{"id":100158,"date":"2026-10-16T17:01:26","date_gmt":"2026-10-16T17:01:26","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=100158"},"modified":"2026-10-16T17:02:13","modified_gmt":"2026-10-16T17:02:13","slug":"neivykdyti-uzsakymai","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/lt\/istekliai\/neivykdyti-uzsakymai\/","title":{"rendered":"Ne\u012fvykdyti u\u017esakymai: k\u0105 jie rei\u0161kia j\u016bs\u0173 gamyklai"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Ne\u012fvykdyti u\u017esakymai: k\u0105 jie rei\u0161kia j\u016bs\u0173 gamyklai<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/lt\/\">Prad\u017eia<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/\">I\u0161tekliai<\/a> &raquo; Ne\u012fvykdyti u\u017esakymai: k\u0105 jie rei\u0161kia j\u016bs\u0173 gamyklai<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Numatomas skaitymo laikas: <\/span><span class=\"yoast-reading-time__reading-time\">8<\/span><span class=\"yoast-reading-time__time-unit\"> minut\u0117s<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p><strong>Ne\u012fvykdyti u\u017esakymai \u2013 tai priimti klient\u0173 u\u017esakymai, kurie dar n\u0117ra \u012fvykdyti.<\/strong> Gamyboje \u0161i s\u0105voka paprastai apima dar nepristatytus u\u017esakymus, j\u0173 kiek\u012f arba vert\u0119. Vien\u0173 u\u017esakym\u0173 gamyba gali b\u016bti dar neprad\u0117ta, kiti gali b\u016bti jau gaminami arba laukti i\u0161siuntimo.<\/p>\n\n\n<p>Ne\u012fvykdyti u\u017esakymai savaime n\u0117ra problema. Jie gali rodyti, kad \u012fmon\u0117 turi pakankamai u\u017esakym\u0173 atei\u010diai. Gamybai svarbiausia atsakyti \u012f klausim\u0105: ar likusius darbus pavyks atlikti laiku, kad b\u016bt\u0173 laikomasi klientams jau pa\u017ead\u0117t\u0173 pristatymo termin\u0173?<\/p>\n\n\n<p>Vien bendras u\u017esakym\u0173 kiekis ar vert\u0117 \u012f \u0161\u012f klausim\u0105 neatsako. SkyPlanner APS susieja ne\u012fvykdytiems u\u017esakymams reikalingus gamybos darbus su turimais paj\u0117gumais. Taip gaunate bendr\u0105 grafik\u0105, o ne dar vien\u0105 s\u0105ra\u0161\u0105, kur\u012f tenka perdaryti kaskart klientui papra\u0161ius ankstesnio pristatymo.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kas priskiriama ne\u012fvykdytiems u\u017esakymams?<\/h2>\n\n\n<p>\u012etraukite priimtus u\u017esakymus, kuri\u0173 pristatymo \u012fsipareigojimai dar ne\u012fvykdyti, taip pat nepristatyt\u0105 i\u0161 dalies pristatyto u\u017esakymo dal\u012f. Komercinius pasi\u016blymus, u\u017eklausas ir nepatvirtintas pardavimo galimybes vertinkite atskirai: jos gali b\u016bti svarbios planuojant ateit\u012f, ta\u010diau n\u0117ra tas pats, kas patvirtinti klient\u0173 u\u017esakymai.<\/p>\n\n\n<p>Tarkime, klientas u\u017esako 100 korpus\u0173, o j\u016bs pristatote 40. \u0160io u\u017esakymo ne\u012fvykdytas likutis yra 60 korpus\u0173, o ne pradiniai 100. Vien pagaminus likusius 60, pristatymo \u012fsipareigojimas dar neb\u016btinai \u012fvykdytas: korpusus dar gali reik\u0117ti patikrinti, supakuoti ar i\u0161si\u0173sti.<\/p>\n\n\n<p>Kai kiekis matuojamas tais pa\u010diais vienetais, likutis apskai\u010diuojamas taip:<\/p>\n\n\n<p><strong>Ne\u012fvykdyt\u0173 u\u017esakym\u0173 likutis laikotarpio pabaigoje = likutis laikotarpio prad\u017eioje + naujai priimt\u0173 u\u017esakym\u0173 kiekis \u2212 pristatytas kiekis \u2212 at\u0161auktas kiekis<\/strong>. Kiti sutarti u\u017esakym\u0173 pakeitimai \u012ftraukiami kaip koregavimai.