{"id":106877,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integracijos\/erp\/oracle-fusion-cloud\/integravimo-vadovas\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"integravimo-vadovas","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/oracle-fusion-cloud\/integravimo-vadovas\/","title":{"rendered":"Oracle Fusion Cloud integravimo vadovas: gamybos tvarkara\u0161\u010di\u0173 sudarymas su SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lt\/integracijos\/\">Integracijos<\/a> \/ <a href=\"\/lt\/integracijos\/erp\/\">ERP<\/a> \/ Oracle Fusion Cloud<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Oracle Fusion Cloud integravimo vadovas: <span class=\"hl\">gamybos tvarkara\u0161\u010di\u0173 sudarymas su SkyPlanner APS<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u0160iame Oracle Fusion Cloud integravimo vadove partneriams ir IT komandoms paai\u0161kinama, kaip sujungti Oracle Fusion Cloud Manufacturing su SkyPlanner APS. SkyPlanner kei\u010diasi duomenimis su Oracle Fusion Cloud abiem kryptimis per pa\u010dios Oracle REST i\u0161teklius:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>\u012e SkyPlanner perduodami gamybos u\u017esakymai ir j\u0173 operacijos, darb\u0173 apra\u0161ai, darbo centrai, gamybos i\u0161tekliai, kalendoriai, prek\u0117s, preki\u0173 strukt\u016bros, atsarg\u0173 liku\u010diai ir pirkimo u\u017esakymai.<\/li>\n\n\n<li>Planuojamos prad\u017eios ir u\u017ebaigimo datos gr\u0105\u017einamos \u012f kiekvien\u0105 gamybos u\u017esakymo operacij\u0105.<\/li>\n\n\n<li>Operatori\u0173 patvirtinimai gr\u0105\u017einami kaip operacij\u0173 ir i\u0161tekli\u0173 apskaitos \u012fra\u0161ai.<\/li>\n\n\n<li>SkyPlanner webhooks i\u0161kart prane\u0161a apie tvarkara\u0161\u010dio pakeitimus.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lt\/bandymas\/\">I\u0161bandykite nemokamai<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lt\/susisiekite-su-pardavejais\/\">U\u017esisakykite demonstracij\u0105<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Gamybos tvarkara\u0161\u010di\u0173 sudarymas<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt laiko juosta su darbo centruose suplanuotomis u\u017eduotimis ir \u017eemiau pateiktu u\u017esakym\u0173 s\u0105ra\u0161u.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Diegimo metu SkyPlanner komanda sukonfig\u016bruoja integracij\u0105 pagal j\u016bs\u0173 Oracle Fusion Cloud aplink\u0105 ir teikia palaikym\u0105 prad\u0117jus j\u0105 naudoti. \u0160is vadovas skirtas partneriams ir programuotojams, norintiems prisid\u0117ti prie integravimo arba patiems kurti sprendimus naudojant dokumentuot\u0105 SkyPlanner REST API (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API dokumentacija<\/a>).<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"oracle-fusion-cloud-s-integration-interfaces\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Oracle Fusion Cloud integravimo s\u0105sajos<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Oracle Fusion Cloud suteikia i\u0161orinei tvarkara\u0161\u010di\u0173 sudarymo sistemai tris duomen\u0173 perdavimo b\u016bdus:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>REST API for Oracle Fusion Cloud SCM.<\/strong> Bazinis kelias yra <code>\/fscmRestApi\/resources\/11.13.18.05\/<\/code>. Tvarkara\u0161\u010di\u0173 sudarymo sistema naudoja \u0161iuos i\u0161teklius: <code>workOrders<\/code> (su antriniais i\u0161tekliais <code>WorkOrderOperation<\/code>, <code>WorkOrderOperationResource<\/code> ir <code>WorkOrderOperationMaterial<\/code>), <code>processWorkOrders<\/code>, <code>workDefinitions<\/code>, <code>workCenters<\/code>, <code>productionResources<\/code>, <code>calendars<\/code>, <code>itemsV2<\/code>, <code>itemStructures<\/code> ir <code>inventoryOnhandBalances<\/code>. Vykdymo duomenys siun\u010diami \u012f <code>operationTransactions<\/code>, <code>resourceTransactions<\/code> ir <code>materialTransactions<\/code>. Pirkimo u\u017esakymai gaunami i\u0161 Procurement REST API i\u0161tekliaus <code>purchaseOrders<\/code>. (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/supply-chain-and-manufacturing\/26c\/fasrp\/rest-endpoints.html\">REST galiniai ta\u0161kai<\/a>)<\/li>\n\n\n<li><strong>File-Based Data Import (FBDI).<\/strong> Procesas Import Work Orders pagal \u0161ablon\u0105 sukuria arba atnaujina gamybos u\u017esakymus, j\u0173 operacijas ir operacij\u0173 i\u0161teklius, o Import Work Order Resource Transactions \u012fkelia i\u0161tekli\u0173 apskaitos \u012fra\u0161us. Oracle ai\u0161kiai nurodo apribojim\u0105 d\u0117l duomen\u0173 perdavimo laiko: &#8222;This option isn&#8217;t suitable for importing manufacturing data on a real-time basis.&#8221; (\u0160is b\u016bdas netinka gamybos duomenims importuoti realiuoju laiku.) (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/supply-chain-and-manufacturing\/26c\/faips\/mfg-file-based-data-import-fbdi.html\">\u0161altinis<\/a>)<\/li>\n\n\n<li><strong>Oracle Integration (OIC).