{"id":106094,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integracijos\/erp\/xero\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"xero","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/xero\/","title":{"rendered":"SkyPlanner APS su Xero: gamybos tvarkara\u0161\u010di\u0173 sudarymas gamintojams"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lt\/integracijos\/\">Integracijos<\/a> \/ <a href=\"\/lt\/integracijos\/erp\/\">ERP<\/a> \/ Xero<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SkyPlanner APS su Xero: <span class=\"hl\">gamybos tvarkara\u0161\u010di\u0173 sudarymas gamintojams<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">SkyPlanner APS \u2013 tai Xero skirtas gamybos planavimo priedas, kuris i\u0161 patvirtint\u0173 komercini\u0173 pasi\u016blym\u0173 sudaro tvarkara\u0161t\u012f kiekvienoms stakl\u0117ms, operatoriui, \u012frankiui ir med\u017eiagai, atsi\u017evelgdamas \u012f realius stakli\u0173 ir darbuotoj\u0173 paj\u0117gumus. Kontaktai, prek\u0117s, s\u0105skaitos fakt\u016bros ir apskaita lieka Xero. SkyPlanner suteikia gamybos plan\u0105, kurio apskaitos programoje n\u0117ra, o Autopilot automati\u0161kai atnaujina tvarkara\u0161t\u012f, kai gamyboje \u012fvyksta poky\u010di\u0173.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lt\/bandymas\/\">Prad\u0117ti nemokam\u0105 bandom\u0105j\u012f laikotarp\u012f<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lt\/susisiekite-su-pardavejais\/\">U\u017esakyti demonstracij\u0105<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Gamybos tvarkara\u0161\u010di\u0173 sudarymas<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt diagrama su darbo centrams suplanuotomis u\u017eduotimis ir u\u017esakym\u0173 s\u0105ra\u0161u apa\u010dioje.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner ir Xero kei\u010diasi duomenimis abiem kryptimis. \u012e SkyPlanner perduodami kontaktai, prek\u0117s, kuri\u0173 atsargos apskaitomos, patvirtinti komerciniai pasi\u016blymai ir pirkimo u\u017esakymai su pristatymo datomis. Atgal perduodama planuojama u\u017ebaigimo data, \u012fvykdyt\u0173 u\u017esakym\u0173 s\u0105skait\u0173 fakt\u016br\u0173 juodra\u0161\u010diai ir u\u017eregistruotas projektams skirtas darbo laikas. Pradedant naudotis sistema, SkyPlanner komanda sukonfig\u016bruoja integracij\u0105 su j\u016bs\u0173 organizacija Xero sistemoje.<\/p>\n\n\n<p>Kaina prasideda nuo 199 \u20ac per m\u0117nes\u012f u\u017e 5 darbo centrus. Kiekvienas papildomas darbo centras kainuoja 20 \u20ac per m\u0117nes\u012f. Nemokamai i\u0161bandyti galima 30 dien\u0173 naudojant iki 20 darbo centr\u0173, kredito kortel\u0117s nereikia.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-production\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas pasikei\u010dia j\u016bs\u0173 gamyboje<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Planas kiekvienoms stakl\u0117ms, o ne patvirtint\u0173 komercini\u0173 pasi\u016blym\u0173 s\u0105ra\u0161as.<\/p>\n\n\n<p class=\"fx-pain__b\">Xero sistemoje patvirtintas komercinis pasi\u016blymas laukia, kol bus i\u0161ra\u0161yta s\u0105skaita fakt\u016bra. SkyPlanner planavimo variklis Arcturus kiekvien\u0105 pasi\u016blym\u0105 paver\u010dia u\u017eduotimis ir interaktyvioje Gantt diagramoje paskiria jas atitinkamiems darbo centrams konkre\u010diu laiku.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Pristatymo terminai, kuri\u0173 galite laikytis.<\/p>\n\n\n<p class=\"fx-pain__b\">Kiekvieno u\u017esakymo u\u017ebaigimo data apskai\u010diuojama pagal vis\u0173 stakli\u0173 ir darbuotoj\u0173 apkrov\u0105. Dar prie\u0161 i\u0161si\u0173sdami komercin\u012f pasi\u016blym\u0105 matote, kad CNC stakl\u0117s u\u017eimtos dviem savait\u0117ms, o surinkimas laisvas.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Pamainos pagal j\u016bs\u0173 cecho darb\u0105.<\/p>\n\n\n<p class=\"fx-pain__b\">Kiekvienam darbo centrui ir darbuotojui atskirai nustatomos pamainos, atostogos, neatvykimai ir vir\u0161valand\u017ei\u0173 pamainos. Prid\u0117kite vakarin\u0119 pamain\u0105 siaurojoje vietoje \u2013 datos i\u0161kart pasikeis.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Ma\u017eiau perderinim\u0173.