{"id":103056,"date":"2026-10-20T16:09:04","date_gmt":"2026-10-20T16:09:04","guid":{"rendered":"https:\/\/skyplanner.ai\/integracijos\/erp\/monday\/"},"modified":"2026-10-20T16:09:04","modified_gmt":"2026-10-20T16:09:04","slug":"monday","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/monday\/","title":{"rendered":"SkyPlanner APS, skirta monday.com: gamybos planavimas pagal realius \u012frengini\u0173 ir darbuotoj\u0173 paj\u0117gumus"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lt\/integracijos\/\">Integracijos<\/a> \/ <a href=\"\/lt\/integracijos\/erp\/\">ERP<\/a> \/ monday.com<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SkyPlanner APS, skirta monday.com: <span class=\"hl\">gamybos planavimas pagal realius \u012frengini\u0173 ir darbuotoj\u0173 paj\u0117gumus<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">SkyPlanner APS \u2013 gamybos planavimo priedas gamintojams, kurie u\u017esakymus valdo monday.com. Tvarkara\u0161tis sudaromas pagal realius \u012frengini\u0173 ir darbuotoj\u0173 paj\u0117gumus, numatant kiekvieno \u012frenginio, operatoriaus, \u012frankio ir med\u017eiagos naudojim\u0105. J\u016bs\u0173 lentos lieka ten, kur dirba komanda, o jose pateiktas tvarkara\u0161tis pagaliau atitinka tikrov\u0119.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lt\/bandymas\/\">Prad\u0117ti nemokam\u0105 bandom\u0105j\u012f laikotarp\u012f<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lt\/susisiekite-su-pardavejais\/\">U\u017esakyti demonstracij\u0105<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Gamybos tvarkara\u0161\u010di\u0173 sudarymas<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt diagrama su darbo centrams suplanuotomis u\u017eduotimis ir u\u017esakym\u0173 s\u0105ra\u0161u apa\u010dioje.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner integracija su monday.com veikia abiem kryptimis: u\u017esakym\u0173 \u012fra\u0161ai su kiekiais, terminais ir b\u016bsenomis perduodami \u012f SkyPlanner, o suplanuota prad\u017eia, pabaiga, darbo centras ir vykdymo eiga gr\u0105\u017einami \u012f j\u016bs\u0173 stulpelius. Diegimo metu SkyPlanner komanda pritaiko integracij\u0105 j\u016bs\u0173 lentoms.<\/p>\n\n\n<p>Kaina prasideda nuo 199 \u20ac per m\u0117nes\u012f u\u017e 5 darbo centrus. Kiekvienas papildomas darbo centras kainuoja 20 \u20ac per m\u0117nes\u012f. Nemokamai i\u0161bandyti galima 30 dien\u0173 naudojant iki 20 darbo centr\u0173, kredito kortel\u0117s nereikia.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-production\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas pasikei\u010dia j\u016bs\u0173 gamyboje<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Vietoj raudon\u0173 Workload burbul\u0173 \u2013 \u012fgyvendinamas planas.<\/p>\n\n\n<p class=\"fx-pain__b\">monday.com parodo, kam paskirta per daug darbo. SkyPlanner kiekvien\u0105 u\u017eduot\u012f suplanuoja tam \u012frenginiui ir tai pamainai, kur yra laisv\u0173 paj\u0117gum\u0173, tod\u0117l gamybos ceche niekada nesusidaro perkrova.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Kiekvienam \u012frenginiui \u2013 atskiras kalendorius.<\/p>\n\n\n<p class=\"fx-pain__b\">Kiekvienam darbo centrui atskirai nustatomos pamainos, technin\u0117s prie\u017ei\u016bros pertraukos, vir\u0161valand\u017eiai ir neatvykimai. Jei u\u017eduo\u010diai reikia trij\u0173 operatori\u0173, jai skiriami trys \u017emon\u0117s, kuri\u0173 pamainos laisvos. Viename \u012frenginyje naudojamas \u0161tampas tuo pat metu niekada neskiriamas kitam.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Klientams \u017eadami terminai \u2013 pagal tvarkara\u0161t\u012f.<\/p>\n\n\n<p class=\"fx-pain__b\">Kiekvienam u\u017esakymo \u012fra\u0161ui j\u016bs\u0173 lentoje priskiriama planuojama pabaigos data, apskai\u010diuota pagal realius paj\u0117gumus. Pardav\u0117jai klientams atsako remdamiesi planu, o ne optimisti\u0161kai nubr\u0117\u017eta Timeline juosta.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Skub\u016bs u\u017esakymai perplanuojami automati\u0161kai.