{"id":101125,"date":"2026-10-17T13:00:38","date_gmt":"2026-10-17T13:00:38","guid":{"rendered":"https:\/\/skyplanner.ai\/?page_id=101125"},"modified":"2026-10-17T13:00:38","modified_gmt":"2026-10-17T13:00:38","slug":"gamybos-planavimas","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/sap-s4hana\/gamybos-planavimas\/","title":{"rendered":"Ar SAP S\/4HANA palaiko gamybos planavim\u0105? Apkrov\u0173 i\u0161lyginimas, PP\/DS ir SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lt\/integracijos\/\">Integracijos<\/a> \/ <a href=\"\/lt\/integracijos\/erp\/\">ERP<\/a> \/ SAP S\/4HANA<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Ar SAP S\/4HANA palaiko gamybos planavim\u0105? <span class=\"hl\">Apkrov\u0173 i\u0161lyginimas, PP\/DS ir SkyPlanner APS<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">Bendr\u0105ja prasme gamybos planavimas pagal turimus paj\u0117gumus rei\u0161kia tvarkara\u0161\u010dio sudarym\u0105 atsi\u017evelgiant \u012f realiai prieinamus \u012frengini\u0173 ir darbuotoj\u0173 paj\u0117gumus. SAP S\/4HANA paj\u0117gum\u0173 apribojimai taikomi dviem b\u016bdais: bazin\u0117je sistemoje apkrovos i\u0161lyginamos rankiniu b\u016bdu, o integruotame PP\/DS tvarkara\u0161\u010diai sudaromi automati\u0161kai. Standartin\u0117je S\/4HANA operacij\u0173 terminai pagal u\u017esakymo \u012fvykdymo laik\u0105 nustatomi neatsi\u017evelgiant \u012f paj\u0117gum\u0173 ribas. Siaur\u0173j\u0173 viet\u0173 operacijos suplanuojamos pagal turimus paj\u0117gumus tada, kai planuotojas Fiori paj\u0117gum\u0173 program\u0117l\u0117se i\u0161lygina j\u0173 apkrovas. PP\/DS, parduodam\u0105 pavadinimu SAP S\/4HANA Manufacturing for planning and scheduling, reikia aktyvuoti, \u012fsigyti jo licencij\u0105 ir skirti darbuotoj\u0173 darbui su juo.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lt\/bandymas\/\">Prad\u0117ti nemokam\u0105 bandom\u0105j\u012f laikotarp\u012f<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lt\/susisiekite-su-pardavejais\/\">U\u017esakyti demonstracij\u0105<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Gamybos tvarkara\u0161\u010di\u0173 sudarymas<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt diagrama su darbo centrams suplanuotomis u\u017eduotimis ir u\u017esakym\u0173 s\u0105ra\u0161u apa\u010dioje.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Gamyklos, kurioms reikia <a href=\"\/lt\/istekliai\/ribotu-pajegumu-planavimas\/\">planuoti atsi\u017evelgiant \u012f kiekvieno i\u0161tekliaus paj\u0117gum\u0173 ribas<\/a> ne\u012fgyvendinant PP\/DS projekto, greta S\/4HANA naudoja SkyPlanner APS.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-sap-s-4hana-plans-production-step-by-step\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kaip SAP S\/4HANA planuoja gamyb\u0105: \u017eingsnis po \u017eingsnio<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>S\/4HANA turi du gamybos paj\u0117gum\u0173 planavimo lygius. Dauguma gamykl\u0173 naudoja tik pirm\u0105j\u012f.<\/p>\n\n\n<h3 class=\"wp-block-heading\">1. MRP ir termin\u0173 nustatymas pagal u\u017esakymo \u012fvykdymo laik\u0105<\/h3>\n\n\n<p>MRP Live (MD01N) sukuria planinius u\u017esakymus. Tada pagal u\u017esakymo \u012fvykdymo laik\u0105 nustatomi operacij\u0173 terminai, o pagal darbo centro paruo\u0161imo, apdorojimo ir u\u017ebaigimo formules apskai\u010diuojamas paj\u0117gum\u0173 poreikis. Neatsi\u017evelgiama \u012f tai, kiek \u0161\u012f darbo centr\u0105 jau apkrauna kiti u\u017esakymai. SAP Learning tai \u012fvardija ai\u0161kiai: &#8222;The operations are scheduled infinitely. The non-working times of the work centers are taken into account, but not the capacity requirements of other orders&#8221; (operacijos planuojamos neatsi\u017evelgiant \u012f paj\u0117gum\u0173 ribas; \u012fvertinamas darbo centr\u0173 nedarbo laikas, bet ne kit\u0173 u\u017esakym\u0173 paj\u0117gum\u0173 poreikis) (<a href=\"https:\/\/learning.sap.com\/courses\/exploring-the-capacity-planning-in-sap-s-4hana\/outlining-sap-s-4hana-capacity-planning\">SAP Learning<\/a>). Tod\u0117l darbo centrai perkraunami.<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. Pagrindiniai darbo centro paj\u0117gum\u0173 duomenys<\/h3>\n\n\n<p>Paj\u0117gumai apibr\u0117\u017eiami <strong>Work Center<\/strong> objekte, o ne u\u017esakyme. Darbo centras gali tur\u0117ti kelias paj\u0117gum\u0173 kategorijas (SAP pavyzdys: 001 \u012frenginiams ir 002 darbuotojams). Kiekvienos kategorijos formul\u0117s technologinio mar\u0161ruto normines vertes paver\u010dia paj\u0117gum\u0173 poreikiu. <strong>Factory Calendar<\/strong> nustato darbo dienas, konkretiems laiko intervalams nustatyti paj\u0117gumai pakei\u010dia standartinius prieinamus paj\u0117gumus, o paj\u0117gum\u0173 versijos (standartin\u0117, minimali ir maksimali) leid\u017eia modeliuoti alternatyvius pamain\u0173 grafikus.<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. Paj\u0117gum\u0173 vertinimas<\/h3>\n\n\n<p>Program\u0117l\u0117je <strong>Manage Work Center Capacity<\/strong> planuotojai lygina poreik\u012f su prieinamais paj\u0117gumais. U\u017e MRP atsakingi darbuotojai juos taip pat gali patikrinti atsarg\u0173 ir poreiki\u0173 s\u0105ra\u0161e. Vertinimas parodo perkrovas, bet joki\u0173 operacij\u0173 neperkelia.<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. Planuotojo atliekamas apkrov\u0173 i\u0161lyginimas<\/h3>\n\n\n<p>I\u0161lyginant apkrovas operacijos paskiriamos atsi\u017evelgiant \u012f paj\u0117gum\u0173 ribas. \u0160\u012f darb\u0105 atlieka planuotojas. SAP Learning: &#8222;In capacity leveling, operations are scheduled finitely. They are dispatched to periods with free capacity.