{"id":106558,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integracijos\/erp\/delmiaworks\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"delmiaworks","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/delmiaworks\/","title":{"rendered":"SkyPlanner APS sistemai DELMIAWorks (IQMS): gamybos planavimas pagal realius \u012frengini\u0173 ir darbuotoj\u0173 paj\u0117gumus"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lt\/integracijos\/\">Integracijos<\/a> \/ <a href=\"\/lt\/integracijos\/erp\/\">ERP<\/a> \/ DELMIAWorks<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SkyPlanner APS sistemai DELMIAWorks (IQMS): <span class=\"hl\">gamybos planavimas pagal realius \u012frengini\u0173 ir darbuotoj\u0173 paj\u0117gumus<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">SkyPlanner APS \u2013 gamybos planavimo pagal realius paj\u0117gumus priedas ERP sistemai DELMIAWorks, anks\u010diau vadintai IQMS. Kiekvieno preso, formos, operatoriaus ir med\u017eiagos naudojimas suplanuojamas konkre\u010diu laiku. Arcturus per kelias sekundes optimizuoja vis\u0105 plan\u0105, o Autopilot automati\u0161kai j\u012f perskai\u010diuoja pasikeitus gamybos s\u0105lygoms.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lt\/bandymas\/\">Prad\u0117ti nemokam\u0105 bandom\u0105j\u012f laikotarp\u012f<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lt\/susisiekite-su-pardavejais\/\">U\u017esakyti demonstracij\u0105<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Gamybos tvarkara\u0161\u010di\u0173 sudarymas<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt diagrama su darbo centrams suplanuotomis u\u017eduotimis ir u\u017esakym\u0173 s\u0105ra\u0161u apa\u010dioje.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner ir DELMIAWorks kei\u010diasi duomenimis abiem kryptimis. \u012e SkyPlanner perduodami gamybos u\u017esakymai, Bills of Manufacturing su detali\u0173 operacijomis, darbo centrai, \u012frankiai ir formos, atsarg\u0173 pozicijos bei pirkimo u\u017esakymai. Atgal perduodamos suplanuotos prad\u017eios ir pabaigos datos, priskirtas darbo centras, gamybos \u012fra\u0161ai ir u\u017eduo\u010di\u0173 darbo laiko duomenys. Diegimo metu SkyPlanner komanda pritaiko integracij\u0105 prie j\u016bs\u0173 DELMIAWorks konfig\u016bracijos.<\/p>\n\n\n<p>Kaina \u2013 nuo 199 \u20ac per m\u0117nes\u012f u\u017e 5 darbo centrus. Kiekvienas papildomas darbo centras kainuoja 20 \u20ac per m\u0117nes\u012f. Nemokamai i\u0161bandyti galite 30 dien\u0173: iki 20 darbo centr\u0173, visos Basic funkcijos, be mok\u0117jimo kortel\u0117s.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-production\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas pasikei\u010dia j\u016bs\u0173 gamyboje<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Kiekvienam presui \u2013 \u012fvykdoma darb\u0173 seka.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner kiekvien\u0105 gamybos u\u017esakym\u0105 suplanuoja konkre\u010diam presui, ekstruderiui ar surinkimo celei konkre\u010diu laiku. Paj\u0117gumai nustatomi pagal pamainas, darbuotoj\u0173 neatvykimus ir vir\u0161valand\u017eius, tod\u0117l planas atitinka realias gamybos cecho galimybes.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Ma\u017eesn\u0117s form\u0173 ir spalv\u0173 keitimo s\u0105naudos.<\/p>\n\n\n<p class=\"fx-pain__b\">Paruo\u0161imo laiko matricoje saugoma kiekvienos gamini\u0173 poros perderinimo trukm\u0117 abiem kryptimis. Pereiti nuo m\u0117lynos spalvos prie raudonos gali u\u017etrukti 30 minu\u010di\u0173, o nuo raudonos prie m\u0117lynos \u2013 60 minu\u010di\u0173, nes reikia visi\u0161kai i\u0161valyti cilindr\u0105. Arcturus parenka toki\u0105 u\u017esakym\u0173 sek\u0105, kad visuose presuose kartu b\u016bt\u0173 prarandama ma\u017eiausiai laiko.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Form\u0173 skai\u010dius ribotas.<\/p>\n\n\n<p class=\"fx-pain__b\">Viename prese naudojama forma niekada nerezervuojama kitam presui tuo pa\u010diu metu. Viena forma kartu gaminamos skirtingos detal\u0117s planuojamos kaip viena u\u017eduotis. Jei pirmiausia pasirinktas presas u\u017eimtas, darbas perkeliamas \u012f kit\u0105 tai formai tinkant\u012f pres\u0105.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Brigados planuojamos kartu su \u012frenginiais.<\/p>\n\n\n<p class=\"fx-pain__b\">U\u017eduo\u010diai, kuriai reikia trij\u0173 operatori\u0173, priskiriami trys tuo metu pamainoje neu\u017eimti darbuotojai. Form\u0173 derintoj\u0173, proces\u0173 technik\u0173 ir pres\u0173 operatori\u0173 darbas planuojamas pagal t\u0105 pat\u012f plan\u0105.