<\/p>\n\n\n<p class=\"fx-pain__b\">Sustojus \u012frenginiui ar lentoje atsiradus skubiam u\u017esakymui, Autopilot automati\u0161kai atnaujina tvarkara\u0161t\u012f pagal gamybos poky\u010dius. J\u016bs\u0173 nustatyti u\u017erakinimai ir prioritetai lieka galioti.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Ma\u017eiau perderinim\u0173.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner \u017eino, kiek laiko u\u017etrunka perderinti \u012frengin\u012f vieno gaminio gamyb\u0105 kei\u010diant kito gaminio gamyba ir atvirk\u0161\u010diai. Pavyzd\u017eiui, pereiti nuo m\u0117lynos prie raudonos gali u\u017etrukti 30 minu\u010di\u0173, o nuo raudonos prie m\u0117lynos \u2013 60. Tod\u0117l planavimo variklis parenka toki\u0105 u\u017eduo\u010di\u0173 sek\u0105, kad b\u016bt\u0173 prarasta kuo ma\u017eiau laiko.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Med\u017eiag\u0173 prieinamumas patikrinamas prie\u0161 pradedant darb\u0105.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner tikrina atsargas ir laukiamus pirkimo u\u017esakymus. Jei u\u017eduo\u010diai reikalingos med\u017eiagos dar nepristatytos, ji planuojama po j\u0173 pristatymo datos, kad prie \u012frenginio nereik\u0117t\u0173 laukti med\u017eiag\u0173.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Gamintoj\u0173 atsiliepimai apie SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"UTU tiekimo grandin\u0117s specialistas Kalle Kalliom\u00e4ki elektros skyd\u0173 gamybos ceche Ulviloje\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>sutaupoma kas savait\u0119<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSu SkyPlanner nuo gamybos planavimo Excel lentel\u0117se per\u0117jome prie gamybos optimizavimo realiuoju laiku.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, tiekimo grandin\u0117s specialistas<\/b><br>UTU \u00b7 Elektros skydai ir skirstymo \u012franga<\/p>\n\n\n<p class=\"ind-cust__result\">Planuojant gamyb\u0105 kas savait\u0119 sutaupoma 2 valandos darbo laiko, o nauja u\u017eduo\u010di\u0173 eil\u0117 gamybos linij\u0105 pasiekia per kelias sekundes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lt\/klientu-istorijos\/utu\/\">Skaitykite UTU atsiliepim\u0105<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatoriai su \u0161vari\u0173j\u0173 patalp\u0173 apranga prie buteliuk\u0173 pildymo linijos Laboratory &amp; Allied vaist\u0173 gamykloje Nairobyje\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>gamybos efektyvumas<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eGamybos efektyvumas padid\u0117jo 90%.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT vadovas<\/b><br>Laboratory &amp; Allied \u00b7 Vaist\u0173 gamyba<\/p>\n\n\n<p class=\"ind-cust__result\">Gamybos efektyvumas padid\u0117jo 90%, o optimizuotas trij\u0173 m\u0117nesi\u0173 planas visiems darbo centrams sudaromas grei\u010diau nei per 30 minu\u010di\u0173.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lt\/klientu-istorijos\/laboratory-allied\/\">Skaitykite Laboratory &amp; Allied atsiliepim\u0105<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"KJH-Comp suvirintojas \u0161lifuoja suvirint\u0105 plieno konstrukcij\u0105 Alah\u00e4rm\u00e4 gamykloje\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>pristatymo patikimumas, i\u0161aug\u0119s nuo ma\u017edaug 50%<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner atlieka lemiam\u0105 vaidmen\u012f u\u017etikrinant m\u016bs\u0173 pristatymo patikimum\u0105.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, generalinis direktorius<\/b><br>KJH-Comp \u00b7 Lak\u0161tinio metalo apdirbimas ir sutartin\u0117 gamyba<\/p>\n\n\n<p class=\"ind-cust__result\">Pristatymo patikimumas i\u0161augo nuo ma\u017edaug 50% iki net 98%, o tvarkara\u0161\u010diams sudaryti dabar pakanka vieno meistro vietoj dviej\u0173.