{"id":101364,"date":"2026-10-17T13:00:38","date_gmt":"2026-10-17T13:00:38","guid":{"rendered":"https:\/\/skyplanner.ai\/?page_id=101364"},"modified":"2026-10-17T13:00:38","modified_gmt":"2026-10-17T13:00:38","slug":"gamybos-planavimas","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/sage-x3\/gamybos-planavimas\/","title":{"rendered":"Ar Sage X3 palaiko gamybos planavim\u0105? MRP, apkrovos, gamybos planavimo \u012frankiai ir SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lt\/integracijos\/\">Integracijos<\/a> \/ <a href=\"\/lt\/integracijos\/erp\/\">ERP<\/a> \/ Sage X3<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Ar Sage X3 palaiko gamybos planavim\u0105? <span class=\"hl\">MRP, apkrovos, gamybos planavimo \u012frankiai ir SkyPlanner APS<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">Standartin\u0117 Sage X3 gamybos u\u017esakym\u0173 tvarkara\u0161\u010di\u0173 sudarymo funkcija neatsi\u017evelgia \u012f paj\u0117gum\u0173 ribas. \u0160i\u0105 sprag\u0105 u\u017epildo SkyPlanner APS. X3 planuoja med\u017eiagas naudodama MRP, o gamybos u\u017esakym\u0173 datas nustato funkcija Scheduling (FUNMAUTJ). Sage Jungtin\u0117s Karalyst\u0117s pagalbos komanda \u0161\u012f \u012frank\u012f apib\u016bdina kaip planuojant\u012f neribotais paj\u0117gumais: jis planuoja &#8222;each work order independently&#8221; (kiekvien\u0105 gamybos u\u017esakym\u0105 atskirai) ir nepaskirsto u\u017esakym\u0173 laike pagal i\u0161tekli\u0173 apkrov\u0105.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lt\/bandymas\/\">Prad\u0117ti nemokam\u0105 bandom\u0105j\u012f laikotarp\u012f<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lt\/susisiekite-su-pardavejais\/\">U\u017esakyti demonstracij\u0105<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Gamybos tvarkara\u0161\u010di\u0173 sudarymas<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt diagrama su darbo centrams suplanuotomis u\u017eduotimis ir u\u017esakym\u0173 s\u0105ra\u0161u apa\u010dioje.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Gamybos planavimui pagal turimus paj\u0117gumus reikia atskiro sprendimo. Sage si\u016blo vietin\u0117je infrastrukt\u016broje diegiam\u0105 Production Scheduler arba bendr\u0105j\u0105 Finite scheduler interface (GFS) s\u0105saj\u0105 su Sage X3 Web Scheduling ar tre\u010diosios \u0161alies tvarkara\u0161\u010di\u0173 sudarymo \u012frankiu. Gamyklos, kurioms reikia kiekvien\u0105 \u012frengin\u012f, darbuotoj\u0105 ir \u012frank\u012f <a href=\"\/lt\/istekliai\/ribotu-pajegumu-planavimas\/\">\u012ftraukti \u012f gamybos plan\u0105 pagal turimus paj\u0117gumus<\/a>, kartu su X3 naudoja SkyPlanner APS.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-sage-x3-plans-and-schedules-production-step\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kaip Sage X3 planuoja gamyb\u0105 ir sudaro jos tvarkara\u0161\u010dius: \u017eingsnis po \u017eingsnio<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h3 class=\"wp-block-heading\">1. Paj\u0117gumai apibr\u0117\u017eiami darbo centruose<\/h3>\n\n\n<p>Paj\u0117gumai nustatomi darbo centro duomenyse (funkcija <strong>GESMWS<\/strong>, lentel\u0117 WORKSTATIO). Tvarkara\u0161\u010di\u0173 sudarymui svarb\u016bs \u0161ie laukai:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Structure<\/strong> (TWD): savait\u0117s strukt\u016bra, pagal kuri\u0105 priskiriamas pamain\u0173 grafikas.<\/li>\n\n\n<li><strong>No. of resources<\/strong> (WSTNBR): i\u0161tekli\u0173 skai\u010dius, reikalingas operacijai atlikti darbo centre. Sage pateikia darbuotoj\u0173 darbo centro, kuriam reikia trij\u0173 \u017emoni\u0173, pavyzd\u012f.<\/li>\n\n\n<li><strong>% efficiency<\/strong> (EFF) ir <strong>Shrinkage in %<\/strong> (SHR): pagal \u0161iuos laukus koreguojama technologinio mar\u0161ruto trukm\u0117.<\/li>\n\n\n<li><strong>Work center type<\/strong> (WSTTYP): \u012frenginys, darbuotojai arba subranga.<\/li>\n\n\n<li>\u017dymimasis langelis <strong>Constraint<\/strong> ir kortel\u0117 Replacement, kurioje alternatyviems darbo centrams skirtas atskiras laukas <strong>Work center type<\/strong> (RPLWSTTYP). Kiekvienam alternatyviam darbo centrui nustatomas prioritetas.<\/li>\n\n\n<li>Paj\u0117gum\u0173 poky\u010di\u0173 lentel\u0117 laikinoms pamainoms ar prastovoms nurodyti. Joje \u012fra\u0161omos prad\u017eios ir pabaigos datos, prie\u017eastis, pakeista darbo laiko strukt\u016bra ir pakeistas i\u0161tekli\u0173 skai\u010dius.<\/li>\n\n<\/ul>\n\n\n<p>Kortel\u0117je Load apkrova suskirstoma \u012f Firm, Planned, MRP ir MPS kategorijas, tod\u0117l planuotojas mato, kas jau patvirtinta, o kas dar tik si\u016bloma.<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. MRP sukuria pasi\u016blymus<\/h3>\n\n\n<p>MRP (<strong>FUNMRP<\/strong>) subalansuoja pasi\u016bl\u0105 ir paklaus\u0105 pagal atskaitos dat\u0105 ir sand\u0117liavimo viet\u0105. Ji naudoja pardavimo u\u017esakym\u0173, gamybos u\u017esakymams reikaling\u0173 med\u017eiag\u0173, pirkimo u\u017esakym\u0173, gamybos u\u017esakym\u0173, subrangos u\u017esakym\u0173 ir perk\u0117lim\u0173 duomenis. Pagal juos sukuriami gamybos ir pirkimo u\u017esakym\u0173 pasi\u016blymai. Rezultat\u0105 lemia prek\u0117s ir vietos \u012fra\u0161o laukai Suggestion type, Reorder quantity ir Splitting.