&#8221; (I\u0161lyginant apkrovas operacijos planuojamos nevir\u0161ijant turim\u0173 paj\u0117gum\u0173. Jos paskiriamos \u012f laikotarpius, kuriais yra laisv\u0173 paj\u0117gum\u0173.) Tam naudojami \u012frankiai:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>\u012erankis<\/th><th>K\u0105 jis daro<\/th><\/tr><\/thead><tbody><tr><td>Lentelin\u0117 planavimo priemon\u0117<\/td><td>Paskiria operacijas \u012f laikotarpius, kuriais yra laisv\u0173 paj\u0117gum\u0173. SAP: &#8222;you cannot create a specific sequence for the dispatched operations within a period&#8221; (negalima nustatyti konkre\u010dios \u012f t\u0105 pat\u012f laikotarp\u012f paskirt\u0173 operacij\u0173 sekos)<\/td><\/tr><tr><td><strong>Capacity Scheduling Table<\/strong> (anks\u010diau \u2013 Schedule Production)<\/td><td>Paskiria siaur\u0173j\u0173 viet\u0173 operacijas arba panaikina j\u0173 paskyrim\u0105. &#8222;Only bottleneck operations that are assigned to a pacemaker work center are considered.&#8221; (Vertinamos tik siaur\u0173j\u0173 viet\u0173 operacijos, priskirtos gamybos takt\u0105 nustatan\u010diam darbo centrui.) Kit\u0173 u\u017esakymo operacij\u0173 terminai pakoreguojami planuojant nuo vidurin\u0117s operacijos<\/td><\/tr><tr><td><strong>Capacity Scheduling Board<\/strong><\/td><td>Grafin\u0117 diagrama, kurioje galima paskirti atskiras siaur\u0173j\u0173 viet\u0173 operacijas gamybos takt\u0105 nustatantiems darbo centrams, pakeisti j\u0173 laik\u0105 arba panaikinti paskyrim\u0105<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Klasikin\u0117 Graphical Planning Table (CM21, CM22 ir kitos CM* transakcijos) priklauso suderinamumo funkcijoms. SAP Learning: &#8222;The use right for the Graphical Planning Table expires on Dec 31, 2025.&#8221; (Teis\u0117 naudotis \u0161ia planavimo lentele baigiasi nurodyt\u0105 dien\u0105.) \u0160i data jau pra\u0117jo. Jei j\u016bs\u0173 planuotojai vis dar dirba su CM* transakcijomis, pereiti prie Fiori program\u0117li\u0173 jau v\u0117luojate.<\/p>\n\n\n<h3 class=\"wp-block-heading\">5. Integruotas PP\/DS<\/h3>\n\n\n<p>PP\/DS yra SAP priemon\u0117 automatiniam gamybos planavimui, atsi\u017evelgiant \u012f turimus paj\u0117gumus. Anks\u010diau ji buvo SAP APO dalis, o nuo 1610 versijos yra integruota \u012f vietoje diegiam\u0105 S\/4HANA. SAP j\u0105 pristato kaip kit\u0105 \u017eingsn\u012f po MRP: &#8222;Move beyond classic MRP with SAP S\/4HANA Manufacturing for planning and scheduling software&#8221; (per\u017eenkite klasikinio MRP ribas su \u0161ia gamybos planavimo ir tvarkara\u0161\u010di\u0173 sudarymo programine \u012franga) (<a href=\"https:\/\/www.sap.com\/products\/scm\/manufacturing-for-planning-and-scheduling.html\">SAP produkto puslapis<\/a>).<\/p>\n\n\n<p>Koki\u0173 galimybi\u0173 ji suteikia:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>I\u0161tekliai<\/strong> su Finite Scheduling po\u017eymiu: &#8222;You define whether a resource is finite or infinite in the scheduling parameters for the resource via the Finite Scheduling indicator&#8221; (i\u0161tekliaus planavimo parametruose Finite Scheduling po\u017eymiu nustatote, ar taikomos jo paj\u0117gum\u0173 ribos) (<a href=\"https:\/\/help.sap.com\/docs\/SAP_S4HANA_ON-PREMISE\/f899ce30af9044299d573ea30b533f1c\/de4dc95360267614e10000000a174cb4.html\">SAP pagalba<\/a>). Kiekvieno paleidimo metu optimizatorius gali \u0161i\u0105 nuostat\u0105 pakeisti: jo optimizavimo profilyje yra parinktis &#8222;Always Schedule as Finite&#8221; (visada planuoti atsi\u017evelgiant \u012f paj\u0117gum\u0173 ribas), kuri leid\u017eia paskirti operacijas i\u0161tekliams nevir\u0161ijant j\u0173 paj\u0117gum\u0173 (<a href=\"https:\/\/learning.sap.com\/courses\/planning-with-advanced-planning-methods-in-eppds\/configuring-the-optimization-profile\">SAP Learning<\/a>).<\/li>\n\n\n<li>Planavimo re\u017eimai: neatsi\u017evelgiant \u012f paj\u0117gum\u0173 ribas, ie\u0161kant laisvo laiko tarpo, pridedant operacij\u0105 pabaigoje, \u012fterpiant operacij\u0105, \u012fterpiant operacij\u0105 ir panaikinant tarpus, \u012fspraud\u017eiant operacij\u0105.<\/li>\n\n\n<li>Euristiniai algoritmai ir optimizavimo procesai, ma\u017einantys paruo\u0161imo trukm\u0119, s\u0105naudas ir v\u0117lavimus.<\/li>\n\n\n<li>Paruo\u0161imo matrica nuo operacij\u0173 sekos priklausantiems perderinimams, minimal\u016bs ir maksimal\u016bs laiko tarpai tarp operacij\u0173 bei alternatyv\u016bs re\u017eimai.<\/li>\n\n\n<li>Pasi\u016blos ir poreikio susiejimas keliais lygiais, gamybos kampanij\u0173 ir blok\u0173 planavimas bei \u012fsp\u0117jimai.<\/li>\n\n\n<li><strong>Production Scheduling Board<\/strong> (Fiori Gantt diagrama) ir program\u0117l\u0117 <strong>Monitor Capacity Utilization<\/strong>.<\/li>\n\n<\/ul>\n\n\n<p>Tam reikia pasirengti. \u0160i\u0105 funkcij\u0105 aktyvuojate per Customizing (Advanced Planning &gt; Basic Settings &gt; Activate Advanced Planning and Scheduling), paleid\u017eiate su HANA integruot\u0105 liveCache ir pa\u017eymite med\u017eiagas bei darbo centrus, kuriems bus taikomas i\u0161pl\u0117stinis planavimas. Visa, kas nepa\u017eym\u0117ta, lieka klasikiniame MRP. Kaip SAP produkto ekspertas ra\u0161o tinklara\u0161tyje, optimizatorius &#8222;needs to be additionally installed preferably in a separate hardware&#8221; (turi b\u016bti \u012fdiegtas papildomai, pageidautina atskiroje aparatin\u0117je \u012frangoje) (<a href=\"https:\/\/community.sap.com\/t5\/supply-chain-management-blog-posts-by-sap\/pp-ds-for-sap-s-4hana-advanced-planning-a-powerful-planning-and-scheduling\/ba-p\/13380309\">SAP Community<\/a>). Tame pa\u010diame \u012fra\u0161e: &#8222;A dedicated license, Manufacturing for Planning and Scheduling is required if this switch is set to Active.