{"id":104570,"date":"2026-10-20T19:34:39","date_gmt":"2026-10-20T19:34:39","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=104570"},"modified":"2026-10-20T19:35:37","modified_gmt":"2026-10-20T19:35:37","slug":"pirmojo-perejimo-iseiga","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/lt\/istekliai\/pirmojo-perejimo-iseiga\/","title":{"rendered":"Pirmojo per\u0117jimo i\u0161eiga: formul\u0117, pavyzdys ir nematomas taisymas"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Pirmojo per\u0117jimo i\u0161eiga: formul\u0117, pavyzdys ir nematomas taisymas<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/lt\/\">Prad\u017eia<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/\">I\u0161tekliai<\/a> &raquo; Pirmojo per\u0117jimo i\u0161eiga: formul\u0117, pavyzdys ir nematomas taisymas<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Numatomas skaitymo laikas: <\/span><span class=\"yoast-reading-time__reading-time\">9<\/span><span class=\"yoast-reading-time__time-unit\"> minut\u0117s<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Pirmojo per\u0117jimo i\u0161eiga (FPY) \u2013 tai procentin\u0117 gamini\u0173 dalis, kuri apibr\u0117\u017etame procese i\u0161 pirmo karto atitinka sutartus kokyb\u0117s reikalavimus, be remonto, taisymo ar pakartotinio bandymo po nes\u0117km\u0117s. \u0160is rodiklis parodo, kokia produkcijos dalis buvo tinkama i\u0161 karto, o ne kokia galiausiai tapo tinkama.<\/p>\n\n\n<p>\u0160is skirtumas svarbus, kai pagamintos produkcijos kiekis atrodo pakankamas, ta\u010diau gamykla vos sp\u0117ja vykdyti u\u017esakymus. Pataisytas detales vis tiek galima i\u0161si\u0173sti, bet joms paruo\u0161ti sunaudotas laikas, kurio reik\u0117jo kitiems u\u017esakymams. Stebint FPY kartu su taisymui skirtomis pastangomis, i\u0161ry\u0161k\u0117ja tai, ko neparodo bendras tinkamos produkcijos kiekis. Susiej\u0119 \u0161iuos darbus su SkyPlanner gamybos \u012fra\u0161ais ir tvarkara\u0161\u010di\u0173 sudarymu, lengviau \u012fvertinsite j\u0173 poveik\u012f paj\u0117gumams ir pristatymams.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kaip apskai\u010diuoti pirmojo per\u0117jimo i\u0161eig\u0105<\/h2>\n\n\n<p>Naudokite \u0161i\u0105 formul\u0119:<\/p>\n\n\n<p><strong>Pirmojo per\u0117jimo i\u0161eiga (%) = I\u0161 pirmo karto priimt\u0173 gamini\u0173 skai\u010dius \u00f7 \u012e apibr\u0117\u017et\u0105 proces\u0105 patekusi\u0173 gamini\u0173 skai\u010dius \u00d7 100<\/strong><\/p>\n\n\n<p>Skai\u010diuokite atskirus gaminius, o ne patikras ar pavienius defektus. Detal\u0117, kuri i\u0161 prad\u017ei\u0173 neatitiko reikalavim\u0173, bet po taisymo buvo priimta, \u012fskai\u010diuojama \u012f galutin\u0119 tinkam\u0105 produkcij\u0105, ta\u010diau nelaikoma tinkama i\u0161 pirmo karto. Kelis defektus turinti detal\u0117 \u0161iame skai\u010diavime vis tiek laikoma vienu netinkamu gaminiu.<\/p>\n\n\n<p>Prie\u0161 rinkdami duomenis, apibr\u0117\u017ekite vertinamo proceso ribas. Galite vertinti mechaninio apdirbimo operacij\u0105, bandym\u0173 darbo viet\u0105 arba vis\u0105 gamybos mar\u0161rut\u0105. Skaitiklis ir vardiklis turi apimti t\u0105 pa\u010di\u0105 gamini\u0173 grup\u0119 ties pasirinkta proceso riba.