<\/strong> Oracle integravimo platforma perduoda duomen\u0173 srautus tarp Fusion ir kit\u0173 sistem\u0173. Oracle Integration integravimo \u0161ablonas reaguoja \u012f Oracle Fusion Cloud Manufacturing \u012fvyk\u012f Work Order Status Change (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/paas\/integration-cloud\/sync-kanban-scm\/index.html\">\u0161altinis<\/a>). Naudokite \u0161\u012f b\u016bd\u0105, jei j\u016bs\u0173 \u012fmon\u0117 jau naudoja OIC.<\/li>\n\n<\/ol>\n\n\n<p>Tvarkara\u0161\u010diams sudaryti realiuoju laiku pagrindinis b\u016bdas yra REST. FBDI tinka pradiniam pagrindini\u0173 duomen\u0173 \u012fk\u0117limui.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"authentication-and-access\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Autentifikavimas ir prieiga<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Oracle REST sauga.<\/strong> &#8222;Fusion Applications REST APIs use a global Oracle Web Services Manager (OWSM) security policy called Multi Token Over SSL RESTful Service Policy.&#8221; (Fusion Applications REST API taiko bendr\u0105 Oracle Web Services Manager (OWSM) saugos politik\u0105, vadinam\u0105 Multi Token Over SSL RESTful Service Policy.) Ji leid\u017eia naudoti Basic autentifikavim\u0105 per SSL ir autentifikavim\u0105 \u017eetonais, pavyzd\u017eiui, SAML 2.0 bearer \u017eetonu. (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/supply-chain-and-manufacturing\/26c\/fasrp\/Quick_Start.html\">Greita prad\u017eia<\/a>)<\/li>\n\n\n<li><strong>Integracijai skirtas naudotojas.<\/strong> Sukurkite atskir\u0105 Oracle naudotoj\u0105 integracijai. Priskirkite jam pareigybi\u0173 vaidmenis, suteikian\u010dius reikiamas teises dirbti su gamybos u\u017esakymais, darb\u0173 apra\u0161ais, atsargomis ir apskaitos \u012fra\u0161ais. Prieig\u0105 apribokite tik \u012f projekto apimt\u012f \u012ftrauktomis gamybos organizacijomis.<\/li>\n\n\n<li><strong>Puslapiavimas.<\/strong> Oracle riboja vienos SCM REST u\u017eklausos gr\u0105\u017einam\u0173 \u012fra\u0161\u0173 skai\u010di\u0173, tod\u0117l skaitydami duomenis naudokite <code>limit<\/code> ir <code>offset<\/code>, o rezultatus filtruokite pagal organizacij\u0105 ir b\u016bsen\u0105 (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/supply-chain-and-manufacturing\/26c\/faips\/scm-rest-services.html\">\u0161altinis<\/a>)<\/li>\n\n<\/ul>\n\n\n<p>SkyPlanner REST API autentifikavimui naudoja API \u017eeton\u0105 antra\u0161t\u0117je <code>Authorization-Token<\/code> (SkyPlanner Settings &gt; API). S\u0105saja dokumentuota Swagger\/OpenAPI formatu. <a href=\"\/lt\/docs\/integravimo-pamoka\/\">Integravimo pamokoje<\/a> paai\u0161kinta, kaip atlikti pirm\u0105sias u\u017eklausas.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"events-and-polling\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u012evykiai ir periodin\u0117s u\u017eklausos<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Oracle duomenys nuskaitomi periodin\u0117mis u\u017eklausomis. Filtruotos REST u\u017eklausos surenka naujus ir pakeistus gamybos u\u017esakymus, per\u0117jimus \u012f i\u0161leist\u0105 b\u016bsen\u0105, atsarg\u0173 liku\u010dius ir pirkimo u\u017esakymus. Da\u017enis nustatomas kiekvienai gamyklai atskirai: gamybos u\u017esakymai gali b\u016bti nuskaitomi kas kelias minutes, o atsargos \u2013 kas valand\u0105. Jei naudojate Oracle Integration, \u012fvykis Work Order Status Change gali inicijuoti duomen\u0173 nuskaitym\u0105 i\u0161 karto.<\/p>\n\n\n<p>Pasikeitus b\u016bsenai ar tvarkara\u0161\u010diui, SkyPlanner siun\u010dia \u017einiatinklio prane\u0161imus (webhooks), tod\u0117l duomen\u0173 \u012fra\u0161ym\u0105 atgal inicijuoja \u012fvykiai.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Duomen\u0173 susiejimas<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Oracle Fusion Cloud objektas (REST i\u0161teklius)<\/th><th>SkyPlanner objektas<\/th><th>Kryptis<\/th><th>Da\u017enis<\/th><\/tr><\/thead><tbody><tr><td>Prek\u0117s (<code>itemsV2<\/code>), matavimo vienetai<\/td><td>Gaminiai ir med\u017eiagos<\/td><td>Oracle \u2192 SkyPlanner<\/td><td>Pradinis \u012fk\u0117limas, v\u0117liau \u2013 periodin\u0117s u\u017eklausos<\/td><\/tr><tr><td>Preki\u0173 strukt\u016bros (<code>itemStructures<\/code>)<\/td><td>Gaminio strukt\u016bra, pusgaminiai, kiekvienam gaminiui reikalingos med\u017eiagos<\/td><td>Oracle \u2192 SkyPlanner<\/td><td>Pradinis \u012fk\u0117limas, v\u0117liau \u2013 pasikeitus duomenims<\/td><\/tr><tr><td>Darb\u0173 apra\u0161ai (<code>workDefinitions<\/code>): operacijos, operacij\u0173 i\u0161tekliai, s\u0105naudos, Basis Type<\/td><td>Proceso etapai su trukm\u0117mis, paruo\u0161imo ir u\u017ebaigimo laikais<\/td><td>Oracle \u2192 SkyPlanner<\/td><td>Pradinis \u012fk\u0117limas, v\u0117liau \u2013 pasikeitus duomenims<\/td><\/tr><tr><td>Darbo