<\/p>\n\n\n<p>\u0160\u012f skai\u010diavim\u0105 taikykite konkre\u010diam gaminiui arba naudokite kit\u0105 prasming\u0105 bendr\u0105 matavimo vienet\u0105. Sud\u0117jus skirtingus gaminius \u012f vien\u0105 vienet\u0173 skai\u010di\u0173, galima daugiau pasl\u0117pti nei atskleisti. Ne\u012fvykdyt\u0173 u\u017esakym\u0173 vert\u0117 vadovybei parodo komercin\u0119 pad\u0117t\u012f, ta\u010diau neatskleid\u017eia, kiek \u012frengini\u0173 darbo valand\u0173 dar reik\u0117s.<\/p>\n\n\n<p>Ai\u0161kiai nurodykite, kuriuo momentu ataskaitoje u\u017esakymas laikomas \u012fvykdytu, pavyzd\u017eiui, i\u0161siuntus prekes ar jas prista\u010dius klientui, ir \u0161io kriterijaus laikykit\u0117s nuosekliai. Kitaip gali atrodyti, kad pardavimo ir gamybos skyriai nesutaria, nors jie tiesiog skai\u010diuoja skirtingus dalykus.<\/p>\n\n\n<p>Ne\u012fvykdytus u\u017esakymus lengviau \u012fvertinti suprantant tris skirtumus:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Ne\u012fvykdyti ir v\u0117luojantys u\u017esakymai:<\/strong> u\u017esakymas, kur\u012f reikia pristatyti kit\u0105 m\u0117nes\u012f, gali b\u016bti ne\u012fvykdytas, bet nev\u0117luoti. V\u0117luojantys u\u017esakymai \u2013 tai ta ne\u012fvykdyt\u0173 u\u017esakym\u0173 dalis, kurios sutartas \u012fvykdymo terminas jau pra\u0117jo.<\/li><li><strong>Ne\u012fvykdyti u\u017esakymai ir nebaigta gamyba:<\/strong> nebaigta gamyba (WIP) apima jau prad\u0117tus, bet dar nebaigtus darbus. Ne\u012fvykdyti u\u017esakymai gali apimti ir dar neprad\u0117tus gaminti u\u017esakymus bei pagamint\u0105 produkcij\u0105, laukian\u010di\u0105 pristatymo. Gamyba \u012f sand\u0117l\u012f gali b\u016bti priskiriama nebaigtai gamybai, nors n\u0117ra susijusi su patvirtintu kliento u\u017esakymu.<\/li><li><strong>Ne\u012fvykdyti u\u017esakymai ir u\u017esakymai, laukiantys atsarg\u0173 papildymo:<\/strong> pastarieji paprastai rei\u0161kia u\u017esakymus, kuri\u0173 \u0161iuo metu negalima \u012fvykdyti i\u0161 turim\u0173 atsarg\u0173. Ne\u012fvykdyt\u0173 u\u017esakym\u0173 s\u0105voka platesn\u0117: ji apima ir u\u017esakymus, priimtus \u012fvykdyti \u012fprastais terminais ateityje.<\/li><\/ul>\n\n\n<p>Tod\u0117l norint suma\u017einti ne\u012fvykdyt\u0173 u\u017esakym\u0173 apimt\u012f neu\u017etenka prad\u0117ti daugiau u\u017eduo\u010di\u0173. Reikia u\u017ebaigti reikiamus darbus ir pristatyti produkcij\u0105.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kod\u0117l toks pats ne\u012fvykdyt\u0173 u\u017esakym\u0173 kiekis gali reik\u0161ti visai kitok\u012f darbo kr\u016bv\u012f<\/h2>\n\n\n<p>Tarkime, j\u016bs\u0173 gamykla turi tris ne\u012fvykdytus korpus\u0173 u\u017esakymus. Nuo j\u0173 b\u016bsenos priklauso, kokius darbus gamyklai dar reikia atlikti.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>U\u017esakymo b\u016bsena<\/th><th>Kas liko atlikti<\/th><th>Planavimo klausimas<\/th><\/tr><\/thead><tbody><tr><td>Priimtas, gamyba neprad\u0117ta<\/td><td>Pjovimas, lenkimas, dengimas ir surinkimas<\/td><td>Kur grafike galima sutalpinti vis\u0105 gamybos mar\u0161rut\u0105, atsi\u017evelgiant \u012f esamus \u012fsipareigojimus?<\/td><\/tr><tr><td>I\u0161 dalies pagamintas<\/td><td>Dengimas ir surinkimas<\/td><td>Kada atsiras laisv\u0173 dengimo paj\u0117gum\u0173 ir ar po to pavyks laiku atlikti surinkim\u0105?<\/td><\/tr><tr><td>Gamyba baigta<\/td><td>Pakavimas ir i\u0161siuntimas<\/td><td>Kas trukdo i\u0161si\u0173sti pagamint\u0105 u\u017esakym\u0105?<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Visi trys u\u017esakymai priskiriami dar nepristatytiems u\u017esakymams. Ta\u010diau ne visiems reikia i\u0161 naujo pereiti vis\u0105 gamybos mar\u0161rut\u0105. Dar kart\u0105 suplanavus pradin\u0119 darb\u0173 apimt\u012f, gamybos paj\u0117gum\u0173 poreikis b\u016bt\u0173 pervertintas, o ne\u012ftraukus dar neprad\u0117to u\u017esakymo \u2013 nepakankamai \u012fvertintas.