{"id":108752,"date":"2026-10-24T12:48:10","date_gmt":"2026-10-24T12:48:10","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=108752"},"modified":"2026-10-24T12:49:05","modified_gmt":"2026-10-24T12:49:05","slug":"mtbf","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/lt\/istekliai\/mtbf\/","title":{"rendered":"Vidutinis laikas tarp gedim\u0173: kaip skai\u010diuoti ir taikyti MTBF"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Vidutinis laikas tarp gedim\u0173: kaip skai\u010diuoti ir taikyti MTBF<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/lt\/\">Prad\u017eia<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/\">I\u0161tekliai<\/a> &raquo; Vidutinis laikas tarp gedim\u0173: kaip skai\u010diuoti ir taikyti MTBF<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Numatomas skaitymo laikas: <\/span><span class=\"yoast-reading-time__reading-time\">11<\/span><span class=\"yoast-reading-time__time-unit\"> minut\u0117s<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p><strong>Vidutinis laikas tarp gedim\u0173 (MTBF) \u2013 tai vidutinis remontuojamo \u012frenginio veikimo laikas, tenkantis vienam gedimui.<\/strong> Gamybos \u012frenginio MTBF apskai\u010diuojamas bendr\u0105 jo veikimo valand\u0173 skai\u010di\u0173 padalijus i\u0161 per t\u0105 pat\u012f steb\u0117jimo laikotarp\u012f u\u017eregistruot\u0173 \u012frenginio gedim\u0173 skai\u010diaus:<\/p>\n\n\n<p><strong>MTBF = bendras veikimo laikas \u00f7 gedim\u0173 skai\u010dius<\/strong><\/p>\n\n\n<p>Jei \u012frenginys veik\u0117 160 valand\u0173 ir per t\u0105 laik\u0105 sugedo keturis kartus, steb\u0117tas MTBF yra 40 veikimo valand\u0173. Tai nerei\u0161kia, kad jis ges kas 40 valand\u0173 arba kad atlikus technin\u0119 prie\u017ei\u016br\u0105 prie\u0161 pat sueinant 40 valand\u0173 pavyks i\u0161vengti kito gedimo.<\/p>\n\n\n<p>Svarbu suprasti, k\u0105 pasteb\u0117tas d\u0117sningumas skatina i\u0161tirti ir pakeisti. Kai technin\u0117s prie\u017ei\u016bros ir gamybos komandos susitaria d\u0117l darb\u0173, laikotarp\u012f, kuriuo \u012frenginys bus neprieinamas, reikia \u012ftraukti ir \u012f u\u017esakym\u0173 grafik\u0105. SkyPlanner APS susieja \u0161\u012f paj\u0117gum\u0173 pokyt\u012f su paveikiamais darbais ir pristatymo datomis, tod\u0117l nereikia patiems derinti technin\u0117s prie\u017ei\u016bros darb\u0173 s\u0105ra\u0161o su atskiromis \u012frengini\u0173 u\u017eduo\u010di\u0173 eil\u0117mis.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Nuspr\u0119skite, k\u0105 i\u0161 ties\u0173 matuosite skai\u010diuodami MTBF<\/h2>\n\n\n<p>Padalyti paprasta. Daugiau atidumo reikia norint u\u017etikrinti, kad veikimo valandos ir gedim\u0173 skai\u010dius b\u016bt\u0173 skai\u010diuojami pagal tuos pa\u010dius kriterijus. Prie\u0161 rengdami ataskait\u0105, su duomenis registruojan\u010diais \u017emon\u0117mis susitarkite d\u0117l keturi\u0173 dalyk\u0173.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Apibr\u0117\u017ekite vertinam\u0105 \u012frengin\u012f<\/h3>\n\n\n<p>Prad\u0117kite nuo konkretaus \u012frenginio arba ai\u0161kiai apibr\u0117\u017etos sistemos. Apdirbimo centras, jo suklys ir visas mechaninio apdirbimo padalinys \u2013 skirtingi vertinimo objektai, kuri\u0173 ribos skiriasi.<\/p>\n\n\n<p>Jei vertinate vis\u0105 \u012frengin\u012f, suklio gedimas, d\u0117l kurio \u012frenginys negali atlikti reikiamo darbo, laikomas \u012frenginio gedimu. Pakeitus suklio komponent\u0105 ir v\u0117l prad\u0117jus naudoti \u012frengin\u012f, jis netampa neremontuojamu gaminiu.<\/p>\n\n\n<p>MTBF galima skai\u010diuoti ir visai linijai, ta\u010diau linijos gedim\u0105 apibr\u0117\u017ekite kaip jos geb\u0117jimo atlikti reikiam\u0105 funkcij\u0105 praradim\u0105. Sud\u0117jus visus komponent\u0173 pavojaus signalus, tas pats linijos darbo nutr\u016bkimas gali b\u016bti suskai\u010diuotas kelis kartus.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Apibr\u0117\u017ekite gedim\u0105, o ne vien sustojim\u0105<\/h3>\n\n\n<p>Nurodykite reikiam\u0105 funkcij\u0105 ir \u012fvyk\u012f, kuris bus laikomas jos praradimu. Gedimu gali b\u016bti laikomas ir toks \u012frangos sutrikimas, d\u0117l kurio \u012frenginys nebeatitinka reikiam\u0173 veikimo s\u0105lyg\u0173, nors n\u0117ra visi\u0161kai i\u0161sijung\u0119s.