<\/p>\n\n\n<p>Datos nustatomos pagal \u012fvykdymo laik\u0105. Si\u016blomo gamybos u\u017esakymo pabaigos data gaunama i\u0161 poreikio datos at\u0117mus kokyb\u0117s kontrolei skirt\u0105 laik\u0105. Prad\u017eios data gaunama i\u0161 pabaigos datos at\u0117mus gamybos trukm\u0119 arba technologinio mar\u0161ruto trukm\u0119, jei prek\u0117s gamybos trukm\u0117 skai\u010diuojama pagal mar\u0161rut\u0105. Jei apskai\u010diuota prad\u017eia yra ankstesn\u0117 u\u017e apdorojimo dat\u0105, X3 naudoja apdorojimo dat\u0105.<\/p>\n\n\n<p>MRP \u017einyne paj\u0117gumams skiriamas vienas sakinys: &#8222;An appropriate MRP setup is used, in parallel with the MRP process, to generate a workload.&#8221; (Atitinkami MRP nustatymai naudojami apkrovai generuoti lygiagre\u010diai su MRP procesu.) (<a href=\"https:\/\/online-help.sagex3.com\/erp\/12\/en-us\/Content\/FCT\/FUNMRP.htm\">Sage X3 \u017einynas, FUNMRP<\/a>) Taigi generuojama apkrova, o ne tikrinami paj\u0117gumai.<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. Scheduling (FUNMAUTJ) nustato operacij\u0173 datas<\/h3>\n\n\n<p>Scheduling i\u0161d\u0117sto kiekvieno gamybos u\u017esakymo operacijas pagal technologin\u012f mar\u0161rut\u0105 (<strong>GESROU<\/strong>). Priklausomai nuo u\u017esakyme nurodyt\u0173 pageidaujam\u0173 dat\u0173, planuojama pirmyn arba atgal. Operacij\u0173 prad\u017eios ir pabaigos datos \u012fra\u0161omos \u012f gamybos u\u017esakymo operacij\u0173 duomenis (MFGOPE), o antra\u0161t\u0117je (MFGHEAD) lauko Scheduling status reik\u0161m\u0117 pakei\u010diama \u012f Scheduled.<\/p>\n\n\n<p>Sage Jungtin\u0117s Karalyst\u0117s pagalbos komanda V12 tvarkara\u0161\u010di\u0173 sudarymo vadove ai\u0161kiai apra\u0161o \u0161i\u0105 logik\u0105: &#8222;The function schedules each work order independently.&#8221; (Funkcija kiekvieno gamybos u\u017esakymo tvarkara\u0161t\u012f sudaro atskirai.) Taip pat: &#8222;It does not delay or stagger work orders based on overall resource load.&#8221; (Ji neatideda ir nepaskirsto gamybos u\u017esakym\u0173 laike pagal bendr\u0105 i\u0161tekli\u0173 apkrov\u0105.) (<a href=\"https:\/\/communityhub.sage.com\/sage-global-solutions\/sage_x3\/b\/sage-x3-uk-support-insights\/posts\/detailed-guide-to-sage-x3-v12-scheduling-and-workload-functions-funmautj-consmwk-funmiwl\">Sage Community Hub<\/a>) Visi de\u0161imt u\u017esakym\u0173, kuriuos turi atlikti viena CNC cel\u0117, gauna idealias datas, nepaisant reali\u0173 cel\u0117s paj\u0117gum\u0173.<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. Loads parodo perkrov\u0105, o j\u0105 pa\u0161alina planuotojas<\/h3>\n\n\n<p><strong>Loads<\/strong> (<strong>CONSMWK<\/strong>) palygina kiekvieno darbo centro apkrov\u0105 su jo paj\u0117gumais pagal laikotarpius. <strong>Recalculate the loads<\/strong> (<strong>FUNMIWL<\/strong>, Manufacturing &gt; Batch processes) i\u0161 naujo apskai\u010diuoja apkrovos duomenis. Raudona juosta rei\u0161kia, kad tuo laikotarpiu darbo centro apkrova vir\u0161ija paj\u0117gumus. Tuomet planuotojas naudodamas <strong>Planning workbench<\/strong> pakei\u010dia tvarkara\u0161t\u012f arba i\u0161 jo pa\u0161alina u\u017esakymus, perkelia operacijas \u012f laisv\u0105 darbo centr\u0105 arba rankiniu b\u016bdu paskirsto u\u017esakymus laike.<\/p>\n\n\n<p>X3 parodo problem\u0105. J\u0105 i\u0161sprend\u017eia \u017emogus.<\/p>\n\n\n<h3 class=\"wp-block-heading\">5. Gamybos planavimui reikia papildomo sprendimo<\/h3>\n\n\n<p>Sage si\u016blo du b\u016bdus. Abu \u012fjungiami veiklos kodais:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Production Scheduler<\/strong> (veiklos kodas POPS su pa\u017eym\u0117tu Active, funkcija FUNPSSCH). Tai planavimo \u012frankis, rodantis gamybos u\u017esakym\u0173 tvarkara\u0161t\u012f &#8222;in the form of a Gantt chart&#8221; (Gantt diagramos forma). Atskiras veiklos kodas <strong>Finite Capacity<\/strong> gamybos tvarkara\u0161\u010di\u0173 sudarymo funkcijose \u012fjungia re\u017eim\u0105, kuriuo planuojama pagal realius paj\u0117gumus. Gamybos u\u017esakymai perduodami komanda Submit for scheduling.<\/li>\n\n\n<li><strong>Generic Finite scheduler interface<\/strong> (veiklos kodas <strong>GFS<\/strong>). Tai Sage sukurta bendroji s\u0105saja, jungianti debesijoje ar vietin\u0117je infrastrukt\u016broje veikian\u010di\u0105 X3 su papildomu Sage tvarkara\u0161\u010di\u0173 sudarymo \u012frankiu <strong>Sage X3 Web Scheduling<\/strong> arba nepriklausomo programin\u0117s \u012frangos tiek\u0117jo internetiniu tvarkara\u0161\u010di\u0173 sudarymo \u012frankiu. X3 j\u012f valdo komandomis Submit for scheduling, Resubmit for scheduling ir Remove from scheduling (Manufacturing &gt; Finite scheduler).<\/li>\n\n<\/ul>\n\n\n<p>X3 taip pat apskai\u010diuoja kiekvienos operacijos <strong>Earliest start<\/strong> dat\u0105 pagal komponent\u0173 prieinamum\u0105 (First Date of Material Availability, FDMA). \u0160i data perduodama Production Scheduler arba internetiniam tvarkara\u0161\u010di\u0173 sudarymo \u012frankiui kaip apribojimas. Pati standartin\u0117 tvarkara\u0161\u010di\u0173 sudarymo funkcija jos nenaudoja. Gamybos u\u017esakym\u0173 \u017einyne nurodyta: &#8222;The Sage X3 scheduling process does not consider component availability when determining operation start dates.&#8221; (Nustatydamas operacij\u0173 prad\u017eios datas, Sage X3 tvarkara\u0161\u010di\u0173 sudarymo procesas neatsi\u017evelgia \u012f komponent\u0173 prieinamum\u0105.)