{"id":101334,"date":"2026-10-17T13:00:38","date_gmt":"2026-10-17T13:00:38","guid":{"rendered":"https:\/\/skyplanner.ai\/?page_id=101334"},"modified":"2026-10-17T13:00:38","modified_gmt":"2026-10-17T13:00:38","slug":"integravimo-vadovas","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/infor-cloudsuite-industrial\/integravimo-vadovas\/","title":{"rendered":"Infor CloudSuite Industrial integravimo vadovas: gamybos tvarkara\u0161\u010di\u0173 sudarymas su SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lt\/integracijos\/\">Integracijos<\/a> \/ <a href=\"\/lt\/integracijos\/erp\/\">ERP<\/a> \/ Infor CloudSuite Industrial<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Infor CloudSuite Industrial integravimo vadovas <span class=\"hl\">gamybos tvarkara\u0161\u010diams sudaryti su SkyPlanner APS<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u0160iame vadove Infor CloudSuite Industrial (CSI, anks\u010diau \u2013 SyteLine) partneriams ir IT komandoms paai\u0161kinama, kaip sujungti CSI su SkyPlanner APS. SkyPlanner su CSI kei\u010diasi duomenimis abiem kryptimis per Infor OS:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>\u012e SkyPlanner perduodamos u\u017eduotys, operacijos, i\u0161tekliai, atsargos ir pirkimo u\u017esakymai.<\/li>\n\n\n<li>Suplanuotos operacij\u0173 datos gr\u0105\u017einamos \u012f CSI u\u017eduotis.<\/li>\n\n\n<li>Operatori\u0173 darbo duomenys gr\u0105\u017einami kaip u\u017eduo\u010di\u0173 operacij\u0173 \u012fra\u0161ai, kuriuos CSI registruoja apskaitoje.<\/li>\n\n\n<li>SkyPlanner siun\u010dia prane\u0161imus per webhook s\u0105sajas vos pasikeitus tvarkara\u0161\u010diui.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lt\/bandymas\/\">I\u0161bandykite nemokamai<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lt\/susisiekite-su-pardavejais\/\">U\u017esisakykite demonstracij\u0105<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Gamybos tvarkara\u0161\u010di\u0173 sudarymas<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt laiko juosta su darbo centrams suplanuotomis u\u017eduotimis ir apa\u010dioje pateiktu u\u017esakym\u0173 s\u0105ra\u0161u.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Diegimo metu SkyPlanner komanda pritaiko integracij\u0105 j\u016bs\u0173 CSI konfig\u016bracijai ir pri\u017ei\u016bri j\u0105 prad\u0117jus naudoti. \u0160is vadovas skirtas partneriams ir programuotojams, norintiems prisid\u0117ti prie integravimo arba patiems kurti sprendimus naudojant dokumentuot\u0105 SkyPlanner REST API.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-shapes-every-csi-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas lemia kiekvienos CSI integracijos sprendimus<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner veikia debesijoje, tod\u0117l CSI viduje nereikia diegti jokios SkyPlanner programin\u0117s \u012frangos. Keliems klientams skirtoje CSI aplinkoje integracijos veikia per Infor OS vienu i\u0161 dviej\u0173 b\u016bd\u0173:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Mongoose IDO REST API per ION API Gateway.<\/strong> CSI verslo objektai yra IDO (Intelligent Data Objects), veikiantys Mongoose platformoje. REST paslauga pasiekiama per <code>IDORequestService<\/code>, o Infor j\u0105 skelbia ION API saugykloje. REST 1 versijoje prieinami <code>LoadCollection<\/code>, <code>AddItem(s)<\/code>, <code>UpdateItem(s)<\/code>, <code>DeleteItem(s)<\/code>, <code>InvokeMethod<\/code>, <code>IDOInfo<\/code> ir <code>FireAESEvent<\/code>, gr\u0105\u017einantys XML arba JSON atsakymus. Taip pat yra REST 2 versijos galini\u0173 ta\u0161k\u0173 rinkinys.<\/li>\n\n\n<li><strong>ION BOD (Business Object Documents) dokumentai<\/strong>, kuriuos ION perduoda per prijungimo ta\u0161kus. CSI skelbia siun\u010diamus <code>Sync<\/code> BOD dokumentus objektams <code>ProductionOrder<\/code>, <code>ItemMaster<\/code> ir <code>PurchaseOrder<\/code>, taip pat atsarg\u0173 dokumentus, pavyzd\u017eiui, <code>InventoryAdjustment<\/code>, <code>InventoryCount<\/code> ir <code>InventoryHold<\/code>.<\/li>\n\n<\/ol>\n\n\n<p>2026.10 siun\u010diam\u0173 BOD s\u0105ra\u0161e n\u0117ra med\u017eiag\u0173 specifikacijoms, technologiniams mar\u0161rutams ar darbo centrams skirt\u0173 BOD. Tod\u0117l tvarkara\u0161\u010di\u0173 sudarymo integracija pirmiausia remiasi IDO, o BOD galima papildomai naudoti kaip prane\u0161imus apie u\u017eduo\u010di\u0173 pakeitimus.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"authentication-and-licensing\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Autentifikavimas ir licencijavimas<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Jungiantis per \u0161liuz\u0105, CSI naudoja ION API i\u0161duotus OAuth 2.0 prieigos \u017eetonus (bearer):<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>ION API sukurkite <strong>Backend Service<\/strong> program\u0105 ir atsisi\u0173skite jos <code>.ionapi<\/code> fail\u0105. Jame saugomi kliento prisijungimo duomenys ir tarnybin\u0117s paskyros raktai (<code>saak<\/code>, <code>sask<\/code>). Be j\u0173 prieigos \u017eeton\u0173 u\u017eklausos nepavyks.<\/li>\n\n\n<li>Su kiekvienu per ION atliekamu i\u0161kvietimu si\u0173skite <code>X-Infor-MongooseConfig<\/code> antra\u0161t\u0119. Joje nurodoma tikslin\u0117 CSI konfig\u016bracija (padalinys).<\/li>\n\n\n<li>Kiekvienai aplinkai laikykite atskirus <code>.ionapi<\/code> failus. Produkcin\u0117s aplinkos failas netiks autentifikuotis bandomojoje kliento aplinkoje.<\/li>\n\n<\/ul>\n\n\n<p>Vietin\u0117je infrastrukt\u016broje \u012fdiegta SyteLine naudoja t\u0105 pa\u010di\u0105 IDO schem\u0105. Mongoose dokumentacijoje apra\u0161yti tiesioginiai IDO REST API i\u0161kvietimai su saugos \u017eetonu, gautu per <code>GetSecurityToken<\/code>, nenaudojant ION API Gateway.