{"id":107341,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integracijos\/erp\/cegid\/integravimo-vadovas\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"integravimo-vadovas","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/cegid\/integravimo-vadovas\/","title":{"rendered":"Cegid integravimo vadovas: gamybos tvarkara\u0161\u010di\u0173 sudarymas su SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lt\/integracijos\/\">Integracijos<\/a> \/ <a href=\"\/lt\/integracijos\/erp\/\">ERP<\/a> \/ Cegid<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Cegid integravimo vadovas: <span class=\"hl\">gamybos tvarkara\u0161\u010di\u0173 sudarymas su SkyPlanner APS<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u0160iame Cegid integravimo vadove partneriams ir IT komandoms paai\u0161kinama, kaip sujungti gamybai skirtas Cegid ERP sistemas su SkyPlanner APS. Pirmiausia aptariama Cegid PMI, tada \u2013 Cegid Primavera ir Cegid Ekon. SkyPlanner kei\u010diasi duomenimis su Cegid abiem kryptimis per pa\u010dios Cegid s\u0105sajas:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>\u012e SkyPlanner perduodami OF (ordres de fabrication, ordens de fabrico, \u00f3rdenes de fabricaci\u00f3n) gamybos u\u017esakymai su operacijomis, technologiniais mar\u0161rutais (gammes), gamini\u0173 specifikacijomis (nomenclatures), darbo centrais (postes de charge) ir stakl\u0117mis, taip pat preki\u0173, atsarg\u0173 ir u\u017esakym\u0173 tiek\u0117jams duomenys.<\/li>\n\n\n<li>Kiekvienai OF operacijai \u012f Cegid gr\u0105\u017einamos planuojamos prad\u017eios ir pabaigos datos.<\/li>\n\n\n<li>Jei pasirinksite, operatori\u0173 darbo laikas gali b\u016bti gr\u0105\u017einamas kaip pointages (PMI), Di\u00e1rios de Trabalho (Primavera) arba imputaciones (Ekon) \u012fra\u0161ai.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lt\/bandymas\/\">I\u0161bandykite nemokamai<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lt\/susisiekite-su-pardavejais\/\">U\u017esisakykite demonstracij\u0105<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Gamybos tvarkara\u0161\u010di\u0173 sudarymas<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt diagrama su darbo centrams suplanuotomis u\u017eduotimis ir u\u017esakym\u0173 s\u0105ra\u0161u apa\u010dioje.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"cegid-s-integration-interfaces\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Cegid integravimo s\u0105sajos<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>Cegid PMI.<\/strong> Cegid teikia PMI skirt\u0105 Web API: &#8222;Facilitez les \u00e9changes s\u00e9curis\u00e9s avec vos applications externes gr\u00e2ce \u00e0 la mise \u00e0 disposition de Web API depuis votre gestion de production Cegid.&#8221; (Supaprastinkite saug\u0173 duomen\u0173 keitim\u0105si su i\u0161orin\u0117mis programomis naudodami Cegid gamybos valdymo sistemos Web API.) Web API u\u017etikrina, kad i\u0161orin\u0117se programose b\u016bt\u0173 laikomasi Manufacturing PMI verslo taisykli\u0173 (<a href=\"https:\/\/www.cegid.com\/fr\/produits\/pmi\/\">Cegid PMI<\/a>). PMI taip pat si\u016blo EDI, standartizuotus XML failus techniniams duomenims i\u0161 CAD perduoti ir ataskait\u0173 generatori\u0173 su eksportu \u012f Excel. Eksportas \u012f Excel \u2013 grei\u010diausias b\u016bdas paruo\u0161ti duomenis i\u0161bandymui.<\/p>\n\n\n<p><strong>Cegid Primavera.<\/strong> PRIMAVERA ERP V10 API &#8222;allows third party applications to perform both data query and writing operations&#8221; (leid\u017eia tre\u010di\u0173j\u0173 \u0161ali\u0173 programoms ir u\u017eklausti, ir \u012fra\u0161yti duomenis) ir apima visus produkto modulius (<a href=\"https:\/\/developers.ila.cegid.com\/en\/v10\/api-documentation\/\">V10 API dokumentacija<\/a>). Web API dokumentacija ir i\u0161kvietimai pasiekiami per Swagger, suskirstyti pagal modulius (<a href=\"https:\/\/developers.ila.cegid.com\/en\/v10\/resources\/web-api-en\/article\/swagger-na-web-api\/\">Web API Swagger<\/a>). Produ\u00e7\u00e3o (GPR) modulis apima technines korteles (fichas t\u00e9cnicas), grynuosius poreikius, OF paleidim\u0105, Planeamento, gamybos \u012fra\u0161us ir Di\u00e1rios de Trabalho (<a href=\"https:\/\/v10api.primaverabss.com\/html\/api\/producao\/toc.html\">Produ\u00e7\u00e3o \u017einynas<\/a>). Pagrindin\u0117s tvarkara\u0161\u010diams sudaryti skirtos paslaugos:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>IGprBSOrdensFabrico<\/strong> nuskaito gamybos u\u017esakymus (ordens de fabrico) ir j\u0173 operacijas (GprBEOFOperacao).