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lt\/klientu-istorijos\/kjh-comp\/\">Skaityti KJH-Comp atsiliepim\u0105<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Mamec generalinis direktorius Hannu Ryyn\u00e4nen \u012fmon\u0117s gamybos ceche Lohjoje\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>1 000 ir daugiau<\/b><span>automati\u0161kai suplanuot\u0173 gamybos u\u017esakym\u0173<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eGamyb\u0105 valdome visai kitaip, o m\u016bs\u0173 supratimas apie paj\u0117gumus pasiek\u0117 visi\u0161kai kit\u0105 lyg\u012f.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, generalinis direktorius<\/b><br>Mamec \u00b7 Pramonin\u0117s mai\u0161ykl\u0117s, siurbliai ir auk\u0161t\u0173j\u0173 technologij\u0173 gamyba pagal u\u017esakym\u0105<\/p>\n\n\n<p class=\"ind-cust__result\">T\u016bkstan\u010diai gamybos u\u017esakym\u0173 suplanuojami automati\u0161kai, o visa organizacija mato gamybos pad\u0117t\u012f realiuoju laiku.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lt\/klientu-istorijos\/mamec\/\">Skaityti Mamec atsiliepim\u0105<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-the-monday-com-integration-works\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kaip veikia integracija su monday.com<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>U\u017esakymai saugomi monday.com.<\/strong> U\u017esakym\u0173 \u012fra\u0161ai i\u0161 j\u016bs\u0173 gamybos lentos perduodami \u012f SkyPlanner kartu su gaminiu, kiekiu, terminu, prioritetu ir b\u016bsena.<\/li>\n\n\n<li><strong>SkyPlanner sudaro ir nuolat atnaujina tvarkara\u0161t\u012f.<\/strong> Arcturus variklis per kelias sekundes suplanuoja kiekvien\u0105 operacij\u0105 kiekviename darbo centre ir perplanuoja pasikeitus gamybos s\u0105lygoms.<\/li>\n\n\n<li><strong>Datos ir vykdymo eiga gr\u0105\u017einamos \u012f j\u016bs\u0173 lent\u0105.<\/strong> Suplanuota prad\u017eia ir pabaiga \u012fra\u0161omos \u012f Timeline stulpel\u012f, darbo centras \u2013 \u012f jam skirt\u0105 stulpel\u012f, o operatoriaus vykdomo darbo eiga atnaujina Status stulpel\u012f.<\/li>\n\n<\/ol>\n\n\n<p>Integracija naudoja pa\u010dios monday.com GraphQL API ir automatinius prane\u0161imus (webhooks), tod\u0117l j\u016bs\u0173 komanda i\u0161saugo savo lentas ir automatizavimo taisykles. Kiekviena \u012fmon\u0117 monday.com lentas susikuria skirtingai, tad diegimo metu SkyPlanner komanda susieja j\u016bs\u0173 stulpelius ir prad\u0117jus naudoti sistem\u0105 toliau pri\u017ei\u016bri integracij\u0105. Integracijos kaina pagal j\u016bs\u0173 proces\u0105 ir poreikius pateikiama i\u0161 anksto. J\u016bs\u0173 monday.com partneris arba j\u016bs\u0173 programuotojai taip pat gali kurti integracij\u0105 naudodami dokumentuot\u0105 SkyPlanner API (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API dokumentacija<\/a>).<\/p>\n\n\n<p>Stulpeli\u0173 susiejimas, automatiniai prane\u0161imai (webhooks) ir duomen\u0173 \u012fra\u0161ymas atgal paai\u0161kinti <a href=\"\/lt\/integracijos\/erp\/monday\/integravimo-vadovas\/\">monday.com integracijos vadove, skirtame gamybos tvarkara\u0161\u010diams sudaryti<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-moves-between-monday-com-and-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kokiais duomenimis kei\u010diasi monday.com ir SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>monday.com<\/th><th>SkyPlanner<\/th><th>Kryptis<\/th><\/tr><\/thead><tbody><tr><td>\u012era\u0161as gamybos lentoje (Name, Numbers, Date, Status stulpeliai)<\/td><td>U\u017esakymas su gaminiu, kiekiu, terminu ir prioritetu<\/td><td>\u012e SkyPlanner<\/td><\/tr><tr><td>Antriniai \u012fra\u0161ai arba per Connect Boards susieta lenta<\/td><td>Kiekvieno u\u017esakymo proceso etapai<\/td><td>\u012e SkyPlanner<\/td><\/tr><tr><td>\u012era\u0161as gamini\u0173 arba atsarg\u0173 lentoje<\/td><td>Gaminiai, med\u017eiagos ir atsargos<\/td><td>\u012e SkyPlanner<\/td><\/tr><tr><td>Pirkimo u\u017esakym\u0173 lenta su numatoma pristatymo data<\/td><td>Laukiamos med\u017eiagos pagal pristatymo dat\u0105<\/td><td>\u012e SkyPlanner<\/td><\/tr><tr><td>Timeline stulpelis<\/td><td>Suplanuota prad\u017eia ir pabaiga<\/td><td>Atgal \u012f monday.com<\/td><\/tr><tr><td>Status, Dropdown arba Text stulpelis<\/td><td>Darbo centras ir u\u017eduoties vykdymo eiga<\/td><td>Atgal \u012f monday.com<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>\u012erengini\u0173 kalendoriai, paruo\u0161imo laikai, \u012frankiai ir alternatyv\u016bs \u012frenginiai saugomi SkyPlanner, nes monday.com lentose jie n\u0117ra saugomi kaip duomenys, pagal kuriuos galima sudaryti tvarkara\u0161t\u012f.