<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"where-sage-x3-stops\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kur baigiasi Sage X3 galimyb\u0117s<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Standartinis tvarkara\u0161\u010di\u0173 sudarymas neatsi\u017evelgia \u012f paj\u0117gum\u0173 ribas.<\/strong> Sage pagalbos vadove ra\u0161oma, kad perkrovoms pa\u0161alinti &#8222;would require finite capacity scheduling or manual adjustment&#8221; (reik\u0117t\u0173 gamybos planavimo pagal realius paj\u0117gumus arba rankinio koregavimo). (<a href=\"https:\/\/communityhub.sage.com\/sage-global-solutions\/sage_x3\/b\/sage-x3-uk-support-insights\/posts\/detailed-guide-to-sage-x3-v12-scheduling-and-workload-functions-funmautj-consmwk-funmiwl\">Sage Community Hub<\/a>)<\/li>\n\n\n<li><strong>Apkrovos duomenys pasensta.<\/strong> Prid\u0117jus pamain\u0105 arba pakeitus kalendori\u0173, &#8222;existing load buckets won&#8217;t automatically adjust&#8221; (esamos laikotarpi\u0173 apkrovos automati\u0161kai nepasikeis), kol nebus paleista Recalculate the loads. Pagal numatytuosius nustatymus per\u017ei\u016broje rodomi tik \u012f tvarkara\u0161t\u012f \u012ftraukti u\u017esakymai. MRP pasi\u016blymai rodomi tik naudojant per\u017ei\u016bros kod\u0105 ALL. (tas pats \u0161altinis)<\/li>\n\n\n<li><strong>Production Scheduler veikia tik vietin\u0117je infrastrukt\u016broje.<\/strong> &#8222;Production Scheduler is only available for on-premises instances of Sage X3.&#8221; (Production Scheduler prieinamas tik vietin\u0117je infrastrukt\u016broje \u012fdiegtoms Sage X3 sistemoms.) (<a href=\"https:\/\/online-help.sagex3.com\/erp\/12\/en-us\/Content\/OBJ\/ACV_POPS.htm\">Sage X3 V12 \u017einynas, POPS<\/a>) V11 puslapyje nurodomas dar vienas apribojimas: &#8222;Production Scheduler is not available for new Sage X3 installations.&#8221; (Production Scheduler neprieinamas naujai diegiamoms Sage X3 sistemoms.) (<a href=\"https:\/\/online-help.sagex3.com\/erp\/11\/en-US\/OBJ\/ACV_POPS.htm\">Sage X3 V11 \u017einynas<\/a>)<\/li>\n\n\n<li><strong>Production Scheduler apribojimai nurodyti dokumentacijoje.<\/strong> Sage i\u0161vardija \u0161ias \u0161iuo metu neprieinamas galimybes (<a href=\"https:\/\/online-help.sagex3.com\/erp\/12\/en-us\/Content\/FCT\/FUNPSSCH.htm\">Sage X3 \u017einynas, FUNPSSCH<\/a>):<\/li>\n\n<\/ul>\n\n\n<p>&#8211; paruo\u0161imo trukm\u0117s optimizavimas pagal kelis prek\u0117s parametrus ir paruo\u0161imo matric\u0105 &#8211; s\u0105sajos tarp gamybos u\u017esakym\u0173 &#8211; keli\u0173 i\u0161tekli\u0173 tvarkara\u0161\u010di\u0173 sudarymas sinchronizuojant lygiagre\u010dias operacijas &#8211; galim\u0173 naudoti i\u0161tekli\u0173, kuri\u0173 gamybos sparta skiriasi, s\u0105ra\u0161ai<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Optimizuojami gamybos u\u017esakymai u\u017erakinami.<\/strong> \u012e Production Scheduler perduotam gamybos u\u017esakymui priskiriama b\u016bsena <strong>Being optimized<\/strong>, o &#8222;You cannot modify the work order at these statuses.&#8221; (Esant \u0161ioms b\u016bsenoms gamybos u\u017esakymo keisti negalima.) U\u017esakymas lieka u\u017erakintas, kol pa\u0161alinamas i\u0161 tvarkara\u0161\u010dio. (<a href=\"https:\/\/online-help.sagex3.com\/erp\/12\/en-us\/Content\/FCT\/FUNPSMOPT.htm\">Sage X3 \u017einynas, FUNPSMOPT<\/a>)<\/li>\n\n\n<li><strong>I\u0161pl\u0117stin\u0117 GFS s\u0105saja reikalauja vieno i\u0161tekliaus kiekvienai operacijai.<\/strong> Lauko No. of resources \u017einyne nurodyta: &#8222;You must set this field to 1 if you are using the generic Finite scheduler advanced interface.&#8221; (Jei naudojate bendr\u0105j\u0105 i\u0161pl\u0117stin\u0119 Finite scheduler s\u0105saj\u0105, \u0161io lauko reik\u0161m\u0119 turite nustatyti \u012f 1.) Pateikiama ir prie\u017eastis: &#8222;Sage X3 Web Scheduling cannot optimize production times when multiple resources are assigned to a work center.&#8221; (Sage X3 Web Scheduling negali optimizuoti gamybos trukm\u0117s, kai darbo centrui priskirti keli i\u0161tekliai.) (<a href=\"https:\/\/online-help.sagex3.com\/erp\/12\/en-us\/Content\/FCT\/GESMWS.htm\">Sage X3 \u017einynas, GESMWS<\/a>) Taigi tvarkara\u0161\u010di\u0173 sudarymo \u012frankiui negalima nurodyti, kad operacijai reikia trij\u0173 darbuotoj\u0173 komandos.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"when-sage-x3-s-native-planning-is-enough\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kada pakanka Sage X3 integruot\u0173 planavimo funkcij\u0173<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Daugeliui Sage X3 naudojan\u010di\u0173 gamykl\u0173 gamybos planavimo pagal realius paj\u0117gumus \u012frankio nereikia.<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Temp\u0105 lemia med\u017eiagos, o ne \u012frenginiai.<\/strong> Gaminant \u012f sand\u0117l\u012f ar vykdant pasikartojan\u010di\u0105 gamyb\u0105, tikroji rizika yra pav\u0117luotas med\u017eiag\u0173 pirkimas. Tvarkingos gamini\u0173 sud\u0117ties specifikacijos, technologiniai mar\u0161rutai, u\u017esakymo \u012fvykdymo laikai, partij\u0173 dyd\u017eiai ir saugos atsargos MRP sistemoje i\u0161sprend\u017eia did\u017ei\u0105j\u0105 problemos dal\u012f.<\/li>\n\n\n<li><strong>Pakanka matyti apkrov\u0105.<\/strong> Kas savait\u0119 per\u017ei\u016br\u0117jus Loads ir atlikus kelis rankinius pakeitimus Planning workbench, gamykla laikosi termin\u0173.<\/li>\n\n\n<li><strong>Jau turite vietin\u0117je infrastrukt\u016broje \u012fdiegt\u0105 Production Scheduler.