{"id":104012,"date":"2026-10-20T16:09:04","date_gmt":"2026-10-20T16:09:04","guid":{"rendered":"https:\/\/skyplanner.ai\/integracijos\/erp\/monitor-erp\/integravimo-vadovas\/"},"modified":"2026-10-20T16:09:04","modified_gmt":"2026-10-20T16:09:04","slug":"integravimo-vadovas","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/monitor-erp\/integravimo-vadovas\/","title":{"rendered":"Monitor ERP integravimo vadovas: gamybos tvarkara\u0161\u010di\u0173 sudarymas su SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lt\/integracijos\/\">Integracijos<\/a> \/ <a href=\"\/lt\/integracijos\/erp\/\">ERP<\/a> \/ Monitor ERP<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Monitor ERP integravimo vadovas: <span class=\"hl\">gamybos tvarkara\u0161\u010di\u0173 sudarymas su SkyPlanner APS<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u0160iame Monitor ERP integravimo vadove partneriams ir IT komandoms paai\u0161kinama, kaip sujungti Monitor ERP (Monitor G5) su SkyPlanner APS. SkyPlanner kei\u010diasi duomenimis su Monitor ERP abiem kryptimis per Monitor ERP API:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>\u012e SkyPlanner perduodami gamybos u\u017esakymai, operacijos, darbo centrai, technologiniai mar\u0161rutai ir med\u017eiagos.<\/li>\n\n\n<li>Kiekvienos operacijos planuojama prad\u017eia, planuojama pabaiga ir darbo centras \u012fra\u0161omi atgal \u012f Monitor.<\/li>\n\n\n<li>U\u017eregistruoti laiko ir kiekio duomenys padeda i\u0161laikyti abiej\u0173 sistem\u0173 duomen\u0173 suderinamum\u0105.<\/li>\n\n\n<li>SkyPlanner per webhook s\u0105sajas i\u0161kart perduoda tvarkara\u0161\u010dio pakeitimus.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lt\/bandymas\/\">I\u0161bandykite nemokamai<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lt\/susisiekite-su-pardavejais\/\">U\u017esisakykite demonstracij\u0105<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Gamybos tvarkara\u0161\u010di\u0173 sudarymas<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt laiko juosta su darbo centrams suplanuotomis u\u017eduotimis ir apa\u010dioje pateiktu u\u017esakym\u0173 s\u0105ra\u0161u.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Diegimo metu SkyPlanner komanda sukonfig\u016bruoja integracij\u0105 pagal j\u016bs\u0173 Monitor G5 aplink\u0105, o prad\u0117jus j\u0105 naudoti teikia palaikym\u0105. \u0160is vadovas skirtas partneriams ir programuotojams, norintiems dalyvauti integravimo projekte arba patiems kurti sprendimus naudojant dokumentuot\u0105 SkyPlanner REST API (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API \u017einynas<\/a>).<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"the-monitor-erp-api\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Monitor ERP API<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Dokumentuota Monitor G5 integravimo s\u0105saja yra <strong>Monitor ERP API v1<\/strong>. Joje derinami CQRS ir REST principai, o JSON duomenys perduodami per HTTPS. (<a href=\"https:\/\/api.monitor.se\/articles\/v1\/index.html\">Monitor ERP API<\/a>)<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>U\u017eklausos<\/strong> nuskaito duomenis naudojant GET. Jos palaiko OData tipo parametrus: <code>$filter<\/code>, <code>$select<\/code>, <code>$expand<\/code>, <code>$orderby<\/code>, <code>$top<\/code> ir <code>$skip<\/code>.<\/li>\n\n\n<li><strong>Komandos<\/strong> \u012fra\u0161o duomenis naudojant POST, pavyzd\u017eiui, <code>Manufacturing\/ManufacturingOrderOperations\/Update<\/code>.<\/li>\n\n\n<li><strong>Batch<\/strong> vykdo kelias komandas viena transakcija per <code>POST \/api\/v1\/Batch<\/code>: \u012fvykdomos visos komandos arba n\u0117 viena. Nor\u0117dami i\u0161bandyti komand\u0173 paket\u0105 ir at\u0161aukti jo pakeitimus, prid\u0117kite <code>\/Simulate<\/code> arba <code>\/Validate<\/code>. Taip saugiai \u012fra\u0161omas visas tvarkara\u0161tis. (<a href=\"https:\/\/api.monitor.se\/articles\/v1\/commands\/batch.html\">Batch<\/a>)<\/li>\n\n<\/ul>\n\n\n<p>Bazinis URL yra <code>https:\/\/{host}:8001\/{languageCode}\/{companyNumber}\/api\/v1\/<\/code>. \u012emon\u0117s numer\u012f sudaro duomen\u0173 baz\u0117s numeris ir \u012fmon\u0117s identifikatorius, pavyzd\u017eiui, <code>004.1<\/code>.<\/p>\n\n\n<p>Apie licencijavim\u0105 Monitor nurodo: &#8222;It is free to query and extract information from the API for all our customers. However, in order to use commands and write data to the ERP system, you need to purchase Monitor ERP API.