{"id":101245,"date":"2026-10-17T13:00:38","date_gmt":"2026-10-17T13:00:38","guid":{"rendered":"https:\/\/skyplanner.ai\/?page_id=101245"},"modified":"2026-10-17T13:00:38","modified_gmt":"2026-10-17T13:00:38","slug":"gamybos-planavimas","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/epicor-kinetic\/gamybos-planavimas\/","title":{"rendered":"Ar Epicor Kinetic turi gamybos planavimo funkcij\u0105? Sistemos planavimo \u012frankiai, APS ir SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lt\/integracijos\/\">Integracijos<\/a> \/ <a href=\"\/lt\/integracijos\/erp\/\">ERP<\/a> \/ Epicor Kinetic<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Ar Epicor Kinetic turi gamybos planavimo funkcij\u0105? <span class=\"hl\">Sistemos planavimo \u012frankiai, APS ir SkyPlanner APS<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">Taip, Epicor Kinetic turi integruot\u0105 gamybos planavimo funkcij\u0105. \u010cia gamybos planavimas rei\u0161kia tvarkara\u0161\u010dio sudarym\u0105 atsi\u017evelgiant \u012f realiai prieinamus \u012frengini\u0173 ir darbuotoj\u0173 paj\u0117gumus. Modulis Scheduling and Resource Management sudaro tvarkara\u0161\u010dius atsi\u017evelgdamas \u012f turimus paj\u0117gumus, o atskiras modulis Advanced Planning and Scheduling (APS) leid\u017eia taikyti daugiau nei du apribojimus, planuoti pagal i\u0161tekli\u0173 galimybes ir naudoti optimizavimo taisykles.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lt\/bandymas\/\">Prad\u0117ti nemokam\u0105 bandom\u0105j\u012f laikotarp\u012f<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lt\/susisiekite-su-pardavejais\/\">U\u017esakyti demonstracij\u0105<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Gamybos tvarkara\u0161\u010di\u0173 sudarymas<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt diagrama su darbo centrams suplanuotomis u\u017eduotimis ir u\u017esakym\u0173 s\u0105ra\u0161u apa\u010dioje.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Kasdieniame darbe yra trys apribojimai. Planavim\u0105 pagal turimus paj\u0117gumus reikia \u012fjungti keliose vietose, bazinis modulis vienai operacijai leid\u017eia taikyti ne daugiau kaip du apribojimus, o paruo\u0161imo optimizavimas galimas tik su APS.<\/p>\n\n\n<p>SkyPlanner APS veikia kartu su Kinetic ir automati\u0161kai planuoja pagal ribotus kiekvieno darbo centro paj\u0117gumus \u2013 be APS licencijos. Sudarant tvarkara\u0161t\u012f atsi\u017evelgiama \u012f operatori\u0173 brigadas, bendrai naudojamus \u012frankius, sand\u0117lyje esan\u010dias ir pagal pirkimo u\u017esakymus gaunamas med\u017eiagas bei nuo operacij\u0173 sekos priklausan\u010dius perderinimus. Pasikeitus situacijai gamyboje, Autopilot automati\u0161kai perskai\u010diuoja tvarkara\u0161t\u012f.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-epicor-kinetic-schedules-capacity-step-by-st\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kaip Epicor Kinetic planuoja paj\u0117gumus: \u017eingsnis po \u017eingsnio<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Kinetic planavimas apima tris lygmenis. <strong>MRP<\/strong> su \u012ftrauktomis Forecasting ir MPS funkcijomis planuoja med\u017eiag\u0173 poreik\u012f. <strong>Scheduling and Resource Management<\/strong> \u2013 atskiras modulis, kuris sudaro u\u017eduo\u010di\u0173 tvarkara\u0161\u010dius pagal i\u0161teklius. <strong>APS<\/strong> \u2013 dar vienas modulis, kur\u012f Epicor apib\u016bdina kaip &#8222;an extension to Scheduling&#8221; (Scheduling pl\u0117tin\u012f). (<a href=\"https:\/\/www.epaccsys.com\/wp-content\/uploads\/Epicor-Kinetic-Planning-and-Scheduling-Suite-Epaccsys.pdf\">Epicor bro\u0161i\u016bra<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">1. U\u017eduotys ir gamybos metodas<\/h3>\n\n\n<p>Gamybos u\u017esakym\u0105 Epicor vadina <strong>Job<\/strong>. Kiekviena u\u017eduotis sudaroma pagal gamybos metod\u0105: med\u017eiagas apibr\u0117\u017eia BOM, o technologin\u012f mar\u0161rut\u0105 \u2013 operacij\u0173 s\u0105ra\u0161as. Kiekvienai operacijai nurodoma <strong>Capability<\/strong>, <strong>Resource Group<\/strong> arba <strong>Resource<\/strong>. Epicor User Help forume patyr\u0119 naudotojai sutaria: pasirinkus i\u0161tekli\u0173 galimyb\u0119, kit\u0173 dviej\u0173 parink\u010di\u0173 taikyti negalima, ta\u010diau grup\u0117je vis tiek galima nurodyti konkret\u0173 i\u0161tekli\u0173. Epicor bro\u0161i\u016broje <strong>Automated Scheduling by Capability<\/strong>, kai konkret\u0173 i\u0161tekli\u0173 parenka planavimo variklis, nurodoma kaip APS funkcija. (<a href=\"https:\/\/www.epiusers.help\/t\/finite-schedule-not-doing-finite-scheduling\/72831\">forumas<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. Riboti ar neriboti paj\u0117gumai: nustatoma kiekvienam i\u0161tekliui<\/h3>\n\n\n<p>Paj\u0117gumai nustatomi i\u0161tekliams \u2013 \u012frenginiams, darbuotojams ir \u012frankiams, kurie sujungiami \u012f i\u0161tekli\u0173 grupes. Grup\u0117je gali b\u016bti bet koks i\u0161tekli\u0173 skai\u010dius, o konkret\u0173 i\u0161tekli\u0173 sistema priskiria pagal jo prieinamum\u0105. Kiekvienas i\u0161teklius turi savo kalendori\u0173, paj\u0117gumus, laukimo eil\u0117je ir perk\u0117limo laik\u0105.