{"id":101924,"date":"2026-10-20T06:47:48","date_gmt":"2026-10-20T06:47:48","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=101924"},"modified":"2026-10-20T06:48:36","modified_gmt":"2026-10-20T06:48:36","slug":"komplektavimas-gamyboje","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/lt\/istekliai\/komplektavimas-gamyboje\/","title":{"rendered":"Komplektavimas gamyboje: surinkim\u0105 prad\u0117kite su visu komplektu"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Komplektavimas gamyboje: surinkim\u0105 prad\u0117kite su visu komplektu<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/lt\/\">Prad\u017eia<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/\">I\u0161tekliai<\/a> &raquo; Komplektavimas gamyboje: surinkim\u0105 prad\u0117kite su visu komplektu<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Numatomas skaitymo laikas: <\/span><span class=\"yoast-reading-time__reading-time\">9<\/span><span class=\"yoast-reading-time__time-unit\"> minut\u0117s<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Surinkimas jau prad\u0117tas, kai paai\u0161k\u0117ja, kad tr\u016bksta laikiklio. Dabar operatorius ie\u0161ko dali\u0173, nebaigtas gaminys u\u017eima darbastal\u012f, o kitai u\u017eduo\u010diai neb\u0117ra vietos. Atsarg\u0173 ataskaita gal ir atrod\u0117 gerai, ta\u010diau u\u017eduotis vis tiek nebuvo parengta vykdyti.<\/p>\n\n\n<p><strong>Komplektavimas gamyboje \u2013 tai konkre\u010diai gamybos u\u017eduo\u010diai ar operacijai reikaling\u0173 dali\u0173 surinkimas, sutvarkymas ir patikrinimas prie\u0161 pristatant jas \u012f naudojimo viet\u0105.<\/strong> Tikslas paprastas: kad operatorius gal\u0117t\u0173 surinkin\u0117ti, o ne ie\u0161koti, r\u016b\u0161iuoti ar laukti.<\/p>\n\n\n<p>Kad komplektas b\u016bt\u0173 naudingas, neu\u017etenka vien tinkam\u0173 dali\u0173. Jis turi pasiekti reikiam\u0105 darbo viet\u0105 tada, kai j\u012f ten bus galima panaudoti. SkyPlanner APS viename grafike susieja med\u017eiag\u0173 prieinamum\u0105, ankstesnius gamybos etapus ir realius \u012frengini\u0173 bei darbuotoj\u0173 paj\u0117gumus. Taip paruo\u0161tos dalys padeda dirbti be pertr\u016bki\u0173, u\u017euot sudariusios dar vien\u0105 eil\u0119, kuri\u0105 tenka tvarkyti rankiniu b\u016bdu.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kas sudaro gamybai skirt\u0105 komplekt\u0105?<\/h2>\n\n\n<p>Komplekt\u0105 sudaro konkre\u010diam darbui reikalingi komponentai ir j\u0173 kiekiai. Jis gali b\u016bti skirtas visam gaminiui, mazgui arba vienai didesnio u\u017esakymo operacijai. Svarbu ai\u0161kiai apibr\u0117\u017eti paskirt\u012f: suvirinimui skirtas komplektas gali b\u016bti visas, nors galutiniam surinkimui reikalingas perkamas variklis dar neatvyko.<\/p>\n\n\n<p>Dalis galima gabenti pad\u0117kle, d\u0117\u017e\u0117je ar ve\u017eim\u0117lyje. Stambios dalys gali likti netoliese esan\u010dioje paruo\u0161imo vietoje, pa\u017eym\u0117tos kaip skirtos tai pa\u010diai u\u017eduo\u010diai. U\u017esakymo identifikacinius duomenis, taikom\u0105 br\u0117\u017einio redakcij\u0105 ir surinkimo instrukcijas laikykite kartu su komplektu arba pasir\u016bpinkite, kad jas b\u016bt\u0173 lengva pasiekti i\u0161 komplekto vietos. Svarbiausia, kad operatorius gal\u0117t\u0173 atpa\u017einti tinkamas dalis ir atlikti numatyt\u0105 darb\u0105.<\/p>\n\n\n<p>Komplektavimas susij\u0119s su kitais darbais, ta\u010diau j\u0173 nereik\u0117t\u0173 painioti:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Dali\u0173 rinkimas<\/strong> \u2013 tai dali\u0173 pa\u0117mimas i\u0161 sand\u0117liavimo viet\u0173. Komplektuojant surinktos dalys sutelkiamos \u012f vien\u0105 komplekt\u0105 ir patikrinamos pagal konkre\u010dios u\u017eduoties reikalavimus.<\/li><li><strong>Surinkimas<\/strong> \u2013 tai dali\u0173 sujungimas \u012f gamin\u012f ar mazg\u0105. Komplektuojant \u0161ios dalys paruo\u0161iamos, bet neb\u016btinai sujungiamos.