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner saugo kiekvienos gamini\u0173 poros paruo\u0161imo laikus abiem per\u0117jimo kryptimis. Per\u0117jimas nuo m\u0117lynos spalvos prie raudonos gali trukti 30 minu\u010di\u0173, o nuo raudonos prie m\u0117lynos \u2013 60. Skai\u010diavimo variklis i\u0161d\u0117sto u\u017eduotis tokia seka, kad b\u016bt\u0173 prarandama kuo ma\u017eiau laiko.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Atsi\u017evelgiama \u012f bendrus \u012frankius ir brigadas.<\/p>\n\n\n<p class=\"fx-pain__b\">Vienose stakl\u0117se naudojama forma niekada nebus tuo pa\u010diu metu rezervuota kitoms. U\u017eduo\u010diai, kuriai reikia trij\u0173 operatori\u0173, paskiriami trys \u017emon\u0117s, turintys laisvo laiko savo pamainose.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Automatinis perplanavimas gavus skub\u0173 u\u017esakym\u0105 ar \u012fvykus gedimui.<\/p>\n\n\n<p class=\"fx-pain__b\">Priskirkite u\u017esakymui Fast Track arba auk\u0161tesn\u012f prioritet\u0105, ir skai\u010diavimo variklis ras jam vietos tvarkara\u0161tyje. Sustojus \u012frenginiui, Autopilot perplanuoja darbus, o Running Time Lock palieka prad\u0117tas u\u017eduotis j\u0173 vietose.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Med\u017eiagos patikrinamos prie\u0161 pradedant darb\u0105.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner nuskaito preki\u0173, kuri\u0173 atsargos apskaitomos, liku\u010dius ir numatom\u0105 pristatymo dat\u0105 i\u0161 kiekvieno Xero pirkimo u\u017esakymo. U\u017eduotis, kuriai reikia tiek\u0117jo pristatymo, suplanuojama tik po preki\u0173 atvykimo.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Darbai baigti \u2013 s\u0105skait\u0105 galima i\u0161ra\u0161yti.<\/p>\n\n\n<p class=\"fx-pain__b\">Operatoriai registruoja darb\u0105 telefonu arba plan\u0161etiniu kompiuteriu, naudodami Mobile Confirmations arba Production Timer. Kai u\u017esakymas \u012fvykdytas, Xero sistemoje jau laukia patvirtinimo s\u0105skaitos fakt\u016bros juodra\u0161tis su komercinio pasi\u016blymo eilut\u0117mis.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Gamintoj\u0173 atsiliepimai apie SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"UTU tiekimo grandin\u0117s specialistas Kalle Kalliom\u00e4ki elektros skyd\u0173 gamybos ceche Ulviloje\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>sutaupoma kas savait\u0119<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSu SkyPlanner nuo gamybos planavimo Excel lentel\u0117se per\u0117jome prie gamybos optimizavimo realiuoju laiku.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, tiekimo grandin\u0117s specialistas<\/b><br>UTU \u00b7 Elektros skydai ir skirstomieji \u012frenginiai<\/p>\n\n\n<p class=\"ind-cust__result\">Planuojant gamyb\u0105 kas savait\u0119 sutaupoma 2 valandos darbo laiko, o nauja u\u017eduo\u010di\u0173 eil\u0117 gamybos linij\u0105 pasiekia per kelias sekundes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lt\/klientu-istorijos\/utu\/\">Skaityti UTU atsiliepim\u0105<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"\u0160vari\u0173j\u0173 patalp\u0173 aprang\u0105 vilkintys operatoriai prie buteliuk\u0173 pildymo linijos Laboratory &amp; Allied vaist\u0173 gamykloje Nairobyje\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>gamybos efektyvumas<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eGamybos efektyvumas padid\u0117jo 90%.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT vadovas<\/b><br>Laboratory &amp; Allied \u00b7 Vaist\u0173 gamyba<\/p>\n\n\n<p class=\"ind-cust__result\">Gamybos efektyvumas padid\u0117jo 90%, o optimizuotas trij\u0173 m\u0117nesi\u0173 planas visiems darbo centrams sudaromas per ma\u017eiau nei 30 minu\u010di\u0173.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lt\/klientu-istorijos\/laboratory-allied\/\">Skaityti Laboratory &amp; Allied atsiliepim\u0105<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/28-83df4743-ff34-41a5-9a41-c3dcc6f0897b.png\" alt=\"Opes Corporation\" width=\"106\" height=\"32\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>100%<\/b><span>pristatymo patikimumas nuo 2021 m.<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner leid\u017eia mums ai\u0161kiai matyti paj\u0117gumus ir numatyti planavimo rezultatus.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Dan Berglund, COO\/CFO<\/b><br>Opes Corporation \u00b7 Chemijos ir maisto produkt\u0173 gamyba<\/p>\n\n\n<p class=\"ind-cust__result\">Vis\u0105 laik\u0105, kai naudojama SkyPlanner, nuo 2021 m., pristatymo patikimumas siekia 100%.