<\/li>\n\n\n<li><strong>IGprBSPlaneamento<\/strong> \u012fkelia OF planavimui ir atnaujina suplanuotas operacijas naudodama <strong>ActualizaPlaneamentoOperacao<\/strong>.<\/li>\n\n\n<li><strong>IGprBSCentrosTrabalho<\/strong>, <strong>IGprBSPostosTrabalho<\/strong>, <strong>IGprBSOperadores<\/strong> ir <strong>IGprBSRoteiros<\/strong> nuskaito darbo centrus (centros de trabalho), darbo vietas (postos), operatorius (operadores) ir technologinius mar\u0161rutus (roteiros).<\/li>\n\n\n<li><strong>IGprBSDiariosTrabalho<\/strong> registruoja darb\u0105 naudodama <strong>IniciaPicagem<\/strong> ir <strong>TerminaPicagem<\/strong>.<\/li>\n\n<\/ul>\n\n\n<p><strong>Cegid Ekon XRP Industria.<\/strong> Cegid nurodo, kad Ekon gali b\u016bti sujungta su kitomis \u012fmon\u0117s valdymo sistemomis (<a href=\"https:\/\/www.cegid.com\/ib\/es\/productos\/software-gestion-produccion-industrial\/erp-fabricacion\/\">Cegid Ekon<\/a>). SkyPlanner komanda parenka s\u0105saj\u0105 j\u016bs\u0173 Ekon sistemai apibr\u0117\u017edama projekto apimt\u012f.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"authentication-and-licensing\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Autentifikavimas ir licencijavimas<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Cegid PMI.<\/strong> Apibr\u0117\u017eiant projekto apimt\u012f, kartu su j\u016bs\u0173 Cegid partneriu j\u016bs\u0173 PMI sistemoje \u012fjungiama integravimui reikalinga Web API prieiga.<\/li>\n\n\n<li><strong>Cegid Primavera.<\/strong> Kiekvienas Web API objektas turi Login metod\u0105, kuris gr\u0105\u017eina Bearer prieigos rakt\u0105 su seanso raktu. Prieigos raktas atnaujinamas per token galin\u012f ta\u0161k\u0105 (<a href=\"https:\/\/developers.ila.cegid.com\/en\/v10\/resources\/web-api-en\/article\/swagger-na-web-api\/\">Web API Swagger<\/a>). Integravimo naudotojui reikia Produ\u00e7\u00e3o licencij\u0173 toms sritims, \u012f kurias jis kreipiasi.<\/li>\n\n\n<li><strong>SkyPlanner pus\u0117je.<\/strong> REST API autentifikavimui naudoja API prieigos rakt\u0105 Authorization-Token antra\u0161t\u0117je (SkyPlanner Settings &gt; API), o jos dokumentacija pateikta Swagger\/OpenAPI. <a href=\"\/lt\/docs\/integravimo-pamoka\/\">Integravimo instrukcijoje<\/a> paai\u0161kinti pirmieji i\u0161kvietimai.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"events-and-polling\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u012evykiai ir periodin\u0117s u\u017eklausos<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Cegid duomenys gaunami periodin\u0117mis u\u017eklausomis. Nauji darbai aptinkami u\u017eklausose filtruojant atvirus OF ir naujausius pakeitimus. Da\u017enis nustatomas kiekvienai gamyklai atskirai: OF u\u017eklausos siun\u010diamos kas kelias minutes, o atsarg\u0173 \u2013 kas valand\u0105.<\/p>\n\n\n<p>Pasikeitus b\u016bsenai arba tvarkara\u0161\u010diui, SkyPlanner siun\u010dia webhook prane\u0161imus, tod\u0117l duomen\u0173 \u012fra\u0161ym\u0105 atgal \u012f Cegid inicijuoja \u012fvykiai.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Duomen\u0173 susiejimas<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Cegid objektas (PMI \/ Primavera)<\/th><th>SkyPlanner objektas<\/th><th>Kryptis<\/th><th>Da\u017enis<\/th><\/tr><\/thead><tbody><tr><td>Prek\u0117s (Articles \/ artigos)<\/td><td>Produktai ir med\u017eiagos<\/td><td>Cegid \u2192 SkyPlanner<\/td><td>Pradinis \u012fk\u0117limas, v\u0117liau \u2013 periodin\u0117s u\u017eklausos<\/td><\/tr><tr><td>Gamini\u0173 specifikacijos (Nomenclatures \/ fichas t\u00e9cnicas), komponentai (componentes)<\/td><td>Gaminio strukt\u016bra, pusgaminiai, kiekvienam gaminiui reikalingos med\u017eiagos<\/td><td>Cegid \u2192 SkyPlanner<\/td><td>Pradinis \u012fk\u0117limas, v\u0117liau \u2013 pasikeitus duomenims<\/td><\/tr><tr><td>Technologiniai mar\u0161rutai ir operacijos (Gammes \/ roteiros, opera\u00e7\u00f5es)<\/td><td>Proceso etapai su trukme, paruo\u0161imo ir u\u017ebaigimo laiku<\/td><td>Cegid \u2192 SkyPlanner<\/td><td>Pradinis \u012fk\u0117limas, v\u0117liau \u2013 pasikeitus duomenims<\/td><\/tr><tr><td>Darbo centrai ir stakl\u0117s (Postes de charge \/ centros de trabalho, postos de trabalho)<\/td><td>Darbo centrai, darbo centr\u0173 grup\u0117s, efektyvumo