<\/p>\n\n\n<p>Planin\u0117 technin\u0117 prie\u017ei\u016bra, \u012fprastas perderinimas kitam gaminiui, operatoriaus nebuvimas ir med\u017eiag\u0173 laukimas savaime n\u0117ra \u012frangos gedimai. \u0160iuos nuostolius registruokite, bet atskirkite juos nuo gedim\u0173 skai\u010diaus.<\/p>\n\n\n<p>Nuspr\u0119skite, kaip vertinsite trumpalaikius sutrikimus ir pakartotin\u012f \u012frangos b\u016bsenos atstatym\u0105. Keli pavojaus signal\u0173 \u012fra\u0161ai per vien\u0105 dar nepa\u0161alint\u0105 gedim\u0105 netur\u0117t\u0173 b\u016bti skai\u010diuojami kaip keli nepriklausomi gedimai. Naujas gedimas po to, kai veikimas i\u0161 ties\u0173 atkurtas, yra naujas \u012fvykis. I\u0161saugokite pirminius i\u0161samius duomenis, kad gal\u0117tum\u0117te tirti pasikartojan\u010dius sutrikimus, o ne pasl\u0117ptum\u0117te juos nustatydami, kokius \u012fvykius \u012ftraukti \u012f ataskait\u0105.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Pasirinkite, kok\u012f veikimo laik\u0105 skai\u010diuosite<\/h3>\n\n\n<p>\u0160iame vadove naudojamas <strong>pagal veikimo laik\u0105 skai\u010diuojamas MTBF<\/strong>: \u012ftraukiamos valandos, kuriomis vertinamas \u012frenginys i\u0161 tikr\u0173j\u0173 veikia pagal nustatytas matavimo ribas. Remonto ir kitas neveikimo laikas \u012f skaitikl\u012f ne\u012ftraukiamas. Rezultatas n\u0117ra vidutinis kalendorinis intervalas nuo vieno gedimo momento iki kito.<\/p>\n\n\n<p>Nurodykite, k\u0105 apima j\u016bs\u0173 naudojamas veikimo signalas. \u012ejungtos \u012frangos valand\u0173 skaitiklis, vykstan\u010dio ciklo signalas ir pamain\u0173, kuriomis dirba darbuotojai, kalendorius gali duoti skirtingas sumas. Jei j\u016bs\u0173 \u012frangai svarbiau cikl\u0173 ar paleidim\u0173 skai\u010dius nei veikimo valandos, \u0161\u012f rodikl\u012f steb\u0117kite kartu su valandomis, u\u017euot laik\u0119 juos lygiaver\u010diais.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Laikykit\u0117s t\u0173 pa\u010di\u0173 steb\u0117jimo laikotarpio rib\u0173<\/h3>\n\n\n<p>Veikimo valandoms ir gedimams taikykite t\u0105 pa\u010di\u0105 ataskaitinio laikotarpio prad\u017ei\u0105 ir pabaig\u0105. Gedimus skai\u010diuokite pagal tai, kada jie \u012fvyko \u0161iame laikotarpyje. Jei remontas baigtas \u0161\u012f m\u0117nes\u012f, o gedimas \u012fvyko pra\u0117jus\u012f, nelaikykite jo nauju \u0161io m\u0117nesio gedimu.<\/p>\n\n\n<p>\u012etraukite vis\u0105 faktin\u012f veikimo laik\u0105 per pasirinkt\u0105 laikotarp\u012f, taip pat ir t\u0105, po kurio iki ataskaitinio laikotarpio pabaigos gedimo nebuvo. Vertinate vis\u0105 per laikotarp\u012f steb\u0117t\u0105 veikim\u0105, o ne atrenkate tik tuos veikimo tarpsnius, kurie baig\u0117si gedimu. Skai\u010diuodami bendr\u0105 laikotarpio prastov\u0173 trukm\u0119, \u012ftraukite tik tas neprieinamumo valandas, kurios patenka \u012f \u0161\u012f laikotarp\u012f. Jei gedimas t\u0119siasi u\u017e laikotarpio rib\u0173, atskirai i\u0161saugokite vis\u0105 \u012fvykio ir veikimo atk\u016brimo \u012fra\u0161\u0105.<\/p>\n\n\n<p>Apie kiekvien\u0105 gedim\u0105 i\u0161saugokite \u012frenginio ID, gedimo laik\u0105, veikimo atk\u016brimo laik\u0105, pasteb\u0117t\u0105 po\u017eym\u012f arba gedimo pob\u016bd\u012f ir svarbias veikimo s\u0105lygas. \u0160ie duomenys padeda paai\u0161kinti gaut\u0105 vidurk\u012f.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kaip apskai\u010diuoti MTBF: gamybos pavyzdys<\/h2>\n\n\n<p>Tarkime, stebime vien\u0105 remontuojam\u0105 apdirbimo centr\u0105 per ataskaitin\u012f laikotarp\u012f, apimant\u012f 200 valand\u0173, kuriomis dirbo darbuotojai. Jo laiko apskaita i\u0161skaidoma taip, kaip parodyta toliau. Kategorijos nepersidengia, o keturi gedimai pagal sutart\u0105 apibr\u0117\u017eim\u0105 yra atskiri \u012frangos gedimai.