{"id":102527,"date":"2026-10-20T13:56:48","date_gmt":"2026-10-20T13:56:48","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=102527"},"modified":"2026-10-20T13:57:35","modified_gmt":"2026-10-20T13:57:35","slug":"nebaigta-gamyba","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/lt\/istekliai\/nebaigta-gamyba\/","title":{"rendered":"Nebaigta gamyba: kiekis, savikaina ir valdymas"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Nebaigta gamyba: kiekis, savikaina ir valdymas<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/lt\/\">Prad\u017eia<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/\">I\u0161tekliai<\/a> &raquo; Nebaigta gamyba: kiekis, savikaina ir valdymas<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Numatomas skaitymo laikas: <\/span><span class=\"yoast-reading-time__reading-time\">9<\/span><span class=\"yoast-reading-time__time-unit\"> minut\u0117s<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Nebaigta gamyba (WIP) \u2013 tai gaminiai, kuriuos jau prad\u0117ta gaminti, bet kurie dar neu\u017ebaigti. Jai priskiriamos ir apdirbamos detal\u0117s, ir nebaigti gaminiai, laukiantys kitos operacijos. Apskaitoje nebaigta gamyba taip pat rei\u0161kia \u0161iems gaminiams iki \u0161iol sukauptas gamybos i\u0161laidas.<\/p>\n\n\n<p>\u0160ie du po\u017ei\u016briai atsako \u012f skirtingus klausimus. Vienet\u0173 skai\u010dius parodo, kiek gamini\u0173 dar neu\u017ebaigta, o savikaina \u2013 kiek gamybos i\u0161laid\u0173 jiems jau priskirta. Ta\u010diau nei vienas, nei kitas rodiklis atskirai nepaai\u0161kina, kod\u0117l partija laukia nuo pirmadienio ar kada j\u0105 pagaliau bus galima u\u017ebaigti.<\/p>\n\n\n<p>B\u016btent \u012f \u0161\u012f klausim\u0105 gamybos vadovui verta ie\u0161koti atsakymo toliau. SkyPlanner APS susieja likusias operacijas su paj\u0117gumais, med\u017eiag\u0173 parengtimi ir prioritetais, tod\u0117l padeda u\u017ebaigti gaminius, u\u017euot nuolat ilginus laukian\u010di\u0173 darb\u0173 eiles. Geriau suderintas operacij\u0173 laikas ma\u017eina perteklin\u0119 nebaigt\u0105 gamyb\u0105 ir \u012f j\u0105 \u012f\u0161aldyt\u0105 kapital\u0105.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kas priskiriama nebaigtai gamybai?<\/h2>\n\n\n<p>Atsargas galima suskirstyti pagal tris gamybos srauto etapus:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>\u017daliavos ir med\u017eiagos:<\/strong> med\u017eiagos bei pirktiniai komponentai, laukiantys panaudojimo gamyboje.<\/li><li><strong>Nebaigta gamyba:<\/strong> gaminiai, kuriuos jau prad\u0117ta gaminti, ta\u010diau dar reikia apdirbti ar surinkti arba atlikti j\u0173 privalomas galutines patikras.<\/li><li><strong>Pagaminta produkcija:<\/strong> u\u017ebaigti gaminiai, net jei jie dar neparduoti ar nei\u0161si\u0173sti.<\/li><\/ul>\n\n\n<p>Mechani\u0161kai apdirbtas korpusas, laukiantis padengimo, yra nebaigta gamyba. Tas pats galioja surinktam gaminiui, laukian\u010diam galutin\u0117s patikros, be kurios jo negalima laikyti u\u017ebaigtu. U\u017ebaigtas ir priimtas gaminys, laukiantis pristatymo sunkve\u017eimio, jau yra pagaminta produkcija, o ne nebaigta gamyba.<\/p>\n\n\n<p>Laukiantis nebaigtas gaminys vis tiek \u012fskai\u010diuojamas \u012f nebaigtos gamybos kiek\u012f. Eil\u0117s, perk\u0117limas tarp operacij\u0173 ir sustabdymai gali sudaryti didel\u0119 gaminio gamyboje praleid\u017eiamo laiko dal\u012f, nors tuo metu jo neapdirba joks \u012frenginys.