{"id":110588,"date":"2026-10-26T03:51:55","date_gmt":"2026-10-26T03:51:55","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=110588"},"modified":"2026-10-26T03:52:49","modified_gmt":"2026-10-26T03:52:49","slug":"cikline-inventorizacija","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/lt\/istekliai\/cikline-inventorizacija\/","title":{"rendered":"Ciklin\u0117 inventorizacija gamyboje: \u0161alinkite atsarg\u0173 neatitikimus"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Ciklin\u0117 inventorizacija gamyboje: \u0161alinkite atsarg\u0173 neatitikimus<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/lt\/\">Prad\u017eia<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/\">I\u0161tekliai<\/a> &raquo; Ciklin\u0117 inventorizacija gamyboje: \u0161alinkite atsarg\u0173 neatitikimus<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Numatomas skaitymo laikas: <\/span><span class=\"yoast-reading-time__reading-time\">11<\/span><span class=\"yoast-reading-time__time-unit\"> minut\u0117s<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Atsarg\u0173 apskaita rodo, kad komponent\u0173 yra. Ta\u010diau atidar\u0119s talp\u0105 operatorius pamato, kad j\u0173 neu\u017eteks u\u017eduo\u010diai baigti. Sand\u0117lio darbuotojai ie\u0161ko tr\u016bkstam\u0173 dali\u0173, pirkim\u0173 skyrius skuba u\u017esakyti pakaital\u0173, o gamybos planuotojas perdaro tvarkara\u0161t\u012f, sudaryt\u0105 darant prielaid\u0105, kad dali\u0173 pakanka.<\/p>\n\n\n<p>Ciklin\u0117 inventorizacija padeda tokius neatitikimus pasteb\u0117ti anks\u010diau. U\u017euot lauk\u0119 viso sand\u0117lio inventorizacijos, reguliariai tikrinate pasirinktas atsargas, tiriate skirtumus ir taisote juos suk\u0117lusius procesus. Nauda \u2013 ne vien tikslesn\u0117 atsarg\u0173 ataskaita. Ma\u017eiau gamybos sprendim\u0173 priimama remiantis med\u017eiagomis, kurios egzistuoja tik apskaitoje.<\/p>\n\n\n<p>Patikslinta informacija turi pasiekti ir gamybos plan\u0105. SkyPlanner APS susieja med\u017eiag\u0173 prieinamum\u0105 su nuo j\u0173 priklausan\u010diais u\u017esakymais, \u012frenginiais ir pamainomis. Taip planuotojas gali reaguoti \u012f tr\u016bkum\u0105 neperdarydamas kiekvienos darb\u0173 eil\u0117s rankomis.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kas yra ciklin\u0117 inventorizacija?<\/h2>\n\n\n<p>Ciklin\u0117 inventorizacija \u2013 tai reguliarus fizinis pasirinkt\u0173 atsarg\u0173 skai\u010diavimas, pagal plan\u0105 paeiliui tikrinant vis kitas j\u0173 dalis. Fakti\u0161kai rastas kiekis lyginamas su apskaitoje nurodytu tos pa\u010dios prek\u0117s kiekiu toje pa\u010dioje vietoje, esant tam pa\u010diam atsarg\u0173 statusui ir tuo pa\u010diu laiko momentu. Tada i\u0161siai\u0161kinami ir pa\u0161alinami visi neatitikimai.<\/p>\n\n\n<p>Pagal inventorizacijos plan\u0105 galima paeiliui tikrinti sand\u0117liavimo vietas, preki\u0173 grupes arba atskirus prek\u0117s ir vietos apskaitos \u012fra\u0161us. Kai kurios atsargos tikrinamos da\u017eniau, nes j\u0173 apskaitos klaidos kelia didesn\u0119 finansin\u0119 ar gamybos rizik\u0105. Siekiama nuolatin\u0117s tikrinimo tvarkos, o ne pavieni\u0173 paie\u0161k\u0173, kai darbas d\u0117l tr\u016bkumo jau sustoj\u0119s.<\/p>\n\n\n<p>\u0160ios trys susijusios veiklos atlieka skirtingas funkcijas:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Nuolatin\u0117 atsarg\u0173 apskaita<\/strong> palaiko einam\u0105j\u012f likut\u012f pagal gavimo, i\u0161davimo, sunaudojimo ir kitas operacijas. Ji rodo, kiek atsarg\u0173, sistemos duomenimis, tur\u0117t\u0173 b\u016bti.<\/li><li><strong>Ciklin\u0117 inventorizacija<\/strong> leid\u017eia visus veiklos metus fizi\u0161kai tikrinti pasirinkt\u0173 apskaitos \u012fra\u0161\u0173 tikslum\u0105. Ji padeda aptikti neu\u017eregistruotas operacijas, neteisingus kiekius ir kitus neatitikimus, kol dar lengva atsekti, kas \u012fvyko.<\/li><li><strong>Visuotin\u0117 fizin\u0117 inventorizacija<\/strong> apima visas nustatytos apimties atsargas pasirinktu laiko momentu. Atliekant ciklin\u0119 inventorizacij\u0105 tikrinama ma\u017eesn\u0117mis dalimis, o ne viskas vienu kartu.<\/li><\/ul>\n\n\n<p>Einamasis apskaitos likutis ne\u012frodo, kad atsarg\u0173 i\u0161 tikr\u0173j\u0173 yra. Ciklin\u0117 inventorizacija taip pat savaime nerei\u0161kia, kad \u012fvykdyti \u012fmon\u0117s finansin\u0117s atskaitomyb\u0117s ar audito reikalavimai. \u0160iuos reikalavimus nustatykite atskirai nuo \u0161ios atsarg\u0173 tikrinimo tvarkos.