{"id":107894,"date":"2026-10-23T19:50:04","date_gmt":"2026-10-23T19:50:04","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=107894"},"modified":"2026-10-23T19:50:56","modified_gmt":"2026-10-23T19:50:56","slug":"optimalus-uzsakymo-dydis","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/lt\/istekliai\/optimalus-uzsakymo-dydis\/","title":{"rendered":"Optimalus u\u017esakymo dydis: apskai\u010diuokite tinkamesn\u0119 pirkimo partij\u0105"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Optimalus u\u017esakymo dydis: apskai\u010diuokite tinkamesn\u0119 pirkimo partij\u0105<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/lt\/\">Prad\u017eia<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/\">I\u0161tekliai<\/a> &raquo; Optimalus u\u017esakymo dydis: apskai\u010diuokite tinkamesn\u0119 pirkimo partij\u0105<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Numatomas skaitymo laikas: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> minut\u0117s<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p><strong>Optimalus u\u017esakymo dydis (EOQ) \u2013 tai atsarg\u0173 papildymo kiekis, kuriam esant baziniame EOQ modelyje u\u017esakymo ir atsarg\u0173 laikymo s\u0105naud\u0173 suma yra ma\u017eiausia.<\/strong> Gamintojui, perkan\u010diam nuolat naudojam\u0105 komponent\u0105, jis atsako \u012f klausim\u0105: kiek u\u017esakyti kiekvien\u0105 kart\u0105, atsi\u017evelgiant \u012f sunaudojim\u0105 ir s\u0105naudas?<\/p>\n\n\n<p>Skai\u010diuojama pagal formul\u0119 <strong>EOQ = \u221a(2 \u00d7 D \u00d7 S \/ H)<\/strong>, kur D \u2013 metinis poreikis vienetais, S \u2013 pastoviosios vieno u\u017esakymo s\u0105naudos, o H \u2013 vieno vieneto laikymo s\u0105naudos per metus.<\/p>\n\n\n<p>Gautas kiekis yra naudingas atspirties ta\u0161kas, bet dar ne galutinis pirkimo sprendimas. Tiek\u0117jo pakuot\u0117s dydis ar minimalus u\u017esakymo kiekis gali lemti, kiek i\u0161 ties\u0173 galima u\u017esakyti. Be to, ekonomi\u0161ka pirkimo partija nepad\u0117s rytojaus gamybai, jei bus pristatyta tik kit\u0105 savait\u0119. SkyPlanner APS susieja numatomus med\u017eiag\u0173 pristatymus su gamybos u\u017esakymais, kuriems j\u0173 reikia. Taip pirkim\u0173 ir gamybos komandos gali dirbti pagal bendr\u0105 grafik\u0105, u\u017euot derinusios atskirus s\u0105ra\u0161us.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kod\u0117l u\u017esakant daugiau galima i\u0161leisti daugiau<\/h2>\n\n\n<p>Kiekvienas atsarg\u0173 papildymas kainuoja ne tik tiek, kiek patys komponentai: reikia parengti pirkimo u\u017esakym\u0105, \u012fforminti gavim\u0105 ir priimti siunt\u0105. Perkant didesniais kiekiais, u\u017esakym\u0173 b\u016bna ma\u017eiau, tad re\u010diau patiriamos \u0161ios pastoviosios s\u0105naudos.<\/p>\n\n\n<p>Ta\u010diau didesn\u0117s siuntos rei\u0161kia ir didesnes atsargas tarp papildym\u0173. Jose \u012f\u0161aldomos l\u0117\u0161os, patiriama sand\u0117liavimo, draudimo ir pasenimo s\u0105naud\u0173. Pirkti dvigubai daugiau neb\u016btinai ekonomi\u0161ka vien tod\u0117l, kad u\u017esakym\u0173 skai\u010dius suma\u017e\u0117ja perpus.<\/p>\n\n\n<p>EOQ padeda suderinti \u0161iuos du prie\u0161ingus veiksnius. Baziniame modelyje visa papildymo partija tampa tinkama naudoti vienu metu, o v\u0117liau atsargos tolygiai ma\u017e\u0117ja, nes sunaudojamos gamyboje. Tod\u0117l vidutin\u0117s ciklo atsargos lygios pusei u\u017esakomo kiekio. Jei reikia saugos atsarg\u0173, jos pridedamos atskirai ir \u012f \u0161\u012f pus\u0117s partijos skai\u010diavim\u0105 ne\u012ftraukiamos.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Teisingai nustatykite tris EOQ skai\u010diavimo rodiklius<\/h2>\n\n\n<p>Naudokite suderintus matavimo vienetus ir t\u0105 pat\u012f laikotarp\u012f. Metin\u012f poreik\u012f reikia derinti su metin\u0117mis laikymo s\u0105naudomis; m\u0117nesini\u0173 s\u0105naud\u0173 \u012f t\u0105 pat\u012f skai\u010diavim\u0105 negalima \u012fra\u0161yti j\u0173 neperskai\u010diavus.