<\/p>\n\n\n<p>I\u0161orin\u0117s programos, kurios jungiasi per IDO sluoksn\u012f, naudoja <strong>Automation<\/strong> licencijos modul\u012f. Jam visada priskiriamas IDO seanso tipas. Pa\u010dios bendrov\u0117s Infor programoms, pavyzd\u017eiui, APS, papildomos tokios licencijos nereikia. SkyPlanner ry\u0161iui reikia vienos tokios licencijos ir prieigos prie ION API j\u016bs\u0173 kliento aplinkoje.<\/p>\n\n\n<p>SkyPlanner REST API leid\u017eia skaityti ir \u012fra\u0161yti u\u017esakym\u0173, gamini\u0173, med\u017eiag\u0173, proceso \u017eingsni\u0173, pirkimo u\u017esakym\u0173 ir laiko apskaitos duomenis. Autentifikavimui naudojamas API prieigos raktas, siun\u010diamas antra\u0161t\u0117je Authorization-Token. API apra\u0161yta Swagger\/OpenAPI formatu (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API \u017einynas<\/a>); taip pat \u017er. <a href=\"\/lt\/docs\/integravimo-pamoka\/\">SkyPlanner dokumentacij\u0105<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"change-detection-bod-triggers-aes-and-polling\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Pakeitim\u0173 aptikimas: BOD trigeriai, AES ir periodin\u0117s u\u017eklausos<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Pakeitimai i\u0161 CSI perduodami ION BOD dokumentais. Tvarkara\u0161\u010diams sudaryti svarbus <code>ProductionOrder<\/code> BOD dokumentas. J\u012f konfig\u016bruojate formoje <strong>Replication Document Outbound Cross References<\/strong>, nurodydami publikavimo apibr\u0117\u017etis:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Trigeris<\/th><th>Kas publikuojama<\/th><\/tr><\/thead><tbody><tr><td><code>TriggerProductionOrderSyncSp<\/code><\/td><td>Visi gamybos u\u017esakymai; vykdoma tik priekiniame plane<\/td><\/tr><tr><td><code>TriggerProductionOrderBGSyncSp<\/code><\/td><td>U\u017esakymai, kuriems k\u0105 tik sudarytas tvarkara\u0161tis; galima vykdyti kaip fonin\u0119 u\u017eduot\u012f<\/td><\/tr><tr><td><code>TriggerProductionOrderBGSchSyncSp<\/code><\/td><td>Pakeisti gamybos u\u017esakymai; galima vykdyti kaip fonin\u0119 u\u017eduot\u012f<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Infor pavyzd\u017eiuose filtruojama pagal u\u017eduoties b\u016bsen\u0105: <code>'Firm'<\/code> \u2013 tvarkara\u0161\u010dio pakeitimams, o pasirinktinai <code>'Released'<\/code> \u2013 med\u017eiag\u0173 ir darbo s\u0105naud\u0173 pakeitimams. Taip pat atrenkami \u012fra\u0161ai, kuri\u0173 <code>RecordDate<\/code> yra v\u0117lesn\u0117 u\u017e paskutinio rankinio fonin\u0117s u\u017eduoties publikavimo dat\u0105.<\/p>\n\n\n<p>Mongoose <strong>Application Event System (AES)<\/strong> taip pat gali vykdyti \u012fvyki\u0173 veiksmus, o REST API suteikia prieig\u0105 prie <code>FireAESEvent<\/code>. Pagrindin\u0117 schema \u2013 periodin\u0117s IDO u\u017eklausos: kas kelias minutes vykdomas <code>LoadCollection<\/code> objektams <code>SLJobs<\/code> ir <code>SLJobRoutes<\/code>, filtruojant pagal \u012fra\u0161o dat\u0105. Jei padalinys nori, kad pakeitimai b\u016bt\u0173 siun\u010diami nelaukiant u\u017eklausos, papildomai naudojamas <code>ProductionOrder<\/code> BOD dokumentas.<\/p>\n\n\n<p>Prie\u0161inga kryptimi SkyPlanner siun\u010dia tvarkara\u0161\u010dio pakeitimus per \u017einiatinklio prane\u0161imus (webhooks), kai tik jie \u012fvyksta. Kiekvienas toks prane\u0161imas inicijuoja duomen\u0173 \u012fra\u0161ym\u0105 atgal \u012f CSI.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Duomen\u0173 susiejimas<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Toliau pateikti standartini\u0173 IDO pavadinimai. Klient\u0173 aplinkose, kuriose IDO i\u0161pl\u0117sti, naudojami tie patys objektai su papildomomis savyb\u0117mis. Diegimo metu SkyPlanner komanda susieja ir \u0161ias savybes.<\/p>\n\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>CSI objektas (IDO \/ BOD \/ forma)<\/th><th>SkyPlanner objektas<\/th><th>Kryptis<\/th><th>Da\u017enumas<\/th><\/tr><\/thead><tbody><tr><td>Prek\u0117s (<code>SLItems<\/code>), <code>Sync ItemMaster<\/code> BOD dokumentas<\/td><td>Gaminiai ir med\u017eiagos<\/td><td>CSI \u2192 SkyPlanner<\/td><td>Pradinis \u012fk\u0117limas, v\u0117liau \u2013 BOD dokumentais arba kasdien perduodant pakeitimus<\/td><\/tr><tr><td>Gaminio technologinis mar\u0161rutas (<code>SLItemRoutes<\/code>)<\/td><td>Proceso etapai su paruo\u0161imo ir vykdymo trukme<\/td><td>CSI \u2192 SkyPlanner<\/td><td>Pradinis \u012fk\u0117limas, v\u0117liau \u2013 pasikeitus duomenims<\/td><\/tr><tr><td>Paruo\u0161imo i\u0161tekli\u0173 grup\u0117s ir paruo\u0161imo reik\u0161mi\u0173 paie\u0161kos lentel\u0117s<\/td><td>Paruo\u0161imo trukmi\u0173 matrica (nuo gamini\u0173 sekos priklausantys perderinimai)<\/td><td>CSI \u2192 SkyPlanner, v\u0117liau valdoma SkyPlanner sistemoje<\/td><td>Pradinis \u012fk\u0117limas<\/td><\/tr><tr><td>Gaminio BOM, u\u017eduoties med\u017eiagos (<code>SLJobmatls<\/code>)<\/td><td>Gaminio strukt\u016bra, tarpiniai gaminiai, med\u017eiag\u0173 poreikis kiekvienai u\u017eduo\u010diai<\/td><td>CSI \u2192 SkyPlanner<\/td><td>Pradinis \u012fk\u0117limas, v\u0117liau \u2013 su kiekviena u\u017eduotimi<\/td><\/tr><tr><td>I\u0161tekli\u0173 grup\u0117s ir i\u0161tekliai (su grup\u0117s nari\u0173 seka)<\/td><td>Darbo centr\u0173 grup\u0117s, darbo centrai, alternatyv\u016bs darbo centrai<\/td><td>CSI \u2192 SkyPlanner<\/td><td>Pradinis \u012fk\u0117limas, v\u0117liau \u2013 retai<\/td><\/tr><tr><td>\u012erankiai ir darbuotoj\u0173 skai\u010dius kiekvienai operacijai<\/td><td>\u012erankiai kaip riboti bendri i\u0161tekliai, operatori\u0173 skai\u010dius kiekviename darbo centre<\/td><td>Tvarkoma SkyPlanner sistemoje<\/td><td>Nustatoma pradinio diegimo metu<\/td><\/tr><tr><td>Darbo centrai (<code>SLWcs<\/code>)<\/td><td>Ne tvarkara\u0161\u010dio sudarymo objektas; naudojamas tik s\u0105naud\u0173 informacijai<\/td><td>CSI \u2192 SkyPlanner<\/td><td>Pasirinktinai<\/td><\/tr><tr><td>Pamainos ir \u0161ventin\u0117s dienos<\/td><td>Pamainos ir neatvykimai<\/td><td>CSI \u2192 