{"id":103836,"date":"2026-10-20T16:09:04","date_gmt":"2026-10-20T16:09:04","guid":{"rendered":"https:\/\/skyplanner.ai\/integracijos\/erp\/katana\/integravimo-vadovas\/"},"modified":"2026-10-20T16:09:04","modified_gmt":"2026-10-20T16:09:04","slug":"integravimo-vadovas","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/katana\/integravimo-vadovas\/","title":{"rendered":"Katana integravimo su SkyPlanner APS vadovas gamybos tvarkara\u0161\u010diams sudaryti"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lt\/integracijos\/\">Integracijos<\/a> \/ <a href=\"\/lt\/integracijos\/erp\/\">ERP<\/a> \/ Katana<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Katana integravimo vadovas <span class=\"hl\">gamybos tvarkara\u0161\u010diams sudaryti su SkyPlanner APS<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u0160iame Katana integravimo vadove konsultantams ir IT komandoms paai\u0161kinama, kaip sujungti Katana Cloud Inventory (Katana MRP) su SkyPlanner APS. SkyPlanner kei\u010diasi duomenimis su Katana abiem kryptimis per vie\u0161\u0105j\u0105 Katana API:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>\u012e SkyPlanner perduodami gamybos u\u017esakymai, operacij\u0173 eilut\u0117s, gamini\u0173 recept\u016bros, gamybos operacijos, i\u0161tekliai, atsargos ir pirkimo u\u017esakymai.<\/li>\n\n\n<li>Tvarkara\u0161tyje nustatyta u\u017esakym\u0173 seka gr\u0105\u017einama \u012f Katana skirtuk\u0105 Schedule, o kiekvienam gamybos u\u017esakymui nurodomas gamybos terminas.<\/li>\n\n\n<li>Operacij\u0173 b\u016bsena ir faktin\u0117 trukm\u0117 gr\u0105\u017einamos \u012f operacij\u0173 eilutes.<\/li>\n\n\n<li>Katana \u012fvyki\u0173 prane\u0161imai informuoja SkyPlanner apie pasikeitimus, o SkyPlanner \u012fvyki\u0173 prane\u0161imai perduoda tvarkara\u0161\u010dio pakeitimus i\u0161kart jiems \u012fvykus.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lt\/bandymas\/\">I\u0161bandykite nemokamai<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lt\/susisiekite-su-pardavejais\/\">U\u017esisakykite demonstracij\u0105<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Gamybos tvarkara\u0161\u010di\u0173 sudarymas<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt laiko juosta su darbo centrams suplanuotomis u\u017eduotimis ir apa\u010dioje pateiktu u\u017esakym\u0173 s\u0105ra\u0161u.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Diegimo metu SkyPlanner komanda sukonfig\u016bruoja integracij\u0105 pagal j\u016bs\u0173 Katana nustatymus ir pri\u017ei\u016bri j\u0105 prad\u0117jus naudoti. \u0160is vadovas skirtas konsultantams ir programuotojams, norintiems prisid\u0117ti prie integravimo arba patiems kurti sprendimus naudojantis dokumentuota SkyPlanner REST API (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API \u017einynas<\/a>).<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"the-katana-api\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Katana API<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Katana yra vienas debesijos produktas su atskiromis klient\u0173 aplinkomis, tod\u0117l visi klientai naudoja t\u0105 pa\u010di\u0105 API. Tai REST API v1 versija, pasiekiama adresu <code>https:\/\/api.katanamrp.com\/v1<\/code>. OpenAPI 3.0 specifikacija pateikta adresu <code>https:\/\/api.katanamrp.com\/v1\/openapi.json<\/code>. Dokumentacij\u0105 rasite <a href=\"https:\/\/developer.katanamrp.com\/reference\/api-introduction\">Katana Developer Hub<\/a>.<\/p>\n\n\n<p>Tvarkara\u0161\u010diams sudaryti reikalingi API prieigos ta\u0161kai:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Pagrindiniai duomenys:<\/strong> <code>\/products<\/code>, <code>\/materials<\/code>, <code>\/variants<\/code>, <code>\/recipe_rows<\/code>, <code>\/bom_rows<\/code>, <code>\/product_operation_rows<\/code>.<\/li>\n\n\n<li><strong>U\u017esakymai:<\/strong> <code>\/manufacturing_orders<\/code>, <code>\/manufacturing_order_operation_rows<\/code>, <code>\/manufacturing_order_recipe_rows<\/code>, <code>\/manufacturing_order_productions<\/code>.<\/li>\n\n\n<li><strong>Seka:<\/strong> <code>\/manufacturing_order_rerank<\/code>.<\/li>\n\n\n<li><strong>Pasi\u016bla ir paklausa:<\/strong> <code>\/inventory<\/code>, <code>\/purchase_orders<\/code>, <code>\/purchase_order_rows<\/code>, <code>\/sales_orders<\/code>, <code>\/sales_order_rows<\/code>.