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Polimerin\u0117 \u017ealiava ir \u012fd\u0117klai atvyksta iki darbo prad\u017eios.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner tikrina kiekvienos med\u017eiagos atsargas ir laukiamus pirkimo u\u017esakymus. Gamybos u\u017esakymas, kuriam tr\u016bksta polimerin\u0117s \u017ealiavos, planuojamas po jos pristatymo datos, o ne skiriamas presui ir v\u0117liau stabdomas.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Sugedus \u012frenginiui ar gavus skub\u0173 u\u017esakym\u0105, planas atnaujinamas automati\u0161kai.<\/p>\n\n\n<p class=\"fx-pain__b\">Sugedus presui ar gavus skub\u0173 u\u017esakym\u0105, Autopilot perskai\u010diuoja tvarkara\u0161t\u012f. Running Time Lock u\u017efiksuoja artimiausi\u0173 valand\u0173 u\u017eduotis, tod\u0117l jau sumontuotos formos lieka savo vietose.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Kiekvienas operatorius mato darb\u0173 eil\u0119.<\/p>\n\n\n<p class=\"fx-pain__b\">Operatoriai telefone ar plan\u0161et\u0117je mato b\u016bsimas u\u017eduotis ir registruoja atliekam\u0105 darb\u0105. Naudotoj\u0173 skai\u010dius neribojamas, tod\u0117l visos pamainos dirba pagal t\u0105 pat\u012f plan\u0105.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Gamintoj\u0173 atsiliepimai apie SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"UTU tiekimo grandin\u0117s specialistas Kalle Kalliom\u00e4ki elektros skyd\u0173 gamybos ceche Ulviloje\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>sutaupoma kas savait\u0119<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSu SkyPlanner nuo gamybos planavimo Excel lentel\u0117se per\u0117jome prie gamybos optimizavimo realiuoju laiku.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, tiekimo grandin\u0117s specialistas<\/b><br>UTU \u00b7 Elektros skydai ir skirstomieji \u012frenginiai<\/p>\n\n\n<p class=\"ind-cust__result\">Planuojant gamyb\u0105 kas savait\u0119 sutaupomos 2 valandos darbo laiko, o nauja u\u017eduo\u010di\u0173 eil\u0117 gamybos linij\u0105 pasiekia per kelias sekundes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lt\/klientu-istorijos\/utu\/\">Skaityti UTU atsiliepim\u0105<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"\u0160vari\u0173j\u0173 patalp\u0173 aprang\u0105 vilkintys operatoriai prie buteliuk\u0173 pildymo linijos Laboratory &amp; Allied vaist\u0173 gamykloje Nairobyje\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>gamybos efektyvumas<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eGamybos efektyvumas padid\u0117jo 90%.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT vadovas<\/b><br>Laboratory &amp; Allied \u00b7 Vaist\u0173 gamyba<\/p>\n\n\n<p class=\"ind-cust__result\">Gamybos efektyvumas padid\u0117jo 90%, o optimizuotas trij\u0173 m\u0117nesi\u0173 planas visiems darbo centrams sudaromas per ma\u017eiau nei 30 minu\u010di\u0173.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lt\/klientu-istorijos\/laboratory-allied\/\">Skaityti Laboratory &amp; Allied atsiliepim\u0105<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Mamec generalinis direktorius Hannu Ryyn\u00e4nen \u012fmon\u0117s gamybos ceche Lohjoje\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>1 000 ir daugiau<\/b><span>automati\u0161kai suplanuot\u0173 gamybos u\u017esakym\u0173<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eGamyb\u0105 valdome visai kitaip, o m\u016bs\u0173 supratimas apie paj\u0117gumus pakilo \u012f visi\u0161kai kit\u0105 lyg\u012f.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, generalinis direktorius<\/b><br>Mamec \u00b7 Pramoniniai mai\u0161ytuvai, siurbliai ir auk\u0161t\u0173j\u0173 technologij\u0173 sutartin\u0117 gamyba<\/p>\n\n\n<p class=\"ind-cust__result\">T\u016bkstan\u010diai gamybos u\u017esakym\u0173 suplanuojami automati\u0161kai, o visa organizacija mato gamybos pad\u0117t\u012f realiuoju laiku.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lt\/klientu-istorijos\/mamec\/\">Skaityti Mamec atsiliepim\u0105<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/28-83df4743-ff34-41a5-9a41-c3dcc6f0897b.png\" alt=\"Opes Corporation\" width=\"106\" height=\"32\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>100%<\/b><span>pristatymo patikimumas nuo 2021 m.<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner leid\u017eia ai\u0161kiai matyti paj\u0117gumus ir suteikia planavimui apibr\u0117\u017etumo.