{"id":106935,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integracijos\/erp\/qad-adaptive-erp\/integravimo-vadovas\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"integravimo-vadovas","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/qad-adaptive-erp\/integravimo-vadovas\/","title":{"rendered":"QAD Adaptive ERP integravimo vadovas: gamybos tvarkara\u0161\u010di\u0173 sudarymas su SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lt\/integracijos\/\">Integracijos<\/a> \/ <a href=\"\/lt\/integracijos\/erp\/\">ERP<\/a> \/ QAD Adaptive ERP<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">QAD Adaptive ERP integravimo vadovas: <span class=\"hl\">gamybos tvarkara\u0161\u010di\u0173 sudarymas su SkyPlanner APS<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u0160iame QAD Adaptive ERP integravimo vadove partneriams ir IT komandoms paai\u0161kinama, kaip sujungti QAD Adaptive ERP, \u012fskaitant ankstesnes QAD Enterprise Edition ir MFG\/PRO sistemas, su SkyPlanner APS. SkyPlanner integruojama su QAD Adaptive ERP abiem kryptimis per pa\u010dios QAD s\u0105sajas:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>\u012e SkyPlanner perduodami gamybos u\u017esakymai ir j\u0173 operacijos, prek\u0117s, gamini\u0173 strukt\u016bros, technologiniai mar\u0161rutai, darbo centrai, cecho kalendoriai, atsarg\u0173 duomenys ir pirkimo u\u017esakymai.<\/li>\n\n\n<li>Suplanuotos i\u0161leidimo ir \u012fvykdymo datos gr\u0105\u017einamos \u012f Work Order Maintenance (16.1).<\/li>\n\n\n<li>Operatori\u0173 darbo laiko \u012fra\u0161ai gr\u0105\u017einami per Labor Feedback by Work Order (16.20.1), o pagaminti kiekiai \u2013 per Work Order Receipt (16.11).<\/li>\n\n\n<li>SkyPlanner siun\u010dia prane\u0161imus per webhook s\u0105sajas vos pasikeitus tvarkara\u0161\u010diui.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lt\/bandymas\/\">I\u0161bandykite nemokamai<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lt\/susisiekite-su-pardavejais\/\">U\u017esisakykite demonstracij\u0105<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Gamybos tvarkara\u0161\u010di\u0173 sudarymas<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt laiko juosta su darbo centrams suplanuotomis u\u017eduotimis ir apa\u010dioje pateiktu u\u017esakym\u0173 s\u0105ra\u0161u.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Diegimo prad\u017eioje SkyPlanner komanda pritaiko integracij\u0105 prie j\u016bs\u0173 QAD konfig\u016bracijos ir pri\u017ei\u016bri j\u0105 prad\u0117jus eksploatuoti. \u0160is vadovas skirtas partneriams ir programuotojams, norintiems prisid\u0117ti prie integravimo arba patiems kurti sprendimus naudojantis dokumentuota SkyPlanner REST API (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API \u017einynas<\/a>).<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"qad-s-integration-interfaces\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">QAD integravimo s\u0105sajos<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>QAD si\u016blo tris b\u016bdus i\u0161orinei tvarkara\u0161\u010di\u0173 sudarymo sistemai prijungti:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>QAD QXtend Inbound (QXI).<\/strong> QAD j\u0105 apib\u016bdina taip: &#8222;a Web services-based, SOAP-compliant, XML framework, enabling complete platform-independent access to QAD Enterprise Applications business functionality.&#8221; (\u017diniatinklio paslaugomis pagr\u012fsta, SOAP reikalavimus atitinkanti XML sistema, suteikianti nuo platformos nepriklausom\u0105 prieig\u0105 prie vis\u0173 QAD Enterprise Applications verslo funkcij\u0173.) Kiekviena u\u017eklausa yra <strong>QDoc<\/strong> dokumentas, paleid\u017eiantis QAD program\u0105 su tokiomis pa\u010diomis patikromis, kokios atliekamos jos ekrane. \u012e kiekvien\u0105 u\u017eklaus\u0105 gr\u0105\u017einamas atsakymo QDoc dokumentas. Tarp i\u0161leist\u0173 QDoc dokument\u0173 yra <code>maintainItemMaster<\/code>, <code>maintainRouting<\/code> ir <code>maintainPurchaseOrder<\/code>. Jei programai n\u0117ra i\u0161leisto QDoc dokumento, meniu programa susiejama naudojant QAD \u012frank\u012f <strong>QGen<\/strong>: &#8222;QGen is used to map custom programs or QAD Enterprise Applications programs that do not have released QDoc schemas and events files.&#8221; (QGen naudojamas individualioms programoms arba QAD Enterprise Applications programoms, kurioms n\u0117ra i\u0161leist\u0173 QDoc schem\u0173 ir \u012fvyki\u0173 fail\u0173, susieti.) \u0160\u012f b\u016bd\u0105 naudoja ir pati QAD: &#8222;QAD Production Scheduler uses QAD QXtend to update work orders.&#8221; (QAD Production Scheduler naudoja QAD QXtend gamybos u\u017esakymams atnaujinti.) (<a href=\"https:\/\/connect.qad.com\/documents\/2370665\/2370949\/Qxtend_UG_v0110.pdf\/093456b1-c885-de26-7e61-754987199fa7?t=1634559415409&amp;download=true\">QXtend vadovas<\/a>)<\/li>\n\n\n<li><strong>QAD QXtend Outbound (QXO).