centrai (<code>workCenters<\/code>), \u012frang\u0105 ir darbo j\u0117g\u0105 apibr\u0117\u017eiantys gamybos i\u0161tekliai (<code>productionResources<\/code>)<\/td><td>Darbo centrai, j\u0173 grup\u0117s, darbuotojai, efektyvumo rodikliai<\/td><td>Oracle \u2192 SkyPlanner<\/td><td>Pradinis \u012fk\u0117limas, v\u0117liau \u2013 retai<\/td><\/tr><tr><td>Kalendoriai ir pamainos (<code>calendars<\/code>, pamain\u0173 i\u0161imtys)<\/td><td>Pamainos ir nedarbo dienos<\/td><td>Oracle \u2192 SkyPlanner<\/td><td>Kasdien arba pamainos tvarkomos atskirai SkyPlanner sistemoje<\/td><\/tr><tr><td>Gamybos organizacijos<\/td><td>Darbo centr\u0173 grup\u0117s pagal gamykl\u0105<\/td><td>Oracle \u2192 SkyPlanner<\/td><td>Pradinis \u012fk\u0117limas<\/td><\/tr><tr><td>Gamybos u\u017esakymai (<code>workOrders<\/code>, <code>processWorkOrders<\/code>) su <code>WorkOrderOperation<\/code> ir <code>WorkOrderOperationMaterial<\/code><\/td><td>U\u017esakymai ir u\u017eduotys su terminais bei med\u017eiag\u0173 poreikiais<\/td><td>Oracle \u2192 SkyPlanner<\/td><td>U\u017eklausos kas kelias minutes<\/td><\/tr><tr><td>Turim\u0173 atsarg\u0173 liku\u010diai (<code>inventoryOnhandBalances<\/code>)<\/td><td>Atsarg\u0173 liku\u010diai<\/td><td>Oracle \u2192 SkyPlanner<\/td><td>U\u017eklausos kas valand\u0105 arba sudarant tvarkara\u0161t\u012f<\/td><\/tr><tr><td>Pirkimo u\u017esakymai (<code>purchaseOrders<\/code>) su pa\u017ead\u0117tomis pristatymo datomis<\/td><td>Pirkimo u\u017esakymai, gaunamos med\u017eiagos pagal pristatymo dat\u0105<\/td><td>Oracle \u2192 SkyPlanner<\/td><td>U\u017eklausos kas valand\u0105 arba sudarant tvarkara\u0161t\u012f<\/td><\/tr><tr><td><code>WorkOrderOperation<\/code> <code>PlannedStartDate<\/code>, <code>PlannedCompletionDate<\/code> (PATCH)<\/td><td>Planuojama kiekvienos u\u017eduoties prad\u017eia ir pabaiga<\/td><td>SkyPlanner \u2192 Oracle<\/td><td>Pasikeitus tvarkara\u0161\u010diui, per SkyPlanner \u017einiatinklio prane\u0161im\u0105 (webhook)<\/td><\/tr><tr><td><code>WorkOrderOperationResource<\/code> datos (PATCH)<\/td><td>I\u0161tekli\u0173 priskyrimas kiekvienai u\u017eduo\u010diai<\/td><td>SkyPlanner \u2192 Oracle<\/td><td>Pasikeitus tvarkara\u0161\u010diui, jei pasirinkta<\/td><\/tr><tr><td><code>operationTransactions<\/code> (POST)<\/td><td>Pagaminti kiekiai pagal operacij\u0105<\/td><td>SkyPlanner \u2192 Oracle<\/td><td>Su kiekvienu patvirtinimu<\/td><\/tr><tr><td><code>resourceTransactions<\/code> (POST)<\/td><td>Laiko apskaitos \u012fra\u0161ai: darbuotoj\u0173 ir \u012frengini\u0173 darbo laikas<\/td><td>SkyPlanner \u2192 Oracle<\/td><td>Su kiekvienu patvirtinimu arba kiekvien\u0105 pamain\u0105, jei pasirinkta<\/td><\/tr><tr><td>Oracle Fusion Cloud sistemoje n\u0117ra<\/td><td>Paruo\u0161imo laik\u0173 matrica, \u012frankiai kaip riboto prieinamumo i\u0161tekliai, alternatyv\u016bs \u012frenginiai ir darbuotojai<\/td><td>Tvarkoma SkyPlanner sistemoje<\/td><td>Sukonfig\u016bruojama diegimo metu<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Integravimo modeliai<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. Pradinis pagrindini\u0173 duomen\u0173 \u012fk\u0117limas.<\/strong> Nuskaitykite prekes, preki\u0173 strukt\u016bras, darb\u0173 apra\u0161us, darbo centrus, gamybos i\u0161teklius ir kalendorius per REST arba vien\u0105 kart\u0105 \u012fkelkite juos i\u0161 FBDI eksportuot\u0173 duomen\u0173. Apgalvotai susiekite darbo centrus: darbo centras, kuriame yra keturi to paties i\u0161tekliaus \u012frenginiai, tampa viena darbo centr\u0173 grupe arba keturiais darbo centrais. Kiekviena gamybos organizacija tampa darbo centr\u0173 grupe, tod\u0117l visos gamyklos \u012ftraukiamos \u012f vien\u0105 plan\u0105.<\/p>\n\n\n<p><strong>2. Gamybos u\u017esakym\u0173 sinchronizavimas.<\/strong> Nuskaitykite i\u0161leistus ir dar nei\u0161leistus gamybos u\u017esakymus su j\u0173 operacijomis ir med\u017eiagomis, taip pat ne\u012fvykdytus pirkimo u\u017esakymus. SkyPlanner laiko u\u017esakytas med\u017eiagas prieinamomis pirkimo u\u017esakymo pristatymo dien\u0105 ir atnaujina atsargas, kai pirkimo u\u017esakymui priskiriama b\u016bsena Delivered.<\/p>\n\n\n<p>Sudarykite gamybos u\u017esakym\u0173, o ne Supply Planning planini\u0173 u\u017esakym\u0173 tvarkara\u0161\u010dius. Pirmiausia planiniai u\u017esakymai Oracle sistemoje turi tapti gamybos u\u017esakymais.<\/p>\n\n\n<p><strong>3. Tvarkara\u0161\u010dio \u012fra\u0161ymas atgal.<\/strong> Kai planavimo variklis \u012ftraukia u\u017eduot\u012f \u012f tvarkara\u0161t\u012f arba j\u0105 perkelia, SkyPlanner webhook suaktyvina PATCH u\u017eklaus\u0105 \u012f <code>workOrders\/{WorkOrderId}\/child\/WorkOrderOperation\/{WorkOrderOperationId}<\/code> su <code>PlannedStartDate<\/code> ir <code>PlannedCompletionDate<\/code>. Taikoma Oracle taisykl\u0117: &#8222;The planned start date must not occur before the start date of the work order or after the finish date of the work order.