SkyPlanner<\/td><td>Kas savait\u0119 arba valdoma SkyPlanner sistemoje<\/td><\/tr><tr><td>Gamybos u\u017esakymai (<code>SLJobs<\/code>), <code>Sync ProductionOrder<\/code> BOD dokumentas<\/td><td>U\u017esakymai su \u012fvykdymo terminais ir prioritetu<\/td><td>CSI \u2192 SkyPlanner<\/td><td>BOD trigeris arba periodin\u0117s u\u017eklausos kas kelias minutes<\/td><\/tr><tr><td>Gamybos u\u017esakymo operacijos (<code>SLJobRoutes<\/code>)<\/td><td>Kiekvieno proceso etapo u\u017eduotys ir i\u0161tekli\u0173 grup\u0117<\/td><td>CSI \u2192 SkyPlanner<\/td><td>Su kiekviena u\u017eduotimi<\/td><\/tr><tr><td>Klient\u0173 u\u017esakym\u0173 eilut\u0117s (<code>SLCoItems<\/code>), klientai (<code>SLCustomers<\/code>)<\/td><td>Klient\u0173 u\u017esakym\u0173 \u012fvykdymo terminai ir klient\u0173 prioritetai<\/td><td>CSI \u2192 SkyPlanner<\/td><td>Periodin\u0117s u\u017eklausos<\/td><\/tr><tr><td>Preki\u0173 atsargos sand\u0117lyje, atsarg\u0173 BOD dokumentai<\/td><td>Atsargos (sand\u0117lio liku\u010diai)<\/td><td>CSI \u2192 SkyPlanner<\/td><td>Kas valand\u0105 arba prie\u0161 kiekvien\u0105 tvarkara\u0161\u010dio sudarym\u0105<\/td><\/tr><tr><td>Pirkimo u\u017esakymai (neu\u017ebaigtos pirkimo u\u017esakym\u0173 eilut\u0117s), <code>Sync PurchaseOrder<\/code> BOD dokumentas<\/td><td>Pirkimo u\u017esakymai ir gaunamos med\u017eiagos su numatoma pristatymo data<\/td><td>CSI \u2192 SkyPlanner<\/td><td>Kas valand\u0105 arba gavus BOD dokument\u0105, prie\u0161 kiekvien\u0105 tvarkara\u0161\u010dio sudarym\u0105<\/td><\/tr><tr><td>Gamybos u\u017esakymo operacij\u0173 tvarkara\u0161tis (kiekvienos operacijos prad\u017eia ir pabaiga) ir u\u017esakymo prad\u017eios bei pabaigos datos objekte <code>SLJobs<\/code>, \u012fra\u0161omos per <code>UpdateItems<\/code><\/td><td>Planuojama kiekvienos operacijos prad\u017eia ir pabaiga<\/td><td>SkyPlanner \u2192 CSI<\/td><td>Kaskart pasikeitus tvarkara\u0161\u010diui, gavus SkyPlanner webhook prane\u0161im\u0105<\/td><\/tr><tr><td>\u012e apskait\u0105 ne\u012ftraukti u\u017eduo\u010di\u0173 \u012fra\u0161ai (<code>SLJobtrans<\/code>), kuriami per <code>AddItems<\/code>, darbuotojai (<code>SLEmployees<\/code>), prie\u017eastys (<code>SLReasons<\/code>)<\/td><td>Laiko \u012fra\u0161ai, tinkamos produkcijos ir broko kiekiai, prie\u017eas\u010di\u0173 kodai<\/td><td>SkyPlanner \u2192 CSI<\/td><td>Po kiekvieno patvirtinimo<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Integravimo modeliai<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. Pradinis pagrindini\u0173 duomen\u0173 \u012fk\u0117limas.<\/strong> Per <code>LoadCollection<\/code> nuskaitykite prekes, gamini\u0173 technologinius mar\u0161rutus, BOM, i\u0161tekli\u0173 grupes, i\u0161teklius ir pamainas. SkyPlanner darbo centrus kurkite pagal i\u0161teklius ir i\u0161tekli\u0173 grupes, o ne pagal CSI darbo centrus. Infor ai\u0161kiai nurodo, kad darbo centras &#8222;captures costs only and does not affect the actual planning or scheduling.&#8221; (tik fiksuoja s\u0105naudas ir neturi \u012ftakos faktiniam planavimui ar tvarkara\u0161\u010di\u0173 sudarymui).<\/p>\n\n\n<p><strong>2. U\u017esakym\u0173 sinchronizavimas.<\/strong> Perduokite patvirtintus ir vykdyti i\u0161leistus gamybos u\u017esakymus su j\u0173 operacijomis bei med\u017eiagomis. APS suplanuotus u\u017esakymus palikite CSI. Kiekvien\u0105 kart\u0105 paleidus APS Planning, ankstesnis planas i\u0161trinamas ir sukuriamas i\u0161 naujo, tod\u0117l suplanuoti u\u017esakymai neturi pastovaus identifikatoriaus, pagal kur\u012f b\u016bt\u0173 galima sudaryti tvarkara\u0161t\u012f. Pirmiausia lange <strong>Planning Detail<\/strong> patvirtinkite juos kaip gamybos u\u017eduotis.<\/p>\n\n\n<p><strong>3. Tvarkara\u0161\u010dio \u012fra\u0161ymas atgal \u012f CSI.<\/strong> \u012era\u0161ym\u0105 inicijuoja SkyPlanner tvarkara\u0161\u010dio webhook prane\u0161imas. Integracija per SkyPlanner REST API nuskaito nauj\u0105 planuojam\u0105 kiekvienos operacijos prad\u017ei\u0105 ir pabaig\u0105. Per <code>UpdateItems<\/code> ji \u012fra\u0161o \u0161iuos duomenis \u012f gamybos u\u017esakymo operacij\u0173 tvarkara\u0161t\u012f, \u012fra\u0161us atpa\u017eindama pagal u\u017esakym\u0105, sufiks\u0105 ir operacijos numer\u012f. Tai tos pa\u010dios operacij\u0173 datos, kurias nustato Scheduler ir kurios redaguojamos per Resource Gantt. Atitinkamai atnaujinamos ir u\u017esakymo prad\u017eios bei pabaigos datos objekte <code>SLJobs<\/code>.<\/p>\n\n\n<p>Kai kuriuose padaliniuose tvarkara\u0161\u010dio laukai apsaugoti arba reikalaujama, kad kiekvienam pakeitimui b\u016bt\u0173 taikoma CSI logika. Tokiais atvejais \u012fra\u0161oma per individual\u0173 IDO metod\u0105, i\u0161kvie\u010diam\u0105 su <code>InvokeMethod<\/code>. Jis atlieka t\u0105 pat\u012f atnaujinim\u0105, taikydamas pa\u010dios CSI patikras.<\/p>\n\n\n<p><strong>4. Darb\u0173 patvirtinimai gamybos ceche.<\/strong> Operatoriai registruoja laik\u0105 ir kiekius telefonu arba plan\u0161ete (Mobile Confirmations, Production Timer, Quick Log Mode). Kiekvienas u\u017ebaigtas laiko \u012fra\u0161as tampa \u012f apskait\u0105 ne\u012ftraukta <code>SLJobtrans<\/code> eilute, sukuriama per <code>AddItems<\/code>. Joje perduodamas gamybos u\u017esakymas, sufiksas, operacija, darbuotojas, valandos, tinkamos produkcijos ir broko kiekiai. Tada CSI funkcija Job Labor Transaction Posting j\u016bs\u0173 pasirinktu da\u017enumu \u012ftraukia darbo ir prid\u0117tines s\u0105naudas \u012f u\u017esakymo nebaigtos gamybos apskait\u0105.<\/p>\n\n\n<p><strong>5. Atsakomyb\u0117 u\u017e duomenis, pakartotiniai bandymai ir konflikt\u0173 taisykl\u0117s.