rodikliai<\/td><td>Cegid \u2192 SkyPlanner<\/td><td>Pradinis \u012fk\u0117limas, v\u0117liau \u2013 retai<\/td><\/tr><tr><td>Darbuotojai \/ operatoriai (Salari\u00e9s \/ operadores)<\/td><td>Personalas<\/td><td>Cegid \u2192 SkyPlanner<\/td><td>Pradinis \u012fk\u0117limas, v\u0117liau \u2013 pasikeitus duomenims<\/td><\/tr><tr><td>Kalendoriai \/ paj\u0117gum\u0173 i\u0161imtys (exce\u00e7\u00f5es de capacidade)<\/td><td>Pamainos ir nedarbo dienos<\/td><td>Cegid \u2192 SkyPlanner<\/td><td>Kasdien arba pamainos tvarkomos SkyPlanner sistemoje<\/td><\/tr><tr><td>\u012erankiai ir liejimo formos (Ferramentas e moldes, Primavera)<\/td><td>\u012erankiai kaip riboti i\u0161tekliai<\/td><td>Cegid \u2192 SkyPlanner<\/td><td>Pradinis \u012fk\u0117limas, v\u0117liau \u2013 pasikeitus duomenims<\/td><\/tr><tr><td>Patvirtinti ir planiniai OF (OF fermes ir pr\u00e9visionnels \/ ordens de fabrico) su operacijomis<\/td><td>U\u017esakymai ir u\u017eduotys su terminais ir med\u017eiag\u0173 poreikiais<\/td><td>Cegid \u2192 SkyPlanner<\/td><td>U\u017eklausos kas kelias minutes<\/td><\/tr><tr><td>Atsargos pagal prek\u0119 ir sand\u0117l\u012f<\/td><td>Atsarg\u0173 liku\u010diai<\/td><td>Cegid \u2192 SkyPlanner<\/td><td>U\u017eklausos kas valand\u0105 arba paleidus tvarkara\u0161\u010dio sudarym\u0105<\/td><\/tr><tr><td>U\u017esakymai tiek\u0117jams su pristatymo datomis<\/td><td>Pirkimo u\u017esakymai, gaunamos med\u017eiagos pagal pristatymo dat\u0105<\/td><td>Cegid \u2192 SkyPlanner<\/td><td>U\u017eklausos kas valand\u0105 arba paleidus tvarkara\u0161\u010dio sudarym\u0105<\/td><\/tr><tr><td>Planuojama OF operacijos prad\u017eia ir pabaiga \/ GprBEOFOperacao laukai DataIniPrevista, DataFimPrevista, atnaujinami per ActualizaPlaneamentoOperacao<\/td><td>Kiekvieno etapo planuojama prad\u017eia ir pabaiga, priskirtas darbo centras<\/td><td>SkyPlanner \u2192 Cegid<\/td><td>Pasikeitus tvarkara\u0161\u010diui, per SkyPlanner webhook prane\u0161im\u0105<\/td><\/tr><tr><td>Darbo laiko \u012fra\u0161ai: Pointages \/ Di\u00e1rios de Trabalho (IniciaPicagem, TerminaPicagem)<\/td><td>Darbo laiko \u012fra\u0161ai ir operatori\u0173 patvirtinimai<\/td><td>SkyPlanner \u2192 Cegid<\/td><td>Po kiekvieno patvirtinimo arba kiekvien\u0105 pamain\u0105, jei pasirinkta<\/td><\/tr><tr><td>Cegid n\u0117ra<\/td><td>Paruo\u0161imo laiko matrica, \u012frankiai kaip riboti i\u0161tekliai (PMI), alternatyvios stakl\u0117s ir darbuotojai<\/td><td>Tvarkoma SkyPlanner sistemoje<\/td><td>Nustatoma pradedant naudotis sistema<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Integravimo modeliai<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. Pradinis pagrindini\u0173 duomen\u0173 \u012fk\u0117limas.<\/strong> Nuskaitykite prekes, gamini\u0173 specifikacijas (nomenclatures), technologinius mar\u0161rutus (gammes), darbo centrus (postes de charge), stakles, operatorius ir kalendorius. Atid\u017eiai susiekite postes: poste de charge su keturiomis stakl\u0117mis atitinka vien\u0105 darbo centr\u0173 grup\u0119 su keturiais darbo centrais.<\/p>\n\n\n<p><strong>2. OF sinchronizavimas.<\/strong> Nuskaitykite patvirtintus OF su j\u0173 operacijomis ir komponentais, taip pat atvirus u\u017esakymus tiek\u0117jams. SkyPlanner laiko u\u017esakytas med\u017eiagas prieinamomis pirkimo u\u017esakymo pristatymo dien\u0105 ir atnaujina atsarg\u0173 liku\u010dius, kai pirkimo u\u017esakymui nustatoma b\u016bsena Delivered. Apibr\u0117\u017edami projekto apimt\u012f nuspr\u0119skite, ar \u012f tvarkara\u0161t\u012f bus \u012ftraukiami ir planiniai OF (OF pr\u00e9visionnels), ar tik patvirtinti OF.<\/p>\n\n\n<p><strong>3. Tvarkara\u0161\u010dio \u012fra\u0161ymas atgal \u012f Cegid.<\/strong> Kai planavimo variklis \u012ftraukia u\u017eduot\u012f \u012f tvarkara\u0161t\u012f arba j\u0105 perkelia, SkyPlanner webhook prane\u0161imas inicijuoja \u012fra\u0161ym\u0105 \u012f Cegid. PMI sistemoje planuojamos prad\u017eios ir pabaigos datos perduodamos OF operacijoms per Web API, laikantis PMI verslo taisykli\u0173. Primavera sistemoje integracija i\u0161kvie\u010dia IGprBSPlaneamento.ActualizaPlaneamentoOperacao, perduodama operacij\u0105, darbo centr\u0105 (centro de trabalho) ir planuojam\u0105 prad\u017ei\u0105 bei pabaig\u0105. Taip atnaujinami gamybos u\u017esakymo (ordem de fabrico) operacijos laukai DataIniPrevista ir DataFimPrevista.<\/p>\n\n\n<p><strong>4. Darbo patvirtinimai gamybos ceche.