<\/strong> Jo pakanka darb\u0173 sekai sudaryti Gantt diagramoje, jei nereikia paruo\u0161imo matric\u0173, s\u0105saj\u0173 tarp u\u017esakym\u0173 ar sinchronizuot\u0173 lygiagre\u010di\u0173 operacij\u0173.<\/li>\n\n\n<li><strong>Jau naudojate Web Scheduling<\/strong>, lauko No. of resources reik\u0161m\u0117 nustatyta \u012f 1, o planas atitinka pad\u0117t\u012f gamybos ceche.<\/li>\n\n<\/ul>\n\n\n<h3 class=\"wp-block-heading\">Keturi b\u016bdai sudaryti gamybos tvarkara\u0161\u010dius naudojant Sage X3<\/h3>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Planavimo lentos X3 kliento programoje:<\/strong> Planning workbench ir Loads arba lenta X3 ekranuose, kurioje darbus galima vilkti pele. Jos tinka, kai pakanka matyti apkrov\u0105 ir rankiniu b\u016bdu perkelti darbus, kad gamykla laikyt\u0173si termin\u0173.<\/li>\n\n\n<li><strong>Pa\u010dios Sage gamybos planavimo sprendimai:<\/strong> vietin\u0117je infrastrukt\u016broje \u012fdiegtas Production Scheduler arba per GFS s\u0105saj\u0105 prijungtas Sage X3 Web Scheduling, kai No. of resources reik\u0161m\u0117 nustatyta \u012f 1.<\/li>\n\n\n<li><strong>Didel\u0117s apimties APS sistemos:<\/strong> i\u0161sam\u016bs planavimo sprendimai, kuriuos integruotojas diegia vykdydamas kelis m\u0117nesius trunkant\u012f projekt\u0105. Jie skirti gamykloms, turin\u010dioms atskir\u0105 planavimo skyri\u0173.<\/li>\n\n\n<li><strong>Debesijos APS su darb\u0173 vykdymu gamybos ceche:<\/strong> SkyPlanner APS per kelias sekundes sudaro tvarkara\u0161t\u012f, \u012ftraukdama kiekvien\u0105 darbo centr\u0105, operatori\u0173, \u012frank\u012f ir med\u017eiag\u0105, o operatoriai naudojasi telefonu ar plan\u0161ete. \u0160is sprendimas tinka X3 naudojantiems gamintojams, norintiems prad\u0117ti dirbti su sistema per kelias savaites.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"when-you-need-a-finite-capacity-scheduler\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kada reikia gamybos planavimo \u012frankio<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li>Loads daugum\u0105 savai\u010di\u0173 rodo raudonas juostas, o darbas su Planning workbench jau u\u017eima vis\u0105 darbo dien\u0105.<\/li>\n\n\n<li>Klientams \u017eadamos datos apskai\u010diuojamos pagal u\u017esakymo \u012fvykdymo laik\u0105, tod\u0117l pardavimo ir gamybos komandos nesutaria, kokie terminai yra real\u016bs.<\/li>\n\n\n<li>Pralaidum\u0105 lemia perderinimai, o standartin\u0117 X3 tvarkara\u0161\u010di\u0173 sudarymo funkcija nei\u0161d\u0117sto u\u017eduo\u010di\u0173 taip, kad suma\u017e\u0117t\u0173 perderinim\u0173.<\/li>\n\n\n<li>U\u017eduotims vienu metu reikia keli\u0173 operatori\u0173 arba skirtingi \u012frenginiai naudoja tuos pa\u010dius \u012frankius ir tvirtinimo \u012ftaisus.<\/li>\n\n\n<li>Naudojate Sage X3 debesijoje, tod\u0117l vietiniuose serveriuose veikiantis Production Scheduler jums netinka.<\/li>\n\n\n<li>D\u0117l skubi\u0173 u\u017esakym\u0173 ir gedim\u0173 plan\u0105 tenka perdaryti rankiniu b\u016bdu, da\u017enai \u2013 programoje Excel.<\/li>\n\n\n<li>Operatoriams reikia savo u\u017eduo\u010di\u0173 eil\u0117s, o ne atspausdinto gamybos u\u017esakym\u0173 s\u0105ra\u0161o.<\/li>\n\n<\/ul>\n\n\n<h3 class=\"wp-block-heading\">\u012e k\u0105 atkreipti d\u0117mes\u012f<\/h3>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Riboti kiekvieno i\u0161tekliaus, pamainos ir darbuotojo paj\u0117gumai<\/strong>, atsi\u017evelgiant ir \u012f neatvykimus bei vir\u0161valand\u017eius.<\/li>\n\n\n<li><strong>Nuo sekos priklausantis perderinimas<\/strong>: paruo\u0161imo trukm\u0117s matrica, kurioje per\u0117jimas i\u0161 A \u012f B gali trukti ilgiau nei i\u0161 B \u012f A, ir skai\u010diavimo variklis, parenkantis sek\u0105, kuriai reikia ma\u017eiausiai paruo\u0161imo laiko.<\/li>\n\n\n<li><strong>\u012eranki\u0173 ir brigad\u0173 apribojimai<\/strong>: bendras \u012frankis vienu metu rezervuojamas tik vienoms stakl\u0117ms, o operacijai gali reik\u0117ti keli\u0173 operatori\u0173 vienu metu.<\/li>\n\n\n<li><strong>Med\u017eiag\u0173 prieinamumo tikrinimas sudarant tvarkara\u0161t\u012f<\/strong> pagal atsargas ir ne\u012fvykdytus pirkimo u\u017esakymus bei numatomas j\u0173 pristatymo datas.<\/li>\n\n\n<li><strong>Alternatyvias stakles ir darbuotojus<\/strong> bei keli\u0173 lygi\u0173 gaminius \u012fvertina skai\u010diavimo variklis, o ne planuotojas.<\/li>\n\n\n<li><strong>Perplanavimas be rankinio paleidimo<\/strong>: u\u017eregistravus gamybos u\u017esakymo vykdymo duomenis ar gavus nauj\u0105 u\u017esakym\u0105, tvarkara\u0161tis atnaujinamas be atskiro skai\u010diavimo ciklo.<\/li>\n\n\n<li><strong>Ai\u0161kus atsakomyb\u0117s u\u017e duomenis pasidalijimas su X3<\/strong>: kuri sistema valdo datas, kaip tvarkomi u\u017erakinti gamybos u\u017esakymai ir kokie duomenys gr\u0105\u017einami \u012f X3 (operacij\u0173 datos, b\u016bsena, vykdymo duomenys).<\/li>\n\n\n<li><strong>J\u016bs\u0173 aplinkai tinkantis diegimas.<\/strong> Debesijoje veikianti X3 nesuteikia tiesiogin\u0117s prieigos prie fail\u0173 sistemos ar duomen\u0173 baz\u0117s, tod\u0117l tvarkara\u0161\u010di\u0173 sudarymo sistema turi veikti per GraphQL API, \u017einiatinklio paslaugas arba prieglobos aplinkoje teikiam\u0105 fail\u0173 perdavimo paslaug\u0105.<\/li>\n\n\n<li><strong>Kaip greitai pajusite naud\u0105<\/strong>: galimyb\u0117 i\u0161bandyti su savo duomenimis dar prie\u0161 pradedant integracijos projekt\u0105.