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Laiko kategorija<\/th><th>Valandos per laikotarp\u012f<\/th><th>Kaip vertinama \u0161iame skai\u010diavime<\/th><\/tr><\/thead><tbody><tr><td>Planin\u0117 technin\u0117 prie\u017ei\u016bra<\/td><td>12<\/td><td>Ne veikimo laikas; ne gedimas<\/td><\/tr><tr><td>\u012eprastas paruo\u0161imas ir perderinimas<\/td><td>8<\/td><td>Ne veikimo laikas; ne gedimas<\/td><\/tr><tr><td>Med\u017eiag\u0173 laukimas, kai \u012frenginys neveikia<\/td><td>10<\/td><td>Ne veikimo laikas; ne \u012frangos gedimas<\/td><\/tr><tr><td>Neprieinamumas d\u0117l keturi\u0173 \u012frangos gedim\u0173<\/td><td>10<\/td><td>Ne veikimo laikas; i\u0161saugomas prastov\u0173 analizei<\/td><\/tr><tr><td>Faktinis veikimo laikas<\/td><td>160<\/td><td>MTBF skaitiklis<\/td><\/tr><tr><td>Visas laikas, kuriuo dirbo darbuotojai<\/td><td>200<\/td><td>Kontrolin\u0117 suma, ne skaitiklis<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Skai\u010diuojame taip:<\/p>\n\n\n<p><strong>160 veikimo valand\u0173 \u00f7 4 gedimai = 40 veikimo valand\u0173 vienam gedimui<\/strong><\/p>\n\n\n<p>Jei pradedate nuo viso laiko, kuriuo dirbo darbuotojai, pirmiausia atimkite neveikimo laik\u0105: 200 \u2212 12 \u2212 8 \u2212 10 \u2212 10 = 160 valand\u0173. Jei duomen\u0173 \u0161altinyje jau nurodyta 160 faktinio veikimo valand\u0173, naudokite \u0161\u012f skai\u010di\u0173 tiesiogiai. Dar kart\u0105 at\u0117m\u0119 prastovas, gautum\u0117te per ma\u017e\u0105 MTBF.<\/p>\n\n\n<p>\u0160is pavyzdys taip pat parodo, kod\u0117l vien pamain\u0173 kalendoriaus nepakanka. Padalij\u0119 200 valand\u0173, kuriomis dirbo darbuotojai, i\u0161 keturi\u0173, gautum\u0117te 50 valand\u0173 vienam gedimui, ta\u010diau \u012f \u0161\u012f rezultat\u0105 patekt\u0173 ir laikas, kai \u012frenginys neveik\u0117.<\/p>\n\n\n<p>Rezultat\u0105 pateikite su kontekstu: \u201e\u012erenginys MC-01, ataskaitinis laikotarpis, 160 veikimo valand\u0173, keturi gedimai, steb\u0117tas MTBF \u2013 40 valand\u0173.\u201c Lyginant su kitu laikotarpiu, skaitiklis ir gedim\u0173 skai\u010dius yra tokie pat svarb\u016bs kaip ir pats rodiklis.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kaip nei\u0161kreipti rezultato, kai gedim\u0173 n\u0117ra arba vertinami keli \u012frenginiai<\/h2>\n\n\n<h3 class=\"wp-block-heading\">K\u0105 daryti, jei gedim\u0173 nebuvo?<\/h3>\n\n\n<p>Nedalykite i\u0161 nulio ir nepateikite begalinio MTBF kaip tobulo patikimumo \u012frodymo. Ataskaitoje ra\u0161ykite \u201eper 160 veikimo valand\u0173 gedim\u0173 nepasteb\u0117ta\u201c, nurodydami faktin\u012f veikimo laik\u0105.<\/p>\n\n\n<p>Tai naudingi duomenys, ta\u010diau jie n\u0117ra lygiaver\u010diai keleriems metams darbo be gedim\u0173. Norint apskai\u010diuoti statistin\u0119 apatin\u0119 pasikliautin\u0105j\u0105 rib\u0105, reikia statistinio modelio ir pasirinkto pasikliovimo lygmens. \u012eprastoje gamybos ap\u017evalgoje s\u0105\u017einingiau nurodyti nulin\u012f gedim\u0173 skai\u010di\u0173 ir veikimo laik\u0105, nei i\u0161galvoti ta\u0161kin\u012f \u012fvert\u012f.<\/p>\n\n\n<h3 class=\"wp-block-heading\">K\u0105 daryti, jei naudojami keli\u0173 \u012frengini\u0173 duomenys?<\/h3>\n\n\n<p>Jei pana\u0161ius \u012frenginius pagr\u012fstai sujung\u0117te \u012f grup\u0119, skai\u010diuokite taip: <strong>bendra \u012frengini\u0173 veikimo valand\u0173 suma \u00f7 bendras gedim\u0173 skai\u010dius<\/strong>. Nedalykite vieno bendro kalendorinio laikotarpio i\u0161 vis\u0173 \u012frengini\u0173 gedim\u0173 skai\u010diaus ir neskai\u010diuokite atskir\u0173 j\u0173 MTBF reik\u0161mi\u0173 nesvertinio vidurkio.<\/p>\n\n\n<p>Pavyzd\u017eiui, tarkime, turime du pana\u0161ius \u012frenginius, kuri\u0173 duomenys registruojami pagal tas pa\u010dias taisykles. Vienas veik\u0117 160 valand\u0173 ir sugedo keturis kartus, kitas \u2013 240 valand\u0173 ir sugedo du kartus. Bendras rezultatas yra 400 \u00f7 6, arba ma\u017edaug 66,7 veikimo valandos vienam gedimui, o ne paprastas 40 ir 120 vidurkis, kuris b\u016bt\u0173 80.<\/p>\n\n\n<p>I\u0161saugokite ir atskir\u0173 \u012frengini\u0173 rezultatus. Bendras rodiklis gali pasl\u0117pti \u012frengin\u012f, keliant\u012f daugiausia gamybos problem\u0173. Skirtingos konstrukcijos, am\u017eiaus ar paskirties \u012frang\u0105 gali b\u016bti tikslinga suskirstyti \u012f atskiras grupes, o ne skai\u010diuoti vien\u0105 visos gamyklos patikimumo rodikl\u012f.