&#8221; (Visi m\u016bs\u0173 klientai gali nemokamai teikti u\u017eklausas ir gauti informacij\u0105 per API. Ta\u010diau norint naudoti komandas ir \u012fra\u0161yti duomenis \u012f ERP sistem\u0105, reikia \u012fsigyti Monitor ERP API.) Duomen\u0173 \u012fra\u0161ymo licencij\u0105 \u012ftraukite \u012f projekt\u0105 nuo pat pirmos dienos. (<a href=\"https:\/\/api.monitor.se\/\">api.monitor.se<\/a>)<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"authentication\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Autentifikavimas<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Prisijungimas prie sesijos.<\/strong> Pateikus Monitor naudotojo vard\u0105 ir slapta\u017eod\u012f per <code>POST \/{languageCode}\/{companyNumber}\/login<\/code>, gr\u0105\u017einama <code>X-Monitor-SessionId<\/code> antra\u0161t\u0117, skirta v\u0117lesniems kreipiniams. Taip pat galima autentifikuotis naudojant MFA \u017eeton\u0105.<\/li>\n\n\n<li><strong>OIDC.<\/strong> Nuo Monitor 25.8 versijos taip pat galima prisijungti per Microsoft Entra ID naudojant Authorization Code ir PKCE. (<a href=\"https:\/\/api.monitor.se\/articles\/authentication\/index.html\">Autentifikavimas<\/a>)<\/li>\n\n\n<li><strong>Atskiras API naudotojas.<\/strong> Integracijai sukurkite vien\u0105 naudotoj\u0105. Jam taikomos Monitor prieigos teis\u0117s, pavyzd\u017eiui, Show manufacturing orders ir Replan existing manufacturing order.<\/li>\n\n<\/ul>\n\n\n<p>SkyPlanner REST API autentifikavimui naudoja API \u017eeton\u0105 (SkyPlanner Settings &gt; API), o jos dokumentacija pateikiama Swagger\/OpenAPI formatu. <a href=\"\/lt\/docs\/integravimo-pamoka\/\">Integravimo pamokoje<\/a> paai\u0161kinama, kaip atlikti pirmuosius kreipinius.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"change-detection-and-polling\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Pakeitim\u0173 aptikimas ir periodin\u0117s u\u017eklausos<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Monitor ERP API \u017einyne neapra\u0161ytos nei webhook s\u0105sajos, nei \u012fvyki\u0173 prenumeratos. Pakeitimai aptinkami periodin\u0117mis u\u017eklausomis:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><code>Common\/EntityChangeLogs<\/code> (nuo 2.33 versijos) gr\u0105\u017eina <code>ChangeType<\/code> (Update, Create, Delete), <code>EntityTypeId<\/code>, <code>EntityId<\/code> ir <code>ModifiedTimestamp<\/code>. Si\u0173skite u\u017eklaus\u0105 kas kelias minutes ir gaukite tik pakeistus \u012fra\u0161us. (<a href=\"https:\/\/api.monitor.se\/api\/Monitor.API.Common.EntityChangeLog.html\">EntityChangeLog<\/a>)<\/li>\n\n\n<li>Gamybos u\u017esakym\u0173 u\u017eklausose atrinkite tik neu\u017ebaigtus u\u017esakymus, o rezultatams skaidyti \u012f puslapius naudokite <code>$top<\/code> ir <code>$skip<\/code>.<\/li>\n\n<\/ul>\n\n\n<p>Pasikeitus b\u016bsenai ar tvarkara\u0161\u010diui, SkyPlanner per webhook s\u0105sajas siun\u010dia prane\u0161imus, tod\u0117l duomen\u0173 \u012fra\u0161ym\u0105 atgal \u012f Monitor inicijuoja \u012fvykiai.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Duomen\u0173 susiejimas<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Monitor ERP objektas (API)<\/th><th>SkyPlanner objektas<\/th><th>Kryptis<\/th><th>Da\u017enis<\/th><\/tr><\/thead><tbody><tr><td>Part (<code>Inventory\/Parts<\/code>)<\/td><td>Gaminiai ir med\u017eiagos<\/td><td>Monitor \u2192 SkyPlanner<\/td><td>Pradinis \u012fk\u0117limas, v\u0117liau \u2013 pagal pakeitim\u0173 \u017eurnal\u0105<\/td><\/tr><tr><td>BOM ir technologinis mar\u0161rutas: <code>Manufacturing\/MaterialRows<\/code>, <code>Manufacturing\/OperationRows<\/code><\/td><td>Gaminio strukt\u016bra; proceso etapai su paruo\u0161imo ir vieneto gamybos trukme<\/td><td>Monitor \u2192 SkyPlanner<\/td><td>Pradinis \u012fk\u0117limas, v\u0117liau \u2013 pasikeitus duomenims<\/td><\/tr><tr><td><code>Manufacturing\/AlternativeOperationRows<\/code><\/td><td>Alternatyv\u016bs kiekvieno etapo darbo centrai<\/td><td>Monitor \u2192 SkyPlanner<\/td><td>Pradinis \u012fk\u0117limas, v\u0117liau \u2013 pasikeitus duomenims<\/td><\/tr><tr><td>Darbo centras (<code>Manufacturing\/WorkCenters<\/code>): Type, TimePrecision, BasicTime, NumberOfPlanningUnits, AvailabilityFactor<\/td><td>Darbo centrai, j\u0173 grup\u0117s ir efektyvumo rodikliai<\/td><td>Monitor \u2192 SkyPlanner<\/td><td>Pradinis \u012fk\u0117limas, v\u0117liau \u2013 retai<\/td><\/tr><tr><td><code>Manufacturing\/ProductionCalendarExceptions<\/code>, <code>TimeRecording\/Schedules<\/code><\/td><td>Pamainos ir neatvykimai<\/td><td>Monitor \u2192 SkyPlanner<\/td><td>Kasdien arba pamainos tvarkomos pa\u010dioje SkyPlanner<\/td><\/tr><tr><td><code>Manufacturing\/ManufacturingOrders<\/code>, <code>ManufacturingOrderNodes<\/code><\/td><td>U\u017esakymai su \u012fvykdymo terminais ir b\u016bsenomis<\/td><td>Monitor \u2192 SkyPlanner<\/td><td>Pakeitim\u0173 \u017eurnalo u\u017eklausos kas kelias minutes<\/td><\/tr><tr><td><code>Manufacturing\/ManufacturingOrderOperations<\/code>: Priority, WorkCenterId, PlannedQuantity, RestQuantity, PlannedSetupTime, PlannedUnitTime<\/td><td>Darbai su trukme ir likusiu kiekiu<\/td><td>Monitor \u2192 SkyPlanner<\/td><td>Pakeitim\u0173 \u017eurnalo u\u017eklausos kas kelias minutes<\/td><\/tr><tr><td><code>Manufacturing\/ManufacturingOrderMaterials<\/code><\/td><td>Kiekvieno u\u017esakymo med\u017eiag\u0173 poreikis<\/td><td>Monitor \u2192 SkyPlanner<\/td><td>Periodin\u0117s pakeitim\u0173 \u017eurnalo u\u017eklausos<\/td><\/tr><tr><td><code>Inventory\/PartLocations<\/code> (Balance), <code>Purchase\/PurchaseOrderRows<\/code> (DeliveryDate, RestQuantity)<\/td><td>Atsargos; gaunamos med\u017eiagos pagal j\u0173 pristatymo dat\u0105<\/td><td>Monitor \u2192 SkyPlanner<\/td><td>U\u017eklausos kas valand\u0105 arba sudarant tvarkara\u0161t\u012f<\/td><\/tr><tr><td><code>ManufacturingOrderOperations\/Update<\/code>: PlannedStartDate, PlannedFinishDate (24.5+)<\/td><td>Kiekvienos operacijos planuojama prad\u017eia ir pabaiga<\/td><td>SkyPlanner \u2192 Monitor<\/td><td>Pasikeitus tvarkara\u0161\u010diui, per SkyPlanner webhook s\u0105saj\u0105<\/td><\/tr><tr><td><code>ManufacturingOrderOperations\/SetWorkCenter<\/code><\/td><td>Planavimo variklio parinktas darbo centras<\/td><td>SkyPlanner \u2192 Monitor<\/td><td>Pasikeitus tvarkara\u0161\u010diui<\/td><\/tr><tr><td><code>ReportManufacturingOrderOperation<\/code> \/ <code>ManufacturingOrderOperationReportings<\/code><\/td><td>Laiko \u012fra\u0161ai ir kiekiai<\/td><td>Vienas kanalas, pasirinktas apibr\u0117\u017eiant apimt\u012f<\/td><td>Po kiekvieno patvirtinimo arba pamainos<\/td><\/tr><tr><td>Monitor sistemoje n\u0117ra<\/td><td>Paruo\u0161imo trukm\u0117s matrica, \u012frankiai kaip riboti i\u0161tekliai, darbai su keliais operatoriais<\/td><td>Tvarkoma SkyPlanner sistemoje<\/td><td>Sukonfig\u016bruojama diegimo metu<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Integravimo modeliai<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. Pradinis pagrindini\u0173 duomen\u0173 \u012fk\u0117limas.<\/strong> Nuskaitykite darbo centrus, operacij\u0173 eilutes, alternatyvi\u0173 operacij\u0173 eilutes, med\u017eiag\u0173 eilutes, prekes ir grafikus. Apgalvotai susiekite kiekvien\u0105 darbo centr\u0105 su SkyPlanner darbo centru. Pool tipo darbo centras tampa darbo centr\u0173 grupe, o \u012f j\u012f \u012ftraukti darbo centrai \u2013 i\u0161tekliais, i\u0161 kuri\u0173 renkasi planavimo variklis.<\/p>\n\n\n<p><strong>2. U\u017esakym\u0173 sinchronizavimas.<\/strong> Nuskaitykite neu\u017ebaigtus gamybos u\u017esakymus su j\u0173 mazgais, operacijomis ir med\u017eiagomis, taip pat atsargas ir neu\u017ebaigtus pirkimo u\u017esakymus. SkyPlanner laiko u\u017esakytas med\u017eiagas prieinamomis pirkimo u\u017esakyme nurodyt\u0105 pristatymo dien\u0105 ir atnaujina atsargas, kai u\u017esakymui suteikiama b\u016bsena Delivered. Po pradinio \u012fk\u0117limo pakeitimai gaunami per <code>Common\/EntityChangeLogs<\/code>.<\/p>\n\n\n<p><strong>3. Tvarkara\u0161\u010dio \u012fra\u0161ymas atgal \u012f Monitor.<\/strong> Kiekvienai operacijai, kuri\u0105 planavimo variklis suplanavo arba perk\u0117l\u0117, SkyPlanner siun\u010dia <code>ManufacturingOrderOperations\/Update<\/code> su PlannedStartDate ir PlannedFinishDate. Jei variklis perk\u0117l\u0117 operacij\u0105 \u012f kit\u0105 tos pa\u010dios grup\u0117s \u012frengin\u012f, pirmiausia siun\u010diama <code>SetWorkCenter<\/code>. Vieno u\u017esakymo komandos sujungiamos \u012f vien\u0105 <code>Batch<\/code>, tod\u0117l Monitor priima jas visas arba n\u0117 vienos. Testuodami vykdykite komand\u0173 paket\u0105 per <code>\/Validate<\/code>.<\/p>\n\n\n<p>Ankstesn\u0117se nei 24.5 Monitor versijose planuojam\u0173 dat\u0173 negalima \u012fra\u0161yti per Update. Vietoj to naudokite <code>ManufacturingOrders\/ReplanOperation<\/code> (nuo 2.40 versijos) su StartDate ir FinishDate, o RestrictToOrderBounds nustatykite pagal savo taisykles.<\/p>\n\n\n<p><strong>4. Darb\u0173 patvirtinimas ceche.<\/strong> Naudokite vien\u0105 duomen\u0173 registravimo kanal\u0105:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Duomenys ir toliau registruojami Monitor.<\/strong> Operatoriai, kaip ir dabar, registruoja duomenis per Recording terminal arba \u012frengini\u0173 integracij\u0105. SkyPlanner nuskaito <code>ManufacturingOrderOperationReportings<\/code> kaip darb\u0173 eigos duomenis ir perplanuoja tvarkara\u0161t\u012f.<\/li>\n\n\n<li><strong>Duomenys pradedami registruoti SkyPlanner.<\/strong> Operatoriai registruoja darb\u0105 naudodami Mobile Confirmations arba Production Timer, o SkyPlanner siun\u010dia <code>ReportManufacturingOrderOperation<\/code> \u012f Monitor.<\/li>\n\n<\/ul>\n\n\n<p>Registruojant abiejose sistemose, laiko ir kiekio duomenys dubliuojami.