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Pavyzdys: 90% pirmojo per\u0117jimo i\u0161eiga ir 96% galutin\u0117 i\u0161eiga<\/h3>\n\n\n<p>Tarkime, turime 500 mechani\u0161kai apdirbt\u0173 detali\u0173 partij\u0105 ir \u017einome vis\u0173 detali\u0173 pirmosios patikros rezultatus:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Pirmojo bandymo rezultatas<\/th><th>Detali\u0173 skai\u010dius<\/th><th>Kas vyksta toliau<\/th><\/tr><\/thead><tbody><tr><td>Priimtos be taisymo<\/td><td>450<\/td><td>Paruo\u0161tos kitai operacijai<\/td><\/tr><tr><td>Perduotos taisyti<\/td><td>40<\/td><td>30 v\u0117liau priimamos; 10 galiausiai nura\u0161omos kaip brokas<\/td><\/tr><tr><td>I\u0161 karto nura\u0161ytos kaip brokas<\/td><td>10<\/td><td>Negali b\u016bti perduotos toliau<\/td><\/tr><tr><td>I\u0161 viso operacijai pateikta detali\u0173<\/td><td>500<\/td><td>Kiekviena detal\u0117 turi vien\u0105 pirmojo bandymo rezultat\u0105<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Pirmojo per\u0117jimo i\u0161eiga:<\/p>\n\n\n<p><strong>450 \u00f7 500 \u00d7 100 = 90%<\/strong><\/p>\n\n\n<p>Po taisymo priimt\u0173 detali\u0173 yra 480: pradin\u0117s 450 ir dar 30 s\u0117kmingai pataisyt\u0173 detali\u0173. Taigi galutin\u0117 \u0161ios partijos i\u0161eiga:<\/p>\n\n\n<p><strong>480 \u00f7 500 \u00d7 100 = 96%<\/strong><\/p>\n\n\n<p>Abu rodikliai naudingi. FPY apib\u016bdina pirmojo bandymo rezultatus. Galutin\u0117 i\u0161eiga parodo, kokia dalis galiausiai buvo priimta, \u012fskaitant s\u0117kmingai pataisytas detales. Ataskaitoje nurod\u017eius tik 96%, lieka nematomi taisymo darbai, kuri\u0173 reik\u0117jo toms 30 detali\u0173 i\u0161saugoti.<\/p>\n\n\n<p>FPY skai\u010diavime lik\u0119 10% taip pat n\u0117ra broko dalis. \u0160iame pavyzdyje galiausiai nura\u0161oma 20 detali\u0173, tad galutin\u0117 broko dalis yra 4%. Kiti 6% pradin\u0117s partijos tapo tinkami atlikus papildomus darbus. At\u0117m\u0119 vien broko dal\u012f, gautume galutin\u0119, o ne pirmojo per\u0117jimo i\u0161eig\u0105.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Prie\u0161 pasikliaudami procentiniu rodikliu, nustatykite teisingas skai\u010diavimo taisykles<\/h2>\n\n\n<p>Pati aritmetika paprasta. Daugiau atidumo reikia norint i\u0161saugoti \u201epirmojo bandymo\u201c prasm\u0119, ypa\u010d kai gamybos ir patikr\u0173 \u012fra\u0161ai gaunami i\u0161 skirting\u0173 sistem\u0173.<\/p>\n\n\n<p>1. <strong>Pasirinkite vien\u0105 proces\u0105 ir palyginam\u0173 gamini\u0173 grup\u0119.<\/strong> Tinkamas rezultatas i\u0161 pirmo karto mechaninio apdirbimo etape dar nerei\u0161kia galutinio viso surinkto gaminio pri\u0117mimo. Ai\u0161kiai apibr\u0117\u017ekite mar\u0161rutus ir pri\u0117mimo reikalavimus, kad gamini\u0173 asortimento pokytis neb\u016bt\u0173 klaidingai palaikytas kokyb\u0117s pager\u0117jimu.<\/p>\n\n\n<p>2. <strong>Susiekite pradin\u0119 gamini\u0173 grup\u0119 su jos rezultatais.<\/strong> Prad\u0117kite nuo partijos ar kitos atsekamos grup\u0117s, kurios pirmojo bandymo rezultatai \u017einomi. \u0160iandien u\u017ebaigt\u0173 ir priimt\u0173 gamini\u0173 skai\u010di\u0173 dalydami i\u0161 \u0161iandien prad\u0117t\u0173 gaminti gamini\u0173 skai\u010diaus, galite sumai\u0161yti skirtingas detales, ypa\u010d kai u\u017eduotys vykdomos per kelias pamainas.<\/p>\n\n\n<p>3. <strong>I\u0161saugokite pradin\u012f rezultat\u0105.<\/strong> Pri\u0117mim\u0105 i\u0161 pirmo karto registruokite atskirai nuo v\u0117lesnio pri\u0117mimo po taisymo ar pakartotinio bandymo. Jei pataisytai detalei pra\u0117jus patikr\u0105 ankstesnis neigiamas rezultatas perra\u0161omas, istorija atrodo geresn\u0117, nors tai, kas i\u0161 tikr\u0173j\u0173 \u012fvyko, nepasikei\u010dia.<\/p>\n\n\n<p>4. <strong>Ties pasirinkta proceso riba kiekvien\u0105 gamin\u012f skai\u010diuokite tik kart\u0105.<\/strong> Keli defektai, pakartotiniai bandymai ir pakartotiniai laiko \u012fra\u0161ai nepadidina pradini\u0173 gamini\u0173 skai\u010diaus. Naudokite gamini\u0173 identifikatorius arba suderint\u0105 partijos apskaitos \u012fra\u0161\u0105, kuriame i\u0161saugoti kiekiai ir taisymo istorija.