<\/p>\n\n\n<p>Dabar klientas, kurio u\u017esakymas i\u0161 dalies pagamintas, papra\u0161o ankstesnio pristatymo. Gali atrodyti, kad verta jo u\u017esakym\u0105 perkelti \u012f dengimo eil\u0117s prad\u017ei\u0105. Ta\u010diau dar neprad\u0117tam u\u017esakymui v\u0117liau reik\u0117s t\u0173 pa\u010di\u0173 dengimo i\u0161tekli\u0173, o po dengimo j\u012f dar reik\u0117s surinkti iki pa\u017ead\u0117to termino.<\/p>\n\n\n<p>Turite matyti pasekmes abiem u\u017esakymams, o ne tik patikrinti, ar dengimo grafike galima rasti vietos vienai partijai. Tuo tarpu gamybos spartinimas niekaip nepad\u0117s jau pagamintam u\u017esakymui, laukian\u010diam i\u0161siuntimo.<\/p>\n\n\n<p><strong>\u012esipareigojimus ir likusius darbus valdykite kartu.<\/strong> Taip paai\u0161k\u0117s, koks veiksmas dabar naudingiausias: pakeisti grafik\u0105, priimti sprendim\u0105 d\u0117l paj\u0117gum\u0173 ar tiesiog i\u0161si\u0173sti pagamint\u0105 u\u017esakym\u0105.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Paverskite ne\u012fvykdytus u\u017esakymus gamybos planu su SkyPlanner<\/h2>\n\n\n<p>Klient\u0173 u\u017esakymus ir pristatymus galite ir toliau valdyti savo ERP sistemoje. Per atvir\u0105 REST API SkyPlanner integruojasi su bet kuria ERP ar MES sistema ir susieja esamus u\u017esakym\u0173 bei gamybos duomenis su <a href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/kas-yra-gamybos-planavimas\/\">detaliu gamybos tvarkara\u0161\u010di\u0173 sudarymu<\/a>. Taip galite planuoti darbus nekeisdami sistemos, kurioje registruojami komerciniai \u012fsipareigojimai.<\/p>\n\n\n<p>Grafikui sudaryti naudojami duomenys apib\u016bdina likusius darbus: operacijas, j\u0173 sek\u0105 ir trukm\u0119, tinkamas darbo vietas, pamainas, operatorius ir prioritetus. SkyPlanner dirbtinio intelekto planavimo variklis Arcturus i\u0161d\u0117sto \u0161iuos darbus pagal nustatytus paj\u0117gumus ir priklausomybes. \u012ejungus planavim\u0105, kuriame atsi\u017evelgiama \u012f med\u017eiagas, skai\u010diuojant taip pat \u012fvertinamas j\u0173 prieinamumas.<\/p>\n\n\n<p>Korpusus gaminan\u010diai gamyklai tai rei\u0161kia suplanuoti pjovimo, lenkimo, dengimo ir surinkimo darbus, kuri\u0173 dar reikia priimtiems u\u017esakymams \u012fvykdyti. U\u017euot pristatymo termin\u0105 vertin\u0119 pagal bendr\u0105 u\u017esakym\u0173 apimt\u012f, galite sekti suplanuotus darbus iki numatomos j\u0173 pabaigos.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Raskite viet\u0105 dar nesuplanuotiems darbams<\/h3>\n\n\n<p>Priimtas u\u017esakymas neb\u016btinai jau yra suplanuotas. Pasir\u016bpinkite, kad \u012f plan\u0105 dar ne\u012ftraukti darbai likt\u0173 matomi: i\u0161 pa\u017ei\u016bros tvarkinga Gantt diagrama neturi pasl\u0117pti u\u017e jos rib\u0173 laukian\u010di\u0173 \u012fsipareigojim\u0173.<\/p>\n\n\n<p>SkyPlanner leid\u017eia suplanuoti pasirinktas dar nesuplanuotas u\u017eduotis. Jo Asistentas taip pat leid\u017eia \u012f grafik\u0105 \u012ftraukti dar nesuplanuotas u\u017eduotis. \u012etraukti darbai tampa gamybos grafiko dalimi ir juos galite per\u017ei\u016br\u0117ti kartu su esamomis u\u017eduotimis.<\/p>\n\n\n<p>Tai n\u0117ra tas pats, kas <strong>Perplanuoti visk\u0105<\/strong> \u2013 \u0161is veiksmas perskai\u010diuoja jau laiko juostoje esan\u010dias u\u017eduotis. Pirminiu planavimu \u012ftraukite darbus \u012f plan\u0105, o perplanavimu pritaikykite jau suplanuotus darbus prie pasikeitusi\u0173 s\u0105lyg\u0173.