<\/strong><\/p>\n\n\n<p>Kiekvieno \u012fra\u0161o raktas sudaromas i\u0161 pa\u010dios CSI identifikatori\u0173 (u\u017eduoties, priesagos, operacijos numerio, operacijos \u012fra\u0161o ID), tod\u0117l pakartotinis \u017einiatinklio prane\u0161imas ar periodin\u0117 u\u017eklausa atnaujina t\u0105 pa\u010di\u0105 eilut\u0119, o ne sukuria dublikat\u0105. Nepavykus \u012fra\u0161yti duomen\u0173, bandymas kartojamas ir registruojamas kartu su CSI klaidos tekstu. U\u017eduotis, kurios b\u016bsena CSI pakei\u010diama \u012f Complete arba History, per kit\u0105 sinchronizavim\u0105 pa\u0161alinama i\u0161 SkyPlanner tvarkara\u0161\u010dio. At\u0161auktos SkyPlanner u\u017eduoties duomenys niekada nera\u0161omi atgal.<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Duomenys<\/th><th>Atsakinga sistema<\/th><\/tr><\/thead><tbody><tr><td>Prek\u0117s, technologiniai mar\u0161rutai, med\u017eiag\u0173 specifikacijos, kiekiai, u\u017eduo\u010di\u0173 b\u016bsenos, savikainos skai\u010diavimas<\/td><td>CSI<\/td><\/tr><tr><td>Operacij\u0173 seka, prad\u017eios ir pabaigos laikas, i\u0161tekli\u0173 priskyrimas<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Ilgalaikis med\u017eiag\u0173 planas, Get CTP\/ATP<\/td><td>CSI APS, jei turima licencija<\/td><\/tr><tr><td>Pamainos ir \u0161ventin\u0117s dienos<\/td><td>Viena sistema, pasirenkama apibr\u0117\u017eiant apimt\u012f<\/td><\/tr><tr><td>Darbo s\u0105naudos ir pagamintas kiekis<\/td><td>\u012era\u0161oma \u012f CSI i\u0161 SkyPlanner darbo laiko \u012fra\u0161\u0173<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Pagrindinis konflikt\u0173 \u0161altinis \u2013 integruotos tvarkara\u0161\u010di\u0173 sudarymo priemon\u0117s. APS Planning laiko tvarkara\u0161tyje esan\u010dias operacijas u\u017efiksuotomis, ta\u010diau v\u0117liau paleistas <strong>Scheduler<\/strong> gali jas v\u0117l perkelti. Paprastai jis paleid\u017eiamas kasdien ir apima vien\u0105 dien\u0105. Kai u\u017e detal\u0173 tam tikr\u0173 i\u0161tekli\u0173 grupi\u0173 operacij\u0173 eili\u0161kum\u0105 atsako SkyPlanner, ne\u012ftraukite \u0161i\u0173 grupi\u0173 \u012f CSI Scheduler. Tada i\u0161junkite <strong>Shop Floor Control Parameters<\/strong> parametr\u0105, d\u0117l kurio Scheduler suplanuotus u\u017esakymus laiko paklausa. MRP, APS u\u017esakym\u0173 planavimas ir Get CTP gali likti CSI. SkyPlanner funkcija Running Time Lock neleid\u017eia perkelti prad\u0117t\u0173 operacij\u0173. Pasikeitus gamybos situacijai, Autopilot automati\u0161kai perskai\u010diuoja SkyPlanner tvarkara\u0161t\u012f, laikydamasis j\u016bs\u0173 nustatyt\u0173 u\u017erakt\u0173 ir prioritet\u0173.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u012eprasti projekto etapai<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Diegimas paprastai u\u017ebaigiamas per kelias savaites nuo jo prad\u017eios, net ir didel\u0117se \u012fmon\u0117se. CSI projekt\u0105 sudaro \u0161ie etapai:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>I\u0161bandymas su eksportuotais duomenimis.<\/strong> CSI u\u017eduo\u010di\u0173, operacij\u0173 ir i\u0161tekli\u0173 s\u0105ra\u0161uose naudokite <strong>Save to Excel<\/strong>, konvertuokite duomenis \u012f CSV ir importuokite juos \u012f SkyPlanner. Prie\u0161 kurdami s\u0105saj\u0105 patikrinkite tvarkara\u0161t\u012f.<\/li>\n\n\n<li><strong>Apimties apibr\u0117\u017eimas ir pagrindini\u0173 duomen\u0173 susiejimas.<\/strong> Patvirtinkite susiejimo lentel\u0119, u\u017e kiekvien\u0105 lauk\u0105 atsaking\u0105 sistem\u0105, sinchronizavimo da\u017en\u012f, registravimo apskaitoje kanal\u0105 ir tai, kaip bus apribota integruoto Scheduler apr\u0117ptis.<\/li>\n\n\n<li><strong>Infor OS konfig\u016bravimas.<\/strong> Backend Service programa, kiekvienos kliento aplinkos <code>.ionapi<\/code> failai, Automation licencija ir IDO REST prieiga. Jau projekto prad\u017eioje papra\u0161ykite Infor Cloud pagalbos tarnybos parengti IDO REST prieig\u0105, nes kai kuriose kliento aplinkose j\u0105 reikia \u012fjungti.<\/li>\n\n\n<li><strong>Pradinis \u012fk\u0117limas.<\/strong> Per <code>LoadCollection<\/code> \u012fkeliamos prek\u0117s, BOM, gamini\u0173 technologiniai mar\u0161rutai, i\u0161tekliai, i\u0161tekli\u0173 grup\u0117s ir pamainos. SkyPlanner sistemoje taip pat nustatoma paruo\u0161imo trukmi\u0173 matrica, \u012frankiai ir darbuotoj\u0173 skai\u010dius.<\/li>\n\n\n<li><strong>Gamybos ir pirkimo u\u017esakym\u0173 sinchronizavimas.<\/strong> Pirmiausia \u2013 periodin\u0117s IDO u\u017eklausos u\u017eduotims, operacijoms, med\u017eiagoms ir neu\u017ebaigtiems pirkimo u\u017esakymams gauti. Prireikus v\u0117liau pridedamas <code>ProductionOrder<\/code> BOD trigeris.<\/li>\n\n\n<li><strong>Testavimas lygiagre\u010diai su dabartiniu planu.<\/strong> Naudokite SkyPlanner kartu su esamu vykdytin\u0173 u\u017eduo\u010di\u0173 s\u0105ra\u0161u ir pataisykite technologini\u0173 mar\u0161rut\u0173 trukmes bei i\u0161tekli\u0173 duomenis.<\/li>\n\n\n<li><strong>Tvarkara\u0161\u010dio \u012fra\u0161ymas atgal \u012f CSI ir darb\u0173 patvirtinimai gamybos ceche.<\/strong> Kai datos ir duomenys sutampa, \u012fjunkite tvarkara\u0161\u010dio \u012fra\u0161ym\u0105 atgal \u012f CSI ir darbo s\u0105naud\u0173 perdavim\u0105 per <code>SLJobtrans<\/code>.<\/li>\n\n\n<li><strong>Naudojimo prad\u017eia<\/strong> toms i\u0161tekli\u0173 grup\u0117ms, u\u017e kurias atsako SkyPlanner.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"csi-pitfalls\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Da\u017enos CSI integravimo klaidos<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Darbo centr\u0173 susiejimas su stakl\u0117mis.<\/strong> <code>SLWcs<\/code> atrodo akivaizdus IDO pasirinkimas, ta\u010diau paj\u0117gumams jis netinka. Tvarkara\u0161\u010diai sudaromi pagal i\u0161teklius ir i\u0161tekli\u0173 grupes, atsi\u017evelgiant \u012f grup\u0117s nari\u0173 sek\u0105.<\/li>\n\n\n<li><strong>BOD filtrai, d\u0117l kuri\u0173 u\u017eduotys praleid\u017eiamos arba siun\u010diamos pakartotinai.