<\/strong> Operatoriai registruoja darb\u0105 naudodami SkyPlanner Mobile Confirmations arba Production Timer, o pagal darbo laiko \u012fra\u0161us atnaujinamas tvarkara\u0161tis. J\u016bs pasirenkate, ar darbo laik\u0105 perduoti atgal \u012f Cegid. Jei taip, jis perduodamas kaip pointages \u012fra\u0161ai PMI sistemoje arba per IniciaPicagem ir TerminaPicagem \u012f Primavera Di\u00e1rios de Trabalho. Jei ne, laikas ir toliau registruojamas Cegid sistemoje naudojant br\u016bk\u0161ninius kodus.<\/p>\n\n\n<p><strong>5. Atsakomyb\u0117s u\u017e duomenis ir konflikt\u0173 sprendimo taisykl\u0117s.<\/strong> U\u017efiksuokite jas prie\u0161 prad\u0117dami eksploatuoti integracij\u0105:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Duomenys<\/th><th>Atsakinga sistema<\/th><\/tr><\/thead><tbody><tr><td>Prek\u0117s, gamini\u0173 specifikacijos (nomenclatures), technologiniai mar\u0161rutai (gammes), OF kiekiai ir b\u016bsena<\/td><td>Cegid<\/td><\/tr><tr><td>Operacij\u0173 seka, prad\u017eios ir pabaigos laikas, stakli\u0173 priskyrimas<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Paruo\u0161imo laiko matrica, \u012franki\u0173 ir operatori\u0173 poreikiai, alternatyv\u016bs i\u0161tekliai<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Pamainos ir nedarbo dienos<\/td><td>Viena sistema, pasirinkta apibr\u0117\u017eiant projekto apimt\u012f<\/td><\/tr><tr><td>Darbo laikas, med\u017eiag\u0173 sunaudojimas ir darb\u0173 u\u017ebaigimas<\/td><td>Cegid: duomenys \u012fvedami joje arba perduodami i\u0161 SkyPlanner darbo laiko \u012fra\u0161\u0173<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Pasirinkite vien\u0105 sistem\u0105, kuri \u012fra\u0161ys OF datas. Planuojamas datas turi \u012fra\u0161yti SkyPlanner, o ne PMI planavimo procesai ar Primavera planavimo algoritmas. Nebepaleiskite \u0161i\u0173 planavimo proces\u0173 tiems OF, kuri\u0173 tvarkara\u0161\u010dius sudaro SkyPlanner, kad sistemos neperra\u0161yt\u0173 viena kitos duomen\u0173.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u012eprasti projekto etapai<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Diegimas paprastai baigiamas per kelias savaites nuo \u012fvadini\u0173 darb\u0173 prad\u017eios. Prie\u0161 tai patikrinkite tvarkara\u0161t\u012f per 30 dien\u0173 nemokam\u0105 bandom\u0105j\u012f laikotarp\u012f, naudodami i\u0161 Cegid CSV arba Excel formatu eksportuotus postes, gammes ir atvirus OF.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Duomen\u0173 susiejimas.<\/strong> Patvirtinkite duomen\u0173 susiejimo lentel\u0119, nustatykite, kuri sistema atsakinga u\u017e kuriuos duomenis, sinchronizavimo da\u017en\u012f ir ar laiko duomenys bus gr\u0105\u017einami \u012f Cegid.<\/li>\n\n\n<li><strong>Prieiga prie Cegid.<\/strong> Sukurkite integracijai skirt\u0105 naudotoj\u0105 ir patikrinkite gamybos objektams reikalingas teises bei licencijas. Pirmiausia i\u0161bandykite bandomojoje \u012fmon\u0117je.<\/li>\n\n\n<li><strong>Pradinis duomen\u0173 \u012fk\u0117limas.<\/strong> Articles, nomenclatures, gammes, postes de charge, ma\u0161inos, operatoriai ir kalendoriai.<\/li>\n\n\n<li><strong>OF ir u\u017esakym\u0173 tiek\u0117jams sinchronizavimas.<\/strong> Periodin\u0117s u\u017eklausos su filtrais, puslapiavimu ir pakartotiniais bandymais.<\/li>\n\n\n<li><strong>Apribojim\u0173 nustatymas SkyPlanner sistemoje.<\/strong> Paruo\u0161imo trukm\u0117s matrica, \u012frankiai, kiekvienai u\u017eduo\u010diai reikalingas operatori\u0173 skai\u010dius ir alternatyvios ma\u0161inos ar darbuotojai.<\/li>\n\n\n<li><strong>Tvarkara\u0161\u010dio \u012fra\u0161ymas \u012f Cegid.<\/strong> Planuojamos operacij\u0173 datos perduodamos per SkyPlanner webhook prane\u0161imus, o pasirinkus \u2013 ir laiko apskaitos duomenys.<\/li>\n\n\n<li><strong>Lygiagretus testavimas.<\/strong> Naudokite SkyPlanner greta dabartinio plano, palyginkite datas ir pataisykite pagrindinius duomenis.<\/li>\n\n\n<li><strong>Darbo prad\u017eia.<\/strong> Kai duomenys sutaps, \u012fjunkite j\u0173 \u012fra\u0161ym\u0105 \u012f Cegid.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-to-plan-for-in-a-cegid-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u012e k\u0105 atsi\u017evelgti planuojant Cegid integracij\u0105<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Patvirtinti ir planuojami OF.