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Pirmiausia atskirkite atsarg\u0173 neatitikim\u0105 nuo pristatymo problemos<\/h2>\n\n\n<p>Jei darbo centre n\u0117ra detal\u0117s, tai dar nerei\u0161kia, kad atsarg\u0173 apskaita klaidinga. Detal\u0117 gali tebeb\u016bti apskaitoje nurodytoje sand\u0117lio vietoje ir laukti vidinio pristatymo. Tokiu atveju problema yra <a href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/pfep\/\">med\u017eiag\u0173 pristatymas \u012f darbo viet\u0105<\/a>, o ne kiekis, kur\u012f reik\u0117t\u0173 nura\u0161yti.<\/p>\n\n\n<p>Prie\u0161 lygindami skai\u010dius \u012fsitikinkite, kad abiej\u0173 duomen\u0173 apimtis sutampa. Bendro kiekio visame pastate negalima tiesiogiai lyginti su vienos prie linijos esan\u010dios d\u0117\u017e\u0117s turiniu. U\u017eduo\u010diai jau i\u0161duot\u0173 atsarg\u0173 negalima dar kart\u0105 skai\u010diuoti kaip nei\u0161duot\u0173 sand\u0117lio atsarg\u0173. Detali\u0173, kurioms dar laukiama kokyb\u0117s patvirtinimo, fizi\u0161kai gali b\u016bti, ta\u010diau gamyboje j\u0173 naudoti dar negalima.<\/p>\n\n\n<p>Jei palyginimas i\u0161 ties\u0173 parodo neatitikim\u0105, atsekite j\u012f gal\u0117jusias sukelti apskaitos operacijas ir veiksmus su med\u017eiagomis:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Galima prie\u017eastis<\/th><th>K\u0105 tikrinti<\/th><\/tr><\/thead><tbody><tr><td>U\u017eregistruotas neteisingas gautas kiekis<\/td><td>Palyginkite pristatyt\u0105 kiek\u012f, pri\u0117mimo patikros duomenis ir u\u017eregistruot\u0105 gavim\u0105.<\/td><\/tr><tr><td>D\u0117\u017e\u0117s supainiotos su vienetais<\/td><td>Patikrinkite pirkimo, sand\u0117liavimo ir sunaudojimo matavimo vienetus bei j\u0173 perskai\u010diavimo koeficientus.<\/td><\/tr><tr><td>Med\u017eiagos perkeltos nepakeitus vietos apskaitoje<\/td><td>Patikrinkite pradin\u0119 ir paskirties vietas bei perk\u0117limo operacij\u0105.<\/td><\/tr><tr><td>Faktinis sunaudojimas skiriasi nuo u\u017eregistruoto<\/td><td>Per\u017ei\u016br\u0117kite i\u0161davimo b\u016bd\u0105, med\u017eiag\u0173 specifikacijoje nurodytus kiekius, brok\u0105 ir gr\u0105\u017einimus.<\/td><\/tr><tr><td>Sumai\u0161ytos pana\u0161ios detal\u0117s arba skirtingos j\u0173 versijos<\/td><td>Patikrinkite etiketes, identifikatorius ir tikr\u0105j\u012f talp\u0173 turin\u012f.<\/td><\/tr><tr><td>Pa\u017eeistos arba u\u017eblokuotos atsargos laikomos tinkamomis naudoti<\/td><td>Palyginkite faktin\u0119 atsarg\u0173 b\u016bkl\u0119 su apskaitoje nurodytu prieinamumu.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Pagal \u0161i\u0173 patikr\u0173 rezultatus reik\u0117s skirting\u0173 sprendim\u0173. Grie\u017etesn\u0117 pri\u0117mimo tvarka nei\u0161taisys klaidingo sunaudojimo kiekio, o papildomas atsarg\u0173 pirkimas nepakeis neu\u017eregistruotos perk\u0117limo operacijos.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Pasirinkite, k\u0105 ir kaip da\u017enai skai\u010diuosite<\/h2>\n\n\n<p>Prad\u0117kite nuo tokios gamybos zonos ar med\u017eiag\u0173 grup\u0117s, kuri\u0105 paj\u0117gsite apr\u0117pti ir kurios atsarg\u0173 neatitikimai i\u0161 ties\u0173 trikdo darb\u0105. Paskirkite atsaking\u0105 asmen\u012f, numatykite laik\u0105, kurio neatimt\u0173 kiti darbai, ir nustatykite ai\u0161ki\u0105 aptikt\u0173 neatitikim\u0173 sprendimo tvark\u0105. Nedidel\u0117s apimties nuolatin\u0117 patikra, po kurios neatitikimai i\u0161sprend\u017eiami, naudingesn\u0117 u\u017e ilg\u0105 skai\u010diavimo s\u0105ra\u0161\u0105, kurio rezultatams i\u0161tirti niekas neturi laiko.<\/p>\n\n\n<p>Skai\u010diavimo da\u017enum\u0105 nustatykite pagal kelis kriterijus. Sunaudojam\u0173 atsarg\u0173 vert\u0117 gali pad\u0117ti sutelkti finansin\u0119 kontrol\u0119 ten, kur jos labiausiai reikia, taikant <a href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/atsargu-abc-analize\/\">atsarg\u0173 ABC analiz\u0119<\/a>. Operacij\u0173 da\u017enumas ir ankstesni neatitikimai rodo, kur apskaitos duomenys gali greitai nutolti nuo tikrov\u0117s. Svarba gamybai atskleid\u017eia dar vien\u0105 aspekt\u0105: nebrangi perkama detal\u0117 gali sustabdyti brangaus gaminio surinkim\u0105.<\/p>\n\n\n<p>Aklai netaikykite bendros taisykl\u0117s, kad kiekvien\u0105 A grup\u0117s prek\u0119 b\u016btina skai\u010diuoti kas m\u0117nes\u012f, o C grup\u0117s \u2013 kart\u0105 per metus. Pasirinkite intervalus pagal savo rizik\u0105 ir laik\u0105, kur\u012f galite skirti skai\u010diavimui bei tyrimui. Daugiau d\u0117mesio skirkite ten, kur klaidos kartojasi, o v\u0117liau \u012fvertinkite, ar pa\u0161alinus j\u0173 prie\u017east\u012f apskaita tapo patikimesn\u0117.