&#8221; (Jei \u0161is jungiklis nustatytas \u012f Active, reikalinga atskira Manufacturing for Planning and Scheduling licencija.)<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"where-sap-s-4hana-stops\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kur baigiasi SAP S\/4HANA galimyb\u0117s<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Apribojimas<\/th><th>\u0160altinis<\/th><th>K\u0105 tai rei\u0161kia gamybos ceche<\/th><\/tr><\/thead><tbody><tr><td>Planuojant terminus pagal u\u017esakymo \u012fvykdymo laik\u0105 paj\u0117gum\u0173 ribos nevertinamos<\/td><td>&#8222;The operations are scheduled infinitely&#8221; (operacijos planuojamos neatsi\u017evelgiant \u012f paj\u0117gum\u0173 ribas) (<a href=\"https:\/\/learning.sap.com\/courses\/exploring-the-capacity-planning-in-sap-s-4hana\/outlining-sap-s-4hana-capacity-planning\">SAP Learning<\/a>)<\/td><td>Kiekvien\u0105 kart\u0105 paleidus planavim\u0105 atsiranda perkrov\u0173, kurias ka\u017ekas turi pa\u0161alinti<\/td><\/tr><tr><td>Bazin\u0117je sistemoje apkrovas i\u0161lygina planuotojas<\/td><td>&#8222;In capacity leveling, operations are scheduled finitely&#8221; (i\u0161lyginant apkrovas, gamybos planavimas atliekamas atsi\u017evelgiant \u012f turimus paj\u0117gumus) (tas pats \u0161altinis)<\/td><td>Planas atitinka paj\u0117gum\u0173 ribas tik tada, kai planuotojas paskiria operacijas. Gavus skub\u0173 u\u017esakym\u0105 ar \u012fvykus gedimui, jas reikia paskirti i\u0161 naujo<\/td><\/tr><tr><td>I\u0161lyginant apkrovas lentel\u0117je operacij\u0173 seka nenustatoma<\/td><td>\u012e t\u0105 pat\u012f laikotarp\u012f paskirt\u0173 operacij\u0173 seka nenustatoma (tas pats \u0161altinis)<\/td><td>\u017dinote, kad savait\u0117s plan\u0105 \u012fvykdyti \u012fmanoma, bet ne\u017einote, kuri u\u017eduotis antradien\u012f bus vykdoma pirmiausia<\/td><\/tr><tr><td>Capacity Scheduling Table i\u0161lygina siaur\u0173j\u0173 viet\u0173 operacij\u0173 apkrovas gamybos takt\u0105 nustatan\u010diuose darbo centruose<\/td><td>&#8222;For an order, only the bottleneck operation is dispatched to the pacemaker work center&#8221; (i\u0161 vis\u0173 u\u017esakymo operacij\u0173 gamybos takt\u0105 nustatan\u010diam darbo centrui paskiriama tik siaurosios vietos operacija) (<a href=\"https:\/\/learning.sap.com\/courses\/exploring-the-capacity-planning-in-sap-s-4hana\/capacity-leveling-using-the-capacity-scheduling-table\">SAP Learning<\/a>)<\/td><td>Kit\u0173 operacij\u0173 terminai nustatomi planuojant nuo vidurin\u0117s operacijos, o ne pagal paj\u0117gum\u0173 ribas, tod\u0117l gamybos takto nenustatantys darbo centrai vis tiek perkraunami<\/td><\/tr><tr><td>Sud\u0117tingi atvejai perduodami PP\/DS<\/td><td>SAP pristato PP\/DS kaip priemon\u0119 u\u017esakymams skirtinguose BOM lygiuose sinchronizuoti, med\u017eiag\u0173 prieinamumui \u012fvertinti ir keli\u0173 siaur\u0105sias vietas sudaran\u010di\u0173 i\u0161tekli\u0173 darbui suderinti (<a href=\"https:\/\/learning.sap.com\/courses\/exploring-the-capacity-planning-in-sap-s-4hana\/outlining-sap-s-4hana-capacity-planning\">SAP Learning<\/a>)<\/td><td>Paruo\u0161imo darb\u0173 sekai sudaryti ir linijoms su keliomis siaurosiomis vietomis planuoti reikia antro modulio<\/td><\/tr><tr><td>Ar PP\/DS paisys paj\u0117gum\u0173 rib\u0173, priklauso nuo modelio nustatym\u0173<\/td><td>Finite Scheduling po\u017eymis kiekvienam i\u0161tekliui, &#8222;Always Schedule as Finite&#8221; (visada planuoti atsi\u017evelgiant \u012f paj\u0117gum\u0173 ribas) parinktis optimizavimo profilyje (<a href=\"https:\/\/help.sap.com\/docs\/SAP_S4HANA_ON-PREMISE\/f899ce30af9044299d573ea30b533f1c\/de4dc95360267614e10000000a174cb4.html\">SAP pagalba<\/a>, <a href=\"https:\/\/learning.sap.com\/courses\/planning-with-advanced-planning-methods-in-eppds\/configuring-the-optimization-profile\">SAP Learning<\/a>)<\/td><td>Planuotojai pri\u017ei\u016bri i\u0161tekli\u0173 parametrus, euristinius algoritmus ir optimizavimo profilius. \u012etraukiamos tik tos med\u017eiagos ir i\u0161tekliai, kuriems nustatytas i\u0161pl\u0117stinis planavimas<\/td><\/tr><tr><td>PP\/DS reikia atskiros licencijos ir technini\u0173 komponent\u0173<\/td><td>Atskira licencija, liveCache, atskirai diegiamas optimizatorius (<a href=\"https:\/\/community.sap.com\/t5\/supply-chain-management-blog-posts-by-sap\/pp-ds-for-sap-s-4hana-advanced-planning-a-powerful-planning-and-scheduling\/ba-p\/13380309\">SAP Community<\/a>)<\/td><td>Tai projektas, kuriam reikia Basis specialist\u0173, licencij\u0173 ir apmokyt\u0173 planuotoj\u0173, o ne vienas nustatymas<\/td><\/tr><tr><td>Planned Order API neperduoda duomen\u0173 \u012f PP\/DS<\/td><td>&#8222;Automatic integration to PP\/DS is not enabled from this API&#8221; (automatin\u0117 integracija per \u0161i\u0105 API ne\u012fjungta) (<a href=\"https:\/\/help.sap.com\/docs\/SAP_S4HANA_ON-PREMISE\/a6f0333202384ba2b48a841a4a6deb1b\/43ae2e5876b4a107e10000000a441470.html\">SAP pagalba<\/a>)<\/td><td>U\u017e SAP rib\u0173 sukurti planiniai u\u017esakymai automati\u0161kai nepatenka \u012f PP\/DS plan\u0105<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"when-sap-s-4hana-s-native-planning-is-enough\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kada pakanka pa\u010dios SAP S\/4HANA planavimo galimybi\u0173<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Gamyklai pakanka vien S\/4HANA, kai:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Turite vien\u0105 siaur\u0105j\u0105 viet\u0105, o u\u017esakym\u0173 \u012fvykdymo laikas ilgas.