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lt\/klientu-istorijos\/opes-corporation\/\">Skaitykite Opes Corporation atsiliepim\u0105<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"Piristeel stogo saugos gamini\u0173 gamykla Kauhavoje i\u0161 oro\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>99,2%<\/b><span>pristatymo patikimumas<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner pad\u0117jo ai\u0161kiau nustatyti siaur\u0105sias vietas ir padar\u0117 gamybos valdym\u0105 ai\u0161kesn\u012f.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, gamybos vadovas<\/b><br>Piristeel \u00b7 Stogo saugos ir lietaus nuvedimo sistemos<\/p>\n\n\n<p class=\"ind-cust__result\">\u0160iais metais pristatymo patikimumas pasiek\u0117 99,2%, o gamybos tvarkara\u0161\u010di\u0173 sudarymas padeda sutaupyti iki keturi\u0173 darbo valand\u0173 per dien\u0105.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lt\/klientu-istorijos\/piristeel\/\">Skaityti Piristeel atsiliepim\u0105<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-the-xero-integration-works\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kaip veikia integracija su Xero<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Xero perduoda darbus.<\/strong> \u012e SkyPlanner perduodami kontaktai, prek\u0117s, kuri\u0173 atsargos apskaitomos, su turimais kiekiais, patvirtinti komerciniai pasi\u016blymai ir pirkimo u\u017esakymai su numatomomis pristatymo datomis. Kiekvienas patvirtintas komercinis pasi\u016blymas tampa gamybos u\u017esakymu.<\/li>\n\n\n<li><strong>SkyPlanner sudaro tvarkara\u0161t\u012f ir nuolat j\u012f atnaujina.<\/strong> Kiekvieno gaminio proceso etapus, darbo centrus ir paruo\u0161imo laik\u0105 SkyPlanner sistemoje nustatote vien\u0105 kart\u0105. Tada Arcturus variklis per kelias sekundes suplanuoja kiekvien\u0105 u\u017eduot\u012f kiekvienoms stakl\u0117ms ir perplanuoja darbus pasikeitus gamybos s\u0105lygoms.<\/li>\n\n\n<li><strong>Duomenys apie baigtus darbus gr\u012f\u017eta \u012f Xero.<\/strong> SkyPlanner \u012fra\u0161o planuojam\u0105 u\u017ebaigimo dat\u0105 \u012f komercinio pasi\u016blymo istorij\u0105. \u012evykd\u017eius u\u017esakym\u0105, sukuriamas pardavimo s\u0105skaitos fakt\u016bros juodra\u0161tis su pasi\u016blymo eilut\u0117mis bei nuoroda, o pasi\u016blymo b\u016bsena pakei\u010diama \u012f Invoiced. Projektams u\u017eregistruotos darbo valandos perduodamos \u012f Xero Projects kaip laiko \u012fra\u0161ai.<\/li>\n\n<\/ol>\n\n\n<p>Integracijai naudojamos Xero Accounting API ir Projects API su OAuth 2.0, tod\u0117l Xero sistemoje nieko diegti nereikia. Xero \u017einiatinklio prane\u0161imai (webhooks) prane\u0161a apie naujus ir pakeistus kontaktus bei s\u0105skaitas fakt\u016bras. SkyPlanner nuskaito komercinius pasi\u016blymus, prekes ir pirkimo u\u017esakymus, pasikeitusius nuo paskutinio sinchronizavimo, o SkyPlanner \u017einiatinklio prane\u0161imai perduoda tvarkara\u0161\u010dio pakeitimus vos jiems \u012fvykus. Kiekvienas cechas Xero sistemoje savaip tvarko prekes, komercinius pasi\u016blymus ir atsargas, tod\u0117l diegdama integracij\u0105 SkyPlanner komanda nustato, kaip susieti j\u016bs\u0173 duomenis, o prad\u0117jus j\u0105 naudoti teikia integracijos palaikym\u0105.<\/p>\n\n\n<p>Integracijos kaina pateikiama i\u0161 anksto, \u012fvertinus j\u016bs\u0173 proces\u0105 ir poreikius. J\u016bs\u0173 Xero konsultantas, integracijos partneris ar j\u016bs\u0173 programuotojai taip pat gali kurti sprendimus naudodami dokumentuot\u0105 SkyPlanner API (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API dokumentacija<\/a>). API galiniai ta\u0161kai, lauk\u0173 atitikmenys ir duomen\u0173 gr\u0105\u017einimo taisykl\u0117s apra\u0161yti <a href=\"\/lt\/integracijos\/erp\/xero\/integravimo-vadovas\/\">Xero integracijos vadove gamybos tvarkara\u0161\u010diams sudaryti<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-xero-schedules-and-what-skyplanner-adds\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0105 planuoja Xero ir kuo j\u0105 papildo SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Xero yra apskaitos programa. Joje tvarkomi komerciniai pasi\u016blymai, pardavimo s\u0105skaitos fakt\u016bros, pirkimo u\u017esakymai, tiek\u0117j\u0173 s\u0105skaitos ir banko operacij\u0173 suderinimas, taip pat sekami preki\u0173, kuri\u0173 atsargos apskaitomos, liku\u010diai. Kaip teigia Xero: &#8222;If an item is tracked it means Xero tracks the available quantity and value of the item.