<\/p>\n\n\n<p>Skai\u010diuojant pagal sand\u0117liavimo vietas galima suma\u017einti fizinio darbo s\u0105naudas, nes kartu tikrinamos greta esan\u010dios atsargos. Skai\u010diavimas pagal prekes padeda atsekti vien\u0105 detal\u0119 keliose vietose. Kad ir kur\u012f b\u016bd\u0105 pasirinktum\u0117te, apibr\u0117\u017ekite apr\u0117pt\u012f taip, kad nelikt\u0173 nuo\u0161alyje sunkiai pasiekiam\u0173 viet\u0173, l\u0117tai judan\u010di\u0173 atsarg\u0173 ir netik\u0117tai tu\u0161\u010di\u0173 d\u0117\u017ei\u0173. Tu\u0161\u010dia d\u0117\u017e\u0117, kai apskaitoje likutis teigiamas, yra patikros rezultatas, o ne prie\u017eastis jos neskai\u010diuoti.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Ciklin\u0117s inventorizacijos tvarka, padedanti pa\u0161alinti neatitikimus<\/h2>\n\n\n<h3 class=\"wp-block-heading\">1. Apibr\u0117\u017ekite skai\u010diavimo apimt\u012f<\/h3>\n\n\n<p>Nurodykite prek\u0119 ir jos viet\u0105, taip pat partijas, versijas ar atsarg\u0173 statusus, jei juos skiriate savo veikloje. Apibr\u0117\u017ekite atsarg\u0173 apskaitos matavimo vienet\u0105 ir u\u017edar\u0173 pakuo\u010di\u0173 bei i\u0161 dalies panaudot\u0173 talp\u0173 skai\u010diavimo tvark\u0105. Ribas nustatykite pakankamai ai\u0161kiai, kad skai\u010diavim\u0105 gal\u0117t\u0173 pakartoti kitas \u017emogus.<\/p>\n\n\n<p>\u012etraukite ir netik\u0117tai rastas atsargas, patenkan\u010dias \u012f nustatyt\u0105 apimt\u012f. Tikrinant vien s\u0105ra\u0161e i\u0161spausdintas prekes, neu\u017eregistruotas gavimas ar ne vietoje pad\u0117ta detal\u0117 gali likti nepasteb\u0117ti.<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. Patikimai nustatykite operacij\u0173 atskyrimo moment\u0105<\/h3>\n\n\n<p>Fizinio skai\u010diavimo rezultatas ir sistemos likutis turi atitikti t\u0105 pat\u012f laiko moment\u0105. Prie\u0161ingu atveju net ir tinkamai u\u017eregistruotas atsarg\u0173 pa\u0117mimas skai\u010diavimo metu gali atrodyti kaip tr\u016bkumas.<\/p>\n\n\n<p>Nedidelio bandomojo patikrinimo metu papras\u010diausia kontrol\u0117s priemon\u0117 gali b\u016bti trumpam sustabdyti atsarg\u0173 jud\u0117jim\u0105 pasirinktoje vietoje. Jei darbas turi t\u0119stis, nustatykite tvark\u0105, kaip skai\u010diavimo metu registruosite gavim\u0105, pa\u0117mim\u0105 ir perk\u0117lim\u0105 bei suderinsite \u0161i\u0173 operacij\u0173 laik\u0105 su skai\u010diavimo momentu. Med\u017eiagas tvarkantiems darbuotojams prane\u0161kite, kas skai\u010diuojama ir kas leid\u017eia i\u0161imtis. Kontroliuojate pasirinkt\u0105 apimt\u012f \u2013 neb\u016btina u\u017edaryti viso sand\u0117lio.<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. Skai\u010diuokite nesiremdami numatytu kiekiu<\/h3>\n\n\n<p>Kai \u012fmanoma, prie\u0161 pradin\u012f skai\u010diavim\u0105 darbuotojui nerodykite apskaitos liku\u010dio. Papra\u0161ykite nurodyti fakti\u0161kai rast\u0105 kiek\u012f, o ne patvirtinti ekrane matom\u0105 skai\u010di\u0173.<\/p>\n\n\n<p>Tikrinkite tikr\u0105j\u012f turin\u012f, ne vien talpos etiket\u0119. U\u017era\u0161ykite skai\u010diavimo laik\u0105, matavimo vienet\u0105, viet\u0105 ir skai\u010diavus\u012f asmen\u012f. Taip pat pa\u017eym\u0117kite neai\u0161k\u0173 \u017eenklinim\u0105 ar pa\u017eeist\u0105 pakuot\u0119, \u012f kuriuos reikia atkreipti d\u0117mes\u012f. Jei kiekis nustatomas sveriant ar kitu netiesioginiu b\u016bdu, patikrinkite metod\u0105 ir jo tinkamum\u0105 toms med\u017eiagoms.<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. Perskai\u010diuokite ir i\u0161siai\u0161kinkite neatitikimus<\/h3>\n\n\n<p>Prie\u0161 keisdami likut\u012f patikrinkite prek\u0119, matavimo vienet\u0105, viet\u0105 ir operacij\u0173 atskyrimo moment\u0105. Jei skirtumas reik\u0161mingas arba nepaai\u0161kintas, papra\u0161ykite kito \u017emogaus nepriklausomai perskai\u010diuoti atsargas. Tada i\u0161nagrin\u0117kite prie\u0161 pat skai\u010diavim\u0105 ir netrukus po jo registruot\u0105 gavim\u0105, perk\u0117limus, i\u0161davim\u0105 gamybai, sunaudojim\u0105, gr\u0105\u017einimus ir brok\u0105.<\/p>\n\n\n<p>Neskai\u010diuokite pakartotinai tol, kol kas nors gaus laukiam\u0105 rezultat\u0105. I\u0161saugokite pirmojo skai\u010diavimo rezultat\u0105 ir v\u0117liau surinktus \u012frodymus. Jei kiekio skirtum\u0105 paai\u0161kina teis\u0117tas atsarg\u0173 jud\u0117jimas po skai\u010diavimo momento, suderinkite duomenis atsi\u017evelgdami \u012f t\u0105 operacij\u0105, o ne registruokite papildom\u0105 liku\u010dio koregavim\u0105.