{"id":106181,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integracijos\/erp\/qad-adaptive-erp\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"qad-adaptive-erp","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/qad-adaptive-erp\/","title":{"rendered":"SkyPlanner APS su QAD Adaptive ERP: gamybos planavimas pagal realius \u012frengini\u0173 ir darbuotoj\u0173 paj\u0117gumus"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lt\/integracijos\/\">Integracijos<\/a> \/ <a href=\"\/lt\/integracijos\/erp\/\">ERP<\/a> \/ QAD Adaptive ERP<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SkyPlanner APS su QAD Adaptive ERP: <span class=\"hl\">gamybos planavimas pagal realius \u012frengini\u0173 ir darbuotoj\u0173 paj\u0117gumus<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">SkyPlanner APS \u2013 tai QAD Adaptive ERP (anks\u010diau QAD Enterprise Applications ir MFG\/PRO) priedas, skirtas gamybai planuoti pagal realius \u012frengini\u0173 ir darbuotoj\u0173 paj\u0117gumus. Jis suplanuoja kiekvieno \u012frenginio, operatoriaus, \u012frankio ir med\u017eiagos naudojim\u0105. Matote, kur ir kada vykdoma kiekviena gamybos u\u017esakymo operacija, o pasikeitus gamybos situacijai Autopilot automati\u0161kai perskai\u010diuoja tvarkara\u0161t\u012f.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lt\/bandymas\/\">Prad\u0117ti nemokam\u0105 bandom\u0105j\u012f laikotarp\u012f<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lt\/susisiekite-su-pardavejais\/\">U\u017esakyti demonstracij\u0105<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Gamybos tvarkara\u0161\u010di\u0173 sudarymas<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt diagrama su darbo centrams suplanuotomis u\u017eduotimis ir u\u017esakym\u0173 s\u0105ra\u0161u apa\u010dioje.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner ir QAD Adaptive ERP duomenimis kei\u010diasi abiem kryptimis. \u012e SkyPlanner perduodami gamybos u\u017esakymai su operacijomis, prek\u0117s, gamini\u0173 strukt\u016bros, technologiniai mar\u0161rutai, darbo centrai, atsargos ir pirkimo u\u017esakymai. Suplanuotos paleidimo ir \u012fvykdymo datos per QAD QXtend gr\u0105\u017einamos \u012f Work Order Maintenance, o u\u017eregistruotas darbas \u012fra\u0161omas kaip darbo atlikimo duomenys ir pagamintos produkcijos pajamavimas pagal gamybos u\u017esakym\u0105. Diegimo metu SkyPlanner komanda pritaiko integracij\u0105 prie j\u016bs\u0173 QAD konfig\u016bracijos.<\/p>\n\n\n<p>Kaina prasideda nuo 199 \u20ac per m\u0117nes\u012f u\u017e 5 darbo centrus. Kiekvienas papildomas darbo centras kainuoja 20 \u20ac per m\u0117nes\u012f. Nemokamai i\u0161bandyti galima 30 dien\u0173 naudojant iki 20 darbo centr\u0173, kredito kortel\u0117s nereikia.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-production\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas pasikei\u010dia j\u016bs\u0173 gamyboje<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Kiekvieno \u012frenginio darb\u0173 eil\u0117 atitinka jo paj\u0117gumus.<\/p>\n\n\n<p class=\"fx-pain__b\">QAD modulis Capacity Requirements Planning parodo kiekvieno darbo centro apkrov\u0105. SkyPlanner kiekvien\u0105 gamybos u\u017esakymo operacij\u0105 paskiria konkre\u010diam \u012frenginiui ar darbuotojui konkre\u010diu laiku, atsi\u017evelgdamas \u012f faktines pamainas, neatvykimus ir vir\u0161valand\u017eius.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Datos nebesikei\u010dia be j\u016bs\u0173 \u017einios.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner i\u0161laiko darb\u0173 sek\u0105, o gamybos u\u017esakym\u0173 paleidimo ir \u012fvykdymo datos QAD sistemoje derinamos prie jos. Planuotojams nebereikia i\u0161 naujo \u012fvesti operacij\u0173 dat\u0173 po kiekvieno CRP skai\u010diavimo.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Ma\u017eesn\u0117s perderinimo s\u0105naudos.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner saugo kiekvienos gamini\u0173 poros perderinimo laik\u0105 abiem per\u0117jimo kryptimis. Pereinant nuo \u0161viesios spalvos prie tamsios gali pakakti trumpo praplovimo, o nuo tamsios prie \u0161viesios reikia visapusi\u0161ko valymo. Planavimo variklis i\u0161d\u0117sto u\u017eduotis tokia tvarka, kad b\u016bt\u0173 prarasta kuo ma\u017eiau laiko.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Darbuotoj\u0173 ir \u012franki\u0173 skai\u010dius taip pat ribotas.