<\/strong> PMI sukuria abiej\u0173 tip\u0173 OF pagal CBN. Sudarius planuojam\u0173 OF tvarkara\u0161t\u012f matoma b\u016bsima apkrova, ta\u010diau datas \u012fra\u0161ykite tik \u012f patvirtintus OF.<\/li>\n\n\n<li><strong>\u012e planavim\u0105 ne\u012ftraukiamos operacijos.<\/strong> Primavera sistemoje operacij\u0105 galima pa\u017eym\u0117ti kaip neplanuojam\u0105 (NaoSujeitaPlaneamento). \u012era\u0161ydami duomenis atgal, \u0161ias operacijas praleiskite.<\/li>\n\n\n<li><strong>Ma\u0161in\u0173 ir operatori\u0173 laikas.<\/strong> Primavera kiekvienos operacijos ma\u0161inos ir operatoriaus laik\u0105 saugo atskirai. Susiekite abu laukus, kad u\u017eduotims, kurioms reikia keli\u0173 operatori\u0173, b\u016bt\u0173 priskirta reikiama komanda.<\/li>\n\n\n<li><strong>Persidengian\u010dios operacijos.<\/strong> Primavera operacijoms priskiriamas persidengimo koeficientas. Susiekite j\u012f su SkyPlanner operacij\u0173 laiko nustatymais, antraip tvarkara\u0161tyje bus numatytas ilgesnis laukimas nei i\u0161 ties\u0173 reikia ceche.<\/li>\n\n\n<li><strong>Kuri Cegid ERP sistema naudojama.<\/strong> PMI, Primavera ir Ekon naudoja skirtingas s\u0105sajas. Pirmiausia patikslinkite produkt\u0105 ir versij\u0105, o jei naudojate Cegid XRP Flex, vadovaukit\u0117s <a href=\"\/lt\/integracijos\/erp\/acumatica\/integravimo-vadovas\/\">Acumatica integracijos vadovu<\/a>.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"who-configures-and-supports-the-cegid-integratio\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas konfig\u016bruoja ir pri\u017ei\u016bri Cegid integracij\u0105<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>SkyPlanner komanda sukonfig\u016bruoja integracij\u0105 pradedant naudotis sistema ir teikia pagalb\u0105 prad\u0117jus j\u0105 eksploatuoti.<\/strong> \u0160i pagalba apima sutartus Cegid API i\u0161kvietimus. Kiekviena gamykla Cegid naudoja savaip, tod\u0117l \u010dia praver\u010dia \u0161i\u0173 ypatum\u0173 i\u0161manymas.<\/li>\n\n\n<li><strong>Gali dalyvauti ir j\u016bs\u0173 Cegid partneris.<\/strong> Partneris \u017eino j\u016bs\u0173 sistemos konfig\u016bracij\u0105, individualius pritaikymus ir licencijas, tod\u0117l kartu su SkyPlanner komanda gali sukurti integracijai skirt\u0105 naudotoj\u0105 ir nustatyti API prieig\u0105.<\/li>\n\n\n<li><strong>J\u016bs\u0173 programuotojai gali pl\u0117toti integracij\u0105<\/strong> naudodami SkyPlanner REST API ir API prieigos rakt\u0105. Prad\u017eiai pakanka API prieigos rakto, o prireikus padeda SkyPlanner komanda. Technin\u0119 informacij\u0105 rasite <a href=\"\/lt\/docs\/integravimo-pamoka\/\">SkyPlanner integracijos dokumentacijoje<\/a>.<\/li>\n\n<\/ol>\n\n\n<p>SkyPlanner kaina \u2013 nuo 199 \u20ac per m\u0117nes\u012f, \u012fskaitant 5 darbo centrus ir atsiskaitant kas m\u0117nes\u012f. Integracijos kainos pasi\u016blymas pateikiamas i\u0161 anksto kartu su j\u016bs\u0173 plano pasi\u016blymu, atsi\u017evelgiant \u012f j\u016bs\u0173 proces\u0105 ir poreikius. \u017dr. <a href=\"\/lt\/kainodara\/\">kainas<\/a>, <a href=\"\/lt\/integracijos\/erp\/cegid\/gamybos-planavimas\/\">gamybos planavim\u0105 su Cegid pagal realius ma\u0161in\u0173 ir darbuotoj\u0173 paj\u0117gumus<\/a>, <a href=\"\/lt\/integracijos\/erp\/cegid\/\">Cegid puslap\u012f<\/a> ir <a href=\"\/lt\/integracijos\/erp\/\">ERP integracij\u0173 ap\u017evalg\u0105<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lt\/bandymas\/\">I\u0161bandykite nemokamai<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lt\/susisiekite-su-pardavejais\/\">U\u017esisakykite demonstracij\u0105<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Gamintoj\u0173 atsiliepimai apie SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"UTU tiekimo grandin\u0117s specialistas Kalle Kalliom\u00e4ki elektros skyd\u0173 gamybos ceche Ulviloje\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>sutaupoma kas savait\u0119<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSu SkyPlanner nuo gamybos planavimo Excel lentel\u0117se per\u0117jome prie gamybos optimizavimo realiuoju laiku.