<\/p>\n\n\n<p>Ar paj\u0117gumai riboti, pasirenkama kiekvienam i\u0161tekliui atskirai. Forume ie\u0161kant problem\u0173 prie\u017eas\u010di\u0173 pirmiausia si\u016bloma patikrinti i\u0161tekliaus \u017eymim\u0105j\u012f langel\u012f &#8222;Finite&#8221;. Epicor bro\u0161i\u016broje ra\u0161oma: &#8222;Define each resource with either finite or infinite capacity. When a piece of the schedule is moved, the resource is rescheduled according to its type.&#8221; (Kiekvienam i\u0161tekliui nustatykite ribotus arba neribotus paj\u0117gumus. Perk\u0117lus tvarkara\u0161\u010dio dal\u012f, i\u0161tekliaus tvarkara\u0161tis perskai\u010diuojamas pagal jo tip\u0105.) Taip Kinetic leid\u017eia taikyti \u012fprast\u0105 mi\u0161r\u0173 metod\u0105: paj\u0117gumus riboti ten, kur yra gamybos kli\u016b\u010di\u0173, o kitur laikyti juos neribotais.<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. Planavimo pagal paj\u0117gumus horizontas<\/h3>\n\n\n<p><strong>Finite Load Horizon<\/strong> nustato, iki kada tvarkara\u0161tis koreguojamas atsi\u017evelgiant \u012f turimus paj\u0117gumus, kad tokios korekcijos neb\u016bt\u0173 taikomos pernelyg tolimai atei\u010diai. Epicor tai apib\u016bdina kaip laiko rib\u0105 arba galutin\u0119 dat\u0105 &#8222;for finitely scheduling load on the resource.&#8221; (i\u0161tekliaus apkrovai planuoti pagal turimus paj\u0117gumus). U\u017e \u0161ios ribos operacijos planuojamos neribojant paj\u0117gum\u0173. Forumo naudotojai \u0161\u012f horizont\u0105 nustato i\u0161tekliui, i\u0161tekli\u0173 grupei ir <strong>Site Maintenance<\/strong> skirtuke <strong>Planning<\/strong>.<\/p>\n\n\n<p>Be to, kiekvienas tvarkara\u0161\u010di\u0173 sudarymo \u012frankis turi atskir\u0105 \u017eymim\u0105j\u012f langel\u012f planavimui pagal turimus paj\u0117gumus \u012fjungti. Praleidus bent vien\u0105 lygmen\u012f, tvarkara\u0161tis sudaromas neribojant paj\u0117gum\u0173. Vienas atsakymas forume \u012f klausim\u0105, kod\u0117l neveikia planavimas pagal turimus paj\u0117gumus: &#8222;Be sure the site maintenance &gt; planning tab has a finite horizon value filled in also.&#8221; (\u012esitikinkite, kad site maintenance &gt; planning skirtuke taip pat \u012fvesta planavimo pagal paj\u0117gumus horizonto reik\u0161m\u0117.) (<a href=\"https:\/\/www.epiusers.help\/t\/finite-schedule-not-doing-finite-scheduling\/72831\">forumas<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. Scheduling Blocks, Setup Grouping ir Dual Resource Constraints<\/h3>\n\n\n<p><strong>Scheduling Blocks<\/strong> leid\u017eia modeliuoti periodin\u012f paruo\u0161imo poreik\u012f, pavyzd\u017eiui, \u012franki\u0173 keitim\u0105. <strong>Setup Grouping<\/strong> grupuoja u\u017eduotis pagal j\u016bs\u0173 nustatytus kriterijus, kad paruo\u0161imas b\u016bt\u0173 efektyvesnis.<\/p>\n\n\n<p><strong>Dual Resource Constraints<\/strong> leid\u017eia planuojant gamyb\u0105 pagal turimus paj\u0117gumus operacijai rezervuoti ne tik pagrindin\u012f, bet ir vien\u0105 papildom\u0105 i\u0161tekli\u0173 \u2013 \u012frank\u012f arba darbuotoj\u0105. Tipinis pavyzdys \u2013 \u012frenginys, kuriam reikia sertifikuoto operatoriaus.<\/p>\n\n\n<h3 class=\"wp-block-heading\">5. Global Scheduling<\/h3>\n\n\n<p><strong>Global Scheduling<\/strong> sudaro visos gamyklos tvarkara\u0161t\u012f. Pagalbos tekste nurodyta, kad jis taiko &#8222;scheduling on all jobs that are eligible for Global Scheduling&#8221; (tvarkara\u0161\u010dio sudarym\u0105 visoms u\u017eduotims, tinkamoms Global Scheduling) ir skai\u010diuoja v\u0117lavimo dienas nuo bendrojo tvarkara\u0161\u010dio prad\u017eios datos. U\u017eduo\u010di\u0173 eil\u0119 lemia j\u0173 planavimo prioritetas. Taip pat galite sudaryti atskiros u\u017eduoties tvarkara\u0161t\u012f per <strong>Job Entry<\/strong>, leisti MRP suplanuoti jo sukurtas u\u017eduotis ir planuoti pirmyn arba atgal. Forumo naudotojai suplanuotus i\u0161tekli\u0173 paskyrimus gauna u\u017eklausomis i\u0161 lentel\u0117s <strong>ResourceTimeUsed<\/strong>, atmesdami scenarij\u0173 analiz\u0117s \u012fra\u0161us. (<a href=\"https:\/\/www.epiusers.help\/t\/global-scheduling-order\/82411\">forumas<\/a>, <a href=\"https:\/\/www.epiusers.help\/t\/query-scheduling-board-data\/79381\">forumas<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">6. Planavimo lentos<\/h3>\n\n\n<p>Planuotojai dirba trijose Gantt tipo lentose, kuriose u\u017eduotis galima vilkti pele:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Lenta<\/th><th>Paskirtis<\/th><\/tr><\/thead><tbody><tr><td>Job Scheduling Board<\/td><td>Perkelti ir u\u017efiksuoti vienos u\u017eduoties operacijas<\/td><\/tr><tr><td>Resource Scheduling Board<\/td><td>Per\u017ei\u016br\u0117ti vieno i\u0161tekliaus ar grup\u0117s apkrov\u0105 ir keisti operacij\u0173 sek\u0105<\/td><\/tr><tr><td>Multi-Resource Scheduling Board<\/td><td>Palyginti kelis i\u0161teklius ir perkelti u\u017eduotis i\u0161 vieno \u012f kit\u0105<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Papildomi \u012frankiai apima <strong>scenarij\u0173 analiz\u0117s<\/strong> re\u017eim\u0105, <strong>Change Impact Informer<\/strong>, <strong>Overload Informer<\/strong>, u\u017eduo\u010di\u0173 fiksavim\u0105 bei \u012fsp\u0117jimus apie v\u0117lavim\u0105 ir med\u017eiag\u0173 prieinamum\u0105. Lentel\u0117je <strong>Related Materials<\/strong> rodomos med\u017eiagos, kuri\u0173 prieinamumas ribotas, j\u0173 pirkimo u\u017esakymai, u\u017eduotys ir u\u017esakymo \u012fvykdymo laikas. Gamybos ceche operatoriai registruoja darb\u0105 per <strong>Start Activity<\/strong> ir <strong>Labor Entry<\/strong>.