<\/p>\n\n\n<p class=\"fx-pain__b\">U\u017eduo\u010diai, kuriai reikia trij\u0173 operatori\u0173, paskiriami trys tuo metu pamainose neu\u017eimti darbuotojai. Viename prese naudojamas \u0161tampas ar liejimo forma niekada tuo pa\u010diu metu neskiriami kitam presui. Kai \u012frenginys u\u017eimtas, darbas perkeliamas kitam tinkamam \u012frenginiui ar darbuotojui.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Prad\u017ei\u0105 lemia med\u017eiagos.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner tikrina kiekvienos prek\u0117s atsargas ir numatomus gavimus pagal pirkimo u\u017esakymus. Tiek\u0117jo pristatymo laukiantis gamybos u\u017esakymas planuojamas po pristatymo datos, u\u017euot prad\u0117jus j\u012f vykdyti ir v\u0117liau sustabd\u017eius ceche.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Operatoriai mato savo u\u017eduo\u010di\u0173 eil\u0119.<\/p>\n\n\n<p class=\"fx-pain__b\">Kiekvienas operatorius telefone ar plan\u0161et\u0117je mato artimiausias u\u017eduotis ir registruoja darb\u0105 j\u012f atlikdamas. Biuro darbuotojai eig\u0105 mato realiuoju laiku, o darbo atlikimo duomenys gr\u0105\u017einami \u012f QAD.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Gamintoj\u0173 atsiliepimai apie SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"UTU tiekimo grandin\u0117s specialistas Kalle Kalliom\u00e4ki elektros skyd\u0173 gamybos ceche Ulviloje\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>sutaupoma kas savait\u0119<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSu SkyPlanner nuo gamybos planavimo Excel lentel\u0117se per\u0117jome prie gamybos optimizavimo realiuoju laiku.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, tiekimo grandin\u0117s specialistas<\/b><br>UTU \u00b7 Elektros skydai ir skirstymo \u012franga<\/p>\n\n\n<p class=\"ind-cust__result\">Planuojant gamyb\u0105 kas savait\u0119 sutaupoma 2 valandos darbo laiko, o nauja u\u017eduo\u010di\u0173 eil\u0117 gamybos linij\u0105 pasiekia per kelias sekundes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lt\/klientu-istorijos\/utu\/\">Skaitykite UTU atsiliepim\u0105<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatoriai su \u0161vari\u0173j\u0173 patalp\u0173 apranga prie buteliuk\u0173 pildymo linijos Laboratory &amp; Allied vaist\u0173 gamykloje Nairobyje\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>gamybos efektyvumas<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eGamybos efektyvumas padid\u0117jo 90%.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT vadovas<\/b><br>Laboratory &amp; Allied \u00b7 Vaist\u0173 gamyba<\/p>\n\n\n<p class=\"ind-cust__result\">Gamybos efektyvumas padid\u0117jo 90%, o optimizuotas trij\u0173 m\u0117nesi\u0173 planas visiems darbo centrams sudaromas grei\u010diau nei per 30 minu\u010di\u0173.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lt\/klientu-istorijos\/laboratory-allied\/\">Skaitykite Laboratory &amp; Allied atsiliepim\u0105<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/28-83df4743-ff34-41a5-9a41-c3dcc6f0897b.png\" alt=\"Opes Corporation\" width=\"106\" height=\"32\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>100%<\/b><span>pristatymo patikimumas nuo 2021 m.<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner leid\u017eia ai\u0161kiai matyti paj\u0117gumus ir u\u017etikrina nusp\u0117jam\u0105 planavim\u0105.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Dan Berglund, COO\/CFO<\/b><br>Opes Corporation \u00b7 Chemijos ir maisto produkt\u0173 gamyba<\/p>\n\n\n<p class=\"ind-cust__result\">Pristatymo patikimumas siekia 100% vis\u0105 SkyPlanner naudojimo laikotarp\u012f \u2013 nuo 2021 m.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lt\/klientu-istorijos\/opes-corporation\/\">Skaityti Opes Corporation atsiliepim\u0105<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"KJH-Comp suvirintojas \u0161lifuoja suvirint\u0105 plienin\u0119 konstrukcij\u0105 Alah\u00e4rm\u00e4 gamykloje\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span> pristatymo patikimumas, padid\u0117j\u0119s nuo ma\u017edaug 50%<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner atlieka lemiam\u0105 vaidmen\u012f palaikant m\u016bs\u0173 pristatymo patikimum\u0105.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, generalinis direktorius<\/b><br>KJH-Comp \u00b7 Lak\u0161tinio metalo apdirbimas ir sutartin\u0117 gamyba<\/p>\n\n\n<p class=\"ind-cust__result\">Pristatymo patikimumas i\u0161augo nuo ma\u017edaug 50% iki net 98%, o tvarkara\u0161\u010diams sudaryti dabar pakanka vieno meistro vietoj dviej\u0173.