<\/li><li><strong>Atsarg\u0173 papildymas prie linijos<\/strong> u\u017etikrina, kad darbo vietoje nuolat b\u016bt\u0173 naudojam\u0173 komponent\u0173. Komplektuojant pateikiamas apibr\u0117\u017etas dali\u0173 rinkinys konkre\u010diam darbui.<\/li><\/ul>\n\n\n<p>\u0160iuos b\u016bdus galima derinti. Da\u017enai naudojamus standartinius tvirtinimo elementus laikykite prie linijos esan\u010diose d\u0117\u017eut\u0117se, kuri\u0173 atsargos kontroliuojamos, o konkre\u010diam variantui skirtus laikiklius, laid\u0173 pynes ir prietaisus komplektuokite atskirai. N\u0117ra daug prasm\u0117s atskirai pakuoti kiekvien\u0105 var\u017et\u0105, jei darbo vietoje jau patikimai papildomos j\u0173 atsargos.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kada komplektavimas palengvina gamyb\u0105<\/h2>\n\n\n<p>Komplektavimas ypa\u010d naudingas, kai operatoriai dirba su daugeliu gaminio variant\u0173, dalys atkeliauja i\u0161 skirting\u0173 viet\u0173 arba vertingas surinkimo laikas prarandamas ie\u0161kant komponent\u0173. Ruo\u0161iant komplekt\u0105 kitur, dali\u0173 paie\u0161ka ir tikrinimas nebeu\u017eima riboto paj\u0117gumo darbo vietos.<\/p>\n\n\n<p>Ai\u0161kiai i\u0161d\u0117stytame komplekte lengviau pasteb\u0117ti ir klaidas. Tu\u0161\u010dia pa\u017eym\u0117ta vieta gali parodyti, kad tr\u016bksta komponento, dar prie\u0161 pradedant surinkim\u0105. Atskyrus dalis pagal u\u017eduotis, suma\u017e\u0117ja tikimyb\u0117 paimti i\u0161 pa\u017ei\u016bros tinkam\u0105, bet kitam variantui skirt\u0105 dal\u012f. Kai darbas re\u010diau nutr\u016bksta, kvalifikuoti darbuotojai turi daugiau laiko na\u0161iam darbui, o dali\u0173 laukiantys nebaigti gaminiai ma\u017eiau trikdo gamyb\u0105.<\/p>\n\n\n<p>Vis d\u0117lto komplektavimas reikalauja papildom\u0173 s\u0105naud\u0173. Kiekvien\u0105 komplekt\u0105 reikia paruo\u0161ti, patikrinti ir pristatyti. Stabiliai veikian\u010dioje linijoje, kurioje naudojama nedaug skirting\u0173 standartini\u0173 komponent\u0173, gali b\u016bti papras\u010diau papildyti atsargas prie linijos. Komplektavim\u0105 rinkit\u0117s ten, kur ma\u017eiau paie\u0161k\u0173, klaid\u0173 ir darbo pertr\u016bki\u0173 atperka pasiruo\u0161imo pastangas, o ne vien tod\u0117l, kad kiekvien\u0105 komponent\u0105 galima sutalpinti \u012f d\u0117\u017e\u0119.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kaip vyksta komplektavimas gamyboje<\/h2>\n\n\n<p>Pirmiausia ai\u0161kiai apibr\u0117\u017ekite perdavim\u0105: komplekt\u0105 priimantis \u017emogus turi \u017einoti, kokiam darbui jis skirtas ir ar jau paruo\u0161tas naudoti.<\/p>\n\n\n<h3 class=\"wp-block-heading\">1. Apibr\u0117\u017ekite komplekt\u0105 pagal u\u017eduoties reikalavimus<\/h3>\n\n\n<p>Pagal <a href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/gamybos-uzsakymu-valdymas\/\">gamybos u\u017esakym\u0105<\/a> ir galiojan\u010di\u0105 jo <a href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/erp-bom-medziagu-sarasas\/\">med\u017eiag\u0173 specifikacij\u0105<\/a> nustatykite reikalingas dalis, j\u0173 kiekius ir variantus. Patikrinkite taikom\u0105 redakcij\u0105 ir visus patvirtintus konkretaus u\u017esakymo pakeitimus. Nuspr\u0119skite, ar komplektas skirtas visam surinkimui, ar konkre\u010diai operacijai.<\/p>\n\n\n<p>Pa\u017eym\u0117kite komplekt\u0105 taip, kad b\u016bt\u0173 ai\u0161ku, kuriam darbui jis skirtas. Gali pakakti u\u017esakymo numerio ir operacijos nuorodos. Jei komplektas yra atskirai sand\u0117liuojamas, pakartotinai naudojamas gaminys, jam gali reik\u0117ti atskiro prek\u0117s kodo. Ne kiekvienam konkre\u010diai u\u017eduo\u010diai sudarytam komplektui b\u016btina sukurti nauj\u0105 atsarg\u0173 apskaitos kod\u0105.<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. Prie\u0161 rinkdami dalis patikrinkite, ar jas galima naudoti<\/h3>\n\n\n<p>Neapsiribokite bendru atsarg\u0173 liku\u010diu. Ar dalys tinkamos \u0161iam u\u017esakymui, ar j\u0173 redakcija ir kiekis teisingi, ar jos nepaskirtos kitur ir nelaukia patikros? Jei komponentai gaminami \u012fmon\u0117je, patikrinkite, kada bus baigti b\u016btini j\u0173 gamybos ir pri\u0117mimo etapai.