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Prie\u0161 pasirinkdami veiksmus, \u012fvertinkite, k\u0105 rei\u0161kia MTBF<\/h2>\n\n\n<p>Didesnis steb\u0117tas MTBF rei\u0161kia, kad pagal nustatytas vertinimo ribas vienai veikimo valandai tenka ma\u017eiau u\u017eregistruot\u0173 gedim\u0173. Ar tai rodo pager\u0117jim\u0105, priklauso nuo to, kas dar pasikeit\u0117.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Lyginkite palyginamus duomenis<\/h3>\n\n\n<p>Lyginkite laikotarpius, kuriems taikomas vienodas gedimo apibr\u0117\u017eimas, vienodai skai\u010diuojamas faktinis veikimo laikas ir vertinamas tas pats \u012frenginys ar jo dalis. Tada \u012fvertinkite, kokie darbai buvo atliekami. Jei \u012frenginiu gaminamas lengviau apdorojam\u0173 gamini\u0173 asortimentas ir jis veikia kitokiomis apkrovomis, tai neb\u016btinai \u012frodo, kad technin\u0117s prie\u017ei\u016bros pakeitimas pasiteisino.<\/p>\n\n\n<p>Kartu su rodiklio tendencija pateikite faktin\u012f veikimo laik\u0105 ir gedim\u0173 skai\u010di\u0173. Vienas gedimas per trump\u0105 laikotarp\u012f gali smarkiai pakeisti vidurk\u012f. Ilgesni steb\u0117jimai naudingi, ta\u010diau sujungus keleri\u0173 met\u0173 duomenis, surinktus skirtingomis darbo s\u0105lygomis, galima nepasteb\u0117ti neseniai prasid\u0117jusio blog\u0117jimo. Vertinkite ne tik bendr\u0105 sukaupt\u0173 duomen\u0173 vidurk\u012f, bet ir naujausias tendencijas bei jas l\u0117musias s\u0105lygas.<\/p>\n\n\n<p>Visiems gamybos \u012frenginiams tinkamos \u201egeros MTBF reik\u0161m\u0117s\u201c n\u0117ra. Prasminga siektina reik\u0161m\u0117 nustatoma pagal palyginamus ankstesnius duomenis, reikiam\u0105 darbo re\u017eim\u0105 ir gedimo pasekmes. Auk\u0161ta \u012frenginio, kurio darb\u0105 lengva perkelti kitur, MTBF reik\u0161m\u0117 pristatymui laiku gali b\u016bti ma\u017eiau svarbi nei da\u017eni vienintelio \u012frenginio, galin\u010dio atlikti kritin\u0119 operacij\u0105, sustojimai.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Nelaikykite vidurkio laiku, likusiu iki kito gedimo<\/h3>\n\n\n<p>40 valand\u0173 MTBF nenurodo nei kito gedimo laiko, nei likusios \u012frenginio naudojimo trukm\u0117s. Gedimai gali \u012fvykti vienas netrukus po kito, o kai kurie nepertraukiamo veikimo laikotarpiai gali b\u016bti gerokai ilgesni u\u017e vidurk\u012f.<\/p>\n\n\n<p>Vien MTBF taip pat nepakanka prevencin\u0117s technin\u0117s prie\u017ei\u016bros intervalui pagr\u012fsti. Tinkami veiksmai priklauso nuo gedimo mechanizmo, \u012frenginio b\u016bkl\u0117s duomen\u0173, jo prie\u017ei\u016bros rekomendacij\u0173 ir gedimo pasekmi\u0173. Pavyzd\u017eiui, su am\u017eiumi susijus\u012f d\u0117v\u0117jim\u0105si ir protarpiais pasitaikan\u010di\u0105 tar\u0161\u0105 reikia tirti skirtingai, o bendras vidurkis neparodo, su kuria problema susid\u016br\u0117te.<\/p>\n\n\n<p>Blog\u0117jant rodikliui, per\u017ei\u016br\u0117kite j\u012f l\u0117musius gedimus ir kelkite konkretesnius klausimus: kokio pob\u016bd\u017eio gedimas kartojasi, kokiomis s\u0105lygomis ir koks pakeitimas pad\u0117t\u0173 j\u012f pa\u0161alinti? Atlik\u0119 numatytus darbus, patikrinkite, ar pana\u0161iomis darbo s\u0105lygomis problema pasikartoja.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Gedim\u0173 da\u017en\u012f vertinkite kartu su prarastu laiku<\/h3>\n\n\n<p>MTBF neparodo, kiek laiko po gedimo \u012frenginiu negalima gaminti. Du \u012frenginiai, kuri\u0173 MTBF vienodas, u\u017esakym\u0173 vykdym\u0105 gali paveikti labai skirtingai, jei vienas greitai v\u0117l pradeda veikti, o kitam tenka laukti specialisto ar detal\u0117s.<\/p>\n\n\n<p>Kartu su vidurkiu \u012fvertinkite bendr\u0105 prastov\u0173 d\u0117l gedim\u0173 laik\u0105 ir ilgesnius pavienius sustojimus. Taip pat patikrinkite, kaip jie paveik\u0117 tolesnius gamybos etapus. Trumpas sustojimas prie\u0161 pat vienintel\u012f laisv\u0105 laik\u0105 kritinei operacijai atlikti gali tur\u0117ti didesn\u0119 \u012ftak\u0105 pristatymui nei ilgesn\u0117 prastova, po kurios lieka pakankamai laiko atsilikimui kompensuoti.<\/p>\n\n\n<h2 class=\"wp-block-heading\">MTBF, MTTR ir MTTF skirtumai<\/h2>\n\n\n<p>\u0160ie rodikliai atsako \u012f skirtingus klausimus. Ai\u0161kiai nurodykite, koks objektas vertinamas ir kaip apibr\u0117\u017eiamas skai\u010diuojamas laikas, u\u017euot laik\u0119 \u0161ias santrumpas tarpusavyje pakei\u010diamais \u012fver\u010diais.