<\/p>\n\n\n<h3 class=\"wp-block-heading\">7. Koki\u0173 papildom\u0173 galimybi\u0173 suteikia APS<\/h3>\n\n\n<p>APS naudoja t\u0105 pat\u012f planavimo varikl\u012f ir suteikia papildom\u0173 galimybi\u0173:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Daugiau nei du apribojimai.<\/strong> Epicor: &#8222;The Advanced Planning and Scheduling module provides the ability to use more than two resource constraints.&#8221; (Modulis Advanced Planning and Scheduling leid\u017eia taikyti daugiau nei du i\u0161tekli\u0173 apribojimus.)<\/li>\n\n\n<li><strong>Planavimas pagal Capability ir Dependent Capability.<\/strong><\/li>\n\n\n<li><strong>Minimum WIP scheduling<\/strong> ir <strong>Balanced Optimization<\/strong>, derinant prioritet\u0105, laiko rezerv\u0105 ir paruo\u0161im\u0105.<\/li>\n\n\n<li><strong>Optimization Rules<\/strong> kiekvienam i\u0161tekliui, taip pat planavimas pagal gamybos spart\u0105 ir matmenis.<\/li>\n\n\n<li><strong>Unlimited What-If<\/strong> ir <strong>paj\u0117gumais pagr\u012fstas \u012fvykdymo termino patvirtinimas<\/strong> modulyje Order Management.<\/li>\n\n\n<li><strong>Multi-Plant Communication<\/strong> ir med\u017eiag\u0173 prieinamumas kaip privalomas apribojimas, atsi\u017evelgiant \u012f tiek\u0117j\u0173 kalendorius.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"where-kinetic-s-native-scheduling-leaves-work-to\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0105 naudojant Kinetic planavimo \u012frankius tenka atlikti pa\u010diam planuotojui<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Be APS \u2013 du apribojimai.<\/strong> Bazinis modulis leid\u017eia naudoti pagrindin\u012f ir vien\u0105 papildom\u0105 i\u0161tekli\u0173. Norint vienu metu planuoti \u012frengin\u012f, du operatorius, tvirtinimo \u012ftais\u0105 ir med\u017eiag\u0105, reikia APS licencijos. (<a href=\"https:\/\/www.epaccsys.com\/wp-content\/uploads\/Epicor-Kinetic-Planning-and-Scheduling-Suite-Epaccsys.pdf\">Epicor bro\u0161i\u016bra<\/a>)<\/li>\n\n\n<li><strong>Ribot\u0173 paj\u0117gum\u0173 nustatymuose lengva suklysti.<\/strong> \u017dymimasis langelis ir horizontas nustatomi i\u0161tekliui, i\u0161tekli\u0173 grupei, Site Maintenance ir kiekviename \u012frankyje. Kinetic datos gali b\u016bti apskai\u010diuotos pagal ribotus arba neribotus paj\u0117gumus \u2013 tai priklauso nuo to, kaip buvo paleistas jas apskai\u010diav\u0119s planavimas. (<a href=\"https:\/\/www.epiusers.help\/t\/finite-schedule-not-doing-finite-scheduling\/72831\">forumas<\/a>)<\/li>\n\n\n<li><strong>Paruo\u0161imas valdomas grupuojant, optimizavimas \u2013 su APS.<\/strong> Global Scheduling remiasi u\u017eduo\u010di\u0173 prioritetais ir v\u0117lavimo dienomis. Baziniame modulyje paruo\u0161im\u0105 valdo Scheduling Blocks ir Setup Grouping, o <strong>Balanced Optimization<\/strong>, kartu vertinanti prioritet\u0105, laiko rezerv\u0105 ir paruo\u0161imo laik\u0105, yra APS funkcija. Epicor partneris Bluesky ERP priduria, kad rezultatai priklauso nuo tiksli\u0173 operacij\u0173 trukmi\u0173, pirkim\u0173 \u012fvykdymo termin\u0173 ir u\u017eduo\u010di\u0173 u\u017edarymo. (<a href=\"https:\/\/www.blueskyerp.co.uk\/blog\/a-brief-overview-of-epicor-erp-advanced-planning-scheduling\/\">Bluesky ERP<\/a>)<\/li>\n\n\n<li><strong>Planas neperskai\u010diuojamas, kol ne\u012fsiki\u0161a \u017emogus arba nepaleid\u017eiamas planavimas.<\/strong> Planas pasikei\u010dia, kai kas nors paleid\u017eia Global Scheduling, perskai\u010diuoja u\u017eduoties tvarkara\u0161t\u012f per Job Entry arba perkelia u\u017eduotis lentoje. Sustojus \u012frenginiui, planuotojas turi atlikti vien\u0105 i\u0161 \u0161i\u0173 veiksm\u0173. (<a href=\"https:\/\/www.epiusers.help\/t\/global-scheduling-order\/82411\">forumas<\/a>)<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"when-epicor-kinetic-s-native-scheduling-is-enoug\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kada pakanka Epicor Kinetic planavimo \u012franki\u0173<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Toliau naudokite Kinetic Scheduling arba \u012fsigykite APS licencij\u0105, jei jums tinka dauguma \u0161i\u0173 s\u0105lyg\u0173:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Turite vien\u0105 ar kelis gamybos padalinius, i\u0161tekliai suskirstyti \u012f grupes, o kalendoriai atitinka tikras pamainas.<\/li>\n\n\n<li>Dauguma technologini\u0173 mar\u0161rut\u0173 yra standartiniai, o planuotojams tinka pagal prioritet\u0173 taisykles gauti Global Scheduling rezultatai, kuriuos jie patikslina Job Scheduling Board lentoje.<\/li>\n\n\n<li>Paj\u0117gum\u0173 tr\u016bksta tik keliose gamybos grandyse. Planuodami gamyb\u0105 atsi\u017evelkite \u012f \u0161i\u0173 grand\u017ei\u0173 turimus paj\u0117gumus, o kitoms paj\u0117gum\u0173 apribojim\u0173 netaikykite. Kai pagrindiniai procesai jau veikia, Bluesky ERP rekomenduoja b\u016btent tok\u012f metod\u0105. (<a href=\"https:\/\/www.blueskyerp.co.uk\/blog\/a-brief-overview-of-epicor-erp-advanced-planning-scheduling\/\">Bluesky ERP<\/a>)<\/li>\n\n\n<li>Jau turite APS licencij\u0105, palaikote tikslius u\u017esakym\u0173 \u012fvykdymo laikus ir normatyvus, laiku u\u017edarote u\u017eduotis ir turite administratori\u0173, i\u0161manant\u012f planavimo varikl\u012f.<\/li>\n\n\n<li>Modulyje Order Management jums reikia paj\u0117gumais pagr\u012fsto \u012fvykdymo termino patvirtinimo.<\/li>\n\n<\/ul>\n\n\n<p>Jei tai atitinka j\u016bs\u0173 situacij\u0105, tinkamai sukonfig\u016bruokite planavim\u0105 pagal paj\u0117gumus visuose lygmenyse ir palaikykite tikslius duomenis.