<\/p>\n\n\n<p>Taip pat galite i\u0161girsti s\u0105vok\u0105 <strong>nebaigti darbai<\/strong>. \u012emon\u0117se ir skirtingose pramon\u0117s \u0161akose jos vartosena skiriasi. \u0160iame vadove WIP rei\u0161kia nebaigtos gamybos atsargas, o ne sumos, u\u017e kuri\u0105 i\u0161ra\u0161oma projekto s\u0105skaita, apskai\u010diavim\u0105 ar u\u017eduo\u010di\u0173 skai\u010di\u0173 programin\u0117s \u012frangos k\u016br\u0117j\u0173 lentoje.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kaip i\u0161matuoti fizin\u012f nebaigtos gamybos kiek\u012f<\/h2>\n\n\n<p>Pirmiausia ai\u0161kiai apsibr\u0117\u017ekite matavimo ribas, pavyzd\u017eiui, vienos gamini\u0173 grup\u0117s keli\u0105 nuo pirmos gamybos operacijos iki galutinio pri\u0117mimo. Pasirinktu laiko momentu suskai\u010diuokite visus \u0161iose ribose esan\u010dius nebaigtus vienetus. Gaminant birius ar skystus produktus, tinkamesnis matavimo vienetas gali b\u016bti kilogramai ar litrai, o ne vienetai.<\/p>\n\n\n<p>\u012esivaizduokite gamykl\u0105, kuri stebi vien\u0105 vienod\u0173 korpus\u0173 grup\u0119. Penktadienio pamainos pabaigoje nustatoma:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Dabartinis etapas<\/th><th>Nebaigti korpusai<\/th><th>K\u0105 dar reikia atlikti<\/th><\/tr><\/thead><tbody><tr><td>Mechani\u0161kai apdirbami<\/td><td>20<\/td><td>U\u017ebaigti mechanin\u012f apdirbim\u0105, atlikti apdail\u0105 ir patikrinti<\/td><\/tr><tr><td>Laukia apdailos<\/td><td>60<\/td><td>Atlikti apdail\u0105 ir patikrinti<\/td><\/tr><tr><td>Laukia galutin\u0117s patikros<\/td><td>20<\/td><td>Patikrinti ir priimti<\/td><\/tr><tr><td><strong>I\u0161 viso nebaigtoje gamyboje<\/strong><\/td><td><strong>100<\/strong><\/td><td><strong>Likusi\u0173 darb\u0173 apimtis skiriasi<\/strong><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Kiekvien\u0105 korpus\u0105 skai\u010diuokite tik kart\u0105 pagal dabartin\u012f jo etap\u0105. Neskai\u010diuokite tos pa\u010dios partijos i\u0161 naujo prie kiekvienos dar neatliktos jos mar\u0161ruto operacijos.<\/p>\n\n\n<p>Kiek\u012f taip pat galite patikrinti pagal jud\u0117jim\u0105 per pasirinktas ribas. Tarkime, savait\u0117s prad\u017eioje buvo 120 nebaigt\u0173 korpus\u0173, dar 480 prad\u0117ta gaminti, o 500 tapo pagaminta produkcija. Jei nebuvo broko ar kit\u0173 jud\u0117jim\u0173:<\/p>\n\n\n<p><strong>Nebaigtos gamybos kiekis laikotarpio pabaigoje = 120 + 480 \u2212 500 = 100 korpus\u0173<\/strong><\/p>\n\n\n<p>Jei rezultatas nesutampa su fakti\u0161kai suskai\u010diuotu kiekiu, prie\u0161 darydami i\u0161vadas apie gamybos rezultatus patikrinkite, ar u\u017eregistruoti visi u\u017ebaigti gaminiai, perk\u0117limai ir brokas, taip pat ar sutampa apskaitos ir skai\u010diavimo laiko riba.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Vienet\u0173 skai\u010dius n\u0117ra likusi\u0173 darb\u0173 apimtis<\/h3>\n\n\n<p>Lentel\u0117je nurodyta 100 nebaigt\u0173 vienet\u0173, ta\u010diau 20 korpus\u0173, laukian\u010di\u0173 patikros, reikia gerokai ma\u017eiau darbo nei 20 vis dar mechani\u0161kai apdirbam\u0173 korpus\u0173. Tod\u0117l dvi vienodo dyd\u017eio eil\u0117s gali kelti labai skirting\u0105 paj\u0117gum\u0173 poreik\u012f.<\/p>\n\n\n<p>\u012evairius gaminius gaminan\u010dioje gamykloje darbo u\u017esakym\u0173 skai\u010dius pasako dar ma\u017eiau: vienam u\u017esakymui gali pakakti trumpos patikros, o kitam prireikti keli\u0173 dien\u0173 darbo naudojant skirtingus i\u0161teklius. Kiekius steb\u0117kite pagal gamin\u012f arba prasmingai sudaryt\u0105 gamini\u0173 grup\u0119, o apkrov\u0105 vertinkite pagal likusi\u0173 operacij\u0173 trukm\u0119. \u0160i\u0105 apkrov\u0105 nurodykite valandomis \u2013 ji n\u0117ra nei nebaigtos gamybos vienet\u0173 skai\u010dius, nei jos vert\u0117.