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-monday-com-s-gantt-and-workload-views-cover\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0105 apima monday.com Gantt ir Workload rodiniai ir k\u0105 prideda SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>monday.com yra darb\u0173 valdymo platforma, o ne gamybos tvarkara\u0161\u010di\u0173 sudarymo sistema. Ji brai\u017eo Gantt juostas pagal \u017emoni\u0173 \u012fvestas datas ir spalva pa\u017eymi i\u0161tekli\u0173, kai jo apkrova vir\u0161ija paj\u0117gumus. Pa\u010dios monday.com pagalbos centre paai\u0161kinta, k\u0105 tai rei\u0161kia:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Workload parodo perkrov\u0105, o j\u0105 pa\u0161alina \u017emogus.<\/strong> Rodinyje galima matyti &#8222;who is over their capacity and assign upcoming tasks accordingly.&#8221; (kieno darbo kr\u016bvis vir\u0161ija paj\u0117gumus, ir atitinkamai paskirstyti b\u016bsimas u\u017eduotis). Darbai savaime neperkeliami \u012f laisv\u0105 laik\u0105. (<a href=\"https:\/\/support.monday.com\/hc\/en-us\/articles\/360010166559-Resource-management-with-Workload\">monday.com<\/a>)<\/li>\n\n\n<li><strong>Priklausomyb\u0117s kei\u010dia datas, bet ne paj\u0117gumus.<\/strong> Re\u017eimas Flexible &#8222;ensures no overlap between the dates of items that are dependent on one another.&#8221; (u\u017etikrina, kad vienas nuo kito priklausan\u010di\u0173 \u012fra\u0161\u0173 datos nepersidengt\u0173). Du nepriklausomi u\u017esakymai vis tiek gali b\u016bti suplanuoti tam pa\u010diam \u012frenginiui t\u0105 pa\u010di\u0105 valand\u0105. (<a href=\"https:\/\/support.monday.com\/hc\/en-us\/articles\/360007402599-Dependencies-on-monday-com\">monday.com<\/a>)<\/li>\n\n\n<li><strong>Darbo grafikai skirti \u017emon\u0117ms.<\/strong> &#8222;work schedule defines which days and hours a resource works each week,&#8221; (darbo grafikas nustato, kuriomis savait\u0117s dienomis ir valandomis dirba i\u0161teklius), o pats grafikas priskiriamas naudotojams ir komandoms. \u012erenginio pamainai ar technin\u0117s prie\u017ei\u016bros laikotarpiui atskiros vietos n\u0117ra. (<a href=\"https:\/\/support.monday.com\/hc\/en-us\/articles\/36305176145682-Managing-resource-schedules-and-time-off\">monday.com<\/a>)<\/li>\n\n\n<li><strong>N\u0117ra technologini\u0173 mar\u0161rut\u0173, paruo\u0161imo ar med\u017eiag\u0173 valdymo.<\/strong> Lentose n\u0117ra technologini\u0173 mar\u0161rut\u0173, paruo\u0161imo laiko, med\u017eiag\u0173 \u017einiara\u0161\u010di\u0173 ar atsarg\u0173 tikrinimo.<\/li>\n\n<\/ul>\n\n\n<p>Tod\u0117l po kiekvieno skubaus u\u017esakymo planuotojas \u012fra\u0161us perkelia rankiniu b\u016bdu. Visi apribojimai paai\u0161kinti straipsnyje <a href=\"\/lt\/integracijos\/erp\/monday\/gamybos-planavimas\/\">Ar monday.com galima planuoti gamyb\u0105 pagal realius paj\u0117gumus?<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"monday-com-today-and-with-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">monday.com dabar ir su SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>monday.com<\/th><th>monday.com su SkyPlanner APS<\/th><\/tr><\/thead><tbody><tr><td>Paj\u0117gumai<\/td><td>Perkrova pa\u017eymima spalva<\/td><td>Atsi\u017evelgiama \u012f kiekvieno \u012frenginio, \u017emogaus ir \u012frankio ribotus paj\u0117gumus bei pamainas<\/td><\/tr><tr><td>Tvarkara\u0161tis<\/td><td>Datas \u012fveda \u017emon\u0117s<\/td><td>Operacij\u0173 tvarkara\u0161tis sudaromas per kelias sekundes<\/td><\/tr><tr><td>\u012erenginiai<\/td><td>Modeliuojami kaip stulpelis arba \u017emogus<\/td><td>Darbo centrai