{"id":102408,"date":"2026-10-20T11:42:15","date_gmt":"2026-10-20T11:42:15","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=102408"},"modified":"2026-10-20T11:43:02","modified_gmt":"2026-10-20T11:43:02","slug":"takto-laikas","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/lt\/istekliai\/takto-laikas\/","title":{"rendered":"Takto laikas: apskai\u010diuokite reikiam\u0105 gamybos temp\u0105"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Takto laikas: apskai\u010diuokite reikiam\u0105 gamybos temp\u0105<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/lt\/\">Prad\u017eia<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/\">I\u0161tekliai<\/a> &raquo; Takto laikas: apskai\u010diuokite reikiam\u0105 gamybos temp\u0105<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Numatomas skaitymo laikas: <\/span><span class=\"yoast-reading-time__reading-time\">9<\/span><span class=\"yoast-reading-time__time-unit\"> minut\u0117s<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Takto laikas nusako, kokiu tempu reikia gaminti, kad b\u016bt\u0173 patenkinta klient\u0173 paklausa. Jis i\u0161rei\u0161kiamas turimo gamybos laiko dalimi, tenkan\u010dia vienam reikiamam kokybi\u0161kam gaminiui. Dviej\u0173 minu\u010di\u0173 takto laikas rei\u0161kia, kad per turim\u0105 laik\u0105 vidutini\u0161kai kas dvi minutes turi b\u016bti pagaminamas vienas kokybi\u0161kas gaminys.<\/p>\n\n\n<p>Apskai\u010diuoti paprasta. Ta\u010diau tuomet kyla svarbiausias klausimas: ar j\u016bs\u0173 \u012frenginiai, darbuotojai ir gamybos mar\u0161rutas leid\u017eia i\u0161laikyti tok\u012f temp\u0105?<\/p>\n\n\n<p>Vien nustatytas paklausos tikslas nerezervuoja \u012frenginio ir nepanaikina poreikio j\u012f perderinti. SkyPlanner APS susieja reikiamus kiekius su i\u0161samiu gamybos tvarkara\u0161\u010diu. Taip galite matyti, koki\u0173 i\u0161tekli\u0173 prireiks darbams atlikti, ir reaguoti pasikeitus paklausai ar i\u0161tekli\u0173 prieinamumui.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Takto laiko formul\u0117<\/h2>\n\n\n<p><strong>Takto laikas = turimas gamybos laikas \u00f7 klient\u0173 paklausa<\/strong><\/p>\n\n\n<p>Abu dyd\u017eiai turi b\u016bti to paties laikotarpio. Per pamain\u0105 turimas minutes dalykite i\u0161 per pamain\u0105 reikiamo vienet\u0173 skai\u010diaus, o per savait\u0119 turimas valandas \u2013 i\u0161 per savait\u0119 reikiamo vienet\u0173 skai\u010diaus. Rezultatas yra laikas vienam vienetui, o ne vienet\u0173 skai\u010dius per valand\u0105.<\/p>\n\n\n<p>\u012esivaizduokite gamybos cel\u0119, dirban\u010di\u0105 a\u0161tuoni\u0173 valand\u0173 pamain\u0105. Pertraukos ir kiti sutarti nedarbo laikotarpiai i\u0161 viso trunka 60 minu\u010di\u0173, tad gamybai lieka 420 minu\u010di\u0173. Klientams i\u0161 \u0161ios cel\u0117s kiekvien\u0105 pamain\u0105 reikia 210 kokybi\u0161k\u0173 gamini\u0173.<\/p>\n\n\n<p><strong>420 minu\u010di\u0173 \u00f7 210 vienet\u0173 = 2 minut\u0117s vienam vienetui<\/strong><\/p>\n\n\n<p>Tai yra 120 sekund\u017ei\u0173 vienam vienetui, o tai atitinka reikiam\u0105 vidutin\u012f gamybos temp\u0105 \u2013 30 vienet\u0173 per kiekvien\u0105 gamybai turim\u0105 valand\u0105. Tai n\u0117ra visos a\u0161tuoni\u0173 valand\u0173 pamainos vidurkis, nes \u012f pamain\u0105 \u012feina ir nedarbo laikotarpiai.<\/p>\n\n\n<p>Dviej\u0173 minu\u010di\u0173 rodiklis nusako, kokio tempo reikia paklausai patenkinti. Jis neparodo, kokiu tempu cel\u0117 dirba dabar ar kiek laiko vienas gaminys u\u017etrunka pereidamas visas operacijas.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Pasirinkite duomenis pagal tai, k\u0105 turite pagaminti<\/h2>\n\n\n<p>Prie\u0161 taikydami tikslin\u012f takto laik\u0105, sutarkite, k\u0105 apima nurodytas kiekis ir turimas laikas. Tikslus atsakymas \u012f netinkam\u0105 klausim\u0105 vis tiek lems prast\u0105 gamybos plan\u0105.