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Rodiklis<\/th><th>\u012e kok\u012f klausim\u0105 atsako<\/th><th>Praktinis skirtumas<\/th><\/tr><\/thead><tbody><tr><td>MTBF: vidutinis laikas tarp gedim\u0173<\/td><td>Kiek remontuojamo \u012frenginio veikimo laiko teko vienam gedimui?<\/td><td>Po remonto \u012frenginys v\u0117l naudojamas.<\/td><\/tr><tr><td>MTTR: vidutinis remonto arba veikimo atk\u016brimo laikas<\/td><td>Kiek vidutini\u0161kai trunka remontas arba veikimo atk\u016brimas pagal pasirinkt\u0105 laiko apibr\u0117\u017eim\u0105?<\/td><td>Nurodykite, ar \u012f laik\u0105 \u012ftraukiamas laukimas, diagnostika, bandymai ir pakartotinis paleidimas, nes ataskaitose taikomos skirtingos skai\u010diavimo ribos.<\/td><\/tr><tr><td>MTTF: vidutinis laikas iki gedimo<\/td><td>Kiek laiko neremontuojamas gaminys ar komponentas veikia iki gedimo?<\/td><td>Taikomas gaminiui ar komponentui, kuris kei\u010diamas, o ne remontuojamas; \u0161is rodiklis savaime netaikomas visam \u012frenginiui, kuriame jis naudojamas.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Planuojant gamyb\u0105 svarbus visas laikas, kai \u012frenginio negalima naudoti, net jei remonto ataskaitoje skai\u010diuojamas tik tiesioginio darbo laikas. Komponent\u0105 pakeisti gali u\u017etrukti neilgai, ta\u010diau \u012frenginys gali neveikti gerokai ilgiau, kol komanda j\u012f gaus ir atliks patikras, b\u016btinas gamybai atnaujinti.<\/p>\n\n\n<p>\u0160is skirtumas padeda i\u0161vengti da\u017enos planavimo klaidos: vidutin\u0119 remonto trukm\u0119 laikyti pa\u017eadu, kad kiekvienas b\u016bsimas gedimas bus pa\u0161alintas per tiek pat laiko.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Remdamiesi patikimumo analiz\u0117s i\u0161vadomis, priimkite gamybos sprendimus su SkyPlanner<\/h2>\n\n\n<p>Tarkime, po tyrimo technin\u0117s prie\u017ei\u016bros komanda sutaria kit\u0105 tre\u010diadien\u012f apdirbimo centre atlikti tris valandas truksian\u010dius darbus. \u0160is prie\u017ei\u016brai skirtas laikas pasirinktas remiantis techniniu sprendimu, o ne pagal 40 valand\u0173 MTBF numatyta gedimo data.<\/p>\n\n\n<p>\u0160is susitarimas pakei\u010dia klient\u0173 u\u017esakymams vykdyti prieinamus paj\u0117gumus. Jei jis lieka tik technin\u0117s prie\u017ei\u016bros kalendoriuje, gamybos plane darbai ir toliau gali b\u016bti skiriami \u012frenginiui, kurio tuo metu nebus galima naudoti. Tuomet planuotojas \u0161\u012f neatitikim\u0105 pastebi jau m\u0117gindamas u\u017etikrinti tos savait\u0117s pristatymus.<\/p>\n\n\n<p>SkyPlanner sistemoje <a href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/gamybos-planavimas-irenginiu-prieziuros-metu\/\">\u012fra\u0161ykite sutart\u0105 laikotarp\u012f<\/a> kaip <strong>darbo centro i\u0161imt\u012f<\/strong>. D\u0117l \u0161ios i\u0161imties tuo laikotarpiu i\u0161teklius bus neprieinamas. Tada planavimui skirtas dirbtinis intelektas Arcturus gali perskai\u010diuoti operacij\u0173, kurias leid\u017eiama planuoti, grafik\u0105, atsi\u017evelgdamas \u012f pasikeitusius paj\u0117gumus ir nustatytus darbo centrus, pamainas, operacij\u0173 trukm\u0119, priklausomybes, prioritetus bei u\u017eraktus. Ganto diagramoje rodoma gauta operacij\u0173 seka.<\/p>\n\n\n<p>Planuodami tre\u010diadienio prie\u017ei\u016bros darbus, patikrinkite, ar po laukian\u010di\u0173 apdirbimo operacij\u0173 vis dar lieka laiko tolesnei patikrai ir surinkimui. Jei u\u017eduotis skiriama kitam tinkamam i\u0161tekliui, patikrinkite ir tai, kokiems kitiems \u012fsipareigojimams vykdyti tas i\u0161teklius jau numatytas. Laisvas laikas naudingas tik tada, kai operacij\u0105 i\u0161 ties\u0173 galima atlikti tuo i\u0161tekliumi, o likusius gamybos mar\u0161ruto etapus vis dar sp\u0117jama \u012fvykdyti.<\/p>\n\n\n<p>Tod\u0117l SkyPlanner yra naudingas kitas \u017eingsnis, kai patikimumui gerinti skirti darbai pakei\u010dia \u012frengini\u0173 prieinamum\u0105. Techninius ir komercinius sprendimus ir toliau priimate j\u016bs, o Arcturus atlieka <a href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/kas-yra-gamybos-planavimas\/\">tarpusavyje susijusi\u0173 operacij\u0173 planavimo skai\u010diavimus<\/a>. Ma\u017eiau laiko skiriama darb\u0173 eil\u0117ms perd\u0117lioti, o gamybos ir pardavimo komandos turi bendr\u0105 pagrind\u0105 likusiems sprendimams d\u0117l pristatymo priimti.