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"where-skyplanner-fits\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kada tinka SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner APS \u2013 debesijoje veikianti gamybos planavimo sistema, sudaranti tvarkara\u0161\u010dius pagal realius \u012frengini\u0173 ir darbuotoj\u0173 paj\u0117gumus. Naudojama su Sage X3, ji pa\u0161alina visus pirmiau i\u0161vardytus tr\u016bkumus:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Visada aktualus tvarkara\u0161tis.<\/strong> Arcturus AI variklis per kelias sekundes sudaro gamybos tvarkara\u0161t\u012f pagal realius paj\u0117gumus, o Autopilot automati\u0161kai j\u012f atnaujina pasikeitus gamybos situacijai. Nereikia atskirai vykdyti Recalculate the loads veiksmo, nelieka ir perkrov\u0173, kurias planuotojui tekt\u0173 \u0161alinti rankiniu b\u016bdu.<\/li>\n\n\n<li><strong>Brigados ir alternatyvos nekei\u010diant modelio.<\/strong> Viename darbo centre vienu metu gali dirbti keli operatoriai, tod\u0117l operacija, kuriai reikia trij\u0173 \u017emoni\u0173, lieka viena operacija. Lygiagre\u010diai veikian\u010dios stakl\u0117s modeliuojamos kaip darbo centr\u0173 grup\u0117, kurioje kiekvienas centras turi savo na\u0161um\u0105. Kai pagrindin\u0117s stakl\u0117s ar darbuotojai neprieinami, variklis perkelia u\u017eduotis alternatyvioms stakl\u0117ms ar darbuotojams arba paskirsto u\u017eduot\u012f keliems.<\/li>\n\n\n<li><strong>Paruo\u0161imo trukm\u0117s matrica, kurios tr\u016bksta Production Scheduler.<\/strong> Matricoje saugoma nuo gamini\u0173 sekos priklausanti perderinimo trukm\u0117 (i\u0161 m\u0117lynos \u012f raudon\u0105 \u2013 30 min, i\u0161 raudonos \u012f m\u0117lyn\u0105 \u2013 60 min), o variklis parenka sek\u0105, kuriai reikia ma\u017eiausiai paruo\u0161imo laiko. Taip pat modeliuojamas paruo\u0161imo darbui ir sutvarkymo po darbo laikas.<\/li>\n\n\n<li><strong>\u012erankiai \u2013 riboti i\u0161tekliai.<\/strong> Viename darbo centre naudojamas \u012frankis tuo pa\u010diu metu neskiriamas kitam darbo centrui.<\/li>\n\n\n<li><strong>Tvarkara\u0161tis pagal med\u017eiag\u0173 prieinamum\u0105.<\/strong> Variklis modeliuoja b\u016bsimas atsargas, tod\u0117l darbus planuoja tik tada, kai yra jiems reikaling\u0173 med\u017eiag\u0173. U\u017esakytos med\u017eiagos laikomos prieinamomis pirkimo u\u017esakyme nurodyt\u0105 pristatymo dien\u0105, o atsargos atnaujinamos pa\u017eym\u0117jus pirkimo u\u017esakym\u0105 b\u016bsena Delivered (<a href=\"\/lt\/docs\/kas-yra-ir-kaip-naudoti-pirkimo-uzsakymu-funkcija\/\">apie pirkimo u\u017esakymus SkyPlanner dokumentacijoje<\/a>).<\/li>\n\n\n<li><strong>J\u016bs\u0173 valdomi prioritetai ir u\u017eraktai.<\/strong> Variklio sprendimus lemia u\u017eduoties prioritetas, prioritet\u0173 nustatymas pagal u\u017ebaigimo dat\u0105, kliento prioritetas, Fast Track ir Dynamic Priorities. Running Time Lock ir Bulldozer, kuris pastumia v\u0117lesnes u\u017eduotis, leid\u017eia planuotojams i\u0161laikyti kontrol\u0119.<\/li>\n\n\n<li><strong>Darb\u0173 vykdymas gamybos ceche.<\/strong> Operatoriai telefone arba plan\u0161et\u0117je mato savo u\u017eduo\u010di\u0173 eil\u0119 ir registruoja darb\u0105 naudodami Mobile Confirmations, Production Timer ir Quick Log Mode.<\/li>\n\n\n<li><strong>Debesijoje, kad ir kur veikt\u0173 j\u016bs\u0173 X3.<\/strong> SkyPlanner veikia vienodai tiek su Sage debesijoje, tiek su j\u016bs\u0173 serveriuose veikian\u010dia X3.<\/li>\n\n<\/ul>\n\n\n<p><strong>Rinkit\u0117s SkyPlanner, kai reikia gamybos planavimo pagal realius paj\u0117gumus su debesijoje veikian\u010dia X3<\/strong>, o Production Scheduler naudoti negalite.<\/p>\n\n\n<p><strong>Rinkit\u0117s SkyPlanner, kai operacijoms reikia brigad\u0173 arba alternatyvi\u0173 stakli\u0173<\/strong> ir nenorite priverstinai nustatyti lauko No. of resources reik\u0161m\u0117s 1.<\/p>\n\n\n<p><strong>Rinkit\u0117s SkyPlanner, kai norite vienoje sistemoje planuoti ir registruoti operatori\u0173 darbo laik\u0105,<\/strong> o laiko \u012fra\u0161us gr\u0105\u017einti \u012f X3 kaip gamybos vykdymo duomenis.<\/p>\n\n\n<p><strong>Rinkit\u0117s SkyPlanner, kai norite per kelias savaites prad\u0117ti planuoti gamyb\u0105 pagal realius paj\u0117gumus,<\/strong> o ne po kelis m\u0117nesius trunkan\u010dio APS projekto.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Integracija su Sage X3<\/h3>\n\n\n<p>SkyPlanner su Sage X3 kei\u010diasi duomenimis abiem kryptimis. I\u0161 X3 gaunami gamybos u\u017esakymai (MFGHEAD, MFGOPE), technologiniai mar\u0161rutai, darbo centrai, kalendoriai, atsargos ir ne\u012fvykdyti pirkimo u\u017esakymai. Suplanuotos operacij\u0173 datos gr\u0105\u017einamos per Work order \u017einiatinklio paslaug\u0105 (GESMFG), o u\u017eregistruotos valandos perduodamos kaip Production tracking duomenys (GESMTK). SkyPlanner \u017einiatinklio prane\u0161imai (\u201ewebhooks\u201c) perduoda kiekvien\u0105 tvarkara\u0161\u010dio pakeitim\u0105 vos jam \u012fvykus.<\/p>\n\n\n<p>Kiekviena gamykla X3 naudoja savaip, tod\u0117l SkyPlanner komanda pritaiko integracij\u0105 j\u016bs\u0173 aplinkai ir pri\u017ei\u016bri j\u0105 prad\u0117jus naudoti. J\u016bs\u0173 Sage X3 partneris ar vidiniai programuotojai taip pat gali kurti integracij\u0105 naudodamiesi dokumentuota SkyPlanner REST API (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API dokumentacija<\/a>). Prad\u017eiai pakanka API rakto.