<\/strong> Planavimo rezultatai parodo perkrovas prie\u0161 kelias savaites, o planuotojas kart\u0105 per savait\u0119 i\u0161lygina gamybos takt\u0105 nustatan\u010dio darbo centro apkrov\u0105 priemon\u0117je Capacity Scheduling Table.<\/li>\n\n\n<li><strong>Poreik\u012f daugiausia nustato MRP ir jis yra stabilus.<\/strong> Skubi\u0173 u\u017esakym\u0173 nedaug, o reik\u0161ming\u0105 poveik\u012f turintys perderinimai reti.<\/li>\n\n\n<li><strong>Jau turite PP\/DS licencij\u0105 ir su juo dirban\u010di\u0173 darbuotoj\u0173.<\/strong> J\u016bs\u0173 planuotojai kasdien dirba su Production Scheduling Board, o visos svarbios med\u017eiagos ir darbo centrai pa\u017eym\u0117ti i\u0161pl\u0117stiniam planavimui.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"when-you-need-a-finite-capacity-scheduler\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kada reikia gamybos planavimo priemon\u0117s<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Tai rodo kasdien\u0117je veikloje matomi po\u017eymiai:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Po kiekvieno MRP skai\u010diavimo planuotojai i\u0161 naujo sudaro plan\u0105 Excel, nes paskirtos vykdymo datos nebeatitinka tikrov\u0117s.<\/li>\n\n\n<li>Gamybos apimt\u012f riboja keli darbo centrai, o ne vienas gamybos ritm\u0105 diktuojantis centras.<\/li>\n\n\n<li>U\u017esakym\u0173 sud\u0117tis kei\u010diasi kasdien, tad kart\u0105 per savait\u0119 i\u0161lyginti apkrovas nepakanka.<\/li>\n\n\n<li>Pardavimo komanda klientams \u017eada datas pagal u\u017esakym\u0173 \u012fvykdymo laik\u0105, o pristatymo laiku rodikliai prast\u0117ja.<\/li>\n\n\n<li>PP\/DS buvo \u012fvertintas, bet jo atsisakyta d\u0117l kainos, reikaling\u0173 pastang\u0173 ar kompetencij\u0173 tr\u016bkumo. Arba gamykla yra ma\u017eesnis padalinys didesn\u0117je S\/4HANA aplinkoje, kuriam atskiras PP\/DS projektas niekada nebus skirtas.<\/li>\n\n\n<li>Operatoriai dirba pagal spausdintus u\u017esakym\u0173 s\u0105ra\u0161us ir pav\u0117luotai patvirtina atliktus darbus, tod\u0117l planas visada atsilieka nuo tikrov\u0117s.<\/li>\n\n<\/ul>\n\n\n<h3 class=\"wp-block-heading\">\u012e k\u0105 atkreipti d\u0117mes\u012f<\/h3>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Vis\u0173 i\u0161tekli\u0173 paj\u0117gum\u0173 rib\u0173 paisymas<\/strong>, \u012fskaitant darbuotojus ir pamainas, nemodeliuojant kiekvieno i\u0161tekliaus atskirai.<\/li>\n\n\n<li><strong>Operacij\u0173 sekos sudarymas<\/strong> konkre\u010dios dienos viduje, o ne vien j\u0173 paskirstymas laikotarpiais.<\/li>\n\n\n<li><strong>Real\u016bs apribojimai<\/strong>: nuo gamini\u0173 sekos priklausantis perderinimo laikas, \u012frankiai, kurie vienu metu gali b\u016bti tik vienoje vietoje, operacijos, kurioms reikia keli\u0173 operatori\u0173, alternatyvios stakl\u0117s ir darbuotojai.<\/li>\n\n\n<li><strong>Atsi\u017evelgimas \u012f med\u017eiag\u0173 prieinamum\u0105<\/strong>: operacija netur\u0117t\u0173 prasid\u0117ti, kol n\u0117ra jai reikaling\u0173 komponent\u0173. Turi b\u016bti \u012fvertintos ir turimos atsargos, ir dar ne\u012fvykdyti pirkimo u\u017esakymai.<\/li>\n\n\n<li><strong>Automatinis tvarkara\u0161\u010dio perskai\u010diavimas<\/strong> pasikeitus u\u017esakymui ar sustojus stakl\u0117ms.<\/li>\n\n\n<li><strong>Ai\u0161kus atsakomybi\u0173 atskyrimas nuo S\/4HANA<\/strong>: S\/4HANA valdo pagrindinius duomenis, u\u017esakymus ir atsargas, o tvarkara\u0161\u010di\u0173 sudarymo sistema \u2013 sek\u0105 ir datas. Duomenys atgal \u012fra\u0161omi per oficialiai patvirtintas API, o ne tiesiogiai atnaujinant lenteles.<\/li>\n\n\n<li><strong>Gr\u012f\u017etamasis ry\u0161ys i\u0161 gamybos cecho<\/strong>, perduodamas \u012f S\/4HANA kaip atlikt\u0173 darb\u0173 patvirtinimai.<\/li>\n\n\n<li><strong>I\u0161bandymas su j\u016bs\u0173 gamybos u\u017esakymais, eksportuotais CSV formatu<\/strong>, dar prie\u0161 pradedant dirbti su OData paslaugomis.<\/li>\n\n<\/ol>\n\n\n<p>Sprendimus galima suskirstyti \u012f keturias grupes:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Planavimo lentos SAP kliente<\/strong>: standartin\u0117s paj\u0117gum\u0173 planavimo program\u0117l\u0117s ir papildomos lentos SAP GUI ar Fiori aplinkoje, kurias valdo planuotojas. Jos tinka, kai gamybos ritm\u0105 diktuoja vienas darbo centras, o paklausa yra stabili ir planuojama pagal MRP.<\/li>\n\n\n<li><strong>Pa\u010dios SAP pa\u017eangiojo planavimo sprendimas<\/strong>: integruotasis PP\/DS gamykloms, kurios \u012fsigyja jo licencij\u0105, j\u012f aktyvuoja ir skiria darbuotoj\u0173 jam valdyti.<\/li>\n\n\n<li><strong>Didel\u0117ms \u012fmon\u0117ms skirti APS paketai<\/strong>: atskiros platformos, prijungiamos vykdant diegimo projekt\u0105 ir valdomos tam skirtos planavimo komandos.<\/li>\n\n\n<li><strong>Debesijos APS su gamybos vykdymo funkcijomis<\/strong> \u2013 \u0161iai grupei priklauso SkyPlanner. Kiekvienam i\u0161tekliui automati\u0161kai sudaromas jo paj\u0117gum\u0173 ribas atitinkantis tvarkara\u0161tis, Autopilot j\u012f perskai\u010diuoja, o operatoriai dirba telefonu ar plan\u0161ete. Sistema pradeda veikti per kelias savaites.<\/li>\n\n<\/ul>\n\n\n<p>Aptariant S\/4HANA minimos ir tiekimo grandin\u0117s planavimo platformos, \u012fskaitant SAP IBP. Jos planuoja tiekimo tinkl\u0105, o ne operacij\u0173 sek\u0105 konkre\u010diose stakl\u0117se.