<\/strong> <code>ProductionOrder<\/code> publikavimas priklauso nuo pasirinkto trigerio ir b\u016bsen\u0173 filtr\u0173. Filtruojant tik pagal <code>'Firm'<\/code>, nepastebimi vykdyti perduot\u0173 u\u017eduo\u010di\u0173 med\u017eiag\u0173 ir darbo s\u0105naud\u0173 pakeitimai. Nenurod\u017eius paskutinio publikavimo datos filtro, viskas i\u0161siun\u010diama i\u0161 naujo.<\/li>\n\n\n<li><strong>Atmetami atgal \u012fra\u0161omi darbo duomenys.<\/strong> CSI atmeta darbo duomenis, jei u\u017eduoties b\u016bsena n\u0117ra Released arba Scheduled, jei operacija jau baigta arba darbuotojas neaktyvus. Pirmiausia patikrinkite duomenis ir registruokite atmetimus.<\/li>\n\n\n<li><strong>Prielaida, kad eilut\u0117 jau rei\u0161kia \u012f apskait\u0105 \u012ftraukt\u0105 \u012fra\u0161\u0105.<\/strong> <code>SLJobtrans<\/code> eilut\u0117 lieka ne\u012ftraukta \u012f apskait\u0105, kol nepaleid\u017eiama Job Labor Transaction Posting. Su finans\u0173 komanda suderinkite \u012ftraukimo \u012f apskait\u0105 da\u017enum\u0105, kad darbo s\u0105naudos laiku patekt\u0173 \u012f nebaigtos gamybos ir darbo u\u017emokes\u010dio apskait\u0105.<\/li>\n\n\n<li><strong>V\u0117luojan\u010dios u\u017eduotys i\u0161 APS.<\/strong> APS planuoja atgal nuo termino, o jei tai nepavyksta \u2013 \u012f priek\u012f nuo \u0161iandienos. \u012e praeit\u012f ji niekada neplanuoja. U\u017euot pasikliov\u0119 gauta prad\u017eios data, leiskite SkyPlanner sudaryti v\u0117luojan\u010di\u0173 u\u017esakym\u0173 tvarkara\u0161t\u012f pagal realius paj\u0117gumus.<\/li>\n\n\n<li><strong>Mongoose ypatumai.<\/strong> Kablelius <code>InvokeMethod<\/code> parametr\u0173 reik\u0161m\u0117se pakeiskite kaitos seka <code>\\x2c<\/code>.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"who-configures-the-cloudsuite-industrial-integra\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kas konfig\u016bruoja CloudSuite Industrial integracij\u0105<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>SkyPlanner komanda j\u0105 sukonfig\u016bruoja diegimo metu ir pri\u017ei\u016bri prad\u0117jus naudoti.<\/strong> Tai apima SkyPlanner pus\u0119 bei j\u016bs\u0173 kliento aplinkai pritaikyt\u0105 IDO ir BOD s\u0105saj\u0105. Komanda j\u0105 pri\u017ei\u016bri, kai kei\u010diasi i\u0161tekli\u0173 grup\u0117s, IDO pl\u0117tiniai ar u\u017eduo\u010di\u0173 b\u016bsenos. Kiekviena gamykla CSI naudoja skirtingai, o komanda turi patirties susiejant \u0161iuos duomenis.<\/li>\n\n\n<li><strong>J\u016bs\u0173 Infor partneris gali prisid\u0117ti.<\/strong> Partneris i\u0161mano j\u016bs\u0173 IDO pl\u0117tinius ir ION konfig\u016bracij\u0105, dirba pagal SkyPlanner Swagger\/OpenAPI dokumentacij\u0105 ir u\u017esiprenumeruoja \u017einiatinklio prane\u0161imus.<\/li>\n\n\n<li><strong>J\u016bs\u0173 programuotojai gali kurti integracij\u0105<\/strong> naudodami t\u0105 pa\u010di\u0105 REST API, kurioje autentifikuojamasi prieigos raktu. Prad\u017eiai pakanka SkyPlanner API rakto (<a href=\"\/lt\/docs\/integravimo-pamoka\/\">integravimo vadovas<\/a>), o prireikus padeda SkyPlanner komanda.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"why-csi-teams-add-skyplanner-instead-of-tuning-a\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kod\u0117l CSI komandos renkasi SkyPlanner, u\u017euot derinusios dar vien\u0105 paketin\u012f skai\u010diavim\u0105<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner integracijos apimtis CSI pus\u0117je nedidel\u0117. Sistema nuskaito u\u017eduotis, operacijas, med\u017eiagas ir i\u0161teklius, o atgal \u012fra\u0161o du dalykus: planuojam\u0105 operacij\u0173 laik\u0105 ir darbo s\u0105naudas per <code>SLJobtrans<\/code>. Tarp \u0161i\u0173 veiksm\u0173 ji perplanuoja darbus, kuriuos CSI atveju planuotojas tur\u0117t\u0173 pakoreguoti per Resource Gantt arba kurie b\u016bt\u0173 perplanuoti per kit\u0105 Scheduler paleidim\u0105:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>\u012e \u012fvykius reaguojantis tvarkara\u0161tis.<\/strong> Arcturus per kelias sekundes sudaro gamybos plan\u0105, atsi\u017evelgdamas \u012f realius \u012frengini\u0173 ir darbuotoj\u0173 paj\u0117gumus. Autopilot automati\u0161kai j\u012f perskai\u010diuoja pasikeitus gamybos situacijai \u2013 tiek gavus pakeist\u0105 u\u017eduot\u012f i\u0161 CSI, tiek operatoriui u\u017eregistravus darbo eig\u0105. Tuomet nauji suplanuoti laikai perduodami naudojant \u201ewebhooks\u201c.<\/li>\n\n\n<li><strong>Darbo laikas registruojamas ten, kur dirbama.<\/strong> Mobile Confirmations, Production Timer ir Quick Log Mode operatori\u0173 \u012fvestus duomenis paver\u010dia laiko \u012fra\u0161ais, susietais su <code>SLJobtrans<\/code> eilut\u0117mis. Taip darbo s\u0105naud\u0173 duomenys pasiekia CSI be pakartotinio \u012fvedimo.<\/li>\n\n\n<li><strong>Apribojimai, atitinkantys cecho s\u0105lygas.<\/strong> Paruo\u0161imo trukmi\u0173 matrica parenka perderinim\u0173 sek\u0105, kuriai reikia ma\u017eiausiai paruo\u0161imo laiko. \u012erankiai yra bendro naudojimo i\u0161tekliai, kuri\u0173 prieinamumas ribotas. Viename darbo centre vienu metu gali dirbti keli operatoriai, o pagrindin\u0117ms ma\u0161inoms ar darbuotojams esant u\u017eimtiems pasitelkiamos alternatyvios ma\u0161inos ir darbuotojai.<\/li>\n\n\n<li><strong>Eili\u0161kumas pagal med\u017eiag\u0173 prieinamum\u0105.<\/strong> Kai perduodami u\u017eduo\u010di\u0173 med\u017eiag\u0173, atsarg\u0173 ir atvir\u0173 CSI pirkimo u\u017esakym\u0173 duomenys, sudarant tvarkara\u0161t\u012f tikrinamas med\u017eiag\u0173 prieinamumas. U\u017esakyta med\u017eiaga laikoma prieinama pirkimo u\u017esakyme nurodyt\u0105 pristatymo dien\u0105, o atsargos atnaujinamos, kai pirkimo u\u017esakymas pa\u017eymimas Delivered.<\/li>\n\n\n<li><strong>I\u0161bandymas, ma\u017einantis projekto rizik\u0105.