<\/li>\n\n<\/ul>\n\n\n<p>Prieigos ta\u0161ko <code>\/resources<\/code> n\u0117ra. I\u0161tekliai nurodomi gaminio operacij\u0173 ir gamybos u\u017esakymo (MO) operacij\u0173 eilut\u0117se, laukuose <code>resource_id<\/code> ir <code>resource_name<\/code>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"authentication-and-limits\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Autentifikavimas ir apribojimai<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Autentifikavimui naudojamas API raktas, perduodamas kaip Bearer prieigos raktas: <code>Authorization: Bearer &lt;api key&gt;<\/code>. Rakt\u0105 sukurkite pasirink\u0119 <strong>Settings &gt; API &gt; Add new API key<\/strong>. (<a href=\"https:\/\/developer.katanamrp.com\/reference\/api-authentication\">\u0160altinis<\/a>)<\/p>\n\n\n<p>Projektuojant sinchronizavim\u0105 reikia atsi\u017evelgti \u012f \u0161iuos ribojimus:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Pagal numatytuosius nustatymus Katana API leid\u017eia 60 u\u017eklaus\u0173 per 60 sekund\u017ei\u0173 (<a href=\"https:\/\/developer.katanamrp.com\/reference\/api-rate-limiting\">\u0161altinis<\/a>)<\/li>\n\n\n<li>Vir\u0161ijus \u0161i\u0105 rib\u0105, API gr\u0105\u017eina kod\u0105 429 su <code>Retry-After<\/code>. <code>X-Ratelimit-Remaining<\/code> nurodo, kiek u\u017eklaus\u0173 dar galima pateikti.<\/li>\n\n\n<li>S\u0105ra\u0161\u0173 prieigos ta\u0161kai gr\u0105\u017eina rezultatus puslapiais ir leid\u017eia filtruoti pagal atnaujinimo dat\u0105, tod\u0117l sinchronizuojant perduodam\u0173 pakeitim\u0173 apimtis i\u0161lieka nedidel\u0117.<\/li>\n\n<\/ul>\n\n\n<p>SkyPlanner REST API autentifikavimui naudojamas API prieigos raktas (SkyPlanner Settings &gt; API), o dokumentacija pateikta Swagger\/OpenAPI formatu. <a href=\"\/lt\/docs\/integravimo-pamoka\/\">Integravimo pamokoje<\/a> paai\u0161kinama, kaip atlikti pirm\u0105sias u\u017eklausas.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"webhooks\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u012evyki\u0173 prane\u0161imai<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>U\u017eregistruokite \u012fvyki\u0173 prane\u0161im\u0173 gavim\u0105 POST u\u017eklausa \u012f <code>\/webhooks<\/code>, nurodydami HTTPS URL ir reikiamus \u012fvykius. (<a href=\"https:\/\/developer.katanamrp.com\/reference\/webhooks\">\u0160altinis<\/a>) Tvarkara\u0161\u010diams sudaryti naudingi \u0161ie \u012fvykiai:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><code>manufacturing_order.created<\/code>, <code>.updated<\/code>, <code>.deleted<\/code>, <code>.in_progress<\/code>, <code>.blocked<\/code>, <code>.done<\/code><\/li>\n\n\n<li><code>manufacturing_order_operation_row.created<\/code>, <code>.updated<\/code>, <code>.in_progress<\/code>, <code>.paused<\/code>, <code>.completed<\/code><\/li>\n\n\n<li><code>current_inventory.material_updated<\/code>, <code>.material_out_of_stock<\/code><\/li>\n\n\n<li><code>purchase_order.*<\/code> ir <code>purchase_order_row.*<\/code>, \u012fskaitant gavimo \u012fvykius<\/li>\n\n\n<li><code>product.*<\/code>, <code>product_recipe_row.*<\/code> ir <code>sales_order.*<\/code><\/li>\n\n<\/ul>\n\n\n<p>Prane\u0161imuose pateikiama tik i\u0161tekliaus r\u016b\u0161is, veiksmas ir <code>href<\/code>. Gav\u0117jas parsisiun\u010dia vis\u0105 objekt\u0105 pagal href nuorod\u0105. Kiekviename prane\u0161ime yra patikrai skirta <code>x-sha2-signature<\/code> antra\u0161t\u0117 (HMAC SHA-256). J\u016bs\u0173 prieigos ta\u0161kas turi per 10 sekund\u017ei\u0173 atsakyti kodu 20X. Katana pakartoja siuntim\u0105 tris kartus: po 30 sekund\u017ei\u0173, 2 minu\u010di\u0173 ir 15 minu\u010di\u0173.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Duomen\u0173 susiejimas<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Katana objektas (prieigos ta\u0161kas)<\/th><th>SkyPlanner objektas<\/th><th>Kryptis<\/th><th>Da\u017enis<\/th><\/tr><\/thead><tbody><tr><td>Gaminiai, med\u017eiagos, variantai (<code>\/products<\/code>, <code>\/materials<\/code>, <code>\/variants<\/code>)<\/td><td>Produktai ir med\u017eiagos<\/td><td>Katana \u2192 SkyPlanner<\/td><td>Pradinis \u012fk\u0117limas, v\u0117liau \u2013 gavus \u012fvykio prane\u0161im\u0105<\/td><\/tr><tr><td>Gaminio recept\u016bra \/ BOM (<code>\/recipe_rows<\/code>, <code>\/bom_rows<\/code>)<\/td><td>Gaminio strukt\u016bra, pusgaminiai<\/td><td>Katana \u2192 SkyPlanner<\/td><td>Pradinis \u012fk\u0117limas, v\u0117liau \u2013 gavus \u012fvykio prane\u0161im\u0105<\/td><\/tr><tr><td>Gamybos operacijos (<code>\/product_operation_rows<\/code>): tipas, i\u0161teklius, laikas<\/td><td>Proceso etapai su trukme ir paruo\u0161imo laiku<\/td><td>Katana \u2192 SkyPlanner<\/td><td>Pradinis \u012fk\u0117limas, v\u0117liau \u2013 pasikeitus duomenims<\/td><\/tr><tr><td>I\u0161tekliai (<code>resource_id<\/code>, <code>resource_name<\/code> operacij\u0173 eilut\u0117se)<\/td><td>Darbo centrai, darbo centr\u0173 grup\u0117s<\/td><td>Katana \u2192 SkyPlanner<\/td><td>Pradinis \u012fk\u0117limas, v\u0117liau \u2013 atsiradus naujam i\u0161tekliui<\/td><\/tr><tr><td>Gamybos u\u017esakymas su operacij\u0173 eilut\u0117mis (<code>\/manufacturing_orders<\/code>, <code>\/manufacturing_order_operation_rows<\/code>)<\/td><td>U\u017esakymai ir u\u017eduotys<\/td><td>Katana \u2192 SkyPlanner<\/td><td>Realiuoju laiku per \u012fvyki\u0173 prane\u0161imus<\/td><\/tr><tr><td>Gamybos u\u017esakymo med\u017eiagos (<code>\/manufacturing_order_recipe_rows<\/code>)<\/td><td>U\u017eduo\u010diai reikalingos med\u017eiagos<\/td><td>Katana \u2192 SkyPlanner<\/td><td>Realiuoju laiku per \u012fvyki\u0173 prane\u0161imus<\/td><\/tr><tr><td>Atsargos, pirkimo u\u017esakymai su pristatymo datomis (<code>\/inventory<\/code>, <code>\/purchase_order_rows<\/code>)<\/td><td>Atsargos ir numatomos gauti med\u017eiagos<\/td><td>Katana \u2192 SkyPlanner<\/td><td>Realiuoju laiku per \u012fvyki\u0173 prane\u0161imus<\/td><\/tr><tr><td>Pardavimo u\u017esakymo laukas <code>delivery_date<\/code> (<code>\/sales_orders<\/code>)<\/td><td>U\u017esakymo \u012fvykdymo terminas, kliento prioritetas<\/td><td>Katana \u2192 SkyPlanner<\/td><td>Realiuoju laiku per \u012fvyki\u0173 prane\u0161imus<\/td><\/tr><tr><td>Gamybos u\u017esakym\u0173 seka (POST <code>\/manufacturing_order_rerank<\/code>)<\/td><td>Atvir\u0173 gamybos u\u017esakym\u0173 seka tvarkara\u0161tyje<\/td><td>SkyPlanner \u2192 Katana<\/td><td>Pasikeitus tvarkara\u0161\u010diui<\/td><\/tr><tr><td>Gamybos u\u017esakymo laukas <code>production_deadline_date<\/code> (PATCH <code>\/manufacturing_orders\/{id}<\/code>)<\/td><td>Planuojama pabaiga<\/td><td>SkyPlanner \u2192 Katana<\/td><td>Pasikeitus tvarkara\u0161\u010diui<\/td><\/tr><tr><td>Operacijos eilut\u0117s laukai <code>status<\/code>, <code>total_actual_time<\/code> (PATCH <code>\/manufacturing_order_operation_rows\/{id}<\/code>)<\/td><td>Mobile Confirmations, darbo laiko \u012fra\u0161ai<\/td><td>SkyPlanner \u2192 Katana<\/td><td>Registruojant atlikt\u0105 darb\u0105<\/td><\/tr><tr><td>Katana \u0161i\u0173 duomen\u0173 n\u0117ra<\/td><td>Pamainos, neatvykimai, paruo\u0161imo laik\u0173 matrica, \u012frankiai, operatori\u0173 skai\u010dius, alternatyv\u016bs darbo centrai<\/td><td>Tvarkoma SkyPlanner sistemoje<\/td><td>Nustatoma pradedant naudotis sistema<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Integravimo modeliai<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. Pradinis pagrindini\u0173 duomen\u0173 \u012fk\u0117limas.<\/strong> Nuskaitykite produktus, med\u017eiagas, variantus, recept\u016br\u0173 eilutes ir produkt\u0173 operacij\u0173 eilutes puslapiais, ribodami u\u017eklaus\u0173 da\u017en\u012f, kad nevir\u0161ytum\u0117te leistinos ribos. Pagal operacij\u0173 eilut\u0117se nurodytus atskirus i\u0161teklius sukurkite SkyPlanner darbo centrus ir i\u0161laikykite rakt\u0173 atitikt\u012f santykiu 1:1. Kiekvienam darbo centrui SkyPlanner sistemoje nustatykite pamainas, atostogas ir vir\u0161valand\u017eius, nes Katana neturi i\u0161tekli\u0173 kalendoriaus.<\/p>\n\n\n<p><strong>2. U\u017esakym\u0173 sinchronizavimas.<\/strong> U\u017esiprenumeruokite gamybos u\u017esakym\u0173, operacij\u0173 eilu\u010di\u0173, atsarg\u0173 ir pirkimo u\u017esakym\u0173 \u012fvykius. Gav\u0119 kiekvien\u0105 \u012fvyk\u012f, nuskaitykite objekt\u0105 pagal jo href ir atnaujinkite u\u017eduot\u012f. SkyPlanner laiko, kad u\u017esakytos med\u017eiagos bus prieinamos pirkimo u\u017esakymo pristatymo dien\u0105, o gavus u\u017esakytas prekes atnaujina atsargas. Kasnakt atliekamas duomen\u0173 sutikrinimas pagal atnaujinimo datos filtrus aptinka visus praleistus \u012fvykius.<\/p>\n\n\n<p><strong>3. Tvarkara\u0161\u010dio \u012fra\u0161ymas atgal \u012f Katana.<\/strong> Planas \u012f Katana perkeliamas dviem u\u017eklausomis:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>POST <code>\/manufacturing_order_rerank<\/code> &#8222;moves one or more manufacturing orders to an exact place in the production schedule&#8221; (perkelia vien\u0105 ar daugiau gamybos u\u017esakym\u0173 \u012f konkre\u010di\u0105 gamybos tvarkara\u0161\u010dio viet\u0105). Viena u\u017eklausa galima perkelti iki 250 atvir\u0173 gamybos u\u017esakym\u0173 \u012f prad\u017ei\u0105, pabaig\u0105 arba prie\u0161 nurodyt\u0105 gamybos u\u017esakym\u0105 ar po jo. (<a href=\"https:\/\/developer.katanamrp.com\/reference\/rerankmanufacturingorder\">\u0161altinis<\/a>)<\/li>\n\n\n<li>PATCH <code>\/manufacturing_orders\/{id}<\/code> nustato lauk\u0105 <code>production_deadline_date<\/code>. Katana priima \u0161i\u0105 reik\u0161m\u0119 tik tada, kai tai gamyklos vietai i\u0161jungtas automatinis termino skai\u010diavimas. (<a href=\"https:\/\/developer.katanamrp.com\/reference\/updatemanufacturingorder\">\u0161altinis<\/a>)<\/li>\n\n<\/ul>\n\n\n<p>Sekos pakeitimas turi \u012ftakos ne tik s\u0105ra\u0161ui. Katana sistemoje &#8222;higher-priority MOs reserve required materials and subassemblies first&#8221; (auk\u0161tesnio prioriteto gamybos u\u017esakymai pirmieji rezervuoja reikalingas med\u017eiagas ir mazgus), tod\u0117l SkyPlanner nustatyta seka taip pat lemia, kuriam gamybos u\u017esakymui Katana skirs atsargas.<\/p>\n\n\n<p><strong>4. Atlikto darbo patvirtinimai gamybos ceche.<\/strong> Operatoriai registruoja atlikt\u0105 darb\u0105 naudodami SkyPlanner Mobile Confirmations, Production Timer arba Quick Log Mode. SkyPlanner \u012fra\u0161o b\u016bsen\u0105 ir faktin\u012f darbo laik\u0105 \u012f gamybos u\u017esakymo operacijos eilut\u0119. Jei gamykla vietoj \u0161i\u0173 priemoni\u0173 toliau naudoja Katana Shop Floor App, SkyPlanner nuskaito operacij\u0173 eilu\u010di\u0173 \u012fvykius. Kiekvienai gamyklai pasirinkite vien\u0105 atlikto darbo registravimo kanal\u0105.<\/p>\n\n\n<p><strong>5. Atsakomyb\u0117s u\u017e duomenis ir konflikt\u0173 sprendimo taisykl\u0117s.<\/strong> U\u017era\u0161ykite jas prie\u0161 prad\u0117dami naudoti integracij\u0105:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Duomenys<\/th><th>Atsakinga sistema<\/th><\/tr><\/thead><tbody><tr><td>Produktai, recept\u016bros, gamybos operacijos, atsargos, pirkimai, pardavimo u\u017esakymai<\/td><td>Katana<\/td><\/tr><tr><td>Operacij\u0173 seka, prad\u017eios ir pabaigos laikai, kiekvienai operacijai priskirtas darbo centras<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Gamybos u\u017esakymo vieta skirtuke Schedule ir gamybos u\u017ebaigimo terminas<\/td><td>SkyPlanner, duomenys \u012fra\u0161omi \u012f Katana<\/td><\/tr><tr><td>Pamainos, neatvykimai, paruo\u0161imo laik\u0173 matrica, \u012frankiai, alternatyv\u016bs i\u0161tekliai<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Operacijos b\u016bsena ir u\u017eregistruotas laikas<\/td><td>Vienas kanalas, pasirinktas apibr\u0117\u017eiant apimt\u012f<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u012eprasti projekto etapai<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Diegimas paprastai baigiamas per kelias savaites nuo pasirengimo naudoti sistem\u0105 prad\u017eios. Prie\u0161 tai 30 dien\u0173 nemokamai bandote sistem\u0105 su savo duomenimis, eksportuotais i\u0161 Katana CSV formatu, pavyzd\u017eiui, su Tasks s\u0105ra\u0161u i\u0161 Make ekrano.<\/p>\n\n\n<p>Pat\u012f projekt\u0105 sudaro \u0161ie etapai:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Planas ir raktas.<\/strong> Patikrinkite, ar j\u016bs\u0173 Katana planas apima API ir Manufacturing Management, ir sukurkite API rakt\u0105.<\/li>\n\n\n<li><strong>Termin\u0173 re\u017eimas.<\/strong> Sutarkite i\u0161jungti automatin\u012f termin\u0173 nustatym\u0105 gamyklos vietai, kad gamybos terminus valdyt\u0173 SkyPlanner.<\/li>\n\n\n<li><strong>Susiejimas.<\/strong> Patvirtinkite susiejimo lentel\u0119, i\u0161tekli\u0173 raktus, taisykles, kuri sistema valdo duomenis, ir ataskait\u0173 teikimo kanal\u0105.<\/li>\n\n\n<li><strong>Pradinis duomen\u0173 \u012fk\u0117limas.<\/strong> Produktai, variantai, recept\u016bros, gamybos operacijos, i\u0161tekliai.<\/li>\n\n\n<li><strong>Sinchronizavimas pagal \u012fvykius.<\/strong> \u012evyki\u0173 prane\u0161imai apie u\u017esakymus, operacijas, atsargas ir pirkimo u\u017esakymus bei naktinis duomen\u0173 sutikrinimas.<\/li>\n\n\n<li><strong>Apribojim\u0173 nustatymas SkyPlanner sistemoje.<\/strong> Pamainos, paruo\u0161imo laik\u0173 matrica, \u012frankiai, operatori\u0173 skai\u010dius ir alternatyv\u016bs darbo centrai.<\/li>\n\n\n<li><strong>Duomen\u0173 \u012fra\u0161ymas atgal.<\/strong> U\u017esakym\u0173 eili\u0161kumas ir terminai, v\u0117liau \u2013 operacij\u0173 b\u016bsenos ir laikas.<\/li>\n\n\n<li><strong>Lygiagretus testavimas ir paleidimas.<\/strong> Palyginkite SkyPlanner datas su dabartin\u0117mis datomis Schedule skirtuke, pataisykite pagrindinius duomenis ir \u012fjunkite duomen\u0173 \u012fra\u0161ym\u0105 atgal.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-to-plan-for-in-a-katana-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u012e k\u0105 atsi\u017evelgti planuojant integracij\u0105 su Katana<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Termin\u0173 re\u017eimas perra\u0161o datas.