{"id":103174,"date":"2026-10-20T16:09:04","date_gmt":"2026-10-20T16:09:04","guid":{"rendered":"https:\/\/skyplanner.ai\/integracijos\/erp\/proalpha\/"},"modified":"2026-10-20T16:09:04","modified_gmt":"2026-10-20T16:09:04","slug":"proalpha","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/proalpha\/","title":{"rendered":"SkyPlanner APS sistemai proALPHA: gamybos planavimas pagal realius paj\u0117gumus"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lt\/integracijos\/\">Integracijos<\/a> \/ <a href=\"\/lt\/integracijos\/erp\/\">ERP<\/a> \/ proALPHA ERP<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SkyPlanner APS sistemai proALPHA: <span class=\"hl\">gamybos planavimas pagal realius paj\u0117gumus<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">SkyPlanner APS \u2013 tai proALPHA priedas, skirtas gamybai planuoti pagal realius stakli\u0173 ir darbuotoj\u0173 paj\u0117gumus. Jis suplanuoja kiekvien\u0173 stakli\u0173, operatoriaus, \u012frankio ir med\u017eiagos naudojim\u0105. Planuotojams nebereikia i\u0161 naujo d\u0117lioti plano programoje Excel, o pasikeitus situacijai gamyboje Autopilot automati\u0161kai atnaujina tvarkara\u0161t\u012f.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lt\/bandymas\/\">Prad\u0117ti nemokam\u0105 bandom\u0105j\u012f laikotarp\u012f<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lt\/susisiekite-su-pardavejais\/\">U\u017esakyti demonstracij\u0105<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Gamybos tvarkara\u0161\u010di\u0173 sudarymas<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt diagrama su darbo centrams suplanuotomis u\u017eduotimis ir u\u017esakym\u0173 s\u0105ra\u0161u apa\u010dioje.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner su Proalpha kei\u010diasi duomenimis abiem kryptimis: i\u0161 Proalpha gaunami gamybos u\u017esakymai, operacijos, i\u0161tekliai, detal\u0117s ir atsargos, o atgal perduodamos suplanuotos operacij\u0173 datos, priskirtos stakl\u0117s ir operatori\u0173 patvirtinimai. Pradiniame diegimo etape SkyPlanner komanda pritaiko integracij\u0105 prie j\u016bs\u0173 Proalpha konfig\u016bracijos.<\/p>\n\n\n<p>Kaina prasideda nuo 199 \u20ac per m\u0117nes\u012f u\u017e 5 darbo centrus. Kiekvienas papildomas darbo centras kainuoja 20 \u20ac per m\u0117nes\u012f. Nemokamai i\u0161bandyti galima 30 dien\u0173 naudojant iki 20 darbo centr\u0173, kredito kortel\u0117s nereikia.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-production\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas pasikei\u010dia j\u016bs\u0173 gamyboje<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Plano programoje Excel nebereikia.<\/p>\n\n\n<p class=\"fx-pain__b\">Tvarkara\u0161tis sudaromas pagal j\u016bs\u0173 Proalpha gamybos u\u017esakymus ir saugomas vienoje vietoje. Visi dirba pagal t\u0105 pat\u012f plan\u0105, o ne pagal planuotojo skai\u010diuokl\u0119 ar u\u017era\u0161us.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Atsi\u017evelgiama \u012f kiekvieno i\u0161tekliaus ribas.<\/p>\n\n\n<p class=\"fx-pain__b\">Planuojant stakli\u0173, \u017emoni\u0173 ir \u012franki\u0173 naudojim\u0105 atsi\u017evelgiama \u012f faktines pamainas, nedarbo laik\u0105 ir vir\u0161valand\u017eius. Vienose stakl\u0117se naudojamas tvirtinimo \u012ftaisas niekada neskiriamas kitoms tuo pa\u010diu metu. U\u017eduo\u010diai, kuriai reikia trij\u0173 operatori\u0173, skiriami trys \u017emon\u0117s, kuri\u0173 pamainose tuo metu yra laisvo laiko.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Ma\u017eiau perderinim\u0173.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner saugo paruo\u0161imo laik\u0105 pereinant nuo vieno gaminio prie kito kiekvienai gamini\u0173 porai abiem kryptimis. Pereiti nuo m\u0117lynos spalvos prie raudonos gali u\u017etrukti 30 minu\u010di\u0173, o nuo raudonos prie m\u0117lynos \u2013 60. Planavimo variklis i\u0161d\u0117sto u\u017eduotis tokia seka, kad b\u016bt\u0173 prarasta kuo ma\u017eiau laiko.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Med\u017eiagos patikrinamos prie\u0161 pradedant darb\u0105.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner sudaro tvarkara\u0161t\u012f pagal turimas atsargas ir numatomus pristatymus pagal pirkimo u\u017esakymus. Tiek\u0117jo pristatymo laukianti u\u017eduotis planuojama ne anks\u010diau nei pristatymo dien\u0105, tod\u0117l darbas nesustoja prie stakli\u0173.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Pasikeitus situacijai, planas atnaujinamas automati\u0161kai.