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Nebaigtos gamybos savikainos formul\u0117<\/h2>\n\n\n<p>Supaprastintam laikotarpio i\u0161laid\u0173 suderinimui taikoma formul\u0117:<\/p>\n\n\n<p><strong>Nebaigtos gamybos savikaina laikotarpio pabaigoje = nebaigtos gamybos savikaina laikotarpio prad\u017eioje + per laikotarp\u012f priskirtos gamybos i\u0161laidos \u2212 pagamintos produkcijos savikaina<\/strong><\/p>\n\n\n<p>Per laikotarp\u012f priskirtas gamybos i\u0161laidas sudaro sunaudotos tiesiogin\u0117s med\u017eiagos, tiesioginio darbo i\u0161laidos ir paskirstytos netiesiogin\u0117s gamybos i\u0161laidos. <strong>Pagamintos produkcijos savikaina (COGM)<\/strong> \u2013 tai savikaina, perkeliama i\u0161 nebaigtos gamybos u\u017ebaigus gaminius. Tai n\u0117ra nei pardavimo kaina, nei per laikotarp\u012f parduotos produkcijos savikaina.<\/p>\n\n\n<p>Panagrin\u0117kime atskir\u0105 m\u0117nesio savikainos pavyzd\u012f. Nebaigtos gamybos savikaina m\u0117nesio prad\u017eioje yra $18 000, per m\u0117nes\u012f priskiriama $72 000 gamybos i\u0161laid\u0173, o u\u017ebaigti gaminiai, kuri\u0173 savikaina $65 000, perkeliami \u012f pagamintos produkcijos atsargas. Jei kit\u0173 koregavim\u0173 n\u0117ra:<\/p>\n\n\n<p><strong>$18 000 + $72 000 \u2212 $65 000 = $25 000 nebaigtos gamybos savikaina m\u0117nesio pabaigoje<\/strong><\/p>\n\n\n<p>Tai savikainos likutis, o ne 25 000 vienet\u0173 ar $25 000 b\u016bsimo pelno. \u0160is pavyzdys nesusij\u0119s su pirmiau pateiktu korpus\u0173 kiekio skai\u010diavimu.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Kod\u0117l vienet\u0173 skai\u010dius neparodo vert\u0117s<\/h3>\n\n\n<p>Nebaigto gaminio savikain\u0105 sudaro tik iki to momento jam priskirtos i\u0161laidos. Padauginus nebaigt\u0173 vienet\u0173 skai\u010di\u0173 i\u0161 visos u\u017ebaigto gaminio savikainos, liku\u010dio vert\u0117 gali b\u016bti pervertinta. Be to, \u201e\u012fveikta pus\u0117 mar\u0161ruto\u201c neb\u016btinai rei\u0161kia pus\u0119 visos savikainos: brangios med\u017eiagos gali b\u016bti sunaudotos prad\u017eioje, o darbo ir apdirbimo i\u0161laidos kauptis v\u0117liau.<\/p>\n\n\n<p>Remkit\u0117s savo finans\u0173 skyriaus taikomais savikainos apskaitos duomenimis ir apskaitos politika. Liku\u010dio poky\u010dio skai\u010diavimas paai\u0161kina savikainos jud\u0117jim\u0105, ta\u010diau rengiant finansines ataskaitas pagal taikomus apskaitos reikalavimus gali prireikti ir vert\u0117s koregavim\u0173.<\/p>\n\n\n<p>Priimant gamybos sprendimus svarbus paprastesnis skirtumas: sukaupta savikaina parodo, kiek i\u0161laid\u0173 jau patirta gaminant, o likusi mar\u0161ruto dalis \u2013 ko dar reikia gaminiui u\u017ebaigti. Reikia abiej\u0173 po\u017ei\u016bri\u0173, o ne vieno vietoje kito.<\/p>\n\n\n<h2 class=\"wp-block-heading\">K\u0105 i\u0161 ties\u0173 parodo didelis ar ma\u017eas nebaigtos gamybos kiekis<\/h2>\n\n\n<p>Didelis nebaigtos gamybos rodiklis yra prie\u017eastis pasidom\u0117ti i\u0161samiau, bet ne galutin\u0117 diagnoz\u0117. Jis gali rodyti i\u0161augusi\u0105 paklaus\u0105, pasikeitus\u012f gamini\u0173 asortiment\u0105, s\u0105moningai apsaugotus paj\u0117gumus ar d\u0117l sutrikimo besikaupian\u010dius darbus. Ma\u017eas rodiklis gali reik\u0161ti skland\u0173 sraut\u0105, ta\u010diau taip pat gali rodyti, kad kritiniam i\u0161tekliui tr\u016bksta darb\u0173, kuriuos jau galima prad\u0117ti.<\/p>\n\n\n<p>Tikslas n\u0117ra visi\u0161kai atsisakyti nebaigtos gamybos. Svarbu tur\u0117ti pakankamai reikiam\u0173 darb\u0173, kad gaminiai b\u016bt\u0173 patikimai u\u017ebaigiami, bet vengti be reikalo per anksti prad\u0117t\u0173 darb\u0173, laukimo ir kilnojimo.