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lt\/klientu-istorijos\/kjh-comp\/\">Skaityti KJH-Comp atsiliepim\u0105<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-the-qad-adaptive-erp-integration-works\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kaip veikia integracija su QAD Adaptive ERP<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>QAD perduoda duomenis apie darbus.<\/strong> \u012e SkyPlanner perduodami gamybos u\u017esakymai ir j\u0173 operacijos, prek\u0117s, gamini\u0173 strukt\u016bros, technologiniai mar\u0161rutai, darbo centrai, cech\u0173 darbo kalendoriai, atsargos ir pirkimo u\u017esakymai.<\/li>\n\n\n<li><strong>SkyPlanner sudaro tvarkara\u0161t\u012f ir nuolat j\u012f atnaujina.<\/strong> Arcturus variklis per kelias sekundes optimizuoja vis\u0105 plan\u0105 ir perskai\u010diuoja j\u012f pasikeitus gamybos situacijai.<\/li>\n\n\n<li><strong>Datos ir u\u017eregistruotas darbas gr\u0105\u017einami \u012f QAD.<\/strong> Suplanuotos paleidimo ir \u012fvykdymo datos gr\u0105\u017einamos \u012f kiekvien\u0105 gamybos u\u017esakym\u0105 per QXtend Inbound QDoc, naudojant Work Order Maintenance (16.1). Operatori\u0173 patvirtinimai \u012fra\u0161omi per Labor Feedback by Work Order (16.20.1) ir Work Order Receipt (16.11).<\/li>\n\n<\/ol>\n\n\n<p>QAD lieka pagrindine j\u016bs\u0173 duomen\u0173 apskaitos sistema. Prek\u0117s, gamini\u0173 strukt\u016bros, MRP, pirkimai, atsargos, savikainos skai\u010diavimas ir finansai lieka ten, kur yra. SkyPlanner atsako u\u017e vien\u0105 dalyk\u0105: kiekvienos operacijos sek\u0105 ir laik\u0105 kiekvienam gamybos i\u0161tekliui.<\/p>\n\n\n<p>SkyPlanner nuskaito QAD duomenis per QAD QXtend Outbound verslo objektus (Item, Product Structure, Routing, Work Center, Inventory Transaction) ir QAD verslo dokument\u0173 REST u\u017eklaus\u0173 API. Duomenys gr\u0105\u017einami per QAD QXtend Inbound \u2013 QAD SOAP ir XML s\u0105saj\u0105 su tomis pa\u010diomis programomis, kuriomis naudojasi planuotojas. SkyPlanner siun\u010dia kiekvien\u0105 tvarkara\u0161\u010dio pakeitim\u0105 vos jam \u012fvykus, naudodamas \u017einiatinklio prane\u0161imus (webhooks).<\/p>\n\n\n<p>Kiekviena gamykla QAD naudoja savaip, tod\u0117l diegimo metu SkyPlanner komanda pritaiko integracij\u0105 prie j\u016bs\u0173 konfig\u016bracijos ir pri\u017ei\u016bri j\u0105 prad\u0117jus naudoti sistem\u0105. Integracijos kainos pasi\u016blymas pateikiamas i\u0161 anksto, atsi\u017evelgiant \u012f j\u016bs\u0173 proces\u0105 ir poreikius. J\u016bs\u0173 QAD partneris arba programuotojai taip pat gali kurti integracij\u0105 naudodamiesi dokumentuota SkyPlanner API (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API dokumentacija<\/a>).<\/p>\n\n\n<p>QDocs, duomen\u0173 susiejimas ir duomen\u0173 gr\u0105\u017einimo \u012f QAD taisykl\u0117s apra\u0161ytos <a href=\"\/lt\/integracijos\/erp\/qad-adaptive-erp\/integravimo-vadovas\/\">vadove apie QAD Adaptive ERP integracij\u0105 gamybos tvarkara\u0161\u010diams sudaryti<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-qad-adaptive-erp-schedules-and-what-skyplan\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0105 planuoja QAD Adaptive ERP ir koki\u0173 galimybi\u0173 prideda SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>QAD gerai planuoja med\u017eiagas, o pasikartojan\u010dios gamybos linijas valdo per Line Schedule Workbench. Diskre\u010diosios gamybos u\u017esakymams reikalingi paj\u0117gumai skai\u010diuojami naudojant Capacity Requirements Planning. <a href=\"https:\/\/connect.qad.com\/documents\/2370665\/207142422\/Manufacturing_UG_v2020EE.pdf\/a61c043d-f21c-631a-4a2e-c0c2d152294c?t=1600374319852&amp;download=true\">QAD gamybos naudotojo vadove<\/a> nurodytos \u0161ios taisykl\u0117s:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>CRP planuoja atgal nuo \u012fvykdymo datos.<\/strong> Sistema &#8222;takes the due date of an order or repetitive schedule and schedules each of its operations from the last operation in the order routing or process backward to the first one.&#8221; (ima u\u017esakymo arba pasikartojan\u010dios gamybos tvarkara\u0161\u010dio \u012fvykdymo dat\u0105 ir planuoja operacijas atgal \u2013 nuo paskutin\u0117s technologinio mar\u0161ruto ar proceso operacijos iki pirmosios).<\/li>\n\n\n<li><strong>Perkrovas sprend\u017eia planuotojas.<\/strong> &#8222;If a work center or machine is over- or under-loaded, you can modify either its capacity or the timing or amount of the load.&#8221; (Jei darbo centras ar \u012frenginys apkrautas per daug arba per ma\u017eai, galite keisti jo paj\u0117gumus, apkrovos laik\u0105 arba dyd\u012f.)<\/li>\n\n\n<li><strong>Visa apkrova priskiriama vienai dienai.