<\/p>\n\n\n<p class=\"fx-pain__b\">Sustojus stakl\u0117ms, gavus skub\u0173 u\u017esakym\u0105 ar darb\u0105 baigus anks\u010diau, Autopilot automati\u0161kai atnaujina tvarkara\u0161t\u012f. Toliau laikomasi j\u016bs\u0173 u\u017efiksuot\u0173 plano element\u0173 ir prioritet\u0173.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Operatoriai mato savo u\u017eduo\u010di\u0173 eil\u0119.<\/p>\n\n\n<p class=\"fx-pain__b\">Kiekvienas operatorius telefone ar plan\u0161et\u0117je mato b\u016bsimas u\u017eduotis ir registruoja atliekam\u0105 darb\u0105. Patvirtinimai perduodami atgal \u012f Proalpha gamybos u\u017esakym\u0105.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Gamintoj\u0173 atsiliepimai apie SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"UTU tiekimo grandin\u0117s specialistas Kalle Kalliom\u00e4ki elektros skyd\u0173 gamybos ceche Ulviloje\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>sutaupoma kas savait\u0119<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSu SkyPlanner nuo gamybos planavimo Excel lentel\u0117se per\u0117jome prie gamybos optimizavimo realiuoju laiku.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, tiekimo grandin\u0117s specialistas<\/b><br>UTU \u00b7 Elektros skydai ir skirstymo \u012franga<\/p>\n\n\n<p class=\"ind-cust__result\">Planuojant gamyb\u0105 kas savait\u0119 sutaupoma 2 valandos darbo laiko, o nauja u\u017eduo\u010di\u0173 eil\u0117 gamybos linij\u0105 pasiekia per kelias sekundes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lt\/klientu-istorijos\/utu\/\">Skaitykite UTU atsiliepim\u0105<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatoriai su \u0161vari\u0173j\u0173 patalp\u0173 apranga prie buteliuk\u0173 pildymo linijos Laboratory &amp; Allied vaist\u0173 gamykloje Nairobyje\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>gamybos efektyvumas<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eGamybos efektyvumas padid\u0117jo 90%.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT vadovas<\/b><br>Laboratory &amp; Allied \u00b7 Vaist\u0173 gamyba<\/p>\n\n\n<p class=\"ind-cust__result\">Gamybos efektyvumas padid\u0117jo 90%, o optimizuotas trij\u0173 m\u0117nesi\u0173 planas visiems darbo centrams sudaromas grei\u010diau nei per 30 minu\u010di\u0173.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lt\/klientu-istorijos\/laboratory-allied\/\">Skaitykite Laboratory &amp; Allied atsiliepim\u0105<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/13-9cbf2d28-08ef-49a1-94e3-0095e107df55.jpg\" alt=\"Fredman Operations gamybos vadov\u0117 Anu J\u00e4rvinen prie darbo cel\u0117s, kurioje robotas krauna gaminius ant pad\u0117kl\u0173, Raumoje\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/10-2fd983ec-02a7-440d-b77d-281f37545c8d.png\" alt=\"Fredman Operations\" width=\"137\" height=\"48\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>6 m\u0117nesiams<\/b><span>\u012f priek\u012f pardav\u0117jai mato laisvus paj\u0117gumus<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner suteikia tvirt\u0105 pagrind\u0105 visam gamybos planavimui ir u\u017etikrina jo patikimum\u0105.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Anu J\u00e4rvinen, gamybos vadov\u0117<\/b><br>Fredman Operations \u00b7 S\u0105ly\u010diui su maistu tinkamas pakavimo popierius<\/p>\n\n\n<p class=\"ind-cust__result\">Pardav\u0117jai mato laisvus paj\u0117gumus \u0161e\u0161iems m\u0117nesiams \u012f priek\u012f, o \u012f pra\u0161ymus pakeisti tvarkara\u0161t\u012f atsakoma per kelias sekundes, nors anks\u010diau tam reik\u0117davo valandos ar daugiau.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lt\/klientu-istorijos\/fredman-operations\/\">Skaitykite Fredman Operations atsiliepim\u0105<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Mamec generalinis direktorius Hannu Ryyn\u00e4nen \u012fmon\u0117s gamybos ceche Lohjoje\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>1 000 ir daugiau<\/b><span>automati\u0161kai suplanuot\u0173 gamybos u\u017esakym\u0173<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eGamyb\u0105 valdome visai kitaip, o m\u016bs\u0173 supratimas apie paj\u0117gumus pasiek\u0117 visi\u0161kai kit\u0105 lyg\u012f.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, generalinis direktorius<\/b><br>Mamec \u00b7 Pramonin\u0117s mai\u0161ykl\u0117s, siurbliai ir auk\u0161t\u0173j\u0173 technologij\u0173 gamyba pagal u\u017esakym\u0105<\/p>\n\n\n<p class=\"ind-cust__result\">T\u016bkstan\u010diai gamybos u\u017esakym\u0173 suplanuojami automati\u0161kai, o visa organizacija mato gamybos pad\u0117t\u012f realiuoju laiku.