<\/p>\n\n\n<h3 class=\"wp-block-heading\">5. Patvirtinkite tinkam\u0105 koregavim\u0105<\/h3>\n\n\n<p>Atskirkite skai\u010diavimo rezultato registravim\u0105 nuo leidimo keisti atsarg\u0173 apskait\u0105. Nustatykite, kas atsako u\u017e patvirtinim\u0105 ir kokiais atvejais sprendim\u0105 reikia perduoti auk\u0161tesniam atsakingam asmeniui, atsi\u017evelgdami \u012f prek\u0117s vert\u0119 ir rizik\u0105 gamybai.<\/p>\n\n\n<p>U\u017efiksuokite patvirtint\u0105 kiek\u012f, neatitikim\u0105, jo prie\u017east\u012f, koregavim\u0105 patvirtinus\u012f asmen\u012f ir pagrind\u017eian\u010dius \u012frodymus. Taisykite tikr\u0105j\u0105 klaid\u0105: jei klaidingai nurodyta vieta ar atsarg\u0173 b\u016bsena, gali reik\u0117ti kitokios apskaitos operacijos nei kiekio koregavimas. Prie\u0161 registruodami koregavim\u0105 patikrinkite, ar netr\u016bksta pirmini\u0173 apskaitos operacij\u0173, kad v\u0117liau u\u017eregistravus gavim\u0105 ar sunaudojim\u0105 tas pats skirtumas neb\u016bt\u0173 i\u0161taisytas du kartus.<\/p>\n\n\n<p>Jei patvirtintas tr\u016bkumas kelia gr\u0117sm\u0119 vykdomiems darbams, nedelsdami informuokite gamybos planuotoj\u0105. Kol t\u0119siamas ilgesnis pagrindin\u0117s prie\u017easties tyrimas, rizika pristatymo terminams neturi likti nepasteb\u0117ta.<\/p>\n\n\n<h3 class=\"wp-block-heading\">6. Sutvarkykite proces\u0105, d\u0117l kurio atsirado klaida<\/h3>\n\n\n<p>Patvirtintas koregavimas i\u0161taiso dabartin\u012f apskaitos \u012fra\u0161\u0105. Ta\u010diau jis nepaai\u0161kina, kod\u0117l \u012fvyko klaida, ir neu\u017ekerta kelio jai pasikartoti.<\/p>\n\n\n<p>Paskirkite u\u017e korekcin\u012f veiksm\u0105 atsaking\u0105 asmen\u012f ir nustatykite \u012fvykdymo termin\u0105. Gali reik\u0117ti pakeisti pri\u0117mimo patikr\u0105, i\u0161taisyti matavimo vienet\u0173 perskai\u010diavim\u0105, registruoti brok\u0105 toje operacijoje, kurioje jis atsiranda, arba sutvarkyti nepanaudot\u0173 komponent\u0173 gr\u0105\u017einimo \u012f sand\u0117l\u012f tvark\u0105. Kai procesas bus atliktas dar kart\u0105, pakartotinai patikrinkite susijusias atsargas. Vertinkite, ar neatitikimas pasikartoja, o ne tai, ar pavyko u\u017eregistruoti koregavim\u0105.<\/p>\n\n\n<h3 class=\"wp-block-heading\">7. Sudarydami gamybos tvarkara\u0161t\u012f naudokite patikslintus duomenis apie turimas med\u017eiagas<\/h3>\n\n\n<p>\u012esitikinkite, kad patvirtintas koregavimas pasiek\u0117 sistem\u0105, i\u0161 kurios gamybos tvarkara\u0161\u010diui gaunami duomenys apie med\u017eiagas. Tada i\u0161 naujo \u012fvertinkite u\u017esakymus, kuriems reikia tos med\u017eiagos, j\u0173 prioritetus ir i\u0161teklius, kuriuos jie naudoja kartu su kitais darbais.<\/p>\n\n\n<p>U\u017e atsargas atsakinga komanda patikslino pradin\u012f kiek\u012f. Ta\u010diau planuotojui vis dar reikia atsakymo \u012f kit\u0105 klausim\u0105: <strong>k\u0105 dabar galime pagaminti, kokia seka ir kaip pasikeis pristatymo datos?<\/strong><\/p>\n\n\n<h2 class=\"wp-block-heading\">Pavyzdys: skai\u010diavimas baigtas, bet detali\u0173 vis dar reikia dviem u\u017esakymams<\/h2>\n\n\n<p>\u012esivaizduokite gamintoj\u0105, kurio apskaitoje nurodyta, kad sand\u0117lyje yra 120 tinkam\u0173 naudoti korpus\u0173. Dviem artimiausiems u\u017esakymams reikia po 60 korpus\u0173. Laikantis nustatytos tvarkos suskai\u010diuojama 90, o nepriklausomas pakartotinis skai\u010diavimas patvirtina \u0161\u012f kiek\u012f.<\/p>\n\n\n<p>Komanda patikrina, ar korpusai nebuvo perkelti \u012f kit\u0105 viet\u0105 arba jau i\u0161duoti. Nustatoma, kad skirtumas atsirado d\u0117l pa\u017eeist\u0173 korpus\u0173, kurie anks\u010diau buvo pa\u0161alinti juos tvarkant, ta\u010diau nebuvo u\u017eregistruoti kaip brokas. Patvirtinus koregavim\u0105, tinkam\u0173 naudoti korpus\u0173 likutis suma\u017einamas iki 90. Komanda taip pat ai\u0161kiai nustato, kas nuo \u0161iol atsakingas u\u017e toki\u0173 pa\u0161alinim\u0173 registravim\u0105.<\/p>\n\n\n<p>Taip i\u0161sprend\u017eiamas nustatytas kiekio neatitikimas. Ta\u010diau korpus\u0173 abiem u\u017esakymams vis tiek neu\u017etenka: bendras j\u0173 poreikis teb\u0117ra 120. Pirkim\u0173 skyrius tikrina tr\u016bkstam\u0173 korpus\u0173 tiekimo galimybes, o planuotojas nusprend\u017eia, kuriam \u012fsipareigojimui teikti pirmenyb\u0119.