<\/p>\n\n\n<p><strong>5. Atsakomyb\u0117s u\u017e duomenis ir konflikt\u0173 sprendimo taisykl\u0117s.<\/strong> U\u017era\u0161ykite jas prie\u0161 prad\u0117dami naudoti integracij\u0105:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Duomenys<\/th><th>Atsakinga sistema<\/th><\/tr><\/thead><tbody><tr><td>Prek\u0117s, BOM ir technologinis mar\u0161rutas, kiekiai, u\u017esakymo b\u016bsena<\/td><td>Monitor<\/td><\/tr><tr><td>Operacij\u0173 seka, planuojama prad\u017eia ir pabaiga, darbo centras grup\u0117je<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Paruo\u0161imo trukmi\u0173 matrica, \u012frankiai, operatori\u0173 skai\u010dius, alternatyv\u016bs i\u0161tekliai<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Pamainos ir neatvykimai<\/td><td>Viena sistema, pasirinkta apibr\u0117\u017eiant apimt\u012f<\/td><\/tr><tr><td>Operacij\u0173 vykdymo registravimas<\/td><td>Vienas kanalas, pasirinktas apibr\u0117\u017eiant apimt\u012f<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Daugiausia konflikt\u0173 kyla, kai planuotojai ir toliau kei\u010dia prioritetin\u012f plan\u0105. <strong>Rescheduling according to New finish<\/strong> ir eilu\u010di\u0173 vilkimas modulyje Priority planning perra\u0161o SkyPlanner \u012fra\u0161ytas datas. Kai u\u017e sek\u0105 atsako SkyPlanner, Priority planning naudojamas tik per\u017ei\u016brai. Su Autopilot SkyPlanner automati\u0161kai perskai\u010diuoja tvarkara\u0161t\u012f pasikeitus gamybos situacijai.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u012eprasti projekto etapai<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Diegimas paprastai u\u017ebaigiamas per kelias savaites nuo diegimo proceso prad\u017eios. Prie\u0161 tai sistem\u0105 galite nemokamai i\u0161bandyti 30 dien\u0173 su savo duomenimis. Eksportuokite nebaigt\u0173 gamybos u\u017esakym\u0173 operacijas ir darbo centrus i\u0161 Monitor \u012f Excel, importuokite juos ir patikrinkite tvarkara\u0161t\u012f dar prie\u0161 prad\u0117dami integravimo darbus.<\/p>\n\n\n<p>Pat\u012f projekt\u0105 sudaro \u0161ie etapai:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Apimties apibr\u0117\u017eimas.<\/strong> Suderinkite duomen\u0173 atitikmen\u0173 lentel\u0119, atsakomyb\u0117s u\u017e duomenis taisykles, periodini\u0173 u\u017eklaus\u0173 intervalus, vykdymo registravimo kanal\u0105 ir Monitor versij\u0105.<\/li>\n\n\n<li><strong>Prieiga.<\/strong> Sukurkite API naudotoj\u0105, \u012fsigykite Monitor ERP API ra\u0161ymo licencij\u0105 ir atverkite tinklo prieig\u0105 per 8001 prievad\u0105.<\/li>\n\n\n<li><strong>Pradinis duomen\u0173 \u012fk\u0117limas.<\/strong> Prek\u0117s, darbo centrai, operacij\u0173 eilut\u0117s, alternatyvos, med\u017eiagos ir tvarkara\u0161\u010diai.<\/li>\n\n\n<li><strong>U\u017esakym\u0173 ir pirkimo u\u017esakym\u0173 sinchronizavimas<\/strong> pagal pakeitim\u0173 \u017eurnal\u0105.<\/li>\n\n\n<li><strong>Apribojim\u0173 nustatymas SkyPlanner sistemoje.<\/strong> Paruo\u0161imo trukmi\u0173 matrica, \u012frankiai, operatori\u0173 skai\u010dius ir alternatyvios stakl\u0117s ar darbuotojai.<\/li>\n\n\n<li><strong>Tvarkara\u0161\u010dio \u012fra\u0161ymas atgal<\/strong> paketais, patikrinant su <code>\/Validate<\/code>.<\/li>\n\n\n<li><strong>Lygiagretus testavimas.<\/strong> Naudokite SkyPlanner kartu su prioritetiniu planu, palyginkite datas ir sutvarkykite pagrindinius duomenis.<\/li>\n\n\n<li><strong>Darbo prad\u017eia.<\/strong> Kai duomenys sutaps, \u012fjunkite \u012fra\u0161ym\u0105 atgal.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-to-plan-for-in-a-monitor-erp-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u012e k\u0105 atsi\u017evelgti planuojant Monitor ERP integracij\u0105<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Prieinamumo koeficientas.<\/strong> Monitor perskai\u010diuoja bendr\u0105j\u012f paj\u0117gum\u0105 \u012f gryn\u0105j\u012f pagal prieinamumo koeficient\u0105. Naujam darbo centrui pagal numatyt\u0105j\u0105 nuostat\u0105 taikoma 80 %. Taikykite j\u012f tik vien\u0105 kart\u0105: kaip SkyPlanner efektyvumo rodikl\u012f arba trumpindami pamainas, bet niekada abiem b\u016bdais.<\/li>\n\n\n<li><strong>Laiko tikslumas.<\/strong> Darbo centr\u0173, kuriems naudojamas Day planning, paj\u0117gumas nurodomas kaip bazinis dienos laikas, be pamain\u0173 prad\u017eios ir pabaigos. Pagal gamybos darbo grafikus nustatykite tikr\u0105sias pamainas SkyPlanner sistemoje, kad darbai b\u016bt\u0173 suplanuoti darbo valandomis.<\/li>\n\n\n<li><strong>Laukimo laikas ir persidengimas.<\/strong> Operacij\u0173 eilut\u0117se nurodomas laukimo laikas ir persidengimas procentais (%). Apibr\u0117\u017edami apimt\u012f nuspr\u0119skite, kaip kiekvien\u0105 reik\u0161m\u0119 perkelti \u012f SkyPlanner, antraip prad\u0117jus naudoti integracij\u0105 pasikeis u\u017esakym\u0173 \u012fvykdymo trukm\u0117s.