<\/p>\n\n\n<p>Numatomus pristatymus atskirkite nuo jau gaut\u0173 dali\u0173. Tiek\u0117jo pa\u017ead\u0117ta data galima remtis planuojant b\u016bsimus darbus, ta\u010diau ji nerei\u0161kia, kad \u0161iandien ruo\u0161iamame komplekte jau yra visos dalys. Tr\u016bkumus nustatykite pakankamai anksti, kad pirkim\u0173 ar gamybos darbuotojai gal\u0117t\u0173 imtis veiksm\u0173, kol surinkimo komandai dar netenka laukti.<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. Surinkite ir ai\u0161kiai i\u0161d\u0117stykite dalis<\/h3>\n\n\n<p>Paimkite reikiamus kiekius, atskirkite pana\u0161ius variantus ir saugokite dalis nuo pa\u017eeidim\u0173 jas perkeldami. Naudokite skyrelius ar pa\u017eym\u0117tas vietas, jei tai palengvina tikrinim\u0105 ir surinkim\u0105. Pa\u017eym\u0117kite visus atskirai paruo\u0161tus stambius komponentus, kad komplektas neatrodyt\u0173 visas, kol toks komponentas dar yra kitur.<\/p>\n\n\n<p>Med\u017eiag\u0173 jud\u0117jim\u0105 registruokite atsarg\u0173 apskaitos sistemoje. Komplektui paimtos dalys neturi b\u016bti rodomos kaip laisvos kitai u\u017eduo\u010diai. Jei pasikeitus prioritetams komplektas i\u0161ardomas, u\u017eregistruokite ir dali\u0173 gr\u0105\u017einim\u0105 arba paskyrim\u0105 kitam darbui.<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. Patikrinkite komplekt\u0105 ir ai\u0161kiai pa\u017eym\u0117kite neatitiktis<\/h3>\n\n\n<p>Patikrinkite surinktas dalis pagal nustatytus reikalavimus: ar tai tinkamos dalys, ar teisingas j\u0173 kiekis ir redakcija, ar j\u0173 b\u016bkl\u0117 tinkama naudoti. Kur reikia, taikykite \u012fprastus kokyb\u0117s ir atsekamumo reikalavimus. Turi b\u016bti ai\u0161ku, kas patvirtino komplekto parengt\u012f ir kas dar nesutvarkyta.<\/p>\n\n\n<p>Ne\u017eym\u0117kite komplekto kaip paruo\u0161to, jei jame dar tr\u016bksta dali\u0173. Nepilnus komplektus atskirkite nuo paruo\u0161t\u0173 fizi\u0161kai arba ai\u0161kiai juos pa\u017eym\u0117kite, kad neb\u016bt\u0173 galima supainioti. Tr\u016bkstam\u0105 dal\u012f u\u017eregistruokite, u\u017euot pasikliov\u0119 pastaba, kuri\u0105 ka\u017ekas tur\u0117s prisiminti.<\/p>\n\n\n<h3 class=\"wp-block-heading\">5. Paruo\u0161kite ir pristatykite pagal gamybos sek\u0105<\/h3>\n\n\n<p>Komplekt\u0105 paruo\u0161kite pakankamai anksti, kad sp\u0117tum\u0117te pasteb\u0117ti ir i\u0161spr\u0119sti problemas, o tada laiku pristatykite numatytam darbui. Neu\u017epildykite surinkimo zonos darbais, kuri\u0173 artimiausiu metu neprad\u0117site. Visas komplektas, laukiantis jam skirtoje paruo\u0161imo zonoje, naudingesnis u\u017e ve\u017eim\u0117l\u012f, u\u017estojant\u012f kitam u\u017esakymui reikaling\u0105 darbastal\u012f.<\/p>\n\n\n<p>Perduodant turi b\u016bti ai\u0161ku, kuriai u\u017eduo\u010diai komplektas skirtas, ar jis paruo\u0161tas ir kur turi b\u016bti pristatytas. Panaudoj\u0119 komplekt\u0105, sutvarkykite likusias dalis ir u\u017efiksuotus neatitikimus, kad kit\u0105 atsarg\u0173 patikr\u0105 gal\u0117tum\u0117te prad\u0117ti nuo patikim\u0173 duomen\u0173.<\/p>\n\n\n<h2 class=\"wp-block-heading\">K\u0105 daryti, kai komplekte tr\u016bksta dali\u0173<\/h2>\n\n\n<p>Dali\u0173 tr\u016bkumas reikalauja gamybos sprendimo \u2013 tai ne vien sand\u0117lio problema. Nustatykite tiksl\u0173 tr\u016bkstam\u0105 kiek\u012f, paveikt\u0105 operacij\u0105, u\u017e tr\u016bkumo pa\u0161alinim\u0105 atsaking\u0105 asmen\u012f ir artimiausi\u0105 pagr\u012fst\u0105 dat\u0105, kada dalys bus prieinamos. D\u0117l perkamo komponento gali reik\u0117ti gauti tiek\u0117jo atsakym\u0105, o gaminamam komponentui gali prireikti mechaninio apdirbimo, apdailos ar patikros paj\u0117gum\u0173.