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Apibr\u0117\u017ekite gamini\u0173 \u0161eim\u0105 ir produkcijos apskaitos ta\u0161k\u0105<\/h3>\n\n\n<p>Prad\u0117kite nuo gaminio arba nuolat gaminamos gamini\u0173 \u0161eimos, kuri\u0105 prasminga vertinti kaip bendr\u0105 gamybos sraut\u0105. Nurodykite, kur skai\u010diuojama pagaminta produkcija: pavyzd\u017eiui, i\u0161 cel\u0117s i\u0161einantys baigti mazgai, o ne per kelias operacijas pagamint\u0173 detali\u0173 suma.<\/p>\n\n\n<p>Neskai\u010diuokite to paties vieneto i\u0161 naujo kiekvien\u0105 kart\u0105, kai jis pereina kit\u0105 darbo viet\u0105. Taip pat nelaikykite paprastos detal\u0117s ir sud\u0117tingo mazgo lygiaver\u010diais vienetais vien tod\u0117l, kad abu yra u\u017esakym\u0173 s\u0105ra\u0161e.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Paklaus\u0105 vertinkite pagal planuojam\u0105 laikotarp\u012f<\/h3>\n\n\n<p>Skai\u010diuokite kiek\u012f, kurio klientams reikia per planuojam\u0105 laikotarp\u012f. Jei papildote atsargas, poreik\u012f nustatykite pagal atsarg\u0173 papildymo politik\u0105, o ne gaminkite didel\u012f kiek\u012f be pagr\u012fsto poreikio vien tam, kad \u012frenginiai nestov\u0117t\u0173.<\/p>\n\n\n<p>Savait\u0117s vidurkis gali pad\u0117ti nustatyti pasikartojant\u012f gamybos ritm\u0105, ta\u010diau patikrinkite ir tos savait\u0117s pristatymo terminus. Penktadien\u012f pagamintas visas reikiamas kiekis nepad\u0117s laiku \u012fvykdyti u\u017esakymo, kur\u012f reik\u0117jo pristatyti antradien\u012f.<\/p>\n\n\n<p>Kai paklausa auga, o turimas laikas nesikei\u010dia, takto laikas trump\u0117ja: kiekvienam reikiamam vienetui tenka ma\u017eiau laiko. Paklausai ma\u017e\u0117jant, takto laikas ilg\u0117ja. Jei per laikotarp\u012f paklausos n\u0117ra, prasmingo takto laiko apskai\u010diuoti negalima \u2013 dalyba i\u0161 nulio nesukuria gamybos tikslo.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Ai\u0161kiai nustatykite, kiek laiko turite gamybai<\/h3>\n\n\n<p>Skai\u010diuokite laik\u0105, fakti\u0161kai skirt\u0105 tam gamybos srautui, at\u0117m\u0119 suplanuotus nedarbo laikotarpius, pavyzd\u017eiui, pertraukas, per kurias gamyba sustoja. Skai\u010diuodami gamini\u0173 \u0161eimos takto laik\u0105, ne\u012ftraukite visos pamainos, jei \u0161i \u0161eima bendr\u0105 i\u0161tekli\u0173 gali naudoti tik dal\u012f pamainos.<\/p>\n\n\n<p>Nuosekliai apskaitykite paruo\u0161imo laik\u0105 ir nuostolius. \u0160iame vadove perderinimas laikomas darbu, kuris turi tilpti \u012f turim\u0105 gamybos laik\u0105, tod\u0117l jo trukm\u0117 papildomai i\u0161 to laiko neatimama. Taikant kitus skai\u010diavimo b\u016bdus, suplanuot\u0173 perderinim\u0173 trukm\u0117 atimama i\u0161 anksto. Kad ir kur\u012f b\u016bd\u0105 pasirinktum\u0117te, t\u0105 pat\u012f laik\u0105 \u012fskai\u010diuokite tik vien\u0105 kart\u0105.<\/p>\n\n\n<p>Netik\u0117ti gedimai, l\u0117tesnis darbas ir brokas klient\u0173 paklausos nesuma\u017eina. Jie ma\u017eina j\u016bs\u0173 galimybes j\u0105 patenkinti. Vertindami paj\u0117gumus, ai\u0161kiai \u012ftraukite \u0161iuos nuostolius, u\u017euot pasl\u0117p\u0119 juos pernelyg optimistiniu turimo laiko \u012fver\u010diu.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Takto ir ciklo laikas: reikiamas tempas ir faktiniai rezultatai<\/h2>\n\n\n<p>Takto laik\u0105 lemia paklausa. Ciklo laikas nustatomas matuojant proces\u0105: kiek i\u0161 tikr\u0173j\u0173 trunka pasikartojanti operacija arba gamybos ciklas. Gamybos u\u017esakymo \u012fvykdymo laikas yra dar kitas rodiklis \u2013 tai laikas, per kur\u012f pereinamas nustatytas gamybos mar\u0161rutas, \u012fskaitant laukim\u0105 tarp operacij\u0173.