su atskirais kalendoriais ir alternatyvomis<\/td><\/tr><tr><td>Perderinimai<\/td><td>Nemodeliuojami<\/td><td>U\u017eduotys i\u0161d\u0117stomos taip, kad paruo\u0161imo laikas b\u016bt\u0173 kuo trumpesnis<\/td><\/tr><tr><td>Med\u017eiagos<\/td><td>Atskiros lentos, atsargos netikrinamos<\/td><td>U\u017eduotys pradedamos, kai yra atsarg\u0173 arba gaunamos med\u017eiagos<\/td><\/tr><tr><td>Poky\u010diai<\/td><td>\u012era\u0161ai perkeliami rankiniu b\u016bdu<\/td><td>Autopilot perplanuoja pagal j\u016bs\u0173 prioritetus<\/td><\/tr><tr><td>Gamybos cechas<\/td><td>B\u016bsena kei\u010diama lentoje<\/td><td>Operatoriai savo u\u017eduo\u010di\u0173 eil\u0119 mato telefone arba plan\u0161et\u0117je<\/td><\/tr><tr><td>J\u016bs\u0173 komanda<\/td><td>Dirba monday.com<\/td><td>Toliau dirba monday.com, bet jau su realiomis datomis<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-to-choose-a-scheduler-for-monday-com\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kaip pasirinkti gamybos tvarkara\u0161\u010di\u0173 sudarymo sistem\u0105 monday.com<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Pa\u010dios monday.com Gantt ir Workload rodiniai tinka nedideliam cechui, kuriame yra vos keli \u012frenginiai, vieno etapo u\u017eduotys ir vienas planuotojas, \u017einantis siaur\u0105j\u0105 viet\u0105. Kai to nebepakanka, pirk\u0117jai lygina keturias sprendim\u0173 grupes. Gantt ir i\u0161tekli\u0173 program\u0117l\u0117s papildo lentas naujais rodiniais. MRP sistemos prijungiamos per automatizavimo \u012frankius. Didel\u0117ms \u012fmon\u0117ms skirtiems APS sprendimams reikia planavimo komandos. SkyPlanner priklauso debesijos APS sistemoms, kurios apima ir darb\u0173 vykdym\u0105 gamybos ceche.<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Rinkit\u0117s SkyPlanner, kai keli\u0173 etap\u0173 u\u017eduotys atliekamos keliais \u012frenginiais,<\/strong> o Workload rodinys kiekvien\u0105 savait\u0119 raudonas.<\/li>\n\n\n<li><strong>Rinkit\u0117s SkyPlanner, kai gamybos apimtis lemia perderinimai.<\/strong> SkyPlanner i\u0161d\u0117sto u\u017eduotis taip, kad bendras paruo\u0161imo laikas b\u016bt\u0173 kuo trumpesnis.<\/li>\n\n\n<li><strong>Rinkit\u0117s SkyPlanner, kai bendri \u012frankiai, brigados ir \u012frengini\u0173 pamainos lemia, kok\u012f darb\u0105 galima prad\u0117ti toliau.<\/strong><\/li>\n\n\n<li><strong>Rinkit\u0117s SkyPlanner, kai nuo med\u017eiag\u0173 gavimo priklauso, kuri\u0105 u\u017eduot\u012f galima prad\u0117ti.<\/strong><\/li>\n\n\n<li><strong>Rinkit\u0117s SkyPlanner, kai planas kei\u010diasi kelis kartus per savait\u0119.<\/strong> Autopilot perplanuoja darbus, o naujos datos gr\u0105\u017einamos \u012f j\u016bs\u0173 lent\u0105.<\/li>\n\n\n<li><strong>Rinkit\u0117s SkyPlanner, kai norite ir toliau naudoti monday.com<\/strong> u\u017esakymams, pardavimams ir b\u016bsenoms valdyti, bet kartu tur\u0117ti tr\u016bkstam\u0105 tvarkara\u0161\u010di\u0173 sudarymo \u012frank\u012f.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kaip prad\u0117ti<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Prad\u0117kite nemokam\u0105 bandom\u0105j\u012f laikotarp\u012f.<\/strong> 30 dien\u0173, iki 20 darbo centr\u0173, visos Basic funkcijos. Mok\u0117jimo kortel\u0117s nereikia.<\/li>\n\n\n<li><strong>Sukurkite savo gamybos model\u012f.<\/strong> SkyPlanner sistemoje sukurkite \u012frengini\u0173, darbuotoj\u0173 ir pamain\u0173 \u012fra\u0161us arba juos importuokite. Galime pad\u0117ti prad\u0117ti naudotis sistema.<\/li>\n\n\n<li><strong>\u012ekelkite u\u017esakymus.<\/strong> Eksportuokite gamybos lent\u0105 i\u0161 monday.com \u012f Excel, importuokite j\u0105 \u012f SkyPlanner ir palyginkite sudaryt\u0105 tvarkara\u0161t\u012f su dabartiniu planu.<\/li>\n\n\n<li><strong>Prijunkite monday.com.<\/strong> SkyPlanner komanda sukonfig\u016bruos dvikrypt\u0119 integracij\u0105 su j\u016bs\u0173 lentomis ir teiks jos palaikym\u0105 prad\u0117jus dirbti.<\/li>\n\n<\/ol>\n\n\n<p><strong>Kainodara.