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Dan Berglund, COO\/CFO<\/b><br>Opes Corporation \u00b7 Chemijos ir maisto produkt\u0173 gamyba<\/p>\n\n\n<p class=\"ind-cust__result\">Vis\u0105 SkyPlanner naudojimo laik\u0105, nuo 2021 m., pristatymo patikimumas siekia 100%.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lt\/klientu-istorijos\/opes-corporation\/\">Skaityti Opes Corporation atsiliepim\u0105<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-the-delmiaworks-integration-works\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kaip veikia integracija su DELMIAWorks<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>DELMIAWorks perduoda darbus.<\/strong> \u012e SkyPlanner perduodami gamybos u\u017esakymai, Bills of Manufacturing su detali\u0173 operacijomis, darbo centrai, \u012frankiai ir formos, atsarg\u0173 pozicijos, atsarg\u0173 liku\u010diai bei pirkimo u\u017esakymai.<\/li>\n\n\n<li><strong>SkyPlanner sudaro tvarkara\u0161t\u012f ir nuolat j\u012f atnaujina.<\/strong> Arcturus per kelias sekundes suplanuoja visus gamybos u\u017esakymus visuose presuose ir perskai\u010diuoja plan\u0105 pasikeitus gamybos s\u0105lygoms.<\/li>\n\n\n<li><strong>Datos, presai ir atlikto darbo duomenys gr\u0105\u017einami atgal.<\/strong> Suplanuotos prad\u017eios ir pabaigos datos bei priskirtas darbo centras gr\u0105\u017einami \u012f DELMIAWorks gamybos u\u017esakymus. Tinkamos detal\u0117s registruojamos gamybos \u012fra\u0161uose, o paruo\u0161imo ir gamybos trukm\u0117 \u2013 u\u017eduo\u010di\u0173 darbo laiko \u012fra\u0161uose.<\/li>\n\n<\/ol>\n\n\n<p>DELMIAWorks lieka pagrindine j\u016bs\u0173 duomen\u0173 sistema. Atsarg\u0173 pozicijos, BOM, MRP, pirkimai, kokyb\u0117s valdymas, RealTime steb\u0117sena, savikainos skai\u010diavimas ir apskaita lieka ten, kur yra. SkyPlanner atsako u\u017e vien\u0105 dalyk\u0105: kiekvieno gamybos u\u017esakymo vykdymo sek\u0105 ir laik\u0105 kiekvienam presui, formai ir operatoriui.<\/p>\n\n\n<p>SkyPlanner nuskaito DELMIAWorks duomenis per DELMIAWorks WebAPI, kuri turi REST ir GraphQL SDK. Duomenys gr\u0105\u017einami per WebAPI REST valdiklius: Manufacturing WorkOrders valdiklis perduoda kiekvieno gamybos u\u017esakymo suplanuotas datas ir darbo centr\u0105, AddProductionRecords registruoja tinkamas detales, o Time &amp; Attendance u\u017eduo\u010di\u0173 i\u0161kvietimai \u2013 darbo laik\u0105. Konkret\u016bs gamybos u\u017esakymo laukai nustatomi diegimo metu apibr\u0117\u017eiant apimt\u012f. SkyPlanner webhook prane\u0161imai perduoda kiekvien\u0105 tvarkara\u0161\u010dio pakeitim\u0105 i\u0161kart, o sinchronizavimo su DELMIAWorks da\u017enis nustatomas kiekvienai gamyklai atskirai.<\/p>\n\n\n<p>Kiekviena gamykla DELMIAWorks naudoja savaip, tod\u0117l diegimo metu SkyPlanner komanda per REST API pritaiko integracij\u0105 prie j\u016bs\u0173 konfig\u016bracijos ir teikia pagalb\u0105 prad\u0117jus j\u0105 naudoti. Integracijos kaina pagal j\u016bs\u0173 proces\u0105 ir poreikius pateikiama i\u0161 anksto. Integracij\u0105 taip pat gali sukurti j\u016bs\u0173 DELMIAWorks partneris arba j\u016bs\u0173 programuotojai, naudodami dokumentuot\u0105 SkyPlanner API (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API \u017einynas<\/a>).<\/p>\n\n\n<p>WebAPI valdikliai, duomen\u0173 susiejimas ir duomen\u0173 gr\u0105\u017einimo taisykl\u0117s apra\u0161yti <a href=\"\/lt\/integracijos\/erp\/delmiaworks\/integravimo-vadovas\/\">DELMIAWorks APS integracijos vadove, skirtame gamybos tvarkara\u0161\u010di\u0173 sudarymui<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-delmiaworks-schedules-and-what-skyplanner-a\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0105 suplanuoja DELMIAWorks ir k\u0105 prideda SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>DELMIAWorks sudaro tvarkara\u0161t\u012f, kuriame atsi\u017evelgiama \u012f realius paj\u0117gumus. Jos Advanced Planning and Scheduling modulis yra ERP sistemos &#8222;a core component&#8221; (pagrindinis komponentas), o Dassault <a href=\"https:\/\/www.solidworks.com\/product\/delmiaworks\/manufacturing-erp\/manufacturing\/scheduling\/aps-software\/\">APS puslapyje<\/a> apra\u0161oma, kaip jis veikia:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Apkrova paskirstoma pagal taisykles.<\/strong> Auto Load paskirsto &#8222;work orders based on priority and &#8222;runs the best&#8221; machine information.&#8221; (gamybos u\u017esakymus pagal prioritet\u0105 ir informacij\u0105 apie tinkamiausi\u0105 \u012frengin\u012f). Taisykl\u0117s nustatomos Bill of Manufacturing lygmeniu.