<\/p>\n\n\n<p>5. <strong>Ai\u0161kiai rodykite dar ne\u017einomus rezultatus.<\/strong> Detal\u0117s, kurios dar laukia patikros, savaime nelaikomos nei priimtomis, nei atmestomis. Rodykite toki\u0173 detali\u0173 kiek\u012f, o galutin\u012f grup\u0117s FPY apskai\u010diuokite tik gav\u0119 visus pirmojo bandymo rezultatus, u\u017euot nepastebimai pa\u0161alin\u0119 problemines detales i\u0161 skai\u010diavimo.<\/p>\n\n\n<p>\u012eprastame operacijos mar\u0161rute gali b\u016bti numatytos kelios patikros. Teisingai i\u0161 pirmo karto atlikti vis\u0105 sutart\u0105 sek\u0105 n\u0117ra tas pats, kas kartoti nepavykus\u012f bandym\u0105 ar taisyti defekt\u0105. \u0160\u012f skirtum\u0105 \u012ftvirtinkite rodiklio skai\u010diavimo apra\u0161e ir nuosekliai jo laikykit\u0117s.<\/p>\n\n\n<p>Jei ataskaitoje pateikiami tik <a href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/gamybos-ataskaita\/\">bendri pagamintos ir brokuotos produkcijos kiekiai<\/a>, prie\u0161 naudodami juos FPY apskai\u010diuoti patikrinkite, k\u0105 tie laukai rei\u0161kia. B\u016btina \u017einoti, ar \u012f priimt\u0105 kiek\u012f \u012ftrauktos pataisytos detal\u0117s ir ar pakartotinai apdorotos detal\u0117s nebuvo suskai\u010diuotos daugiau nei kart\u0105.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Pirmojo per\u0117jimo i\u0161eiga ir viso mar\u0161ruto pirmojo per\u0117jimo i\u0161eiga<\/h2>\n\n\n<p>Atskiros operacijos rezultatai gali atrodyti geri, nors visame mar\u0161rute reikia daug taisymo darb\u0173. Viso mar\u0161ruto pirmojo per\u0117jimo i\u0161eiga (RTY) parodo bendr\u0105 nuosekli\u0173 proceso etap\u0173 rezultat\u0105 i\u0161 pirmo karto.<\/p>\n\n\n<p>Jei etap\u0173 seka nuosekli, j\u0173 i\u0161eigas sudauginkite, i\u0161rei\u0161k\u0119 jas de\u0161imtain\u0117mis trupmenomis:<\/p>\n\n\n<p><strong>RTY (%) = Pirmojo per\u0117jimo i\u0161eiga 1 etape \u00d7 Pirmojo per\u0117jimo i\u0161eiga 2 etape \u00d7 \u2026 \u00d7 100<\/strong><\/p>\n\n\n<p>Tarkime, stebime 1 000 detali\u0173, pereinan\u010di\u0173 tris operacijas. \u0160iame pavyzdyje stebimoje grup\u0117je toliau lieka tik detal\u0117s, kurios kiekvien\u0105 etap\u0105 \u012fveik\u0117 i\u0161 pirmo karto; pataisytos detal\u0117s \u012f \u0161i\u0105 grup\u0119 nebegr\u012f\u017eta.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Operacija<\/th><th>\u012e etap\u0105 patenkan\u010di\u0173 stebimos grup\u0117s detali\u0173 skai\u010dius<\/th><th>I\u0161 pirmo karto priimt\u0173 detali\u0173 skai\u010dius<\/th><th>Etapo i\u0161eiga<\/th><\/tr><\/thead><tbody><tr><td>Mechaninis apdirbimas<\/td><td>1 000<\/td><td>900<\/td><td>90%<\/td><\/tr><tr><td>Baigiamasis apdirbimas<\/td><td>900<\/td><td>810<\/td><td>90%<\/td><\/tr><tr><td>Bandymai<\/td><td>810<\/td><td>729<\/td><td>90%<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p><strong>0,90 \u00d7 0,90 \u00d7 0,90 \u00d7 100 = 72,9% RTY<\/strong><\/p>\n\n\n<p>Kiekvienos operacijos i\u0161eiga yra 90%, ta\u010diau visas tris be nes\u0117kmi\u0173 \u012fveikia tik 729 i\u0161 pradini\u0173 1 000 detali\u0173. Apskai\u010diav\u0119 \u0161i\u0173 trij\u0173 procentini\u0173 rodikli\u0173 vidurk\u012f, gautume 90% ir nepamatytume bendro nuosekli\u0173 etap\u0173 poveikio.<\/p>\n\n\n<p>Tikroje gamyboje pataisytos detal\u0117s gali gr\u012f\u017eti \u012f sraut\u0105, o gaminiai gali jud\u0117ti skirtingais mar\u0161rutais. Naudokite etap\u0173 i\u0161eigas, kurias galima derinti pagal gamybos mar\u0161rut\u0105 ir skai\u010diavimo pagrind\u0105. Nedauginkite nesusijusi\u0173 padalini\u0173 vidurki\u0173 ir nevadinkite rezultato fakti\u0161kai i\u0161matuota vis\u0105 proces\u0105 s\u0117kmingai \u012fveikusi\u0173 gamini\u0173 dalimi. I\u0161saugota kiekvieno gaminio pirmojo bandymo istorija leid\u017eia patikrinti, kiek pradini\u0173 gamini\u0173 i\u0161 tikr\u0173j\u0173 \u012fveik\u0117 vis\u0105 mar\u0161rut\u0105 be taisymo.