<\/p>\n\n\n<p>Gr\u012f\u017ekime prie 60 apdailos laukian\u010di\u0173 korpus\u0173. Jei jie mechani\u0161kai apdirbti \u0161\u012f ryt\u0105, o apdaila suplanuota \u0161iandien po piet\u0173, tokia eil\u0117 gali b\u016bti visi\u0161kai pagr\u012fsta. Ta\u010diau jei jie laukia jau savait\u0119, kol apdailai reikalingas i\u0161teklius vykdo kitus u\u017esakymus, tas pats kiekis rodo kitoki\u0105 problem\u0105.<\/p>\n\n\n<p>Nor\u0117dami \u012fvertinti \u0161i\u0105 eil\u0119, i\u0161siai\u0161kinkite:<\/p>\n\n\n<p>1. <strong>Kiek laiko partija gamyboje:<\/strong> kada ji prad\u0117ta gaminti ir kiek laiko laukia \u0161iame etape?<\/p>\n\n\n<p>2. <strong>Kokia kita operacija:<\/strong> kokio i\u0161tekliaus, med\u017eiagos ar patvirtinimo reikia, kad b\u016bt\u0173 galima t\u0119sti darb\u0105?<\/p>\n\n\n<p>3. <strong>Kada planuojama u\u017ebaigti:<\/strong> kada grafike telpa likusios mar\u0161ruto operacijos ir ar tai atitinka u\u017esakymui sutart\u0105 termin\u0105?<\/p>\n\n\n<p>4. <strong>Kod\u0117l laukiama:<\/strong> ar tai suplanuotas darb\u0173 rezervas, konkurencija d\u0117l paj\u0117gum\u0173, med\u017eiag\u0173 tr\u016bkumas, sustabdymas d\u0117l kokyb\u0117s ar kitas sutrikimas?<\/p>\n\n\n<p>Taip nuo teiginio \u201eturime per daug nebaigtos gamybos\u201c galima pereiti prie konkretaus sprendimo ir veiksm\u0173. Tr\u016bkstamas pirktinis komponentas reikalauja kitoki\u0173 veiksm\u0173 nei perkrauta apdailos darbo vieta. Dar vienos partijos mechaninis apdirbimas nei\u0161spr\u0119s n\u0117 vienos i\u0161 \u0161i\u0173 problem\u0173.<\/p>\n\n\n<p>Nebaigt\u0105 gamyb\u0105 vertinkite kartu su <a href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/gamybos-pralaidumas\/\">u\u017ebaigtos produkcijos kiekiu<\/a> ir pristatymo rodikliais. Jei gaminti pradedama daugiau gamini\u0173, nei u\u017ebaigiama, ir kit\u0173 i\u0161\u0117jim\u0173 i\u0161 gamybos n\u0117ra, nebaigtos gamybos atsargos auga. Jei jos ma\u017e\u0117ja tik tod\u0117l, kad gamyba nebegauna u\u017esakym\u0173, tai ne\u012frodo, jog procesas pager\u0117jo. Lyginkite pana\u0161ius laikotarpius ir gamini\u0173 grupes, kad asortimento poky\u010dio nesupainiotum\u0117te su pager\u0117jimu.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Su SkyPlanner suplanuokite, kaip u\u017ebaigti nebaigtus gaminius<\/h2>\n\n\n<p>Kai \u017einote, kur darbai laukia, planavimo klausimas tampa konkretus: kaip suderinti likusias j\u0173 mar\u0161ruto operacijas su visais kitais darbais, kuriuos gamykla turi u\u017ebaigti?<\/p>\n\n\n<p>SkyPlanner sujungia darbo vietas, pamainas, operatorius, proceso operacijas ir j\u0173 trukm\u0119 \u012f <a href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/kas-yra-gamybos-planavimas\/\">bendr\u0105 gamybos grafik\u0105<\/a>. SkyPlanner planavimo dirbtinis intelektas Arcturus i\u0161d\u0117sto operacijas pagal nustatytus paj\u0117gumus, priklausomybes ir prioritetus. U\u017euot kiekvienas padalinys atskirai tvark\u0119s savo eil\u0119, visi gali matyti Gantt rodinyje pateikt\u0105 operacij\u0173 sek\u0105 pagal i\u0161teklius.<\/p>\n\n\n<p>Laukian\u010di\u0173 korpus\u0173 apdailos operacij\u0105 galite vertinti kartu su prie\u0161 j\u0105 ir po jos numatytais darbais. Ar reikalingas i\u0161teklius u\u017eimtas vykdant ankstesn\u012f \u012fsipareigojim\u0105? Ar po apdailos grafike telpa patikra? Ar dabar prad\u0117jus kit\u0105 korpus\u0173 partij\u0105 tik nepadaug\u0117t\u0173 laukian\u010di\u0173 darb\u0173?