<\/strong> &#8222;The system assigns the entire load for an operation to its scheduled start date.&#8221; (Sistema vis\u0105 operacijos apkrov\u0105 priskiria suplanuotai jos prad\u017eios datai.)<\/li>\n\n\n<li><strong>Pakartotiniai CRP skai\u010diavimai kei\u010dia datas.<\/strong> &#8222;When you run CRP, all open operations for selected work orders are rescheduled.&#8221; (Paleidus CRP, visos neu\u017ebaigtos pasirinkt\u0173 gamybos u\u017esakym\u0173 operacijos suplanuojamos i\u0161 naujo.)<\/li>\n\n<\/ul>\n\n\n<p>Pagrindin\u0117je QAD sistemoje apkrovos planavimas pagal realius paj\u0117gumus galimas modulyje Advanced Repetitive, kuriame Line Schedule Workbench sudaro gamybos linij\u0173 tvarkara\u0161\u010dius. Master and Production Scheduling Workbenches apib\u016bdinami kaip &#8222;.NET UI-only scheduling tools&#8221; (tvarkara\u0161\u010di\u0173 sudarymo \u012frankiai, veikiantys tik .NET naudotojo s\u0105sajoje); jiems reikia galiojan\u010dios Maintenance licencijos (<a href=\"https:\/\/connect.qad.com\/documents\/2370665\/209256556\/PlanningSchedWorkbench_AG_v2021EE.pdf\/7adcba49-8b72-8124-9855-08b01a009d86?t=1632916378957&amp;download=true\">QAD vadovas<\/a>). Darb\u0173 sekai sudaryti QAD si\u016blo atskir\u0105 produkt\u0105 \u2013 QAD Advanced Scheduling, pristatyt\u0105 2024 metais (<a href=\"https:\/\/www.qad.com\/solutions\/supply-chain-planning\/advanced-scheduling\">QAD<\/a>).<\/p>\n\n\n<p>Visi veiksmai ir apribojimai paai\u0161kinti straipsnyje <a href=\"\/lt\/integracijos\/erp\/qad-adaptive-erp\/gamybos-planavimas\/\">Ar QAD Adaptive ERP gali planuoti gamyb\u0105 pagal realius paj\u0117gumus?<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"qad-adaptive-erp-today-and-with-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">QAD Adaptive ERP dabar ir su SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>QAD CRP ir gamybos u\u017esakymai<\/th><th>QAD Adaptive ERP su SkyPlanner APS<\/th><\/tr><\/thead><tbody><tr><td>Paj\u0117gumai<\/td><td>CRP planuoja atgal nuo \u012fvykdymo datos ir parodo apkrovos bei paj\u0117gum\u0173 santyk\u012f<\/td><td>Atsi\u017evelgiama \u012f kiekvieno \u012frenginio, darbuotojo ir \u012frankio ribot\u0105 prieinamum\u0105 bei faktines pamainas<\/td><\/tr><tr><td>Perkrovos<\/td><td>Planuotojas kei\u010dia paj\u0117gumus arba apkrovos laik\u0105<\/td><td>Variklis kei\u010dia darb\u0173 sek\u0105 pagal j\u016bs\u0173 prioritetus<\/td><\/tr><tr><td>Apkrova<\/td><td>Visa operacijos apkrova priskiriama jos prad\u017eios datai<\/td><td>Kiekvienai operacijai nustatomas konkretus vykdymo laikas<\/td><\/tr><tr><td>Poky\u010diai<\/td><td>Kiekvienas CRP skai\u010diavimas i\u0161 naujo suplanuoja neu\u017ebaigtas operacijas<\/td><td>Autopilot perskai\u010diuoja plan\u0105; Running Time Lock u\u017efiksuoja artimiausi\u0173 valand\u0173 u\u017eduotis<\/td><\/tr><tr><td>Perderinimai<\/td><td>Vienas paruo\u0161imo laikas kiekvienai technologinio mar\u0161ruto operacijai; perderinimas pasikartojan\u010dios gamybos linijose<\/td><td>Kiekvieno darbo centro paruo\u0161imo ir perderinimo laik\u0173 matrica: ma\u017eiausias bendras paruo\u0161imo laikas<\/td><\/tr><tr><td>Darbuotojai ir \u012frankiai<\/td><td>Darbo centro paj\u0117gumai nustatomi pagal \u012frenginius arba darbuotojus<\/td><td>Konkret\u016bs operatoriai su pamainomis, u\u017eduotys keliems operatoriams, \u012frankiai kaip riboto prieinamumo bendri i\u0161tekliai<\/td><\/tr><tr><td>Med\u017eiagos<\/td><td>MRP suplanuoti u\u017esakymai, nesusieti su \u012frengini\u0173 darbo laiku<\/td><td>U\u017eduotys pradedamos, kai yra atsarg\u0173 arba gaunamos prek\u0117s pagal pirkimo u\u017esakymus<\/td><\/tr><tr><td>Planuotojo darbo aplinka<\/td><td>Input\/Output Inquiry ir CRP ataskaitos; planavimo \u012frankiai .NET naudotojo s\u0105sajoje<\/td><td>Interaktyvi Gantt diagrama nar\u0161ykl\u0117je: perkeliate u\u017eduotis, o planas lieka suderintas<\/td><\/tr><tr><td>Gamybos cechas<\/td><td>Darbo atlikimo duomenys \u012fvedami \u012f QAD<\/td><td>Operatoriai telefone ar plan\u0161et\u0117je mato savo u\u017eduo\u010di\u0173 eil\u0119 ir registruoja darb\u0105<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"qad-adaptive-erp-scheduling-software-and-add-ons\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">QAD Adaptive ERP tvarkara\u0161\u010di\u0173 sudarymo program\u0173 ir pried\u0173 palyginimas<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Sprendimas<\/th><th>Kas tai<\/th><th>Kada tinka<\/th><\/tr><\/thead><tbody><tr><td>QAD Advanced Scheduling (su QAD DSCP Production Planning ir QAD Redzone)<\/td><td>Atskiri