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"when-you-need-a-finite-capacity-scheduler\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kada reikia atskiro gamybos planavimo \u012frankio<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Kitus \u012frankius verta svarstyti, kai:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Scheduling and Resource Management arba APS licencija taip ir nebuvo \u012fsigyta arba modulis nebuvo sukonfig\u016bruotas, o planuotojai dirba Excel remdamiesi MRP datomis.<\/li>\n\n\n<li>Reikia daugiau nei dviej\u0173 apribojim\u0173, ta\u010diau nenorite imtis APS diegimo projekto.<\/li>\n\n\n<li>Planas kei\u010diasi kelis kartus per pamain\u0105 ir norite, kad jis b\u016bt\u0173 perskai\u010diuojamas automati\u0161kai, nelaukiant kito planavimo paleidimo ar planuotojo, kuris perkelt\u0173 u\u017eduotis lentoje.<\/li>\n\n\n<li>Perderinimo laikas priklauso nuo anks\u010diau vykdytos operacijos ir norite, kad seka b\u016bt\u0173 parenkama pagal paruo\u0161imo laik\u0173 matric\u0105.<\/li>\n\n\n<li>U\u017eduotims reikia operatori\u0173 brigados arba keli\u0173 \u012frengini\u0173 bendrai naudojamo tvirtinimo \u012ftaiso.<\/li>\n\n\n<li>Operatoriai turi matyti savo u\u017eduo\u010di\u0173 eil\u0119 plan\u0161et\u0117je ir patvirtinti atliktus darbus, kad pagal tai b\u016bt\u0173 atnaujinamas planas.<\/li>\n\n<\/ul>\n\n\n<h3 class=\"wp-block-heading\">Keturi b\u016bdai sudaryti tvarkara\u0161\u010dius naudojant Kinetic<\/h3>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Kinetic planavimo lentos.<\/strong> Planuotojai koreguoja Kinetic sudaryt\u0105 tvarkara\u0161t\u012f. Tinka gamyklai, kurioje ma\u017eai paj\u0117gumus ribojan\u010di\u0173 grand\u017ei\u0173, o planas kei\u010diasi retai.<\/li>\n\n\n<li><strong>Kinetic Scheduling kartu su APS.<\/strong> Global Scheduling paleid\u017eiamas periodi\u0161kai. Tinka gamykloms, kurios turi APS licencij\u0105 ir administratori\u0173, derinant\u012f planavimo varikl\u012f.<\/li>\n\n\n<li><strong>Didel\u0117ms \u012fmon\u0117ms skirti APS sprendim\u0173 paketai.<\/strong> Atskira planavimo sistema, diegiama vykdant ilg\u0105 projekt\u0105. Tinka didel\u0117ms planavimo komandoms, kurios dirba su keliomis gamyklomis ir turi savo specialist\u0173.<\/li>\n\n\n<li><strong>Debesijos APS su darb\u0173 vykdymu gamybos ceche.<\/strong> SkyPlanner APS automati\u0161kai sudaro tvarkara\u0161t\u012f pagal kiekvieno i\u0161tekliaus turimus paj\u0117gumus, perplanuoja naudodama Autopilot ir leid\u017eia patvirtinti darbus mobiliaisiais \u012frenginiais. Tinka ma\u017eoms ir vidutin\u0117ms Kinetic naudojan\u010dioms gamykloms, kurioms reikia nuolat atnaujinamo tvarkara\u0161\u010dio darbui ceche.<\/li>\n\n<\/ul>\n\n\n<h3 class=\"wp-block-heading\">\u012e k\u0105 atkreipti d\u0117mes\u012f<\/h3>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Kinetic atitinkantis duomen\u0173 modelis.<\/strong> U\u017eduotys, operacijos, i\u0161tekli\u0173 grup\u0117s, i\u0161tekliai ir j\u0173 galimyb\u0117s. Jei planavimo \u012frankis neatsi\u017evelgia \u012f lauk\u0105 Capability, darbui priskiriamas netinkamas i\u0161teklius.<\/li>\n\n\n<li><strong>I\u0161samus apribojim\u0173 vertinimas.<\/strong> Kiekvieno i\u0161tekliaus pamainos, neatvykimai ir vir\u0161valand\u017eiai; keli operatoriai vienai u\u017eduo\u010diai; \u012frankiai, kurie negali vienu metu b\u016bti dviejose vietose; nuo darb\u0173 sekos priklausantis paruo\u0161imo laikas; alternatyv\u016bs i\u0161tekliai, kai pagrindinis nepasiekiamas.<\/li>\n\n\n<li><strong>Med\u017eiag\u0173 prieinamumo vertinimas.<\/strong> U\u017eduo\u010diai reikalingos med\u017eiagos, detali\u0173 kiekiai sand\u0117liuose ir pirkimo u\u017esakym\u0173 pristatymo grafikai tikrinami pagal kiekvienos operacijos prad\u017ei\u0105.<\/li>\n\n\n<li><strong>Perplanavimas realiuoju laiku.<\/strong> Planas atnaujinamas pasikeitus gamybai ar u\u017esakymams, o ne per kit\u0105 viso plano perskai\u010diavim\u0105.<\/li>\n\n\n<li><strong>Duomen\u0173 \u012fra\u0161ymas atgal per Kinetic tvarkara\u0161\u010di\u0173 sudarymo mechanizm\u0105.<\/strong> Operacij\u0173 datos turi b\u016bti perduodamos per <strong>Erp.BO.ScheduleEngineSvc<\/strong> (MoveJobItem, ChangeResource), o po to u\u017eduotis turi b\u016bti u\u017erakinta. Darb\u0173 patvirtinimai turi b\u016bti \u012fra\u0161omi kaip darbo apskaitos \u012fra\u0161ai per <strong>Erp.BO.LaborSvc<\/strong>.<\/li>\n\n\n<li><strong>Ai\u0161kus integravimo b\u016bdas.<\/strong> <a href=\"https:\/\/www.epicor.com\/en\/products\/enterprise-resource-planning-erp\/epicor-kinetic\/tools-and-technology\/open-rest-api\/\">Kinetic REST API<\/a> valdo kiekvien\u0105 integracij\u0105 naudodama API raktus ir prieigos sritis, tod\u0117l prieigos srityje turi b\u016bti nurodytos visos paslaugos ir metodai, kuriuos kvie\u010dia tvarkara\u0161\u010di\u0173 sudarymo sistema. Duomenims skaityti paprastai naudojamos <strong>Erp.BO.JobEntrySvc<\/strong>, <strong>Erp.BO.ResourceGroupSvc<\/strong> ir Business Activity Queries (BAQs).<\/li>\n\n\n<li><strong>Atsakomyb\u0117s u\u017e duomenis taisykl\u0117s.<\/strong> Nuspr\u0119skite, kuri sistema nustato operacij\u0173 datas, kad Global Scheduling neperra\u0161yt\u0173 i\u0161orin\u0117je sistemoje sudaryto plano.<\/li>\n\n\n<li><strong>I\u0161bandymas su savo duomenimis<\/strong> dar prie\u0161 pradedant integravimo darbus.