<\/strong> \u012ekelkite per Save to Excel eksportuotus duomenis \u012f 30 dien\u0173 bandom\u0105j\u0105 versij\u0105 ir pamatykite savo u\u017eduotis gamybos plane, sudarytame atsi\u017evelgiant \u012f realius \u012frengini\u0173 ir darbuotoj\u0173 paj\u0117gumus. Sustabdykite siaur\u0105j\u0105 viet\u0105 sudarant\u012f i\u0161tekli\u0173, prid\u0117kite skub\u0173 u\u017esakym\u0105 ir atid\u0117kite pirkimo u\u017esakymo pristatym\u0105. \u010cia patikrintas duomen\u0173 susiejimas taps IDO darb\u0173 apimtimi.<\/li>\n\n<\/ul>\n\n\n<p><strong>Rinkit\u0117s SkyPlanner, kai<\/strong> CSI turi likti pagrindine preki\u0173, u\u017eduo\u010di\u0173 ir savikainos duomen\u0173 sistema. Gausite tvarkara\u0161\u010di\u0173 sudarymo priemon\u0119 ir gamybos cecho program\u0117l\u0119 su nedidel\u0117s apimties, ai\u0161kia s\u0105saja: \u012f j\u0105 perduodamos u\u017eduotys ir pagrindiniai duomenys, o i\u0161 jos \u2013 suplanuotas laikas ir darbo duomenys. SkyPlanner kaina prasideda nuo 199 \u20ac per m\u0117nes\u012f, \u012fskaitant 5 darbo centrus. Mokama kas m\u0117nes\u012f, atsisakyti galima bet kada. Integracijos kaina pagal j\u016bs\u0173 proces\u0105 ir poreikius pateikiama i\u0161 anksto kartu su pasirinkto plano kaina, tod\u0117l visas i\u0161laidas \u017einote dar prie\u0161 prad\u0117dami.<\/p>\n\n\n<p>Per\u017ei\u016br\u0117kite <a href=\"\/lt\/kainodara\/\">kainas<\/a>, <a href=\"\/lt\/funkcijos\/\">funkcijas<\/a> ir <a href=\"\/lt\/docs\/integravimo-pamoka\/\">SkyPlanner dokumentacij\u0105<\/a>. CSI APS ir Scheduler palyginim\u0105 su debesijoje veikian\u010dia tvarkara\u0161\u010di\u0173 sudarymo priemone rasite straipsnyje <a href=\"\/lt\/integracijos\/erp\/infor-cloudsuite-industrial\/gamybos-planavimas\/\">\u201eGamybos planavimas su Infor CloudSuite Industrial\u201c<\/a>. Taip pat galite apsilankyti <a href=\"\/lt\/integracijos\/erp\/infor-cloudsuite-industrial\/\">Infor CloudSuite Industrial puslapyje<\/a> ir <a href=\"\/lt\/integracijos\/erp\/\">ERP integracij\u0173 skiltyje<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lt\/bandymas\/\">I\u0161bandykite nemokamai<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lt\/susisiekite-su-pardavejais\/\">U\u017esisakykite demonstracij\u0105<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Gamintoj\u0173 atsiliepimai apie SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"UTU tiekimo grandin\u0117s specialistas Kalle Kalliom\u00e4ki elektros skyd\u0173 gamybos ceche Ulviloje\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>sutaupoma kas savait\u0119<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSu SkyPlanner nuo gamybos planavimo Excel lentel\u0117se per\u0117jome prie gamybos optimizavimo realiuoju laiku.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, tiekimo grandin\u0117s specialistas<\/b><br>UTU \u00b7 Elektros skydai ir skirstymo \u012franga<\/p>\n\n\n<p class=\"ind-cust__result\">Planuojant gamyb\u0105 kas savait\u0119 sutaupoma 2 valandos darbo laiko, o nauja darb\u0173 eil\u0117 gamybos linij\u0105 pasiekia per kelias sekundes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lt\/customers\/utu\/\">Skaitykite UTU atsiliepim\u0105<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatoriai su \u0161varioms patalpoms skirtais kostiumais prie buteliuk\u0173 pildymo linijos Laboratory &amp; Allied vaist\u0173 gamykloje Nairobyje\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>gamybos efektyvumas<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eGamybos efektyvumas padid\u0117jo 90%.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT vadovas<\/b><br>Laboratory &amp; Allied \u00b7 Vaist\u0173 gamyba<\/p>\n\n\n<p class=\"ind-cust__result\">Gamybos efektyvumas padid\u0117jo 90%, o optimizuotas trij\u0173 m\u0117nesi\u0173 planas visiems darbo centrams sudaromas per ma\u017eiau nei 30 minu\u010di\u0173.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lt\/customers\/laboratory-allied\/\">Skaitykite Laboratory &amp; Allied atsiliepim\u0105<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"KJH-Comp suvirintojas \u0161lifuoja suvirint\u0105 plienin\u0119 konstrukcij\u0105 Alah\u00e4rm\u00e4 gamykloje\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>pristatymo patikimumas, i\u0161aug\u0119s nuo ma\u017edaug 50%<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner atlieka lemiam\u0105 vaidmen\u012f u\u017etikrinant m\u016bs\u0173 pristatymo patikimum\u0105.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, generalinis direktorius<\/b><br>KJH-Comp \u00b7 Lak\u0161tinio metalo apdirbimas ir u\u017esakomoji gamyba<\/p>\n\n\n<p class=\"ind-cust__result\">Pristatymo patikimumas i\u0161augo nuo ma\u017edaug 50% iki net 98%, o tvarkara\u0161\u010diams sudaryti dabar pakanka vieno meistro vietoj dviej\u0173.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lt\/customers\/kjh-comp\/\">Skaitykite KJH-Comp atsiliepim\u0105<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/13-9cbf2d28-08ef-49a1-94e3-0095e107df55.jpg\" alt=\"Fredman Operations gamybos vadov\u0117 Anu J\u00e4rvinen \u0161alia robotizuotos krovimo ant pale\u010di\u0173 cel\u0117s Raumoje\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/10-2fd983ec-02a7-440d-b77d-281f37545c8d.png\" alt=\"Fredman Operations\" width=\"137\" height=\"48\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>6 m\u0117nesiams<\/b><span>\u012f priek\u012f pardavimo komanda mato laisvus paj\u0117gumus<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner suteikia pagrind\u0105 visam gamybos planavimui ir u\u017etikrina jo patikimum\u0105.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Anu J\u00e4rvinen, gamybos vadov\u0117<\/b><br>Fredman Operations \u00b7 Su maistu liestis tinkamas pakavimo popierius<\/p>\n\n\n<p class=\"ind-cust__result\">Pardavimo komanda mato laisvus paj\u0117gumus \u0161e\u0161iems m\u0117nesiams \u012f priek\u012f, o \u012f pra\u0161ymus pakeisti tvarkara\u0161t\u012f, kuriems anks\u010diau reik\u0117davo valandos ar daugiau, dabar atsakoma per kelias sekundes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lt\/customers\/fredman-operations\/\">Skaitykite Fredman Operations atsiliepim\u0105<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Da\u017eniausiai u\u017eduodami klausimai<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kas kuria integracij\u0105 su CloudSuite Industrial arba SyteLine?