<\/li>\n\n\n<li><strong>Med\u017eiag\u0173 ir \u012franki\u0173 tr\u016bkumas rodomas i\u0161im\u010di\u0173 s\u0105ra\u0161uose.<\/strong> &#8222;Exceptions lists&#8221; (i\u0161im\u010di\u0173 s\u0105ra\u0161ai) rodo &#8222;materials and tools or other constraints associated with a work order that will be unavailable or need to be expedited.&#8221; (su gamybos u\u017esakymu susijusias med\u017eiagas, \u012frankius ar kitus apribojimus: ko tr\u016bks arba ko pristatym\u0105 reik\u0117s paspartinti). Pagal \u0161\u012f s\u0105ra\u0161\u0105 veiksm\u0173 imasi planuotojas.<\/li>\n\n\n<li><strong>Artimiausio laikotarpio planas apsaugotas.<\/strong> &#8222;User-defined &#8222;time fences&#8221; protect the current schedule against repositioning.&#8221; (Naudotojo nustatytos laiko ribos apsaugo esam\u0105 tvarkara\u0161t\u012f nuo u\u017eduo\u010di\u0173 perk\u0117limo.)<\/li>\n\n\n<li><strong>Paj\u0117gumai tikrinami apytiksliai.<\/strong> &#8222;Rough Cut Capacity Tools&#8221; (apytikslio paj\u0117gum\u0173 vertinimo \u012frankiai) palygina &#8222;work center daily and weekly required hours to available hours.&#8221; (darbo centrui reikalingas dienos ir savait\u0117s valandas su turimomis valandomis).<\/li>\n\n<\/ul>\n\n\n<p>Kasdien planuotojas tempia gamybos u\u017esakymus i\u0161 vieno darbo centro \u012f kit\u0105, kad i\u0161lygint\u0173 apkrov\u0105, o po pakeitim\u0173 i\u0161 naujo paleid\u017eia Update Schedule ir Auto Load. SkyPlanner papildomai optimizuoja vis\u0105 plan\u0105: Arcturus vienu metu nustato vis\u0173 gamybos u\u017esakym\u0173 sek\u0105 visuose presuose. Tuo pa\u010diu skai\u010diavimu \u012fvertinama nuo keitimo krypties priklausanti perderinimo trukm\u0117, ribotas form\u0173 skai\u010dius, brigad\u0173 darbuotoj\u0173 u\u017eimtumas ir laukiamos med\u017eiagos. Toliau plan\u0105 nuolat atnaujina Autopilot.<\/p>\n\n\n<p>Darbo eiga ir aplinkyb\u0117s, kuriomis tvarkara\u0161\u010di\u0173 sudarymo sistema atsiperka, apra\u0161ytos straipsnyje <a href=\"\/lt\/integracijos\/erp\/delmiaworks\/gamybos-planavimas\/\">Ar DELMIAWorks planuoja gamyb\u0105 pagal realius paj\u0117gumus?<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"delmiaworks-today-and-with-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">DELMIAWorks dabar ir su SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>DELMIAWorks APS<\/th><th>DELMIAWorks su SkyPlanner APS<\/th><\/tr><\/thead><tbody><tr><td>Paj\u0117gumai<\/td><td>Tvarkara\u0161tis pagal kiekvieno darbo centro paj\u0117gumus; apytiksl\u0117s dienos ir savait\u0117s patikros<\/td><td>Atsi\u017evelgiama \u012f kiekvieno preso, darbuotojo ir formos u\u017eimtum\u0105, realias pamainas ir konkret\u0173 laik\u0105<\/td><\/tr><tr><td>Darb\u0173 seka<\/td><td>Auto Load paskirsto pagal prioritet\u0105 ir &#8222;runs best&#8221; (tinkamiausi\u0105) darbo centr\u0105<\/td><td>Arcturus per kelias sekundes optimizuoja vis\u0105 plan\u0105<\/td><\/tr><tr><td>Perderinimas<\/td><td>Paruo\u0161imo \u0161ablonai ir kontroliniai s\u0105ra\u0161ai kitam paruo\u0161imui<\/td><td>Paruo\u0161imo laiko matrica: m\u0117lyna\u2192raudona 30 min, raudona\u2192m\u0117lyna 60 min; ma\u017eiausia bendra paruo\u0161imo trukm\u0117<\/td><\/tr><tr><td>Formos ir \u012frankiai<\/td><td>\u012eranki\u0173 naudojimo konfliktai rodomi i\u0161im\u010di\u0173 s\u0105ra\u0161uose<\/td><td>Formos ir \u012frankiai rezervuojami kaip bendri riboto prieinamumo i\u0161tekliai<\/td><\/tr><tr><td>Brigados<\/td><td>Darbuotoj\u0173 paj\u0117gumai lyginami su norma<\/td><td>U\u017eduo\u010diai, kuriai reikia trij\u0173 operatori\u0173, priskiriami trys tuo metu pamainoje neu\u017eimti darbuotojai<\/td><\/tr><tr><td>Med\u017eiagos<\/td><td>Med\u017eiag\u0173 i\u0161im\u010di\u0173 s\u0105ra\u0161as, pagal kur\u012f planuotojas spartina tiekim\u0105<\/td><td>U\u017eduotys pradedamos, kai yra atsarg\u0173 arba atvyksta pagal pirkimo u\u017esakymus laukiamos med\u017eiagos<\/td><\/tr><tr><td>Artimiausio laikotarpio planas<\/td><td>Laiko ribos apsaugo esam\u0105 tvarkara\u0161t\u012f<\/td><td>Running Time Lock u\u017efiksuoja artimiausi\u0173 valand\u0173 u\u017eduotis<\/td><\/tr><tr><td>Pakeitimai<\/td><td>Update Schedule ir Auto Load, tada u\u017eduotys perkeliamos rankiniu b\u016bdu<\/td><td>Autopilot perskai\u010diuoja plan\u0105 pagal j\u016bs\u0173 prioritetus ir u\u017efiksuotas u\u017eduotis<\/td><\/tr><tr><td>Gamybos cechas<\/td><td>Shopworks ir RealTime prie preso<\/td><td>Operatoriai taip pat mato savo darb\u0173 eil\u0119 ir registruoja darb\u0105 