&#8221; (Planuojama prad\u017eios data negali b\u016bti ankstesn\u0117 u\u017e gamybos u\u017esakymo prad\u017eios dat\u0105 arba v\u0117lesn\u0117 u\u017e jo pabaigos dat\u0105.) (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/supply-chain-and-manufacturing\/26c\/fasrp\/op-workorders-workorderid-child-workorderoperation-workorderoperationid-patch.html\">\u0161altinis<\/a>) Tod\u0117l, jei naujas tvarkara\u0161tis per\u017eengia \u0161ias ribas, integracija pirmiausia PATCH u\u017eklausa atnaujina gamybos u\u017esakymo antra\u0161t\u0117s datas, o tada \u2013 operacijas.<\/p>\n\n\n<p><strong>4. Atlikt\u0173 darb\u0173 patvirtinimas ceche.<\/strong> Operatoriai registruoja darbus naudodami SkyPlanner Mobile Confirmations arba Production Timer, o laiko apskaitos \u012fra\u0161ai padeda palaikyti aktual\u0173 tvarkara\u0161t\u012f. Pagaminti kiekiai perduodami \u012f <code>operationTransactions<\/code>, o darbuotoj\u0173 ir \u012frengini\u0173 darbo laikas \u2013 \u012f <code>resourceTransactions<\/code>. Jei j\u016bs\u0173 gamykla jau registruoja darb\u0173 eig\u0105 Oracle sistemoje, SkyPlanner nuskaito \u0161iuos duomenis.<\/p>\n\n\n<p><strong>5. Duomen\u0173 valdymo ir konflikt\u0173 sprendimo taisykl\u0117s.<\/strong> U\u017efiksuokite jas prie\u0161 prad\u0117dami naudoti integracij\u0105:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Duomenys<\/th><th>Atsakinga sistema<\/th><\/tr><\/thead><tbody><tr><td>Prek\u0117s, preki\u0173 strukt\u016bros, darb\u0173 apra\u0161ai, kiekiai, gamybos u\u017esakymo b\u016bsena<\/td><td>Oracle Fusion Cloud<\/td><\/tr><tr><td>Operacij\u0173 seka, prad\u017eios ir pabaigos laikas, i\u0161tekli\u0173 priskyrimas<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Paruo\u0161imo ir u\u017ebaigimo trukmi\u0173 matrica, reikalavimai \u012frankiams ir operatoriams, alternatyv\u016bs i\u0161tekliai<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Pamainos ir nedarbo dienos<\/td><td>Viena sistema, pasirinkta apibr\u0117\u017eiant apimt\u012f<\/td><\/tr><tr><td>I\u0161tekli\u0173, operacij\u0173 ir med\u017eiag\u0173 apskaitos \u012fra\u0161ai<\/td><td>Oracle \u2013 \u012fvedama tiesiogiai arba perduodama i\u0161 SkyPlanner laiko apskaitos \u012fra\u0161\u0173<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Pasirinkite vien\u0105 sistem\u0105, kuri \u012fra\u0161ys operacij\u0173 datas. SkyPlanner nereikia Oracle tvarkara\u0161\u010di\u0173 sudarymo darbo srities, tod\u0117l planuojamas datas ji \u012fra\u0161o vietoj Production Scheduling. Jei Production Scheduling vis dar i\u0161leid\u017eia tvarkara\u0161\u010dius, jai priskirkite kitas organizacijas nei tas, kurioms tvarkara\u0161\u010dius sudaro SkyPlanner.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u012eprasti projekto etapai<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Diegimas paprastai u\u017ebaigiamas per kelias savaites nuo \u012fvadinio etapo prad\u017eios, net ir didel\u0117se \u012fmon\u0117se. Prie\u0161 tai patikrinkite tvarkara\u0161t\u012f per 30 dien\u0173 nemokam\u0105 bandom\u0105j\u012f laikotarp\u012f, naudodami i\u0161 Oracle CSV arba Excel formatu eksportuotus darbo centrus, darb\u0173 apra\u0161us ir ne\u012fvykdytus gamybos u\u017esakymus.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Duomen\u0173 susiejimas.<\/strong> Suderinkite susiejimo lentel\u0119, duomen\u0173 valdymo taisykles, \u012f apimt\u012f \u012ftrauktas organizacijas, sinchronizavimo da\u017en\u012f ir tai, ar operacij\u0173 \u012fra\u0161ai bus perduodami atgal.<\/li>\n\n\n<li><strong>Prieiga prie Oracle.<\/strong> Sukurkite integracijos naudotoj\u0105 ir vaidmenis. Pirmiausia i\u0161bandykite bandymams skirtoje Oracle aplinkoje.<\/li>\n\n\n<li><strong>Pradinis duomen\u0173 \u012fk\u0117limas.<\/strong> Prek\u0117s, preki\u0173 strukt\u016bros, darb\u0173 apra\u0161ai, darbo centrai, gamybos i\u0161tekliai, kalendoriai.<\/li>\n\n\n<li><strong>Gamybos ir pirkimo u\u017esakym\u0173 sinchronizavimas.<\/strong> Periodin\u0117s u\u017eklausos su filtrais, rezultat\u0173 skaidymu puslapiais ir pakartotiniais bandymais.<\/li>\n\n\n<li><strong>Apribojim\u0173 nustatymas SkyPlanner sistemoje.<\/strong> Paruo\u0161imo ir u\u017ebaigimo trukmi\u0173 matrica, \u012frankiai, kiekvienai u\u017eduo\u010diai reikaling\u0173 operatori\u0173 skai\u010dius ir alternatyv\u016bs \u012frenginiai ar darbuotojai.<\/li>\n\n\n<li><strong>Tvarkara\u0161\u010dio \u012fra\u0161ymas atgal.<\/strong> PATCH u\u017eklausos, suaktyvinamos per SkyPlanner webhooks, ir operacij\u0173 \u012fra\u0161ai, jei pasirinkta juos perduoti.<\/li>\n\n\n<li><strong>Lygiagretus testavimas.<\/strong> Naudokite SkyPlanner lygiagre\u010diai su dabartiniu planu, palyginkite datas ir i\u0161taisykite pagrindinius duomenis.<\/li>\n\n\n<li><strong>Naudojimo prad\u017eia.<\/strong> Kai duomenys sutampa, \u012fjunkite \u012fra\u0161ym\u0105 atgal paeiliui kiekvienoje gamykloje.