<\/p>\n\n\n<p>Tada nuspr\u0119skite, kuriuos darbus i\u0161 tikr\u0173j\u0173 galima t\u0119sti. Jei d\u0117l tr\u016bkstamos dalies numatytos operacijos ne\u012fmanoma u\u017ebaigti, ne\u012ftraukite \u0161io darbo \u012f paruo\u0161t\u0173 u\u017eduo\u010di\u0173 eil\u0119 ir vietoj jo pasirinkite kit\u0105 tinkam\u0105, jau paruo\u0161t\u0105 u\u017eduot\u012f. Jei darb\u0105 prad\u0117site vien tam, kad \u017emogus tur\u0117t\u0173 k\u0105 veikti, darbastalis gali likti u\u017eimtas nebaigtu gaminiu, o v\u0117liau darb\u0105 teks perduoti dar kart\u0105.<\/p>\n\n\n<p>Kartais atskir\u0105 operacij\u0105 galima u\u017ebaigti ir be tr\u016bkstamo komponento. Ai\u0161kiai apibr\u0117\u017ekite \u0161\u012f darb\u0105, jam reikalingas dalis ir u\u017ebaigimo ta\u0161k\u0105, u\u017euot nevis\u0105 galutinio surinkimo komplekt\u0105 laik\u0119 visu. Prie\u0161 kei\u010diant reikalavimus, bet kuri pakaitin\u0117 dalis turi b\u016bti patvirtinta nustatyta tvarka.<\/p>\n\n\n<p>Galiausiai atnaujinkite grafik\u0105. Gauti tr\u016bkstam\u0105 dal\u012f \u2013 tik pus\u0117 darbo: surinkimui, bandymams ar kitam v\u0117lesniam etapui reikalingi i\u0161tekliai i\u0161 prad\u017ei\u0173 numatytu laiku jau gali b\u016bti u\u017eimti. SkyPlanner padeda perskai\u010diuoti susijusi\u0173 darb\u0173 grafik\u0105, kad nauja dali\u0173 prieinamumo data neb\u016bt\u0173 automati\u0161kai laikoma nauja u\u017ebaigimo data.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Pavyzdys: atsargos sand\u0117lyje dar nerei\u0161kia, kad komplektas paruo\u0161tas<\/h2>\n\n\n<p>\u012esivaizduokite gamintoj\u0105, ruo\u0161iant\u012f valdymo spint\u0105. Jos surinkimo komplektui reikia perkam\u0173 komutavimo aparat\u0173, gaminamos montavimo plok\u0161t\u0117s ir kliento konfig\u016bracijai skirtos laid\u0173 pyn\u0117s.<\/p>\n\n\n<p>Komutavimo aparatai yra sand\u0117lyje. Montavimo plok\u0161t\u0117 dar gaminama. Lentynoje yra laid\u0173 pyn\u0117, ta\u010diau ji skirta kitam variantui. Bendra atsarg\u0173 patikra gal\u0117t\u0173 sudaryti \u012fsp\u016bd\u012f, kad u\u017esakymas beveik paruo\u0161tas, o komplekto patikra atskleid\u017eia dvi konkre\u010dias problemas dar prie\u0161 spintai u\u017eimant surinkimo darbastal\u012f.<\/p>\n\n\n<p>Pirkim\u0173 skyrius i\u0161siai\u0161kina, kada gali atvykti tinkama laid\u0173 pyn\u0117. Gamybos skyrius patikrina, kokie plok\u0161t\u0117s gamybos darbai dar liko. Tuomet planuotojas gali laisv\u0105 darbastalio laik\u0105 skirti kitai jau paruo\u0161tai spintos surinkimo u\u017eduo\u010diai, o nevis\u0105 komplekt\u0105 palikti ai\u0161kiai pa\u017eym\u0117t\u0105 paruo\u0161imo zonoje.<\/p>\n\n\n<p>Kai tr\u016bkstamos dalys bus gautos, spintai vis tiek reik\u0117s laisvo surinkimo laiko ir v\u0117lesni\u0173 bandym\u0173. \u0160ias operacijas planuojant kartu, i\u0161laikoma komplektavimo nauda: dalys pristatomos darbui, kur\u012f galima t\u0119sti, o ne tiesiog papildo kit\u0105 eil\u0119.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Susiekite komplekt\u0173 parengt\u012f su paj\u0117gumais naudodami SkyPlanner<\/h2>\n\n\n<p>SkyPlanner viename gamybos plane susieja \u0161iame pavyzdyje aptart\u0105 komponent\u0173 prieinamum\u0105 ir gamybos paj\u0117gumus. Perkamus arba sand\u0117liuojamus komponentus galima susieti kaip med\u017eiagas. Komponentus, kuriuos dar reikia pagaminti, galima apibr\u0117\u017eti kaip tarpinius gaminius su atskirais proceso etapais. Nusta\u010dius, kaip nuo j\u0173 gamybos priklauso pagrindinis surinkimas, \u0161ie darbai susiejami plane.<\/p>\n\n\n<p>\u012ejungus planavim\u0105 pagal med\u017eiag\u0173 prieinamum\u0105, SkyPlanner planavimo dirbtinis intelektas Arcturus, apskai\u010diuodamas prad\u017eios laikus, atsi\u017evelgia \u012f atsargas ir gaunamas med\u017eiagas. Pirkimo u\u017esakym\u0173 pristatymo datos nurodo numatom\u0105 prieinamum\u0105, o patvirtinus pristatym\u0105 atsargos atnaujinamos. Tai padeda planuotojui derinti b\u016bsimus darbus, o fizin\u0117 komplekto patikra patvirtina, k\u0105 i\u0161 tikr\u0173j\u0173 jau galima perduoti.