&#8221; (Jei prek\u0117s atsargos apskaitomos, Xero seka turim\u0105 jos kiek\u012f ir vert\u0119.) (<a href=\"https:\/\/developer.xero.com\/documentation\/api\/accounting\/items\">\u0161altinis<\/a>)<\/p>\n\n\n<p>Xero n\u0117ra med\u017eiag\u0173 \u017einiara\u0161\u010di\u0173, technologini\u0173 mar\u0161rut\u0173, stakli\u0173 ar gamybos u\u017esakym\u0173 duomen\u0173. \u0160iuo metu Xero neturi funkcijos gaminti gatavus gaminius i\u0161 komponent\u0173. Savo produkto id\u0117j\u0173 forume Xero komanda 2026 m. apie surenkam\u0173 gamini\u0173 atsarg\u0173 apskait\u0105 ra\u0161\u0117: &#8222;hasn&#8217;t been roadmapped at this stage.&#8221; (\u0160iame etape tai dar ne\u012ftraukta \u012f pl\u0117tros plan\u0105.) (<a href=\"https:\/\/productideas.xero.com\/forums\/967139-purchase-orders-bills-inventory\/suggestions\/45048400-advanced-inventory-assembly-inventory\">\u0161altinis<\/a>)<\/p>\n\n\n<p>Savo atsarg\u0173 valdymo puslapyje Xero \u012fmon\u0117ms, kurioms reikia daugiau funkcij\u0173, si\u016blo programas: &#8222;Apps include Cin7 Core, Unleashed, and ZapInventory&#8221; (Tarp \u0161i\u0173 program\u0173 \u2013 Cin7 Core, Unleashed ir ZapInventory). (<a href=\"https:\/\/www.xero.com\/us\/accounting-software\/manage-inventory\/\">\u0161altinis<\/a>) \u0160ios programos skirtos atsargoms ir u\u017esakymams valdyti. SkyPlanner suteikia stakli\u0173 ir darbuotoj\u0173 darbo plan\u0105. Kiekvienas \u017eingsnis paai\u0161kintas straipsnyje <a href=\"\/lt\/integracijos\/erp\/xero\/gamybos-planavimas\/\">Ar Xero galima sudaryti gamybos tvarkara\u0161\u010dius?<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"xero-today-and-with-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Xero dabar ir su SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>Xero<\/th><th>Xero su SkyPlanner APS<\/th><\/tr><\/thead><tbody><tr><td>U\u017esakym\u0173 portfelis<\/td><td>Patvirtinti komerciniai pasi\u016blymai ir pardavimo s\u0105skaitos fakt\u016bros<\/td><td>Kiekvienas u\u017esakymas i\u0161skaidytas \u012f u\u017eduotis darbo centr\u0173 laiko juostoje<\/td><\/tr><tr><td>Paj\u0117gumai<\/td><td>Nemodeliuojami<\/td><td>Kiekvienoms stakl\u0117ms, darbuotojui ir \u012frankiui nustatytos atskiros pamainos<\/td><\/tr><tr><td>Technologiniai mar\u0161rutai<\/td><td>Nesaugomi<\/td><td>Kiekvienam gaminiui nustatyti proceso etapai, darbo centrai ir paruo\u0161imo laikas<\/td><\/tr><tr><td>Darb\u0173 eili\u0161kumas<\/td><td>Planuotojas nustato eili\u0161kum\u0105 lentoje arba skai\u010diuokl\u0117je<\/td><td>Variklis nustato vis\u0173 ne\u012fvykdyt\u0173 u\u017esakym\u0173 eili\u0161kum\u0105 pagal prioritet\u0105 ir termin\u0105<\/td><\/tr><tr><td>Perderinimai<\/td><td>Nemodeliuojami<\/td><td>Perderinimo laiko matrica, ma\u017eiausias bendras paruo\u0161imo laikas<\/td><\/tr><tr><td>Poky\u010diai<\/td><td>Skambu\u010diai ir rankinis perplanavimas<\/td><td>Autopilot perplanuoja viso cecho darb\u0105<\/td><\/tr><tr><td>Med\u017eiagos<\/td><td>Turimas kiekvienos prek\u0117s, kurios atsargos apskaitomos, kiekis<\/td><td>Po kiekvieno pakeitimo tikrinamos atsargos ir pirkimo u\u017esakym\u0173 pristatymo datos<\/td><\/tr><tr><td>Gamybos cechas<\/td><td>Popierin\u0117s u\u017eduo\u010di\u0173 kortel\u0117s<\/td><td>U\u017eduo\u010di\u0173 eil\u0117 su numatytu laiku, Mobile Confirmations, Production Timer<\/td><\/tr><tr><td>S\u0105skait\u0173 i\u0161ra\u0161ymas<\/td><td>S\u0105skaita fakt\u016bra \u012fvedama rankiniu b\u016bdu baigus darb\u0105<\/td><td>Pagal baigtus darbus sukuriamas s\u0105skaitos fakt\u016bros juodra\u0161tis<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-moves-between-xero-and-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kokiais duomenimis kei\u010diasi Xero ir SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Xero<\/th><th>SkyPlanner<\/th><th>Kryptis<\/th><\/tr><\/thead><tbody><tr><td>Contact (klientas)<\/td><td>Klientas, pristatymo prioritetas<\/td><td>\u012e SkyPlanner<\/td><\/tr><tr><td>Item (su atsarg\u0173 apskaita ir be jos) su QuantityOnHand<\/td><td>Gaminiai ir med\u017eiagos, atsargos<\/td><td>\u012e SkyPlanner<\/td><\/tr><tr><td>Quote (Accepted) su eilut\u0117mis<\/td><td>U\u017esakymas