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-to-plan-for-in-an-oracle-fusion-cloud-integ\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u012e k\u0105 atsi\u017evelgti planuojant integracij\u0105 su Oracle Fusion Cloud<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Numatytojo planavimo variklio veikimas.<\/strong> Oracle planavimo variklis, neatsi\u017evelgiantis \u012f apribojimus, paleid\u017eiamas kuriant \u012fra\u0161\u0105 ir atliekant &#8222;certain update actions.&#8221; (tam tikrus atnaujinimo veiksmus). Savo aplinkoje patikrinkite, kurie atnaujinimai perskai\u010diuoja datas, ir u\u017etikrinkite, kad SkyPlanner operacij\u0173 datas \u012fra\u0161yt\u0173 paskutin\u0117.<\/li>\n\n\n<li><strong>Gamybos u\u017esakym\u0173 laiko ribos.<\/strong> Operacij\u0173 datos turi patekti \u012f laikotarp\u012f tarp gamybos u\u017esakymo prad\u017eios ir pabaigos dat\u0173. Pirmiausia PATCH u\u017eklausa atnaujinkite antra\u0161t\u0119.<\/li>\n\n\n<li><strong>Basis Type.<\/strong> I\u0161tekli\u0173 s\u0105naudos nurodomos vienam vienetui tik tada, kai Basis Type reik\u0161m\u0117 yra Variable. Fixed rei\u0161kia fiksuot\u0105 vienos operacijos trukm\u0119. Importuodami perskai\u010diuokite \u0161ias reik\u0161mes, antraip visos trukm\u0117s bus neteisingos.<\/li>\n\n\n<li><strong>Diskre\u010dioji ir procesin\u0117 gamyba.<\/strong> Diskre\u010diosios gamybos \u012fmon\u0117s naudoja <code>workOrders<\/code>, o procesin\u0117s \u2013 <code>processWorkOrders<\/code>. Jei taikote abu gamybos b\u016bdus, susiekite abu i\u0161teklius.<\/li>\n\n\n<li><strong>Skaidymas puslapiais.<\/strong> Oracle riboja viena REST u\u017eklausa gr\u0105\u017einam\u0173 \u012fra\u0161\u0173 skai\u010di\u0173. Kiekvienos u\u017eklausos rezultatus skaitykite puslapiais ir filtruokite pagal organizacij\u0105 bei b\u016bsen\u0105.<\/li>\n\n\n<li><strong>Ketvirtiniai atnaujinimai.<\/strong> Oracle atnaujina Fusion kas ketvirt\u012f. U\u017eklausos kelyje nurodykite konkre\u010di\u0105 REST versij\u0105 ir po kiekvieno atnaujinimo testuokite i\u0161 naujo.<\/li>\n\n\n<li><strong>B\u016bsen\u0173 taisykl\u0117s.<\/strong> Gamybos u\u017esakymams, kuri\u0173 b\u016bsena yra Pending Approval arba kurie jau u\u017edaryti, netur\u0117t\u0173 b\u016bti priskiriamos naujos datos. Nuskaitydami duomenis juos atmeskite filtru.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"who-configures-and-supports-the-oracle-fusion-cl\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas konfig\u016bruoja ir pri\u017ei\u016bri integracij\u0105 su Oracle Fusion Cloud<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>SkyPlanner komanda sukonfig\u016bruoja integracij\u0105 diegimo metu ir j\u0105 pri\u017ei\u016bri prad\u0117jus naudoti.<\/strong> Konfig\u016bravimas ir prie\u017ei\u016bra apima sutartus REST i\u0161teklius ir organizacijas. Kiekviena gamykla naudoja Oracle Fusion Cloud savaip, tod\u0117l \u010dia pritaikomos \u017einios apie jos darbo specifik\u0105.<\/li>\n\n\n<li><strong>Gali dalyvauti ir j\u016bs\u0173 Oracle partneris.<\/strong> Partneris i\u0161mano j\u016bs\u0173 organizacijas, vaidmenis ir pl\u0117tinius, tod\u0117l kartu su SkyPlanner komanda gali sukurti integracijos naudotoj\u0105, nustatyti vaidmenis ir reikiamus Oracle Integration srautus.<\/li>\n\n\n<li><strong>J\u016bs\u0173 programuotojai gali toliau pl\u0117toti integracij\u0105,<\/strong> naudodamiesi SkyPlanner REST API ir API prieigos raktu. Prad\u017eiai pakanka API prieigos rakto, o prireikus padeda SkyPlanner komanda. Dokumentacij\u0105 rasite puslapyje <a href=\"\/lt\/docs\/integravimo-pamoka\/\">SkyPlanner integracijos dokumentacija<\/a>.<\/li>\n\n<\/ol>\n\n\n<p>SkyPlanner kaina prasideda nuo 199 \u20ac per m\u0117nes\u012f; \u012f j\u0105 \u012ftraukti 5 darbo centrai, mokama kas m\u0117nes\u012f. Integracijos kainos pasi\u016blymas pagal j\u016bs\u0173 proces\u0105 ir poreikius pateikiamas i\u0161 anksto kartu su pasirinktu planu. Per\u017ei\u016br\u0117kite <a href=\"\/lt\/kainodara\/\">kainas<\/a>, <a href=\"\/lt\/integracijos\/erp\/oracle-fusion-cloud\/gamybos-planavimas\/\">gamybos planavim\u0105 su Oracle Fusion Cloud pagal realius \u012frengini\u0173 ir darbuotoj\u0173 paj\u0117gumus<\/a>, <a href=\"\/lt\/integracijos\/erp\/oracle-fusion-cloud\/\">Oracle Fusion Cloud puslap\u012f<\/a> ir <a href=\"\/lt\/integracijos\/erp\/\">ERP integracij\u0173 ap\u017evalg\u0105<\/a>. Naudojate NetSuite? Skaitykite <a href=\"\/lt\/integracijos\/erp\/netsuite\/integravimo-vadovas\/\">NetSuite integracijos vadov\u0105<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lt\/bandymas\/\">I\u0161bandykite nemokamai<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lt\/susisiekite-su-pardavejais\/\">U\u017esisakykite demonstracij\u0105<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Gamintoj\u0173 atsiliepimai apie SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"UTU tiekimo grandin\u0117s specialistas Kalle Kalliom\u00e4ki elektros skyd\u0173 gamybos ceche Ulviloje\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>sutaupoma kas savait\u0119<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner pad\u0117jo mums pereiti nuo gamybos planavimo Excel lentel\u0117se prie gamybos optimizavimo realiuoju laiku.