<\/p>\n\n\n<p>Gaminys gali kelias valandas keliauti per linij\u0105, i\u0161 kurios kas dvi minutes i\u0161eina baigtas gaminys. Skirtinguose etapuose vienu metu apdorojami keli gaminiai. Tod\u0117l takto laikas nerei\u0161kia, kad vis\u0105 mar\u0161rut\u0105 b\u016btina pereiti per dvi minutes.<\/p>\n\n\n<p>Lygindami ciklo laik\u0105 su takto laiku, patikrinkite, kas \u012ftraukta \u012f matavim\u0105. \u012e automatin\u012f \u012frenginio pjovimo cikl\u0105 gali ne\u012feiti pakrovimas ir i\u0161krovimas. Matuojant cikl\u0105 tik \u012frenginiui veikiant, gali b\u016bti ne\u012fskai\u010diuotos prastovos. N\u0117 vienas i\u0161 \u0161i\u0173 matavim\u0173 savaime ne\u012frodo, kok\u012f kokybi\u0161kos baigtos produkcijos gamybos temp\u0105 galima nuolat i\u0161laikyti.<\/p>\n\n\n<p>Jei vienoje darbo vietoje vienu metu gaminamas vienas vienetas, u\u017e takto laik\u0105 ilgesnis ciklas rodo paj\u0117gum\u0173 tr\u016bkum\u0105 dar ne\u012fskai\u010diavus atskiro paruo\u0161imo laiko ar nuostoli\u0173. Trumpesnis ciklas palieka laiko rezerv\u0105, ta\u010diau ne\u012frodo, kad visas srautas gali patenkinti paklaus\u0105. M\u016bs\u0173 <a href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/gamybos-ciklo-laikas\/\">gamybos ciklo laiko matavimo<\/a> vadove paai\u0161kinta, kaip surinkti planavimui tinkamus operacijos trukm\u0117s duomenis.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Patikrinkite, ar turim\u0173 paj\u0117gum\u0173 pakanka reikiamam tempui<\/h2>\n\n\n<p>Gr\u012f\u017ekime prie cel\u0117s, kurioje per turimas 420 minu\u010di\u0173 reikia pagaminti 210 kokybi\u0161k\u0173 gamini\u0173. Tarkime, jos na\u0161um\u0105 ribojanti operacija trunka 1,8 minut\u0117s vienam vienetui, o paruo\u0161imui per pamain\u0105 reikia 30 minu\u010di\u0173. Apdorojimui ir paruo\u0161imui naudojamas tas pats i\u0161teklius, ir \u0161ie darbai nevyksta vienu metu. \u0160iame supaprastintame pavyzdyje n\u0117ra nei broko, nei neplanuot\u0173 prastov\u0173.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Paj\u0117gum\u0173 patikra<\/th><th>Skai\u010diavimas<\/th><th>Reikiamas laikas<\/th><\/tr><\/thead><tbody><tr><td>Gamini\u0173 apdorojimas<\/td><td>210 vienet\u0173 \u00d7 1,8 minut\u0117s<\/td><td>378 minut\u0117s<\/td><\/tr><tr><td>Paruo\u0161imas<\/td><td>Apskaitomas atskirai<\/td><td>30 minu\u010di\u0173<\/td><\/tr><tr><td>Visi darbai<\/td><td>378 + 30<\/td><td>408 minut\u0117s<\/td><\/tr><tr><td>Lik\u0119s laikas<\/td><td>420 \u2212 408<\/td><td>12 minu\u010di\u0173<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Darbai telpa \u012f \u0161iam i\u0161tekliui turim\u0105 laik\u0105, ta\u010diau rezervas tesiekia 12 minu\u010di\u0173. Kol ne\u012fskai\u010diuotas paruo\u0161imas, atrodo, kad 1,8 minut\u0117s ciklas palieka pakankam\u0105 atsarg\u0105, palyginti su dviej\u0173 minu\u010di\u0173 takto laiku. Ta\u010diau sutrikimas ar papildomas broko taisymas gali greitai i\u0161naudoti likus\u012f laik\u0105.<\/p>\n\n\n<p>Dabar tarkime, kad paklausa i\u0161auga iki 240 vienet\u0173, o pamainos trukm\u0117 nesikei\u010dia. Naujas takto laikas yra <strong>420 \u00f7 240 = 1,75 minut\u0117s vienam vienetui<\/strong>. Ta\u010diau operacija vis dar trunka 1,8 minut\u0117s vienam vienetui, o paruo\u0161imas \u2013 30 minu\u010di\u0173.<\/p>\n\n\n<p>Darbams atlikti dabar reikia <strong>240 \u00d7 1,8 + 30 = 462 minu\u010di\u0173<\/strong>. Tai 42 minut\u0117mis daugiau nei turimos 420 minu\u010di\u0173. Gamybos lentoje \u012fra\u0161ytas trumpesnis tikslinis laikas \u0161io tr\u016bkumo nepa\u0161alins.