<\/strong> U\u017e pasirinkt\u0105 plan\u0105 mokama kas m\u0117nes\u012f pagal darbo centr\u0173 skai\u010di\u0173. Bet kada galite prid\u0117ti ar pa\u0161alinti darbo centrus arba atsisakyti prenumeratos. Daugiau informacijos rasite <a href=\"\/lt\/kainodara\/\">kainodaros puslapyje<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lt\/bandymas\/\">I\u0161bandykite nemokamai<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lt\/susisiekite-su-pardavejais\/\">Susisiekite su pardavimo komanda<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Da\u017eniausiai u\u017eduodami klausimai<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Koks tvarkara\u0161\u010di\u0173 sudarymo priedas geriausiai tinka monday.com?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS \u2013 tai gamybos planavimo priedas, kuris atsi\u017evelgia \u012f realius \u012frengini\u0173 bei darbuotoj\u0173 paj\u0117gumus ir su monday.com kei\u010diasi duomenimis abiem kryptimis. \u012e j\u012f perduodamos u\u017esakym\u0173 eilut\u0117s su kiekiais, terminais ir b\u016bsenomis, o \u012f j\u016bs\u0173 lent\u0173 stulpelius gr\u0105\u017einami suplanuoti prad\u017eios ir pabaigos laikai, darbo centrai bei pa\u017eanga. Kiekvieno \u012frenginio, operatoriaus ir \u012frankio paj\u0117gumai bei med\u017eiag\u0173 kiekiai yra riboti. SkyPlanner saugo perderinimo laikus kei\u010diant vien\u0105 gamin\u012f kitu abiem kryptimis ir i\u0161d\u0117sto u\u017eduotis taip, kad paruo\u0161imo laikas b\u016bt\u0173 kuo trumpesnis. Pasikeitus situacijai gamyboje, Autopilot automati\u0161kai perskai\u010diuoja tvarkara\u0161t\u012f. Kaina \u2013 nuo 199 \u20ac per m\u0117nes\u012f, o nemokamas bandomasis laikotarpis trunka 30 dien\u0173.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ar monday.com gali planuoti gamyb\u0105 pagal realius paj\u0117gumus?<\/summary>\n<p class=\"sp-faq__a\">Ne. monday.com rodinyje Workload parodo, kada vir\u0161ijamas darbuotojo ar kito i\u0161tekliaus paj\u0117gumas, o planuotojas darbus perskirsto rankiniu b\u016bdu. Sistema nepaskiria u\u017eduo\u010di\u0173 laisviems \u012frengini\u0173 laiko intervalams. SkyPlanner APS papildo j\u0105 visos gamyklos <a href=\"\/lt\/istekliai\/ribotu-pajegumu-planavimas\/\">gamybos planavimu<\/a> pagal realius paj\u0117gumus ir \u012fra\u0161o datas atgal \u012f j\u016bs\u0173 lentas.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ar monday.com gali sudaryti \u012frengini\u0173 darbo tvarkara\u0161\u010dius?<\/summary>\n<p class=\"sp-faq__a\">\u012erengin\u012f galima tik pa\u017eym\u0117ti. Jis gali b\u016bti nurodytas Status stulpelyje arba kaip i\u0161teklius Workload rodinyje, ta\u010diau darbo grafikai ir nedarbo laikas priskiriami \u017emon\u0117ms bei komandoms. SkyPlanner leid\u017eia kiekvienam \u012frenginiui nustatyti atskiras pamainas, technin\u0117s prie\u017ei\u016bros pertraukas, paruo\u0161imo darbus ir alternatyvius \u012frenginius.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kas pasikeis m\u016bs\u0173 monday.com lentose?<\/summary>\n<p class=\"sp-faq__a\">Labai nedaug. J\u016bs\u0173 monday.com administratorius vien\u0105 kart\u0105 suteikia prieig\u0105 per API, o j\u016bs pridedate Timeline ir darbo centro stulpelius, jei j\u0173 lentoje dar n\u0117ra. SkyPlanner veikia debesijoje kartu su monday.com ir prisijungia per jos GraphQL API bei \u017einiatinklio \u012fvyki\u0173 prane\u0161imus.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ar SkyPlanner pakei\u010dia monday.com?<\/summary>\n<p class=\"sp-faq__a\">Ne, jos veikia kartu. U\u017esakymai, klientai, projektai ir b\u016bsenos lieka monday.com. SkyPlanner sudaro gamybos tvarkara\u0161t\u012f pagal realius paj\u0117gumus ir gr\u0105\u017eina suplanuotas datas bei pa\u017eang\u0105 \u012f j\u016bs\u0173 lent\u0105.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kiek SkyPlanner kainuoja gamybos \u012fmonei, naudojan\u010diai monday.com?