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, tiekimo grandin\u0117s specialistas<\/b><br>UTU \u00b7 Elektros skydai ir skirstymo \u012franga<\/p>\n\n\n<p class=\"ind-cust__result\">Gamybos planavimas kas savait\u0119 sutaupo 2 valandas darbo laiko, o nauja darb\u0173 eil\u0117 gamybos linij\u0105 pasiekia per kelias sekundes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lt\/klientu-istorijos\/utu\/\">Skaitykite UTU atsiliepim\u0105<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"\u0160vari\u0173j\u0173 patalp\u0173 aprang\u0105 vilkintys operatoriai prie buteliuk\u0173 pildymo linijos Laboratory &amp; Allied farmacijos gamykloje Nairobyje\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>gamybos efektyvumas<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eGamybos efektyvumas padid\u0117jo 90%.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT vadovas<\/b><br>Laboratory &amp; Allied \u00b7 Vaist\u0173 gamyba<\/p>\n\n\n<p class=\"ind-cust__result\">Gamybos efektyvumas padid\u0117jo 90%, o optimizuotas trij\u0173 m\u0117nesi\u0173 planas visiems darbo centrams sudaromas per ma\u017eiau nei 30 minu\u010di\u0173.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lt\/klientu-istorijos\/laboratory-allied\/\">Skaitykite Laboratory &amp; Allied atsiliepim\u0105<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"Piristeel stogo saugos gamini\u0173 gamykla Kauhavoje, vaizdas i\u0161 oro\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>99,2%<\/b><span>pristatymo patikimumas<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSu SkyPlanner tapo lengviau pasteb\u0117ti gamybos kli\u016btis, o gamybos valdymas tapo ai\u0161kesnis.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, gamybos vadovas<\/b><br>Piristeel \u00b7 Stogo saugos ir lietaus nuvedimo sistemos<\/p>\n\n\n<p class=\"ind-cust__result\">\u0160iemet pristatymo patikimumas pasiek\u0117 99,2%, o tvarkara\u0161\u010di\u0173 sudarymas sutaupo iki keturi\u0173 valand\u0173 darbo laiko per dien\u0105.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lt\/klientu-istorijos\/piristeel\/\">Skaitykite Piristeel atsiliepim\u0105<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Mamec generalinis direktorius Hannu Ryyn\u00e4nen \u012fmon\u0117s gamybos ceche Lohjoje\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>1 000-iai<\/b><span>gamybos u\u017esakym\u0173 automati\u0161kai \u012ftraukiami \u012f tvarkara\u0161t\u012f<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eDabar gamyb\u0105 valdome visai kitaip, o m\u016bs\u0173 supratimas apie paj\u0117gumus pakilo \u012f visi\u0161kai kit\u0105 lyg\u012f.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, generalinis direktorius<\/b><br>Mamec \u00b7 Pramoniniai mai\u0161ytuvai, siurbliai ir auk\u0161t\u0173j\u0173 technologij\u0173 sutartin\u0117 gamyba<\/p>\n\n\n<p class=\"ind-cust__result\">T\u016bkstan\u010diai gamybos u\u017esakym\u0173 automati\u0161kai \u012ftraukiami \u012f tvarkara\u0161t\u012f, o visa organizacija mato gamybos pad\u0117t\u012f realiuoju laiku.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lt\/klientu-istorijos\/mamec\/\">Skaitykite Mamec atsiliepim\u0105<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Da\u017eniausiai u\u017eduodami klausimai<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ar Oracle Fusion Cloud turi gamybos u\u017esakym\u0173 API?<\/summary>\n<p class=\"sp-faq__a\">Taip. Oracle Fusion Cloud SCM REST API turi <code>workOrders<\/code> i\u0161tekli\u0173 su pavald\u017eiais operacij\u0173, i\u0161tekli\u0173 ir med\u017eiag\u0173 i\u0161tekliais, taip pat <code>processWorkOrders<\/code>, skirt\u0105 procesinei gamybai. Palaikomi GET, POST ir PATCH metodai.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kaip planuojamos datos \u012fra\u0161omos atgal \u012f Oracle Fusion Cloud?<\/summary>\n<p class=\"sp-faq__a\">PATCH u\u017eklausa atnaujinamas gamybos u\u017esakymui pavaldus <code>WorkOrderOperation<\/code> i\u0161teklius, nustatant <code>PlannedStartDate<\/code> ir <code>PlannedCompletionDate<\/code>. Operacij\u0173 datos turi patekti \u012f gamybos u\u017esakymo laikotarp\u012f, tod\u0117l prireikus pirmiausia PATCH u\u017eklausa atnaujinama antra\u0161t\u0117.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kaip operatori\u0173 patvirtinimai pasiekia Oracle?<\/summary>\n<p class=\"sp-faq__a\">Pagaminti kiekiai perduodami \u012f <code>operationTransactions<\/code>, o darbuotoj\u0173 ir \u012frengini\u0173 darbo laikas \u2013 \u012f <code>resourceTransactions<\/code>. Abu yra Fusion Manufacturing REST i\u0161tekliai, \u012f kuriuos duomenys siun\u010diami POST metodu.