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kokia pirmojo per\u0117jimo i\u0161eiga laikoma gera?<\/h2>\n\n\n<p>Prasmingas tikslinis rodiklis turi atitikti gamin\u012f, proces\u0105, kokyb\u0117s reikalavimus ir neatitikties pasekmes. Vien bendro orientacinio rodiklio nepakanka \u012fvertinti, ar konkre\u010dios operacijos rezultatai geri.<\/p>\n\n\n<p>Prad\u0117kite nuo palyginam\u0173 darb\u0173 rezultat\u0173 tendencijos. Procentin\u012f rodikl\u012f vertinkite kartu su i\u0161matuot\u0173 gamini\u0173 skai\u010diumi, neatitik\u010di\u0173 prie\u017eastimis ir taisymo darb\u0173 apimtimi. Didesnis FPY prasmingas tik tada, kai taikomos tos pa\u010dios pri\u0117mimo taisykl\u0117s. Tai n\u0117ra pager\u0117jimas, jei komanda tik su\u0161velnino patikros kriterijus arba i\u0161 vardiklio pa\u0161alino probleminius gaminius.<\/p>\n\n\n<p>Nor\u0117dami gerinti rezultatus, ie\u0161kokite pasikartojan\u010dios problemos, kuri\u0105 galite pa\u0161alinti. Pirmojo bandymo neatitiktis grupuokite pagal operacij\u0105 ir patvirtint\u0105 prie\u017east\u012f. Pasikartojanti vieno gaminio matmen\u0173 problema gali paskatinti tikrinti \u012frank\u012f, tvirtinimo \u012ftais\u0105, med\u017eiag\u0105 ar darbo metod\u0105, ta\u010diau vien procentinis rodiklis nepasakys, kur slypi prie\u017eastis. Kartu su darbus atliekan\u010diais \u017emon\u0117mis patikrinkite duomenis, pa\u0161alinkite prie\u017east\u012f ir v\u0117l i\u0161matuokite palyginamos produkcijos rezultatus.<\/p>\n\n\n<p>\u012evertinkite ir taisymo na\u0161t\u0105. Dviej\u0173 operacij\u0173 FPY gali b\u016bti vienodas, ta\u010diau pasekm\u0117s labai skirsis, jei vienai pakanka trumpo pataisymo, o kita kelioms valandoms u\u017eima bendro naudojimo stakles. B\u016btent tada kokyb\u0117s rezultatai tampa svarb\u016bs priimant planavimo sprendimus.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u012evertinkite real\u0173 paj\u0117gum\u0173 poreik\u012f taisymo darbams, kuriuos atskleid\u017eia FPY<\/h2>\n\n\n<p>Gr\u012f\u017ekime prie 500 detali\u0173 partijos. Tarkime, kiekvienas i\u0161 40 bandym\u0173 pataisyti detal\u0119 tame pa\u010diame apdirbimo centre trunka dar 12 minu\u010di\u0173, nesvarbu, ar detal\u0117 galiausiai priimama, ar nura\u0161oma kaip brokas.<\/p>\n\n\n<p><strong>40 bandym\u0173 \u00d7 12 minu\u010di\u0173 = 480 minu\u010di\u0173 = 8 stakli\u0173 darbo valandos<\/strong><\/p>\n\n\n<p>Galutin\u0117s i\u0161eigos ataskaitoje nurodyta 480 priimt\u0173 detali\u0173. Ta\u010diau gamybos plane reikia numatyti ir tas a\u0161tuonias papildomas valandas. Papildomam derinimui, patikrai ar detali\u0173 tvarkymui gali prireikti daugiau laiko ir kitose darbo vietose.<\/p>\n\n\n<p>Nemanykite, kad 10% detali\u0173, nepriimt\u0173 i\u0161 pirmo karto, rei\u0161kia lygiai 10% prarast\u0173 paj\u0117gum\u0173. Defekt\u0173 taisymo mar\u0161rutai ir trukm\u0117 skiriasi. Apskai\u010diuokite, kiek darbo i\u0161 tikr\u0173j\u0173 reikia atlikti ir kokiais i\u0161tekliais. \u012erengini\u0173 darbo valandas ir operatori\u0173 darbo valandas taip pat skai\u010diuokite atskirai, kai jos atspindi skirtingus apribojimus.<\/p>\n\n\n<p>Jei \u0161is apdirbimo centras iki svarbios siuntos i\u0161siuntimo jau u\u017eimtas suplanuotais darbais, atskira defekt\u0173 taisymo eil\u0117 papildom\u0173 paj\u0117gum\u0173 nesukurs. Ji tik pakeis, kur\u012f u\u017esakym\u0105 pavyks u\u017ebaigti pirmiau. Anksti pasteb\u0117j\u0119 darb\u0173 konflikt\u0105, tur\u0117site laiko nustatyti prioritet\u0105, pasitelkti kit\u0105 tinkam\u0105 i\u0161tekli\u0173 arba persvarstyti pa\u017ead\u0117t\u0105 pristatymo termin\u0105, kol tai netapo paskutin\u0117s minut\u0117s staigmena.