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"where-skyplanner-fits\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kada tinka SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner APS veikia debesijoje kartu su Epicor Kinetic ir pa\u0161alina visas pirmiau i\u0161vardytas spragas. MRP, u\u017eduotys ir savikainos skai\u010diavimas lieka Kinetic. SkyPlanner perima i\u0161samaus operacij\u0173 tvarkara\u0161\u010dio sudarym\u0105 ir nuolat j\u012f atnaujina, tod\u0117l planuotojui nebereikia rankiniu b\u016bdu keisti darb\u0173 sekos.<\/p>\n\n\n<p>Rinkit\u0117s SkyPlanner, kai:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Trukdo dviej\u0173 apribojim\u0173 riba.<\/strong> Arcturus planavimo variklis per kelias sekundes sudaro bendr\u0105 tvarkara\u0161t\u012f darbo centrams, \u017emon\u0117ms, \u012frankiams ir med\u017eiagoms, atsi\u017evelgdamas \u012f turimus paj\u0117gumus. Viename darbo centre naudojamo \u012frankio tuo metu negalima priskirti jokiam kitam darbo centrui.<\/li>\n\n\n<li><strong>Ribot\u0173 paj\u0117gum\u0173 nustatymai vis nesutampa.<\/strong> SkyPlanner kiekvieno darbo centro paj\u0117gumus riboja pagal jo pamainas. Nereikia derinti atskir\u0173 \u012franki\u0173 \u017eymim\u0173j\u0173 langeli\u0173 ar planavimo horizont\u0173.<\/li>\n\n\n<li><strong>U\u017eduo\u010diai reikia komandos.<\/strong> Vien\u0105 u\u017eduot\u012f tame pa\u010diame darbo centre vienu metu gali atlikti keli operatoriai. Atsi\u017evelgiama \u012f kiekvieno faktines pamainas, atostogas, neatvykimus ir vir\u0161valand\u017eius. Kai darbuotojas ar \u012frenginys nepasiekiamas, sistema perkelia darbus \u012f alternatyvius darbo centrus ir priskiria kitus darbuotojus.<\/li>\n\n\n<li><strong>Skubius u\u017esakymus reikia vykdyti be eil\u0117s.<\/strong> Fast Track, Dynamic Priorities ir kliento prioritetas leid\u017eia skubius darbus atlikti anks\u010diau. Running Time Lock i\u0161laiko vykdom\u0105 u\u017eduot\u012f jos vietoje, o Bulldozer pastumia v\u0117lesnes u\u017eduotis. Planuotojai ir toliau gali perkelti u\u017eduotis interaktyvioje Gantt laiko juostoje, o sistema suderina likusi\u0105 tvarkara\u0161\u010dio dal\u012f.<\/li>\n\n\n<li><strong>Planas negali laukti kito perskai\u010diavimo.<\/strong> Autopilot automati\u0161kai atnaujina tvarkara\u0161t\u012f pasikeitus gamybai ir perplanuoja tik tada, kai reikia. Ir toliau vadovaujamasi j\u016bs\u0173 taisykl\u0117mis, u\u017eraktais ir prioritetais.<\/li>\n\n\n<li><strong>Prad\u017eios data priklauso nuo perkam\u0173 detali\u0173.<\/strong> Sudarant tvarkara\u0161t\u012f tikrinamos atsargos ir laukiami pirkimo u\u017esakymai. Neu\u017ebaigtame Kinetic pirkimo u\u017esakyme nurodytos med\u017eiagos laikomos prieinamomis numatyt\u0105 pristatymo dien\u0105, o atsargos atnaujinamos, kai pirkimo u\u017esakymas pa\u017eymimas Delivered.<\/li>\n\n\n<li><strong>Perderinimo trukm\u0117 priklauso nuo darb\u0173 sekos.<\/strong> Paruo\u0161imo laiko matricoje saugoma perderinimo trukm\u0117 pereinant nuo vieno gaminio prie kito. Prireikus ji gali skirtis pagal krypt\u012f (i\u0161 m\u0117lynos \u012f raudon\u0105 \u2013 30 minu\u010di\u0173, i\u0161 raudonos \u012f m\u0117lyn\u0105 \u2013 60). Sistema parenka sek\u0105, kuriai reikia ma\u017eiausiai paruo\u0161imo laiko, be atskiro APS optimizavimo projekto.<\/li>\n\n\n<li><strong>Planas turi pasiekti gamybos cech\u0105.<\/strong> Naudodami Mobile Confirmations, Production Timer ir Quick Log Mode, operatoriai telefone ar plan\u0161et\u0117je mato savo darb\u0173 eil\u0119 ir registruoja atlikt\u0105 darb\u0105. \u0160ie duomenys perduodami atgal \u012f Kinetic kaip darbo apskaitos \u012fra\u0161ai.<\/li>\n\n\n<li><strong>Norite prad\u0117ti naudotis per kelias savaites.<\/strong> Diegimas paprastai baigiamas per kelias savaites nuo kliento parengimo naudotis sistema prad\u017eios.<\/li>\n\n<\/ul>\n\n\n<p>Prad\u0117kite nuo u\u017eduo\u010di\u0173 ir i\u0161tekli\u0173 eksporto CSV formatu per <a href=\"\/lt\/bandymas\/\">30 dien\u0173 nemokam\u0105 bandom\u0105j\u012f laikotarp\u012f<\/a> (iki 20 darbo centr\u0173, mok\u0117jimo kortel\u0117s nereikia). Dar prie\u0161 integravimo darbus pamatysite savo tvarkara\u0161t\u012f, sudaryt\u0105 pagal turimus paj\u0117gumus. V\u0117liau kaina prasideda nuo 199 \u20ac per m\u0117nes\u012f, \u012fskaitant 5 darbo centrus. Mokama kas m\u0117nes\u012f, atsisakyti galima bet kada. Integracijos kain\u0105 pateikiame i\u0161 anksto kartu su j\u016bs\u0173 planu, atsi\u017evelg\u0119 \u012f j\u016bs\u0173 proces\u0105 ir poreikius, tod\u0117l vis\u0105 kain\u0105 \u017einote dar prie\u0161 prad\u0117dami.<\/p>\n\n\n<p>SkyPlanner ir Kinetic duomenimis kei\u010diasi abiem kryptimis. U\u017eduotys, operacijos, i\u0161tekliai ir pirkimo u\u017esakym\u0173 pristatymo grafiko eilut\u0117s gaunami per Kinetic REST API ir BAQ u\u017eklausas. Suplanuotos operacij\u0173 datos perduodamos atgal per Kinetic tvarkara\u0161\u010di\u0173 sudarymo modul\u012f (<code>ScheduleEngineSvc.MoveJobItem<\/code>), u\u017eregistruotas darbo laikas \u2013 per <code>LaborSvc<\/code>, o tvarkara\u0161\u010dio pakeitimai siun\u010diami per \u017einiatinklio prane\u0161imus (webhooks), vos tik jie \u012fvyksta. Kiekviena gamykla Kinetic naudoja savaip \u2013 nuo technologini\u0173 mar\u0161rut\u0173 pagal i\u0161tekli\u0173 galimybes iki individuali\u0173 BPM pritaikym\u0173. Tod\u0117l diegdama SkyPlanner komanda priderina integracij\u0105 prie j\u016bs\u0173 konfig\u016bracijos ir teikia jos palaikym\u0105 prad\u0117jus naudoti sistem\u0105. J\u016bs\u0173 Epicor partneris arba j\u016bs\u0173 programuotojai taip pat gali kurti integracij\u0105 naudodamiesi dokumentuota SkyPlanner REST API (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API \u017einynas<\/a>) \u2013 tam pakanka API rakto. Produkto dokumentacija vie\u0161ai prieinama <a href=\"\/lt\/docs\/integravimo-pamoka\/\">SkyPlanner dokumentacijos svetain\u0117je<\/a>.