<\/p>\n\n\n<p>Arcturus sudaro operacij\u0173 grafik\u0105 pagal nustatytus darbo centrus, pamainas, trukmes, tarpusavio priklausomybes ir prioritetus. Gaut\u0105 darb\u0173 sek\u0105 rodo Gantt diagrama. Valdymo spint\u0173 gamintojui tai rei\u0161kia, kad plok\u0161t\u0117s gamyba, surinkimas ir bandymai \u012ftraukti \u012f bendr\u0105 susiet\u0105 plan\u0105, o ne suplanuoti atskiromis datomis, kurias v\u0117liau reikia derinti.<\/p>\n\n\n<p>Pasikeitus tiekimui ar paj\u0117gumams, atnaujinkite atitinkamus pradinius duomenis ir perskai\u010diuokite grafik\u0105. Prioritetus nustatote j\u016bs, o Arcturus atlieka planavimo skai\u010diavimus. Taip ma\u017eiau laiko sugai\u0161tate i\u0161 naujo sudarydami darbo centr\u0173 u\u017eduo\u010di\u0173 eiles ir ai\u0161kiau matote, kuriuos darbus galima atlikti turimais i\u0161tekliais, laikantis \u012fsipareigojim\u0173.<\/p>\n\n\n<p>SkyPlanner integruojama su bet kuria ERP ar MES sistema per atvir\u0105 REST API. Galite ir toliau valdyti u\u017esakymus bei atsargas esamoje sistemoje, o detal\u0173 planavim\u0105, reikaling\u0105 detal\u0117ms ir gamybos paj\u0117gumams suderinti, patik\u0117ti SkyPlanner.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Kaip KJH-Comp u\u017etikrina detali\u0173 parengt\u012f prie\u0161 suvirinim\u0105<\/h3>\n\n\n<p>Suomijos lak\u0161tinio metalo gamini\u0173 subrangov\u0117 KJH-Comp anks\u010diau naudojo C9000 ERP sistem\u0105 ir skai\u010diuokles apytikriam savait\u0117s apkrovimui planuoti. Ta\u010diau konkre\u010dioms dienoms u\u017eduotis \u012frenginiams vis dar tekdavo skirstyti rankiniu b\u016bdu, o detali\u0173 parengt\u012f \u2013 tikrinti rankiniu b\u016bdu.<\/p>\n\n\n<p>KJH-Comp \u012fdiegtame SkyPlanner sprendime numatytas detali\u0173 komplektavimo etapas prie\u0161 suvirinim\u0105: prie\u0161 u\u017eduo\u010diai patenkant \u012f darb\u0173 eil\u0119 patikrinama, ar paruo\u0161tos visos reikalingos detal\u0117s, \u012fskaitant perkamas. Gamybos planavimas pagal realius \u012frengini\u0173 ir darbuotoj\u0173 paj\u0117gumus bei u\u017eduo\u010di\u0173 priskyrimas \u012frenginiams automatizuoti, o u\u017esakymai ir toliau \u012fvedami \u012f C9000.<\/p>\n\n\n<p>\u0160is konkre\u010diam klientui pritaikytas sprendimas parodo, kod\u0117l svarbu susieti \u0161iuos procesus: parengties patikra padeda sudaryti darb\u0173 eil\u0119, u\u017euot likusi atskira u\u017eduotimi, kuri\u0105 ka\u017ekam tenka kartoti. KJH-Comp taip pat nurodo, kad u\u017e planavim\u0105 dabar atsako vienas meistras vietoje dviej\u0173, o kitam paskirti kiti darbai. <a href=\"https:\/\/skyplanner.ai\/lt\/klientu-istorijos\/kjh-comp\/\">KJH-Comp atsiliepime apie SkyPlanner<\/a> pla\u010diau apra\u0161oma, kaip pasikeit\u0117 kasdienis planavimas.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Prad\u0117kite nuo vieno komplekto ir darb\u0173, kuriuos su juo reikia u\u017ebaigti<\/h2>\n\n\n<p>Pasirinkite gamini\u0173 grup\u0119, kurios surinkim\u0105 nuolat trikdo tr\u016bkstamos arba netinkamos detal\u0117s. Sutarkite, kas laikoma pilnu komplektu, kas j\u012f tikrina ir kaip informacija apie tr\u016bkum\u0105 pasiekia \u017emog\u0173, galint\u012f j\u012f pa\u0161alinti. Komplekto perdavim\u0105 derinkite su gamybos darb\u0173 seka, u\u017euot kaup\u0119 komplektus, kuriems n\u0117ra laisvo laiko surinkti.<\/p>\n\n\n<p>Steb\u0117kite, ar perduodami komplektai yra pilni, fiksuokite sustojimus d\u0117l tr\u016bkstam\u0173 ar netinkam\u0173 detali\u0173 ir darbo s\u0105naudas komplektams paruo\u0161ti bei pristatyti. Vertinkite ir komplektavimo, ir surinkimo darbo s\u0105naudas: perkelti darbus i\u0161 surinkimo zonos naudinga tuomet, kai tai padeda visam procesui, o ne tik pagerina vieno padalinio rodiklius.