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lt\/klientu-istorijos\/mamec\/\">Skaityti Mamec atsiliepim\u0105<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-the-proalpha-integration-works\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kaip veikia integracija su proALPHA<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Proalpha perduoda u\u017eduotis.<\/strong> \u012e SkyPlanner patenka atviri gamybos u\u017esakymai (Fertigungsauftr\u00e4ge) su j\u0173 operacijomis, i\u0161tekliais, paruo\u0161imo ir vykdymo laikais, taip pat detal\u0117s ir atsargos.<\/li>\n\n\n<li><strong>SkyPlanner sudaro tvarkara\u0161t\u012f ir nuolat j\u012f atnaujina.<\/strong> Arcturus variklis per kelias sekundes suplanuoja kiekvien\u0105 operacij\u0105 kiekviename darbo centre ir atnaujina plan\u0105 pasikeitus situacijai gamyboje.<\/li>\n\n\n<li><strong>Datos, stakl\u0117s ir patvirtinimai perduodami atgal.<\/strong> Kiekvienos operacijos suplanuota prad\u017eia ir pabaiga, priskirtas i\u0161teklius ir operatori\u0173 patvirtinimai gr\u0105\u017einami \u012f Proalpha gamybos u\u017esakym\u0105.<\/li>\n\n<\/ol>\n\n\n<p>Duomenims \u012fra\u0161yti atgal naudojamos pa\u010dios Proalpha REST API i\u0161 Proalpha API Portal: setWorkOrderOperationDates, changeWorkOrderOperationResource ir operationDataEntry. Kiekvienoje gamykloje Proalpha duomen\u0173 modelis skiriasi, tod\u0117l pradiniame diegimo etape SkyPlanner komanda susieja j\u016bs\u0173 i\u0161teklius ir gamybos u\u017esakymus, o prad\u0117jus naudoti sistem\u0105 toliau teikia integracijos palaikym\u0105. Integracijos kaina pateikiama i\u0161 anksto pagal j\u016bs\u0173 proces\u0105 ir poreikius. J\u016bs\u0173 Proalpha partneris arba j\u016bs\u0173 programuotojai taip pat gali kurti integracij\u0105 naudodamiesi dokumentuota SkyPlanner API (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API \u017einynas<\/a>).<\/p>\n\n\n<p>S\u0105sajos, lauk\u0173 susiejimas ir taisykl\u0117s, nustatan\u010dios, kuri sistema valdo duomenis, apra\u0161yti <a href=\"\/lt\/integracijos\/erp\/proalpha\/integravimo-vadovas\/\">proALPHA integracijos vadove, skirtame gamybos tvarkara\u0161\u010diams sudaryti<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-moves-between-proalpha-and-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kokiais duomenimis kei\u010diasi proALPHA ir SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>proALPHA<\/th><th>SkyPlanner<\/th><th>Kryptis<\/th><\/tr><\/thead><tbody><tr><td>Detal\u0117 (Teil)<\/td><td>Gaminiai ir med\u017eiagos<\/td><td>\u012e SkyPlanner<\/td><\/tr><tr><td>Gamybos u\u017esakymas (Fertigungsauftrag) su kiekiu ir \u012fvykdymo terminu<\/td><td>U\u017esakymas ir u\u017eduotys su \u012fvykdymo terminu ir prioritetu<\/td><td>\u012e SkyPlanner<\/td><\/tr><tr><td>Gamybos u\u017esakymo operacijos su norminiu paruo\u0161imo ir vykdymo laiku<\/td><td>Proceso etapai su paruo\u0161imo laiku ir trukme<\/td><td>\u012e SkyPlanner<\/td><\/tr><tr><td>I\u0161tekliai, i\u0161tekli\u0173 grup\u0117s, alternatyvios i\u0161tekli\u0173 grup\u0117s<\/td><td>Darbo centrai, darbo centr\u0173 grup\u0117s, alternatyv\u016bs darbo centrai<\/td><td>\u012e SkyPlanner<\/td><\/tr><tr><td>I\u0161tekli\u0173 kalendoriai<\/td><td>Pamainos, nedarbo laikas ir efektyvumo rodikliai<\/td><td>\u012e SkyPlanner<\/td><\/tr><tr><td>Atsargos pagal MRP srit\u012f<\/td><td>Med\u017eiag\u0173 atsargos<\/td><td>\u012e SkyPlanner<\/td><\/tr><tr><td>Pirkimo u\u017esakymai su pristatymo data<\/td><td>Gaunamos med\u017eiagos pagal pristatymo dat\u0105<\/td><td>\u012e SkyPlanner<\/td><\/tr><tr><td>setWorkOrderOperationDates<\/td><td>Suplanuota kiekvienos operacijos prad\u017eia ir pabaiga<\/td><td>Atgal \u012f Proalpha<\/td><\/tr><tr><td>changeWorkOrderOperationResource<\/td><td>Pagal tvarkara\u0161t\u012f priskirtas darbo centras<\/td><td>Atgal \u012f Proalpha<\/td><\/tr><tr><td>operationDataEntry<\/td><td>Operatori\u0173 u\u017eregistruotas laikas ir kiekiai<\/td><td>Atgal \u012f Proalpha<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Pradiniame diegimo etape sistemoje SkyPlanner nustatoma perderinimo laik\u0173 matrica, \u012franki\u0173 i\u0161tekliai ir kiekvienai u\u017eduo\u010diai reikalingas operatori\u0173 skai\u010dius.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"proalpha-aps-and-finite-capacity-scheduling\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Proalpha APS ir gamybos planavimas pagal realius paj\u0117gumus<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Proalpha turi savo APS, \u012ftraukt\u0105 \u012f Proalpha Production. Tiek\u0117jas j\u0105 apib\u016bdina taip:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>APS \u2013 sistemos pagrindas.