<\/strong> QXO &#8222;exports user-configurable business objects as XML QDocs out of QAD products.&#8221; (Eksportuoja naudotojo konfig\u016bruojamus verslo objektus i\u0161 QAD produkt\u0173 XML QDoc formatu.) Standartiniai verslo objektai: Item, Product Structure, Routing, Work Center, Department, Inventory Transaction ir Inventory Status.<\/li>\n\n\n<li><strong>Verslo dokument\u0173 REST API.<\/strong> Nuo Adaptive ERP 2022.1 versijos: &#8222;Query REST APIs are now available for business documents,&#8221; (Verslo dokumentams jau prieinamos u\u017eklaus\u0173 REST API.) Jos leid\u017eia filtruoti, r\u016b\u0161iuoti, skaidyti rezultatus puslapiais ir gauti dalinius duomenis. Dokumentacija pateikta j\u016bs\u0173 sistemos Swagger (<a href=\"https:\/\/connect.qad.com\/documents\/2370665\/159231649\/QAD_Adaptive_ERP_Web_UI_RN_v2022_1.pdf\/602f6b29-ef47-decd-4825-127b06b25b16?t=1670945442202&amp;download=true\">versijos pastabos<\/a>).<\/li>\n\n<\/ol>\n\n\n<p>Duomenys \u012fra\u0161omi per QXtend. Duomenims skaityti naudojamos QXO ir u\u017eklaus\u0173 REST API.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"authentication-and-licensing\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Autentifikavimas ir licencijavimas<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>QXtend Inbound.<\/strong> Gav\u0117jo pus\u0117je \u012fjungus Require Authentication, kiekviename QDoc dokumente perduodamas Session ID arba QAD naudotojo vardas ir slapta\u017eodis. Prie\u0161 paleisdama program\u0105, QXI patikrina naudotojo prieigos prie meniu teises.<\/li>\n\n\n<li><strong>Integracijos naudotojas.<\/strong> Sukurkite atskir\u0105 QAD naudotoj\u0105 ir suteikite jam prieig\u0105 tik prie t\u0173 meniu program\u0173, kurias kvie\u010dia integracija: Work Order Maintenance, Labor Feedback by Work Order, Work Order Receipt ir pagrindini\u0173 duomen\u0173 program\u0173.<\/li>\n\n\n<li><strong>QXtend licencija.<\/strong> QXtend licencijuojama pagal agentus ir gav\u0117jus. QAD vadove nurodyta, kad \u017einiatinklio paslaug\u0173 duomen\u0173 srautas \u012f i\u0161orin\u0119 program\u0105 ir i\u0161 jos n\u0117ra nemokamas, tod\u0117l prie\u0161 prad\u0117dami projekt\u0105 pasitikrinkite QXtend licencij\u0105.<\/li>\n\n<\/ul>\n\n\n<p>SkyPlanner REST API autentifikavimui naudoja API prieigos rakt\u0105, perduodam\u0105 <code>Authorization-Token<\/code> antra\u0161t\u0117je (SkyPlanner Settings &gt; API). API dokumentuota Swagger\/OpenAPI formatu. <a href=\"\/lt\/docs\/integravimo-pamoka\/\">Integravimo pamokoje<\/a> paai\u0161kinta, kaip atlikti pirmuosius i\u0161kvietimus.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"events-and-change-data\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u012evykiai ir duomen\u0173 pakeitimai<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>QXtend Outbound yra QAD duomen\u0173 pakeitim\u0173 perdavimo mechanizmas. &#8222;A change occurs to watched data in QAD Enterprise Applications. Change notifications are written out to the qxevents database.&#8221; (Pasikeitus stebimiems QAD Enterprise Applications duomenims, prane\u0161imai apie pakeitimus \u012fra\u0161omi \u012f qxevents duomen\u0173 baz\u0119.) Tada QXO suformuoja QDoc dokumentus ir perduoda juos &#8222;to a directory location where the subscriber polls for and picks up new QDocs,&#8221; (\u012f katalog\u0105, kuriame prenumeratorius periodi\u0161kai tikrina, ar yra nauj\u0173 QDoc dokument\u0173, ir juos pasiima) arba \u017einiatinklio paslaugai, priiman\u010diai u\u017eklausas nurodytu URL.<\/p>\n\n\n<p>SkyPlanner kaip \u017einiatinklio paslauga prenumeruoja QXO skelbiamus duomenis, o duomenis, kuri\u0173 QXO neapima, periodi\u0161kai nuskaito per u\u017eklaus\u0173 REST API. Work Order n\u0117ra standartinis QXO verslo objektas. Tod\u0117l integracijoje arba sukuriamas QXO verslo objektas gamybos u\u017esakym\u0173 lentel\u0117ms (<code>wo_mstr<\/code>, <code>wr_route<\/code>), arba gamybos u\u017esakymai kas kelias minutes nuskaitomi per u\u017eklaus\u0173 REST API.<\/p>\n\n\n<p>Pasikeitus b\u016bsenai ar tvarkara\u0161\u010diui, SkyPlanner siun\u010dia webhook prane\u0161imus, tod\u0117l duomen\u0173 gr\u0105\u017einim\u0105 \u012f QAD valdo \u012fvykiai.