<\/li>\n\n\n<li><strong>Darbo centr\u0173 grup\u0117s.<\/strong> \u012e grupes sujungti darbo centrai planuojami naudojant Pool planning, o ne Priority planning. Nuskaitykite \u012f grup\u0119 \u012ftrauktus darbo centrus, ne tik pa\u010dios grup\u0117s eilut\u0119.<\/li>\n\n\n<li><strong>Versij\u0173 reikalavimai.<\/strong> Planuojamoms datoms \u012fra\u0161yti per Update reikia 24.5 versijos. Darbo centr\u0173 paj\u0117gumo laukams API s\u0105sajoje reikia 24.3, o OIDC \u2013 25.8. Prie\u0161 apibr\u0117\u017edami apimt\u012f patikrinkite naudojam\u0105 leidim\u0105.<\/li>\n\n\n<li><strong>Tinklas ir sertifikatas.<\/strong> Vietoje \u012fdiegta Monitor teikia API per 8001 prievad\u0105 su savaranki\u0161kai pasira\u0161ytu sertifikatu. SkyPlanner veikia debesijoje, tod\u0117l numatykite ugniasien\u0117s taisykl\u0119 arba tarpin\u012f perdavimo server\u012f ir ai\u0161kiai nustatykite, kad sertifikatu b\u016bt\u0173 pasitikima.<\/li>\n\n\n<li><strong>Licencijos.<\/strong> Kiekvienai tre\u010diosios \u0161alies programai, kuri \u012fra\u0161o duomenis, reikia atskir\u0173 licencijuot\u0173 API naudotoj\u0173. Su kiekviena sistema pateikiamas vienas API naudotojas, turintis tik skaitymo teis\u0119.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"the-monitor-erp-integration-who-configures-and-s\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Monitor ERP integracija: kas j\u0105 konfig\u016bruoja ir pri\u017ei\u016bri<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Darbai apima duomen\u0173 susiejim\u0105 su j\u016bs\u0173 darbo centrais, operacij\u0173 eilut\u0117mis ir u\u017esakym\u0173 srautu. Taip pat nustatomi apribojimai, kuri\u0173 Monitor nesaugo: paruo\u0161imo trukmi\u0173 matrica, \u012frankiai, operatori\u0173 skai\u010dius ir alternatyv\u016bs i\u0161tekliai.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>SkyPlanner komanda sukonfig\u016bruoja integracij\u0105 diegimo metu ir pri\u017ei\u016bri j\u0105 prad\u0117jus naudoti.<\/strong> Ji atsako u\u017e SkyPlanner pus\u0119 ir sutartus Monitor ERP API i\u0161kvietimus. Kiekviena gamykla Monitor G5 naudoja savaip, tod\u0117l \u010dia pritaikomos \u017einios apie j\u016bs\u0173 darbo tvark\u0105.<\/li>\n\n\n<li><strong>J\u016bs\u0173 Monitor partneris taip pat gali dalyvauti.<\/strong> Partneris \u017eino j\u016bs\u0173 konfig\u016bracij\u0105, versij\u0105 ir prieigos teises, tod\u0117l gali parengti API naudotoj\u0105, licencij\u0105 ir tinklo prieig\u0105. SkyPlanner suteikia REST API, Swagger\/OpenAPI dokumentacij\u0105 ir \u012fvyki\u0173 prane\u0161imus (webhooks).<\/li>\n\n\n<li><strong>J\u016bs\u0173 programuotojai gali kurti savo sprendimus<\/strong> naudodami t\u0105 pa\u010di\u0105 dokumentuot\u0105 REST API ir API prieigos rakt\u0105. Prad\u017eiai pakanka API prieigos rakto, o prireikus padeda SkyPlanner komanda. Vie\u0161\u0105 dokumentacij\u0105 rasite skiltyje <a href=\"\/lt\/docs\/integravimo-pamoka\/\">SkyPlanner dokumentacija<\/a>.<\/li>\n\n<\/ol>\n\n\n<p>Sujungus sistemas, Arcturus variklis sudaro tvarkara\u0161t\u012f pagal aktualius Monitor u\u017esakymus, o suplanuotos datos \u012fra\u0161omos \u012f gamybos u\u017esakym\u0173 operacijas. SkyPlanner kainuoja nuo 199 \u20ac per m\u0117nes\u012f, \u012fskaitant 5 darbo centrus, mokant kas m\u0117nes\u012f. Integracijos kaina pagal j\u016bs\u0173 proces\u0105 ir poreikius pateikiama i\u0161 anksto kartu su pasirinktu planu, tod\u0117l visas i\u0161laidas \u017einosite dar prie\u0161 prad\u0117dami. Per\u017ei\u016br\u0117kite <a href=\"\/lt\/kainodara\/\">kainas<\/a>, palyginkite su pa\u010dios Monitor planavimo galimyb\u0117mis straipsnyje <a href=\"\/lt\/integracijos\/erp\/monitor-erp\/gamybos-planavimas\/\">Monitor ERP gamybos planavimas pagal realius \u012frengini\u0173 ir darbuotoj\u0173 paj\u0117gumus<\/a>, susipa\u017einkite su ap\u017evalga <a href=\"\/lt\/integracijos\/erp\/monitor-erp\/\">Monitor ERP puslapyje<\/a> ir kitomis ERP sistemomis <a href=\"\/lt\/integracijos\/erp\/\">ERP integracij\u0173 skiltyje<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lt\/bandymas\/\">I\u0161bandykite nemokamai<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lt\/susisiekite-su-pardavejais\/\">U\u017esisakykite demonstracij\u0105<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Gamintoj\u0173 atsiliepimai apie SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"UTU tiekimo grandin\u0117s specialistas Kalle Kalliom\u00e4ki elektros skyd\u0173 gamybos ceche Ulviloje\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>sutaupoma kas savait\u0119<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSu SkyPlanner nuo gamybos planavimo Excel lentel\u0117se per\u0117jome prie gamybos optimizavimo realiuoju laiku.