QAD planavimo ir tvarkara\u0161\u010di\u0173 sudarymo produktai, skirti jos ERP sistemai<\/td><td>Planuojate kiekvien\u0105 linij\u0105 atskirai ir norite naudoti tik QAD produktus<\/td><\/tr><tr><td>Vietoje diegiama APS su QAD jungtimi (pavyzd\u017eiui, Asprova, PlanetTogether)<\/td><td>Kompiuteryje ar serveryje veikian\u010dios tvarkara\u0161\u010di\u0173 sudarymo programos, gaunan\u010dios QAD duomenis per jungt\u012f arba \u012fgyvendinus integravimo projekt\u0105<\/td><td>Planavimo komanda pri\u017ei\u016bri atskir\u0105 tvarkara\u0161\u010di\u0173 sudarymo model\u012f<\/td><\/tr><tr><td>Planavimo ir agent\u0173 platformos (pavyzd\u017eiui, b2wise, Zentio)<\/td><td>Planavimo \u012frankiai, nurodantys QAD tarp ERP sistem\u0173, su kuriomis gali susijungti<\/td><td>Norite papildyti QAD atsarg\u0173 arba planavimo analitika<\/td><\/tr><tr><td>Debesijos APS, sujungta su QAD (SkyPlanner APS)<\/td><td>Nar\u0161ykl\u0117je veikiantis gamybos planavimo \u012frankis, atsi\u017evelgiantis \u012f realius paj\u0117gumus ir abiem kryptimis sinchronizuojantis QAD gamybos u\u017esakymus<\/td><td>Tvarkara\u0161tis turi atsinaujinti automati\u0161kai ir pasiekti kiekvien\u0105 operatori\u0173<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p><strong>Vietoj QAD Advanced Scheduling ir tvarkara\u0161\u010di\u0173 sudarymo \u012franki\u0173 rinkit\u0117s SkyPlanner, kai:<\/strong><\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Diskre\u010diosios gamybos u\u017esakymus vykdote pasitelkdami \u012frenginius ir darbuotojus.<\/strong> QAD apib\u016bdina Advanced Scheduling kaip &#8222;a minute-by-minute, line-by-line optimized production schedule for each plant&#8221; (kiekvienos gamyklos gamybos tvarkara\u0161t\u012f, optimizuot\u0105 kiekvienai minutei ir kiekvienai linijai) (<a href=\"https:\/\/www.qad.com\/blog\/2024\/11\/supercharge-qad-redzone-with-production-planning-and-advanced-scheduling\">QAD tinklara\u0161tis<\/a>). SkyPlanner sudaro gamybos u\u017esakym\u0173 operacij\u0173 sek\u0105 kiekvienam \u012frenginiui, operatoriui ir \u012frankiui.<\/li>\n\n\n<li><strong>Jums reikia tvarkara\u0161\u010dio, o ne planavimo program\u0173 rinkinio.<\/strong> QAD pristato Advanced Scheduling kartu su DSCP Production Planning ir Redzone. SkyPlanner \u2013 vienas papildomas produktas greta QAD. Per 30 dien\u0173 bandom\u0105j\u012f laikotarp\u012f j\u012f i\u0161bandysite su savo gamybos u\u017esakymais, o prad\u0117j\u0119 diegti gal\u0117site naudoti gamyboje per kelias savaites.<\/li>\n\n\n<li><strong>Datos neturi keistis po kiekvieno CRP skai\u010diavimo.<\/strong> QAD \u012fsp\u0117ja, kad rankiniu b\u016bdu pakoreguotos operacij\u0173 datos, paleidus CRP, \u201ewill probably be changed\u201c (tikriausiai bus pakeistos). SkyPlanner \u012fra\u0161o savo tvarkara\u0161t\u012f atitinkan\u010dias gamybos u\u017esakym\u0173 i\u0161leidimo ir \u012fvykdymo datas, tod\u0117l CRP duomenys ir planas sutampa.<\/li>\n\n\n<li><strong>Perderinimai lemia, kiek pagaminsite.<\/strong> Paruo\u0161imo laiko matricoje saugoma kiekvieno darbo centro perderinimo trukm\u0117, atsi\u017evelgiant \u012f tai, nuo kokio gaminio prie kokio pereinama. Pagal j\u0105 sudaroma spalv\u0173, skoni\u0173 ar med\u017eiag\u0173 seka, kuriai reikia ma\u017eiausiai bendro paruo\u0161imo laiko.<\/li>\n\n\n<li><strong>Planuotojai ir operatoriai dirba nar\u0161ykl\u0117je.<\/strong> QAD planavimo aplinkos veikia tik .NET UI s\u0105sajoje. SkyPlanner veikia nar\u0161ykl\u0117je, naudotoj\u0173 skai\u010dius neribojamas, o Mobile Confirmations leid\u017eia telefone ar plan\u0161et\u0117je matyti aktuali\u0105 u\u017eduo\u010di\u0173 eil\u0119.<\/li>\n\n\n<li><strong>Norite vienos m\u0117nesin\u0117s kainos.<\/strong> Nuo 199 \u20ac per m\u0117nes\u012f. Dvikrypt\u0117s integracijos kaina pateikiama i\u0161 anksto, o jos palaikymu r\u016bpinasi SkyPlanner komanda.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kaip prad\u0117ti<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Prad\u0117kite nemokam\u0105 bandom\u0105j\u012f laikotarp\u012f.<\/strong> 30 dien\u0173, iki 20 darbo centr\u0173, visos Basic funkcijos, mok\u0117jimo kortel\u0117s nereikia.<\/li>\n\n\n<li><strong>Apra\u0161ykite savo gamyb\u0105.<\/strong> SkyPlanner sistemoje sukurkite \u012frenginius, darbuotojus ir pamainas arba importuokite darbo centrus i\u0161 QAD. Prad\u0117ti naudotis sistema gali pad\u0117ti m\u016bs\u0173 komanda.<\/li>\n\n\n<li><strong>\u012ekelkite gamybos u\u017esakymus.