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Rodiklis<\/th><th>Reik\u0161m\u0117 perkant komponent\u0105<\/th><th>Matavimo vienetas<\/th><\/tr><\/thead><tbody><tr><td>D<\/td><td>Numatomas metinis komponento sunaudojimas<\/td><td>Vnt. per metus<\/td><\/tr><tr><td>S<\/td><td>Pastoviosios s\u0105naudos, patiriamos pateikiant vien\u0105 atsarg\u0173 papildymo u\u017esakym\u0105 ir priimant u\u017esakytas prekes<\/td><td>Valiutos vnt. vienam u\u017esakymui<\/td><\/tr><tr><td>H<\/td><td>Vieno vieneto laikymo s\u0105naudos per metus<\/td><td>Valiutos vnt. vienam vienetui per metus<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<h3 class=\"wp-block-heading\">D: skai\u010diuokite komponento sunaudojim\u0105, o ne pardavimo pajamas<\/h3>\n\n\n<p>Perkant guolius, D yra guoli\u0173 skai\u010dius, kur\u012f numatoma sunaudoti gamyboje per metus. Tai n\u0117ra \u012frengini\u0173, kuriuose jie naudojami, pardavimo vert\u0117. \u0160is skai\u010dius taip pat neb\u016btinai sutampa su pernai nupirktu kiekiu: priklausomai nuo pirkim\u0173 apimties, atsargos gal\u0117jo padid\u0117ti arba suma\u017e\u0117ti.<\/p>\n\n\n<p>\u012etraukite vis\u0173 gamini\u0173, kuriems naudojamas \u0161is komponentas, poreik\u012f ir atitinkamai \u012fvertinkite numatomus proceso nuostolius. Patikrinkite, ar metinis kiekis atspindi gana tolyg\u0173 sunaudojim\u0105. Jei komponentas naudojamas tik dviem dideliems klient\u0173 projektams, reikia pirkimo plano su konkre\u010diomis datomis, o ne i\u0161 metin\u0117s sumos i\u0161vesto tariamai tolygaus sunaudojimo.<\/p>\n\n\n<h3 class=\"wp-block-heading\">S: atskirkite u\u017esakymo s\u0105naudas nuo pirkimo kainos<\/h3>\n\n\n<p>S apima pastovi\u0105sias kiekvieno atsarg\u0173 papildymo s\u0105naudas, pavyzd\u017eiui, u\u017esakymo administravim\u0105, fiksuot\u0105 pristatymo mokest\u012f ir preki\u0173 pri\u0117mimo darbus. Tai n\u0117ra vis\u0173 u\u017esakyt\u0173 komponent\u0173 vert\u0117 s\u0105skaitoje.<\/p>\n\n\n<p>Vertinamam u\u017esakymui taikykite pagr\u012fstas s\u0105naudas. Jei keli\u0173 r\u016b\u0161i\u0173 prek\u0117s perkamos vienu u\u017esakymu arba ve\u017eamos vienu sunkve\u017eimiu, kiekvienai priskyrus visos siuntos s\u0105naudas, S bus per didelis. Taip pat nuo svorio priklausan\u010dio transportavimo mokes\u010dio negalima tiesiog laikyti pastoviosiomis vieno u\u017esakymo s\u0105naudomis. \u012evertis turi atitikti susitarimus su tiek\u0117ju ir preki\u0173 pri\u0117mimo tvark\u0105.<\/p>\n\n\n<h3 class=\"wp-block-heading\">H: procentin\u0119 atsarg\u0173 laikymo norm\u0105 i\u0161reik\u0161kite pinigais<\/h3>\n\n\n<p>Jei komponentas kainuoja $20, o metin\u0117 atsarg\u0173 laikymo s\u0105naud\u0173 norma yra 25%, atitinkamos laikymo s\u0105naudos yra:<\/p>\n\n\n<p><strong>H = $20 \u00d7 0,25 = $5 vienam komponentui per metus<\/strong><\/p>\n\n\n<p>\u012e EOQ formul\u0119 \u012fra\u0161ykite $5, o ne 25 ar 0,25. Nustatydami laikymo s\u0105naudas \u012ftraukite aktualias kapitalo, sand\u0117liavimo ir su atsargomis susijusios rizikos s\u0105naudas, ta\u010diau t\u0173 pa\u010di\u0173 s\u0105naud\u0173 ne\u012fskai\u010diuokite du kartus.<\/p>\n\n\n<p>Apskaitoje paskirstytos bendrosios s\u0105naudos dar nerei\u0161kia, kad perkant ma\u017eesn\u0119 partij\u0105 tiek pat bus sutaupyta pinig\u0173. Skai\u010diavimas naudingiausias tada, kai pirkim\u0173 ir finans\u0173 komandos sutaria, kurios s\u0105naudos i\u0161 ties\u0173 priklauso nuo pasirinkto kiekio.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Skai\u010diavimo pavyzdys: guoli\u0173 pirkimas gamybai<\/h2>\n\n\n<p>Tarkime, gamintojas perka standartin\u012f guol\u012f, naudojam\u0105 keliuose gaminiuose. Planuojant remiamasi \u0161iomis prielaidomis:<\/p>\n\n\n<ul class=\"wp-block-list\"><li>Metinis sunaudojimas D: <strong>12 000 guoli\u0173<\/strong>.<\/li><li>Pastoviosios u\u017esakymo s\u0105naudos S: <strong>$75 vienam atsarg\u0173 papildymui<\/strong>.<\/li><li>Vieneto pirkimo kaina: <strong>$20<\/strong>.<\/li><li>Metin\u0117 atsarg\u0173 laikymo s\u0105naud\u0173 norma: <strong>25%<\/strong>, taigi H yra <strong>$5 vienam guoliui<\/strong>.<\/li><\/ul>\n\n\n<p>Tai pavyzdiniai duomenys, o ne orientaciniai gamybos s\u0105naud\u0173 rodikliai ar SkyPlanner kliento rezultatai.<\/p>\n\n\n<p><strong>EOQ = \u221a[(2 \u00d7 12 000 \u00d7 75) \/ 5] = \u221a360 000 = 600 guoli\u0173<\/strong><\/p>\n\n\n<p>U\u017esakant po 600 guoli\u0173, pagal model\u012f gaunama 12,000 \/ 600 = <strong>20 u\u017esakym\u0173 per metus<\/strong>, o vidutin\u0117s ciklo atsargos yra 600 \/ 2 = <strong>300 guoli\u0173<\/strong>.