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Duomen\u0173 susiejimas<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>QAD objektas (programa, s\u0105saja)<\/th><th>SkyPlanner objektas<\/th><th>Kryptis<\/th><th>Da\u017enis<\/th><\/tr><\/thead><tbody><tr><td>Prek\u0117s (Item Master Maintenance 1.4.1; QXO Item)<\/td><td>Gaminiai ir med\u017eiagos<\/td><td>QAD \u2192 SkyPlanner<\/td><td>Pradinis \u012fk\u0117limas, v\u0117liau \u2013 pasikeitus duomenims per QXO<\/td><\/tr><tr><td>Gamini\u0173 strukt\u016bros (13.5; QXO Product Structure)<\/td><td>Gaminio strukt\u016bra, sudedamieji gaminiai, kiekvieno gaminio med\u017eiagos<\/td><td>QAD \u2192 SkyPlanner<\/td><td>Pradinis \u012fk\u0117limas, v\u0117liau \u2013 pasikeitus duomenims per QXO<\/td><\/tr><tr><td>Technologiniai mar\u0161rutai (14.13.1; QXO Routing): eil\u0117s, paruo\u0161imo, vykdymo, laukimo ir perk\u0117limo laikas<\/td><td>Proceso \u017eingsniai su j\u0173 trukme, paruo\u0161imo ir u\u017ebaigimo trukm\u0117mis<\/td><td>QAD \u2192 SkyPlanner<\/td><td>Pradinis \u012fk\u0117limas, v\u0117liau \u2013 pasikeitus duomenims per QXO<\/td><\/tr><tr><td>Darbo centrai (14.5) ir padaliniai (14.1; QXO Work Center, Department)<\/td><td>Darbo centrai, j\u0173 grup\u0117s ir efektyvumo rodikliai<\/td><td>QAD \u2192 SkyPlanner<\/td><td>Pradinis \u012fk\u0117limas, v\u0117liau \u2013 retai<\/td><\/tr><tr><td>Cecho ir darbo centr\u0173 kalendoriai<\/td><td>Pamainos ir nedarbo dienos<\/td><td>QAD \u2192 SkyPlanner<\/td><td>Kasdien arba pamainos tvarkomos atskirai SkyPlanner sistemoje<\/td><\/tr><tr><td>Gamybos u\u017esakymai (16.1) su j\u0173 technologiniais mar\u0161rutais (16.13.13) ir komponentais<\/td><td>U\u017esakymai ir u\u017eduotys su terminais bei med\u017eiag\u0173 poreikiu<\/td><td>QAD \u2192 SkyPlanner<\/td><td>Individualus QXO objektas arba periodin\u0117s REST u\u017eklausos kas kelias minutes<\/td><\/tr><tr><td>Atsargos (QXO Inventory Status, Inventory Transaction)<\/td><td>Atsarg\u0173 liku\u010diai<\/td><td>QAD \u2192 SkyPlanner<\/td><td>Pasikeitus duomenims arba kas valand\u0105<\/td><\/tr><tr><td>Pirkimo u\u017esakymai su pristatymo terminais<\/td><td>Pirkimo u\u017esakymai, gaunamos med\u017eiagos pagal pristatymo dat\u0105<\/td><td>QAD \u2192 SkyPlanner<\/td><td>U\u017eklausos kas valand\u0105 arba sudarant tvarkara\u0161t\u012f<\/td><\/tr><tr><td>Gamybos u\u017esakym\u0173 i\u0161leidimo ir \u012fvykdymo datos (Work Order Maintenance 16.1, QXtend Inbound QDoc)<\/td><td>Kiekvieno u\u017esakymo planuojama prad\u017eia ir pabaiga<\/td><td>SkyPlanner \u2192 QAD<\/td><td>Pasikeitus tvarkara\u0161\u010diui, per SkyPlanner webhook prane\u0161im\u0105<\/td><\/tr><tr><td>Labor Feedback by Work Order (16.20.1): kiekvienos operacijos paruo\u0161imo ir vykdymo laikas<\/td><td>Laiko apskaitos \u012fra\u0161ai ir operatori\u0173 patvirtinimai<\/td><td>SkyPlanner \u2192 QAD<\/td><td>Po kiekvieno patvirtinimo arba kiekvien\u0105 pamain\u0105, jei pasirinkta<\/td><\/tr><tr><td>Work Order Receipt (16.11)<\/td><td>Pagaminti kiekiai<\/td><td>SkyPlanner \u2192 QAD<\/td><td>Po kiekvieno patvirtinimo, jei pasirinkta<\/td><\/tr><tr><td>QAD sistemoje n\u0117ra<\/td><td>Paruo\u0161imo trukmi\u0173 matrica, \u012frankiai kaip riboti i\u0161tekliai, alternatyvios stakl\u0117s ir darbuotojai<\/td><td>Tvarkoma SkyPlanner sistemoje<\/td><td>Konfig\u016bruojama diegimo metu<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Integravimo modeliai<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. Pradinis pagrindini\u0173 duomen\u0173 \u012fk\u0117limas.<\/strong> Nuskaitykite prekes, gamini\u0173 strukt\u016bras, technologinius mar\u0161rutus, darbo centrus ir kalendorius per QXO arba u\u017eklaus\u0173 REST API. Apgalvotai susiekite darbo centrus: darbo centras su keturiomis stakl\u0117mis tampa viena darbo centr\u0173 grupe arba keturiais darbo centrais. Serijin\u0117s gamybos linijos i\u0161 Production Line Maintenance taip pat gali tapti darbo centrais.<\/p>\n\n\n<p><strong>2. Gamybos u\u017esakym\u0173 sinchronizavimas.<\/strong> Nuskaitykite patvirtintus planinius ir i\u0161leistus gamybos u\u017esakymus su j\u0173 technologiniais mar\u0161rutais bei komponentais, taip pat ne\u012fvykdytus pirkimo u\u017esakymus. SkyPlanner laiko u\u017esakytas med\u017eiagas prieinamomis pirkimo u\u017esakyme nurodyt\u0105 pristatymo dien\u0105 ir atnaujina atsargas, kai pirkimo u\u017esakymas pa\u017eymimas b\u016bsena Delivered.<\/p>\n\n\n<p>\u012e tvarkara\u0161t\u012f \u012ftraukite gamybos u\u017esakymus, o ne MRP planinius u\u017esakymus. Pirmiausia QAD sistemoje planiniai u\u017esakymai turi tapti patvirtintais planiniais arba i\u0161leistais gamybos u\u017esakymais.<\/p>\n\n\n<p><strong>3. Tvarkara\u0161\u010dio duomen\u0173 gr\u0105\u017einimas.<\/strong> Kai planavimo variklis \u012ftraukia u\u017esakym\u0105 \u012f tvarkara\u0161t\u012f arba j\u012f perkelia, SkyPlanner webhook prane\u0161imas inicijuoja QXtend Inbound QDoc u\u017eklaus\u0105 programai Work Order Maintenance (16.1). I\u0161leidimo data nustatoma pagal pirm\u0105j\u0105 suplanuot\u0105 operacij\u0105, o \u012fvykdymo data \u2013 pagal paskutin\u0119. QXtend paleid\u017eia program\u0105 su pa\u010dios QAD patikromis ir gr\u0105\u017eina atsakymo QDoc dokument\u0105, kur\u012f integracija patikrina.<\/p>\n\n\n<p>Kiekvienoms stakl\u0117ms numatyta operacij\u0173 seka lieka SkyPlanner sistemoje ir operatorius pasiekia per Mobile Confirmations. Taip integracija nesusiduria su QAD taikomu i\u0161leist\u0173 u\u017esakym\u0173 technologini\u0173 mar\u0161rut\u0173 keitimo draudimu.