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ar Oracle Fusion Cloud palaiko webhooks?<\/summary>\n<p class=\"sp-faq__a\">Fusion skelbia verslo \u012fvykius, pavyzd\u017eiui, Work Order Status Change, kuriuos gali prenumeruoti Oracle Integration. Jei Oracle Integration nenaudojama, integracija periodi\u0161kai u\u017eklausia REST API pagal kiekvienai gamyklai nustatyt\u0105 grafik\u0105. SkyPlanner siun\u010dia tvarkara\u0161\u010dio pakeitimus per savo \u201ewebhook\u201c prane\u0161imus i\u0161kart, kai jie \u012fvyksta.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>K\u0105 Oracle partneriui si\u016blyti: Oracle Production Scheduling ar SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner, jei klientas nori vieno bendro, automati\u0161kai atnaujinamo tvarkara\u0161\u010dio visoms gamykloms, kuriame atsi\u017evelgiama \u012f realius \u012frengini\u0173 ir darbuotoj\u0173 paj\u0117gumus. Production Scheduling \u012fjungiama Supply Chain Planning pakete ir tvarkara\u0161\u010dius sudaro atskirai kiekvienai planavimo organizacijai, o perderinimo taisykles taiko tik \u012frangos i\u0161tekliams, kuriuos sudaro vienas \u012frenginys (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/supply-chain-and-manufacturing\/26c\/fapsu\/changeover-rules.html\">Oracle dokumentacija<\/a>). SkyPlanner prisijungia per SCM REST API, automati\u0161kai perplanuoja gamyb\u0105, planuoja perderinimus, \u012frankius, brigadas ir med\u017eiagas. Naudotoj\u0173 skai\u010dius neribojamas, o kaina prasideda nuo 199 \u20ac per m\u0117nes\u012f.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ar galime i\u0161bandyti SkyPlanner prie\u0161 kurdami integracij\u0105?<\/summary>\n<p class=\"sp-faq__a\">Taip. Per 30 dien\u0173 nemokam\u0105 bandom\u0105j\u012f laikotarp\u012f galite naudoti iki 20 darbo centr\u0173 ir importuoti duomenis i\u0161 Oracle CSV arba Excel failais. Mok\u0117jimo kortel\u0117s nereikia. <a href=\"\/lt\/bandymas\/\">Prad\u0117kite nemokam\u0105 bandym\u0105<\/a> arba <a href=\"\/lt\/susisiekite-su-pardavejais\/\">susisiekite su pardavimo komanda<\/a>, kad apibr\u0117\u017etum\u0117te integracijos apimt\u012f.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integracijos \/ ERP \/ Oracle Fusion Cloud Oracle Fusion Cloud integravimo vadovas: gamybos tvarkara\u0161\u010di\u0173 sudarymas su SkyPlanner APS \u0160iame Oracle Fusion Cloud integravimo vadove partneriams ir IT komandoms paai\u0161kinama, kaip sujungti Oracle Fusion Cloud Manufacturing su SkyPlanner APS. SkyPlanner kei\u010diasi duomenimis su Oracle Fusion Cloud abiem kryptimis per pa\u010dios Oracle REST i\u0161teklius: skyplanner.ai \u00b7 Gamybos &#8230; <a title=\"Oracle Fusion Cloud integravimo vadovas: gamybos tvarkara\u0161\u010di\u0173 sudarymas su SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/oracle-fusion-cloud\/integravimo-vadovas\/\" aria-label=\"Read more about Oracle Fusion Cloud integravimo vadovas: gamybos tvarkara\u0161\u010di\u0173 sudarymas su SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":106152,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-106877","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Oracle Cloud APS integravimo vadovas gamybos tvarkara\u0161\u010diams<\/title>\n<meta name=\"description\" content=\"Prijunkite Oracle Fusion Cloud prie SkyPlanner APS: SCM REST API, workOrders PATCH operacij\u0173 datoms, operacij\u0173 ir i\u0161tekli\u0173 \u012fra\u0161ai, susiejimas, projekt\u0173 patarimai.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/oracle-fusion-cloud\/integravimo-vadovas\/\" \/>\n<meta property=\"og:locale\" content=\"lt_LT\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Oracle Fusion Cloud integravimo vadovas: gamybos tvarkara\u0161\u010di\u0173 sudarymas su SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"Prijunkite Oracle Fusion Cloud prie SkyPlanner APS: SCM REST API, workOrders PATCH operacij\u0173 datoms, operacij\u0173 ir i\u0161tekli\u0173 \u012fra\u0161ai, susiejimas, projekt\u0173 patarimai.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/oracle-fusion-cloud\/integravimo-vadovas\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"12 minu\u010di\u0173\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/oracle-fusion-cloud\\\/integravimo-vadovas\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/oracle-fusion-cloud\\\/integravimo-vadovas\\\/\",\"name\":\"Oracle Cloud APS integravimo vadovas gamybos tvarkara\u0161\u010diams\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"Prijunkite Oracle Fusion Cloud prie SkyPlanner APS: SCM REST API, workOrders PATCH operacij\u0173 datoms, operacij\u0173 ir i\u0161tekli\u0173 \u012fra\u0161ai, susiejimas, projekt\u0173 patarimai.