<\/p>\n\n\n<p>MRP, gaminius, gamini\u0173 komplektavimo \u017einiara\u0161\u010dius, technologinius mar\u0161rutus, pirkimus ir atsargas toliau valdote X3 sistemoje.<\/p>\n\n\n<p>Prad\u0117kite nuo CSV duomen\u0173 importo per 30 dien\u0173 nemokam\u0105 bandom\u0105j\u012f laikotarp\u012f. Kaina prasideda nuo 199 \u20ac per m\u0117nes\u012f, \u012f j\u0105 \u012ftraukti 5 darbo centrai. Integracijos kaina pagal j\u016bs\u0173 procesus ir poreikius pateikiama i\u0161 anksto kartu su pasirinkto plano kaina, tod\u0117l visas i\u0161laidas \u017einote dar prie\u0161 prad\u0117dami.<\/p>\n\n\n<p>Su\u017einokite apie <a href=\"\/lt\/integracijos\/erp\/sage-x3\/\">SkyPlanner APS, skirt\u0105 Sage X3<\/a>, per\u017ei\u016br\u0117kite duomen\u0173 susiejim\u0105 <a href=\"\/lt\/integracijos\/erp\/sage-x3\/integravimo-vadovas\/\">Sage X3 integracijos vadove<\/a>, taip pat <a href=\"\/lt\/funkcijos\/\">funkcijas<\/a> ir <a href=\"\/lt\/kainodara\/\">kainas<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lt\/bandymas\/\">I\u0161bandyti nemokamai<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lt\/susisiekite-su-pardavejais\/\">U\u017esisakyti pristatym\u0105<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Gamintoj\u0173 atsiliepimai apie SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"UTU tiekimo grandin\u0117s specialistas Kalle Kalliom\u00e4ki elektros skyd\u0173 gamybos ceche Ulviloje\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>sutaupoma kas savait\u0119<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSu SkyPlanner nuo gamybos planavimo Excel lentel\u0117se per\u0117jome prie gamybos optimizavimo realiuoju laiku.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, tiekimo grandin\u0117s specialistas<\/b><br>UTU \u00b7 Elektros skydai ir skirstomieji \u012frenginiai<\/p>\n\n\n<p class=\"ind-cust__result\">Planuojant gamyb\u0105 kas savait\u0119 sutaupomos 2 darbo valandos, o nauja u\u017eduo\u010di\u0173 eil\u0117 gamybos linij\u0105 pasiekia per kelias sekundes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lt\/klientu-istorijos\/utu\/\">Skaityti UTU atsiliepim\u0105<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatoriai su \u0161vari\u0173j\u0173 patalp\u0173 apranga prie buteliuk\u0173 pildymo linijos Laboratory &amp; Allied vaist\u0173 gamykloje Nairobyje\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>gamybos efektyvumas<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eGamybos efektyvumas i\u0161augo 90%.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT vadovas<\/b><br>Laboratory &amp; Allied \u00b7 Vaist\u0173 gamyba<\/p>\n\n\n<p class=\"ind-cust__result\">Gamybos efektyvumas i\u0161augo 90%, o optimizuotas trij\u0173 m\u0117nesi\u0173 planas visiems darbo centrams sudaromas grei\u010diau nei per 30 minu\u010di\u0173.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lt\/klientu-istorijos\/laboratory-allied\/\">Skaityti Laboratory &amp; Allied atsiliepim\u0105<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/13-9cbf2d28-08ef-49a1-94e3-0095e107df55.jpg\" alt=\"Fredman Operations gamybos vadov\u0117 Anu J\u00e4rvinen prie robotizuoto krovimo ant pad\u0117kl\u0173 \u012frenginio Raumoje\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/10-2fd983ec-02a7-440d-b77d-281f37545c8d.png\" alt=\"Fredman Operations\" width=\"137\" height=\"48\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>6 m\u0117nesiams<\/b><span>\u012f priek\u012f pardav\u0117jai mato laisvus paj\u0117gumus<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner suteikia tvirt\u0105 ir patikim\u0105 pagrind\u0105 visam gamybos planavimui.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Anu J\u00e4rvinen, gamybos vadov\u0117<\/b><br>Fredman Operations \u00b7 Su maistu liestis tinkamas pakavimo popierius<\/p>\n\n\n<p class=\"ind-cust__result\">Pardav\u0117jai mato laisvus paj\u0117gumus \u0161e\u0161iems m\u0117nesiams \u012f priek\u012f, o \u012f u\u017eklausas d\u0117l tvarkara\u0161\u010dio pakeitim\u0173, kurioms anks\u010diau reik\u0117davo valandos ar daugiau, dabar atsakoma per kelias sekundes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lt\/klientu-istorijos\/fredman-operations\/\">Skaityti Fredman Operations atsiliepim\u0105<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"Piristeel stogo saugos element\u0173 gamykla Kauhavoje i\u0161 oro\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>99,2%<\/b><span>pristatymo patikimumas<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner pad\u0117jo ai\u0161kiai pamatyti gamyb\u0105 ribojan\u010dias vietas ir suteik\u0117 ai\u0161kumo gamybos valdymui.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, gamybos vadovas<\/b><br>Piristeel \u00b7 Stogo saugos ir lietaus nuvedimo sistemos<\/p>\n\n\n<p class=\"ind-cust__result\">\u0160iemet pristatymo patikimumas pasiek\u0117 99,2%, o sudarant tvarkara\u0161\u010dius kasdien sutaupoma iki keturi\u0173 darbo valand\u0173.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lt\/klientu-istorijos\/piristeel\/\">Skaityti Piristeel atsiliepim\u0105<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Da\u017eniausiai u\u017eduodami klausimai<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ar Sage X3 sudaro tvarkara\u0161\u010dius pagal ribotus, ar pagal neribotus paj\u0117gumus?