su terminu, kiekvienos eilut\u0117s u\u017eduotys<\/td><td>\u012e SkyPlanner<\/td><\/tr><tr><td>PurchaseOrder su ExpectedArrivalDate ir DeliveryDate<\/td><td>Atvykstanti med\u017eiaga su pristatymo data<\/td><td>\u012e SkyPlanner<\/td><\/tr><tr><td>Quote istorijos pastaba<\/td><td>Planuojama u\u017ebaigimo data<\/td><td>Atgal \u012f Xero<\/td><\/tr><tr><td>Invoice (ACCREC, Draft) su komercinio pasi\u016blymo eilut\u0117mis ir nuoroda<\/td><td>\u012evykdytas u\u017esakymas<\/td><td>Atgal \u012f Xero<\/td><\/tr><tr><td>Quote b\u016bsena Invoiced<\/td><td>\u012evykdytas u\u017esakymas<\/td><td>Atgal \u012f Xero<\/td><\/tr><tr><td>Projects laiko \u012fra\u0161as<\/td><td>Mobile Confirmations, darbo laiko \u012fra\u0161ai<\/td><td>Atgal \u012f Xero<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"xero-scheduling-software-and-add-ons-compared\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Xero skirt\u0173 tvarkara\u0161\u010di\u0173 sudarymo program\u0173 ir pried\u0173 palyginimas<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Sprendimas<\/th><th>Kas tai<\/th><th>Kada tinka<\/th><\/tr><\/thead><tbody><tr><td>Tik Xero<\/td><td>Komerciniai pasi\u016blymai, s\u0105skaitos fakt\u016bros, pirkimo u\u017esakymai ir atsarg\u0173 apskaita Xero sistemoje, o planas \u2013 lentoje<\/td><td>Turite vienas ar dvejas stakles, o vienas \u017emogus \u017eino darb\u0173 eili\u0161kum\u0105<\/td><\/tr><tr><td>Atsarg\u0173 valdymo ir MRP programos, sinchronizuojamos su Xero (pavyzd\u017eiui, Katana, MRPeasy, Fishbowl Manufacturing, Cin7 Core, Unleashed)<\/td><td>Atskira atsarg\u0173, med\u017eiag\u0173 \u017einiara\u0161\u010di\u0173 ir u\u017esakym\u0173 valdymo sistema, perduodanti pardavimo bei tiek\u0117j\u0173 s\u0105skaitas fakt\u016bras ir s\u0105naudas \u012f Xero<\/td><td>Norite perkelti atsarg\u0173 ir u\u017esakym\u0173 valdym\u0105 i\u0161 Xero \u012f kit\u0105 sistem\u0105<\/td><\/tr><tr><td>Debesijos APS, prijungta per API (SkyPlanner APS)<\/td><td>Gamybos planavimo \u012frankis, kuris atsi\u017evelgia \u012f realius \u012frengini\u0173 ir darbuotoj\u0173 paj\u0117gumus, nuskaito komercinius pasi\u016blymus i\u0161 Xero ir gr\u0105\u017eina duomenis apie atliktus darbus<\/td><td>Norite toliau naudoti Xero, o \u012frenginiams ir darbuotojams reikia realaus darbo plano<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Jei kartu su Xero jau naudojate MRP sistem\u0105, SkyPlanner sudaro tvarkara\u0161\u010dius pagal jos duomenis. \u017dr. <a href=\"\/lt\/integracijos\/erp\/katana\/\">Katana<\/a> ir <a href=\"\/lt\/integracijos\/erp\/mrpeasy\/\">MRPeasy<\/a> puslapius.<\/p>\n\n\n<p><strong>Rinkit\u0117s SkyPlanner kartu su Xero, jei:<\/strong><\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Norite naudoti Xero nieko nekeisdami.<\/strong> SkyPlanner papildo j\u0105 gamybos planu, o apskaita, prek\u0117s ir s\u0105skait\u0173 i\u0161ra\u0161ymas lieka ten, kur yra.<\/li>\n\n\n<li><strong>Tiems patiems u\u017esakymams vykdyti tinka keli \u012frenginiai,<\/strong> o darb\u0173 eil\u0117 laikoma tik kieno nors galvoje.<\/li>\n\n\n<li><strong>Gamybos apimt\u012f lemia perderinimai.<\/strong> Perderinimo laiko matricoje kiekvienai gamini\u0173 porai nurodomas per\u0117jimo laikas abiem kryptimis. Pagal j\u0105 parenkama seka, kuriai reikia ma\u017eiausiai paruo\u0161imo laiko.<\/li>\n\n\n<li><strong>Operatoriai, tvirtinimo \u012ftaisai ir med\u017eiagos riboja plan\u0105 ne ma\u017eiau nei \u012frenginiai.<\/strong> Planuojant vienu metu atsi\u017evelgiama \u012f vis\u0173 i\u0161tekli\u0173 ribotum\u0105, o u\u017eduotims, kurioms reikia keli\u0173 operatori\u0173, skiriami reikiami darbuotojai.<\/li>\n\n\n<li><strong>Norite i\u0161ra\u0161yti s\u0105skaitas u\u017e atliktus darbus i\u0161 naujo ne\u012fvesdami duomen\u0173.<\/strong> S\u0105skaitos fakt\u016bros juodra\u0161tis perduodamas \u012f Xero vos patvirtinus, kad u\u017esakymas \u012fvykdytas.<\/li>\n\n\n<li><strong>Norite vienos ai\u0161kios kainos.<\/strong> Nuo 199 \u20ac per m\u0117nes\u012f. Dvikrypt\u0117s integracijos kaina pateikiama i\u0161 anksto, o jos palaikymu r\u016bpinasi SkyPlanner komanda.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kaip prad\u0117ti<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Prad\u0117kite nemokam\u0105 bandom\u0105j\u012f laikotarp\u012f.