<\/p>\n\n\n<p>Kad b\u016bt\u0173 ai\u0161ku, kod\u0117l 600 yra ekonomi\u0161kas kiekis, palyginkite metines s\u0105naudas, kurios kei\u010diasi priklausomai nuo u\u017esakomo kiekio Q:<\/p>\n\n\n<p><strong>Metin\u0117s u\u017esakymo s\u0105naudos = (D \/ Q) \u00d7 S<\/strong><\/p>\n\n\n<p><strong>Metin\u0117s ciklo atsarg\u0173 laikymo s\u0105naudos = (Q \/ 2) \u00d7 H<\/strong><\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>U\u017esakomas kiekis<\/th><th>Metin\u0117s u\u017esakymo s\u0105naudos<\/th><th>Metin\u0117s ciklo atsarg\u0173 laikymo s\u0105naudos<\/th><th>Bendra metini\u0173 s\u0105naud\u0173 suma<\/th><\/tr><\/thead><tbody><tr><td>300 guoli\u0173<\/td><td>$3 000<\/td><td>$750<\/td><td>$3 750<\/td><\/tr><tr><td>600 guoli\u0173<\/td><td>$1 500<\/td><td>$1 500<\/td><td>$3 000<\/td><\/tr><tr><td>900 guoli\u0173<\/td><td>$1 000<\/td><td>$2 250<\/td><td>$3 250<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Kai n\u0117ra papildom\u0173 ribojim\u0173, esant optimaliam kiekiui u\u017esakymo s\u0105naudos lygios ciklo atsarg\u0173 laikymo s\u0105naudoms. Padidinus kiek\u012f iki 900, u\u017esakymo s\u0105naudos suma\u017e\u0117ja, ta\u010diau laikymo s\u0105naudos i\u0161auga daugiau, nei sutaupoma.<\/p>\n\n\n<p>\u0160ie $3 000 <strong>n\u0117ra visos metin\u0117s guoli\u0173 pirkimo s\u0105naudos<\/strong>. U\u017e pa\u010dius guolius vis tiek mokama 12 000 \u00d7 $20 = $240 000 per metus. \u0160iame pavyzdyje \u0161i suma nepriklauso nuo u\u017esakymo dyd\u017eio, tod\u0117l nekei\u010dia optimalaus Q. Jei vieneto kaina priklauso nuo kiekio, j\u0105 b\u016btina v\u0117l \u012ftraukti \u012f palyginim\u0105.<\/p>\n\n\n<p>Tai ilgalaikiai metini\u0173 s\u0105naud\u0173 \u012fver\u010diai. Pavyzd\u017eiui, u\u017esakant po 900 vienet\u0173 gautas 13,33 u\u017esakymo per metus rezultatas nusako vidutin\u012f u\u017esakym\u0173 da\u017en\u012f, o ne reikalavim\u0105 pateikti dal\u012f pirkimo u\u017esakymo.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Pritaikykite apskai\u010diuot\u0105 kiek\u012f tiek\u0117jo s\u0105lygoms<\/h2>\n\n\n<p>Bazinis EOQ modelis remiasi prielaidomis, kad poreikis yra tolygus ir \u017einomas, u\u017esakymo bei laikymo s\u0105naudos nekinta, laikas nuo u\u017esakymo iki atsarg\u0173 papildymo yra pastovus, visa gauta partija tinkama naudoti ir atsarg\u0173 nepritr\u016bksta. Taip pat laikoma, kad n\u0117ra nei kiekio nuolaid\u0173, nei privalom\u0173 kiekio ribojim\u0173. Modeliu patikimiausia remtis perkant nuolat naudojamas prekes, kai j\u0173 pirkimo s\u0105lygos artimos \u0161ioms prielaidoms.<\/p>\n\n\n<p>Tada palyginkite kiekius, kuriuos i\u0161 ties\u0173 galite nupirkti.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Pakuo\u010di\u0173 dyd\u017eiai ir minimal\u016bs u\u017esakymo kiekiai<\/h3>\n\n\n<p>Tarkime, tiek\u0117jas guolius parduoda pakuot\u0117mis po 250. U\u017esakyti 600 guoli\u0173 negalima. Pagal t\u0105 pa\u010di\u0105 s\u0105naud\u0173 formul\u0119 palyginkite artimiausius kiekius, kuriuos sudaro pilnos pakuot\u0117s:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>500 guoli\u0173:<\/strong> $1 800 u\u017esakymo s\u0105naud\u0173 + $1 250 laikymo s\u0105naud\u0173 = <strong>$3 050 per metus<\/strong>.<\/li><li><strong>750 guoli\u0173:<\/strong> $1 200 u\u017esakymo s\u0105naud\u0173 + $1 875 laikymo s\u0105naud\u0173 = <strong>$3 075 per metus<\/strong>.<\/li><\/ul>\n\n\n<p>Jei n\u0117ra kit\u0173 ribojim\u0173, pagal \u0161\u012f model\u012f 500 vienet\u0173 partija kainuoja ma\u017eiau. Automati\u0161kai suapvalinus kiek\u012f \u012f didesn\u0119 pus\u0119, \u0161is rezultatas likt\u0173 nepasteb\u0117tas.<\/p>\n\n\n<p>Dabar tarkime, kad tiek\u0117jas dar ir nustato minimal\u0173 750 vienet\u0173 u\u017esakymo kiek\u012f. Tuomet 500 vienet\u0173 varianto rinktis nebegalima. Pasirinkus 750 vienet\u0173, metin\u0117s s\u0105naudos pagal model\u012f yra $75, arba 2,5%, didesn\u0117s nei optimalaus kiekio be ribojim\u0173 atveju. Tai ai\u0161kus pagrindas nuspr\u0119sti, ar verta der\u0117tis d\u0117l ma\u017eesnio minimalaus kiekio.