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Su SkyPlanner \u012ftraukite u\u017efiksuotus defekt\u0173 taisymo darbus \u012f kit\u0105 gamybos plan\u0105<\/h2>\n\n\n<p>SkyPlanner sujungia gamybos laiko apskait\u0105, i\u0161samias ataskaitas ir gamybos tvarkara\u0161\u010di\u0173 sudarym\u0105 pasitelkiant dirbtin\u012f intelekt\u0105. Gamykloje, kurioje defekt\u0173 taisymas nuolat trikdo pristatymus, tai prakti\u0161kas kitas \u017eingsnis: ai\u0161kiai matyti, kiek darbo reikia defektams pa\u0161alinti, ir patvirtintus taisymo darbus realisti\u0161kai suplanuoti kartu su klient\u0173 u\u017esakymais.<\/p>\n\n\n<p>SkyPlanner laiko apskaitos \u012frankis Timer fiksuoja darbo laik\u0105 ir pagamint\u0173 ar brokuot\u0173 detali\u0173 kiekius. Ataskaitoje All Timelogs Report \u0161ie \u012fra\u0161ai susiejami su u\u017eduotimi, operacija, darbo centru, darbuotoju, prad\u017eios ir pabaigos laiku, u\u017ebaigt\u0173 ir brokuot\u0173 detali\u0173 skai\u010diumi, u\u017eregistruotu darbo laiku ir pastabomis. Joje \u012fra\u0161us galima per\u017ei\u016br\u0117ti, redaguoti ir patvirtinti.<\/p>\n\n\n<p>Kai defekt\u0173 taisymo darbai ai\u0161kiai pa\u017eym\u0117ti u\u017eduo\u010di\u0173 ir laiko apskaitos \u012fra\u0161uose, galite i\u0161siai\u0161kinti, kam buvo skirtas u\u017eregistruotas laikas, u\u017euot mat\u0119 tik bendr\u0105 dienos sum\u0105. FPY skai\u010diavimui i\u0161saugokite kokyb\u0117s apskaitos arba MES \u012fra\u0161uose esan\u010di\u0105 pri\u0117mimo i\u0161 pirmo karto ir defekt\u0173 taisymo istorij\u0105. \u0160ie \u012fra\u0161ai paai\u0161kina kokyb\u0117s rezultat\u0105, o su jais susieti laiko apskaitos \u012fra\u0161ai parodo, kiek darbo prireik\u0117 defektams pa\u0161alinti.<\/p>\n\n\n<p>Tuomet \u012f tvarkara\u0161t\u012f \u012ftraukite <a href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/gamybos-uzsakymu-valdymas\/\">patvirtintas defekt\u0173 taisymo operacijas<\/a>, j\u0173 trukm\u0119 ir joms tinkamus i\u0161teklius. SkyPlanner dirbtinio intelekto variklis Arcturus sudaro gamybos tvarkara\u0161t\u012f pagal nustatytus paj\u0117gumus, operacij\u0173 priklausomybes ir prioritetus. Gantt laiko juostoje matysite apskai\u010diuot\u0105 darb\u0173 sek\u0105 ir u\u017ebaigimo datas. Prioritetus ir sprendimus, kuri\u0173 sistema neturi keisti, nustatote j\u016bs, o Arcturus atlieka susijusius tvarkara\u0161\u010dio skai\u010diavimus.<\/p>\n\n\n<p>\u0160ios hipotetin\u0117s partijos atveju klausimas tampa konkretus: kur sutalpinti dar a\u0161tuonias apdirbimo valandas ir kaip tai paveiks u\u017esakymus, kuriems \u0161is i\u0161teklius jau paskirtas? Perskai\u010diav\u0119 <a href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/kas-yra-gamybos-planavimas\/\">bendr\u0105 plan\u0105<\/a>, matysite, k\u0105 teks derinti, ir nereik\u0117s rankiniu b\u016bdu taisyti atskiros kiekvieno paveikto darbo centro eil\u0117s.<\/p>\n\n\n<p>Per atvir\u0105 REST API SkyPlanner integruojama su bet kuria ERP ar MES sistema. Galite ir toliau naudoti sistemas, kuriose saugomi j\u016bs\u0173 u\u017esakymai ir kokyb\u0117s istorija, o i\u0161 j\u0173 kylan\u010dius darbus \u012ftraukti \u012f gamybos tvarkara\u0161t\u012f, sudarom\u0105 atsi\u017evelgiant \u012f ribotus paj\u0117gumus.