<\/strong> &#8222;APS (Advanced Planning and Scheduling) is the core of Proalpha Production.&#8221; (APS, arba pa\u017eangusis planavimas ir tvarkara\u0161\u010di\u0173 sudarymas, yra Proalpha Production pagrindas.) (<a href=\"https:\/\/www.proalpha.com\/en\/proalpha-erp\/modules\/production\/\">Proalpha<\/a>)<\/li>\n\n\n<li><strong>Optimizuotas keli\u0173 i\u0161tekli\u0173 planavimas.<\/strong> APS &#8222;allows optimized resource planning according to managerial targets such as delivery reliability and cycle times.&#8221; (leid\u017eia optimizuoti i\u0161tekli\u0173 planavim\u0105 pagal valdymo tikslus, pavyzd\u017eiui, pristatymo patikimum\u0105 ir ciklo trukm\u0119.) Operacijai galima naudoti bet kok\u012f i\u0161tekli\u0173 skai\u010di\u0173, suderinus j\u0173 prieinamum\u0105.<\/li>\n\n\n<li><strong>Automatinis u\u017esakym\u0173 planavimas.<\/strong> Proalpha kliento patirties apra\u0161yme nurodoma, kad APS automati\u0161kai planuoja u\u017esakymus ir nustato j\u0173 vykdymo sek\u0105 (&#8222;automatisch geplant und eingetaktet&#8221; \u2013 automati\u0161kai suplanuojami ir i\u0161d\u0117stomi laike). (<a href=\"https:\/\/www.proalpha.com\/de\/proalpha-referenzen\/dickert\">Proalpha<\/a>)<\/li>\n\n\n<li><strong>Galimyb\u0117 koreguoti rankiniu b\u016bdu.<\/strong> &#8222;Finite planning allows manual changes to the sequence in which orders are processed on short notice.&#8221; (Planuojant pagal realius paj\u0117gumus, u\u017esakym\u0173 vykdymo sek\u0105 galima operatyviai keisti rankiniu b\u016bdu.)<\/li>\n\n\n<li><strong>Proces\u0173 modeliai vietoje technologini\u0173 mar\u0161rut\u0173.<\/strong> Proalpha &#8222;completely dispenses with bills of materials and routings for production planning&#8221; (planuojant gamyb\u0105 visi\u0161kai atsisako med\u017eiag\u0173 \u017einiara\u0161\u010di\u0173 ir technologini\u0173 mar\u0161rut\u0173) ir planuoja pagal gamini\u0173 proces\u0173 modelius.<\/li>\n\n\n<li><strong>B\u016btini duomenys i\u0161 gamybos realiuoju laiku.<\/strong> Gamybos duomen\u0173 rinkimas &#8222;enables precise advanced planning and scheduling (APS).&#8221; (leid\u017eia tiksliai atlikti pa\u017eang\u0173j\u012f planavim\u0105 ir sudaryti tvarkara\u0161\u010dius (APS).) (<a href=\"https:\/\/www.proalpha.com\/en\/proalpha-erp\/processes\/plant-data-collection-pdc\">Proalpha<\/a>)<\/li>\n\n<\/ul>\n\n\n<p>Toks optimizavimas priklauso nuo tvarking\u0173 proces\u0173 modeli\u0173, i\u0161tekli\u0173 kalendori\u0173 ir realiuoju laiku gaunam\u0173 duomen\u0173 i\u0161 gamybos cecho \u2013 visa tai parengiama \u012fgyvendinant Proalpha projekt\u0105. Pats Proalpha atstovas dr. Markus Berg popierinius patvirtinimus, suvedamus savaitgal\u012f, vadina &#8222;f\u00fcr eine APS-Planung zu ungenau&#8221; (pernelyg netiksliais APS planavimui) (<a href=\"https:\/\/it-production.com\/produktionsmanagement\/interview-markus-berg-proalpha\/\">IT&amp;Production<\/a>). To ne\u012fsidiegusios gamyklos greta ERP ir toliau planuoja programoje Excel. SkyPlanner vienu varikliu kartu planuoja stakles, \u017emones, \u012frankius, med\u017eiagas ir perderinimus, o Autopilot atnaujina tvarkara\u0161t\u012f. Integracij\u0105 sukonfig\u016bruoja SkyPlanner komanda. Jau bandomuoju laikotarpiu gamyklos gauna savo gamybos u\u017esakym\u0173 tvarkara\u0161t\u012f, sudaryt\u0105 pagal realius paj\u0117gumus, o sistemos kaina skelbiama vie\u0161ai. Visi \u017eingsniai paai\u0161kinti straipsnyje <a href=\"\/lt\/integracijos\/erp\/proalpha\/gamybos-planavimas\/\">Ar proALPHA leid\u017eia planuoti gamyb\u0105 pagal realius paj\u0117gumus?<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-skyplanner-adds-to-proalpha\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kuo SkyPlanner papildo proALPHA<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>Proalpha su planu programoje Excel<\/th><th>Proalpha su SkyPlanner APS<\/th><\/tr><\/thead><tbody><tr><td>Planas<\/td><td>Vieno planuotojo pri\u017ei\u016brima skai\u010diuokl\u0117<\/td><td>Vienas nuolat atnaujinamas tvarkara\u0161tis pagal Proalpha gamybos u\u017esakymus<\/td><\/tr><tr><td>Paj\u0117gumai<\/td><td>Vertinami i\u0161 akies<\/td><td>Atsi\u017evelgiama \u012f kiekvien\u0173 stakli\u0173, \u017emogaus ir \u012frankio paj\u0117gum\u0173 ribas bei pamainas<\/td><\/tr><tr><td>Seka<\/td><td>Kei\u010diama rankiniu b\u016bdu<\/td><td>Per kelias sekundes sudaromas atskir\u0173 operacij\u0173 tvarkara\u0161tis<\/td><\/tr><tr><td>Perderinimai<\/td><td>Remiamasi planuotojo patirtimi<\/td><td>U\u017eduotys i\u0161d\u0117stomos taip, kad bendras