<\/p>\n\n\n<p>Kaip sistemos susiejamos, skaitykite <a href=\"\/lt\/integracijos\/erp\/epicor-kinetic\/\">Epicor Kinetic puslapyje<\/a>, o technin\u0119 informacij\u0105 rasite <a href=\"\/lt\/integracijos\/erp\/epicor-kinetic\/integravimo-vadovas\/\">integravimo vadove<\/a>. Jei norite kartu su mumis aptarti savo Kinetic i\u0161teklius ir u\u017eduotis, <a href=\"\/lt\/susisiekite-su-pardavejais\/\">u\u017esisakykite demonstracij\u0105<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Gamintoj\u0173 atsiliepimai apie SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, UTU tiekimo grandin\u0117s specialistas, elektros skyd\u0173 gamybos ceche Ulviloje\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>sutaupoma kas savait\u0119<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSu SkyPlanner nuo gamybos planavimo Excel lentel\u0117se per\u0117jome prie gamybos optimizavimo realiuoju laiku.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, tiekimo grandin\u0117s specialistas<\/b><br>UTU \u00b7 Elektros skydai ir skirstymo \u012frenginiai<\/p>\n\n\n<p class=\"ind-cust__result\">Planuojant gamyb\u0105 kas savait\u0119 sutaupomos 2 darbo valandos, o nauja darb\u0173 eil\u0117 gamybos linij\u0105 pasiekia per kelias sekundes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lt\/klientu-istorijos\/utu\/\">Skaitykite UTU atsiliepim\u0105<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"\u0160vari\u0173j\u0173 patalp\u0173 aprang\u0105 vilkintys operatoriai prie buteliuk\u0173 pildymo linijos Laboratory &amp; Allied vaist\u0173 gamykloje Nairobyje\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>gamybos efektyvumas<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eGamybos efektyvumas padid\u0117jo 90%.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT vadovas<\/b><br>Laboratory &amp; Allied \u00b7 Vaist\u0173 gamyba<\/p>\n\n\n<p class=\"ind-cust__result\">Gamybos efektyvumas padid\u0117jo 90%, o optimizuotam trij\u0173 m\u0117nesi\u0173 planui visiems darbo centrams sudaryti reikia ma\u017eiau nei 30 minu\u010di\u0173.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lt\/klientu-istorijos\/laboratory-allied\/\">Skaitykite Laboratory &amp; Allied atsiliepim\u0105<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"KJH-Comp suvirintojas \u0161lifuoja suvirint\u0105 plienin\u0119 konstrukcij\u0105 Alah\u00e4rm\u00e4 gamykloje\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>pristatymo patikimumas, padid\u0117j\u0119s nuo ma\u017edaug 50%<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner atlieka lemiam\u0105 vaidmen\u012f u\u017etikrinant m\u016bs\u0173 pristatymo patikimum\u0105.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, generalinis direktorius<\/b><br>KJH-Comp \u00b7 Lak\u0161tinio metalo apdirbimas ir sutartin\u0117 gamyba<\/p>\n\n\n<p class=\"ind-cust__result\">Pristatymo patikimumas i\u0161augo nuo ma\u017edaug 50% iki net 98%, o tvarkara\u0161\u010diams sudaryti dabar pakanka vieno meistro vietoj dviej\u0173.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lt\/klientu-istorijos\/kjh-comp\/\">Skaitykite KJH-Comp atsiliepim\u0105<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/13-9cbf2d28-08ef-49a1-94e3-0095e107df55.jpg\" alt=\"Anu J\u00e4rvinen, Fredman Operations gamybos vadov\u0117, prie robotizuotos krovimo ant pale\u010di\u0173 cel\u0117s Raumoje\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/10-2fd983ec-02a7-440d-b77d-281f37545c8d.png\" alt=\"Fredman Operations\" width=\"137\" height=\"48\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>6 m\u0117nesi\u0173<\/b><span>laisvus paj\u0117gumus mato pardavim\u0173 komanda<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner suteikia pagrind\u0105 visam gamybos planavimui ir u\u017etikrina jo patikimum\u0105.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Anu J\u00e4rvinen, gamybos vadov\u0117<\/b><br>Fredman Operations \u00b7 S\u0105ly\u010diui su maistu tinkamas pakavimo popierius<\/p>\n\n\n<p class=\"ind-cust__result\">Pardavim\u0173 komanda mato laisvus paj\u0117gumus \u0161e\u0161iems m\u0117nesiams \u012f priek\u012f, o \u012f pra\u0161ymus pakeisti tvarkara\u0161t\u012f, kuriems anks\u010diau reik\u0117davo valandos ar daugiau, dabar atsakoma per kelias sekundes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lt\/klientu-istorijos\/fredman-operations\/\">Skaitykite Fredman Operations atsiliepim\u0105<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Da\u017eniausiai u\u017eduodami klausimai<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ar Epicor Kinetic turi gamybos planavimo funkcij\u0105?<\/summary>\n<p class=\"sp-faq__a\">Taip. Modulis Scheduling and Resource Management sudaro tvarkara\u0161\u010dius pagal ribotus kiekvieno i\u0161tekliaus paj\u0117gumus nustatytame planavimo horizonte. APS yra atskiras pl\u0117tinys, skirtas daugiau nei dviem apribojimams ir optimizavimui.