<\/p>\n\n\n<p>Rinkit\u0117s SkyPlanner, kai \u0161is derinimas tampa kasdiene perplanavimo na\u0161ta. <a href=\"https:\/\/skyplanner.ai\/lt\/susisiekite-su-pardavejais\/\">U\u017esisakykite SkyPlanner demonstracij\u0105<\/a> ir jai parinkite vien\u0105 tipi\u0161k\u0105 u\u017esakym\u0105 su perkamais bei gaminamais komponentais ir kit\u0105 u\u017esakym\u0105, kuriam reikia to paties surinkimo i\u0161tekliaus. Galime parodyti, kaip susietas planavimas padeda ma\u017eiau laiko skirti atskiroms darb\u0173 eil\u0117ms tikrinti ir daugiau \u2013 u\u017etikrinti, kad darbai, kuriems viskas sukomplektuota, jud\u0117t\u0173 pirmyn.<\/p>\n\n\n<p>Pirmiausia norite susipa\u017einti savaranki\u0161kai? <a href=\"https:\/\/skyplanner.ai\/lt\/bandymas\/\">I\u0161bandykite SkyPlanner su demonstraciniais duomenimis<\/a> ir pamatykite, kaip med\u017eiagos, operacij\u0173 sekos ir paj\u0117gumai suderinami viename <a href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/kas-yra-gamybos-planavimas\/\">gamybos grafike<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Komplektavimas gamyboje: surinkim\u0105 prad\u0117kite su visu komplektu Prad\u017eia &raquo; I\u0161tekliai &raquo; Komplektavimas gamyboje: surinkim\u0105 prad\u0117kite su visu komplektu Surinkimas jau prad\u0117tas, kai paai\u0161k\u0117ja, kad tr\u016bksta laikiklio. Dabar operatorius ie\u0161ko dali\u0173, nebaigtas gaminys u\u017eima darbastal\u012f, o kitai u\u017eduo\u010diai neb\u0117ra vietos. Atsarg\u0173 ataskaita gal ir atrod\u0117 gerai, ta\u010diau u\u017eduotis vis tiek nebuvo parengta vykdyti. Komplektavimas gamyboje \u2013 &#8230; <a title=\"Komplektavimas gamyboje: surinkim\u0105 prad\u0117kite su visu komplektu\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/komplektavimas-gamyboje\/\" aria-label=\"Read more about Komplektavimas gamyboje: surinkim\u0105 prad\u0117kite su visu komplektu\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":102150,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2560,301],"tags":[],"class_list":["post-101924","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-gamybos-efektyvumas","category-istekliai","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Komplektavimas gamyboje: surinkite tik paruo\u0161\u0119 visas dalis<\/title>\n<meta name=\"description\" content=\"Dali\u0173 tr\u016bkum\u0105 aptikite prie\u0161 surinkim\u0105. Su\u017einokite, kaip paruo\u0161ti pilnus u\u017eduo\u010di\u0173 komplektus ir su SkyPlanner susieti dali\u0173 parengt\u012f su paj\u0117gumais.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/komplektavimas-gamyboje\/\" \/>\n<meta property=\"og:locale\" content=\"lt_LT\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Komplektavimas gamyboje: surinkim\u0105 prad\u0117kite su visu komplektu\" \/>\n<meta property=\"og:description\" content=\"Dali\u0173 tr\u016bkum\u0105 aptikite prie\u0161 surinkim\u0105. Su\u017einokite, kaip paruo\u0161ti pilnus u\u017eduo\u010di\u0173 komplektus ir su SkyPlanner susieti dali\u0173 parengt\u012f su paj\u0117gumais.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lt\/istekliai\/komplektavimas-gamyboje\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-20T06:47:48+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-20T06:48:36+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/kitting-in-manufacturing-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"11 minu\u010di\u0173\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/komplektavimas-gamyboje\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/komplektavimas-gamyboje\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Komplektavimas gamyboje: surinkim\u0105 prad\u0117kite su visu komplektu\",\"datePublished\":\"2026-10-20T06:47:48+00:00\",\"dateModified\":\"2026-10-20T06:48:36+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/komplektavimas-gamyboje\\\/\"},\"wordCount\":2157,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/komplektavimas-gamyboje\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/kitting-in-manufacturing-hero.png\",\"articleSection\":[\"Gamybos efektyvumas\",\"i\u0161tekliai\"],\"inLanguage\":\"lt-LT\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/komplektavimas-gamyboje\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/komplektavimas-gamyboje\\\/\",\"name\":\"Komplektavimas