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"where-skyplanner-fits\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kada tinka SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner APS \u2013 debesijos tvarkara\u0161\u010di\u0173 sudarymo sistema su dirbtiniu intelektu, veikianti greta SAP S\/4HANA ir u\u017epildanti sprag\u0105 tarp MRP ir gamybos planavimo pagal realius paj\u0117gumus. MRP lieka SAP sistemoje, o SkyPlanner perima apkrov\u0173 i\u0161lyginim\u0105, kur\u012f j\u016bs\u0173 planuotojai dabar atlieka rankiniu b\u016bdu:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Vis\u0173 i\u0161tekli\u0173 paj\u0117gum\u0173 ribos \u012fvertinamos automati\u0161kai.<\/strong> Arcturus variklis per kelias sekundes sudaro gamybos tvarkara\u0161t\u012f pagal u\u017esakymus, prioritetus, apribojimus, paj\u0117gumus, med\u017eiagas ir taisykles, nevir\u0161ydamas reali\u0173 \u012frengini\u0173 ir darbuotoj\u0173 paj\u0117gum\u0173. Kiekvien\u0105 kart\u0105 skai\u010diuojant \u012fvertinamos kiekvieno darbo centro, pamainos ir darbuotojo paj\u0117gum\u0173 ribos. Planavimas neapsiriboja vienu gamybos ritm\u0105 diktuojan\u010diu centru ir nereikia derinti optimizavimo profilio.<\/li>\n\n\n<li><strong>Konkreti seka, o ne vien suskirstymas laikotarpiais.<\/strong> Interaktyvioje Gantt laiko juostoje planuotojai mato, kuri u\u017eduotis antradien\u012f bus vykdoma pirma. Nutempus u\u017eduot\u012f \u012f kit\u0105 viet\u0105, variklis i\u0161laiko plano suderinamum\u0105.<\/li>\n\n\n<li><strong>Planuojama pagal med\u017eiag\u0173 prieinamum\u0105.<\/strong> Kiekvienai u\u017eduo\u010diai tikrinamos turimos atsargos ir laukiami pirkimo u\u017esakymai. U\u017esakytos med\u017eiagos laikomos prieinamomis pirkimo u\u017esakyme nurodyt\u0105 pristatymo dien\u0105, o atsargos atnaujinamos pa\u017eym\u0117jus u\u017esakym\u0105 b\u016bsena \u201ePristatyta\u201c. Tod\u0117l operacija neprasideda, kol n\u0117ra jai reikaling\u0173 komponent\u0173.<\/li>\n\n\n<li><strong>Perderinimai pagal gamini\u0173 sek\u0105.<\/strong> Paruo\u0161imo laiko matricoje saugomas kiekvienai gamini\u0173 porai reikalingas perderinimo laikas. Jis gali skirtis priklausomai nuo krypties: i\u0161 m\u0117lynos \u012f raudon\u0105 \u2013 30 minu\u010di\u0173, i\u0161 raudonos \u012f m\u0117lyn\u0105 \u2013 60. Variklis pagal \u0161i\u0105 matric\u0105 parenka sek\u0105, kuriai reikia ma\u017eiausiai paruo\u0161imo laiko, o taisykl\u0117 \u201eAllow similarity\u201c grupuoja u\u017eduotis, turin\u010dias bendr\u0105 po\u017eym\u012f, pavyzd\u017eiui, naudojam\u0105 \u012frank\u012f.<\/li>\n\n\n<li><strong>\u012erankiai ir darbuotoj\u0173 komandos \u2013 planavimo apribojimai.<\/strong> Viename darbo centre naudojamas \u012frankis tuo pa\u010diu metu neplanuojamas kitame. U\u017eduo\u010diai, kuriai reikia trij\u0173 operatori\u0173, skiriami trys. Kai pagrindin\u0117s stakl\u0117s ar darbuotojas neprieinami, variklis \u012fvertina alternatyvas.<\/li>\n\n\n<li><strong>Visada aktualus planas.<\/strong> Pasikeitus situacijai gamyboje, Autopilot automati\u0161kai perskai\u010diuoja tvarkara\u0161t\u012f. Taip kassavaitin\u012f apkrov\u0173 i\u0161lyginim\u0105 pakei\u010dia kasdienis planas, atitinkantis pad\u0117t\u012f gamybos ceche.<\/li>\n\n\n<li><strong>Patvirtinimai i\u0161 gamybos cecho.<\/strong> Naudodami Mobile Confirmations, Production Timer ir Quick Log Mode, operatoriai telefone ar plan\u0161et\u0117je mato savo darb\u0173 eil\u0119 ir registruoja atlikt\u0105 darb\u0105. Per integracij\u0105 \u0161ie darbo laiko \u012fra\u0161ai perduodami \u012f S\/4HANA kaip gamybos u\u017esakym\u0173 patvirtinimai.<\/li>\n\n<\/ul>\n\n\n<p><strong>Rinkit\u0117s SkyPlanner, kai<\/strong> gamybos apimt\u012f riboja keli darbo centrai ir vieno gamybos ritm\u0105 diktuojan\u010dio centro apkrov\u0173 i\u0161lyginimo nebepakanka, kad planas b\u016bt\u0173 \u012fvykdomas.<\/p>\n\n\n<p><strong>Rinkit\u0117s SkyPlanner, kai<\/strong> perderinimo laikas priklauso nuo gamini\u0173 sekos arba bendri \u012frankiai ir keli\u0173 operatori\u0173 reikalaujan\u010dios u\u017eduotys lemia, k\u0105 galima vykdyti toliau.<\/p>\n\n\n<p><strong>Rinkit\u0117s SkyPlanner, kai<\/strong> j\u016bs\u0173 gamyklai nebepakanka rankinio apkrov\u0173 i\u0161lyginimo, PP\/DS projektas b\u016bt\u0173 per didelis sprendimas \u0161iai problemai, o savo gamybos tvarkara\u0161t\u012f, atitinkant\u012f realius \u012frengini\u0173 ir darbuotoj\u0173 paj\u0117gumus, norite tur\u0117ti per kelias savaites.<\/p>\n\n\n<p>Med\u017eiagos, gamini\u0173 komplektavimo \u017einiara\u0161\u010diai, technologiniai mar\u0161rutai, darbo centrai, gamybos u\u017esakymai ir atsargos lieka S\/4HANA sistemoje. SkyPlanner su ja kei\u010diasi duomenimis abiem kryptimis:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Gamybos u\u017esakymai ir operacijos gaunami per API_PRODUCTION_ORDER_2_SRV, o darbo centrai \u2013 per API_WORK_CENTERS.<\/li>\n\n\n<li>Kiekviena operacija S\/4HANA sistemoje priskiriama vykdyti per ScheduleProductionOrderOperation veiksm\u0105, nurodant planavimo pirmyn re\u017eim\u0105, priskyrimo vykdyti b\u016bsen\u0105 ir SkyPlanner nustatyt\u0105 prad\u017eios dat\u0105 bei laik\u0105.<\/li>\n\n\n<li>U\u017eregistruotos darbo valandos perduodamos per API_PROD_ORDER_CONFIRMATION_2_SRV.<\/li>\n\n\n<li>SkyPlanner webhook prane\u0161imai perduoda kiekvien\u0105 tvarkara\u0161\u010dio pakeitim\u0105 i\u0161kart, kai jis \u012fvyksta.