<\/p>\n\n\n<p>Pakeitus \u0161io u\u017esakymo vykdymo laik\u0105, pasikei\u010dia ne tik med\u017eiag\u0173 s\u0105ra\u0161as. Jo mechaninio apdirbimo ir surinkimo operacijoms naudojami tie patys i\u0161tekliai kaip ir kitiems u\u017esakymams, \u012fskaitant darbus, kuriems \u0161i\u0173 korpus\u0173 nereikia. Tod\u0117l patikslintas atsarg\u0173 likutis gali pakeisti kelias darb\u0173 eiles ir pristatymo datas. B\u016btent tokiu atveju atsarg\u0173 duomen\u0173 susiejimas su <a href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/kas-yra-gamybos-planavimas\/\">bendru gamybos tvarkara\u0161\u010diu<\/a> suma\u017eina rankinio planavimo darb\u0105.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Vertinkite pirmojo skai\u010diavimo rezultat\u0105, o ne vien pakoreguot\u0105 likut\u012f<\/h2>\n\n\n<p>Atsarg\u0173 apskaitos tikslumas turi b\u016bti ai\u0161kiai apibr\u0117\u017etas. Praktin\u012f \u012fra\u0161\u0173 atitikties rodikl\u012f apskai\u010diuosite taip: prek\u0117s ir vietos \u012fra\u0161\u0173, kuri\u0173 duomenys sutapo su pirmojo skai\u010diavimo rezultatais, skai\u010di\u0173 padalykite i\u0161 vis\u0173 patikrint\u0173 prek\u0117s ir vietos \u012fra\u0161\u0173 skai\u010diaus, o rezultat\u0105 i\u0161reik\u0161kite procentais. Nurodykite, ar atitiktis rei\u0161kia visi\u0161k\u0105 sutapim\u0105, ar leid\u017eiamas sutartas nuokrypis, ir nuosekliai laikykit\u0117s \u0161io apibr\u0117\u017eimo.<\/p>\n\n\n<p>Tikslum\u0105 vertinkite pagal skai\u010diavimo rezultatus prie\u0161 koregavim\u0105. Ataskaita, parengta tik i\u0161taisius visus skirtumus, paslepia tikr\u0105j\u0105 skai\u010diavimo metu nustatyt\u0105 pad\u0117t\u012f.<\/p>\n\n\n<p>Procentin\u012f rodikl\u012f vertinkite kartu su nei\u0161spr\u0119stais neatitikimais, pasikartojan\u010diomis prie\u017eastimis, skai\u010diavimo apr\u0117ptimi ir gamybos pertr\u016bkiais d\u0117l med\u017eiag\u0173. Auk\u0161tas bendras rodiklis gali pasl\u0117pti vieno itin svarbaus komponento tr\u016bkum\u0105. Be to, rizika grind\u017eiama skai\u010diavimo programa, pagal kuri\u0105 tikslingai tikrinamos problemin\u0117s prek\u0117s, nesuteikia ne\u0161ali\u0161ko vis\u0173 gamyklos atsarg\u0173 apskaitos \u012fra\u0161\u0173 tikslumo \u012fver\u010dio.<\/p>\n\n\n<p>Naudinga tendencija \u2013 ma\u017eiau pasikartojan\u010di\u0173 klaid\u0173 ir netik\u0117tum\u0173 planuojamu u\u017eduo\u010di\u0173 prad\u017eios metu, o ne vien da\u017enesnis skai\u010diavimas.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Su SkyPlanner paverskite patikslintus atsarg\u0173 duomenis \u012fgyvendinamu planu<\/h2>\n\n\n<p>Rinkit\u0117s SkyPlanner, jei j\u016bs\u0173 komanda gali nustatyti, koki\u0173 med\u017eiag\u0173 yra, ta\u010diau vis dar sugai\u0161ta per daug laiko derindama jas su u\u017esakymais ir i\u0161 naujo sudarydama darb\u0173 prie \u012frengini\u0173 eiles. SkyPlanner sujungia \u0161iuos sprendimus \u012f vien\u0105 gamybos tvarkara\u0161t\u012f.<\/p>\n\n\n<p>Su gaminiu susietos med\u017eiagos perkeliamos ir \u012f jo u\u017esakym\u0173 eilutes. Atsarg\u0173 duomenis galima tvarkyti per integracij\u0105 arba SkyPlanner modulyje Warehouse. \u012ejungus tvarkara\u0161\u010di\u0173 sudarym\u0105 atsi\u017evelgiant \u012f med\u017eiagas, SkyPlanner dirbtinio intelekto planavimo variklis Arcturus vertina med\u017eiag\u0173 prieinamum\u0105 kartu su darbo centr\u0173 paj\u0117gumais, pamainomis, operacij\u0173 priklausomyb\u0117mis ir j\u016bs\u0173 nustatytomis taisykl\u0117mis.<\/p>\n\n\n<p>Kai planavimo duomenyse atsispind\u0117s patvirtintas atsarg\u0173 koregavimas, perskai\u010diuokite tvarkara\u0161t\u012f ir per\u017ei\u016br\u0117kite rezultat\u0105 Ganto diagramoje. Matysite, kaip su \u0161iuo koregavimu susij\u0119 darbai i\u0161d\u0117stomi tarp kit\u0173 u\u017esakym\u0173, u\u017euot atskirai redagav\u0119 kiekvieno i\u0161tekliaus darb\u0173 eil\u0119. Prioritetus nustatote j\u016bs, o tvarkara\u0161t\u012f apskai\u010diuoja Arcturus. Taip reikia ma\u017eiau rankinio derinimo ir galima anks\u010diau pamatyti, kuriems pristatymo \u012fsipareigojimams reikia d\u0117mesio.<\/p>\n\n\n<p>SkyPlanner per atvir\u0105 REST API integruojamas su bet kuria ERP ar MES sistema. I\u0161laikykite savo veiklai tinkam\u0105 pri\u0117mimo, skai\u010diavimo ir neatitikim\u0173 tvirtinimo tvark\u0105, o pagal j\u0105 tvarkomus med\u017eiag\u0173 duomenis susiekite su detaliu gamybos tvarkara\u0161\u010di\u0173 sudarymu. Skai\u010diavimas patvirtina fizin\u0119 atsarg\u0173 b\u016bkl\u0119, o SkyPlanner padeda priimti sprendimus d\u0117l jos poveikio gamybai.