<\/p>\n\n\n<p><strong>4. Darb\u0173 patvirtinimai ceche.<\/strong> Operatoriai registruoja darb\u0105 naudodami SkyPlanner Mobile Confirmations arba Production Timer, o pagal darbo laiko \u012fra\u0161us tvarkara\u0161tis nuolat atnaujinamas. J\u016bs pasirenkate, ar faktin\u012f darbo laik\u0105 gr\u0105\u017einti \u012f QAD. Jei taip, kiekvienos operacijos paruo\u0161imo ir vykdymo laikas perduodamas \u012f Labor Feedback by Work Order, o pagaminti kiekiai \u2013 \u012f Work Order Receipt. Jei ne, darbo laikas \u012f QAD \u012fvedamas kaip anks\u010diau.<\/p>\n\n\n<p><strong>5. Atsakomyb\u0117s u\u017e duomenis ir konflikt\u0173 sprendimo taisykl\u0117s.<\/strong> U\u017era\u0161ykite jas prie\u0161 prad\u0117dami eksploatuoti sistem\u0105:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Duomenys<\/th><th>Atsakinga sistema<\/th><\/tr><\/thead><tbody><tr><td>Prek\u0117s, gamini\u0173 strukt\u016bros, technologiniai mar\u0161rutai, kiekiai, gamybos u\u017esakym\u0173 b\u016bsenos<\/td><td>QAD<\/td><\/tr><tr><td>Operacij\u0173 seka, prad\u017eios ir pabaigos laikas, stakli\u0173 priskyrimas<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Gamybos u\u017esakym\u0173 i\u0161leidimo ir \u012fvykdymo datos<\/td><td>SkyPlanner \u012fra\u0161o, QAD saugo<\/td><\/tr><tr><td>Paruo\u0161imo laiko matrica, \u012franki\u0173 ir operatori\u0173 poreikiai, alternatyv\u016bs i\u0161tekliai<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Pamainos ir nedarbo dienos<\/td><td>Viena sistema, pasirinkta apibr\u0117\u017eiant apimt\u012f<\/td><\/tr><tr><td>Darbo laikas, komponent\u0173 i\u0161davimas ir produkcijos pri\u0117mimas<\/td><td>QAD: duomenys \u012fvedami joje arba perduodami i\u0161 SkyPlanner darbo laiko \u012fra\u0161\u0173<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Pasirinkite vien\u0105 sistem\u0105, kuri \u012fra\u0161ys gamybos u\u017esakym\u0173 datas. SkyPlanner nereikia QAD tvarkara\u0161\u010di\u0173 sudarymo modulio, tod\u0117l jos planuojam\u0173 u\u017esakym\u0173 datas \u012fra\u0161o SkyPlanner, o ne tvarkara\u0161\u010di\u0173 planavimo darbo sritys ar kitos planavimo sistemos.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u012eprasti projekto etapai<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Prad\u0117jus diegim\u0105, jis paprastai u\u017ebaigiamas per kelias savaites. Prie\u0161 tai patikrinkite tvarkara\u0161t\u012f per 30 dien\u0173 nemokam\u0105 bandom\u0105j\u012f laikotarp\u012f, naudodami i\u0161 QAD CSV arba Excel formatu eksportuotus darbo centrus, technologinius mar\u0161rutus ir ne\u012fvykdytus gamybos u\u017esakymus.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Duomen\u0173 susiejimas.<\/strong> Suderinkite susiejimo lentel\u0119, atsakomyb\u0117s u\u017e duomenis taisykles, \u012f projekto apimt\u012f patenkan\u010dias gamybos vietas ir domenus, sinchronizavimo da\u017en\u012f bei tai, ar darbo laiko duomenys bus gr\u0105\u017einami \u012f QAD.<\/li>\n\n\n<li><strong>Prieiga prie QAD.<\/strong> Sukurkite integracijos naudotoj\u0105, patikrinkite QXtend licencijavim\u0105, sukonfig\u016bruokite QXtend gav\u0117j\u0105 ir QXO prenumeratori\u0173. Pirmiausia i\u0161bandykite bandomajame domene.<\/li>\n\n\n<li><strong>QDoc paruo\u0161imas.<\/strong> Naudokite i\u0161leistus QDoc dokumentus, jei j\u0173 yra, o prireikus sugeneruokite QDoc dokumentus programoms Work Order Maintenance, Labor Feedback by Work Order ir Work Order Receipt naudodami QGen.<\/li>\n\n\n<li><strong>Pradinis \u012fk\u0117limas.<\/strong> Prek\u0117s, gamini\u0173 strukt\u016bros, technologiniai mar\u0161rutai, darbo centrai ir kalendoriai.<\/li>\n\n\n<li><strong>Gamybos ir pirkimo u\u017esakym\u0173 sinchronizavimas.<\/strong> QXO \u012fvykiai arba periodin\u0117s REST u\u017eklausos su filtrais, rezultat\u0173 skaidymu puslapiais ir pakartotiniais bandymais.<\/li>\n\n\n<li><strong>Apribojim\u0173 nustatymas SkyPlanner sistemoje.<\/strong> Paruo\u0161imo laiko matrica, \u012frankiai, kiekvienai u\u017eduo\u010diai reikalingas operatori\u0173 skai\u010dius ir alternatyvios stakl\u0117s ar darbuotojai.<\/li>\n\n\n<li><strong>Tvarkara\u0161\u010dio duomen\u0173 gr\u0105\u017einimas ir lygiagretus testavimas.<\/strong> Perduokite datas pagal SkyPlanner webhook prane\u0161imus, planuokite lygiagre\u010diai su esamu planu, palyginkite datas ir pataisykite pagrindinius duomenis.<\/li>\n\n\n<li><strong>Eksploatavimo prad\u017eia.<\/strong> Kai duomenys sutaps, \u012fjunkite j\u0173 gr\u0105\u017einim\u0105 \u012f QAD.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-to-plan-for-in-a-qad-adaptive-erp-integrati\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u012e k\u0105 atsi\u017evelgti planuojant QAD Adaptive ERP integracij\u0105<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Pakartotinis CRP vykdymas.