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, tiekimo grandin\u0117s specialistas<\/b><br>UTU \u00b7 Elektros skydai ir skirstomieji \u012frenginiai<\/p>\n\n\n<p class=\"ind-cust__result\">Planuojant gamyb\u0105 kas savait\u0119 sutaupomos 2 darbo valandos, o nauja u\u017eduo\u010di\u0173 eil\u0117 gamybos linij\u0105 pasiekia per kelias sekundes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lt\/klientu-istorijos\/utu\/\">Skaitykite UTU atsiliepim\u0105<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatoriai su \u0161vari\u0173j\u0173 patalp\u0173 apranga prie buteliuk\u0173 pildymo linijos Laboratory &amp; Allied farmacijos gamykloje Nairobyje\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>gamybos efektyvumas<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eGamybos efektyvumas padid\u0117jo 90%.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT vadovas<\/b><br>Laboratory &amp; Allied \u00b7 Vaist\u0173 gamyba<\/p>\n\n\n<p class=\"ind-cust__result\">Gamybos efektyvumas padid\u0117jo 90%, o optimizuotas trij\u0173 m\u0117nesi\u0173 planas visiems darbo centrams sudaromas per ma\u017eiau nei 30 minu\u010di\u0173.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lt\/klientu-istorijos\/laboratory-allied\/\">Skaitykite Laboratory &amp; Allied atsiliepim\u0105<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/13-9cbf2d28-08ef-49a1-94e3-0095e107df55.jpg\" alt=\"Fredman Operations gamybos vadov\u0117 Anu J\u00e4rvinen prie robotizuotos krovimo ant pad\u0117kl\u0173 cel\u0117s Raumoje\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/10-2fd983ec-02a7-440d-b77d-281f37545c8d.png\" alt=\"Fredman Operations\" width=\"137\" height=\"48\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>6 m\u0117nesiams<\/b><span>\u012f priek\u012f pardavimo komanda mato laisvus paj\u0117gumus<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner suteikia tvirt\u0105 pagrind\u0105 visam gamybos planavimui ir u\u017etikrina jo patikimum\u0105.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Anu J\u00e4rvinen, gamybos vadov\u0117<\/b><br>Fredman Operations \u00b7 Su maistu liestis tinkamas pakavimo popierius<\/p>\n\n\n<p class=\"ind-cust__result\">Pardavimo komanda mato laisvus paj\u0117gumus \u0161e\u0161iems m\u0117nesiams \u012f priek\u012f, o \u012f pra\u0161ymus pakeisti tvarkara\u0161t\u012f, kuriems anks\u010diau reik\u0117davo valandos ar daugiau, dabar atsakoma per kelias sekundes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lt\/klientu-istorijos\/fredman-operations\/\">Skaitykite Fredman Operations atsiliepim\u0105<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/28-83df4743-ff34-41a5-9a41-c3dcc6f0897b.png\" alt=\"Opes Corporation\" width=\"106\" height=\"32\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>100%<\/b><span>pristatymo patikimumas nuo 2021 m.<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner leid\u017eia ai\u0161kiai matyti paj\u0117gumus, o planavimo rezultatai tampa nusp\u0117jami.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Dan Berglund, COO\/CFO<\/b><br>Opes Corporation \u00b7 Chemijos ir maisto produkt\u0173 gamyba<\/p>\n\n\n<p class=\"ind-cust__result\">Vis\u0105 SkyPlanner naudojimo laik\u0105, nuo 2021 m., pristatymo patikimumas siekia 100%.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lt\/klientu-istorijos\/opes-corporation\/\">Skaitykite Opes Corporation atsiliepim\u0105<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Da\u017eniausiai u\u017eduodami klausimai<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ar Cegid PMI turi API?<\/summary>\n<p class=\"sp-faq__a\">Taip. Cegid teikia PMI skirt\u0105 Web API, leid\u017eian\u010di\u0105 saugiai keistis duomenimis su i\u0161orin\u0117mis programomis ir i\u0161laikyti Manufacturing PMI verslo taisykles. SkyPlanner per j\u0105 nuskaito OF ir \u012fra\u0161o planuojamas datas bei pointages.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ar Cegid Primavera turi gamybos u\u017esakymams skirt\u0105 API?<\/summary>\n<p class=\"sp-faq__a\">Taip. PRIMAVERA V10 API leid\u017eia nuskaityti ir \u012fra\u0161yti duomenis visuose moduliuose. Produ\u00e7\u00e3o modulyje pasiekiami ordens de fabrico, Planeamento su ActualizaPlaneamentoOperacao ir Di\u00e1rios de Trabalho.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kaip planuojamos datos \u012fra\u0161omos atgal \u012f Cegid?<\/summary>\n<p class=\"sp-faq__a\">PMI sistemoje jos per Web API \u012fra\u0161omos \u012f kiekvien\u0105 OF operacij\u0105. Primavera sistemoje naudojamas IGprBSPlaneamento.ActualizaPlaneamentoOperacao, kuris nustato planuojam\u0105 ordem de fabrico operacijos prad\u017ei\u0105 ir pabaig\u0105.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ar Cegid palaiko \u017einiatinklio prane\u0161imus (webhooks)?