<\/summary>\n<p class=\"sp-faq__a\">Diegimo metu SkyPlanner komanda sukonfig\u016bruoja abipus\u0119 integracij\u0105 pagal j\u016bs\u0173 CSI aplink\u0105, naudodama IDO REST API ir ION BOD, o prad\u0117jus j\u0105 naudoti teikia palaikym\u0105. J\u016bs\u0173 Infor partneris arba j\u016bs\u0173 programuotojai taip pat gali kurti integracij\u0105 naudodamiesi dokumentuota SkyPlanner REST API \u2013 tam pakanka API rakto. Bandomuoju laikotarpiu galite prad\u0117ti nuo duomen\u0173, eksportuot\u0173 CSV arba Excel formatu.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kuri\u0105 CSI API reik\u0117t\u0173 naudoti gamybos tvarkara\u0161\u010di\u0173 sudarymo integracijai?<\/summary>\n<p class=\"sp-faq__a\">Naudokite Mongoose IDO REST API per ION API Gateway, o OAuth 2.0 autentifikavimui \u2013 Backend Service <code>.ionapi<\/code> fail\u0105. Jei periodin\u0117s u\u017eklausos nepakankamai greitos, u\u017eduo\u010di\u0173 pakeitimams aptikti prid\u0117kite <code>ProductionOrder<\/code> BOD dokument\u0105.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kaip planuojamos datos ir darbo s\u0105naudos \u012fra\u0161omos atgal \u012f CSI?<\/summary>\n<p class=\"sp-faq__a\">Planuojama operacij\u0173 prad\u017eia ir pabaiga per IDO <code>UpdateItems<\/code> \u012fra\u0161oma atgal \u012f gamybos u\u017esakymo operacij\u0173 tvarkara\u0161t\u012f. U\u017esakymo prad\u017eios ir pabaigos datos atnaujinamos objekte <code>SLJobs<\/code>. Padaliniai, kuriuose \u0161ie laukai apsaugoti, naudoja individual\u0173 IDO metod\u0105, i\u0161kvie\u010diam\u0105 per <code>InvokeMethod<\/code>. Darbo s\u0105naudos per <code>AddItems<\/code> \u012fra\u0161omos kaip \u012f apskait\u0105 ne\u012ftrauktos <code>SLJobtrans<\/code> eilut\u0117s, o Job Labor Transaction Posting jas \u012ftraukia \u012f nebaigtos gamybos apskait\u0105.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ar i\u0161orinei tvarkara\u0161\u010di\u0173 sudarymo sistemai prijungti reikia papildomos Infor licencijos?<\/summary>\n<p class=\"sp-faq__a\">Taip, reikia Automation licencijos. Infor licencijavimo dokumentacijoje nurodyta, kad i\u0161orin\u0117s programos, kurios jungiasi per IDO sluoksn\u012f, naudoja \u0161i\u0105 licencij\u0105 su IDO seanso tipu.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ar galime toliau naudoti CSI APS ir papildomai prijungti SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">Taip. CSI APS ir toliau valdo med\u017eiag\u0173 plan\u0105 bei Get CTP\/ATP, o SkyPlanner nustato u\u017eduo\u010di\u0173 eili\u0161kum\u0105 tose i\u0161tekli\u0173 grup\u0117se, kurias jai patikite.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kiek trunka integracijos su CSI projektas?<\/summary>\n<p class=\"sp-faq__a\">Diegimas paprastai u\u017ebaigiamas per kelias savaites nuo pradinio diegimo etapo prad\u017eios. Projektas apima duomen\u0173 susiejim\u0105, pradin\u012f \u012fk\u0117lim\u0105, gamybos ir pirkimo u\u017esakym\u0173 sinchronizavim\u0105, tvarkara\u0161\u010dio \u012fra\u0161ym\u0105 atgal \u012f CSI, patvirtinimus per <code>SLJobtrans<\/code>, lygiagret\u0173 veikim\u0105 ir paleidim\u0105 eksploatuoti.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ar galime i\u0161bandyti SkyPlanner dar neprad\u0117j\u0119 kurti integracijos?<\/summary>\n<p class=\"sp-faq__a\">Taip. Per 30 dien\u0173 nemokam\u0105 bandom\u0105j\u012f laikotarp\u012f galite naudoti iki 20 darbo centr\u0173 ir visas Basic funkcijas. Mok\u0117jimo kortel\u0117s nereikia. Prad\u0117kite nuo i\u0161 CSI eksportuot\u0173 CSV arba Excel fail\u0173. <a href=\"\/lt\/bandymas\/\">Prad\u0117kite nemokam\u0105 bandom\u0105j\u012f laikotarp\u012f<\/a> arba <a href=\"\/lt\/susisiekite-su-pardavejais\/\">pasitarkite su pardavimo komanda<\/a> d\u0117l savo aplinkos.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integracijos \/ ERP \/ Infor CloudSuite Industrial Infor CloudSuite Industrial integravimo vadovas gamybos tvarkara\u0161\u010diams sudaryti su SkyPlanner APS \u0160iame vadove Infor CloudSuite Industrial (CSI, anks\u010diau \u2013 SyteLine) partneriams ir IT komandoms paai\u0161kinama, kaip sujungti CSI su SkyPlanner APS. SkyPlanner su CSI kei\u010diasi duomenimis abiem kryptimis per Infor OS: skyplanner.ai \u00b7 Gamybos tvarkara\u0161\u010di\u0173 sudarymas Diegimo metu &#8230; <a title=\"Infor CloudSuite Industrial integravimo vadovas: gamybos tvarkara\u0161\u010di\u0173 sudarymas su SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/infor-cloudsuite-industrial\/integravimo-vadovas\/\" aria-label=\"Read more about Infor CloudSuite Industrial integravimo vadovas: gamybos tvarkara\u0161\u010di\u0173 sudarymas su SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100887,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-101334","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Infor CloudSuite Industrial: tvarkara\u0161\u010di\u0173 integravimo vadovas<\/title>\n<meta name=\"description\" content=\"Sujunkite Infor CloudSuite Industrial (SyteLine) su SkyPlanner APS: IDO REST per ION, ProductionOrder BOD, dat\u0173 gr\u0105\u017einimas, SLJobtrans darbo apskaita ir klaidos.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/infor-cloudsuite-industrial\/integravimo-vadovas\/\" \/>\n<meta property=\"og:locale\" content=\"lt_LT\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Infor CloudSuite Industrial integravimo vadovas: gamybos tvarkara\u0161\u010di\u0173 sudarymas su SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"Sujunkite Infor CloudSuite Industrial (SyteLine) su SkyPlanner APS: IDO REST per ION, ProductionOrder BOD, dat\u0173 gr\u0105\u017einimas, SLJobtrans darbo apskaita ir klaidos.