<\/p>\n\n\n<p>MOQ yra tiek\u0117jo nustatyta apatin\u0117 kiekio riba. EOQ \u2013 pirk\u0117jo apskai\u010diuotas kiekis, kuriam esant s\u0105naudos ma\u017eiausios. \u0160ie rodikliai atsako \u012f skirtingus klausimus.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Kiekio nuolaidos ir pristatymo susitarimai<\/h3>\n\n\n<p>D\u0117l ma\u017eesn\u0117s vieneto kainos gali apsimok\u0117ti u\u017esakyti daugiau, ta\u010diau reikia palyginti bendr\u0105 poveik\u012f: metines pirkimo, u\u017esakymo, laikymo ir nuo kiekio priklausan\u010dias transportavimo s\u0105naudas. Remkit\u0117s faktine nuolaid\u0173 tvarka: kaina, taikoma kiekvienam vienetui, n\u0117ra tas pats, kas nuolaida tik nustatyt\u0105 rib\u0105 vir\u0161ijantiems vienetams.<\/p>\n\n\n<p>Kai bendrasis pirkimo u\u017esakymas vykdomas pagal kelis atskirus tiekimo nurodymus, kei\u010diasi ir tai, kas laikoma vienu u\u017esakymu skai\u010diuojant s\u0105naudas, ir fakti\u0161kai laikom\u0173 atsarg\u0173 kiekis. Jei prek\u0117s pristatomos ir mokes\u010diai taikomi atskirai, nelaikykite viso sutarties kiekio viena i\u0161kart gaunama siunta.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Sand\u0117liavimas, galiojimo laikas ir netolygus poreikis<\/h3>\n\n\n<p>Patikrinkite, ar partijai pakaks tinkamos sand\u0117liavimo vietos ir ar j\u0105 sp\u0117site sunaudoti iki galiojimo pabaigos, konstrukcijos pakeitimo arba tol, kol jos dar reik\u0117s klientui. Kiekis, kurio nepavyks sunaudoti, n\u0117ra ekonomi\u0161kas vien tod\u0117l, kad pagal supaprastint\u0105 s\u0105naud\u0173 kreiv\u0119 jis u\u017etikrina ma\u017eiausias s\u0105naudas.<\/p>\n\n\n<p>Jei poreikis sezoninis arba atsargos sunaudojamos dideliais kiekiais nereguliariais intervalais, planuokite poreik\u012f pagal laikotarpius ir taikykite tinkam\u0105 atsarg\u0173 papildymo politik\u0105. Kai poreikis ar tiekimo terminai neapibr\u0117\u017eti, saugos atsargas \u012fvertinkite atskirai. EOQ didinimas nepakei\u010dia b\u016btinyb\u0117s suprasti tr\u016bkumo rizik\u0105.<\/p>\n\n\n<h2 class=\"wp-block-heading\">EOQ parodo, kiek u\u017esakyti, o ne kada<\/h2>\n\n\n<p>Guoli\u0173 pavyzdyje per 250 darbo dien\u0173 sunaudojama 12 000 vienet\u0173, taigi <strong>48 guoliai per darbo dien\u0105<\/strong>. Tokiu tempu 600 guoli\u0173 partijos pakanka <strong>12,5 darbo dienos<\/strong>. Tai partijos sunaudojimo ciklas, o ne tiek\u0117jo u\u017esakymo \u012fvykdymo laikas.<\/p>\n\n\n<p>Kai atsarg\u0173 lygis stebimas nuolat, u\u017esakymo pateikimo riba paprastai nustatoma taip:<\/p>\n\n\n<p><strong>Pakartotinio u\u017esakymo ta\u0161kas = numatomas poreikis per atsarg\u0173 papildymo u\u017esakymo \u012fvykdymo laik\u0105 + saugos atsargos<\/strong><\/p>\n\n\n<p>Jei nuo u\u017esakymo iki papildyt\u0173 atsarg\u0173 parengimo naudoti praeina a\u0161tuonios darbo dienos, o \u0161iame pavyzdyje atskirai pasirenkamos 96 guoli\u0173 saugos atsargos:<\/p>\n\n\n<p><strong>Pakartotinio u\u017esakymo ta\u0161kas = (48 \u00d7 8) + 96 = 480 guoli\u0173<\/strong><\/p>\n\n\n<p>Dabar ai\u0161kiai atskirti du sprendimai: pagal \u0161i\u0105 politik\u0105 u\u017esakoma <strong>600<\/strong> guoli\u0173, kai pasiekiama <strong>480<\/strong> guoli\u0173 riba. 96 guoli\u0173 saugos atsargos pasirinktos tik pavyzd\u017eiui \u2013 jos nebuvo apskai\u010diuotos pagal EOQ. Neapibr\u0117\u017etumui padengti reikaling\u0105 atsarg\u0173 kiek\u012f \u012fvertinkite remdamiesi <a href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/saugos-atsargos\/\">saugos atsarg\u0173 vadovu<\/a>.<\/p>\n\n\n<p>\u0160i\u0105 rib\u0105 taikykite atsarg\u0173 pozicijai: prie turim\u0173 naudoti tinkam\u0173 atsarg\u0173 prid\u0117kite dar negautus papildymo u\u017esakymus ir atimkite kiek\u012f, kur\u012f jau turite pateikti arba esate rezervav\u0119 pagal savo atsarg\u0173 apskaitos taisykles. To paties \u012fsipareigojimo ne\u012fskai\u010diuokite du kartus. Vertinant tik sand\u0117lio likut\u012f, galima pakartotinai u\u017esakyti atsargas, kurios jau pakeliui.<\/p>\n\n\n<p>Ta\u010diau u\u017esakytos med\u017eiagos dar n\u0117ra parengtos naudoti. D\u0117l pateikto pirkimo u\u017esakymo atsarg\u0173 pozicija gali i\u0161likti didesn\u0117 u\u017e u\u017esakymo rib\u0105, nors numatoma gavimo data yra per v\u0117lyva kliento u\u017esakymui \u012fvykdyti. Kiek\u012f ir gavimo laik\u0105 b\u016btina tikrinti kartu.