<\/summary>\n<p class=\"sp-faq__a\">Nuo 199 \u20ac per m\u0117nes\u012f u\u017e 5 darbo centrus. Kiekvienas papildomas darbo centras kainuoja 20 \u20ac per m\u0117nes\u012f. Darbo centras \u2013 tai gamybos i\u0161teklius, turintis savo suplanuot\u0173 u\u017eduo\u010di\u0173 eil\u0119. Integracijos kain\u0105 pateikiame i\u0161 anksto kartu su pasirinkto plano kaina, atsi\u017evelg\u0119 \u012f j\u016bs\u0173 proces\u0105 ir poreikius, tad visas i\u0161laidas \u017einote dar prie\u0161 prad\u0117dami.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kiek trunka diegimas?<\/summary>\n<p class=\"sp-faq__a\">Diegimas paprastai baigiamas per kelias savaites nuo tada, kai pradedama ruo\u0161tis naudoti sistem\u0105. Komanda nustato j\u016bs\u0173 lentos stulpeli\u0173 atitikt\u012f, prijungia u\u017esakym\u0173 duomenis ir pasir\u016bpina, kad suplanuotos datos b\u016bt\u0173 \u012fra\u0161omos atgal. Prie\u0161 pradedant naudoti sistem\u0105, viskas i\u0161bandoma lyginant su dabartiniu planu.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ar galime i\u0161bandyti SkyPlanner dar neprijung\u0119 monday.com?<\/summary>\n<p class=\"sp-faq__a\">Taip. Eksportuokite savo gamybos lent\u0105 \u012f Excel ir importuokite j\u0105 per 30 dien\u0173 bandom\u0105j\u012f laikotarp\u012f. Dar neprad\u0117jus integracijos darb\u0173, pamatysite savo gamybos tvarkara\u0161t\u012f, sudaryt\u0105 pagal realius paj\u0117gumus.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integracijos \/ ERP \/ monday.com SkyPlanner APS, skirta monday.com: gamybos planavimas pagal realius \u012frengini\u0173 ir darbuotoj\u0173 paj\u0117gumus SkyPlanner APS \u2013 gamybos planavimo priedas gamintojams, kurie u\u017esakymus valdo monday.com. Tvarkara\u0161tis sudaromas pagal realius \u012frengini\u0173 ir darbuotoj\u0173 paj\u0117gumus, numatant kiekvieno \u012frenginio, operatoriaus, \u012frankio ir med\u017eiagos naudojim\u0105. J\u016bs\u0173 lentos lieka ten, kur dirba komanda, o jose pateiktas tvarkara\u0161tis &#8230; <a title=\"SkyPlanner APS, skirta monday.com: gamybos planavimas pagal realius \u012frengini\u0173 ir darbuotoj\u0173 paj\u0117gumus\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/monday\/\" aria-label=\"Read more about SkyPlanner APS, skirta monday.com: gamybos planavimas pagal realius \u012frengini\u0173 ir darbuotoj\u0173 paj\u0117gumus\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100679,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-103056","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>monday.com integracija: gamybos planavimas su APS<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS priedas monday.com: abipus\u0117 integracija, planavimas pagal paj\u0117gumus kiekvienam \u012frenginiui, pamainai ir med\u017eiagai. Nuo 199 \u20ac per m\u0117nes\u012f.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/monday\/\" \/>\n<meta property=\"og:locale\" content=\"lt_LT\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SkyPlanner APS, skirta monday.com: gamybos planavimas pagal realius \u012frengini\u0173 ir darbuotoj\u0173 paj\u0117gumus\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS priedas monday.com: abipus\u0117 integracija, planavimas pagal paj\u0117gumus kiekvienam \u012frenginiui, pamainai ir med\u017eiagai. Nuo 199 \u20ac per m\u0117nes\u012f.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/monday\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"11 minu\u010di\u0173\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/monday\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/monday\\\/\",\"name\":\"monday.com integracija: gamybos planavimas su APS\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#website\"},\"datePublished\":\"2026-10-20T16:09:04+00:00\",\"description\":\"SkyPlanner APS priedas monday.com: abipus\u0117 integracija, planavimas pagal paj\u0117gumus kiekvienam \u012frenginiui, pamainai ir med\u017eiagai. Nuo 199 \u20ac per m\u0117nes\u012f.