<\/p>\n\n\n<p>Reikia praktinio sprendimo: sutrumpinti operacijos ar paruo\u0161imo laik\u0105, skirti tinkam\u0173 papildom\u0173 paj\u0117gum\u0173, perkelti tam tinkamus darbus kitam i\u0161tekliui arba susitarti d\u0117l kitokio reikiamo kiekio ar pristatymo termino. Prie\u0161 laikydami si\u016blom\u0105 darbo pagreitinim\u0105 realiu paj\u0117gum\u0173 padid\u0117jimu, \u012fvertinkite kokyb\u0119, darbuotoj\u0173 poreik\u012f ir saugius darbo metodus.<\/p>\n\n\n<p>\u010cia svarbus ir <a href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/kas-yra-gamybos-planavimas\/\">gamybos tvarkara\u0161\u010di\u0173 sudarymas<\/a>. Pirmiau pateiktu skai\u010diavimu patikrinama bendra vieno i\u0161tekliaus apkrova. Tvarkara\u0161tis leid\u017eia patikrinti, kada darbus galima atlikti, ar ankstesn\u0117s operacijos bus baigtos laiku ir kokiems kitiems u\u017esakymams reikia to paties i\u0161tekliaus. Net jei bendra darb\u0173 trukm\u0117 telpa \u012f turim\u0105 laik\u0105, darbai gali b\u016bti baigti per v\u0117lai, jeigu reikiami paj\u0117gumai atsilaisvina tik po pristatymo termino.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Ar takto laikas tinka didel\u0117s \u012fvairov\u0117s gamybai?<\/h2>\n\n\n<p>Takto laik\u0105 lengviausia interpretuoti ten, kur gaminiai juda pasikartojan\u010diu srautu, o jiems pagaminti reikalingo darbo apimtis yra gana pana\u0161i. Didel\u0117s \u012fvairov\u0117s gamyboje jis taip pat gali pad\u0117ti suprasti pasikartojan\u010di\u0105 tinkamai parinktos gamini\u0173 \u0161eimos paklaus\u0105. Vis d\u0117lto vienas visai gamyklai taikomas takto laikas gali pasl\u0117pti b\u016btent t\u0105 apribojim\u0105, kur\u012f reikia pasteb\u0117ti.<\/p>\n\n\n<p>De\u0161im\u010diai vieno gaminio vienet\u0173 gali prireikti daugiau \u012frenginio laiko nei penkiasde\u0161im\u010diai kito gaminio vienet\u0173. Skirtingiems gaminiams taip pat gali reik\u0117ti skirting\u0173 mar\u0161rut\u0173, tvirtinimo \u012ftais\u0173 ar \u012fg\u016bd\u017ei\u0173. Suvedus juos \u012f vien\u0105 vidutin\u012f vienet\u0173 skai\u010di\u0173, j\u0173 paj\u0117gum\u0173 poreikis netampa vienodas.<\/p>\n\n\n<p>I\u0161laikykite paklausos tiksl\u0105, o kiekvieno gaminio kiek\u012f perskai\u010diuokite \u012f fakti\u0161kai reikaling\u0173 operacij\u0173 ir paruo\u0161imo darb\u0173 apimt\u012f. \u012evertinkite bendr\u0105 apkrov\u0105 i\u0161tekliams, kuriuos \u0161ie gaminiai naudoja kartu. Vienetiniams darbams, kuri\u0173 mar\u0161rutai ir trukm\u0117 labai skiriasi, i\u0161samus u\u017esakym\u0173 tvarkara\u0161\u010di\u0173 sudarymas yra naudingesnis nei bandymas visiems darbams primesti vienod\u0105 ritm\u0105.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Su SkyPlanner paverskite paklausos tiksl\u0105 \u012fgyvendinamu tvarkara\u0161\u010diu<\/h2>\n\n\n<p>SkyPlanner naudojamas ne tam, kad pakeist\u0173 paprast\u0105 dalybos veiksm\u0105. Jis padeda susieti apskai\u010diuot\u0105 gamybos poreik\u012f su darbais, kuriuos b\u016btina atlikti tam poreikiui patenkinti.<\/p>\n\n\n<p>SkyPlanner sistemoje gaminio proceso etapus, j\u0173 trukm\u0119 ir tinkamas darbo vietas apibr\u0117\u017eiate vien\u0105 kart\u0105. Naujoms u\u017esakym\u0173 pozicijoms priskiriamas \u0161is mar\u0161rutas, o j\u0173 kiekiai ir pristatymo datos nurodo tvarkara\u0161\u010di\u0173 sudarymo sistemai, k\u0105 reikia atlikti. Galite nurodyti vieno vieneto apdorojimo trukm\u0119, gamybos spart\u0105 arba fiksuotos trukm\u0117s operacij\u0105, o paruo\u0161imo laik\u0105 apskaityti atskirai.<\/p>\n\n\n<p>Arcturus \u2013 SkyPlanner dirbtinis intelektas gamybos tvarkara\u0161\u010diams sudaryti \u2013 planuoja visas u\u017eduotis kartu, atsi\u017evelgdamas \u012f nustatytus paj\u0117gumus, pamainas, operacij\u0173 priklausomybes ir j\u016bs\u0173 pasirinktus prioritetus. Gantt rodinyje matomos sudarytos darb\u0173 eil\u0117s ir j\u0173 vykdymo laikas pagal i\u0161teklius. Taip matote, kada numatyta baigti reikiamus darbus, u\u017euot dar\u0119 prielaid\u0105, kad pakankamas vidutinis tempas garantuoja u\u017esakymo \u012fvykdym\u0105 laiku.