paruo\u0161imo laikas b\u016bt\u0173 kuo trumpesnis<\/td><\/tr><tr><td>\u012erankiai ir brigados<\/td><td>Sekami atskirai<\/td><td>Atsi\u017evelgiama \u012f \u012franki\u0173 prieinamumo ribas; u\u017eduotims skiriamas reikiamas operatori\u0173 skai\u010dius<\/td><\/tr><tr><td>Med\u017eiagos<\/td><td>Tikrina planuotojas<\/td><td>U\u017eduotys pradedamos turint atsarg\u0173 arba gavus med\u017eiagas<\/td><\/tr><tr><td>Poky\u010diai<\/td><td>Po kiekvieno sutrikimo planas sudaromas i\u0161 naujo<\/td><td>Autopilot atnaujina plan\u0105 laikydamasis j\u016bs\u0173 prioritet\u0173<\/td><\/tr><tr><td>Gamybos cechas<\/td><td>Patvirtinimai popieriuje arba terminale<\/td><td>Operatoriaus u\u017eduo\u010di\u0173 eil\u0117 ir darbo registravimas telefone ar plan\u0161et\u0117je<\/td><\/tr><tr><td>Duomen\u0173 \u012fra\u0161ymas atgal<\/td><td>Datos \u012f Proalpha \u012fvedamos rankiniu b\u016bdu<\/td><td>Datos, i\u0161tekliai ir patvirtinimai perduodami per REST<\/td><\/tr><tr><td>Prad\u017eia<\/td><td>Proalpha projektas, vie\u0161o kainora\u0161\u010dio n\u0117ra<\/td><td>J\u016bs\u0173 gamybos u\u017esakym\u0173 tvarkara\u0161tis nemokamu bandomuoju laikotarpiu<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-to-choose-a-scheduler-for-proalpha\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kaip pasirinkti gamybos tvarkara\u0161\u010di\u0173 sudarymo sprendim\u0105 proALPHA sistemai<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Be pirmiau apra\u0161yt\u0173 projekto darb\u0173, Proalpha APS derina kartu su savo konsultantais. KWM atveju: &#8222;Production planning was optimized remotely together with Proalpha consultants&#8221; (gamybos planavimas buvo optimizuotas nuotoliniu b\u016bdu kartu su Proalpha konsultantais) (<a href=\"https:\/\/www.proalpha.com\/en\/references\/kwm-weisshaar-gmbh\">Proalpha<\/a>). Proalpha kainos neskelbia; kainodaros puslapyje atsakoma: &#8222;Das kommt darauf an&#8221; (tai priklauso nuo aplinkybi\u0173) (<a href=\"https:\/\/www.proalpha.com\/de\/preis\">Proalpha<\/a>). <a href=\"\/lt\/gamybos-tvarkarasciu-sudarymo-programa-vidutinems-gamybos\/\">Vidutinio dyd\u017eio gamykla<\/a>, \u0161iandien planuojanti darbus Excel, su SkyPlanner grei\u010diau gauna tinkam\u0105 naudoti tvarkara\u0161t\u012f, sudaryt\u0105 pagal realius \u012frengini\u0173 ir darbuotoj\u0173 paj\u0117gumus. Abiem atvejais Proalpha lieka pagrindin\u0117 sistema.<\/p>\n\n\n<p><strong>Rinkit\u0117s SkyPlanner, o ne Proalpha APS, jei:<\/strong><\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>\u0160iuo metu planuojate Excel<\/strong> ir norite savo gamybos u\u017esakym\u0173 tvarkara\u0161t\u012f, atitinkant\u012f realius paj\u0117gumus, gauti per kelias savaites, o ne tik u\u017ebaig\u0119 planavimo projekt\u0105.<\/li>\n\n\n<li><strong>Pirmiausia norite i\u0161bandyti su tikrais duomenimis<\/strong> per 30 dien\u0173 bandom\u0105j\u012f laikotarp\u012f, dar nepri\u0117m\u0119 sprendimo d\u0117l licencijos ar projekto.<\/li>\n\n\n<li><strong>Perderinimai lemia j\u016bs\u0173 gamybos apimt\u012f.<\/strong> Paruo\u0161imo laiko matrica i\u0161d\u0117sto u\u017eduotis taip, kad bendras paruo\u0161imo laikas b\u016bt\u0173 kuo trumpesnis.<\/li>\n\n\n<li><strong>Bendrai naudojami \u012frankiai ir u\u017eduotys, kurioms reikia keli\u0173 operatori\u0173, lemia, k\u0105 galima vykdyti toliau.<\/strong><\/li>\n\n\n<li><strong>Med\u017eiag\u0173 atvykimas lemia, kuri\u0105 u\u017eduot\u012f galima prad\u0117ti.<\/strong> Kiekvienos operacijos prad\u017eia priklauso nuo atsarg\u0173 ir pirkimo u\u017esakym\u0173.<\/li>\n\n\n<li><strong>Planas kei\u010diasi kasdien.<\/strong> Po kiekvieno poky\u010dio Autopilot perskai\u010diuoja tvarkara\u0161t\u012f, planuotojui nereikia paleisti perskai\u010diavimo, o naujos datos perduodamos atgal \u012f Proalpha.<\/li>\n\n\n<li><strong>Operatoriai turi dirbti pagal savo u\u017eduo\u010di\u0173 eil\u0119<\/strong> telefone ar plan\u0161et\u0117je, o patvirtinimai turi b\u016bti perduodami \u012f Proalpha.<\/li>\n\n\n<li><strong>Norite, kad integracij\u0105 jums sukonfig\u016bruot\u0173 ir pri\u017ei\u016br\u0117t\u0173.<\/strong> SkyPlanner komanda j\u0105 \u012fdiegia ir pri\u017ei\u016bri prad\u0117jus naudoti sistem\u0105. Vie\u0161ai skelbiama kaina \u2013 nuo 199 \u20ac per m\u0117nes\u012f.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kaip prad\u0117ti<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Prad\u0117kite nemokam\u0105 bandom\u0105j\u012f laikotarp\u012f.<\/strong> 30 dien\u0173, iki 20 darbo centr\u0173, visos Basic funkcijos, be mok\u0117jimo kortel\u0117s.