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ar gamybos planavimui pagal turimus paj\u0117gumus Kinetic sistemoje reikia APS modulio?<\/summary>\n<p class=\"sp-faq__a\">Ne. Gamybos planavimas pagal turimus paj\u0117gumus su vienu papildomu apribojimu veikia modulyje Scheduling and Resource Management. APS reikia norint taikyti daugiau nei du apribojimus, planuoti pagal i\u0161tekli\u0173 galimybes ir naudoti Minimum WIP bei paj\u0117gumais pagr\u012fst\u0105 pristatymo termino patvirtinim\u0105. Epicor neskelbia n\u0117 vieno i\u0161 \u0161i\u0173 moduli\u0173 kainora\u0161\u010dio.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kod\u0117l Kinetic planuoja neribodama paj\u0117gum\u0173, nors \u012fjungtas planavimas pagal turimus paj\u0117gumus?<\/summary>\n<p class=\"sp-faq__a\">Da\u017eniausiai tr\u016bksta nustatymo viename i\u0161 lygi\u0173. Patikrinkite i\u0161tekliaus \u017eym\u0105 Finite ir \u017eymim\u0105j\u012f langel\u012f, \u012fjungiant\u012f planavim\u0105 pagal turimus paj\u0117gumus \u012frankyje, kur\u012f paleidote. Tada patikrinkite planavimo pagal paj\u0117gumus horizont\u0105 i\u0161tekliaus, i\u0161tekli\u0173 grup\u0117s ir Site Maintenance skirtuko Planning nustatymuose.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ar Epicor Kinetic turi Gantt diagram\u0105 tvarkara\u0161\u010diams sudaryti?<\/summary>\n<p class=\"sp-faq__a\">Taip. Job, Resource ir Multi-Resource Scheduling Boards yra Gantt tipo planavimo lentos, kuriose galima nuvilkti elementus, modeliuoti \u201ekas b\u016bt\u0173, jeigu\u201c scenarijus ir u\u017erakinti u\u017eduotis.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kokius dar apribojimus, be dviej\u0173 Kinetic apribojim\u0173, gali \u012fvertinti SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">Kelis vien\u0105 u\u017eduot\u012f atliekan\u010dius operatorius, \u012frankius kaip bendrus riboto prieinamumo i\u0161teklius ir med\u017eiagas i\u0161 atsarg\u0173 bei laukiam\u0173 pirkimo u\u017esakym\u0173. Sistema taip pat naudoja alternatyvius darbo centrus bei darbuotojus ir paruo\u0161imo laiko matric\u0105 nuo darb\u0173 sekos priklausan\u010diam perderinimui \u012fvertinti. Visa tai \u012ftraukiama \u012f t\u0105 pat\u012f tvarkara\u0161t\u012f, sudarom\u0105 pagal turimus paj\u0117gumus.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ar SkyPlanner APS gali veikti kartu su Epicor Kinetic?<\/summary>\n<p class=\"sp-faq__a\">Taip. SkyPlanner ir Kinetic duomenimis kei\u010diasi abiem kryptimis: i\u0161 Kinetic gaunamos u\u017eduotys, operacijos ir i\u0161tekliai, o suplanuotos datos perduodamos atgal per <code>ScheduleEngineSvc<\/code>, darbo laikas \u2013 per <code>LaborSvc<\/code>. Diegdama SkyPlanner komanda priderina REST v2 integracij\u0105 prie j\u016bs\u0173 Kinetic konfig\u016bracijos. \u017dr. <a href=\"\/lt\/integracijos\/erp\/epicor-kinetic\/integravimo-vadovas\/\">integravimo vadov\u0105<\/a>.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kiek laiko u\u017etrunka paleisti SkyPlanner APS kartu su Kinetic?<\/summary>\n<p class=\"sp-faq__a\">Diegimas paprastai baigiamas per kelias savaites nuo kliento parengimo naudotis sistema prad\u017eios. Prie\u0161 tai per 30 dien\u0173 bandom\u0105j\u012f laikotarp\u012f galite sudaryti savo reali\u0173 u\u017eduo\u010di\u0173 tvarkara\u0161t\u012f pagal CSV arba Excel formatu eksportuotus duomenis. <a href=\"\/lt\/bandymas\/\">Prad\u0117kite nemokam\u0105 bandom\u0105j\u012f laikotarp\u012f<\/a> arba <a href=\"\/lt\/susisiekite-su-pardavejais\/\">susisiekite su pardavim\u0173 komanda<\/a>.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integracijos \/ ERP \/ Epicor Kinetic Ar Epicor Kinetic turi gamybos planavimo funkcij\u0105? Sistemos planavimo \u012frankiai, APS ir SkyPlanner APS Taip, Epicor Kinetic turi integruot\u0105 gamybos planavimo funkcij\u0105. \u010cia gamybos planavimas rei\u0161kia tvarkara\u0161\u010dio sudarym\u0105 atsi\u017evelgiant \u012f realiai prieinamus \u012frengini\u0173 ir darbuotoj\u0173 paj\u0117gumus. Modulis Scheduling and Resource Management sudaro tvarkara\u0161\u010dius atsi\u017evelgdamas \u012f turimus paj\u0117gumus, o atskiras &#8230; <a title=\"Ar Epicor Kinetic turi gamybos planavimo funkcij\u0105? Sistemos planavimo \u012frankiai, APS ir SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/epicor-kinetic\/gamybos-planavimas\/\" aria-label=\"Read more about Ar Epicor Kinetic turi gamybos planavimo funkcij\u0105? Sistemos planavimo \u012frankiai, APS ir SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100858,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-101245","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Ar Epicor Kinetic palaiko gamybos planavim\u0105?<\/title>\n<meta name=\"description\" content=\"Taip: Scheduling and Resource Management \u2013 gamybos planavimas. APS \u2013 atskiras pl\u0117tinys. Kaip tai veikia, kokie apribojimai ir kada pakanka.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/epicor-kinetic\/gamybos-planavimas\/\" \/>\n<meta property=\"og:locale\" content=\"lt_LT\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Ar Epicor Kinetic turi gamybos planavimo funkcij\u0105? Sistemos planavimo \u012frankiai, APS ir SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"Taip: Scheduling and Resource Management \u2013 gamybos planavimas. APS \u2013 atskiras pl\u0117tinys. Kaip tai veikia, kokie apribojimai ir kada pakanka.