<\/p>\n\n\n<h2 class=\"wp-block-heading\">O jei atsarg\u0173 papildymo partij\u0105 gaminate patys?<\/h2>\n\n\n<p>Taikykite <a href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/ekonominis-gamybos-partijos-dydis\/\">ekonomin\u012f gamybos partijos dyd\u012f<\/a> (EPQ), kai atsargos papildomos palaipsniui ir tuo pat metu toliau naudojamos. Taip b\u016bna, pavyzd\u017eiui, kai reguliariai gaminamas komponentas \u012f sand\u0117l\u012f perduodamas dalimis. EPQ \u012fvertina gamybos ir sunaudojimo temp\u0173 santyk\u012f, o bazinis EOQ modelis remiasi prielaida, kad visa partija tampa prieinama naudoti vienu metu.<\/p>\n\n\n<p>Lemiamas skirtumas yra tai, kaip atsargos tampa tinkamos naudoti, o ne vien tai, ar u\u017esakymas vadinamas vidiniu, ar i\u0161oriniu. Jei tiek\u0117jas pristato dalimis arba pagaminta partija sulaikoma iki galutinio kokyb\u0117s patvirtinimo, gali reik\u0117ti kitokio modelio, nei b\u016bt\u0173 galima spr\u0119sti vien i\u0161 u\u017esakymo pavadinimo.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Susiekite suplanuot\u0105 atsarg\u0173 gavim\u0105 su gamyba naudodami SkyPlanner<\/h2>\n\n\n<p>Tarkime, 600 guoli\u0173 tikimasi gauti pirmadien\u012f. J\u0173 reikia dviem klient\u0173 u\u017esakymams, kurie kartu su kitais darbais konkuruoja d\u0117l mechaninio apdirbimo ir surinkimo paj\u0117gum\u0173. Tiek\u0117jas nukelia pristatym\u0105 \u012f ketvirtadien\u012f. Perkamas kiekis nesikei\u010dia, ta\u010diau pirmadienio gamybos planas jau nebeatitinka realyb\u0117s.<\/p>\n\n\n<p>Atnaujinus vien pirkim\u0173 s\u0105ra\u0161\u0105, darb\u0173 eil\u0117s prie \u012frengini\u0173 ir klientams pa\u017ead\u0117ti pristatymo terminai lieka nesuderinti. SkyPlanner \u0161iuos ry\u0161ius sujungia <a href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/kas-yra-gamybos-planavimas\/\">bendrame gamybos grafike<\/a>.<\/p>\n\n\n<p>Pirkimo u\u017esakymuose nurodomi med\u017eiag\u0173 kiekiai ir pristatymo datos. Pristatymo data rodo, kada med\u017eiagos tur\u0117t\u0173 b\u016bti prieinamos, o patvirtinus gavim\u0105 b\u016bsena \u201ePristatyta\u201c atnaujinamas atsarg\u0173 likutis. \u012ejungus planavim\u0105, kuriame atsi\u017evelgiama \u012f med\u017eiagas, j\u0173 prieinamumas daro \u012ftak\u0105 tam, kaip SkyPlanner dirbtinio intelekto planavimo modulis Arcturus sudaro darb\u0173 grafik\u0105 pagal nustatytus paj\u0117gumus, operacij\u0173 priklausomybes ir prioritetus.<\/p>\n\n\n<p>\u012era\u0161ykite pakeist\u0105 gavimo dat\u0105 ir perskai\u010diuokite grafik\u0105. Tuomet susijusius darbo u\u017esakymus galima suderinti su tiek\u0117jo nurodyta data, o Gantt rodinyje j\u0173 laikas matomas greta kit\u0173 gamybos darb\u0173. U\u017euot perk\u0117lin\u0117j\u0119s kiekvien\u0105 priklausom\u0105 operacij\u0105 tarp atskir\u0173 eili\u0173, planuotojas gali sutelkti d\u0117mes\u012f \u012f sprendim\u0105: paspartinti komponento pristatym\u0105, pakeisti prioritetus, rasti alternatyv\u0173 tiekimo \u0161altin\u012f arba patikslinti klientui pa\u017ead\u0117t\u0105 pristatymo termin\u0105.<\/p>\n\n\n<p>Tod\u0117l verta papildyti savo pirkim\u0173 politik\u0105 SkyPlanner: <strong>ma\u017eiau rankinio med\u017eiag\u0173 plano ir gamybos grafiko derinimo, o gavimo datos poky\u010di\u0173 poveikis klient\u0173 u\u017esakymams matomas anks\u010diau.<\/strong> Pirkim\u0173 specialistai nustato ekonomi\u0161k\u0105, sutarties s\u0105lygas atitinkant\u012f partijos dyd\u012f. Bendras grafikas parodo \u0161io sprendimo pasekmes gamybai.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/lt\/klientu-istorijos\/eskomatic\/\">Eskomatic atsiliepimas apie SkyPlanner<\/a> parodo, kod\u0117l toks matomumas svarbus. \u0160i mechaninio apdirbimo pagal u\u017esakymus \u012fmon\u0117 anks\u010diau daugiausia r\u0117m\u0117si rankiniu b\u016bdu sudaromomis darb\u0173 eil\u0117mis, o med\u017eiag\u0173 tr\u016bkumas kartais paai\u0161k\u0117davo likus pernelyg ma\u017eai laiko iki suplanuotos darb\u0173 prad\u017eios. \u012emon\u0117 teigia, kad prad\u0117jus planuoti su ERP susietame Gantt grafike ir ai\u0161kiau matyti med\u017eiag\u0173 prieinamum\u0105, suma\u017e\u0117jo gamybos prastov\u0173 d\u0117l tr\u016bkstam\u0173 med\u017eiag\u0173, o pristatymo datos nustatomos tiksliau. Ai\u0161kesn\u0117 informacija apie med\u017eiagas suteikia komandai patikimesn\u012f pagrind\u0105 kasdieniam planui.