<\/p>\n\n\n<p>Padid\u0117jus kiekiui ar suma\u017e\u0117jus pamainos turimam darbo laikui, atnaujinkite \u0161i\u0105 informacij\u0105 ir leiskite Arcturus perskai\u010diuoti tvarkara\u0161t\u012f. \u012evertinkite poveik\u012f susijusiems u\u017esakymams ir nuspr\u0119skite, ar reikia keisti prioritet\u0105, patvirtinti paj\u0117gum\u0173 koregavim\u0105, ar per\u017ei\u016br\u0117ti \u012fsipareigojim\u0105 klientui. Ma\u017eiau laiko skirsite atskir\u0173 \u012frengini\u0173 darb\u0173 eil\u0117ms taisyti rankiniu b\u016bdu ir tur\u0117site ai\u0161kesn\u012f pagrind\u0105 gamybos sprendimams priimti.<\/p>\n\n\n<p>SkyPlanner sudaro j\u016bs\u0173 apibr\u0117\u017et\u0173 gamybos i\u0161tekli\u0173 darbo tvarkara\u0161\u010dius, o fizinis gamybos linij\u0173 balansavimas ir darbo metod\u0173 keitimas lieka gamybos in\u017einerijos sprendimais. Geriau sudarytas tvarkara\u0161tis padeda matyti, kur reikia imtis veiksm\u0173 ir kaip pakeistas planas paveiks pristatym\u0105.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Kas pasikeit\u0117 Fredman Operations prad\u0117jus matyti kiekvienos pamainos paj\u0117gumus<\/h3>\n\n\n<p>Fredman Operations, Suomijos \u012fmon\u0117, gaminanti virtuv\u0117s ir pakavimo gaminius, tinkamus liestis su maistu, anks\u010diau rankiniu b\u016bdu perkeldavo darb\u0173 korteles i\u0161 L7 ERP \u012f LTR gamybos valdymo programin\u0119 \u012frang\u0105. U\u017eduo\u010di\u0173 prioritetai taip pat buvo nustatomi rankiniu b\u016bdu, o informacijos apie tai, kada atsilaisvins \u012frenginiai ir kokie paj\u0117gumai bus prieinami kiekvienoje pamainoje, tr\u016bko.<\/p>\n\n\n<p>Prad\u0117jus naudoti SkyPlanner, bendras Gantt rodinys ir pamain\u0173 tvarkara\u0161\u010di\u0173 sudarymas leido \u012ftraukti \u0161iuos paj\u0117gumus \u012f gamybos plan\u0105. Darbuotojai gal\u0117jo matyti numatyt\u0105 u\u017eduo\u010di\u0173 prad\u017eios ir pabaigos laik\u0105. \u012emon\u0117s teigimu, tai pad\u0117jo grei\u010diau reaguoti \u012f tvarkara\u0161\u010dio poky\u010dius ir suma\u017eino vir\u0161valand\u017ei\u0173 poreik\u012f.<\/p>\n\n\n<p>Fredman patirtis parodo, kod\u0117l reikiamai gamybos apim\u010diai b\u016btinas prakti\u0161kai pritaikomas paj\u0117gum\u0173 planas: komanda gali \u012fvertinti \u012fsipareigojimus pagal turim\u0105 gamybos laik\u0105, u\u017euot kaskart visk\u0105 i\u0161 naujo skai\u010diavusi rankiniu b\u016bdu. Vis\u0105 istorij\u0105 skaitykite <a href=\"https:\/\/skyplanner.ai\/lt\/klientu-istorijos\/fredman-operations\/\">Fredman Operations atsiliepime apie SkyPlanner<\/a>.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Su\u017einokite, k\u0105 reikiamas gamybos tempas rei\u0161kia prakti\u0161kai<\/h2>\n\n\n<p>Apskai\u010diuokite takto laik\u0105, kad b\u016bt\u0173 ai\u0161ku, kokio gamybos tempo reikia kliento poreikiui patenkinti. Tada naudodami SkyPlanner sudarykite konkre\u010di\u0173 darb\u0173 tvarkara\u0161t\u012f, patikrinkite, kur i\u0161tekli\u0173 apkrova telpa \u012f turimus paj\u0117gumus, ir \u012fvertinkite, kas pasikei\u010dia pakitus poreikiui.<\/p>\n\n\n<p>SkyPlanner per atvir\u0105 REST API integruojama su bet kuria ERP ar MES sistema, tod\u0117l esamus u\u017esakym\u0173 ir gamybos duomenis galite naudoti gamybos tvarkara\u0161\u010diams sudaryti.