telefone ar plan\u0161et\u0117je; naudotoj\u0173 skai\u010dius neribojamas<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"delmiaworks-scheduling-software-and-add-ons-comp\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">DELMIAWorks: tvarkara\u0161\u010di\u0173 sudarymo program\u0173 ir pried\u0173 palyginimas<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Sprendimas<\/th><th>Kas tai<\/th><th>Kada tinka<\/th><\/tr><\/thead><tbody><tr><td>DELMIAWorks APS<\/td><td>DELMIAWorks integruoti tvarkara\u0161\u010dio sudarymo pagal realius paj\u0117gumus, Auto Load ir paj\u0117gum\u0173 vertinimo \u012frankiai<\/td><td>U\u017e planavimo lent\u0105 atsako vienas planuotojas, o perderinimas nesud\u0117tingas<\/td><\/tr><tr><td>DELMIA Ortems<\/td><td>Atskiras Dassault produktas \u012fmon\u0117s veiklai planuoti ir tvarkara\u0161\u010diams sudaryti, susietas su ERP ir MES<\/td><td>Centrin\u0117 planavimo komanda vykdo keli\u0173 gamykl\u0173 veiklos optimizavimo projekt\u0105<\/td><\/tr><tr><td>Gamybos vykdymo priemon\u0117s, pagr\u012fstos prioritetais (pavyzd\u017eiui, LillyWorks)<\/td><td>U\u017eduo\u010di\u0173 s\u0105ra\u0161ai, surikiuoti pagal rizik\u0105 ne\u012fvykdyti u\u017esakym\u0173, o ne tvarkara\u0161tis su konkre\u010diu laiku<\/td><td>Pagal individualius u\u017esakymus dirban\u010diam cechui reikia prioritet\u0173 s\u0105ra\u0161o, o ne darb\u0173 sekos su konkre\u010diu laiku<\/td><\/tr><tr><td>Debesijos APS, prijungta per API (SkyPlanner APS)<\/td><td>Nar\u0161ykl\u0117je veikianti tvarkara\u0161\u010di\u0173 sudarymo priemon\u0117, kuri abiem kryptimis sinchronizuoja DELMIAWorks gamybos u\u017esakymus<\/td><td>Tvarkara\u0161tis turi optimizuotis pats, i\u0161likti aktualus ir pasiekti kiekvien\u0105 operatori\u0173<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p><strong>Rinkit\u0117s SkyPlanner, o ne DELMIAWorks APS, kai:<\/strong><\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Norite optimizuoti vis\u0105 plan\u0105.<\/strong> Auto Load vadovaujasi prioritetais ir \u201eruns best\u201c taisykl\u0117mis. Arcturus optimizuoja vis\u0105 plan\u0105 per kelias sekundes, o Autopilot j\u012f perskai\u010diuoja po kiekvieno reik\u0161mingo poky\u010dio.<\/li>\n\n\n<li><strong>Gamybos apimt\u012f lemia form\u0173 ir spalv\u0173 keitimas.<\/strong> Paruo\u0161imo trukm\u0117s matricoje kiekvienai gamini\u0173 porai nurodoma atskira perderinimo trukm\u0117 abiem keitimo kryptimis. Pagal j\u0105 parenkama darb\u0173 seka, kuriai reikia ma\u017eiausiai bendro paruo\u0161imo laiko.<\/li>\n\n\n<li><strong>Formos, brigados ir derva riboja plan\u0105 ne ma\u017eiau nei presai.<\/strong> Vienas planavimo variklis \u012fvertina kiekvieno preso, darbuotojo ir formos paj\u0117gum\u0173 bei med\u017eiag\u0173 kiekio ribas. U\u017eduotims, kurioms reikia keli\u0173 operatori\u0173, paskiriami darbuotojai, o darbai pradedami tada, kai yra med\u017eiag\u0173.<\/li>\n\n\n<li><strong>Problem\u0173 s\u0105ra\u0161ai atima per daug planuotojo laiko.<\/strong> SkyPlanner sudaro plan\u0105 atsi\u017evelgdamas \u012f neprieinamus \u012frankius ir v\u0117luojan\u010dias med\u017eiagas, u\u017euot tik sura\u0161\u0119s problemas, kurias ka\u017ekas tur\u0117s i\u0161spr\u0119sti.<\/li>\n\n\n<li><strong>Kiekvienas operatorius turi dirbti pagal plan\u0105.<\/strong> Mobile Confirmations rodo aktuali\u0105 darb\u0173 eil\u0119 telefone arba plan\u0161et\u0117je. Naudotoj\u0173 skai\u010dius neribojamas: kaina priklauso nuo darbo centr\u0173, o ne naudotoj\u0173 skai\u010diaus.<\/li>\n\n\n<li><strong>Norite vienos ai\u0161kios kainos.<\/strong> Nuo 199 \u20ac per m\u0117nes\u012f. Dvikrypt\u0117s integracijos kaina pateikiama i\u0161 anksto, o jos palaikymu r\u016bpinasi SkyPlanner komanda.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kaip prad\u0117ti<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Prad\u0117kite nemokam\u0105 bandom\u0105j\u012f laikotarp\u012f.<\/strong> 30 dien\u0173, iki 20 darbo centr\u0173, visos Basic funkcijos. Mok\u0117jimo kortel\u0117s nereikia.<\/li>\n\n\n<li><strong>Sumodeliuokite savo gamyb\u0105.<\/strong> SkyPlanner sistemoje sukurkite presus, formas, darbuotojus ir pamainas arba importuokite darbo centrus i\u0161 DELMIAWorks. Galite gauti pagalb\u0105 pradedant naudotis sistema.<\/li>\n\n\n<li><strong>\u012ekelkite gamybos u\u017esakymus.<\/strong> Eksportuokite nebaigtus gamybos u\u017esakymus ir j\u0173 operacijas i\u0161 DELMIAWorks \u012f Excel, importuokite juos \u012f SkyPlanner ir palyginkite sudaryt\u0105 tvarkara\u0161t\u012f su dabartiniu planu.