<\/p>\n\n\n<p>SkyPlanner per atvir\u0105 REST API integruojasi su bet kuria ERP ar MES sistema, tod\u0117l j\u016bs\u0173 esam\u0173 sistem\u0173 pirkim\u0173 ir u\u017esakym\u0173 duomenis galima naudoti bendram, su jais susietam gamybos grafikui sudaryti.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Pritaikykite pasirinkt\u0105 u\u017esakymo dyd\u012f praktikoje<\/h2>\n\n\n<p>Planuodami perkam\u0173 atsarg\u0173 papildym\u0105, prad\u0117kite nuo EOQ, palyginkite tiek\u0117jo s\u0105lygas atitinkan\u010dius kiekius ir atskirai nustatykite u\u017esakymo pateikimo rib\u0105. Tada susiekite numatom\u0105 gavim\u0105 su u\u017esakymais, kuriems tos atsargos bus sunaudotos. <a href=\"https:\/\/skyplanner.ai\/lt\/susisiekite-su-pardavejais\/\">U\u017esisakykite SkyPlanner demonstracij\u0105<\/a> ir pasitelk\u0119 vien\u0105 perkam\u0105 komponent\u0105, numatom\u0105 jo gavimo dat\u0105 bei du nuo jo priklausan\u010dius klient\u0173 u\u017esakymus pamatykite, kaip \u0161is ry\u0161ys kei\u010dia gamybos plan\u0105. Jei pirmiausia norite susipa\u017einti savaranki\u0161kai, <a href=\"https:\/\/skyplanner.ai\/lt\/bandymas\/\">i\u0161bandykite SkyPlanner su demonstraciniais duomenimis<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Optimalus u\u017esakymo dydis: apskai\u010diuokite tinkamesn\u0119 pirkimo partij\u0105 Prad\u017eia &raquo; I\u0161tekliai &raquo; Optimalus u\u017esakymo dydis: apskai\u010diuokite tinkamesn\u0119 pirkimo partij\u0105 Optimalus u\u017esakymo dydis (EOQ) \u2013 tai atsarg\u0173 papildymo kiekis, kuriam esant baziniame EOQ modelyje u\u017esakymo ir atsarg\u0173 laikymo s\u0105naud\u0173 suma yra ma\u017eiausia. Gamintojui, perkan\u010diam nuolat naudojam\u0105 komponent\u0105, jis atsako \u012f klausim\u0105: kiek u\u017esakyti kiekvien\u0105 kart\u0105, atsi\u017evelgiant \u012f &#8230; <a title=\"Optimalus u\u017esakymo dydis: apskai\u010diuokite tinkamesn\u0119 pirkimo partij\u0105\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/optimalus-uzsakymo-dydis\/\" aria-label=\"Read more about Optimalus u\u017esakymo dydis: apskai\u010diuokite tinkamesn\u0119 pirkimo partij\u0105\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":107916,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2560,301],"tags":[],"class_list":["post-107894","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-gamybos-efektyvumas","category-istekliai","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Optimalus u\u017esakymo dydis: raskite tinkamesn\u0119 pirkimo partij\u0105<\/title>\n<meta name=\"description\" content=\"Raskite optimal\u0173 nuolat naudojamo komponento u\u017esakymo dyd\u012f, patikrinkite tiek\u0117jo ribojimus ir susiekite jo gavim\u0105 su gamybos u\u017esakymais, kuriems jo reikia.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/optimalus-uzsakymo-dydis\/\" \/>\n<meta property=\"og:locale\" content=\"lt_LT\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Optimalus u\u017esakymo dydis: apskai\u010diuokite tinkamesn\u0119 pirkimo partij\u0105\" \/>\n<meta property=\"og:description\" content=\"Raskite optimal\u0173 nuolat naudojamo komponento u\u017esakymo dyd\u012f, patikrinkite tiek\u0117jo ribojimus ir susiekite jo gavim\u0105 su gamybos u\u017esakymais, kuriems jo reikia.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lt\/istekliai\/optimalus-uzsakymo-dydis\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-23T19:50:04+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-23T19:50:56+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-order-quantity-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1776\" \/>\n\t<meta property=\"og:image:height\" content=\"999\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"11 minu\u010di\u0173\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/optimalus-uzsakymo-dydis\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/optimalus-uzsakymo-dydis\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Optimalus u\u017esakymo dydis: apskai\u010diuokite tinkamesn\u0119 