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Vertinkite poveik\u012f pristatymui, ne vien artimiausi\u0105 laisv\u0105 laik\u0105<\/h3>\n\n\n<p>Gantt laiko juostoje matyti, kur ir kada suplanuotos u\u017eduotys. <a href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/gamybos-pajegumu-planavimas\/\">Paj\u0117gum\u0173 ir darbo kr\u016bvio ap\u017evalga<\/a> padeda suprasti, kurie i\u0161tekliai jau u\u017eimti ir kur lik\u0119 darbai konkuruoja d\u0117l laiko.<\/p>\n\n\n<p>Korpus\u0173 gamybos pavyzdyje sekite darbus nuo dengimo iki surinkimo. Ankstesnis laikas dengimui naudingas tik tuomet, jei ir likusi mar\u0161ruto dalis leid\u017eia baigti darbus iki pra\u0161omo termino. Prie\u0161 patvirtindami klientui pristatymo dat\u0105, numatykite laik\u0105 pakavimui, transportui ir kitiems \u012fsipareigojimams po gamybos.<\/p>\n\n\n<p>Tuomet pardavimo ir gamybos skyriai gali aptarti skai\u010diavimais pagr\u012fst\u0105 plan\u0105, u\u017euot keit\u0119si atskirais sp\u0117jimais apie gamyklos u\u017eimtum\u0105.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Perskai\u010diuokite, u\u017euot perdar\u0119 rankomis<\/h3>\n\n\n<p>Klientui papra\u0161ius ankstesnio termino, pakeiskite atitinkam\u0105 prioritet\u0105 ir leiskite Arcturus perskai\u010diuoti suplanuotus darbus. Prie\u0161 duodami nauj\u0105 pa\u017ead\u0105, patikrinkite, kaip pasikeit\u0117 susijusi\u0173 darb\u0173 pabaigos datos. J\u016bs\u0173 nustatyti prioritetai ir u\u017eraktai nukreipia skai\u010diavim\u0105, o programin\u0117 \u012franga atlieka susijusius grafiko pakeitimus.<\/p>\n\n\n<p>Taip pat nuolat atnaujinkite gamybos eigos duomenis. Atliktos operacijos ir turim\u0173 paj\u0117gum\u0173 poky\u010diai lemia, k\u0105 dar galima \u012fgyvendinti. \u012ejungus Autopilot, nustatyti \u012fvykiai arba suplanuoti paleidimai gali inicijuoti perplanavim\u0105 be nuolatin\u0117s rankin\u0117s prie\u017ei\u016bros.<\/p>\n\n\n<p>Taip ma\u017eiau laiko skiriate operacijoms perkelti i\u0161 vienos eil\u0117s \u012f kit\u0105 ir daugiau \u2013 sprendimams pagal gaut\u0105 rezultat\u0105. \u012e pra\u0161ym\u0105 d\u0117l pristatymo galite atsakyti klientui dar belaukiant, o ne tik po dar vieno rankini\u0173 skai\u010diavim\u0173 etapo.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Fredman: atsakymai d\u0117l pristatymo pagal paj\u0117gum\u0173 duomenis<\/h2>\n\n\n<p>Augant u\u017esakym\u0173 apim\u010diai, su \u0161ia problema susid\u016br\u0117 Fredman Operations \u2013 Suomijos gamintojas, tiekiantis s\u0105ly\u010diui su maistu tinkamus virtuv\u0117s ir pakavimo sprendimus. Darbo kortel\u0117s buvo rankomis perkeliamos tarp L7 ERP ir LTR gamybos valdymo programin\u0117s \u012frangos. Planuotojas netur\u0117jo tikslios informacijos, kada atsilaisvins \u012frenginiai ir kiek paj\u0117gum\u0173 bus kiekvienoje pamainoje, o skubus grafiko perplanavimas gal\u0117jo u\u017etrukti valand\u0105 ar ilgiau.<\/p>\n\n\n<p>Naudodama SkyPlanner, Fredman viename Gantt rodinyje mato \u012frenginius, laisvus bei u\u017eimtus paj\u0117gumus ir u\u017eduo\u010di\u0173 eig\u0105. \u012e pamain\u0173 paj\u0117gumus atsi\u017evelgiama kasdien planuojant, o gamybos komanda mato numatyt\u0105 kiekvienos u\u017eduoties prad\u017ei\u0105 ir pabaig\u0105.<\/p>\n\n\n<p>Fredman teigimu, pardavimo skyrius gali \u012fsipareigoti d\u0117l pristatymo remdamasis paj\u0117gum\u0173 duomenimis iki \u0161e\u0161i\u0173 m\u0117nesi\u0173 \u012f priek\u012f, o atsakymai \u012f pra\u0161ymus pakeisti grafik\u0105 gaunami per sekundes, ne valandas. \u012emon\u0117 taip pat nurodo, kad suma\u017e\u0117jo vir\u0161valand\u017ei\u0173 poreikis.