<\/p>\n\n\n<p>Nor\u0117dami aptarti, kaip tai veikt\u0173 j\u016bs\u0173 gamyboje, <a href=\"https:\/\/skyplanner.ai\/lt\/susisiekite-su-pardavejais\/\">u\u017esisakykite SkyPlanner demonstracij\u0105<\/a>. Pasiruo\u0161kite reguliariai gaminam\u0173 gamini\u0173 \u0161eimos duomenis: jos paklaus\u0105, operacij\u0173 trukmes ir pamain\u0173 kalendori\u0173. \u0160ie duomenys leis konkre\u010diai aptarti, k\u0105 reikia pagaminti, kur reikia paj\u0117gum\u0173 ir kaip tvarkara\u0161tis kei\u010diasi pasikeitus s\u0105lygoms. Jei pirmiausia norite susipa\u017einti savaranki\u0161kai, <a href=\"https:\/\/skyplanner.ai\/lt\/bandymas\/\">i\u0161bandykite SkyPlanner su demonstraciniais duomenimis<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Takto laikas: apskai\u010diuokite reikiam\u0105 gamybos temp\u0105 Prad\u017eia &raquo; I\u0161tekliai &raquo; Takto laikas: apskai\u010diuokite reikiam\u0105 gamybos temp\u0105 Takto laikas nusako, kokiu tempu reikia gaminti, kad b\u016bt\u0173 patenkinta klient\u0173 paklausa. Jis i\u0161rei\u0161kiamas turimo gamybos laiko dalimi, tenkan\u010dia vienam reikiamam kokybi\u0161kam gaminiui. Dviej\u0173 minu\u010di\u0173 takto laikas rei\u0161kia, kad per turim\u0105 laik\u0105 vidutini\u0161kai kas dvi minutes turi b\u016bti pagaminamas &#8230; <a title=\"Takto laikas: apskai\u010diuokite reikiam\u0105 gamybos temp\u0105\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/takto-laikas\/\" aria-label=\"Read more about Takto laikas: apskai\u010diuokite reikiam\u0105 gamybos temp\u0105\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":102432,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2560,301],"tags":[],"class_list":["post-102408","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-gamybos-efektyvumas","category-istekliai","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Takto laikas: apskai\u010diuokite reikiam\u0105 gamybos temp\u0105<\/title>\n<meta name=\"description\" content=\"Apskai\u010diuokite takto laik\u0105 pagal paklaus\u0105 ir turim\u0105 laik\u0105. \u012evertinkite reikiamus paj\u0117gumus ir su SkyPlanner sudarykite \u012fgyvendinam\u0105 gamybos tvarkara\u0161t\u012f.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/takto-laikas\/\" \/>\n<meta property=\"og:locale\" content=\"lt_LT\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Takto laikas: apskai\u010diuokite reikiam\u0105 gamybos temp\u0105\" \/>\n<meta property=\"og:description\" content=\"Apskai\u010diuokite takto laik\u0105 pagal paklaus\u0105 ir turim\u0105 laik\u0105. \u012evertinkite reikiamus paj\u0117gumus ir su SkyPlanner sudarykite \u012fgyvendinam\u0105 gamybos tvarkara\u0161t\u012f.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lt\/istekliai\/takto-laikas\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-20T11:42:15+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-20T11:43:02+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/takt-time-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1368\" \/>\n\t<meta property=\"og:image:height\" content=\"770\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"10 minu\u010di\u0173\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/takto-laikas\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/takto-laikas\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Takto laikas: apskai\u010diuokite reikiam\u0105 gamybos temp\u0105\",\"datePublished\":\"2026-10-20T11:42:15+00:00\",\"dateModified\":\"2026-10-20T11:43:02+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/takto-laikas\\\/\"},\"wordCount\":1938,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/takto-laikas\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/takt-time-hero.png\",\"articleSection\":[\"Gamybos efektyvumas\",\"i\u0161tekliai\"],\"inLanguage\":\"lt-LT\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/takto-laikas\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/takto-laikas\\\/\",\"name\":\"Takto