<\/p>\n\n\n<p>Pasikeitus sutartam prie\u017ei\u016bros darb\u0173 laikui, atnaujinkite j\u012f plane. Perskai\u010diuokite grafik\u0105 ir per\u017ei\u016br\u0117kite paveiktus \u012fsipareigojimus, kad kita pamaina neb\u016bt\u0173 planuojama pagal pasenusi\u0105 prielaid\u0105 apie \u012frenginio prieinamum\u0105.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Su\u017einokite, kaip vieno \u012frenginio prieinamumas veikia j\u016bs\u0173 pristatymus<\/h2>\n\n\n<p>Naudinga MTBF analiz\u0117 padeda ai\u0161kiau nuspr\u0119sti, k\u0105 daryti toliau, o ne vien gauti skai\u010di\u0173. Apibr\u0117\u017ekite, kokiais duomenimis remiat\u0117s, i\u0161tirkite reik\u0161mingus gedimus ir sutart\u0105 paj\u0117gum\u0173 pokyt\u012f \u012ftraukite \u012f plan\u0105, kuriuo gamyba i\u0161 tikr\u0173j\u0173 vadovaujasi.<\/p>\n\n\n<p>Rinkit\u0117s SkyPlanner, kai \u0161\u012f pokyt\u012f reikia suderinti su klient\u0173 u\u017esakymais, rankiniu b\u016bdu neperd\u0117liojant kiekvieno susijusio \u012frenginio darb\u0173 eil\u0117s. Per atvir\u0105 REST API s\u0105saj\u0105 SkyPlanner integruojama su bet kuria ERP ar MES sistema, tod\u0117l planavim\u0105 galite tobulinti remdamiesi jau turima u\u017esakym\u0173 ir gamybos informacija.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/lt\/susisiekite-su-pardavejais\/\">U\u017esisakykite SkyPlanner pristatym\u0105<\/a> ir jam pasiruo\u0161kite vieno \u012frenginio pavyzd\u012f: sutart\u0105 laikotarp\u012f, kai jo nebus galima naudoti, ir juo vykdomus u\u017esakymus. Papra\u0161ykite parodyti, kurios operacijos perkeliamos, kaip tai paveikia tolesnius etapus ir d\u0117l kuri\u0173 pa\u017ead\u0117t\u0173 pristatymo termin\u0173 reikia priimti sprendim\u0105. Jei pirmiausia norite susipa\u017einti savaranki\u0161kai, <a href=\"https:\/\/skyplanner.ai\/lt\/bandymas\/\">i\u0161bandykite SkyPlanner su demonstraciniais duomenimis<\/a> ir pamatykite, kaip paj\u0117gum\u0173 pokytis pakei\u010dia gamybos grafik\u0105.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Vidutinis laikas tarp gedim\u0173: kaip skai\u010diuoti ir taikyti MTBF Prad\u017eia &raquo; I\u0161tekliai &raquo; Vidutinis laikas tarp gedim\u0173: kaip skai\u010diuoti ir taikyti MTBF Vidutinis laikas tarp gedim\u0173 (MTBF) \u2013 tai vidutinis remontuojamo \u012frenginio veikimo laikas, tenkantis vienam gedimui. Gamybos \u012frenginio MTBF apskai\u010diuojamas bendr\u0105 jo veikimo valand\u0173 skai\u010di\u0173 padalijus i\u0161 per t\u0105 pat\u012f steb\u0117jimo laikotarp\u012f u\u017eregistruot\u0173 \u012frenginio &#8230; <a title=\"Vidutinis laikas tarp gedim\u0173: kaip skai\u010diuoti ir taikyti MTBF\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/mtbf\/\" aria-label=\"Read more about Vidutinis laikas tarp gedim\u0173: kaip skai\u010diuoti ir taikyti MTBF\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":108771,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2532,301],"tags":[],"class_list":["post-108752","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-ir-planavimas","category-istekliai","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Vidutinis laikas tarp gedim\u0173: kaip skai\u010diuoti ir taikyti MTBF<\/title>\n<meta name=\"description\" content=\"Apskai\u010diuokite \u012frenginio MTBF pagal tikslias veikimo valandas ir gedim\u0173 skai\u010di\u0173. Remkit\u0117s juo gerindami patikimum\u0105 ir vykdydami gamybos \u012fsipareigojimus.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/mtbf\/\" \/>\n<meta property=\"og:locale\" content=\"lt_LT\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Vidutinis laikas tarp gedim\u0173: kaip skai\u010diuoti ir taikyti MTBF\" \/>\n<meta property=\"og:description\" content=\"Apskai\u010diuokite \u012frenginio MTBF pagal tikslias veikimo valandas ir gedim\u0173 skai\u010di\u0173. Remkit\u0117s juo gerindami patikimum\u0105 ir vykdydami gamybos \u012fsipareigojimus.