<\/strong> &#8222;Once automatic mode is enabled, all manual deadlines will be overwritten and cannot be restored.&#8221; (\u012ejungus automatin\u012f re\u017eim\u0105, visi rankiniu b\u016bdu nustatyti terminai bus perra\u0161yti ir j\u0173 atkurti nebebus galima.) Re\u017eim\u0105 pasirinkite vien\u0105 kart\u0105, projekto prad\u017eioje.<\/li>\n\n\n<li><strong>N\u0117ra i\u0161tekli\u0173 kalendoriaus.<\/strong> Nenustatykite pamain\u0173 remdamiesi vien Weekly throughput reik\u0161me. Kiekvienam darbo centrui jas nustatykite SkyPlanner sistemoje.<\/li>\n\n\n<li><strong>I\u0161tekliai nurodomi tik operacij\u0173 eilut\u0117se.<\/strong> Nekeiskite i\u0161tekli\u0173 pavadinim\u0173 Katana sistemoje, nes pagal juos i\u0161tekliai susiejami su SkyPlanner darbo centrais.<\/li>\n\n\n<li><strong>Laiko vienetai.<\/strong> <code>planned_time_parameter<\/code> nurodomas sekund\u0117mis: per-unit operacijoms \u2013 vienam vienetui, o process, setup ir fixed tipams \u2013 bendra trukm\u0117. Teisingai susiekite tip\u0105, antraip apskai\u010diuotos trukm\u0117s nuo teising\u0173 skirsis tiek kart\u0173, kiek yra vienet\u0173.<\/li>\n\n\n<li><strong>Gamybos pagal u\u017esakym\u0105 grup\u0117s.<\/strong> Kei\u010diant eili\u0161kum\u0105, su tuo pa\u010diu pardavimo u\u017esakymu susieti gamybos u\u017esakymai (MO) lieka kartu, tod\u0117l j\u0173 viet\u0105 eil\u0117je nustatykite kaip vienos grup\u0117s.<\/li>\n\n\n<li><strong>Pasikeit\u0117 eili\u0161kumo keitimo logika.<\/strong> Nuo 2026 m. spalio 7 d. rerank prieigos ta\u0161kai perkelia u\u017esakymus tiksliai \u012f nurodyt\u0105 viet\u0105. Integracijas, pritaikytas ankstesnei logikai, reikia i\u0161bandyti i\u0161 naujo. (<a href=\"https:\/\/developer.katanamrp.com\/changelog\/breaking-change-order-rerank-endpoints-place-orders-exactly-where-asked\">\u0160altinis<\/a>)<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"the-katana-integration-who-configures-and-suppor\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Integracija su Katana: kas j\u0105 konfig\u016bruoja ir pri\u017ei\u016bri<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Darbai apima j\u016bs\u0173 i\u0161teklius, gamybos operacijas, u\u017esakym\u0173 sraut\u0105 ir termin\u0173 re\u017eim\u0105. Taip pat nustatoma tai, ko Katana nesaugo: pamainos, paruo\u0161imo laik\u0173 matrica, \u012frankiai, operatori\u0173 skai\u010dius ir alternatyv\u016bs i\u0161tekliai.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>SkyPlanner komanda sukonfig\u016bruoja integracij\u0105 rengiantis naudoti sistem\u0105 ir pri\u017ei\u016bri j\u0105 po paleidimo.<\/strong> Kiekviena gamykla Katana i\u0161teklius ir operacijas nustato skirtingai, tod\u0117l \u0161iame etape pritaikoma sukaupta patirtis.<\/li>\n\n\n<li><strong>Integracij\u0105 gali sukurti j\u016bs\u0173 Katana konsultantas arba integracij\u0173 partneris.<\/strong> SkyPlanner teikia REST API, Swagger\/OpenAPI dokumentacij\u0105 ir \u012fvyki\u0173 prane\u0161imus.<\/li>\n\n\n<li><strong>J\u016bs\u0173 programuotojai gali kurti sprendimus \u0161iuo pagrindu<\/strong> naudodami API prieigos rakt\u0105. Prad\u017eiai pakanka API prieigos rakto, o prireikus padeda SkyPlanner komanda. Produkto dokumentacij\u0105, \u012fskaitant pirkimo u\u017esakymus bei produkt\u0173 ir med\u017eiag\u0173 API, rasite <a href=\"\/lt\/docs\/integravimo-pamoka\/\">SkyPlanner dokumentacijoje<\/a>.<\/li>\n\n<\/ol>\n\n\n<p>SkyPlanner kaina prasideda nuo 199 \u20ac per m\u0117nes\u012f su 5 darbo centrais, mokant kas m\u0117nes\u012f. Integracijos kainos pasi\u016blymas pagal j\u016bs\u0173 proces\u0105 ir poreikius pateikiamas i\u0161 anksto kartu su pasirinktu planu, tad visas i\u0161laidas \u017einote dar prie\u0161 prad\u0117dami. Per\u017ei\u016br\u0117kite <a href=\"\/lt\/kainodara\/\">kainas<\/a>, <a href=\"\/lt\/funkcijos\/\">funkcijas<\/a> ir palyginim\u0105 su pa\u010dios Katana tvarkara\u0161\u010di\u0173 sudarymu puslapyje <a href=\"\/lt\/integracijos\/erp\/katana\/gamybos-planavimas\/\">Gamybos planavimas su Katana pagal realius \u012frengini\u0173 ir darbuotoj\u0173 paj\u0117gumus<\/a>. Ap\u017evalg\u0105 rasite <a href=\"\/lt\/integracijos\/erp\/katana\/\">Katana puslapyje<\/a>, o kitas ERP sistemas \u2013 <a href=\"\/lt\/integracijos\/erp\/\">ERP integracij\u0173 skiltyje<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lt\/bandymas\/\">I\u0161bandykite nemokamai<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lt\/susisiekite-su-pardavejais\/\">U\u017esisakykite demonstracij\u0105<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Gamintoj\u0173 atsiliepimai apie SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, UTU tiekimo grandin\u0117s specialistas, elektros skyd\u0173 gamybos ceche Ulviloje\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>sutaupoma kas savait\u0119<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSu SkyPlanner nuo gamybos planavimo Excel lentel\u0117se per\u0117jome prie gamybos optimizavimo realiuoju laiku.