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/monday\\\/#breadcrumb\"},\"inLanguage\":\"lt-LT\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/monday\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/monday\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP ir MES programin\u0117s \u012frangos integracijos su SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bs\u0173 ERP sistemai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS, skirta monday.com: gamybos planavimas pagal realius \u012frengini\u0173 ir darbuotoj\u0173 paj\u0117gumus\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lt-LT\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lt-LT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"monday.com integracija: gamybos planavimas su APS","description":"SkyPlanner APS priedas monday.com: abipus\u0117 integracija, planavimas pagal paj\u0117gumus kiekvienam \u012frenginiui, pamainai ir med\u017eiagai. Nuo 199 \u20ac per m\u0117nes\u012f.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/monday\/","og_locale":"lt_LT","og_type":"article","og_title":"SkyPlanner APS, skirta monday.com: gamybos planavimas pagal realius \u012frengini\u0173 ir darbuotoj\u0173 paj\u0117gumus","og_description":"SkyPlanner APS priedas monday.com: abipus\u0117 integracija, planavimas pagal paj\u0117gumus kiekvienam \u012frenginiui, pamainai ir med\u017eiagai. Nuo 199 \u20ac per m\u0117nes\u012f.","og_url":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/monday\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"11 minu\u010di\u0173"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/monday\/","url":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/monday\/","name":"monday.com integracija: gamybos planavimas su APS","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lt\/#website"},"datePublished":"2026-10-20T16:09:04+00:00","description":"SkyPlanner APS priedas monday.com: abipus\u0117 integracija, planavimas pagal paj\u0117gumus kiekvienam \u012frenginiui, pamainai ir med\u017eiagai. Nuo 199 \u20ac per m\u0117nes\u012f.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/monday\/#breadcrumb"},"inLanguage":"lt-LT","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/monday\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/monday\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lt\/"},{"@type":"ListItem","position":2,"name":"ERP ir MES programin\u0117s \u012frangos integracijos su SkyPlanner","item":"https:\/\/skyplanner.ai\/lt\/integracijos\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bs\u0173 ERP sistemai","item":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS, skirta monday.com: gamybos planavimas pagal realius \u012frengini\u0173 ir darbuotoj\u0173 paj\u0117gumus"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lt\/#website","url":"https:\/\/skyplanner.ai\/lt\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lt\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lt\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lt-LT"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lt\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lt\/","logo":{"@type":"ImageObject","inLanguage":"lt-LT","@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lt\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integracijos \/ ERP \/ monday.com SkyPlanner APS, skirta monday.com: gamybos planavimas pagal realius \u012frengini\u0173 ir darbuotoj\u0173 paj\u0117gumus SkyPlanner APS \u2013 gamybos planavimo priedas gamintojams, kurie u\u017esakymus valdo monday.com. Tvarkara\u0161tis sudaromas pagal realius \u012frengini\u0173 ir darbuotoj\u0173 paj\u0117gumus, numatant kiekvieno \u012frenginio, operatoriaus, \u012frankio ir med\u017eiagos naudojim\u0105. J\u016bs\u0173 lentos lieka ten, kur dirba komanda, o jose pateiktas tvarkara\u0161tis&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/pages\/103056","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/comments?post=103056"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/pages\/103056\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/pages\/100679"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/media?parent=103056"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}