<\/strong> CRP i\u0161 naujo suplanuoja visas neu\u017ebaigtas pasirinkt\u0173 gamybos u\u017esakym\u0173 operacijas. QAD i\u0161saugo rankiniu b\u016bdu nustatytas datas tik tada, kai &#8222;you also adjusted the work order release and due date to match,&#8221; (taip pat atitinkamai pakoregavote gamybos u\u017esakymo i\u0161leidimo ir \u012fvykdymo datas), o b\u016btent \u0161ias datas ir \u012fra\u0161o SkyPlanner. Vykdykite CRP po duomen\u0173 \u012fra\u0161ymo atgal arba ne\u012ftraukite u\u017esakym\u0173, kuri\u0173 tvarkara\u0161\u010dius sudaro SkyPlanner.<\/li>\n\n\n<li><strong>I\u0161leist\u0173 u\u017esakym\u0173 technologiniai mar\u0161rutai nebekei\u010diami.<\/strong> &#8222;Once the work order status is Exploded, Allocated, or Released, no more changes can be made to the routing.&#8221; (Kai gamybos u\u017esakymo b\u016bsena yra Exploded, Allocated arba Released, technologinio mar\u0161ruto keisti nebegalima.) Nuskaitykite technologin\u012f mar\u0161rut\u0105 i\u0161leid\u017eiant u\u017esakym\u0105, o mar\u0161rutus keiskite tik planuojamuose arba patvirtintuose planuojamuose u\u017esakymuose.<\/li>\n\n\n<li><strong>Technologinio mar\u0161ruto laiko vienetai.<\/strong> Paruo\u0161imo ir vykdymo laikas \u012ftraukiamas \u012f apkrov\u0105, o &#8222;queue, wait, and move times are excluded from load calculations.&#8221; (eil\u0117s, laukimo ir perk\u0117limo laikas \u012f apkrovos skai\u010diavimus ne\u012ftraukiamas.) SkyPlanner sistemoje eil\u0119, laukim\u0105 ir perk\u0117lim\u0105 modeliuokite kaip etapus, kuriems skai\u010diuojama tik trukm\u0117, ir patikrinkite, ar vykdymo laikas nurodytas vienetui, ar visam u\u017esakymui.<\/li>\n\n\n<li><strong>QXtend pralaidumas.<\/strong> QAD \u012fsp\u0117ja: &#8222;UI API adapter performance may be unacceptable when processing high volumes of data or real-time transactions.&#8221; (Apdorojant didelius duomen\u0173 kiekius arba operacijas realiuoju laiku, UI API adapterio na\u0161umas gali b\u016bti nepriimtinas.) Si\u0173skite tik pakeistus u\u017esakymus, grupuokite juos \u012f paketus ir naudokite standartinius QDocs, kai jie yra.<\/li>\n\n\n<li><strong>Domenai ir gamybos vietos.<\/strong> QAD dieginiuose su keliais domenais darbo centrai ir gamybos u\u017esakymai saugomi pagal domen\u0105 ir gamybos viet\u0105. Kiekvienai \u012f projekto apimt\u012f \u012ftrauktai gamybos vietai priskirkite atskir\u0105 darbo centr\u0173 grup\u0119.<\/li>\n\n\n<li><strong>Pasikartojan\u010dios ir diskre\u010diosios gamybos derinimas.<\/strong> Advanced Repetitive linijose naudojami pasikartojan\u010dios gamybos tvarkara\u0161\u010diai, o ne gamybos u\u017esakymai. Apibr\u0117\u017edami apimt\u012f nuspr\u0119skite, kuri\u0173 linij\u0173 tvarkara\u0161\u010dius sudarys SkyPlanner.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"who-configures-and-supports-the-qad-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas konfig\u016bruoja ir pri\u017ei\u016bri QAD integracij\u0105<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>SkyPlanner komanda sukonfig\u016bruoja integracij\u0105 diegimo metu ir teikia pagalb\u0105 prad\u0117jus j\u0105 naudoti.<\/strong> Tai apima sutartus QDocs, QXO prenumeratas ir REST u\u017eklausas. Kiekviena gamykla QAD naudoja savaip, tad b\u016btent \u010dia pritaikoma \u0161i praktin\u0117 patirtis.<\/li>\n\n\n<li><strong>Gali dalyvauti ir j\u016bs\u0173 QAD partneris.<\/strong> Partneris i\u0161mano j\u016bs\u0173 domenus, individualius pritaikymus bei licencijavim\u0105 ir kartu su SkyPlanner komanda gali sukonfig\u016bruoti QXtend, QGen QDocs bei integracijai skirt\u0105 naudotojo paskyr\u0105.<\/li>\n\n\n<li><strong>J\u016bs\u0173 programuotojai gali pl\u0117toti integracij\u0105<\/strong> naudodami SkyPlanner REST API ir API prieigos rakt\u0105. Prad\u017eiai pakanka API prieigos rakto, o prireikus padeda SkyPlanner komanda. Dokumentacij\u0105 rasite skiltyje <a href=\"\/lt\/docs\/integravimo-pamoka\/\">SkyPlanner integracijos dokumentacija<\/a>.<\/li>\n\n<\/ol>\n\n\n<p>SkyPlanner kainuoja nuo 199 \u20ac per m\u0117nes\u012f, \u012f kain\u0105 \u012fskai\u010diuoti 5 darbo centrai, o mokama kas m\u0117nes\u012f. Integracijos kaina, atsi\u017evelgiant \u012f j\u016bs\u0173 proces\u0105 ir poreikius, pateikiama i\u0161 anksto kartu su pasirinkto plano kaina. Per\u017ei\u016br\u0117kite <a href=\"\/lt\/kainodara\/\">kainas<\/a>, <a href=\"\/lt\/integracijos\/erp\/qad-adaptive-erp\/gamybos-planavimas\/\">QAD Adaptive ERP gamybos planavim\u0105 pagal realius paj\u0117gumus<\/a>, <a href=\"\/lt\/integracijos\/erp\/qad-adaptive-erp\/\">QAD Adaptive ERP puslap\u012f<\/a> ir <a href=\"\/lt\/integracijos\/erp\/\">ERP integracij\u0173 skilt\u012f<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lt\/bandymas\/\">I\u0161bandykite nemokamai<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lt\/susisiekite-su-pardavejais\/\">U\u017esisakykite demonstracij\u0105<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Gamintoj\u0173 atsiliepimai apie SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, UTU tiekimo grandin\u0117s specialistas, elektros skyd\u0173 gamybos ceche Ulviloje\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>sutaupoma kas savait\u0119<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSu SkyPlanner nuo gamybos planavimo Excel lentel\u0117se per\u0117jome prie gamybos optimizavimo realiuoju laiku.