<\/strong> 30 dien\u0173, iki 20 darbo centr\u0173, visos Basic funkcijos, be mok\u0117jimo kortel\u0117s.<\/li>\n\n\n<li><strong>Sumodeliuokite savo gamyb\u0105.<\/strong> SkyPlanner sukurkite darbo centrus, darbuotojus, pamainas ir proceso etapus arba importuokite \u0161iuos duomenis. Galite pasinaudoti pagalba pradedant naudotis sistema.<\/li>\n\n\n<li><strong>\u012ekelkite u\u017esakymus.<\/strong> Eksportuokite kontaktus, prekes bei paslaugas ir atvirus komercinius pasi\u016blymus i\u0161 Xero \u012f CSV. Importuokite juos ir palyginkite SkyPlanner sudaryt\u0105 tvarkara\u0161t\u012f su dabartiniu planu.<\/li>\n\n\n<li><strong>Prijunkite Xero.<\/strong> SkyPlanner komanda sukonfig\u016bruos dvikrypt\u0119 integracij\u0105 ir r\u016bpinsis jos palaikymu prad\u0117jus naudoti sistem\u0105.<\/li>\n\n<\/ol>\n\n\n<p><strong>Kainodara.<\/strong> U\u017e planus mokama kas m\u0117nes\u012f pagal darbo centr\u0173 skai\u010di\u0173. Bet kada galite prid\u0117ti ar pa\u0161alinti darbo centrus arba atsisakyti prenumeratos. I\u0161samiau \u017er. <a href=\"\/lt\/kainodara\/\">kainodar\u0105<\/a> arba skaitykite <a href=\"\/lt\/istekliai\/ribotu-pajegumu-planavimas\/\">gamybos planavimo pagal realius paj\u0117gumus vadov\u0105<\/a>. Naudojate ir kit\u0105 sistem\u0105? Per\u017ei\u016br\u0117kite <a href=\"\/lt\/integracijos\/erp\/\">visas integracijas<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lt\/bandymas\/\">Prad\u0117ti nemokam\u0105 bandom\u0105j\u012f laikotarp\u012f<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lt\/susisiekite-su-pardavejais\/\">Susisiekti su pardavim\u0173 komanda<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Da\u017eniausiai u\u017eduodami klausimai<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Koks gamybos tvarkara\u0161\u010di\u0173 sudarymo priedas geriausiai tinka Xero?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS \u2013 tai gamybos planavimo priedas, kuris atsi\u017evelgia \u012f realius \u012frengini\u0173 ir darbuotoj\u0173 paj\u0117gumus ir kei\u010diasi duomenimis su Xero abiem kryptimis. I\u0161 Xero gaunami kontaktai, prek\u0117s, kuri\u0173 atsargos sekamos, priimti komerciniai pasi\u016blymai ir pirkimo u\u017esakymai. Atgal perduodama planuojama u\u017ebaigimo data, \u012fvykdyt\u0173 u\u017esakym\u0173 s\u0105skait\u0173 fakt\u016br\u0173 juodra\u0161\u010diai ir projektams skirto laiko \u012fra\u0161ai. Atsi\u017evelgiama \u012f kiekvieno \u012frenginio, operatoriaus, \u012frankio ir med\u017eiagos ribotum\u0105. Perderinimo laiko matrica, kurioje \u012fvertinama per\u0117jimo kryptis, leid\u017eia i\u0161d\u0117styti u\u017eduotis taip, kad reik\u0117t\u0173 ma\u017eiausiai paruo\u0161imo laiko. Pasikeitus situacijai gamyboje, Autopilot automati\u0161kai perskai\u010diuoja tvarkara\u0161t\u012f. Kaina prasideda nuo 199 \u20ac per m\u0117nes\u012f, o nemokamas bandomasis laikotarpis trunka 30 dien\u0173.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kokia gamybos tvarkara\u0161\u010di\u0173 sudarymo programin\u0117 \u012franga integruojama su Xero?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS integruojama su Xero per Xero Accounting API ir Projects API, naudojant OAuth 2.0 ir Xero \u201ewebhook\u201c prane\u0161imus. SkyPlanner komanda sukonfig\u016bruoja integracij\u0105 diegimo metu. Atsarg\u0173 valdymo ir MRP programos, tokios kaip Katana, MRPeasy ir Fishbowl, taip pat sinchronizuoja duomenis su Xero. Jei naudojate vien\u0105 i\u0161 j\u0173, SkyPlanner gali sudaryti tvarkara\u0161\u010dius pagal jos duomenis.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ar Xero turi gamybos tvarkara\u0161\u010di\u0173 sudarymo funkcij\u0105?<\/summary>\n<p class=\"sp-faq__a\">Ne. Xero neturi gamini\u0173 komplektavimo \u017einiara\u0161\u010di\u0173, technologini\u0173 mar\u0161rut\u0173, \u012frengini\u0173 ar gamybos u\u017esakym\u0173 funkcij\u0173, o surenkam\u0173 gamini\u0173 atsarg\u0173 apskaitos jos pl\u0117tros planuose n\u0117ra. SkyPlanner APS papildo Xero <a href=\"\/lt\/istekliai\/ribotu-pajegumu-planavimas\/\">gamybos planavimu pagal realius paj\u0117gumus<\/a>.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ar nor\u0117dami sudaryti gamybos tvarkara\u0161\u010dius turime pakeisti Xero ERP sistema?