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Su\u017einokite, kaip pirmuoju per\u0117jimu nepriimtos detal\u0117s veikia pristatymus<\/h2>\n\n\n<p>Pasirinkite vien\u0105 operacij\u0105, kurios galutinis priimt\u0173 detali\u0173 skai\u010dius nuolat paslepia papildom\u0105 darb\u0105. SkyPlanner demonstracijai pasiruo\u0161kite jos pirmojo bandymo rezultatus, \u012fprast\u0105 patvirtint\u0105 defekt\u0173 taisymo mar\u0161rut\u0105 ir kliento u\u017esakym\u0105, kur\u012f \u0161ie darbai paveikia.<\/p>\n\n\n<p>Tai bus konkretus atspirties ta\u0161kas norint i\u0161siai\u0161kinti, kaip u\u017efiksuoti gamybos duomenys ir bendras tvarkara\u0161tis gali pad\u0117ti j\u016bs\u0173 komandai reaguoti: \u012fvertinti defekt\u0173 taisymo darb\u0173 apimt\u012f, patikrinti, kurie darbai konkuruoja d\u0117l t\u0173 pa\u010di\u0173 paj\u0117gum\u0173, ir priimti kit\u0105 sprendim\u0105 d\u0117l pristatymo remiantis planu, kuriame numatyti dar neatlikti darbai. <a href=\"https:\/\/skyplanner.ai\/lt\/susisiekite-su-pardavejais\/\">U\u017esisakykite SkyPlanner demonstracij\u0105<\/a> ir aptarkite savo proces\u0105 arba pirmiausia <a href=\"https:\/\/skyplanner.ai\/lt\/bandymas\/\">i\u0161bandykite SkyPlanner su demonstraciniais duomenimis<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Pirmojo per\u0117jimo i\u0161eiga: formul\u0117, pavyzdys ir nematomas taisymas Prad\u017eia &raquo; I\u0161tekliai &raquo; Pirmojo per\u0117jimo i\u0161eiga: formul\u0117, pavyzdys ir nematomas taisymas Pirmojo per\u0117jimo i\u0161eiga (FPY) \u2013 tai procentin\u0117 gamini\u0173 dalis, kuri apibr\u0117\u017etame procese i\u0161 pirmo karto atitinka sutartus kokyb\u0117s reikalavimus, be remonto, taisymo ar pakartotinio bandymo po nes\u0117km\u0117s. \u0160is rodiklis parodo, kokia produkcijos dalis buvo tinkama &#8230; <a title=\"Pirmojo per\u0117jimo i\u0161eiga: formul\u0117, pavyzdys ir nematomas taisymas\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/pirmojo-perejimo-iseiga\/\" aria-label=\"Read more about Pirmojo per\u0117jimo i\u0161eiga: formul\u0117, pavyzdys ir nematomas taisymas\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":104594,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2560,301],"tags":[],"class_list":["post-104570","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-gamybos-efektyvumas","category-istekliai","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Pirmojo per\u0117jimo i\u0161eiga: formul\u0117, pavyzdys, nematomi taisymai<\/title>\n<meta name=\"description\" content=\"Skai\u010diuokite FPY ne\u012ftraukdami pataisyt\u0173 detali\u0173. Su\u017einokite, kiek paj\u0117gum\u0173 reikia taisymui ir kaip SkyPlanner padeda juos planuoti.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/pirmojo-perejimo-iseiga\/\" \/>\n<meta property=\"og:locale\" content=\"lt_LT\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Pirmojo per\u0117jimo i\u0161eiga: formul\u0117, pavyzdys ir nematomas taisymas\" \/>\n<meta property=\"og:description\" content=\"Skai\u010diuokite FPY ne\u012ftraukdami pataisyt\u0173 detali\u0173. Su\u017einokite, kiek paj\u0117gum\u0173 reikia taisymui ir kaip SkyPlanner padeda juos planuoti.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lt\/istekliai\/pirmojo-perejimo-iseiga\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-20T19:34:39+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-20T19:35:37+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"9 minut\u0117s\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/pirmojo-perejimo-iseiga\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/pirmojo-perejimo-iseiga\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Pirmojo per\u0117jimo i\u0161eiga: formul\u0117, pavyzdys ir nematomas