<\/p>\n\n\n<h3 class=\"wp-block-heading\">K\u0105 \u012fmon\u0117je Eskomatic pakeit\u0117 ai\u0161kesn\u0117 informacija apie med\u017eiagas<\/h3>\n\n\n<p>Mechaninio apdirbimo paslaugas teikianti \u012fmon\u0117 Eskomatic anks\u010diau naudojo senesn\u0119 gamybos valdymo sistem\u0105, o darb\u0173 eiles daugiausia sudarydavo rankiniu b\u016bdu. Kadangi tr\u016bko ai\u0161kios informacijos apie med\u017eiag\u0173 b\u016bkl\u0119, j\u0173 tr\u016bkumas gal\u0117jo paai\u0161k\u0117ti likus per ma\u017eai laiko iki suplanuotos u\u017eduoties prad\u017eios.<\/p>\n\n\n<p>Prijungusi SkyPlanner prie turimos ERP sistemos, komanda gavo vaizd\u017eiai pateikt\u0105 darb\u0173 eil\u0119, automatin\u012f apkrovos planavim\u0105 ir ai\u0161kesn\u0119 informacij\u0105 apie med\u017eiagas. <a href=\"https:\/\/skyplanner.ai\/lt\/klientu-istorijos\/eskomatic\/\">Eskomatic teigia<\/a>, kad suma\u017e\u0117jo gamybos sustojim\u0173 d\u0117l med\u017eiag\u0173 tr\u016bkumo ir pavyksta tiksliau nustatyti pristatymo datas. \u0160i patirtis parodo med\u017eiag\u0173 duomen\u0173 susiejimo su tvarkara\u0161\u010di\u0173 sudarymu vert\u0119: planuotojui nebereikia paskutin\u0119 akimirk\u0105 narplioti pasekmi\u0173.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Prad\u0117kite nuo vieno pasikartojan\u010dio neatitikimo<\/h2>\n\n\n<p>Pasirinkite detal\u0119, kurios nuolat tenka ie\u0161koti arba kurios netik\u0117tai pritr\u016bksta. Apibr\u0117\u017ekite jos skai\u010diavimo apimt\u012f, patikros metu kontroliuokite atsarg\u0173 jud\u0117jim\u0105, i\u0161tirkite skirtum\u0105 ir paskirkite, kas atliks korekcin\u012f veiksm\u0105. Tada atsekite, kaip patvirtintas turimo kiekio pokytis paveikia u\u017esakymus, kuriems \u0161ios detal\u0117s reikia.<\/p>\n\n\n<p>Nor\u0117dami pamatyti \u0161\u012f paskutin\u012f \u017eingsn\u012f prakti\u0161kai, <a href=\"https:\/\/skyplanner.ai\/lt\/susisiekite-su-pardavejais\/\">u\u017esisakykite SkyPlanner demonstracij\u0105<\/a>. Pasiruo\u0161kite aptarti vien\u0105 abejoni\u0173 keliant\u012f med\u017eiagos likut\u012f, u\u017esakymus, kuriems reikia \u0161ios detal\u0117s, ir \u012frenginius, kuriuos \u0161ie u\u017esakymai naudoja kartu su kitais darbais. Taip pokalbis tur\u0117s konkret\u0173 tiksl\u0105: pamatyti, kaip patikslintus med\u017eiag\u0173 duomenis galima paversti j\u016bs\u0173 komandai tinkamu gamybos planu. Jei pirmiausia norite susipa\u017einti patys, <a href=\"https:\/\/skyplanner.ai\/lt\/bandymas\/\">i\u0161bandykite SkyPlanner su demonstraciniais duomenimis<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Ciklin\u0117 inventorizacija gamyboje: \u0161alinkite atsarg\u0173 neatitikimus Prad\u017eia &raquo; I\u0161tekliai &raquo; Ciklin\u0117 inventorizacija gamyboje: \u0161alinkite atsarg\u0173 neatitikimus Atsarg\u0173 apskaita rodo, kad komponent\u0173 yra. Ta\u010diau atidar\u0119s talp\u0105 operatorius pamato, kad j\u0173 neu\u017eteks u\u017eduo\u010diai baigti. Sand\u0117lio darbuotojai ie\u0161ko tr\u016bkstam\u0173 dali\u0173, pirkim\u0173 skyrius skuba u\u017esakyti pakaital\u0173, o gamybos planuotojas perdaro tvarkara\u0161t\u012f, sudaryt\u0105 darant prielaid\u0105, kad dali\u0173 pakanka. Ciklin\u0117 inventorizacija &#8230; <a title=\"Ciklin\u0117 inventorizacija gamyboje: \u0161alinkite atsarg\u0173 neatitikimus\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/cikline-inventorizacija\/\" aria-label=\"Read more about Ciklin\u0117 inventorizacija gamyboje: \u0161alinkite atsarg\u0173 neatitikimus\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":110607,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2532,301],"tags":[],"class_list":["post-110588","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-ir-planavimas","category-istekliai","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Ciklin\u0117 inventorizacija gamyboje: \u0161alinkite atsarg\u0173 neatitikimus<\/title>\n<meta name=\"description\" content=\"Apskaitoje atsarg\u0173 yra, bet gamyba laukia? Ciklin\u0117 inventorizacija padeda pa\u0161alinti neatitikimus ir gamybos plane naudoti patikslintus liku\u010dius.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/cikline-inventorizacija\/\" \/>\n<meta property=\"og:locale\" content=\"lt_LT\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Ciklin\u0117 inventorizacija gamyboje: \u0161alinkite atsarg\u0173 neatitikimus\" \/>\n<meta property=\"og:description\" content=\"Apskaitoje atsarg\u0173 yra, bet gamyba laukia? Ciklin\u0117 inventorizacija padeda pa\u0161alinti neatitikimus ir gamybos plane naudoti patikslintus liku\u010dius.