<\/li>\n\n\n<li><strong>Prijunkite DELMIAWorks.<\/strong> SkyPlanner komanda sukonfig\u016bruos dvikrypt\u0119 integracij\u0105 ir r\u016bpinsis jos palaikymu prad\u0117jus j\u0105 naudoti.<\/li>\n\n<\/ol>\n\n\n<p><strong>Kainodara.<\/strong> U\u017e pasirinkt\u0105 plan\u0105 mokama kas m\u0117nes\u012f pagal darbo centr\u0173 skai\u010di\u0173. Bet kada galite prid\u0117ti ar pa\u0161alinti darbo centrus arba atsisakyti prenumeratos. Daugiau informacijos rasite <a href=\"\/lt\/kainodara\/\">kainodaros puslapyje<\/a>. Taip pat skaitykite <a href=\"\/lt\/istekliai\/kas-yra-gamybos-planavimas\/\">gamybos tvarkara\u0161\u010di\u0173 sudarymo vadov\u0105<\/a> arba per\u017ei\u016br\u0117kite <a href=\"\/lt\/integracijos\/erp\/\">visas ERP integracijas<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lt\/bandymas\/\">I\u0161bandykite nemokamai<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lt\/susisiekite-su-pardavejais\/\">Susisiekite su pardavimo komanda<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Da\u017eniausiai u\u017eduodami klausimai<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Koks geriausias DELMIAWorks priedas gamybos tvarkara\u0161\u010diams sudaryti?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS yra gamybos planavimo priedas, kuris \u012fvertina realius \u012frengini\u0173 ir darbuotoj\u0173 paj\u0117gumus ir abiem kryptimis integruojamas su DELMIAWorks. \u012e SkyPlanner perduodami gamybos u\u017esakymai, gamini\u0173 sud\u0117tys (BOM), darbo centrai, formos, atsarg\u0173 pozicijos ir pirkimo u\u017esakymai. Atgal perduodamos suplanuotos datos, darbo centrai, gamybos \u012fra\u0161ai ir darbo laiko duomenys. Planuojant \u012fvertinamos kiekvieno preso, operatoriaus ir formos paj\u0117gum\u0173 bei med\u017eiag\u0173 kiekio ribos. Paruo\u0161imo trukm\u0117s matrica, kurioje atsi\u017evelgiama \u012f keitimo krypt\u012f, parenka form\u0173 ir spalv\u0173 keitimo sek\u0105 taip, kad paruo\u0161imas trukt\u0173 kuo trumpiau. Kaina prasideda nuo 199 \u20ac per m\u0117nes\u012f, o nemokamas bandomasis laikotarpis trunka 30 dien\u0173.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ar DELMIAWorks leid\u017eia planuoti gamyb\u0105 pagal realius paj\u0117gumus?<\/summary>\n<p class=\"sp-faq__a\">Taip. DELMIAWorks APS sudaro kiekvieno darbo centro tvarkara\u0161t\u012f pagal jo paj\u0117gumus. Auto Load priskiria darbus pagal prioritet\u0105 ir geriausiai tam darbui tinkant\u012f \u012frengin\u012f. Taip pat taikomos plano keitimo laiko ribos ir pateikiami su \u012frankiais bei med\u017eiagomis susijusi\u0173 problem\u0173 s\u0105ra\u0161ai. SkyPlanner APS papildomai optimizuoja vis\u0105 plan\u0105, vienu metu \u012fvertindamas kiekvieno preso, formos ir brigados paj\u0117gum\u0173 bei med\u017eiag\u0173 kiekio ribas, ir automati\u0161kai perskai\u010diuoja tvarkara\u0161t\u012f.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kokia gamybos tvarkara\u0161\u010di\u0173 sudarymo programin\u0117 \u012franga integruojama su DELMIAWorks?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS abiem kryptimis integruojamas su DELMIAWorks per DELMIAWorks WebAPI. Per REST valdiklius SkyPlanner nuskaito gamybos u\u017esakymus, gamini\u0173 sud\u0117tis (BOM), darbo centrus, atsarg\u0173 pozicijas ir pirkimo u\u017esakymus. Suplanuotos datos ir darbo centrai \u012f gamybos u\u017esakymus gr\u0105\u017einami per Manufacturing WorkOrders valdikl\u012f, tinkam\u0173 detali\u0173 duomenys \u2013 per AddProductionRecords, o darbo laiko duomenys \u2013 per Time &amp; Attendance u\u017eduo\u010di\u0173 i\u0161kvietimus.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>K\u0105 rinktis \u2013 DELMIAWorks APS ar SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">Rinkit\u0117s SkyPlanner, kai tvarkara\u0161tis turi optimizuotis pats, o gamybos apimt\u012f riboja perderinimai, formos, brigados ir med\u017eiagos. DELMIAWorks APS priskiria gamybos u\u017esakymus pagal taisykles, o su \u012frankiais ir med\u017eiagomis susijusias problemas pateikia planuotojui kaip i\u0161imtis. SkyPlanner jas i\u0161sprend\u017eia viename plane, automati\u0161kai perskai\u010diuoja tvarkara\u0161t\u012f ir kiekvienam operatoriui pateikia jo darb\u0173 eil\u0119 telefone. Naudotoj\u0173 skai\u010dius neribojamas. Tai galite patikrinti per nemokam\u0105 bandom\u0105j\u012f laikotarp\u012f naudodami savo DELMIAWorks gamybos u\u017esakymus.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ar DELMIAWorks ir IQMS yra tas pats?