<\/strong> Eksportuokite ne\u012fvykdytus gamybos u\u017esakymus ir j\u0173 technologinius mar\u0161rutus i\u0161 QAD \u012f Excel, importuokite juos \u012f SkyPlanner ir palyginkite sudaryt\u0105 tvarkara\u0161t\u012f su dabartiniu planu.<\/li>\n\n\n<li><strong>Prijunkite QAD Adaptive ERP.<\/strong> SkyPlanner komanda sukonfig\u016bruoja dvikrypt\u0119 integracij\u0105 per QXtend ir j\u0105 palaiko prad\u0117jus naudoti gamyboje.<\/li>\n\n<\/ol>\n\n\n<p><strong>Kainodara.<\/strong> U\u017e planus mokama kas m\u0117nes\u012f pagal darbo centr\u0173 skai\u010di\u0173. Bet kada galite prid\u0117ti ar pa\u0161alinti darbo centrus arba atsisakyti paslaugos. Daugiau informacijos rasite <a href=\"\/lt\/kainodara\/\">kainodaros puslapyje<\/a>, taip pat galite perskaityti <a href=\"\/lt\/istekliai\/pazangus-planavimas-ir-tvarkarasciu-sudarymas\/\">APS vadov\u0105<\/a> arba per\u017ei\u016br\u0117ti <a href=\"\/lt\/integracijos\/erp\/\">visas ERP integracijas<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lt\/bandymas\/\">I\u0161bandykite nemokamai<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lt\/susisiekite-su-pardavejais\/\">Susisiekite su pardavim\u0173 komanda<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Da\u017eniausiai u\u017eduodami klausimai<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Koks geriausias QAD Adaptive ERP priedas gamybos tvarkara\u0161\u010diams sudaryti?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS \u2013 gamybos planavimo priedas, kuris atsi\u017evelgia \u012f realius \u012frengini\u0173 bei darbuotoj\u0173 paj\u0117gumus ir abiem kryptimis integruojamas su QAD Adaptive ERP. \u012e SkyPlanner perduodami gamybos u\u017esakymai, prek\u0117s, gamini\u0173 strukt\u016bros, technologiniai mar\u0161rutai, darbo centrai, atsargos ir pirkimo u\u017esakymai, o atgal gr\u0105\u017einamos suplanuotos gamybos u\u017esakym\u0173 datos ir atlikto darbo duomenys. Planuojant atsi\u017evelgiama \u012f kiekvieno \u012frenginio, operatoriaus bei \u012frankio ribot\u0105 paj\u0117gum\u0105 ir med\u017eiag\u0173 kiek\u012f. Paruo\u0161imo laiko matrica \u012fvertina per\u0117jimo nuo vieno gaminio prie kito krypt\u012f ir padeda i\u0161d\u0117styti u\u017eduotis taip, kad paruo\u0161imui reik\u0117t\u0173 ma\u017eiausiai laiko. Pasikeitus pad\u0117\u010diai gamyboje, Autopilot automati\u0161kai perskai\u010diuoja tvarkara\u0161t\u012f. Kaina \u2013 nuo 199 \u20ac per m\u0117nes\u012f, o nemokamas bandomasis laikotarpis trunka 30 dien\u0173.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ar QAD Adaptive ERP leid\u017eia planuoti gamyb\u0105 pagal realius paj\u0117gumus?<\/summary>\n<p class=\"sp-faq__a\">Pasikartojan\u010dios gamybos linijoms \u2013 taip: Advanced Repetitive funkcija Line Schedule Workbench paskirsto linij\u0173 apkrov\u0105 nevir\u0161ydama j\u0173 paj\u0117gum\u0173. Diskre\u010diosios gamybos u\u017esakymams CRP sudaro tvarkara\u0161t\u012f atgaline tvarka nuo \u012fvykdymo dat\u0173, o perkrovas palieka spr\u0119sti planuotojui. U\u017eduo\u010di\u0173 sekai sudaryti QAD si\u016blo atskir\u0105 produkt\u0105 QAD Advanced Scheduling. Greta QAD veikianti SkyPlanner APS planuoja darb\u0105 atsi\u017evelgdama \u012f realius kiekvieno \u012frenginio, darbuotojo ir \u012frankio paj\u0117gumus bei turimas med\u017eiagas.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kokia gamybos tvarkara\u0161\u010di\u0173 sudarymo programin\u0117 \u012franga integruojama su QAD Adaptive ERP?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS integruojama su QAD Adaptive ERP abiem kryptimis. Prekes, gamini\u0173 strukt\u016bras, technologinius mar\u0161rutus, darbo centrus, gamybos u\u017esakymus ir atsargas ji nuskaito per QXtend Outbound ir QAD verslo dokument\u0173 REST API s\u0105sajas. Suplanuotos i\u0161leidimo ir \u012fvykdymo datos gr\u0105\u017einamos \u012f Work Order Maintenance per QXtend Inbound QDoc, o patvirtinimai \u012fra\u0161omi kaip Labor Feedback by Work Order ir Work Order Receipt.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>K\u0105 rinktis \u2013 QAD Advanced Scheduling ar SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner, jei norite per kelias savaites prad\u0117ti naudoti tvarkara\u0161t\u012f, kuriame atsi\u017evelgiama \u012f realius kiekvieno \u012frenginio ir darbuotojo paj\u0117gumus. QAD apib\u016bdina Advanced Scheduling kaip kiekvienos gamyklos atskir\u0173 linij\u0173 tvarkara\u0161t\u012f ir pristato j\u012f kartu su DSCP Production Planning ir Redzone. SkyPlanner nustato diskre\u010diosios gamybos u\u017esakym\u0173 sek\u0105, planuoja perderinimus, \u012frankius, brigadas ir med\u017eiagas, automati\u0161kai perskai\u010diuoja plan\u0105 ir kiekvienam operatoriui telefone pateikia jo u\u017eduo\u010di\u0173 eil\u0119. Naudotoj\u0173 skai\u010dius neribojamas.