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, tiekimo grandin\u0117s specialistas<\/b><br>UTU \u00b7 Elektros skydai ir skirstomieji \u012frenginiai<\/p>\n\n\n<p class=\"ind-cust__result\">Planuojant gamyb\u0105 kas savait\u0119 sutaupomos 2 darbo valandos, o nauja darb\u0173 eil\u0117 gamybos linij\u0105 pasiekia per kelias sekundes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lt\/klientu-istorijos\/utu\/\">Skaitykite UTU atsiliepim\u0105<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatoriai su \u0161vari\u0173j\u0173 patalp\u0173 apranga prie buteliuk\u0173 pildymo linijos Laboratory &amp; Allied farmacijos gamykloje Nairobyje\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>gamybos efektyvumas<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eGamybos efektyvumas padid\u0117jo 90%.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT vadovas<\/b><br>Laboratory &amp; Allied \u00b7 Vaist\u0173 gamyba<\/p>\n\n\n<p class=\"ind-cust__result\">Gamybos efektyvumas padid\u0117jo 90%, o optimizuotas trij\u0173 m\u0117nesi\u0173 planas visiems darbo centrams sudaromas per ma\u017eiau nei 30 minu\u010di\u0173.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lt\/klientu-istorijos\/laboratory-allied\/\">Skaitykite Laboratory &amp; Allied atsiliepim\u0105<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Mamec generalinis direktorius Hannu Ryyn\u00e4nen \u012fmon\u0117s gamybos ceche Lohjoje\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>1 000-iai<\/b><span>automati\u0161kai suplanuot\u0173 gamybos u\u017esakym\u0173<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eDabar gamyb\u0105 valdome kitaip, o m\u016bs\u0173 supratimas apie paj\u0117gumus pakilo \u012f visi\u0161kai kit\u0105 lyg\u012f.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, generalinis direktorius<\/b><br>Mamec \u00b7 Pramonin\u0117s mai\u0161ykl\u0117s, siurbliai ir auk\u0161t\u0173j\u0173 technologij\u0173 u\u017esakomoji gamyba<\/p>\n\n\n<p class=\"ind-cust__result\">T\u016bkstan\u010diai gamybos u\u017esakym\u0173 suplanuojami automati\u0161kai, o visa organizacija gamybos situacij\u0105 mato realiuoju laiku.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lt\/klientu-istorijos\/mamec\/\">Skaitykite Mamec atsiliepim\u0105<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/13-9cbf2d28-08ef-49a1-94e3-0095e107df55.jpg\" alt=\"Fredman Operations gamybos vadov\u0117 Anu J\u00e4rvinen prie robotizuotos krovimo ant pale\u010di\u0173 cel\u0117s Raumoje\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/10-2fd983ec-02a7-440d-b77d-281f37545c8d.png\" alt=\"Fredman Operations\" width=\"137\" height=\"48\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>6 m\u0117nesi\u0173<\/b><span>laisvus paj\u0117gumus mato pardavim\u0173 komanda<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner suteikia tvirt\u0105 ir patikim\u0105 pagrind\u0105 visam gamybos planavimui.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Anu J\u00e4rvinen, gamybos vadov\u0117<\/b><br>Fredman Operations \u00b7 Su maistu liestis tinkamas pakavimo popierius<\/p>\n\n\n<p class=\"ind-cust__result\">Pardavim\u0173 komanda mato laisvus paj\u0117gumus \u0161e\u0161iems m\u0117nesiams \u012f priek\u012f, o \u012f u\u017eklausas d\u0117l tvarkara\u0161\u010dio pakeitim\u0173, kurioms anks\u010diau reik\u0117davo valandos ar daugiau, dabar atsakoma per kelias sekundes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lt\/klientu-istorijos\/fredman-operations\/\">Skaitykite Fredman Operations atsiliepim\u0105<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Da\u017eniausiai u\u017eduodami klausimai<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ar Monitor ERP turi API gamybos u\u017esakymams?<\/summary>\n<p class=\"sp-faq__a\">Taip. Monitor ERP API leid\u017eia u\u017eklausomis pasiekti <code>Manufacturing\/ManufacturingOrders<\/code>, <code>ManufacturingOrderNodes<\/code>, <code>ManufacturingOrderOperations<\/code> ir <code>ManufacturingOrderMaterials<\/code>. Tokios komandos kaip <code>ManufacturingOrderOperations\/Update<\/code> ir <code>ReplanOperation<\/code> \u012fra\u0161o suplanuotas datas \u012f Monitor.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ar duomenims \u012fra\u0161yti \u012f Monitor per API reikia papildomos licencijos?<\/summary>\n<p class=\"sp-faq__a\">Taip. Visi Monitor klientai gali nemokamai skaityti duomenis per API. Duomenis \u012fra\u0161an\u010dioms komandoms reikia Monitor parduodamos Monitor ERP API licencijos. Kainos pasi\u016blym\u0105 pateikia j\u016bs\u0173 Monitor partneris arba Monitor pardavim\u0173 komanda.