laikas: apskai\u010diuokite reikiam\u0105 gamybos temp\u0105\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/takto-laikas\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/takto-laikas\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/takt-time-hero.png\",\"datePublished\":\"2026-10-20T11:42:15+00:00\",\"dateModified\":\"2026-10-20T11:43:02+00:00\",\"description\":\"Apskai\u010diuokite takto laik\u0105 pagal paklaus\u0105 ir turim\u0105 laik\u0105. \u012evertinkite reikiamus paj\u0117gumus ir su SkyPlanner sudarykite \u012fgyvendinam\u0105 gamybos tvarkara\u0161t\u012f.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/takto-laikas\\\/#breadcrumb\"},\"inLanguage\":\"lt-LT\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/takto-laikas\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"lt-LT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/takto-laikas\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/takt-time-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/takt-time-hero.png\",\"width\":1368,\"height\":770,\"caption\":\"Evenly spaced finished components leaving an assembly cell illustrate the demand-led production pace of takt time.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/takto-laikas\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Takto laikas: apskai\u010diuokite reikiam\u0105 gamybos temp\u0105\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lt-LT\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lt-LT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lt-LT\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Takto laikas: apskai\u010diuokite reikiam\u0105 gamybos temp\u0105","description":"Apskai\u010diuokite takto laik\u0105 pagal paklaus\u0105 ir turim\u0105 laik\u0105. \u012evertinkite reikiamus paj\u0117gumus ir su SkyPlanner sudarykite \u012fgyvendinam\u0105 gamybos tvarkara\u0161t\u012f.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lt\/istekliai\/takto-laikas\/","og_locale":"lt_LT","og_type":"article","og_title":"Takto laikas: apskai\u010diuokite reikiam\u0105 gamybos temp\u0105","og_description":"Apskai\u010diuokite takto laik\u0105 pagal paklaus\u0105 ir turim\u0105 laik\u0105. \u012evertinkite reikiamus paj\u0117gumus ir su SkyPlanner sudarykite \u012fgyvendinam\u0105 gamybos tvarkara\u0161t\u012f.","og_url":"https:\/\/skyplanner.ai\/lt\/istekliai\/takto-laikas\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-20T11:42:15+00:00","article_modified_time":"2026-10-20T11:43:02+00:00","og_image":[{"width":1368,"height":770,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/takt-time-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Jussi M\u00e4ntyl\u00e4","Est. reading time":"10 minu\u010di\u0173"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/takto-laikas\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/takto-laikas\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Takto laikas: apskai\u010diuokite reikiam\u0105 gamybos temp\u0105","datePublished":"2026-10-20T11:42:15+00:00","dateModified":"2026-10-20T11:43:02+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/takto-laikas\/"},"wordCount":1938,"publisher":{"@id":"https:\/\/skyplanner.ai\/lt\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/takto-laikas\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/takt-time-hero.png","articleSection":["Gamybos efektyvumas","i\u0161tekliai"],"inLanguage":"lt-LT"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/takto-laikas\/","url":"https:\/\/skyplanner.ai\/lt\/istekliai\/takto-laikas\/","name":"Takto laikas: apskai\u010diuokite reikiam\u0105 gamybos temp\u0105","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lt\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/takto-laikas\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/takto-laikas\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/takt-time-hero.png","datePublished":"2026-10-20T11:42:15+00:00","dateModified":"2026-10-20T11:43:02+00:00","description":"Apskai\u010diuokite takto laik\u0105 pagal paklaus\u0105 ir turim\u0105 laik\u0105. \u012evertinkite reikiamus paj\u0117gumus ir su SkyPlanner sudarykite \u012fgyvendinam\u0105 gamybos tvarkara\u0161t\u012f.