<\/p>\n\n\n<p>\u012ejungus planavim\u0105 pagal med\u017eiag\u0173 prieinamum\u0105, Arcturus taip pat atsi\u017evelgia \u012f turimas atsargas ir gaunam\u0173 med\u017eiag\u0173 prieinamum\u0105. Tai svarbu, kai v\u0117lesnei operacijai reikia pirktinio komponento: vien laisvo pirmojo \u012frenginio nepakanka, jei u\u017esakymo darb\u0173 v\u0117liau nebus galima t\u0119sti surinkimo etape.<\/p>\n\n\n<p>Informacija apie darb\u0173 eig\u0105 padeda i\u0161laikyti plan\u0105 aktual\u0173. SkyPlanner funkcija Timer fiksuoja darb\u0173 prad\u017ei\u0105, sustabdymus ir pagamintus kiekius, o atvira REST API leid\u017eia prisijungti prie bet kurios ERP ar MES sistemos. Pasikeitus darb\u0173 eigai, i\u0161tekli\u0173 prieinamumui ar prioritetams, Arcturus gali perskai\u010diuoti gamybos grafik\u0105 pagal atnaujint\u0105 informacij\u0105. J\u016bs nustatote prioritetus, o dirbtinis intelektas atlieka grafiko skai\u010diavimus.<\/p>\n\n\n<p>Taip kasdien tenka ma\u017eiau taisyti atskir\u0173 \u012frengini\u0173 darb\u0173 eiles ir lengviau pagr\u012fstai nuspr\u0119sti, kuriuos darbus t\u0119sti. Galite i\u0161vengti pernelyg ankstyvo papildom\u0173 med\u017eiag\u0173 ir darbo skyrimo u\u017esakymams, o d\u0117mes\u012f sutelkti \u012f nebaigtus darbus, kuriuos b\u016btina atlikti, kad produkcija b\u016bt\u0173 pristatyta.<\/p>\n\n\n<p>Vien gamybos u\u017ebaigimas pinig\u0173 neatlaisvina: perk\u0117lus gaminius i\u0161 nebaigtos gamybos \u012f gatavos produkcijos atsargas, pasikei\u010dia j\u0173 statusas, ta\u010diau jie teb\u0117ra atsargos. Finansin\u0117 nauda gaunama ma\u017einant nereikalingas atsargas ir u\u017ebaigiant tuos darbus, kuri\u0173 reikia klient\u0173 paklausai patenkinti, o ne vien suma\u017einant nebaigtos gamybos eilut\u0117je rodom\u0105 sum\u0105.<\/p>\n\n\n<h2 class=\"wp-block-heading\">K\u0105 \u012fmon\u0117je Mamec pakeit\u0117 tinkamiau parinktas darb\u0173 laikas<\/h2>\n\n\n<p>Suomijos \u012fmon\u0117 Mamec, gaminanti pramonin\u0119 mai\u0161ymo \u012frang\u0105 ir auk\u0161t\u0173j\u0173 technologij\u0173 gaminius pagal sutartis, anks\u010diau t\u016bkstan\u010di\u0173 tarpusavyje susijusi\u0173 gamybos u\u017esakym\u0173 prioritetus nustatydavo pagal popieriniuose u\u017esakymuose nurodytas pristatymo datas. Planavimas ERP sistemoje nesuteik\u0117 bendro vaizdo, o vadovyb\u0117 gamybos apkrov\u0105 vertino remdamasi subjektyviais vertinimais.<\/p>\n\n\n<p>Integravusi SkyPlanner \u012f savo Oscar ERP aplink\u0105, Mamec gal\u0117jo planuoti pagal ribotus paj\u0117gumus, o darbuotojai gavo bendr\u0105 vaizd\u0105 apie u\u017esakym\u0173 b\u016bsen\u0105 ir j\u0173 vykdymo grafik\u0105. U\u017euot pasikliov\u0119 skirtingomis situacijos interpretacijomis, darbuotojai gal\u0117jo susirasti u\u017esakym\u0105 ir patikrinti jo informacij\u0105.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/lt\/klientu-istorijos\/mamec\/\">Mamec teigia<\/a>, kad gamybos terminai tapo labiau pagr\u012fsti, suma\u017e\u0117jo planavimo darbo kr\u016bvis, o nebaigtoje gamyboje be reikalo \u012f\u0161aldoma ma\u017eiau apyvartinio kapitalo, nes darbai pradedami tinkamu laiku. Tai ir yra praktinis ry\u0161ys tarp nebaigtos gamybos atsarg\u0173 ir gamybos grafiko: gamykloje vis dar yra vykdom\u0173 darb\u0173, ta\u010diau dabar lengviau pagr\u012fstai nuspr\u0119sti, kada jie turi b\u016bti gamyboje.