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, tiekimo grandin\u0117s specialistas<\/b><br>UTU \u00b7 Elektros skydai ir skirstymo \u012franga<\/p>\n\n\n<p class=\"ind-cust__result\">Gamybos planavimas kas savait\u0119 sutaupo 2 valandas darbo laiko, o nauja darb\u0173 eil\u0117 gamybos linij\u0105 pasiekia per kelias sekundes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lt\/klientu-istorijos\/utu\/\">Skaitykite UTU atsiliepim\u0105<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatoriai su \u0161vari\u0173j\u0173 patalp\u0173 apranga prie buteliuk\u0173 pildymo linijos Laboratory &amp; Allied vaist\u0173 gamykloje Nairobyje\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>gamybos efektyvumas<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eGamybos efektyvumas padid\u0117jo 90%.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT vadovas<\/b><br>Laboratory &amp; Allied \u00b7 Vaist\u0173 gamyba<\/p>\n\n\n<p class=\"ind-cust__result\">Gamybos efektyvumas padid\u0117jo 90%, o optimizuotas trij\u0173 m\u0117nesi\u0173 planas visiems darbo centrams sudaromas grei\u010diau nei per 30 minu\u010di\u0173.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lt\/klientu-istorijos\/laboratory-allied\/\">Skaitykite Laboratory &amp; Allied atsiliepim\u0105<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/homepage-v2\/logo-eskomatic.png\" alt=\"Eskomatic\" width=\"140\" height=\"15\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>Ma\u017eiau<\/b><span>prastov\u0173 d\u0117l med\u017eiag\u0173 tr\u016bkumo<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner mums vertingas tuo, kad tai kasdieniame darbe veikiantis \u012frankis, ypa\u010d nustatant pristatymo datas.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Tommi M\u00e4nnist\u00f6, gamybos planavimo vadovas<\/b><br>Eskomatic \u00b7 Mechaninis apdirbimas pagal u\u017esakym\u0105<\/p>\n\n\n<p class=\"ind-cust__result\">Automati\u0161kai planuojant apkrov\u0105, tiksliau nustatomos pristatymo datos, o gamybos prastov\u0173 d\u0117l med\u017eiag\u0173 tr\u016bkumo gerokai suma\u017e\u0117jo.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lt\/klientu-istorijos\/eskomatic\/\">Skaitykite Eskomatic atsiliepim\u0105<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Hannu Ryyn\u00e4nen, Mamec generalinis direktorius, \u012fmon\u0117s gamybos ceche Lohjoje\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>1 000-iai<\/b><span>automati\u0161kai suplanuot\u0173 gamybos u\u017esakym\u0173<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eGamyb\u0105 dabar valdome kitaip, o m\u016bs\u0173 supratimas apie paj\u0117gumus pakilo \u012f visi\u0161kai kit\u0105 lyg\u012f.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, generalinis direktorius<\/b><br>Mamec \u00b7 Pramonin\u0117s mai\u0161ykl\u0117s, siurbliai ir auk\u0161t\u0173j\u0173 technologij\u0173 sutartin\u0117 gamyba<\/p>\n\n\n<p class=\"ind-cust__result\">T\u016bkstan\u010diai gamybos u\u017esakym\u0173 suplanuojami automati\u0161kai, o visa organizacija mato gamybos b\u016bkl\u0119 realiuoju laiku.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lt\/klientu-istorijos\/mamec\/\">Skaitykite Mamec atsiliepim\u0105<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Da\u017eniausiai u\u017eduodami klausimai<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ar Katana turi API ir kokio plano reikia?<\/summary>\n<p class=\"sp-faq__a\">Taip. Katana teikia vie\u0161\u0105 REST API, v1, su OpenAPI 3.0 specifikacija. Kain\u0173 puslapyje API prieiga nurodyta Free ir Advantage planuose. Autentifikavimui naudojamas API raktas, sukurtas skiltyje Settings &gt; API ir perduodamas kaip Bearer prieigos raktas.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ar SkyPlanner gali \u012fra\u0161yti tvarkara\u0161t\u012f \u012f Katana?