<\/li>\n\n\n<li><strong>Sumodeliuokite savo gamyb\u0105.<\/strong> SkyPlanner sistemoje sukurkite \u012frenginius, darbuotojus ir pamainas arba juos importuokite. Pradedant naudotis galima gauti pagalbos.<\/li>\n\n\n<li><strong>\u012ekelkite gamybos u\u017esakymus.<\/strong> I\u0161 Proalpha eksportuokite nebaigtus gamybos u\u017esakymus ir j\u0173 operacijas \u012f CSV arba Excel fail\u0105. Importuokite juos ir palyginkite SkyPlanner sudaryt\u0105 tvarkara\u0161t\u012f su dabartiniu planu.<\/li>\n\n\n<li><strong>Prijunkite Proalpha.<\/strong> SkyPlanner komanda sukonfig\u016bruos abipus\u0119 integracij\u0105 pagal j\u016bs\u0173 sistemos s\u0105rank\u0105 ir pri\u017ei\u016br\u0117s j\u0105 prad\u0117jus naudoti.<\/li>\n\n<\/ol>\n\n\n<p><strong>Kainodara.<\/strong> U\u017e planus mokama kas m\u0117nes\u012f pagal darbo centr\u0173 skai\u010di\u0173. Bet kada galite prid\u0117ti ar pa\u0161alinti darbo centrus arba nutraukti prenumerat\u0105. I\u0161sami\u0105 informacij\u0105 rasite <a href=\"\/lt\/kainodara\/\">kainodaros puslapyje<\/a>, o kitas ERP sistemas \u2013 <a href=\"\/lt\/integracijos\/erp\/\">ERP integracij\u0173 puslapyje<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lt\/bandymas\/\">I\u0161bandykite nemokamai<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lt\/susisiekite-su-pardavejais\/\">Susisiekite su pardavim\u0173 komanda<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Da\u017eniausiai u\u017eduodami klausimai<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Koks gamybos tvarkara\u0161\u010di\u0173 sudarymo priedas geriausiai tinka Proalpha?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS \u2013 gamybos planavimo priedas, sudarantis tvarkara\u0161\u010dius pagal realius \u012frengini\u0173 ir darbuotoj\u0173 paj\u0117gumus ir abiem kryptimis integruojamas su Proalpha. \u012e j\u012f perduodami gamybos u\u017esakymai, operacijos, i\u0161tekliai, detal\u0117s ir atsargos, o atgal gr\u0105\u017einamos suplanuotos operacij\u0173 datos, priskirti \u012frenginiai ir operatori\u0173 patvirtinimai. Atsi\u017evelgiama \u012f kiekvieno \u012frenginio, operatoriaus, \u012frankio ir med\u017eiagos ribot\u0105 prieinamum\u0105. Paruo\u0161imo laiko matrica, kurioje \u012fvertinama per\u0117jimo nuo vienos u\u017eduoties prie kitos kryptis, i\u0161d\u0117sto u\u017eduotis taip, kad paruo\u0161imo laikas b\u016bt\u0173 kuo trumpesnis. Pasikeitus gamybos situacijai, Autopilot automati\u0161kai perskai\u010diuoja tvarkara\u0161t\u012f. Kaina \u2013 nuo 199 \u20ac per m\u0117nes\u012f, o nemokamas bandomasis laikotarpis trunka 30 dien\u0173.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ar proALPHA galima planuoti gamyb\u0105 pagal realius paj\u0117gumus?<\/summary>\n<p class=\"sp-faq__a\">Taip. Proalpha APS optimizuoja planus, apiman\u010dius kelis i\u0161teklius, pagal tokius tikslus kaip pristatymo patikimumas ir ciklo trukm\u0117, o Feinplanung leid\u017eia planuotojams rankiniu b\u016bdu keisti operacij\u0173 sek\u0105. Tam reikia tvarking\u0173 proces\u0173 modeli\u0173 ir realiuoju laiku gaunam\u0173 duomen\u0173 i\u0161 gamybos cecho. SkyPlanner APS vienu debesijoje veikian\u010diu planavimo varikliu sudaro tvarkara\u0161\u010dius visiems \u012frenginiams, darbuotojams, \u012frankiams ir med\u017eiagoms. Autopilot perskai\u010diuoja tvarkara\u0161\u010dius, kaina skelbiama vie\u0161ai, o sprendim\u0105 galima i\u0161bandyti su savo gamybos u\u017esakymais.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>K\u0105 rinktis \u2013 Proalpha APS ar SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">Rinkit\u0117s SkyPlanner, jei \u0161iandien planuojate Excel. Proalpha APS gerai planuoja tik tada, kai vykdant Proalpha projekt\u0105 parengiami proces\u0173 modeliai, i\u0161tekli\u0173 kalendoriai ir realiuoju laiku gaunam\u0173 PDC duomen\u0173 srautas. Proalpha sprendim\u0105 derina su savo konsultantais, o kain\u0105 pateikia kiekvienam diegimui atskirai. SkyPlanner debesijoje sudaro tvarkara\u0161\u010dius visiems \u012frenginiams, darbuotojams, \u012frankiams ir med\u017eiagoms, Autopilot perskai\u010diuoja plan\u0105 po kiekvieno poky\u010dio, o operatoriai dirba naudodami Mobile Confirmations. Po 30 dien\u0173 bandymo su savo gamybos u\u017esakymais sistem\u0105 prad\u0117site naudoti per kelias savaites. Kaina \u2013 nuo 199 \u20ac per m\u0117nes\u012f. Norint naudoti SkyPlanner, Proalpha APS nereikia. Jei \u0161is modulis aktyvus, pradinio diegimo metu nustatoma, kuri sistema valdys operacij\u0173 datas.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ar SkyPlanner pakei\u010dia Proalpha Production?