gamyboje: surinkite tik paruo\u0161\u0119 visas dalis\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/komplektavimas-gamyboje\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/komplektavimas-gamyboje\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/kitting-in-manufacturing-hero.png\",\"datePublished\":\"2026-10-20T06:47:48+00:00\",\"dateModified\":\"2026-10-20T06:48:36+00:00\",\"description\":\"Dali\u0173 tr\u016bkum\u0105 aptikite prie\u0161 surinkim\u0105. Su\u017einokite, kaip paruo\u0161ti pilnus u\u017eduo\u010di\u0173 komplektus ir su SkyPlanner susieti dali\u0173 parengt\u012f su paj\u0117gumais.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/komplektavimas-gamyboje\\\/#breadcrumb\"},\"inLanguage\":\"lt-LT\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/komplektavimas-gamyboje\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"lt-LT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/komplektavimas-gamyboje\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/kitting-in-manufacturing-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/kitting-in-manufacturing-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"Organized switchgear, mounting plate and wiring harness on a kitting trolley beside a control cabinet assembly bench.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/komplektavimas-gamyboje\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Komplektavimas gamyboje: surinkim\u0105 prad\u0117kite su visu komplektu\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lt-LT\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lt-LT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lt-LT\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Komplektavimas gamyboje: surinkite tik paruo\u0161\u0119 visas dalis","description":"Dali\u0173 tr\u016bkum\u0105 aptikite prie\u0161 surinkim\u0105. Su\u017einokite, kaip paruo\u0161ti pilnus u\u017eduo\u010di\u0173 komplektus ir su SkyPlanner susieti dali\u0173 parengt\u012f su paj\u0117gumais.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lt\/istekliai\/komplektavimas-gamyboje\/","og_locale":"lt_LT","og_type":"article","og_title":"Komplektavimas gamyboje: surinkim\u0105 prad\u0117kite su visu komplektu","og_description":"Dali\u0173 tr\u016bkum\u0105 aptikite prie\u0161 surinkim\u0105. Su\u017einokite, kaip paruo\u0161ti pilnus u\u017eduo\u010di\u0173 komplektus ir su SkyPlanner susieti dali\u0173 parengt\u012f su paj\u0117gumais.","og_url":"https:\/\/skyplanner.ai\/lt\/istekliai\/komplektavimas-gamyboje\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-20T06:47:48+00:00","article_modified_time":"2026-10-20T06:48:36+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/kitting-in-manufacturing-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Jussi M\u00e4ntyl\u00e4","Est. reading time":"11 minu\u010di\u0173"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/komplektavimas-gamyboje\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/komplektavimas-gamyboje\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Komplektavimas gamyboje: surinkim\u0105 prad\u0117kite su visu komplektu","datePublished":"2026-10-20T06:47:48+00:00","dateModified":"2026-10-20T06:48:36+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/komplektavimas-gamyboje\/"},"wordCount":2157,"publisher":{"@id":"https:\/\/skyplanner.ai\/lt\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/komplektavimas-gamyboje\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/kitting-in-manufacturing-hero.png","articleSection":["Gamybos efektyvumas","i\u0161tekliai"],"inLanguage":"lt-LT"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/komplektavimas-gamyboje\/","url":"https:\/\/skyplanner.ai\/lt\/istekliai\/komplektavimas-gamyboje\/","name":"Komplektavimas gamyboje: surinkite tik paruo\u0161\u0119 visas dalis","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lt\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/komplektavimas-gamyboje\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/komplektavimas-gamyboje\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/kitting-in-manufacturing-hero.png","datePublished":"2026-10-20T06:47:48+00:00","dateModified":"2026-10-20T06:48:36+00:00","description":"Dali\u0173 tr\u016bkum\u0105 aptikite prie\u0161 surinkim\u0105. Su\u017einokite, kaip paruo\u0161ti pilnus u\u017eduo\u010di\u0173 komplektus ir su SkyPlanner susieti dali\u0173 parengt\u012f su paj\u0117gumais.