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, tiekimo grandin\u0117s specialistas<\/b><br>UTU \u00b7 Elektros skydai ir skirstomieji \u012frenginiai<\/p>\n\n\n<p class=\"ind-cust__result\">Planuojant gamyb\u0105 kas savait\u0119 sutaupomos 2 darbo valandos, o nauja u\u017eduo\u010di\u0173 eil\u0117 gamybos linij\u0105 pasiekia per kelias sekundes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lt\/klientu-istorijos\/utu\/\">Skaitykite UTU atsiliepim\u0105<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatoriai su \u0161vari\u0173j\u0173 patalp\u0173 apranga prie buteliuk\u0173 pildymo linijos Laboratory &amp; Allied vaist\u0173 gamykloje Nairobyje\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>gamybos efektyvumas<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eGamybos efektyvumas padid\u0117jo 90 %.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT vadovas<\/b><br>Laboratory &amp; Allied \u00b7 Vaist\u0173 gamyba<\/p>\n\n\n<p class=\"ind-cust__result\">Gamybos efektyvumas padid\u0117jo 90 %, o optimizuotas trij\u0173 m\u0117nesi\u0173 planas visiems darbo centrams sudaromas per ma\u017eiau nei 30 minu\u010di\u0173.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lt\/klientu-istorijos\/laboratory-allied\/\">Skaitykite Laboratory &amp; Allied atsiliepim\u0105<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Hannu Ryyn\u00e4nen, Mamec generalinis direktorius, \u012fmon\u0117s gamybos ceche Lohjoje\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>1 000-iai<\/b><span>gamybos u\u017esakym\u0173 suplanuojami automati\u0161kai<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eGamyb\u0105 dabar valdome kitaip, o m\u016bs\u0173 supratimas apie paj\u0117gumus pakilo \u012f visi\u0161kai kit\u0105 lyg\u012f.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, generalinis direktorius<\/b><br>Mamec \u00b7 Pramonin\u0117s mai\u0161ykl\u0117s, siurbliai ir auk\u0161t\u0173j\u0173 technologij\u0173 u\u017esakomoji gamyba<\/p>\n\n\n<p class=\"ind-cust__result\">T\u016bkstan\u010diai gamybos u\u017esakym\u0173 suplanuojami automati\u0161kai, o visa organizacija mato gamybos pad\u0117t\u012f realiuoju laiku.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lt\/klientu-istorijos\/mamec\/\">Skaitykite Mamec atsiliepim\u0105<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"Piristeel stog\u0173 saugos priemoni\u0173 gamykla Kauhavoje i\u0161 pauk\u0161\u010dio skryd\u017eio\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>99,2%<\/b><span>pristatymo patikimumas<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner pad\u0117jo ai\u0161kiai matyti gamybos kli\u016btis ir suteik\u0117 daugiau ai\u0161kumo valdant gamyb\u0105.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, gamybos vadovas<\/b><br>Piristeel \u00b7 Stog\u0173 saugos ir lietaus vandens nuvedimo sistemos<\/p>\n\n\n<p class=\"ind-cust__result\">\u0160iemet pristatymo patikimumas pasiek\u0117 99,2 %, o sudarant tvarkara\u0161\u010dius sutaupoma iki keturi\u0173 darbo valand\u0173 per dien\u0105.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lt\/klientu-istorijos\/piristeel\/\">Skaitykite Piristeel atsiliepim\u0105<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Da\u017eniausiai u\u017eduodami klausimai<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ar QAD Adaptive ERP turi gamybos u\u017esakymams skirt\u0105 API?<\/summary>\n<p class=\"sp-faq__a\">Taip. QXtend Inbound vykdo Work Order Maintenance ir gamybos cecho programas per SOAP, naudodamas XML QDocs. Jei i\u0161leisto QDoc n\u0117ra, jis sugeneruojamas naudojant QGen. Verslo dokument\u0173 REST API papildomai leid\u017eia vykdyti u\u017eklausas su filtravimu ir skaidymu \u012f puslapius.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ar QAD palaiko \u017einiatinklio prane\u0161imus (webhooks)?<\/summary>\n<p class=\"sp-faq__a\">QAD duomen\u0173 poky\u010di\u0173 perdavimo mechanizmas yra QXtend Outbound: lenteli\u0173 trigeriai u\u017efiksuoja pakeitimus, o QXO pristato QDocs \u017einiatinklio paslaugos URL adresu arba \u012f periodi\u0161kai tikrinam\u0105 katalog\u0105. SkyPlanner \u017einiatinklio prane\u0161imai perduoda tvarkara\u0161\u010dio pakeitimus vos jiems \u012fvykus.