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lt\/istekliai\/cikline-inventorizacija\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-26T03:51:55+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-26T03:52:49+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/cycle-counting-manufacturing-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"12 minu\u010di\u0173\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/cikline-inventorizacija\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/cikline-inventorizacija\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Ciklin\u0117 inventorizacija gamyboje: \u0161alinkite atsarg\u0173 neatitikimus\",\"datePublished\":\"2026-10-26T03:51:55+00:00\",\"dateModified\":\"2026-10-26T03:52:49+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/cikline-inventorizacija\\\/\"},\"wordCount\":2510,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/cikline-inventorizacija\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/cycle-counting-manufacturing-hero.png\",\"articleSection\":[\"APS ir planavimas\",\"i\u0161tekliai\"],\"inLanguage\":\"lt-LT\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/cikline-inventorizacija\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/cikline-inventorizacija\\\/\",\"name\":\"Ciklin\u0117 inventorizacija gamyboje: \u0161alinkite atsarg\u0173 neatitikimus\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/cikline-inventorizacija\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/cikline-inventorizacija\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/cycle-counting-manufacturing-hero.png\",\"datePublished\":\"2026-10-26T03:51:55+00:00\",\"dateModified\":\"2026-10-26T03:52:49+00:00\",\"description\":\"Apskaitoje atsarg\u0173 yra, bet gamyba laukia? Ciklin\u0117 inventorizacija padeda pa\u0161alinti neatitikimus ir gamybos plane naudoti patikslintus liku\u010dius.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/cikline-inventorizacija\\\/#breadcrumb\"},\"inLanguage\":\"lt-LT\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/cikline-inventorizacija\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"lt-LT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/cikline-inventorizacija\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/cycle-counting-manufacturing-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/cycle-counting-manufacturing-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"A gloved finger checks metal parts arranged beside an open bin during a selected physical inventory count.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/cikline-inventorizacija\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Ciklin\u0117 inventorizacija gamyboje: \u0161alinkite atsarg\u0173 neatitikimus\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lt-LT\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lt-LT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lt-LT\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Ciklin\u0117 inventorizacija gamyboje: \u0161alinkite atsarg\u0173 neatitikimus","description":"Apskaitoje atsarg\u0173 yra, bet gamyba laukia? Ciklin\u0117 inventorizacija padeda pa\u0161alinti neatitikimus ir gamybos plane naudoti patikslintus liku\u010dius.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lt\/istekliai\/cikline-inventorizacija\/","og_locale":"lt_LT","og_type":"article","og_title":"Ciklin\u0117 inventorizacija gamyboje: \u0161alinkite atsarg\u0173 neatitikimus","og_description":"Apskaitoje atsarg\u0173 yra, bet gamyba laukia? Ciklin\u0117 inventorizacija padeda pa\u0161alinti neatitikimus ir gamybos plane naudoti patikslintus liku\u010dius.","og_url":"https:\/\/skyplanner.ai\/lt\/istekliai\/cikline-inventorizacija\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-26T03:51:55+00:00","article_modified_time":"2026-10-26T03:52:49+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/cycle-counting-manufacturing-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Jussi M\u00e4ntyl\u00e4","Est. reading time":"12 minu\u010di\u0173"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/cikline-inventorizacija\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/cikline-inventorizacija\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Ciklin\u0117 inventorizacija gamyboje: \u0161alinkite atsarg\u0173 neatitikimus","datePublished":"2026-10-26T03:51:55+00:00","dateModified":"2026-10-26T03:52:49+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/cikline-inventorizacija\/"},"wordCount":2510,"publisher":{"@id":"https:\/\/skyplanner.ai\/lt\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/cikline-inventorizacija\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/cycle-counting-manufacturing-hero.png","articleSection":["APS