<\/p>\n\n\n<p>\u0160i patirtis parodo praktin\u0119 u\u017esakym\u0173 susiejimo su gamyba naud\u0105: grei\u010diau gaunamas bendras atsakymas, kokius darbus ir kada gamykla gali priimti. Daugiau apie komandos patirt\u012f skaitykite <a href=\"https:\/\/skyplanner.ai\/lt\/klientu-istorijos\/fredman-operations\/\">i\u0161samiame Fredman Operations atsiliepime apie SkyPlanner<\/a>.<\/p>\n\n\n<h2 class=\"wp-block-heading\">K\u0105 daryti, kai ne\u012fvykdyti u\u017esakymai netelpa \u012f grafik\u0105<\/h2>\n\n\n<p>Geresnis grafikas gali pad\u0117ti efektyviau i\u0161naudoti turimus paj\u0117gumus. Ta\u010diau net ir geriau planuojant perkrauta dengimo linija negali dirbti neribot\u0105 valand\u0173 skai\u010di\u0173.<\/p>\n\n\n<p>Pagal plan\u0105 nustatykite, kuriems pristatymo \u012fsipareigojimams kyla gr\u0117sm\u0117 ir kas trukdo juos \u012fvykdyti laiku. Tuomet priimkite tiksling\u0105 sprendim\u0105:<\/p>\n\n\n<ul class=\"wp-block-list\"><li>Keiskite prioritetus, kai tai komerci\u0161kai pagr\u012fsta, ir patikrinkite poveik\u012f kitiems u\u017esakymams.<\/li><li>Ilginkite darbo laik\u0105 arba pasitelkite patvirtint\u0105 alternatyv\u0173 i\u0161tekli\u0173 ten, kur tai i\u0161 ties\u0173 gali suma\u017einti paj\u0117gum\u0173 apribojim\u0105.<\/li><li>Spr\u0119skite med\u017eiag\u0173 tr\u016bkumo ar kitas pasirengimo darbui problemas, u\u017euot nuolat perk\u0117lin\u0117j\u0119 darbus, kuri\u0173 negalima prad\u0117ti.<\/li><li>Kai pradinio \u012fsipareigojimo \u012fvykdyti nebe\u012fmanoma, sutarkite su klientu d\u0117l naujo pristatymo termino arba jam naudingo dalinio pristatymo.<\/li><\/ul>\n\n\n<p>V\u0117luojan\u010dius u\u017esakymus per\u017ei\u016br\u0117kite atskirai nuo b\u016bsim\u0173 \u012fsipareigojim\u0173. Ma\u017e\u0117janti bendra ne\u012fvykdyt\u0173 u\u017esakym\u0173 apimtis vis tiek gali sl\u0117pti vis labiau v\u0117luojant\u012f pristatym\u0105 vienam klientui. O augan\u010di\u0105 apimt\u012f galima suvaldyti, jei b\u016bsimiems darbams pakaks paj\u0117gum\u0173.<\/p>\n\n\n<p>Tikslas \u2013 ne kuo ma\u017eiau u\u017esakym\u0173. Svarbu tur\u0117ti ai\u0161kiai suprantamus \u012fsipareigojimus, kuriuos galite pelningai \u012fvykdyti.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u012evertinkite ne\u012fvykdytus u\u017esakymus ir su\u017einokite, k\u0105 galite pa\u017ead\u0117ti klientams<\/h2>\n\n\n<p>Jei gav\u0119s pra\u0161ym\u0105 pristatyti anks\u010diau j\u016bs\u0173 planuotojas vis dar gr\u012f\u017eta prie skai\u010diuokli\u0173, verta rinktis SkyPlanner. SkyPlanner susieja likusius gamybos darbus, paj\u0117gumus ir prioritetus viename grafike, kuriuo j\u016bs\u0173 komanda gali remtis priimdama kit\u0105 sprendim\u0105 d\u0117l pristatymo.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/lt\/susisiekite-su-pardavejais\/\">U\u017esisakykite SkyPlanner demonstracij\u0105<\/a> ir jai pasiruo\u0161kite tipin\u012f u\u017esakym\u0105, informacij\u0105 apie i\u0161tekli\u0173, d\u0117l kurio jis konkuruoja su kitais u\u017esakymais, bei neseniai gaut\u0105 pra\u0161ym\u0105 paankstinti pristatym\u0105. \u0160ie pavyzd\u017eiai pad\u0117s pamatyti, kaip kei\u010diasi planas ir kuriuos kitus \u012fsipareigojimus tie poky\u010diai paveikia. Arba <a href=\"https:\/\/skyplanner.ai\/lt\/bandymas\/\">i\u0161bandykite SkyPlanner su demonstraciniais duomenimis<\/a>, jei pirmiausia norite susipa\u017einti su gamybos grafiko sudarymo aplinka.