien\u012f. Ta\u010diau ketvirtadienio gamybos u\u017esakymo prad\u0117ti negalima: jam tr\u016bksta reikiamo kiekio. Prie\u0161taravimo \u010dia n\u0117ra: septynios dienos pagal vidutin\u012f suvartojim\u0105 dar nerei\u0161kia, kad atsarg\u0173 pakaks konkretiems gamykloje vykdomiems&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/posts\/111232","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/comments?post=111232"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/posts\/111232\/revisions"}],"predecessor-version":[{"id":111296,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/posts\/111232\/revisions\/111296"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/media\/111252"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/media?parent=111232"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/categories?post=111232"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/tags?post=111232"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}