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lt\/istekliai\/mtbf\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-24T12:48:10+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-24T12:49:05+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/mean-time-between-failures-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"12 minu\u010di\u0173\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/mtbf\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/mtbf\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Vidutinis laikas tarp gedim\u0173: kaip skai\u010diuoti ir taikyti MTBF\",\"datePublished\":\"2026-10-24T12:48:10+00:00\",\"dateModified\":\"2026-10-24T12:49:05+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/mtbf\\\/\"},\"wordCount\":2325,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/mtbf\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/mean-time-between-failures-hero.png\",\"articleSection\":[\"APS ir planavimas\",\"i\u0161tekliai\"],\"inLanguage\":\"lt-LT\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/mtbf\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/mtbf\\\/\",\"name\":\"Vidutinis laikas tarp gedim\u0173: kaip skai\u010diuoti ir taikyti MTBF\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/mtbf\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/mtbf\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/mean-time-between-failures-hero.png\",\"datePublished\":\"2026-10-24T12:48:10+00:00\",\"dateModified\":\"2026-10-24T12:49:05+00:00\",\"description\":\"Apskai\u010diuokite \u012frenginio MTBF pagal tikslias veikimo valandas ir gedim\u0173 skai\u010di\u0173. Remkit\u0117s juo gerindami patikimum\u0105 ir vykdydami gamybos \u012fsipareigojimus.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/mtbf\\\/#breadcrumb\"},\"inLanguage\":\"lt-LT\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/mtbf\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"lt-LT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/mtbf\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/mean-time-between-failures-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/mean-time-between-failures-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"A machining centre produces unequal runs of parts, interrupted by fault and repair symbols.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/mtbf\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Vidutinis laikas tarp gedim\u0173: kaip skai\u010diuoti ir taikyti MTBF\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lt-LT\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lt-LT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lt-LT\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Vidutinis laikas tarp gedim\u0173: kaip skai\u010diuoti ir taikyti MTBF","description":"Apskai\u010diuokite \u012frenginio MTBF pagal tikslias veikimo valandas ir gedim\u0173 skai\u010di\u0173. Remkit\u0117s juo gerindami patikimum\u0105 ir vykdydami gamybos \u012fsipareigojimus.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lt\/istekliai\/mtbf\/","og_locale":"lt_LT","og_type":"article","og_title":"Vidutinis laikas tarp gedim\u0173: kaip skai\u010diuoti ir taikyti MTBF","og_description":"Apskai\u010diuokite \u012frenginio MTBF pagal tikslias veikimo valandas ir gedim\u0173 skai\u010di\u0173. Remkit\u0117s juo gerindami patikimum\u0105 ir vykdydami gamybos \u012fsipareigojimus.","og_url":"https:\/\/skyplanner.ai\/lt\/istekliai\/mtbf\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-24T12:48:10+00:00","article_modified_time":"2026-10-24T12:49:05+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/mean-time-between-failures-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Jussi M\u00e4ntyl\u00e4","Est. reading time":"12 minu\u010di\u0173"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/mtbf\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/mtbf\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Vidutinis laikas tarp gedim\u0173: kaip skai\u010diuoti ir taikyti MTBF","datePublished":"2026-10-24T12:48:10+00:00","dateModified":"2026-10-24T12:49:05+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/mtbf\/"},"wordCount":2325,"publisher":{"@id":"https:\/\/skyplanner.ai\/lt\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/mtbf\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/mean-time-between-failures-hero.png","articleSection":["APS