<\/summary>\n<p class=\"sp-faq__a\">Integracija periodi\u0161kai siun\u010dia u\u017eklausas \u012f Cegid pagal kiekvienai gamyklai nustatyt\u0105 grafik\u0105. SkyPlanner \u017einiatinklio prane\u0161imai (webhooks) perduoda tvarkara\u0161\u010dio pakeitimus i\u0161kart jiems \u012fvykus, tod\u0117l datos pasiekia Cegid i\u0161kart po kiekvieno perplanavimo.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>K\u0105 Cegid partneriui si\u016blyti: integruotas Cegid planavimo funkcijas ar SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner, kai kliento apribojimai apima ne tik ma\u0161inas ir atsargas. Pati Cegid rekomenduoja prijungti pa\u017eangius planavimo \u012frankius, jei reikia atsi\u017evelgti \u012f papildomus apribojimus (<a href=\"https:\/\/www.cegid.com\/fr\/produits\/pmi\/\">Cegid PMI<\/a>). SkyPlanner planuoja operatori\u0173 darb\u0105, \u012frankius, paruo\u0161im\u0105 ir med\u017eiagas, automati\u0161kai perplanuoja ir neriboja naudotoj\u0173 skai\u010diaus. Kaina \u2013 nuo 199 \u20ac per m\u0117nes\u012f.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ar galime i\u0161bandyti SkyPlanner prie\u0161 kurdami integracij\u0105?<\/summary>\n<p class=\"sp-faq__a\">Taip. Per 30 dien\u0173 nemokam\u0105 bandom\u0105j\u012f laikotarp\u012f galite naudoti iki 20 darbo centr\u0173 ir importuoti duomenis i\u0161 Cegid CSV arba Excel formatu. Mok\u0117jimo kortel\u0117s nereikia. <a href=\"\/lt\/bandymas\/\">I\u0161bandykite nemokamai<\/a> arba <a href=\"\/lt\/susisiekite-su-pardavejais\/\">susisiekite su pardavimo komanda<\/a>, kad apibr\u0117\u017etum\u0117te integracijos apimt\u012f.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integracijos \/ ERP \/ Cegid Cegid integravimo vadovas: gamybos tvarkara\u0161\u010di\u0173 sudarymas su SkyPlanner APS \u0160iame Cegid integravimo vadove partneriams ir IT komandoms paai\u0161kinama, kaip sujungti gamybai skirtas Cegid ERP sistemas su SkyPlanner APS. Pirmiausia aptariama Cegid PMI, tada \u2013 Cegid Primavera ir Cegid Ekon. SkyPlanner kei\u010diasi duomenimis su Cegid abiem kryptimis per pa\u010dios Cegid s\u0105sajas: &#8230; <a title=\"Cegid integravimo vadovas: gamybos tvarkara\u0161\u010di\u0173 sudarymas su SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/cegid\/integravimo-vadovas\/\" aria-label=\"Read more about Cegid integravimo vadovas: gamybos tvarkara\u0161\u010di\u0173 sudarymas su SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":106384,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-107341","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Cegid APS integravimo vadovas gamybos tvarkara\u0161\u010diams sudaryti<\/title>\n<meta name=\"description\" content=\"Cegid PMI ir Primavera + SkyPlanner APS: PMI Web API, PRIMAVERA V10 API, Planeamento \u012fra\u0161ymas atgal, duomen\u0173 siejimas, periodin\u0117s u\u017eklausos, projekt\u0173 patarimai.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/cegid\/integravimo-vadovas\/\" \/>\n<meta property=\"og:locale\" content=\"lt_LT\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Cegid integravimo vadovas: gamybos tvarkara\u0161\u010di\u0173 sudarymas su SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"Cegid PMI ir Primavera + SkyPlanner APS: PMI Web API, PRIMAVERA V10 API, Planeamento \u012fra\u0161ymas atgal, duomen\u0173 siejimas, periodin\u0117s u\u017eklausos, projekt\u0173 patarimai.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/cegid\/integravimo-vadovas\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"11 minu\u010di\u0173\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/cegid\\\/integravimo-vadovas\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/cegid\\\/integravimo-vadovas\\\/\",\"name\":\"Cegid APS integravimo vadovas gamybos tvarkara\u0161\u010diams sudaryti\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"Cegid PMI ir Primavera + SkyPlanner APS: PMI Web API, PRIMAVERA V10 API, Planeamento \u012fra\u0161ymas atgal, duomen\u0173 siejimas, periodin\u0117s u\u017eklausos, projekt\u0173 patarimai.