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ar Monitor ERP API palaiko \u012fvyki\u0173 prane\u0161imus (webhooks)?<\/summary>\n<p class=\"sp-faq__a\">\u012evyki\u0173 prane\u0161imai (webhooks) dokumentacijoje neapra\u0161yti. Integracija kas kelias minutes siun\u010dia u\u017eklausas \u012f <code>Common\/EntityChangeLogs<\/code> ir nuskaito tik pasikeitusius \u012fra\u0161us. Prie\u0161inga kryptimi pa\u010dios SkyPlanner \u012fvyki\u0173 prane\u0161imai perduoda tvarkara\u0161\u010dio pakeitimus vos jiems \u012fvykus.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kokios Monitor versijos mums reikia?<\/summary>\n<p class=\"sp-faq__a\">Planuojamai prad\u017eiai ir pabaigai \u012fra\u0161yti per <code>ManufacturingOrderOperations\/Update<\/code> reikia Monitor 24.5 arba naujesn\u0117s versijos. Senesniuose G5 leidimuose nuo 2.40 naudojama <code>ReplanOperation<\/code>. Apibr\u0117\u017edami apimt\u012f patvirtiname, kuris b\u016bdas tinka j\u016bs\u0173 leidimui.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kas kuria Monitor ERP integracij\u0105?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner komanda diegimo metu sukonfig\u016bruoja abipus\u0119 integracij\u0105 pagal j\u016bs\u0173 Monitor G5 konfig\u016bracij\u0105 ir pri\u017ei\u016bri j\u0105 prad\u0117jus naudoti. J\u016bs\u0173 Monitor partneris arba j\u016bs\u0173 programuotojai taip pat gali kurti sprendimus naudodami dokumentuot\u0105 SkyPlanner REST API. Prad\u017eiai pakanka API prieigos rakto.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ar galime i\u0161bandyti SkyPlanner prie\u0161 kurdami integracij\u0105?<\/summary>\n<p class=\"sp-faq__a\">Taip. Per 30 dien\u0173 nemokam\u0105 bandom\u0105j\u012f laikotarp\u012f galite naudoti iki 20 darbo centr\u0173 ir importuoti duomenis i\u0161 Monitor Excel arba CSV formatu. Kredito kortel\u0117s nereikia. <a href=\"\/lt\/bandymas\/\">I\u0161bandykite nemokamai<\/a> arba <a href=\"\/lt\/susisiekite-su-pardavejais\/\">susisiekite su pardavim\u0173 komanda<\/a>, kad apibr\u0117\u017etum\u0117te integracijos apimt\u012f.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integracijos \/ ERP \/ Monitor ERP Monitor ERP integravimo vadovas: gamybos tvarkara\u0161\u010di\u0173 sudarymas su SkyPlanner APS \u0160iame Monitor ERP integravimo vadove partneriams ir IT komandoms paai\u0161kinama, kaip sujungti Monitor ERP (Monitor G5) su SkyPlanner APS. SkyPlanner kei\u010diasi duomenimis su Monitor ERP abiem kryptimis per Monitor ERP API: skyplanner.ai \u00b7 Gamybos tvarkara\u0161\u010di\u0173 sudarymas Diegimo metu SkyPlanner &#8230; <a title=\"Monitor ERP integravimo vadovas: gamybos tvarkara\u0161\u010di\u0173 sudarymas su SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/monitor-erp\/integravimo-vadovas\/\" aria-label=\"Read more about Monitor ERP integravimo vadovas: gamybos tvarkara\u0161\u010di\u0173 sudarymas su SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":103085,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-104012","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Monitor ERP ir APS integravimo vadovas gamybos tvarkara\u0161\u010diams<\/title>\n<meta name=\"description\" content=\"Monitor G5 ir SkyPlanner APS integracija: Monitor ERP API u\u017eklausos, komandos, Batch, operacij\u0173 dat\u0173 gr\u0105\u017einimas, apklausa, duomen\u0173 susiejimas, projekt\u0173 patarimai.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/monitor-erp\/integravimo-vadovas\/\" \/>\n<meta property=\"og:locale\" content=\"lt_LT\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Monitor ERP integravimo vadovas: gamybos tvarkara\u0161\u010di\u0173 sudarymas su SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"Monitor G5 ir SkyPlanner APS integracija: Monitor ERP API u\u017eklausos, komandos, Batch, operacij\u0173 dat\u0173 gr\u0105\u017einimas, apklausa, duomen\u0173 susiejimas, projekt\u0173 patarimai.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/monitor-erp\/integravimo-vadovas\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"12 minu\u010di\u0173\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/monitor-erp\\\/integravimo-vadovas\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/monitor-erp\\\/integravimo-vadovas\\\/\",\"name\":\"Monitor ERP ir APS integravimo vadovas gamybos tvarkara\u0161\u010diams\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#website\"},\"datePublished\":\"2026-10-20T16:09:04+00:00\",\"description\":\"Monitor G5 ir SkyPlanner APS integracija: Monitor ERP API u\u017eklausos, komandos, Batch, operacij\u0173 dat\u0173 gr\u0105\u017einimas, apklausa, duomen\u0173 susiejimas, projekt\u0173 patarimai.