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/oracle-fusion-cloud\\\/integravimo-vadovas\\\/#breadcrumb\"},\"inLanguage\":\"lt-LT\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/oracle-fusion-cloud\\\/integravimo-vadovas\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/oracle-fusion-cloud\\\/integravimo-vadovas\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP ir MES programin\u0117s \u012frangos integracijos su SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bs\u0173 ERP sistemai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS su Oracle Fusion Cloud: gamybos planavimas pagal realius \u012frengini\u0173 ir darbuotoj\u0173 paj\u0117gumus\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/oracle-fusion-cloud\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Oracle Fusion Cloud integravimo vadovas: gamybos tvarkara\u0161\u010di\u0173 sudarymas su SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lt-LT\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lt-LT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Oracle Cloud APS integravimo vadovas gamybos tvarkara\u0161\u010diams","description":"Prijunkite Oracle Fusion Cloud prie SkyPlanner APS: SCM REST API, workOrders PATCH operacij\u0173 datoms, operacij\u0173 ir i\u0161tekli\u0173 \u012fra\u0161ai, susiejimas, projekt\u0173 patarimai.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/oracle-fusion-cloud\/integravimo-vadovas\/","og_locale":"lt_LT","og_type":"article","og_title":"Oracle Fusion Cloud integravimo vadovas: gamybos tvarkara\u0161\u010di\u0173 sudarymas su SkyPlanner APS","og_description":"Prijunkite Oracle Fusion Cloud prie SkyPlanner APS: SCM REST API, workOrders PATCH operacij\u0173 datoms, operacij\u0173 ir i\u0161tekli\u0173 \u012fra\u0161ai, susiejimas, projekt\u0173 patarimai.","og_url":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/oracle-fusion-cloud\/integravimo-vadovas\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"12 minu\u010di\u0173"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/oracle-fusion-cloud\/integravimo-vadovas\/","url":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/oracle-fusion-cloud\/integravimo-vadovas\/","name":"Oracle Cloud APS integravimo vadovas gamybos tvarkara\u0161\u010diams","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lt\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"Prijunkite Oracle Fusion Cloud prie SkyPlanner APS: SCM REST API, workOrders PATCH operacij\u0173 datoms, operacij\u0173 ir i\u0161tekli\u0173 \u012fra\u0161ai, susiejimas, projekt\u0173 patarimai.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/oracle-fusion-cloud\/integravimo-vadovas\/#breadcrumb"},"inLanguage":"lt-LT","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/oracle-fusion-cloud\/integravimo-vadovas\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/oracle-fusion-cloud\/integravimo-vadovas\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lt\/"},{"@type":"ListItem","position":2,"name":"ERP ir MES programin\u0117s \u012frangos integracijos su SkyPlanner","item":"https:\/\/skyplanner.ai\/lt\/integracijos\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bs\u0173 ERP sistemai","item":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS su Oracle Fusion Cloud: gamybos planavimas pagal realius \u012frengini\u0173 ir darbuotoj\u0173 paj\u0117gumus","item":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/oracle-fusion-cloud\/"},{"@type":"ListItem","position":5,"name":"Oracle Fusion Cloud integravimo vadovas: gamybos tvarkara\u0161\u010di\u0173 sudarymas su SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lt\/#website","url":"https:\/\/skyplanner.ai\/lt\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lt\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lt\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lt-LT"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lt\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lt\/","logo":{"@type":"ImageObject","inLanguage":"lt-LT","@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lt\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integracijos \/ ERP \/ Oracle Fusion Cloud Oracle Fusion Cloud integravimo vadovas: gamybos tvarkara\u0161\u010di\u0173 sudarymas su SkyPlanner APS \u0160iame Oracle Fusion Cloud integravimo vadove partneriams ir IT komandoms paai\u0161kinama, kaip sujungti Oracle Fusion Cloud Manufacturing su SkyPlanner APS. SkyPlanner kei\u010diasi duomenimis su Oracle Fusion Cloud abiem kryptimis per pa\u010dios Oracle REST i\u0161teklius: skyplanner.ai \u00b7 Gamybos&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/pages\/106877","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/comments?post=106877"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/pages\/106877\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/pages\/106152"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/media?parent=106877"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}