pirkimo partij\u0105\",\"datePublished\":\"2026-10-23T19:50:04+00:00\",\"dateModified\":\"2026-10-23T19:50:56+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/optimalus-uzsakymo-dydis\\\/\"},\"wordCount\":2244,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/optimalus-uzsakymo-dydis\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/economic-order-quantity-hero.png\",\"articleSection\":[\"Gamybos efektyvumas\",\"i\u0161tekliai\"],\"inLanguage\":\"lt-LT\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/optimalus-uzsakymo-dydis\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/optimalus-uzsakymo-dydis\\\/\",\"name\":\"Optimalus u\u017esakymo dydis: raskite tinkamesn\u0119 pirkimo partij\u0105\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/optimalus-uzsakymo-dydis\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/optimalus-uzsakymo-dydis\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/economic-order-quantity-hero.png\",\"datePublished\":\"2026-10-23T19:50:04+00:00\",\"dateModified\":\"2026-10-23T19:50:56+00:00\",\"description\":\"Raskite optimal\u0173 nuolat naudojamo komponento u\u017esakymo dyd\u012f, patikrinkite tiek\u0117jo ribojimus ir susiekite jo gavim\u0105 su gamybos u\u017esakymais, kuriems jo reikia.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/optimalus-uzsakymo-dydis\\\/#breadcrumb\"},\"inLanguage\":\"lt-LT\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/optimalus-uzsakymo-dydis\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"lt-LT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/optimalus-uzsakymo-dydis\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/economic-order-quantity-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/economic-order-quantity-hero.png\",\"width\":1776,\"height\":999,\"caption\":\"A balance scale weighs a delivery parcel and purchase paperwork against boxes of components and a bearing.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/optimalus-uzsakymo-dydis\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Optimalus u\u017esakymo dydis: apskai\u010diuokite tinkamesn\u0119 pirkimo partij\u0105\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lt-LT\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lt-LT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lt-LT\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Optimalus u\u017esakymo dydis: raskite tinkamesn\u0119 pirkimo partij\u0105","description":"Raskite optimal\u0173 nuolat naudojamo komponento u\u017esakymo dyd\u012f, patikrinkite tiek\u0117jo ribojimus ir susiekite jo gavim\u0105 su gamybos u\u017esakymais, kuriems jo reikia.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lt\/istekliai\/optimalus-uzsakymo-dydis\/","og_locale":"lt_LT","og_type":"article","og_title":"Optimalus u\u017esakymo dydis: apskai\u010diuokite tinkamesn\u0119 pirkimo partij\u0105","og_description":"Raskite optimal\u0173 nuolat naudojamo komponento u\u017esakymo dyd\u012f, patikrinkite tiek\u0117jo ribojimus ir susiekite jo gavim\u0105 su gamybos u\u017esakymais, kuriems jo reikia.","og_url":"https:\/\/skyplanner.ai\/lt\/istekliai\/optimalus-uzsakymo-dydis\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-23T19:50:04+00:00","article_modified_time":"2026-10-23T19:50:56+00:00","og_image":[{"width":1776,"height":999,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-order-quantity-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Jussi M\u00e4ntyl\u00e4","Est. reading time":"11 minu\u010di\u0173"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/optimalus-uzsakymo-dydis\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/optimalus-uzsakymo-dydis\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Optimalus u\u017esakymo dydis: apskai\u010diuokite tinkamesn\u0119 pirkimo partij\u0105","datePublished":"2026-10-23T19:50:04+00:00","dateModified":"2026-10-23T19:50:56+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/optimalus-uzsakymo-dydis\/"},"wordCount":2244,"publisher":{"@id":"https:\/\/skyplanner.ai\/lt\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/optimalus-uzsakymo-dydis\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-order-quantity-hero.png","articleSection":["Gamybos