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ar SkyPlanner veikia su MFG\/PRO ir QAD Enterprise Edition?<\/summary>\n<p class=\"sp-faq__a\">Taip. QAD Adaptive ERP yra dabartinis QAD ERP sistemos pavadinimas, apimantis ankstesnius QAD Enterprise Applications Enterprise Edition ir QAD Cloud ERP. Integracijai naudojamos tos pa\u010dios gamybos u\u017esakym\u0173, technologini\u0173 mar\u0161rut\u0173 ir darbo centr\u0173 programos bei QXtend s\u0105saja.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kiek SkyPlanner kainuoja QAD naudojan\u010diai gamyklai?<\/summary>\n<p class=\"sp-faq__a\">Nuo 199 \u20ac per m\u0117nes\u012f u\u017e 5 darbo centrus ir po 20 \u20ac per m\u0117nes\u012f u\u017e kiekvien\u0105 papildom\u0105 darbo centr\u0105. Darbo centras \u2013 tai gamybos i\u0161teklius, turintis atskir\u0105 suplanuot\u0173 u\u017eduo\u010di\u0173 eil\u0119. Integracijos kain\u0105 pagal j\u016bs\u0173 procesus ir poreikius pateikiame i\u0161 anksto kartu su pasirinkto plano kaina, tod\u0117l visas i\u0161laidas \u017einote dar prie\u0161 prad\u0117dami.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kiek laiko trunka diegimas?<\/summary>\n<p class=\"sp-faq__a\">Diegimas paprastai baigiamas per kelias savaites nuo pasirengimo naudoti sistem\u0105 prad\u017eios. Komanda susieja j\u016bs\u0173 darbo centrus, technologinius mar\u0161rutus ir prekes, prijungia gamybos bei pirkimo u\u017esakym\u0173 duomenis ir gr\u0105\u017eina suplanuotas datas. Prie\u0161 pradedant naudoti gamyboje, viskas i\u0161bandoma lyginant su dabartiniu j\u016bs\u0173 planu.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ar galime i\u0161bandyti SkyPlanner prie\u0161 integruodami su QAD?<\/summary>\n<p class=\"sp-faq__a\">Taip. Per 30 dien\u0173 bandom\u0105j\u012f laikotarp\u012f naudojami \u012f Excel eksportuoti j\u016bs\u0173 ne\u012fvykdyti QAD gamybos u\u017esakymai. Dar neprad\u0117jus joki\u0173 integravimo darb\u0173, matysite savo gamybos <a href=\"\/lt\/istekliai\/ribotu-pajegumu-planavimas\/\">plan\u0105, sudaryt\u0105 pagal realius paj\u0117gumus<\/a>.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integracijos \/ ERP \/ QAD Adaptive ERP SkyPlanner APS su QAD Adaptive ERP: gamybos planavimas pagal realius \u012frengini\u0173 ir darbuotoj\u0173 paj\u0117gumus SkyPlanner APS \u2013 tai QAD Adaptive ERP (anks\u010diau QAD Enterprise Applications ir MFG\/PRO) priedas, skirtas gamybai planuoti pagal realius \u012frengini\u0173 ir darbuotoj\u0173 paj\u0117gumus. Jis suplanuoja kiekvieno \u012frenginio, operatoriaus, \u012frankio ir med\u017eiagos naudojim\u0105. Matote, kur &#8230; <a title=\"SkyPlanner APS su QAD Adaptive ERP: gamybos planavimas pagal realius \u012frengini\u0173 ir darbuotoj\u0173 paj\u0117gumus\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/qad-adaptive-erp\/\" aria-label=\"Read more about SkyPlanner APS su QAD Adaptive ERP: gamybos planavimas pagal realius \u012frengini\u0173 ir darbuotoj\u0173 paj\u0117gumus\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100679,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-106181","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>QAD Adaptive ERP integracija: gamybos planavimas su APS<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS priedas QAD Adaptive ERP: planavimas pagal paj\u0117gumus, abipus\u0117 integracija, \u012frenginiai, \u017emon\u0117s, \u012frankiai, med\u017eiagos. Nuo 199 \u20ac per m\u0117nes\u012f.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/qad-adaptive-erp\/\" \/>\n<meta property=\"og:locale\" content=\"lt_LT\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SkyPlanner APS su QAD Adaptive ERP: gamybos planavimas pagal realius \u012frengini\u0173 ir darbuotoj\u0173 paj\u0117gumus\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS priedas QAD Adaptive ERP: planavimas pagal paj\u0117gumus, abipus\u0117 integracija, \u012frenginiai, \u017emon\u0117s, \u012frankiai, med\u017eiagos. Nuo 199 \u20ac per m\u0117nes\u012f.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/qad-adaptive-erp\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"13 minu\u010di\u0173\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/qad-adaptive-erp\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/qad-adaptive-erp\\\/\",\"name\":\"QAD Adaptive ERP integracija: gamybos planavimas su APS\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"SkyPlanner APS priedas QAD Adaptive ERP: planavimas pagal paj\u0117gumus, abipus\u0117 integracija, \u012frenginiai, \u017emon\u0117s, \u012frankiai, med\u017eiagos. Nuo 199 \u20ac per m\u0117nes\u012f.