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Prad\u0117kite nuo vienos pernelyg ilgai laukian\u010dios partijos<\/h2>\n\n\n<p>Pasirinkite nebaigt\u0105 u\u017esakym\u0105, kurio v\u0117lavim\u0105 j\u016bs\u0173 komanda gerai \u017eino. SkyPlanner demonstracijai pasiruo\u0161kite informacij\u0105 apie dabartin\u012f jo gamybos etap\u0105, likus\u012f gamybos mar\u0161rut\u0105, med\u017eiag\u0173 poreik\u012f ir \u012fsipareigot\u0105 pristatymo termin\u0105. Prakti\u0161kai verta patikrinti, ar matote suderint\u0105 \u0161io u\u017esakymo u\u017ebaigimo plan\u0105, kuriame atsi\u017evelgiama ir \u012f kitus u\u017esakymus, kuriems reikia t\u0173 pa\u010di\u0173 i\u0161tekli\u0173.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/lt\/susisiekite-su-pardavejais\/\">U\u017esisakykite SkyPlanner demonstracij\u0105<\/a> ir aptarkite tok\u012f plan\u0105 pagal savo gamybos situacij\u0105 arba pirmiausia <a href=\"https:\/\/skyplanner.ai\/lt\/bandymas\/\">i\u0161bandykite SkyPlanner su demonstraciniais duomenimis<\/a>. Norint pagerinti nebaigtos gamybos rodikl\u012f, pirmiausia reikia suprasti, kokie darbai liko nebaigti. Geresnis gamybos grafikas padeda imtis konkre\u010di\u0173 veiksm\u0173.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Nebaigta gamyba: kiekis, savikaina ir valdymas Prad\u017eia &raquo; I\u0161tekliai &raquo; Nebaigta gamyba: kiekis, savikaina ir valdymas Nebaigta gamyba (WIP) \u2013 tai gaminiai, kuriuos jau prad\u0117ta gaminti, bet kurie dar neu\u017ebaigti. Jai priskiriamos ir apdirbamos detal\u0117s, ir nebaigti gaminiai, laukiantys kitos operacijos. Apskaitoje nebaigta gamyba taip pat rei\u0161kia \u0161iems gaminiams iki \u0161iol sukauptas gamybos i\u0161laidas. \u0160ie &#8230; <a title=\"Nebaigta gamyba: kiekis, savikaina ir valdymas\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/nebaigta-gamyba\/\" aria-label=\"Read more about Nebaigta gamyba: kiekis, savikaina ir valdymas\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":102580,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2560,301],"tags":[],"class_list":["post-102527","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-gamybos-efektyvumas","category-istekliai","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Nebaigta gamyba: kiekis, savikaina ir valdymas<\/title>\n<meta name=\"description\" content=\"\u012evertinkite nebaigt\u0105 gamyb\u0105, apskai\u010diuokite jos savikain\u0105 ir raskite u\u017ebaigimo kli\u016btis. Su\u017einokite, kaip SkyPlanner padeda ma\u017einti perteklin\u0119 nebaigt\u0105 gamyb\u0105.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/nebaigta-gamyba\/\" \/>\n<meta property=\"og:locale\" content=\"lt_LT\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Nebaigta gamyba: kiekis, savikaina ir valdymas\" \/>\n<meta property=\"og:description\" content=\"\u012evertinkite nebaigt\u0105 gamyb\u0105, apskai\u010diuokite jos savikain\u0105 ir raskite u\u017ebaigimo kli\u016btis. Su\u017einokite, kaip SkyPlanner padeda ma\u017einti perteklin\u0119 nebaigt\u0105 gamyb\u0105.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lt\/istekliai\/nebaigta-gamyba\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-20T13:56:48+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-20T13:57:35+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1984\" \/>\n\t<meta property=\"og:image:height\" content=\"1116\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"10 minu\u010di\u0173\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/nebaigta-gamyba\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/nebaigta-gamyba\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Nebaigta gamyba: kiekis, savikaina ir valdymas\",\"datePublished\":\"2026-10-20T13:56:48+00:00\",\"dateModified\":\"2026-10-20T13:57:35+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/nebaigta-gamyba\\\/\"},\"wordCount\":1926,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/nebaigta-gamyba\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/work-in-process-inventory-hero-1.png\",\"articleSection\":[\"Gamybos