taisymas\",\"datePublished\":\"2026-10-20T19:34:39+00:00\",\"dateModified\":\"2026-10-20T19:35:37+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/pirmojo-perejimo-iseiga\\\/\"},\"wordCount\":1905,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/pirmojo-perejimo-iseiga\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/first-pass-yield-hero.png\",\"articleSection\":[\"Gamybos efektyvumas\",\"i\u0161tekliai\"],\"inLanguage\":\"lt-LT\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/pirmojo-perejimo-iseiga\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/pirmojo-perejimo-iseiga\\\/\",\"name\":\"Pirmojo per\u0117jimo i\u0161eiga: formul\u0117, pavyzdys, nematomi taisymai\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/pirmojo-perejimo-iseiga\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/pirmojo-perejimo-iseiga\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/first-pass-yield-hero.png\",\"datePublished\":\"2026-10-20T19:34:39+00:00\",\"dateModified\":\"2026-10-20T19:35:37+00:00\",\"description\":\"Skai\u010diuokite FPY ne\u012ftraukdami pataisyt\u0173 detali\u0173. Su\u017einokite, kiek paj\u0117gum\u0173 reikia taisymui ir kaip SkyPlanner padeda juos planuoti.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/pirmojo-perejimo-iseiga\\\/#breadcrumb\"},\"inLanguage\":\"lt-LT\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/pirmojo-perejimo-iseiga\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"lt-LT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/pirmojo-perejimo-iseiga\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/first-pass-yield-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/first-pass-yield-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"Machined flanges pass inspection directly or take a correction loop, illustrating first-pass yield and rework.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/pirmojo-perejimo-iseiga\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Pirmojo per\u0117jimo i\u0161eiga: formul\u0117, pavyzdys ir nematomas taisymas\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lt-LT\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lt-LT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lt-LT\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Pirmojo per\u0117jimo i\u0161eiga: formul\u0117, pavyzdys, nematomi taisymai","description":"Skai\u010diuokite FPY ne\u012ftraukdami pataisyt\u0173 detali\u0173. Su\u017einokite, kiek paj\u0117gum\u0173 reikia taisymui ir kaip SkyPlanner padeda juos planuoti.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lt\/istekliai\/pirmojo-perejimo-iseiga\/","og_locale":"lt_LT","og_type":"article","og_title":"Pirmojo per\u0117jimo i\u0161eiga: formul\u0117, pavyzdys ir nematomas taisymas","og_description":"Skai\u010diuokite FPY ne\u012ftraukdami pataisyt\u0173 detali\u0173. Su\u017einokite, kiek paj\u0117gum\u0173 reikia taisymui ir kaip SkyPlanner padeda juos planuoti.","og_url":"https:\/\/skyplanner.ai\/lt\/istekliai\/pirmojo-perejimo-iseiga\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-20T19:34:39+00:00","article_modified_time":"2026-10-20T19:35:37+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Jussi M\u00e4ntyl\u00e4","Est. reading time":"9 minut\u0117s"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/pirmojo-perejimo-iseiga\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/pirmojo-perejimo-iseiga\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Pirmojo per\u0117jimo i\u0161eiga: formul\u0117, pavyzdys ir nematomas