ir planavimas","i\u0161tekliai"],"inLanguage":"lt-LT"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/cikline-inventorizacija\/","url":"https:\/\/skyplanner.ai\/lt\/istekliai\/cikline-inventorizacija\/","name":"Ciklin\u0117 inventorizacija gamyboje: \u0161alinkite atsarg\u0173 neatitikimus","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lt\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/cikline-inventorizacija\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/cikline-inventorizacija\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/cycle-counting-manufacturing-hero.png","datePublished":"2026-10-26T03:51:55+00:00","dateModified":"2026-10-26T03:52:49+00:00","description":"Apskaitoje atsarg\u0173 yra, bet gamyba laukia? Ciklin\u0117 inventorizacija padeda pa\u0161alinti neatitikimus ir gamybos plane naudoti patikslintus liku\u010dius.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/cikline-inventorizacija\/#breadcrumb"},"inLanguage":"lt-LT","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lt\/istekliai\/cikline-inventorizacija\/"]}]},{"@type":"ImageObject","inLanguage":"lt-LT","@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/cikline-inventorizacija\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/cycle-counting-manufacturing-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/cycle-counting-manufacturing-hero.png","width":1672,"height":941,"caption":"A gloved finger checks metal parts arranged beside an open bin during a selected physical inventory count."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/cikline-inventorizacija\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lt\/"},{"@type":"ListItem","position":2,"name":"Ciklin\u0117 inventorizacija gamyboje: \u0161alinkite atsarg\u0173 neatitikimus"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lt\/#website","url":"https:\/\/skyplanner.ai\/lt\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lt\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lt\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lt-LT"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lt\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lt\/","logo":{"@type":"ImageObject","inLanguage":"lt-LT","@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"lt-LT","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/cycle-counting-manufacturing-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/cycle-counting-manufacturing-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/cycle-counting-manufacturing-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/cycle-counting-manufacturing-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/cycle-counting-manufacturing-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/cycle-counting-manufacturing-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/cycle-counting-manufacturing-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/cycle-counting-manufacturing-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lt\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Ciklin\u0117 inventorizacija gamyboje: \u0161alinkite atsarg\u0173 neatitikimus Prad\u017eia &raquo; I\u0161tekliai &raquo; Ciklin\u0117 inventorizacija gamyboje: \u0161alinkite atsarg\u0173 neatitikimus Atsarg\u0173 apskaita rodo, kad komponent\u0173 yra. Ta\u010diau atidar\u0119s talp\u0105 operatorius pamato, kad j\u0173 neu\u017eteks u\u017eduo\u010diai baigti. Sand\u0117lio darbuotojai ie\u0161ko tr\u016bkstam\u0173 dali\u0173, pirkim\u0173 skyrius skuba u\u017esakyti pakaital\u0173, o gamybos planuotojas perdaro tvarkara\u0161t\u012f, sudaryt\u0105 darant prielaid\u0105, kad dali\u0173 pakanka. Ciklin\u0117 inventorizacija&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/posts\/110588","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/comments?post=110588"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/posts\/110588\/revisions"}],"predecessor-version":[{"id":110651,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/posts\/110588\/revisions\/110651"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/media\/110607"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/media?parent=110588"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/categories?post=110588"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/tags?post=110588"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}