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/komplektavimas-gamyboje\/#breadcrumb"},"inLanguage":"lt-LT","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lt\/istekliai\/komplektavimas-gamyboje\/"]}]},{"@type":"ImageObject","inLanguage":"lt-LT","@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/komplektavimas-gamyboje\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/kitting-in-manufacturing-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/kitting-in-manufacturing-hero.png","width":1672,"height":941,"caption":"Organized switchgear, mounting plate and wiring harness on a kitting trolley beside a control cabinet assembly bench."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/komplektavimas-gamyboje\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lt\/"},{"@type":"ListItem","position":2,"name":"Komplektavimas gamyboje: surinkim\u0105 prad\u0117kite su visu komplektu"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lt\/#website","url":"https:\/\/skyplanner.ai\/lt\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lt\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lt\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lt-LT"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lt\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lt\/","logo":{"@type":"ImageObject","inLanguage":"lt-LT","@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"lt-LT","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/kitting-in-manufacturing-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/kitting-in-manufacturing-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/kitting-in-manufacturing-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/kitting-in-manufacturing-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/kitting-in-manufacturing-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/kitting-in-manufacturing-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/kitting-in-manufacturing-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/kitting-in-manufacturing-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lt\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Komplektavimas gamyboje: surinkim\u0105 prad\u0117kite su visu komplektu Prad\u017eia &raquo; I\u0161tekliai &raquo; Komplektavimas gamyboje: surinkim\u0105 prad\u0117kite su visu komplektu Surinkimas jau prad\u0117tas, kai paai\u0161k\u0117ja, kad tr\u016bksta laikiklio. Dabar operatorius ie\u0161ko dali\u0173, nebaigtas gaminys u\u017eima darbastal\u012f, o kitai u\u017eduo\u010diai neb\u0117ra vietos. Atsarg\u0173 ataskaita gal ir atrod\u0117 gerai, ta\u010diau u\u017eduotis vis tiek nebuvo parengta vykdyti. Komplektavimas gamyboje \u2013&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/posts\/101924","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/comments?post=101924"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/posts\/101924\/revisions"}],"predecessor-version":[{"id":102195,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/posts\/101924\/revisions\/102195"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/media\/102150"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/media?parent=101924"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/categories?post=101924"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/tags?post=101924"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}