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kaip suplanuotos datos \u012fra\u0161omos atgal \u012f QAD?<\/summary>\n<p class=\"sp-faq__a\">Per QXtend Inbound QDoc, skirt\u0105 Work Order Maintenance (16.1): pagal SkyPlanner tvarkara\u0161t\u012f nustatomos gamybos u\u017esakymo i\u0161leidimo ir \u012fvykdymo datos. QAD patikrina QDoc pagal tas pa\u010dias taisykles kaip ir \u012fvedant duomenis ekrane ir gr\u0105\u017eina atsakymo QDoc.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kaip operatori\u0173 patvirtinimai pasiekia QAD?<\/summary>\n<p class=\"sp-faq__a\">Paruo\u0161imo ir vykdymo laikas registruojamas per Labor Feedback by Work Order (16.20.1), o pagaminti kiekiai \u2013 per Work Order Receipt (16.11). Abiem atvejais naudojami QXtend Inbound QDocs. Ar \u0161iuos duomenis \u012fra\u0161yti atgal, nusprend\u017eiama apibr\u0117\u017eiant apimt\u012f.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>K\u0105 QAD partneriui si\u016blyti: QAD Advanced Scheduling ar SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner, jei klientas dirba su diskre\u010diosios gamybos u\u017esakymais ir nori per kelias savaites tur\u0117ti veikiant\u012f tvarkara\u0161t\u012f, sudarom\u0105 pagal realius \u012frengini\u0173 ir darbuotoj\u0173 paj\u0117gumus. QAD apib\u016bdina Advanced Scheduling kaip kiekvienos gamyklos tvarkara\u0161t\u012f, sudarom\u0105 atskirai kiekvienai linijai, ir pristato j\u012f kartu su DSCP Production Planning bei Redzone (<a href=\"https:\/\/www.qad.com\/blog\/2024\/11\/supercharge-qad-redzone-with-production-planning-and-advanced-scheduling\">QAD<\/a>). SkyPlanner prisijungia per QXtend, planuoja kiekvieno \u012frenginio, operatoriaus, \u012frankio ir med\u017eiagos naudojim\u0105, automati\u0161kai perplanuoja ir neriboja naudotoj\u0173 skai\u010diaus. Kaina \u2013 nuo 199 \u20ac per m\u0117nes\u012f.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ar galime i\u0161bandyti SkyPlanner prie\u0161 kurdami integracij\u0105?<\/summary>\n<p class=\"sp-faq__a\">Taip. Per 30 dien\u0173 nemokam\u0105 bandom\u0105j\u012f laikotarp\u012f galite naudoti iki 20 darbo centr\u0173 ir importuoti QAD duomenis CSV arba Excel formatu. Kredito kortel\u0117s nereikia. <a href=\"\/lt\/bandymas\/\">Prad\u0117kite bandom\u0105j\u012f laikotarp\u012f<\/a> arba <a href=\"\/lt\/susisiekite-su-pardavejais\/\">susisiekite su pardavimo komanda<\/a>, kad apibr\u0117\u017etum\u0117te integracijos apimt\u012f.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integracijos \/ ERP \/ QAD Adaptive ERP QAD Adaptive ERP integravimo vadovas: gamybos tvarkara\u0161\u010di\u0173 sudarymas su SkyPlanner APS \u0160iame QAD Adaptive ERP integravimo vadove partneriams ir IT komandoms paai\u0161kinama, kaip sujungti QAD Adaptive ERP, \u012fskaitant ankstesnes QAD Enterprise Edition ir MFG\/PRO sistemas, su SkyPlanner APS. SkyPlanner integruojama su QAD Adaptive ERP abiem kryptimis per pa\u010dios &#8230; <a title=\"QAD Adaptive ERP integravimo vadovas: gamybos tvarkara\u0161\u010di\u0173 sudarymas su SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/qad-adaptive-erp\/integravimo-vadovas\/\" aria-label=\"Read more about QAD Adaptive ERP integravimo vadovas: gamybos tvarkara\u0161\u010di\u0173 sudarymas su SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":106181,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-106935","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>QAD APS integravimo vadovas gamybos tvarkara\u0161\u010diams sudaryti<\/title>\n<meta name=\"description\" content=\"QAD Adaptive ERP\u2013SkyPlanner APS: QXtend Inbound QDocs \u2192 Work Order Maintenance; QXtend Outbound \u012fvykiai, darbo ataskaitos, susiejimas, projekto patarimai.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/qad-adaptive-erp\/integravimo-vadovas\/\" \/>\n<meta property=\"og:locale\" content=\"lt_LT\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"QAD Adaptive ERP integravimo vadovas: gamybos tvarkara\u0161\u010di\u0173 sudarymas su SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"QAD Adaptive ERP\u2013SkyPlanner APS: QXtend Inbound QDocs \u2192 Work Order Maintenance; QXtend Outbound \u012fvykiai, darbo ataskaitos, susiejimas, projekto patarimai.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/qad-adaptive-erp\/integravimo-vadovas\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"14 minu\u010di\u0173\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/qad-adaptive-erp\\\/integravimo-vadovas\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/qad-adaptive-erp\\\/integravimo-vadovas\\\/\",\"name\":\"QAD APS integravimo vadovas gamybos tvarkara\u0161\u010diams sudaryti\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"QAD Adaptive ERP\u2013SkyPlanner APS: QXtend Inbound QDocs \u2192 Work Order Maintenance; QXtend Outbound \u012fvykiai, darbo ataskaitos, susiejimas, projekto patarimai.