taisymas","datePublished":"2026-10-20T19:34:39+00:00","dateModified":"2026-10-20T19:35:37+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/pirmojo-perejimo-iseiga\/"},"wordCount":1905,"publisher":{"@id":"https:\/\/skyplanner.ai\/lt\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/pirmojo-perejimo-iseiga\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero.png","articleSection":["Gamybos efektyvumas","i\u0161tekliai"],"inLanguage":"lt-LT"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/pirmojo-perejimo-iseiga\/","url":"https:\/\/skyplanner.ai\/lt\/istekliai\/pirmojo-perejimo-iseiga\/","name":"Pirmojo per\u0117jimo i\u0161eiga: formul\u0117, pavyzdys, nematomi taisymai","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lt\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/pirmojo-perejimo-iseiga\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/pirmojo-perejimo-iseiga\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero.png","datePublished":"2026-10-20T19:34:39+00:00","dateModified":"2026-10-20T19:35:37+00:00","description":"Skai\u010diuokite FPY ne\u012ftraukdami pataisyt\u0173 detali\u0173. Su\u017einokite, kiek paj\u0117gum\u0173 reikia taisymui ir kaip SkyPlanner padeda juos planuoti.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/pirmojo-perejimo-iseiga\/#breadcrumb"},"inLanguage":"lt-LT","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lt\/istekliai\/pirmojo-perejimo-iseiga\/"]}]},{"@type":"ImageObject","inLanguage":"lt-LT","@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/pirmojo-perejimo-iseiga\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero.png","width":1672,"height":941,"caption":"Machined flanges pass inspection directly or take a correction loop, illustrating first-pass yield and rework."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/pirmojo-perejimo-iseiga\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lt\/"},{"@type":"ListItem","position":2,"name":"Pirmojo per\u0117jimo i\u0161eiga: formul\u0117, pavyzdys ir nematomas taisymas"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lt\/#website","url":"https:\/\/skyplanner.ai\/lt\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lt\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lt\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lt-LT"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lt\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lt\/","logo":{"@type":"ImageObject","inLanguage":"lt-LT","@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"lt-LT","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lt\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Pirmojo per\u0117jimo i\u0161eiga: formul\u0117, pavyzdys ir nematomas taisymas Prad\u017eia &raquo; I\u0161tekliai &raquo; Pirmojo per\u0117jimo i\u0161eiga: formul\u0117, pavyzdys ir nematomas taisymas Pirmojo per\u0117jimo i\u0161eiga (FPY) \u2013 tai procentin\u0117 gamini\u0173 dalis, kuri apibr\u0117\u017etame procese i\u0161 pirmo karto atitinka sutartus kokyb\u0117s reikalavimus, be remonto, taisymo ar pakartotinio bandymo po nes\u0117km\u0117s. \u0160is rodiklis parodo, kokia produkcijos dalis buvo tinkama&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/posts\/104570","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/comments?post=104570"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/posts\/104570\/revisions"}],"predecessor-version":[{"id":104632,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/posts\/104570\/revisions\/104632"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/media\/104594"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/media?parent=104570"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/categories?post=104570"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/tags?post=104570"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}