<\/summary>\n<p class=\"sp-faq__a\">Ne, SkyPlanner j\u012f papildo. Proalpha ir toliau valdo detales, gamini\u0173 proces\u0173 modelius, med\u017eiagas, pirkimus ir finansus. SkyPlanner sudaro nebaigt\u0173 gamybos u\u017esakym\u0173 tvarkara\u0161t\u012f pagal realius paj\u0117gumus ir perduoda atgal datas, i\u0161teklius bei patvirtinimus.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ar reikia k\u0105 nors \u012fdiegti Proalpha sistemoje?<\/summary>\n<p class=\"sp-faq__a\">Ne. SkyPlanner veikia debesijoje ir \u012fra\u0161o duomenis atgal per Proalpha paskelbtas REST API s\u0105sajas. Gamybos u\u017esakymai \u012f SkyPlanner patenka per j\u016bs\u0173 Proalpha s\u0105sajas, kurios sukonfig\u016bruojamos pradinio diegimo metu.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kiek SkyPlanner kainuoja Proalpha naudojan\u010diai gamyklai?<\/summary>\n<p class=\"sp-faq__a\">Nuo 199 \u20ac per m\u0117nes\u012f su 5 darbo centrais ir po 20 \u20ac per m\u0117nes\u012f u\u017e kiekvien\u0105 papildom\u0105 darbo centr\u0105. Darbo centras \u2013 gamybos i\u0161teklius, turintis savo suplanuot\u0173 u\u017eduo\u010di\u0173 eil\u0119. Integracijos kaina pateikiama i\u0161 anksto kartu su pasirinktu planu, atsi\u017evelgiant \u012f j\u016bs\u0173 proces\u0105 ir poreikius, tod\u0117l visas i\u0161laidas \u017einosite dar prie\u0161 prad\u0117dami.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kiek trunka diegimas?<\/summary>\n<p class=\"sp-faq__a\">Prad\u0117jus pradin\u012f parengim\u0105, diegimas paprastai baigiamas per kelias savaites. Komanda susieja j\u016bs\u0173 i\u0161teklius ir gamybos u\u017esakymus, prijungia atsarg\u0173 bei pirkimo u\u017esakym\u0173 duomenis ir \u012fjungia duomen\u0173 \u012fra\u0161ym\u0105 atgal. Prie\u0161 pradedant naudoti sistem\u0105 viskas i\u0161bandoma lyginant su dabartiniu planu.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ar galime i\u0161bandyti SkyPlanner prie\u0161 integruodami su Proalpha?<\/summary>\n<p class=\"sp-faq__a\">Taip. Per 30 dien\u0173 bandom\u0105j\u012f laikotarp\u012f naudojami j\u016bs\u0173 nebaigti Proalpha gamybos u\u017esakymai, eksportuoti \u012f CSV arba Excel fail\u0105. Dar neprad\u0117jus joki\u0173 integravimo darb\u0173 matysite savo gamybos <a href=\"\/lt\/istekliai\/ribotu-pajegumu-planavimas\/\">tvarkara\u0161t\u012f, sudaryt\u0105 pagal realius paj\u0117gumus<\/a>.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integracijos \/ ERP \/ proALPHA ERP SkyPlanner APS sistemai proALPHA: gamybos planavimas pagal realius paj\u0117gumus SkyPlanner APS \u2013 tai proALPHA priedas, skirtas gamybai planuoti pagal realius stakli\u0173 ir darbuotoj\u0173 paj\u0117gumus. Jis suplanuoja kiekvien\u0173 stakli\u0173, operatoriaus, \u012frankio ir med\u017eiagos naudojim\u0105. Planuotojams nebereikia i\u0161 naujo d\u0117lioti plano programoje Excel, o pasikeitus situacijai gamyboje Autopilot automati\u0161kai atnaujina tvarkara\u0161t\u012f. &#8230; <a title=\"SkyPlanner APS sistemai proALPHA: gamybos planavimas pagal realius paj\u0117gumus\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/proalpha\/\" aria-label=\"Read more about SkyPlanner APS sistemai proALPHA: gamybos planavimas pagal realius paj\u0117gumus\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100679,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-103174","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>proALPHA integracija: APS planavimas pagal realius paj\u0117gumus<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS \u2013 proALPHA priedas: dvikrypt\u0117 integracija, planavimas pagal realius stakli\u0173, pamain\u0173, \u012franki\u0173 ir med\u017eiag\u0173 i\u0161teklius. Nuo 199 \u20ac per m\u0117nes\u012f.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/proalpha\/\" \/>\n<meta property=\"og:locale\" content=\"lt_LT\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SkyPlanner APS sistemai proALPHA: gamybos planavimas pagal realius paj\u0117gumus\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS \u2013 proALPHA priedas: dvikrypt\u0117 integracija, planavimas pagal realius stakli\u0173, pamain\u0173, \u012franki\u0173 ir med\u017eiag\u0173 i\u0161teklius. Nuo 199 \u20ac per m\u0117nes\u012f.