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/qad-adaptive-erp\\\/integravimo-vadovas\\\/#breadcrumb\"},\"inLanguage\":\"lt-LT\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/qad-adaptive-erp\\\/integravimo-vadovas\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/qad-adaptive-erp\\\/integravimo-vadovas\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP ir MES programin\u0117s \u012frangos integracijos su SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bs\u0173 ERP sistemai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS su QAD Adaptive ERP: gamybos planavimas pagal realius \u012frengini\u0173 ir darbuotoj\u0173 paj\u0117gumus\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/qad-adaptive-erp\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"QAD Adaptive ERP integravimo vadovas: gamybos tvarkara\u0161\u010di\u0173 sudarymas su SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lt-LT\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lt-LT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"QAD APS integravimo vadovas gamybos tvarkara\u0161\u010diams sudaryti","description":"QAD Adaptive ERP\u2013SkyPlanner APS: QXtend Inbound QDocs \u2192 Work Order Maintenance; QXtend Outbound \u012fvykiai, darbo ataskaitos, susiejimas, projekto patarimai.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/qad-adaptive-erp\/integravimo-vadovas\/","og_locale":"lt_LT","og_type":"article","og_title":"QAD Adaptive ERP integravimo vadovas: gamybos tvarkara\u0161\u010di\u0173 sudarymas su SkyPlanner APS","og_description":"QAD Adaptive ERP\u2013SkyPlanner APS: QXtend Inbound QDocs \u2192 Work Order Maintenance; QXtend Outbound \u012fvykiai, darbo ataskaitos, susiejimas, projekto patarimai.","og_url":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/qad-adaptive-erp\/integravimo-vadovas\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"14 minu\u010di\u0173"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/qad-adaptive-erp\/integravimo-vadovas\/","url":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/qad-adaptive-erp\/integravimo-vadovas\/","name":"QAD APS integravimo vadovas gamybos tvarkara\u0161\u010diams sudaryti","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lt\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"QAD Adaptive ERP\u2013SkyPlanner APS: QXtend Inbound QDocs \u2192 Work Order Maintenance; QXtend Outbound \u012fvykiai, darbo ataskaitos, susiejimas, projekto patarimai.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/qad-adaptive-erp\/integravimo-vadovas\/#breadcrumb"},"inLanguage":"lt-LT","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/qad-adaptive-erp\/integravimo-vadovas\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/qad-adaptive-erp\/integravimo-vadovas\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lt\/"},{"@type":"ListItem","position":2,"name":"ERP ir MES programin\u0117s \u012frangos integracijos su SkyPlanner","item":"https:\/\/skyplanner.ai\/lt\/integracijos\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bs\u0173 ERP sistemai","item":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS su QAD Adaptive ERP: gamybos planavimas pagal realius \u012frengini\u0173 ir darbuotoj\u0173 paj\u0117gumus","item":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/qad-adaptive-erp\/"},{"@type":"ListItem","position":5,"name":"QAD Adaptive ERP integravimo vadovas: gamybos tvarkara\u0161\u010di\u0173 sudarymas su SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lt\/#website","url":"https:\/\/skyplanner.ai\/lt\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lt\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lt\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lt-LT"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lt\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lt\/","logo":{"@type":"ImageObject","inLanguage":"lt-LT","@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lt\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integracijos \/ ERP \/ QAD Adaptive ERP QAD Adaptive ERP integravimo vadovas: gamybos tvarkara\u0161\u010di\u0173 sudarymas su SkyPlanner APS \u0160iame QAD Adaptive ERP integravimo vadove partneriams ir IT komandoms paai\u0161kinama, kaip sujungti QAD Adaptive ERP, \u012fskaitant ankstesnes QAD Enterprise Edition ir MFG\/PRO sistemas, su SkyPlanner APS. SkyPlanner integruojama su QAD Adaptive ERP abiem kryptimis per pa\u010dios&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/pages\/106935","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/comments?post=106935"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/pages\/106935\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/pages\/106181"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/media?parent=106935"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}