<\/summary>\n<p class=\"sp-faq__a\">Taip. Dassault Systemes \u012fsigijo IQMS ir pervadino jos EnterpriseIQ ERP \u012f DELMIAWorks. SkyPlanner veikia su dabartin\u0117mis DELMIAWorks versijomis per WebAPI.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ar SkyPlanner pakei\u010dia DELMIAWorks MRP arba RealTime?<\/summary>\n<p class=\"sp-faq__a\">Ne, SkyPlanner papildo j\u0173 veikim\u0105. DELMIAWorks ir toliau valdo atsargas, gamini\u0173 sud\u0117tis (BOM), MRP, pirkimus, kokyb\u0119 ir pres\u0173 steb\u0117jim\u0105 per RealTime. SkyPlanner sudaro gamybos u\u017esakym\u0173 tvarkara\u0161t\u012f pagal realius paj\u0117gumus ir gr\u0105\u017eina suplanuotas datas.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kiek SkyPlanner kainuoja DELMIAWorks naudojan\u010diai gamyklai?<\/summary>\n<p class=\"sp-faq__a\">Nuo 199 \u20ac per m\u0117nes\u012f u\u017e 5 darbo centrus ir po 20 \u20ac per m\u0117nes\u012f u\u017e kiekvien\u0105 papildom\u0105 darbo centr\u0105. Darbo centras \u2013 tai gamybos i\u0161teklius, turintis savo suplanuot\u0173 darb\u0173 eil\u0119, pavyzd\u017eiui, presas. J\u016bs\u0173 procesui ir poreikiams pritaikytos integracijos kaina pateikiama i\u0161 anksto kartu su pasirinkto plano kaina, tod\u0117l visas i\u0161laidas \u017einote dar prie\u0161 prad\u0117dami.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kiek trunka diegimas?<\/summary>\n<p class=\"sp-faq__a\">Prad\u0117jus pasirengim\u0105 naudoti sistem\u0105, diegimas paprastai u\u017ebaigiamas per kelias savaites. Komanda susieja j\u016bs\u0173 presus, formas ir operacijas, prijungia gamybos bei pirkimo u\u017esakymus ir nustato suplanuot\u0173 dat\u0173 perdavim\u0105 atgal. Prie\u0161 pradedant naudoti sistem\u0105, viskas i\u0161bandoma lyginant su dabartiniu planu.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ar galime i\u0161bandyti SkyPlanner prie\u0161 integruodami su DELMIAWorks?<\/summary>\n<p class=\"sp-faq__a\">Taip. Per 30 dien\u0173 bandom\u0105j\u012f laikotarp\u012f naudojami nebaigti DELMIAWorks gamybos u\u017esakymai, eksportuoti \u012f Excel. Dar neprasid\u0117jus integracijos darbams pamatysite savo pres\u0173 <a href=\"\/lt\/istekliai\/ribotu-pajegumu-planavimas\/\">gamybos plan\u0105, sudaryt\u0105 pagal realius paj\u0117gumus<\/a>.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integracijos \/ ERP \/ DELMIAWorks SkyPlanner APS sistemai DELMIAWorks (IQMS): gamybos planavimas pagal realius \u012frengini\u0173 ir darbuotoj\u0173 paj\u0117gumus SkyPlanner APS \u2013 gamybos planavimo pagal realius paj\u0117gumus priedas ERP sistemai DELMIAWorks, anks\u010diau vadintai IQMS. Kiekvieno preso, formos, operatoriaus ir med\u017eiagos naudojimas suplanuojamas konkre\u010diu laiku. Arcturus per kelias sekundes optimizuoja vis\u0105 plan\u0105, o Autopilot automati\u0161kai j\u012f perskai\u010diuoja &#8230; <a title=\"SkyPlanner APS sistemai DELMIAWorks (IQMS): gamybos planavimas pagal realius \u012frengini\u0173 ir darbuotoj\u0173 paj\u0117gumus\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/delmiaworks\/\" aria-label=\"Read more about SkyPlanner APS sistemai DELMIAWorks (IQMS): gamybos planavimas pagal realius \u012frengini\u0173 ir darbuotoj\u0173 paj\u0117gumus\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100679,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-106558","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>DELMIAWorks integracija: APS pagal realius paj\u0117gumus<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS \u2013 DELMIAWorks (IQMS) priedas: kiekvieno preso, formos ir operatoriaus planavimas pagal paj\u0117gumus, abipus\u0117 integracija. Nuo 199 \u20ac\/m\u0117n.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/delmiaworks\/\" \/>\n<meta property=\"og:locale\" content=\"lt_LT\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SkyPlanner APS sistemai DELMIAWorks (IQMS): gamybos planavimas pagal realius \u012frengini\u0173 ir darbuotoj\u0173 paj\u0117gumus\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS \u2013 DELMIAWorks (IQMS) priedas: kiekvieno preso, formos ir operatoriaus planavimas pagal paj\u0117gumus, abipus\u0117 integracija. Nuo 199 \u20ac\/m\u0117n.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/delmiaworks\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"13 minu\u010di\u0173\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/delmiaworks\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/delmiaworks\\\/\",\"name\":\"DELMIAWorks integracija: APS pagal realius paj\u0117gumus\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"SkyPlanner APS \u2013 DELMIAWorks (IQMS) priedas: kiekvieno preso, formos ir operatoriaus planavimas pagal paj\u0117gumus, abipus\u0117 integracija. Nuo 199 \u20ac\\\/m\u0117n.