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Ne\u012fvykdyti u\u017esakymai: k\u0105 jie rei\u0161kia j\u016bs\u0173 gamyklai Prad\u017eia &raquo; I\u0161tekliai &raquo; Ne\u012fvykdyti u\u017esakymai: k\u0105 jie rei\u0161kia j\u016bs\u0173 gamyklai Ne\u012fvykdyti u\u017esakymai \u2013 tai priimti klient\u0173 u\u017esakymai, kurie dar n\u0117ra \u012fvykdyti. Gamyboje \u0161i s\u0105voka paprastai apima dar nepristatytus u\u017esakymus, j\u0173 kiek\u012f arba vert\u0119. Vien\u0173 u\u017esakym\u0173 gamyba gali b\u016bti dar neprad\u0117ta, kiti gali b\u016bti jau gaminami arba laukti &#8230; <a title=\"Ne\u012fvykdyti u\u017esakymai: k\u0105 jie rei\u0161kia j\u016bs\u0173 gamyklai\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/neivykdyti-uzsakymai\/\" aria-label=\"Read more about Ne\u012fvykdyti u\u017esakymai: k\u0105 jie rei\u0161kia j\u016bs\u0173 gamyklai\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":100177,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2532,301],"tags":[],"class_list":["post-100158","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-ir-planavimas","category-istekliai","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Ne\u012fvykdyti u\u017esakymai: k\u0105 jie rei\u0161kia j\u016bs\u0173 gamyklai<\/title>\n<meta name=\"description\" content=\"Augantys ne\u012fvykdyti u\u017esakymai \u2013 dar ne pristatymo planas. Su\u017einokite, kas liko ir kaip SkyPlanner sieja priimtus u\u017esakymus su paj\u0117gumais bei realiais terminais.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lt\/istekliai\/neivykdyti-uzsakymai\/\" \/>\n<meta property=\"og:locale\" content=\"lt_LT\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Ne\u012fvykdyti u\u017esakymai: k\u0105 jie rei\u0161kia j\u016bs\u0173 gamyklai\" \/>\n<meta property=\"og:description\" content=\"Augantys ne\u012fvykdyti u\u017esakymai \u2013 dar ne pristatymo planas. Su\u017einokite, kas liko ir kaip SkyPlanner sieja priimtus u\u017esakymus su paj\u0117gumais bei realiais terminais.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lt\/istekliai\/neivykdyti-uzsakymai\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-16T17:01:26+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-16T17:02:13+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/order-backlog-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"9 minut\u0117s\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/neivykdyti-uzsakymai\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/neivykdyti-uzsakymai\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Ne\u012fvykdyti u\u017esakymai: k\u0105 jie rei\u0161kia j\u016bs\u0173 gamyklai\",\"datePublished\":\"2026-10-16T17:01:26+00:00\",\"dateModified\":\"2026-10-16T17:02:13+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/neivykdyti-uzsakymai\\\/\"},\"wordCount\":1837,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/neivykdyti-uzsakymai\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/order-backlog-hero.png\",\"articleSection\":[\"APS ir planavimas\",\"i\u0161tekliai\"],\"inLanguage\":\"lt-LT\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/neivykdyti-uzsakymai\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/neivykdyti-uzsakymai\\\/\",\"name\":\"Ne\u012fvykdyti u\u017esakymai: k\u0105 jie rei\u0161kia j\u016bs\u0173 gamyklai\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/neivykdyti-uzsakymai\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/neivykdyti-uzsakymai\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/order-backlog-hero.png\",\"datePublished\":\"2026-10-16T17:01:26+00:00\",\"dateModified\":\"2026-10-16T17:02:13+00:00\",\"description\":\"Augantys ne\u012fvykdyti u\u017esakymai \u2013 dar ne pristatymo planas. Su\u017einokite, kas liko ir kaip SkyPlanner sieja priimtus u\u017esakymus su paj\u0117gumais bei realiais terminais.