<\/summary>\n<p class=\"sp-faq__a\">Taip. Per <code>\/manufacturing_order_rerank<\/code> SkyPlanner i\u0161d\u0117sto atvirus gamybos u\u017esakymus Katana skirtuke Schedule pagal savo nustatyt\u0105 eili\u0161kum\u0105 ir \u012fra\u0161o kiekvieno gamybos u\u017esakymo (MO) <code>production_deadline_date<\/code>. Operacij\u0173 b\u016bsenos ir faktinis laikas \u012fra\u0161omi \u012f MO operacij\u0173 eilutes. Kiekvieno darbo centro planas su nustatytu u\u017eduo\u010di\u0173 laiku lieka SkyPlanner sistemoje, kur operatoriai dirba pagal savo u\u017eduo\u010di\u0173 eil\u0119.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ar Katana siun\u010dia pakeitimus realiuoju laiku?<\/summary>\n<p class=\"sp-faq__a\">Taip. Katana \u012fvyki\u0173 prane\u0161imai apima gamybos u\u017esakymus, operacij\u0173 eilutes, atsargas, pirkimo ir pardavimo u\u017esakymus. SkyPlanner gauna kiekvien\u0105 pakeist\u0105 objekt\u0105 ir kas nakt\u012f sutikrina duomenis, tod\u0117l net ir praleidus \u012fvyk\u012f u\u017eduoties duomenys nelieka pasen\u0119.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kaip Katana i\u0161tekliai tampa SkyPlanner darbo centrais?<\/summary>\n<p class=\"sp-faq__a\">Kiekvienas atskiras i\u0161teklius Katana operacij\u0173 eilut\u0117se tampa SkyPlanner darbo centru, susietu raktu santykiu 1:1. Tuomet SkyPlanner sistemoje nustatomos pamainos, neatvykimai ir alternatyv\u016bs darbo centrai.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ar galime i\u0161bandyti SkyPlanner prie\u0161 kurdami integracij\u0105?<\/summary>\n<p class=\"sp-faq__a\">Taip. Per 30 dien\u0173 nemokam\u0105 bandom\u0105j\u012f laikotarp\u012f galite naudoti iki 20 darbo centr\u0173, importav\u0119 CSV duomenis i\u0161 Katana. Mok\u0117jimo kortel\u0117s nereikia. <a href=\"\/lt\/bandymas\/\">Prad\u0117kite bandym\u0105<\/a> arba <a href=\"\/lt\/susisiekite-su-pardavejais\/\">susisiekite su pardavimo komanda<\/a>, kad apibr\u0117\u017etum\u0117te integracijos apimt\u012f.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integracijos \/ ERP \/ Katana Katana integravimo vadovas gamybos tvarkara\u0161\u010diams sudaryti su SkyPlanner APS \u0160iame Katana integravimo vadove konsultantams ir IT komandoms paai\u0161kinama, kaip sujungti Katana Cloud Inventory (Katana MRP) su SkyPlanner APS. SkyPlanner kei\u010diasi duomenimis su Katana abiem kryptimis per vie\u0161\u0105j\u0105 Katana API: skyplanner.ai \u00b7 Gamybos tvarkara\u0161\u010di\u0173 sudarymas Diegimo metu SkyPlanner komanda sukonfig\u016bruoja integracij\u0105 &#8230; <a title=\"Katana integravimo su SkyPlanner APS vadovas gamybos tvarkara\u0161\u010diams sudaryti\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/katana\/integravimo-vadovas\/\" aria-label=\"Read more about Katana integravimo su SkyPlanner APS vadovas gamybos tvarkara\u0161\u010diams sudaryti\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":102998,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-103836","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Katana MRP ir APS integravimo vadovas gamybos tvarkara\u0161\u010diams<\/title>\n<meta name=\"description\" content=\"Katana ir SkyPlanner APS integravimas: Katana API v1, API raktai, webhooks, u\u017eklaus\u0173 ribos, gamybos u\u017esakym\u0173 eil\u0117s keitimas, duomen\u0173 susiejimas, projekt\u0173 patarimai.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/katana\/integravimo-vadovas\/\" \/>\n<meta property=\"og:locale\" content=\"lt_LT\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Katana integravimo su SkyPlanner APS vadovas gamybos tvarkara\u0161\u010diams sudaryti\" \/>\n<meta property=\"og:description\" content=\"Katana ir SkyPlanner APS integravimas: Katana API v1, API raktai, webhooks, u\u017eklaus\u0173 ribos, gamybos u\u017esakym\u0173 eil\u0117s keitimas, duomen\u0173 susiejimas, projekt\u0173 patarimai.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/katana\/integravimo-vadovas\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"11 minu\u010di\u0173\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/katana\\\/integravimo-vadovas\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/katana\\\/integravimo-vadovas\\\/\",\"name\":\"Katana MRP ir APS integravimo vadovas gamybos tvarkara\u0161\u010diams\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#website\"},\"datePublished\":\"2026-10-20T16:09:04+00:00\",\"description\":\"Katana ir SkyPlanner APS integravimas: Katana API v1, API raktai, webhooks, u\u017eklaus\u0173 ribos, gamybos u\u017esakym\u0173 eil\u0117s keitimas, duomen\u0173 susiejimas, projekt\u0173 patarimai.