efektyvumas\",\"i\u0161tekliai\"],\"inLanguage\":\"lt-LT\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/nebaigta-gamyba\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/nebaigta-gamyba\\\/\",\"name\":\"Nebaigta gamyba: kiekis, savikaina ir valdymas\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/nebaigta-gamyba\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/nebaigta-gamyba\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/work-in-process-inventory-hero-1.png\",\"datePublished\":\"2026-10-20T13:56:48+00:00\",\"dateModified\":\"2026-10-20T13:57:35+00:00\",\"description\":\"\u012evertinkite nebaigt\u0105 gamyb\u0105, apskai\u010diuokite jos savikain\u0105 ir raskite u\u017ebaigimo kli\u016btis. Su\u017einokite, kaip SkyPlanner padeda ma\u017einti perteklin\u0119 nebaigt\u0105 gamyb\u0105.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/nebaigta-gamyba\\\/#breadcrumb\"},\"inLanguage\":\"lt-LT\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/nebaigta-gamyba\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"lt-LT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/nebaigta-gamyba\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/work-in-process-inventory-hero-1.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/work-in-process-inventory-hero-1.png\",\"width\":1984,\"height\":1116,\"caption\":\"Unfinished metal housings wait between machining and finishing, illustrating work-in-process inventory.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/nebaigta-gamyba\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Nebaigta gamyba: kiekis, savikaina ir valdymas\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lt-LT\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lt-LT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lt-LT\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Nebaigta gamyba: kiekis, savikaina ir valdymas","description":"\u012evertinkite nebaigt\u0105 gamyb\u0105, apskai\u010diuokite jos savikain\u0105 ir raskite u\u017ebaigimo kli\u016btis. Su\u017einokite, kaip SkyPlanner padeda ma\u017einti perteklin\u0119 nebaigt\u0105 gamyb\u0105.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lt\/istekliai\/nebaigta-gamyba\/","og_locale":"lt_LT","og_type":"article","og_title":"Nebaigta gamyba: kiekis, savikaina ir valdymas","og_description":"\u012evertinkite nebaigt\u0105 gamyb\u0105, apskai\u010diuokite jos savikain\u0105 ir raskite u\u017ebaigimo kli\u016btis. Su\u017einokite, kaip SkyPlanner padeda ma\u017einti perteklin\u0119 nebaigt\u0105 gamyb\u0105.","og_url":"https:\/\/skyplanner.ai\/lt\/istekliai\/nebaigta-gamyba\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-20T13:56:48+00:00","article_modified_time":"2026-10-20T13:57:35+00:00","og_image":[{"width":1984,"height":1116,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Jussi M\u00e4ntyl\u00e4","Est. reading time":"10 minu\u010di\u0173"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/nebaigta-gamyba\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/nebaigta-gamyba\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Nebaigta gamyba: kiekis, savikaina ir valdymas","datePublished":"2026-10-20T13:56:48+00:00","dateModified":"2026-10-20T13:57:35+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/nebaigta-gamyba\/"},"wordCount":1926,"publisher":{"@id":"https:\/\/skyplanner.ai\/lt\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/nebaigta-gamyba\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1.png","articleSection":["Gamybos