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/cegid\\\/integravimo-vadovas\\\/#breadcrumb\"},\"inLanguage\":\"lt-LT\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/cegid\\\/integravimo-vadovas\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/cegid\\\/integravimo-vadovas\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP ir MES programin\u0117s \u012frangos integracijos su SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bs\u0173 ERP sistemai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS sistemai Cegid: gamybos planavimas pagal realius \u012frengini\u0173 ir darbuotoj\u0173 paj\u0117gumus\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/cegid\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Cegid integravimo vadovas: gamybos tvarkara\u0161\u010di\u0173 sudarymas su SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lt-LT\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lt-LT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Cegid APS integravimo vadovas gamybos tvarkara\u0161\u010diams sudaryti","description":"Cegid PMI ir Primavera + SkyPlanner APS: PMI Web API, PRIMAVERA V10 API, Planeamento \u012fra\u0161ymas atgal, duomen\u0173 siejimas, periodin\u0117s u\u017eklausos, projekt\u0173 patarimai.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/cegid\/integravimo-vadovas\/","og_locale":"lt_LT","og_type":"article","og_title":"Cegid integravimo vadovas: gamybos tvarkara\u0161\u010di\u0173 sudarymas su SkyPlanner APS","og_description":"Cegid PMI ir Primavera + SkyPlanner APS: PMI Web API, PRIMAVERA V10 API, Planeamento \u012fra\u0161ymas atgal, duomen\u0173 siejimas, periodin\u0117s u\u017eklausos, projekt\u0173 patarimai.","og_url":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/cegid\/integravimo-vadovas\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"11 minu\u010di\u0173"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/cegid\/integravimo-vadovas\/","url":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/cegid\/integravimo-vadovas\/","name":"Cegid APS integravimo vadovas gamybos tvarkara\u0161\u010diams sudaryti","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lt\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"Cegid PMI ir Primavera + SkyPlanner APS: PMI Web API, PRIMAVERA V10 API, Planeamento \u012fra\u0161ymas atgal, duomen\u0173 siejimas, periodin\u0117s u\u017eklausos, projekt\u0173 patarimai.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/cegid\/integravimo-vadovas\/#breadcrumb"},"inLanguage":"lt-LT","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/cegid\/integravimo-vadovas\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/cegid\/integravimo-vadovas\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lt\/"},{"@type":"ListItem","position":2,"name":"ERP ir MES programin\u0117s \u012frangos integracijos su SkyPlanner","item":"https:\/\/skyplanner.ai\/lt\/integracijos\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bs\u0173 ERP sistemai","item":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS sistemai Cegid: gamybos planavimas pagal realius \u012frengini\u0173 ir darbuotoj\u0173 paj\u0117gumus","item":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/cegid\/"},{"@type":"ListItem","position":5,"name":"Cegid integravimo vadovas: gamybos tvarkara\u0161\u010di\u0173 sudarymas su SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lt\/#website","url":"https:\/\/skyplanner.ai\/lt\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lt\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lt\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lt-LT"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lt\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lt\/","logo":{"@type":"ImageObject","inLanguage":"lt-LT","@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lt\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integracijos \/ ERP \/ Cegid Cegid integravimo vadovas: gamybos tvarkara\u0161\u010di\u0173 sudarymas su SkyPlanner APS \u0160iame Cegid integravimo vadove partneriams ir IT komandoms paai\u0161kinama, kaip sujungti gamybai skirtas Cegid ERP sistemas su SkyPlanner APS. Pirmiausia aptariama Cegid PMI, tada \u2013 Cegid Primavera ir Cegid Ekon. SkyPlanner kei\u010diasi duomenimis su Cegid abiem kryptimis per pa\u010dios Cegid s\u0105sajas:&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/pages\/107341","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/comments?post=107341"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/pages\/107341\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/pages\/106384"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/media?parent=107341"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}