<\/summary>\n<p class=\"sp-faq__a\">Standartin\u0117je versijoje planuojama neatsi\u017evelgiant \u012f paj\u0117gum\u0173 ribas. Scheduling (FUNMAUTJ) nustato kiekvieno gamybos u\u017esakymo datas pagal jo technologin\u012f mar\u0161rut\u0105, ta\u010diau nei\u0161d\u0117sto u\u017esakym\u0173 laike pagal i\u0161tekli\u0173 apkrov\u0105. Loads (CONSMWK) parodo perkrovas, kurias planuotojas pa\u0161alina rankiniu b\u016bdu. Gamybos planavimui atsi\u017evelgiant \u012f turimus i\u0161tekli\u0173 paj\u0117gumus reikia Production Scheduler arba per GFS s\u0105saj\u0105 prijungtos tvarkara\u0161\u010di\u0173 sudarymo sistemos.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ar dar galima \u012fsigyti Sage X3 Production Scheduler?<\/summary>\n<p class=\"sp-faq__a\">Pagal V12 \u017einyn\u0105 \u2013 tik vietiniuose serveriuose veikian\u010diai X3. V11 \u017einyne nurodyta, kad naujiems diegimams jis nebesi\u016blomas, tod\u0117l j\u016bs\u0173 Sage partneris gali patvirtinti, kas parduodama \u0161iuo metu. Debesijoje veikian\u010diai Sage X3 dokumentacijoje numatytas b\u016bdas \u2013 bendroji Finite scheduler s\u0105saja.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kuo skiriasi Production Scheduler ir Sage X3 Web Scheduling?<\/summary>\n<p class=\"sp-faq__a\">Production Scheduler \u2013 integruota vietiniuose serveriuose veikianti Gantt tvarkara\u0161\u010di\u0173 sudarymo priemon\u0117, aktyvuojama POPS veiklos kodu. Web Scheduling \u2013 atskiras Sage priedas, veikiantis per bendr\u0105j\u0105 Finite scheduler s\u0105saj\u0105 (GFS), kuri tinka ir debesijoje, ir vietiniuose serveriuose veikian\u010diai X3. Web Scheduling 2023.3.4 versijoje prid\u0117ta GraphQL integracija, kuriai reikia Sage X3 2024 R1.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ar SkyPlanner APS veikia su Sage X3?<\/summary>\n<p class=\"sp-faq__a\">Taip. SkyPlanner su Sage X3 kei\u010diasi duomenimis abiem kryptimis tiek debesijoje, tiek vietiniuose serveriuose. Gamybos u\u017esakymai, technologiniai mar\u0161rutai ir darbo centrai gaunami i\u0161 X3, o suplanuotos datos ir gamybos vykdymo duomenys gr\u0105\u017einami atgal. Prad\u0117kite <a href=\"\/lt\/bandymas\/\">nemokam\u0105 bandom\u0105j\u012f laikotarp\u012f<\/a> naudodami CSV formatu eksportuotus duomenis; SkyPlanner komanda sukonfig\u016bruos integracij\u0105, kai prad\u0117site naudotis sistema.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ar gamybos planavimui pagal realius paj\u0117gumus reikia keisti darbo centr\u0173 model\u012f?<\/summary>\n<p class=\"sp-faq__a\">Jei naudojate bendr\u0105j\u0105 Finite scheduler advanced s\u0105saj\u0105, taip. Sage reikalauja, kad kiekvieno darbo centro lauko No. of resources reik\u0161m\u0117 b\u016bt\u0173 1, tod\u0117l prarandama informacija apie tai, kad operacijai atlikti reikia darbuotoj\u0173 komandos. Naudojant SkyPlanner, to nereikia. Viename darbo centre vienu metu gali dirbti keli operatoriai, lygiagre\u010diai veikian\u010dios stakl\u0117s sujungiamos \u012f darbo centr\u0173 grup\u0119, o j\u016bs\u0173 X3 darbo centrai lieka nepakeisti.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ar Sage X3 parenka u\u017eduo\u010di\u0173 sek\u0105 taip, kad suma\u017eint\u0173 perderinim\u0173 trukm\u0119?<\/summary>\n<p class=\"sp-faq__a\">Standartinis tvarkara\u0161\u010di\u0173 sudarymo funkcionalumas to nedaro, o Production Scheduler nurodo, kad optimizavimas pagal paruo\u0161imo laik\u0173 matric\u0105 \u0161iuo metu neprieinamas. SkyPlanner paruo\u0161imo laik\u0173 matricoje saugoma kiekvienos gamini\u0173 poros perderinimo trukm\u0117 abiem kryptimis, o planavimo variklis parenka toki\u0105 u\u017eduo\u010di\u0173 sek\u0105, kad bendra paruo\u0161imo trukm\u0117 b\u016bt\u0173 ma\u017eiausia.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integracijos \/ ERP \/ Sage X3 Ar Sage X3 palaiko gamybos planavim\u0105? MRP, apkrovos, gamybos planavimo \u012frankiai ir SkyPlanner APS Standartin\u0117 Sage X3 gamybos u\u017esakym\u0173 tvarkara\u0161\u010di\u0173 sudarymo funkcija neatsi\u017evelgia \u012f paj\u0117gum\u0173 ribas. \u0160i\u0105 sprag\u0105 u\u017epildo SkyPlanner APS. X3 planuoja med\u017eiagas naudodama MRP, o gamybos u\u017esakym\u0173 datas nustato funkcija Scheduling (FUNMAUTJ). Sage Jungtin\u0117s Karalyst\u0117s pagalbos komanda &#8230; <a title=\"Ar Sage X3 palaiko gamybos planavim\u0105? MRP, apkrovos, gamybos planavimo \u012frankiai ir SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/sage-x3\/gamybos-planavimas\/\" aria-label=\"Read more about Ar Sage X3 palaiko gamybos planavim\u0105? MRP, apkrovos, gamybos planavimo \u012frankiai ir SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100917,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-101364","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Ar Sage X3 palaiko gamybos planavim\u0105?<\/title>\n<meta name=\"description\" content=\"Standartinis Sage X3 planavimas nepaiso paj\u0117gum\u0173 rib\u0173. Norint paisyti rib\u0173, reikia Production Scheduler ar GFS s\u0105sajos. Kas veikia ir kada reikia APS?\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/sage-x3\/gamybos-planavimas\/\" \/>\n<meta property=\"og:locale\" content=\"lt_LT\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Ar Sage X3 palaiko gamybos planavim\u0105? MRP, apkrovos, gamybos planavimo \u012frankiai ir SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"Standartinis Sage X3 planavimas nepaiso paj\u0117gum\u0173 rib\u0173. Norint paisyti rib\u0173, reikia Production Scheduler ar GFS s\u0105sajos. Kas veikia ir kada reikia APS?