<\/li>\n\n<\/ul>\n\n\n<p>Kiekviena gamykla darbo centrus, paj\u0117gum\u0173 kategorijas ir technologinius mar\u0161rutus konfig\u016bruoja savaip. Tod\u0117l pradinio diegimo metu SkyPlanner komanda pritaiko integracij\u0105 j\u016bs\u0173 S\/4HANA konfig\u016bracijai ir j\u0105 palaiko prad\u0117jus naudoti sistem\u0105. J\u016bs\u0173 SAP partneris ar vidiniai programuotojai taip pat gali kurti integracij\u0105 naudodami dokumentuot\u0105 SkyPlanner REST API (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API \u017einynas<\/a>). Prad\u017eiai pakanka API rakto.<\/p>\n\n\n<p>Prad\u0117kite nuo CSV ar Excel fail\u0173, eksportuot\u0173 i\u0161 S\/4HANA, ir i\u0161bandykite sistem\u0105 nemokamai 30 dien\u0173 \u2013 iki 20 darbo centr\u0173, be mok\u0117jimo kortel\u0117s. Savo tvarkara\u0161t\u012f pamatysite dar prie\u0161 pradedant dirbti su API. V\u0117liau <a href=\"\/lt\/kainodara\/\">kaina<\/a> prasideda nuo 199 \u20ac per m\u0117nes\u012f, \u012fskaitant 5 darbo centrus. Mokama kas m\u0117nes\u012f, atsisakyti galima bet kada. Integracijos kaina pagal j\u016bs\u0173 proces\u0105 ir poreikius pateikiama i\u0161 anksto kartu su pasirinktu planu, tad visas i\u0161laidas \u017einote dar prie\u0161 prad\u0117dami. Diegimas paprastai baigiamas per kelias savaites nuo pradinio diegimo etapo prad\u017eios.<\/p>\n\n\n<p>Kokiais duomenimis kei\u010diasi sistemos, su\u017einosite puslapyje <a href=\"\/lt\/integracijos\/erp\/sap-s4hana\/\">SkyPlanner, skirtas SAP S\/4HANA<\/a>, o technin\u012f \u012fgyvendinim\u0105 rasite <a href=\"\/lt\/integracijos\/erp\/sap-s4hana\/integravimo-vadovas\/\">S\/4HANA integracijos vadove<\/a>. Apie tvarkara\u0161\u010di\u0173 sudarym\u0105 pla\u010diau skaitykite <a href=\"\/lt\/funkcijos\/\">funkcij\u0173<\/a> puslapyje ir <a href=\"\/lt\/docs\/integravimo-pamoka\/\">SkyPlanner dokumentacijoje<\/a>, o apie kitas ERP sistemas \u2013 <a href=\"\/lt\/integracijos\/erp\/\">ERP integracij\u0173<\/a> puslapyje.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lt\/bandymas\/\">I\u0161bandykite nemokamai<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lt\/susisiekite-su-pardavejais\/\">U\u017esisakykite pristatym\u0105<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Gamintoj\u0173 atsiliepimai apie SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"UTU tiekimo grandin\u0117s specialistas Kalle Kalliom\u00e4ki elektros skyd\u0173 gamybos ceche Ulviloje\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>sutaupoma kas savait\u0119<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSu SkyPlanner nuo gamybos planavimo Excel lentel\u0117se per\u0117jome prie gamybos optimizavimo realiuoju laiku.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, tiekimo grandin\u0117s specialistas<\/b><br>UTU \u00b7 Elektros skydai ir skirstomieji \u012frenginiai<\/p>\n\n\n<p class=\"ind-cust__result\">Planuojant gamyb\u0105 kas savait\u0119 sutaupomos 2 darbo valandos, o nauja darb\u0173 eil\u0117 gamybos linij\u0105 pasiekia per kelias sekundes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lt\/klientu-istorijos\/utu\/\">Skaitykite UTU atsiliepim\u0105<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatoriai su \u0161vari\u0173j\u0173 patalp\u0173 apranga prie buteli\u0173 pildymo linijos Laboratory &amp; Allied vaist\u0173 gamykloje Nairobyje\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>gamybos efektyvumas<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eGamybos efektyvumas padid\u0117jo 90%.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT vadovas<\/b><br>Laboratory &amp; Allied \u00b7 Vaist\u0173 gamyba<\/p>\n\n\n<p class=\"ind-cust__result\">Gamybos efektyvumas padid\u0117jo 90%, o optimizuotas trij\u0173 m\u0117nesi\u0173 planas visiems darbo centrams sudaromas per ma\u017eiau nei 30 minu\u010di\u0173.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lt\/klientu-istorijos\/laboratory-allied\/\">Skaitykite Laboratory &amp; Allied atsiliepim\u0105<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Mamec generalinis direktorius Hannu Ryyn\u00e4nen \u012fmon\u0117s gamybos ceche Lohjoje\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>1 000 ir daugiau<\/b><span> automati\u0161kai suplanuot\u0173 gamybos u\u017esakym\u0173<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eGamyb\u0105 valdome visai kitaip, o m\u016bs\u0173 supratimas apie paj\u0117gumus pasiek\u0117 visi\u0161kai kit\u0105 lyg\u012f.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, generalinis direktorius<\/b><br>Mamec \u00b7 Pramoniniai mai\u0161ytuvai, siurbliai ir auk\u0161t\u0173j\u0173 technologij\u0173 u\u017esakomoji gamyba<\/p>\n\n\n<p class=\"ind-cust__result\">T\u016bkstan\u010diai gamybos u\u017esakym\u0173 suplanuojami automati\u0161kai, o visa organizacija mato gamybos pad\u0117t\u012f realiuoju laiku.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lt\/klientu-istorijos\/mamec\/\">Skaitykite Mamec atsiliepim\u0105<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/13-9cbf2d28-08ef-49a1-94e3-0095e107df55.jpg\" alt=\"Fredman Operations gamybos vadov\u0117 Anu J\u00e4rvinen prie robotizuoto krovimo ant pale\u010di\u0173 \u012frenginio Raumoje\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/10-2fd983ec-02a7-440d-b77d-281f37545c8d.png\" alt=\"Fredman Operations\" width=\"137\" height=\"48\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>6 m\u0117nesiams<\/b><span>\u012f priek\u012f pardavimo komanda mato laisvus paj\u0117gumus<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner suteikia patikim\u0105 pagrind\u0105 visam gamybos planavimui.