<\/summary>\n<p class=\"sp-faq__a\">Ne. SkyPlanner veikia kartu su Xero. Kontaktai, prek\u0117s, komerciniai pasi\u016blymai, s\u0105skaitos fakt\u016bros, pirkimai ir apskaita lieka Xero. SkyPlanner sudaro darb\u0173 tvarkara\u0161t\u012f pagal realius paj\u0117gumus ir gr\u0105\u017eina duomenis apie atliktus darbus, kad b\u016bt\u0173 galima i\u0161ra\u0161yti s\u0105skaitas.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kiek kainuoja SkyPlanner naudojant kartu su Xero?<\/summary>\n<p class=\"sp-faq__a\">Nuo 199 \u20ac per m\u0117nes\u012f u\u017e 5 darbo centrus ir po 20 \u20ac per m\u0117nes\u012f u\u017e kiekvien\u0105 papildom\u0105 darbo centr\u0105. Cechas, turintis 10 darbo centr\u0173, moka 299 \u20ac per m\u0117nes\u012f. Integracijos kaina apskai\u010diuojama pagal j\u016bs\u0173 proces\u0105 ir poreikius ir pateikiama i\u0161 anksto kartu su pasirinkto plano kaina, tod\u0117l visas i\u0161laidas \u017einote dar prie\u0161 prad\u0117dami.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ar reikia k\u0105 nors \u012fdiegti Xero sistemoje?<\/summary>\n<p class=\"sp-faq__a\">Ne. SkyPlanner veikia debesijoje kartu su Xero. Xero administratorius vien\u0105 kart\u0105 prisijungia ir suteikia prieig\u0105 Xero OAuth 2.0 lange.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kiek trunka diegimas?<\/summary>\n<p class=\"sp-faq__a\">Diegimas paprastai baigiamas per kelias savaites nuo diegimo darb\u0173 prad\u017eios. Komanda sukonfig\u016bruoja darbo centrus ir proceso etapus, prijungia komercini\u0173 pasi\u016blym\u0173 bei pirkimo u\u017esakym\u0173 duomenis ir \u012fjungia s\u0105skait\u0173 fakt\u016br\u0173 perdavim\u0105 \u012f Xero. Prie\u0161 pradedant naudoti sistem\u0105 viskas i\u0161bandoma remiantis dabartiniu j\u016bs\u0173 planu.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ar galime pirmiausia i\u0161bandyti SkyPlanner su savo Xero duomenimis?<\/summary>\n<p class=\"sp-faq__a\">Taip. Bandomuoju laikotarpiu importuokite prekes ir atvirus komercinius pasi\u016blymus i\u0161 Xero eksportuoto CSV failo. Dar neprasid\u0117jus integracijos darbams pamatysite savo gamybos tvarkara\u0161t\u012f, sudaryt\u0105 atsi\u017evelgiant \u012f realius paj\u0117gumus.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integracijos \/ ERP \/ Xero SkyPlanner APS su Xero: gamybos tvarkara\u0161\u010di\u0173 sudarymas gamintojams SkyPlanner APS \u2013 tai Xero skirtas gamybos planavimo priedas, kuris i\u0161 patvirtint\u0173 komercini\u0173 pasi\u016blym\u0173 sudaro tvarkara\u0161t\u012f kiekvienoms stakl\u0117ms, operatoriui, \u012frankiui ir med\u017eiagai, atsi\u017evelgdamas \u012f realius stakli\u0173 ir darbuotoj\u0173 paj\u0117gumus. Kontaktai, prek\u0117s, s\u0105skaitos fakt\u016bros ir apskaita lieka Xero. SkyPlanner suteikia gamybos plan\u0105, kurio &#8230; <a title=\"SkyPlanner APS su Xero: gamybos tvarkara\u0161\u010di\u0173 sudarymas gamintojams\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/xero\/\" aria-label=\"Read more about SkyPlanner APS su Xero: gamybos tvarkara\u0161\u010di\u0173 sudarymas gamintojams\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100679,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-106094","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Xero integracija: gamybos tvarkara\u0161\u010di\u0173 sudarymo APS priedas<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS \u2013 Xero gamybos tvarkara\u0161\u010di\u0173 sudarymo priedas su abipuse integracija: visos stakl\u0117s, operatoriai, \u012frankiai ir med\u017eiagos. Nuo 199 \u20ac\/m\u0117n.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/xero\/\" \/>\n<meta property=\"og:locale\" content=\"lt_LT\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SkyPlanner APS su Xero: gamybos tvarkara\u0161\u010di\u0173 sudarymas gamintojams\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS \u2013 Xero gamybos tvarkara\u0161\u010di\u0173 sudarymo priedas su abipuse integracija: visos stakl\u0117s, operatoriai, \u012frankiai ir med\u017eiagos. Nuo 199 \u20ac\/m\u0117n.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/xero\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"12 minu\u010di\u0173\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/xero\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/xero\\\/\",\"name\":\"Xero integracija: gamybos tvarkara\u0161\u010di\u0173 sudarymo APS priedas\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"SkyPlanner APS \u2013 Xero gamybos tvarkara\u0161\u010di\u0173 sudarymo priedas su abipuse integracija: visos stakl\u0117s, operatoriai, \u012frankiai ir med\u017eiagos. Nuo 199 \u20ac\\\/m\u0117n.