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/infor-cloudsuite-industrial\/integravimo-vadovas\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"17 minu\u010di\u0173\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/infor-cloudsuite-industrial\\\/integravimo-vadovas\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/infor-cloudsuite-industrial\\\/integravimo-vadovas\\\/\",\"name\":\"Infor CloudSuite Industrial: tvarkara\u0161\u010di\u0173 integravimo vadovas\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#website\"},\"datePublished\":\"2026-10-17T13:00:38+00:00\",\"description\":\"Sujunkite Infor CloudSuite Industrial (SyteLine) su SkyPlanner APS: IDO REST per ION, ProductionOrder BOD, dat\u0173 gr\u0105\u017einimas, SLJobtrans darbo apskaita ir klaidos.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/infor-cloudsuite-industrial\\\/integravimo-vadovas\\\/#breadcrumb\"},\"inLanguage\":\"lt-LT\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/infor-cloudsuite-industrial\\\/integravimo-vadovas\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/infor-cloudsuite-industrial\\\/integravimo-vadovas\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP ir MES programin\u0117s \u012frangos integracijos su SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bs\u0173 ERP sistemai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS sistemai Infor CloudSuite Industrial (SyteLine): gamybos planavimas\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/infor-cloudsuite-industrial\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Infor CloudSuite Industrial integravimo vadovas: gamybos tvarkara\u0161\u010di\u0173 sudarymas su SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lt-LT\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lt-LT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Infor CloudSuite Industrial: tvarkara\u0161\u010di\u0173 integravimo vadovas","description":"Sujunkite Infor CloudSuite Industrial (SyteLine) su SkyPlanner APS: IDO REST per ION, ProductionOrder BOD, dat\u0173 gr\u0105\u017einimas, SLJobtrans darbo apskaita ir klaidos.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/infor-cloudsuite-industrial\/integravimo-vadovas\/","og_locale":"lt_LT","og_type":"article","og_title":"Infor CloudSuite Industrial integravimo vadovas: gamybos tvarkara\u0161\u010di\u0173 sudarymas su SkyPlanner APS","og_description":"Sujunkite Infor CloudSuite Industrial (SyteLine) su SkyPlanner APS: IDO REST per ION, ProductionOrder BOD, dat\u0173 gr\u0105\u017einimas, SLJobtrans darbo apskaita ir klaidos.","og_url":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/infor-cloudsuite-industrial\/integravimo-vadovas\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"17 minu\u010di\u0173"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/infor-cloudsuite-industrial\/integravimo-vadovas\/","url":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/infor-cloudsuite-industrial\/integravimo-vadovas\/","name":"Infor CloudSuite Industrial: tvarkara\u0161\u010di\u0173 integravimo vadovas","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lt\/#website"},"datePublished":"2026-10-17T13:00:38+00:00","description":"Sujunkite Infor CloudSuite Industrial (SyteLine) su SkyPlanner APS: IDO REST per ION, ProductionOrder BOD, dat\u0173 gr\u0105\u017einimas, SLJobtrans darbo apskaita ir klaidos.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/infor-cloudsuite-industrial\/integravimo-vadovas\/#breadcrumb"},"inLanguage":"lt-LT","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/infor-cloudsuite-industrial\/integravimo-vadovas\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/infor-cloudsuite-industrial\/integravimo-vadovas\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lt\/"},{"@type":"ListItem","position":2,"name":"ERP ir MES programin\u0117s \u012frangos integracijos su SkyPlanner","item":"https:\/\/skyplanner.ai\/lt\/integracijos\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bs\u0173 ERP sistemai","item":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS sistemai Infor CloudSuite Industrial (SyteLine): gamybos planavimas","item":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/infor-cloudsuite-industrial\/"},{"@type":"ListItem","position":5,"name":"Infor CloudSuite Industrial integravimo vadovas: gamybos tvarkara\u0161\u010di\u0173 sudarymas su SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lt\/#website","url":"https:\/\/skyplanner.ai\/lt\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lt\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lt\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lt-LT"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lt\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lt\/","logo":{"@type":"ImageObject","inLanguage":"lt-LT","@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lt\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integracijos \/ ERP \/ Infor CloudSuite Industrial Infor CloudSuite Industrial integravimo vadovas gamybos tvarkara\u0161\u010diams sudaryti su SkyPlanner APS \u0160iame vadove Infor CloudSuite Industrial (CSI, anks\u010diau \u2013 SyteLine) partneriams ir IT komandoms paai\u0161kinama, kaip sujungti CSI su SkyPlanner APS. SkyPlanner su CSI kei\u010diasi duomenimis abiem kryptimis per Infor OS: skyplanner.ai \u00b7 Gamybos tvarkara\u0161\u010di\u0173 sudarymas Diegimo metu&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/pages\/101334","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/comments?post=101334"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/pages\/101334\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/pages\/100887"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/media?parent=101334"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}