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Anu J\u00e4rvinen, gamybos vadov\u0117<\/b><br>Fredman Operations \u00b7 Su maistu liestis tinkamas pakavimo popierius<\/p>\n\n\n<p class=\"ind-cust__result\">Pardavimo komanda mato laisvus paj\u0117gumus \u0161e\u0161iems m\u0117nesiams \u012f priek\u012f, o \u012f pra\u0161ymus pakeisti tvarkara\u0161t\u012f, kuriems anks\u010diau reik\u0117davo valandos ar daugiau, dabar atsakoma per kelias sekundes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lt\/klientu-istorijos\/fredman-operations\/\">Skaitykite Fredman Operations atsiliepim\u0105<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Da\u017eniausiai u\u017eduodami klausimai<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ar SAP S\/4HANA turi gamybos tvarkara\u0161\u010di\u0173 sudarymo \u012frank\u012f?<\/summary>\n<p class=\"sp-faq__a\">Taip, du. Pagrindin\u0117s gamybos planavimo funkcijos leid\u017eia \u012fvertinti paj\u0117gumus ir planuotojui i\u0161lyginti apkrov\u0105 naudojant Capacity Scheduling Table bei grafin\u0119 Capacity Scheduling Board. Automatizuotas gamybos planavimas, nevir\u0161ijant turim\u0173 paj\u0117gum\u0173 ir naudojant euristinius metodus, optimizavim\u0105, perderinimo matric\u0105 bei Production Scheduling Board, yra integruoto PP\/DS dalis. \u0160is sprendimas parduodamas kaip SAP S\/4HANA Manufacturing for planning and scheduling.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ar S\/4HANA MRP atsi\u017evelgia \u012f ribotus paj\u0117gumus?<\/summary>\n<p class=\"sp-faq__a\">Ne. Sudarant tvarkara\u0161t\u012f pagal u\u017esakymo \u012fvykdymo laik\u0105, atsi\u017evelgiama \u012f gamyklos kalendori\u0173 ir nedarbo laik\u0105, bet ne \u012f kit\u0173 u\u017esakym\u0173 sukuriam\u0105 darbo centro apkrov\u0105. Operacijos suplanuojamos pagal ribotus paj\u0117gumus v\u0117liau \u2013 i\u0161lyginant apkrov\u0105 arba naudojant PP\/DS.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kuo skiriasi SAP PP ir PP\/DS?<\/summary>\n<p class=\"sp-faq__a\">PP apima pagrindines MRP, gamybos u\u017esakym\u0173, technologini\u0173 mar\u0161rut\u0173, darbo centr\u0173 ir gamybos paj\u0117gum\u0173 planavimo funkcijas. PP\/DS papildomai leid\u017eia planuoti gamyb\u0105 nevir\u0161ijant turim\u0173 paj\u0117gum\u0173 ir atsi\u017evelgiant \u012f operacij\u0173 sek\u0105, ta\u010diau tik toms med\u017eiagoms ir i\u0161tekliams, kuriems sukonfig\u016bruotas i\u0161pl\u0117stinis planavimas. Tam naudojami \u0161io sprendimo euristiniai metodai, optimizavimo priemon\u0117, liveCache ir Production Scheduling Board.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ar PP\/DS \u012ftrauktas \u012f S\/4HANA licencij\u0105?<\/summary>\n<p class=\"sp-faq__a\">SAP \u012fmon\u0117s architekt\u016bros gair\u0117se MRP ir CRP nurodomos kaip pagrindin\u0117s S\/4HANA Enterprise funkcijos, o Manufacturing for planning and scheduling \u2013 kaip atskirai pasirenkamas sprendimas. SAP produkto eksperto tinklara\u0161tyje teigiama, kad i\u0161pl\u0117stinio planavimo funkcijos &#8222;are not part of the standard SAP S\/4HANA Enterprise license.&#8221; (n\u0117ra \u012ftrauktos \u012f standartin\u0119 \u0161ios sistemos Enterprise licencij\u0105). Patikrinkite savo sutart\u012f su SAP.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kas S\/4HANA sistemoje pakei\u010dia CM21 ir Graphical Planning Table?<\/summary>\n<p class=\"sp-faq__a\">Fiori program\u0117l\u0117s Manage Work Center Capacity, Capacity Scheduling Table ir Capacity Scheduling Board. Teis\u0117 naudoti Graphical Planning Table baig\u0117 galioti 2025 m. gruod\u017eio 31 d.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u012e kokius apribojimus tur\u0117t\u0173 atsi\u017evelgti S\/4HANA tvarkara\u0161\u010di\u0173 sudarymo \u012frankis?<\/summary>\n<p class=\"sp-faq__a\">B\u016btina atsi\u017evelgti bent \u012f kiekvien\u0173 stakli\u0173, darbuotojo ir pamainos realius paj\u0117gumus; nuo operacij\u0173 sekos priklausant\u012f perderinim\u0105; keli\u0173 darbo centr\u0173 bendrai naudojamus \u012frankius; operacijas, kurioms reikia keli\u0173 operatori\u0173; alternatyvius i\u0161teklius ir med\u017eiag\u0173 prieinamum\u0105, \u012fskaitant dar ne\u012fvykdytus pirkimo u\u017esakymus. SkyPlanner APS automati\u0161kai \u012fvertina visa tai kaskart sudarydamas tvarkara\u0161t\u012f.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ar SkyPlanner APS gali veikti su SAP S\/4HANA be PP\/DS?<\/summary>\n<p class=\"sp-faq__a\">Taip. SkyPlanner APS pats sudaro gamybos tvarkara\u0161t\u012f pagal S\/4HANA gamybos u\u017esakymus, operacijas, darbo centrus ir med\u017eiagas, atsi\u017evelgdamas \u012f realius \u012frengini\u0173 ir darbuotoj\u0173 paj\u0117gumus. Operacij\u0173 datos ir patvirtinimai perduodami atgal \u012f S\/4HANA, o integracij\u0105 diegimo metu sukonfig\u016bruoja SkyPlanner komanda. Bandom\u0105j\u0105 versij\u0105 prad\u0117site naudoti importav\u0119 CSV arba Excel duomenis. <a href=\"\/lt\/bandymas\/\">I\u0161bandykite nemokamai<\/a> arba <a href=\"\/lt\/susisiekite-su-pardavejais\/\">susisiekite su pardavimo komanda<\/a>.