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/qad-adaptive-erp\\\/#breadcrumb\"},\"inLanguage\":\"lt-LT\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/qad-adaptive-erp\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/qad-adaptive-erp\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP ir MES programin\u0117s \u012frangos integracijos su SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bs\u0173 ERP sistemai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS su QAD Adaptive ERP: gamybos planavimas pagal realius \u012frengini\u0173 ir darbuotoj\u0173 paj\u0117gumus\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lt-LT\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lt-LT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"QAD Adaptive ERP integracija: gamybos planavimas su APS","description":"SkyPlanner APS priedas QAD Adaptive ERP: planavimas pagal paj\u0117gumus, abipus\u0117 integracija, \u012frenginiai, \u017emon\u0117s, \u012frankiai, med\u017eiagos. Nuo 199 \u20ac per m\u0117nes\u012f.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/qad-adaptive-erp\/","og_locale":"lt_LT","og_type":"article","og_title":"SkyPlanner APS su QAD Adaptive ERP: gamybos planavimas pagal realius \u012frengini\u0173 ir darbuotoj\u0173 paj\u0117gumus","og_description":"SkyPlanner APS priedas QAD Adaptive ERP: planavimas pagal paj\u0117gumus, abipus\u0117 integracija, \u012frenginiai, \u017emon\u0117s, \u012frankiai, med\u017eiagos. Nuo 199 \u20ac per m\u0117nes\u012f.","og_url":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/qad-adaptive-erp\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"13 minu\u010di\u0173"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/qad-adaptive-erp\/","url":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/qad-adaptive-erp\/","name":"QAD Adaptive ERP integracija: gamybos planavimas su APS","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lt\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"SkyPlanner APS priedas QAD Adaptive ERP: planavimas pagal paj\u0117gumus, abipus\u0117 integracija, \u012frenginiai, \u017emon\u0117s, \u012frankiai, med\u017eiagos. Nuo 199 \u20ac per m\u0117nes\u012f.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/qad-adaptive-erp\/#breadcrumb"},"inLanguage":"lt-LT","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/qad-adaptive-erp\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/qad-adaptive-erp\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lt\/"},{"@type":"ListItem","position":2,"name":"ERP ir MES programin\u0117s \u012frangos integracijos su SkyPlanner","item":"https:\/\/skyplanner.ai\/lt\/integracijos\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bs\u0173 ERP sistemai","item":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS su QAD Adaptive ERP: gamybos planavimas pagal realius \u012frengini\u0173 ir darbuotoj\u0173 paj\u0117gumus"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lt\/#website","url":"https:\/\/skyplanner.ai\/lt\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lt\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lt\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lt-LT"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lt\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lt\/","logo":{"@type":"ImageObject","inLanguage":"lt-LT","@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lt\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integracijos \/ ERP \/ QAD Adaptive ERP SkyPlanner APS su QAD Adaptive ERP: gamybos planavimas pagal realius \u012frengini\u0173 ir darbuotoj\u0173 paj\u0117gumus SkyPlanner APS \u2013 tai QAD Adaptive ERP (anks\u010diau QAD Enterprise Applications ir MFG\/PRO) priedas, skirtas gamybai planuoti pagal realius \u012frengini\u0173 ir darbuotoj\u0173 paj\u0117gumus. Jis suplanuoja kiekvieno \u012frenginio, operatoriaus, \u012frankio ir med\u017eiagos naudojim\u0105. Matote, kur&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/pages\/106181","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/comments?post=106181"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/pages\/106181\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/pages\/100679"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/media?parent=106181"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}