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/katana\\\/integravimo-vadovas\\\/#breadcrumb\"},\"inLanguage\":\"lt-LT\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/katana\\\/integravimo-vadovas\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/katana\\\/integravimo-vadovas\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP ir MES programin\u0117s \u012frangos integracijos su SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bs\u0173 ERP sistemai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS su Katana: gamybos planavimas pagal realius paj\u0117gumus\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/katana\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Katana integravimo su SkyPlanner APS vadovas gamybos tvarkara\u0161\u010diams sudaryti\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lt-LT\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lt-LT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Katana MRP ir APS integravimo vadovas gamybos tvarkara\u0161\u010diams","description":"Katana ir SkyPlanner APS integravimas: Katana API v1, API raktai, webhooks, u\u017eklaus\u0173 ribos, gamybos u\u017esakym\u0173 eil\u0117s keitimas, duomen\u0173 susiejimas, projekt\u0173 patarimai.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/katana\/integravimo-vadovas\/","og_locale":"lt_LT","og_type":"article","og_title":"Katana integravimo su SkyPlanner APS vadovas gamybos tvarkara\u0161\u010diams sudaryti","og_description":"Katana ir SkyPlanner APS integravimas: Katana API v1, API raktai, webhooks, u\u017eklaus\u0173 ribos, gamybos u\u017esakym\u0173 eil\u0117s keitimas, duomen\u0173 susiejimas, projekt\u0173 patarimai.","og_url":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/katana\/integravimo-vadovas\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"11 minu\u010di\u0173"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/katana\/integravimo-vadovas\/","url":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/katana\/integravimo-vadovas\/","name":"Katana MRP ir APS integravimo vadovas gamybos tvarkara\u0161\u010diams","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lt\/#website"},"datePublished":"2026-10-20T16:09:04+00:00","description":"Katana ir SkyPlanner APS integravimas: Katana API v1, API raktai, webhooks, u\u017eklaus\u0173 ribos, gamybos u\u017esakym\u0173 eil\u0117s keitimas, duomen\u0173 susiejimas, projekt\u0173 patarimai.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/katana\/integravimo-vadovas\/#breadcrumb"},"inLanguage":"lt-LT","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/katana\/integravimo-vadovas\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/katana\/integravimo-vadovas\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lt\/"},{"@type":"ListItem","position":2,"name":"ERP ir MES programin\u0117s \u012frangos integracijos su SkyPlanner","item":"https:\/\/skyplanner.ai\/lt\/integracijos\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bs\u0173 ERP sistemai","item":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS su Katana: gamybos planavimas pagal realius paj\u0117gumus","item":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/katana\/"},{"@type":"ListItem","position":5,"name":"Katana integravimo su SkyPlanner APS vadovas gamybos tvarkara\u0161\u010diams sudaryti"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lt\/#website","url":"https:\/\/skyplanner.ai\/lt\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lt\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lt\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lt-LT"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lt\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lt\/","logo":{"@type":"ImageObject","inLanguage":"lt-LT","@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lt\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integracijos \/ ERP \/ Katana Katana integravimo vadovas gamybos tvarkara\u0161\u010diams sudaryti su SkyPlanner APS \u0160iame Katana integravimo vadove konsultantams ir IT komandoms paai\u0161kinama, kaip sujungti Katana Cloud Inventory (Katana MRP) su SkyPlanner APS. SkyPlanner kei\u010diasi duomenimis su Katana abiem kryptimis per vie\u0161\u0105j\u0105 Katana API: skyplanner.ai \u00b7 Gamybos tvarkara\u0161\u010di\u0173 sudarymas Diegimo metu SkyPlanner komanda sukonfig\u016bruoja integracij\u0105&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/pages\/103836","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/comments?post=103836"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/pages\/103836\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/pages\/102998"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/media?parent=103836"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}