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/xero\\\/#breadcrumb\"},\"inLanguage\":\"lt-LT\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/xero\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/xero\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP ir MES programin\u0117s \u012frangos integracijos su SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bs\u0173 ERP sistemai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS su Xero: gamybos tvarkara\u0161\u010di\u0173 sudarymas gamintojams\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lt-LT\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lt-LT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Xero integracija: gamybos tvarkara\u0161\u010di\u0173 sudarymo APS priedas","description":"SkyPlanner APS \u2013 Xero gamybos tvarkara\u0161\u010di\u0173 sudarymo priedas su abipuse integracija: visos stakl\u0117s, operatoriai, \u012frankiai ir med\u017eiagos. Nuo 199 \u20ac\/m\u0117n.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/xero\/","og_locale":"lt_LT","og_type":"article","og_title":"SkyPlanner APS su Xero: gamybos tvarkara\u0161\u010di\u0173 sudarymas gamintojams","og_description":"SkyPlanner APS \u2013 Xero gamybos tvarkara\u0161\u010di\u0173 sudarymo priedas su abipuse integracija: visos stakl\u0117s, operatoriai, \u012frankiai ir med\u017eiagos. Nuo 199 \u20ac\/m\u0117n.","og_url":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/xero\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"12 minu\u010di\u0173"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/xero\/","url":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/xero\/","name":"Xero integracija: gamybos tvarkara\u0161\u010di\u0173 sudarymo APS priedas","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lt\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"SkyPlanner APS \u2013 Xero gamybos tvarkara\u0161\u010di\u0173 sudarymo priedas su abipuse integracija: visos stakl\u0117s, operatoriai, \u012frankiai ir med\u017eiagos. Nuo 199 \u20ac\/m\u0117n.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/xero\/#breadcrumb"},"inLanguage":"lt-LT","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/xero\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/xero\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lt\/"},{"@type":"ListItem","position":2,"name":"ERP ir MES programin\u0117s \u012frangos integracijos su SkyPlanner","item":"https:\/\/skyplanner.ai\/lt\/integracijos\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bs\u0173 ERP sistemai","item":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS su Xero: gamybos tvarkara\u0161\u010di\u0173 sudarymas gamintojams"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lt\/#website","url":"https:\/\/skyplanner.ai\/lt\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lt\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lt\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lt-LT"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lt\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lt\/","logo":{"@type":"ImageObject","inLanguage":"lt-LT","@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lt\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integracijos \/ ERP \/ Xero SkyPlanner APS su Xero: gamybos tvarkara\u0161\u010di\u0173 sudarymas gamintojams SkyPlanner APS \u2013 tai Xero skirtas gamybos planavimo priedas, kuris i\u0161 patvirtint\u0173 komercini\u0173 pasi\u016blym\u0173 sudaro tvarkara\u0161t\u012f kiekvienoms stakl\u0117ms, operatoriui, \u012frankiui ir med\u017eiagai, atsi\u017evelgdamas \u012f realius stakli\u0173 ir darbuotoj\u0173 paj\u0117gumus. Kontaktai, prek\u0117s, s\u0105skaitos fakt\u016bros ir apskaita lieka Xero. SkyPlanner suteikia gamybos plan\u0105, kurio&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/pages\/106094","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/comments?post=106094"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/pages\/106094\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/pages\/100679"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/media?parent=106094"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}