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/monitor-erp\\\/integravimo-vadovas\\\/#breadcrumb\"},\"inLanguage\":\"lt-LT\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/monitor-erp\\\/integravimo-vadovas\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/monitor-erp\\\/integravimo-vadovas\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP ir MES programin\u0117s \u012frangos integracijos su SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bs\u0173 ERP sistemai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS sistemai Monitor ERP: gamybos planavimas pagal realius paj\u0117gumus\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/monitor-erp\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Monitor ERP integravimo vadovas: gamybos tvarkara\u0161\u010di\u0173 sudarymas su SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lt-LT\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lt-LT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Monitor ERP ir APS integravimo vadovas gamybos tvarkara\u0161\u010diams","description":"Monitor G5 ir SkyPlanner APS integracija: Monitor ERP API u\u017eklausos, komandos, Batch, operacij\u0173 dat\u0173 gr\u0105\u017einimas, apklausa, duomen\u0173 susiejimas, projekt\u0173 patarimai.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/monitor-erp\/integravimo-vadovas\/","og_locale":"lt_LT","og_type":"article","og_title":"Monitor ERP integravimo vadovas: gamybos tvarkara\u0161\u010di\u0173 sudarymas su SkyPlanner APS","og_description":"Monitor G5 ir SkyPlanner APS integracija: Monitor ERP API u\u017eklausos, komandos, Batch, operacij\u0173 dat\u0173 gr\u0105\u017einimas, apklausa, duomen\u0173 susiejimas, projekt\u0173 patarimai.","og_url":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/monitor-erp\/integravimo-vadovas\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"12 minu\u010di\u0173"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/monitor-erp\/integravimo-vadovas\/","url":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/monitor-erp\/integravimo-vadovas\/","name":"Monitor ERP ir APS integravimo vadovas gamybos tvarkara\u0161\u010diams","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lt\/#website"},"datePublished":"2026-10-20T16:09:04+00:00","description":"Monitor G5 ir SkyPlanner APS integracija: Monitor ERP API u\u017eklausos, komandos, Batch, operacij\u0173 dat\u0173 gr\u0105\u017einimas, apklausa, duomen\u0173 susiejimas, projekt\u0173 patarimai.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/monitor-erp\/integravimo-vadovas\/#breadcrumb"},"inLanguage":"lt-LT","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/monitor-erp\/integravimo-vadovas\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/monitor-erp\/integravimo-vadovas\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lt\/"},{"@type":"ListItem","position":2,"name":"ERP ir MES programin\u0117s \u012frangos integracijos su SkyPlanner","item":"https:\/\/skyplanner.ai\/lt\/integracijos\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bs\u0173 ERP sistemai","item":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS sistemai Monitor ERP: gamybos planavimas pagal realius paj\u0117gumus","item":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/monitor-erp\/"},{"@type":"ListItem","position":5,"name":"Monitor ERP integravimo vadovas: gamybos tvarkara\u0161\u010di\u0173 sudarymas su SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lt\/#website","url":"https:\/\/skyplanner.ai\/lt\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lt\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lt\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lt-LT"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lt\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lt\/","logo":{"@type":"ImageObject","inLanguage":"lt-LT","@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lt\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integracijos \/ ERP \/ Monitor ERP Monitor ERP integravimo vadovas: gamybos tvarkara\u0161\u010di\u0173 sudarymas su SkyPlanner APS \u0160iame Monitor ERP integravimo vadove partneriams ir IT komandoms paai\u0161kinama, kaip sujungti Monitor ERP (Monitor G5) su SkyPlanner APS. SkyPlanner kei\u010diasi duomenimis su Monitor ERP abiem kryptimis per Monitor ERP API: skyplanner.ai \u00b7 Gamybos tvarkara\u0161\u010di\u0173 sudarymas Diegimo metu SkyPlanner&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/pages\/104012","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/comments?post=104012"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/pages\/104012\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/pages\/103085"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/media?parent=104012"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}