ir planavimas","i\u0161tekliai"],"inLanguage":"lt-LT"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/mtbf\/","url":"https:\/\/skyplanner.ai\/lt\/istekliai\/mtbf\/","name":"Vidutinis laikas tarp gedim\u0173: kaip skai\u010diuoti ir taikyti MTBF","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lt\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/mtbf\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/mtbf\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/mean-time-between-failures-hero.png","datePublished":"2026-10-24T12:48:10+00:00","dateModified":"2026-10-24T12:49:05+00:00","description":"Apskai\u010diuokite \u012frenginio MTBF pagal tikslias veikimo valandas ir gedim\u0173 skai\u010di\u0173. Remkit\u0117s juo gerindami patikimum\u0105 ir vykdydami gamybos \u012fsipareigojimus.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/mtbf\/#breadcrumb"},"inLanguage":"lt-LT","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lt\/istekliai\/mtbf\/"]}]},{"@type":"ImageObject","inLanguage":"lt-LT","@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/mtbf\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/mean-time-between-failures-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/mean-time-between-failures-hero.png","width":1672,"height":941,"caption":"A machining centre produces unequal runs of parts, interrupted by fault and repair symbols."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/mtbf\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lt\/"},{"@type":"ListItem","position":2,"name":"Vidutinis laikas tarp gedim\u0173: kaip skai\u010diuoti ir taikyti MTBF"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lt\/#website","url":"https:\/\/skyplanner.ai\/lt\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lt\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lt\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lt-LT"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lt\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lt\/","logo":{"@type":"ImageObject","inLanguage":"lt-LT","@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"lt-LT","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/mean-time-between-failures-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/mean-time-between-failures-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/mean-time-between-failures-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/mean-time-between-failures-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/mean-time-between-failures-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/mean-time-between-failures-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/mean-time-between-failures-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/mean-time-between-failures-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lt\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Vidutinis laikas tarp gedim\u0173: kaip skai\u010diuoti ir taikyti MTBF Prad\u017eia &raquo; I\u0161tekliai &raquo; Vidutinis laikas tarp gedim\u0173: kaip skai\u010diuoti ir taikyti MTBF Vidutinis laikas tarp gedim\u0173 (MTBF) \u2013 tai vidutinis remontuojamo \u012frenginio veikimo laikas, tenkantis vienam gedimui. Gamybos \u012frenginio MTBF apskai\u010diuojamas bendr\u0105 jo veikimo valand\u0173 skai\u010di\u0173 padalijus i\u0161 per t\u0105 pat\u012f steb\u0117jimo laikotarp\u012f u\u017eregistruot\u0173 \u012frenginio&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/posts\/108752","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/comments?post=108752"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/posts\/108752\/revisions"}],"predecessor-version":[{"id":108813,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/posts\/108752\/revisions\/108813"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/media\/108771"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/media?parent=108752"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/categories?post=108752"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/tags?post=108752"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}