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/neivykdyti-uzsakymai\\\/#breadcrumb\"},\"inLanguage\":\"lt-LT\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/neivykdyti-uzsakymai\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"lt-LT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/neivykdyti-uzsakymai\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/order-backlog-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/order-backlog-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"Sheet-metal blanks, partly finished enclosures and packed products show different remaining work in an order backlog.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/istekliai\\\/neivykdyti-uzsakymai\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Ne\u012fvykdyti u\u017esakymai: k\u0105 jie rei\u0161kia j\u016bs\u0173 gamyklai\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lt-LT\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lt-LT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lt-LT\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Ne\u012fvykdyti u\u017esakymai: k\u0105 jie rei\u0161kia j\u016bs\u0173 gamyklai","description":"Augantys ne\u012fvykdyti u\u017esakymai \u2013 dar ne pristatymo planas. Su\u017einokite, kas liko ir kaip SkyPlanner sieja priimtus u\u017esakymus su paj\u0117gumais bei realiais terminais.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lt\/istekliai\/neivykdyti-uzsakymai\/","og_locale":"lt_LT","og_type":"article","og_title":"Ne\u012fvykdyti u\u017esakymai: k\u0105 jie rei\u0161kia j\u016bs\u0173 gamyklai","og_description":"Augantys ne\u012fvykdyti u\u017esakymai \u2013 dar ne pristatymo planas. Su\u017einokite, kas liko ir kaip SkyPlanner sieja priimtus u\u017esakymus su paj\u0117gumais bei realiais terminais.","og_url":"https:\/\/skyplanner.ai\/lt\/istekliai\/neivykdyti-uzsakymai\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-16T17:01:26+00:00","article_modified_time":"2026-10-16T17:02:13+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/order-backlog-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Jussi M\u00e4ntyl\u00e4","Est. reading time":"9 minut\u0117s"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/neivykdyti-uzsakymai\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/neivykdyti-uzsakymai\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Ne\u012fvykdyti u\u017esakymai: k\u0105 jie rei\u0161kia j\u016bs\u0173 gamyklai","datePublished":"2026-10-16T17:01:26+00:00","dateModified":"2026-10-16T17:02:13+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/neivykdyti-uzsakymai\/"},"wordCount":1837,"publisher":{"@id":"https:\/\/skyplanner.ai\/lt\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/neivykdyti-uzsakymai\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/order-backlog-hero.png","articleSection":["APS ir planavimas","i\u0161tekliai"],"inLanguage":"lt-LT"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/neivykdyti-uzsakymai\/","url":"https:\/\/skyplanner.ai\/lt\/istekliai\/neivykdyti-uzsakymai\/","name":"Ne\u012fvykdyti u\u017esakymai: k\u0105 jie rei\u0161kia j\u016bs\u0173 gamyklai","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lt\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/neivykdyti-uzsakymai\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/neivykdyti-uzsakymai\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/order-backlog-hero.png","datePublished":"2026-10-16T17:01:26+00:00","dateModified":"2026-10-16T17:02:13+00:00","description":"Augantys ne\u012fvykdyti u\u017esakymai \u2013 dar ne pristatymo planas. Su\u017einokite, kas liko ir kaip SkyPlanner sieja priimtus u\u017esakymus su paj\u0117gumais bei realiais terminais.