efektyvumas","i\u0161tekliai"],"inLanguage":"lt-LT"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/nebaigta-gamyba\/","url":"https:\/\/skyplanner.ai\/lt\/istekliai\/nebaigta-gamyba\/","name":"Nebaigta gamyba: kiekis, savikaina ir valdymas","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lt\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/nebaigta-gamyba\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/nebaigta-gamyba\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1.png","datePublished":"2026-10-20T13:56:48+00:00","dateModified":"2026-10-20T13:57:35+00:00","description":"\u012evertinkite nebaigt\u0105 gamyb\u0105, apskai\u010diuokite jos savikain\u0105 ir raskite u\u017ebaigimo kli\u016btis. Su\u017einokite, kaip SkyPlanner padeda ma\u017einti perteklin\u0119 nebaigt\u0105 gamyb\u0105.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/nebaigta-gamyba\/#breadcrumb"},"inLanguage":"lt-LT","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lt\/istekliai\/nebaigta-gamyba\/"]}]},{"@type":"ImageObject","inLanguage":"lt-LT","@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/nebaigta-gamyba\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1.png","width":1984,"height":1116,"caption":"Unfinished metal housings wait between machining and finishing, illustrating work-in-process inventory."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/nebaigta-gamyba\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lt\/"},{"@type":"ListItem","position":2,"name":"Nebaigta gamyba: kiekis, savikaina ir valdymas"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lt\/#website","url":"https:\/\/skyplanner.ai\/lt\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lt\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lt\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lt-LT"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lt\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lt\/","logo":{"@type":"ImageObject","inLanguage":"lt-LT","@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"lt-LT","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1.png",1984,1116,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1.png",1984,1116,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lt\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Nebaigta gamyba: kiekis, savikaina ir valdymas Prad\u017eia &raquo; I\u0161tekliai &raquo; Nebaigta gamyba: kiekis, savikaina ir valdymas Nebaigta gamyba (WIP) \u2013 tai gaminiai, kuriuos jau prad\u0117ta gaminti, bet kurie dar neu\u017ebaigti. Jai priskiriamos ir apdirbamos detal\u0117s, ir nebaigti gaminiai, laukiantys kitos operacijos. Apskaitoje nebaigta gamyba taip pat rei\u0161kia \u0161iems gaminiams iki \u0161iol sukauptas gamybos i\u0161laidas. \u0160ie&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/posts\/102527","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/comments?post=102527"}],"version-history":[{"count":2,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/posts\/102527\/revisions"}],"predecessor-version":[{"id":102646,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/posts\/102527\/revisions\/102646"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/media\/102580"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/media?parent=102527"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/categories?post=102527"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/tags?post=102527"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}