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/epicor-kinetic\/gamybos-planavimas\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"16 minu\u010di\u0173\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/epicor-kinetic\\\/gamybos-planavimas\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/epicor-kinetic\\\/gamybos-planavimas\\\/\",\"name\":\"Ar Epicor Kinetic palaiko gamybos planavim\u0105?\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#website\"},\"datePublished\":\"2026-10-17T13:00:38+00:00\",\"description\":\"Taip: Scheduling and Resource Management \u2013 gamybos planavimas. APS \u2013 atskiras pl\u0117tinys. Kaip tai veikia, kokie apribojimai ir kada pakanka.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/epicor-kinetic\\\/gamybos-planavimas\\\/#breadcrumb\"},\"inLanguage\":\"lt-LT\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/epicor-kinetic\\\/gamybos-planavimas\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/epicor-kinetic\\\/gamybos-planavimas\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP ir MES programin\u0117s \u012frangos integracijos su SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bs\u0173 ERP sistemai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS sistemai Epicor Kinetic: gamybos planavimas\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/epicor-kinetic\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Ar Epicor Kinetic turi gamybos planavimo funkcij\u0105? Sistemos planavimo \u012frankiai, APS ir SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lt-LT\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lt-LT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Ar Epicor Kinetic palaiko gamybos planavim\u0105?","description":"Taip: Scheduling and Resource Management \u2013 gamybos planavimas. APS \u2013 atskiras pl\u0117tinys. Kaip tai veikia, kokie apribojimai ir kada pakanka.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/epicor-kinetic\/gamybos-planavimas\/","og_locale":"lt_LT","og_type":"article","og_title":"Ar Epicor Kinetic turi gamybos planavimo funkcij\u0105? Sistemos planavimo \u012frankiai, APS ir SkyPlanner APS","og_description":"Taip: Scheduling and Resource Management \u2013 gamybos planavimas. APS \u2013 atskiras pl\u0117tinys. Kaip tai veikia, kokie apribojimai ir kada pakanka.","og_url":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/epicor-kinetic\/gamybos-planavimas\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"16 minu\u010di\u0173"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/epicor-kinetic\/gamybos-planavimas\/","url":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/epicor-kinetic\/gamybos-planavimas\/","name":"Ar Epicor Kinetic palaiko gamybos planavim\u0105?","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lt\/#website"},"datePublished":"2026-10-17T13:00:38+00:00","description":"Taip: Scheduling and Resource Management \u2013 gamybos planavimas. APS \u2013 atskiras pl\u0117tinys. Kaip tai veikia, kokie apribojimai ir kada pakanka.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/epicor-kinetic\/gamybos-planavimas\/#breadcrumb"},"inLanguage":"lt-LT","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/epicor-kinetic\/gamybos-planavimas\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/epicor-kinetic\/gamybos-planavimas\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lt\/"},{"@type":"ListItem","position":2,"name":"ERP ir MES programin\u0117s \u012frangos integracijos su SkyPlanner","item":"https:\/\/skyplanner.ai\/lt\/integracijos\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bs\u0173 ERP sistemai","item":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS sistemai Epicor Kinetic: gamybos planavimas","item":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/epicor-kinetic\/"},{"@type":"ListItem","position":5,"name":"Ar Epicor Kinetic turi gamybos planavimo funkcij\u0105? Sistemos planavimo \u012frankiai, APS ir SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lt\/#website","url":"https:\/\/skyplanner.ai\/lt\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lt\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lt\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lt-LT"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lt\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lt\/","logo":{"@type":"ImageObject","inLanguage":"lt-LT","@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lt\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integracijos \/ ERP \/ Epicor Kinetic Ar Epicor Kinetic turi gamybos planavimo funkcij\u0105? Sistemos planavimo \u012frankiai, APS ir SkyPlanner APS Taip, Epicor Kinetic turi integruot\u0105 gamybos planavimo funkcij\u0105. \u010cia gamybos planavimas rei\u0161kia tvarkara\u0161\u010dio sudarym\u0105 atsi\u017evelgiant \u012f realiai prieinamus \u012frengini\u0173 ir darbuotoj\u0173 paj\u0117gumus. Modulis Scheduling and Resource Management sudaro tvarkara\u0161\u010dius atsi\u017evelgdamas \u012f turimus paj\u0117gumus, o atskiras&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/pages\/101245","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/comments?post=101245"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/pages\/101245\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/pages\/100858"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/media?parent=101245"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}