\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/sage-x3\/gamybos-planavimas\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"16 minu\u010di\u0173\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/sage-x3\\\/gamybos-planavimas\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/sage-x3\\\/gamybos-planavimas\\\/\",\"name\":\"Ar Sage X3 palaiko gamybos planavim\u0105?\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#website\"},\"datePublished\":\"2026-10-17T13:00:38+00:00\",\"description\":\"Standartinis Sage X3 planavimas nepaiso paj\u0117gum\u0173 rib\u0173. Norint paisyti rib\u0173, reikia Production Scheduler ar GFS s\u0105sajos. Kas veikia ir kada reikia APS?\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/sage-x3\\\/gamybos-planavimas\\\/#breadcrumb\"},\"inLanguage\":\"lt-LT\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/sage-x3\\\/gamybos-planavimas\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/sage-x3\\\/gamybos-planavimas\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP ir MES programin\u0117s \u012frangos integracijos su SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bs\u0173 ERP sistemai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS su Sage X3: gamybos planavimas\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/sage-x3\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Ar Sage X3 palaiko gamybos planavim\u0105? MRP, apkrovos, gamybos planavimo \u012frankiai ir SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lt-LT\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lt-LT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Ar Sage X3 palaiko gamybos planavim\u0105?","description":"Standartinis Sage X3 planavimas nepaiso paj\u0117gum\u0173 rib\u0173. Norint paisyti rib\u0173, reikia Production Scheduler ar GFS s\u0105sajos. Kas veikia ir kada reikia APS?","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/sage-x3\/gamybos-planavimas\/","og_locale":"lt_LT","og_type":"article","og_title":"Ar Sage X3 palaiko gamybos planavim\u0105? MRP, apkrovos, gamybos planavimo \u012frankiai ir SkyPlanner APS","og_description":"Standartinis Sage X3 planavimas nepaiso paj\u0117gum\u0173 rib\u0173. Norint paisyti rib\u0173, reikia Production Scheduler ar GFS s\u0105sajos. Kas veikia ir kada reikia APS?","og_url":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/sage-x3\/gamybos-planavimas\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"16 minu\u010di\u0173"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/sage-x3\/gamybos-planavimas\/","url":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/sage-x3\/gamybos-planavimas\/","name":"Ar Sage X3 palaiko gamybos planavim\u0105?","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lt\/#website"},"datePublished":"2026-10-17T13:00:38+00:00","description":"Standartinis Sage X3 planavimas nepaiso paj\u0117gum\u0173 rib\u0173. Norint paisyti rib\u0173, reikia Production Scheduler ar GFS s\u0105sajos. Kas veikia ir kada reikia APS?","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/sage-x3\/gamybos-planavimas\/#breadcrumb"},"inLanguage":"lt-LT","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/sage-x3\/gamybos-planavimas\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/sage-x3\/gamybos-planavimas\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lt\/"},{"@type":"ListItem","position":2,"name":"ERP ir MES programin\u0117s \u012frangos integracijos su SkyPlanner","item":"https:\/\/skyplanner.ai\/lt\/integracijos\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bs\u0173 ERP sistemai","item":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS su Sage X3: gamybos planavimas","item":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/sage-x3\/"},{"@type":"ListItem","position":5,"name":"Ar Sage X3 palaiko gamybos planavim\u0105? MRP, apkrovos, gamybos planavimo \u012frankiai ir SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lt\/#website","url":"https:\/\/skyplanner.ai\/lt\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lt\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lt\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lt-LT"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lt\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lt\/","logo":{"@type":"ImageObject","inLanguage":"lt-LT","@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lt\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integracijos \/ ERP \/ Sage X3 Ar Sage X3 palaiko gamybos planavim\u0105? MRP, apkrovos, gamybos planavimo \u012frankiai ir SkyPlanner APS Standartin\u0117 Sage X3 gamybos u\u017esakym\u0173 tvarkara\u0161\u010di\u0173 sudarymo funkcija neatsi\u017evelgia \u012f paj\u0117gum\u0173 ribas. \u0160i\u0105 sprag\u0105 u\u017epildo SkyPlanner APS. X3 planuoja med\u017eiagas naudodama MRP, o gamybos u\u017esakym\u0173 datas nustato funkcija Scheduling (FUNMAUTJ). Sage Jungtin\u0117s Karalyst\u0117s pagalbos komanda&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/pages\/101364","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/comments?post=101364"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/pages\/101364\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/pages\/100917"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/media?parent=101364"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}