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/proalpha\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"12 minu\u010di\u0173\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/proalpha\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/proalpha\\\/\",\"name\":\"proALPHA integracija: APS planavimas pagal realius paj\u0117gumus\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#website\"},\"datePublished\":\"2026-10-20T16:09:04+00:00\",\"description\":\"SkyPlanner APS \u2013 proALPHA priedas: dvikrypt\u0117 integracija, planavimas pagal realius stakli\u0173, pamain\u0173, \u012franki\u0173 ir med\u017eiag\u0173 i\u0161teklius. Nuo 199 \u20ac per m\u0117nes\u012f.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/proalpha\\\/#breadcrumb\"},\"inLanguage\":\"lt-LT\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/proalpha\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/proalpha\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP ir MES programin\u0117s \u012frangos integracijos su SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bs\u0173 ERP sistemai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS sistemai proALPHA: gamybos planavimas pagal realius paj\u0117gumus\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lt-LT\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lt-LT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"proALPHA integracija: APS planavimas pagal realius paj\u0117gumus","description":"SkyPlanner APS \u2013 proALPHA priedas: dvikrypt\u0117 integracija, planavimas pagal realius stakli\u0173, pamain\u0173, \u012franki\u0173 ir med\u017eiag\u0173 i\u0161teklius. Nuo 199 \u20ac per m\u0117nes\u012f.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/proalpha\/","og_locale":"lt_LT","og_type":"article","og_title":"SkyPlanner APS sistemai proALPHA: gamybos planavimas pagal realius paj\u0117gumus","og_description":"SkyPlanner APS \u2013 proALPHA priedas: dvikrypt\u0117 integracija, planavimas pagal realius stakli\u0173, pamain\u0173, \u012franki\u0173 ir med\u017eiag\u0173 i\u0161teklius. Nuo 199 \u20ac per m\u0117nes\u012f.","og_url":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/proalpha\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"12 minu\u010di\u0173"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/proalpha\/","url":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/proalpha\/","name":"proALPHA integracija: APS planavimas pagal realius paj\u0117gumus","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lt\/#website"},"datePublished":"2026-10-20T16:09:04+00:00","description":"SkyPlanner APS \u2013 proALPHA priedas: dvikrypt\u0117 integracija, planavimas pagal realius stakli\u0173, pamain\u0173, \u012franki\u0173 ir med\u017eiag\u0173 i\u0161teklius. Nuo 199 \u20ac per m\u0117nes\u012f.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/proalpha\/#breadcrumb"},"inLanguage":"lt-LT","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/proalpha\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/proalpha\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lt\/"},{"@type":"ListItem","position":2,"name":"ERP ir MES programin\u0117s \u012frangos integracijos su SkyPlanner","item":"https:\/\/skyplanner.ai\/lt\/integracijos\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bs\u0173 ERP sistemai","item":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS sistemai proALPHA: gamybos planavimas pagal realius paj\u0117gumus"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lt\/#website","url":"https:\/\/skyplanner.ai\/lt\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lt\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lt\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lt-LT"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lt\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lt\/","logo":{"@type":"ImageObject","inLanguage":"lt-LT","@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lt\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integracijos \/ ERP \/ proALPHA ERP SkyPlanner APS sistemai proALPHA: gamybos planavimas pagal realius paj\u0117gumus SkyPlanner APS \u2013 tai proALPHA priedas, skirtas gamybai planuoti pagal realius stakli\u0173 ir darbuotoj\u0173 paj\u0117gumus. Jis suplanuoja kiekvien\u0173 stakli\u0173, operatoriaus, \u012frankio ir med\u017eiagos naudojim\u0105. Planuotojams nebereikia i\u0161 naujo d\u0117lioti plano programoje Excel, o pasikeitus situacijai gamyboje Autopilot automati\u0161kai atnaujina tvarkara\u0161t\u012f.&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/pages\/103174","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/comments?post=103174"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/pages\/103174\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/pages\/100679"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/media?parent=103174"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}