efektyvumas","i\u0161tekliai"],"inLanguage":"lt-LT"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/optimalus-uzsakymo-dydis\/","url":"https:\/\/skyplanner.ai\/lt\/istekliai\/optimalus-uzsakymo-dydis\/","name":"Optimalus u\u017esakymo dydis: raskite tinkamesn\u0119 pirkimo partij\u0105","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lt\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/optimalus-uzsakymo-dydis\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/optimalus-uzsakymo-dydis\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-order-quantity-hero.png","datePublished":"2026-10-23T19:50:04+00:00","dateModified":"2026-10-23T19:50:56+00:00","description":"Raskite optimal\u0173 nuolat naudojamo komponento u\u017esakymo dyd\u012f, patikrinkite tiek\u0117jo ribojimus ir susiekite jo gavim\u0105 su gamybos u\u017esakymais, kuriems jo reikia.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/optimalus-uzsakymo-dydis\/#breadcrumb"},"inLanguage":"lt-LT","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lt\/istekliai\/optimalus-uzsakymo-dydis\/"]}]},{"@type":"ImageObject","inLanguage":"lt-LT","@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/optimalus-uzsakymo-dydis\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-order-quantity-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-order-quantity-hero.png","width":1776,"height":999,"caption":"A balance scale weighs a delivery parcel and purchase paperwork against boxes of components and a bearing."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/optimalus-uzsakymo-dydis\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lt\/"},{"@type":"ListItem","position":2,"name":"Optimalus u\u017esakymo dydis: apskai\u010diuokite tinkamesn\u0119 pirkimo partij\u0105"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lt\/#website","url":"https:\/\/skyplanner.ai\/lt\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lt\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lt\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lt-LT"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lt\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lt\/","logo":{"@type":"ImageObject","inLanguage":"lt-LT","@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"lt-LT","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-order-quantity-hero.png",1776,999,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-order-quantity-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-order-quantity-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-order-quantity-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-order-quantity-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-order-quantity-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-order-quantity-hero.png",1776,999,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-order-quantity-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lt\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Optimalus u\u017esakymo dydis: apskai\u010diuokite tinkamesn\u0119 pirkimo partij\u0105 Prad\u017eia &raquo; I\u0161tekliai &raquo; Optimalus u\u017esakymo dydis: apskai\u010diuokite tinkamesn\u0119 pirkimo partij\u0105 Optimalus u\u017esakymo dydis (EOQ) \u2013 tai atsarg\u0173 papildymo kiekis, kuriam esant baziniame EOQ modelyje u\u017esakymo ir atsarg\u0173 laikymo s\u0105naud\u0173 suma yra ma\u017eiausia. Gamintojui, perkan\u010diam nuolat naudojam\u0105 komponent\u0105, jis atsako \u012f klausim\u0105: kiek u\u017esakyti kiekvien\u0105 kart\u0105, atsi\u017evelgiant \u012f&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/posts\/107894","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/comments?post=107894"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/posts\/107894\/revisions"}],"predecessor-version":[{"id":107957,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/posts\/107894\/revisions\/107957"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/media\/107916"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/media?parent=107894"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/categories?post=107894"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/tags?post=107894"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}