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/delmiaworks\\\/#breadcrumb\"},\"inLanguage\":\"lt-LT\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/delmiaworks\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/delmiaworks\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP ir MES programin\u0117s \u012frangos integracijos su SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bs\u0173 ERP sistemai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS sistemai DELMIAWorks (IQMS): gamybos planavimas pagal realius \u012frengini\u0173 ir darbuotoj\u0173 paj\u0117gumus\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lt-LT\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lt-LT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"DELMIAWorks integracija: APS pagal realius paj\u0117gumus","description":"SkyPlanner APS \u2013 DELMIAWorks (IQMS) priedas: kiekvieno preso, formos ir operatoriaus planavimas pagal paj\u0117gumus, abipus\u0117 integracija. Nuo 199 \u20ac\/m\u0117n.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/delmiaworks\/","og_locale":"lt_LT","og_type":"article","og_title":"SkyPlanner APS sistemai DELMIAWorks (IQMS): gamybos planavimas pagal realius \u012frengini\u0173 ir darbuotoj\u0173 paj\u0117gumus","og_description":"SkyPlanner APS \u2013 DELMIAWorks (IQMS) priedas: kiekvieno preso, formos ir operatoriaus planavimas pagal paj\u0117gumus, abipus\u0117 integracija. Nuo 199 \u20ac\/m\u0117n.","og_url":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/delmiaworks\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"13 minu\u010di\u0173"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/delmiaworks\/","url":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/delmiaworks\/","name":"DELMIAWorks integracija: APS pagal realius paj\u0117gumus","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lt\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"SkyPlanner APS \u2013 DELMIAWorks (IQMS) priedas: kiekvieno preso, formos ir operatoriaus planavimas pagal paj\u0117gumus, abipus\u0117 integracija. Nuo 199 \u20ac\/m\u0117n.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/delmiaworks\/#breadcrumb"},"inLanguage":"lt-LT","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/delmiaworks\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/delmiaworks\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lt\/"},{"@type":"ListItem","position":2,"name":"ERP ir MES programin\u0117s \u012frangos integracijos su SkyPlanner","item":"https:\/\/skyplanner.ai\/lt\/integracijos\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bs\u0173 ERP sistemai","item":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS sistemai DELMIAWorks (IQMS): gamybos planavimas pagal realius \u012frengini\u0173 ir darbuotoj\u0173 paj\u0117gumus"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lt\/#website","url":"https:\/\/skyplanner.ai\/lt\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lt\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lt\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lt-LT"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lt\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lt\/","logo":{"@type":"ImageObject","inLanguage":"lt-LT","@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lt\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integracijos \/ ERP \/ DELMIAWorks SkyPlanner APS sistemai DELMIAWorks (IQMS): gamybos planavimas pagal realius \u012frengini\u0173 ir darbuotoj\u0173 paj\u0117gumus SkyPlanner APS \u2013 gamybos planavimo pagal realius paj\u0117gumus priedas ERP sistemai DELMIAWorks, anks\u010diau vadintai IQMS. Kiekvieno preso, formos, operatoriaus ir med\u017eiagos naudojimas suplanuojamas konkre\u010diu laiku. Arcturus per kelias sekundes optimizuoja vis\u0105 plan\u0105, o Autopilot automati\u0161kai j\u012f perskai\u010diuoja&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/pages\/106558","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/comments?post=106558"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/pages\/106558\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/pages\/100679"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/media?parent=106558"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}