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/neivykdyti-uzsakymai\/#breadcrumb"},"inLanguage":"lt-LT","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lt\/istekliai\/neivykdyti-uzsakymai\/"]}]},{"@type":"ImageObject","inLanguage":"lt-LT","@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/neivykdyti-uzsakymai\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/order-backlog-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/order-backlog-hero.png","width":1672,"height":941,"caption":"Sheet-metal blanks, partly finished enclosures and packed products show different remaining work in an order backlog."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lt\/istekliai\/neivykdyti-uzsakymai\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lt\/"},{"@type":"ListItem","position":2,"name":"Ne\u012fvykdyti u\u017esakymai: k\u0105 jie rei\u0161kia j\u016bs\u0173 gamyklai"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lt\/#website","url":"https:\/\/skyplanner.ai\/lt\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lt\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lt\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lt-LT"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lt\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lt\/","logo":{"@type":"ImageObject","inLanguage":"lt-LT","@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"lt-LT","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/order-backlog-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/order-backlog-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/order-backlog-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/order-backlog-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/order-backlog-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/order-backlog-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/order-backlog-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/order-backlog-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lt\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Ne\u012fvykdyti u\u017esakymai: k\u0105 jie rei\u0161kia j\u016bs\u0173 gamyklai Prad\u017eia &raquo; I\u0161tekliai &raquo; Ne\u012fvykdyti u\u017esakymai: k\u0105 jie rei\u0161kia j\u016bs\u0173 gamyklai Ne\u012fvykdyti u\u017esakymai \u2013 tai priimti klient\u0173 u\u017esakymai, kurie dar n\u0117ra \u012fvykdyti. Gamyboje \u0161i s\u0105voka paprastai apima dar nepristatytus u\u017esakymus, j\u0173 kiek\u012f arba vert\u0119. Vien\u0173 u\u017esakym\u0173 gamyba gali b\u016bti dar neprad\u0117ta, kiti gali b\u016bti jau gaminami arba laukti&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/posts\/100158","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/comments?post=100158"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/posts\/100158\/revisions"}],"predecessor-version":[{"id":100220,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/posts\/100158\/revisions\/100220"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/media\/100177"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/media?parent=100158"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/categories?post=100158"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/tags?post=100158"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}