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/takto-laikas\/#breadcrumb"},"inLanguage":"lt-LT","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lt\/istekliai\/takto-laikas\/"]}]},{"@type":"ImageObject","inLanguage":"lt-LT","@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/takto-laikas\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/takt-time-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/takt-time-hero.png","width":1368,"height":770,"caption":"Evenly spaced finished components leaving an assembly cell illustrate the demand-led production pace of takt time."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/takto-laikas\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lt\/"},{"@type":"ListItem","position":2,"name":"Takto laikas: apskai\u010diuokite reikiam\u0105 gamybos temp\u0105"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lt\/#website","url":"https:\/\/skyplanner.ai\/lt\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lt\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lt\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lt-LT"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lt\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lt\/","logo":{"@type":"ImageObject","inLanguage":"lt-LT","@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"lt-LT","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/takt-time-hero.png",1368,770,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/takt-time-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/takt-time-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/takt-time-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/takt-time-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/takt-time-hero.png",1368,770,false],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/takt-time-hero.png",1368,770,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/takt-time-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lt\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Takto laikas: apskai\u010diuokite reikiam\u0105 gamybos temp\u0105 Prad\u017eia &raquo; I\u0161tekliai &raquo; Takto laikas: apskai\u010diuokite reikiam\u0105 gamybos temp\u0105 Takto laikas nusako, kokiu tempu reikia gaminti, kad b\u016bt\u0173 patenkinta klient\u0173 paklausa. Jis i\u0161rei\u0161kiamas turimo gamybos laiko dalimi, tenkan\u010dia vienam reikiamam kokybi\u0161kam gaminiui. Dviej\u0173 minu\u010di\u0173 takto laikas rei\u0161kia, kad per turim\u0105 laik\u0105 vidutini\u0161kai kas dvi minutes turi b\u016bti pagaminamas&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/posts\/102408","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/comments?post=102408"}],"version-history":[{"count":2,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/posts\/102408\/revisions"}],"predecessor-version":[{"id":102498,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/posts\/102408\/revisions\/102498"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/media\/102432"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/media?parent=102408"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/categories?post=102408"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/tags?post=102408"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}