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integracijos \/ ERP \/ SAP S\/4HANA Ar SAP S\/4HANA palaiko gamybos planavim\u0105? Apkrov\u0173 i\u0161lyginimas, PP\/DS ir SkyPlanner APS Bendr\u0105ja prasme gamybos planavimas pagal turimus paj\u0117gumus rei\u0161kia tvarkara\u0161\u010dio sudarym\u0105 atsi\u017evelgiant \u012f realiai prieinamus \u012frengini\u0173 ir darbuotoj\u0173 paj\u0117gumus. SAP S\/4HANA paj\u0117gum\u0173 apribojimai taikomi dviem b\u016bdais: bazin\u0117je sistemoje apkrovos i\u0161lyginamos rankiniu b\u016bdu, o integruotame PP\/DS tvarkara\u0161\u010diai sudaromi automati\u0161kai. &#8230; <a title=\"Ar SAP S\/4HANA palaiko gamybos planavim\u0105? Apkrov\u0173 i\u0161lyginimas, PP\/DS ir SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/sap-s4hana\/gamybos-planavimas\/\" aria-label=\"Read more about Ar SAP S\/4HANA palaiko gamybos planavim\u0105? Apkrov\u0173 i\u0161lyginimas, PP\/DS ir SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100798,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-101125","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Ar SAP S\/4HANA palaiko gamybos planavim\u0105?<\/title>\n<meta name=\"description\" content=\"S\/4HANA terminus planuoja be paj\u0117gum\u0173 rib\u0173; planuotojai lygina takt\u0105 lemian\u010di\u0173 centr\u0173 apkrovas, PP\/DS ribas taiko automati\u0161kai. Kaip veikia? Kur tinka SkyPlanner APS?\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/sap-s4hana\/gamybos-planavimas\/\" \/>\n<meta property=\"og:locale\" content=\"lt_LT\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Ar SAP S\/4HANA palaiko gamybos planavim\u0105? Apkrov\u0173 i\u0161lyginimas, PP\/DS ir SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"S\/4HANA terminus planuoja be paj\u0117gum\u0173 rib\u0173; planuotojai lygina takt\u0105 lemian\u010di\u0173 centr\u0173 apkrovas, PP\/DS ribas taiko automati\u0161kai. Kaip veikia? Kur tinka SkyPlanner APS?\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/sap-s4hana\/gamybos-planavimas\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"17 minu\u010di\u0173\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/sap-s4hana\\\/gamybos-planavimas\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/sap-s4hana\\\/gamybos-planavimas\\\/\",\"name\":\"Ar SAP S\\\/4HANA palaiko gamybos planavim\u0105?\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#website\"},\"datePublished\":\"2026-10-17T13:00:38+00:00\",\"description\":\"S\\\/4HANA terminus planuoja be paj\u0117gum\u0173 rib\u0173; planuotojai lygina takt\u0105 lemian\u010di\u0173 centr\u0173 apkrovas, PP\\\/DS ribas taiko automati\u0161kai. Kaip veikia? Kur tinka SkyPlanner APS?\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/sap-s4hana\\\/gamybos-planavimas\\\/#breadcrumb\"},\"inLanguage\":\"lt-LT\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/sap-s4hana\\\/gamybos-planavimas\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/sap-s4hana\\\/gamybos-planavimas\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP ir MES programin\u0117s \u012frangos integracijos su SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bs\u0173 ERP sistemai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS, skirta SAP S\\\/4HANA: gamybos planavimas\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/sap-s4hana\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Ar SAP S\\\/4HANA palaiko gamybos planavim\u0105? Apkrov\u0173 i\u0161lyginimas, PP\\\/DS ir SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lt-LT\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lt-LT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Ar SAP S\/4HANA palaiko gamybos planavim\u0105?","description":"S\/4HANA terminus planuoja be paj\u0117gum\u0173 rib\u0173; planuotojai lygina takt\u0105 lemian\u010di\u0173 centr\u0173 apkrovas, PP\/DS ribas taiko automati\u0161kai. Kaip veikia? Kur tinka SkyPlanner APS?","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/sap-s4hana\/gamybos-planavimas\/","og_locale":"lt_LT","og_type":"article","og_title":"Ar SAP S\/4HANA palaiko gamybos planavim\u0105? Apkrov\u0173 i\u0161lyginimas, PP\/DS ir SkyPlanner APS","og_description":"S\/4HANA terminus planuoja be paj\u0117gum\u0173 rib\u0173; planuotojai lygina takt\u0105 lemian\u010di\u0173 centr\u0173 apkrovas, PP\/DS ribas taiko automati\u0161kai. Kaip veikia? Kur tinka SkyPlanner APS?","og_url":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/sap-s4hana\/gamybos-planavimas\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"17 minu\u010di\u0173"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/sap-s4hana\/gamybos-planavimas\/","url":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/sap-s4hana\/gamybos-planavimas\/","name":"Ar SAP S\/4HANA palaiko gamybos planavim\u0105?","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lt\/#website"},"datePublished":"2026-10-17T13:00:38+00:00","description":"S\/4HANA terminus planuoja be paj\u0117gum\u0173 rib\u0173; planuotojai lygina takt\u0105 lemian\u010di\u0173 centr\u0173 apkrovas, PP\/DS ribas taiko automati\u0161kai. Kaip veikia? Kur tinka SkyPlanner APS?","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/sap-s4hana\/gamybos-planavimas\/#breadcrumb"},"inLanguage":"lt-LT","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/sap-s4hana\/gamybos-planavimas\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/sap-s4hana\/gamybos-planavimas\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lt\/"},{"@type":"ListItem","position":2,"name":"ERP ir MES programin\u0117s \u012frangos integracijos su SkyPlanner","item":"https:\/\/skyplanner.ai\/lt\/integracijos\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bs\u0173 ERP sistemai","item":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS, skirta SAP S\/4HANA: gamybos planavimas","item":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/sap-s4hana\/"},{"@type":"ListItem","position":5,"name":"Ar SAP S\/4HANA palaiko gamybos planavim\u0105? Apkrov\u0173 i\u0161lyginimas, PP\/DS ir SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lt\/#website","url":"https:\/\/skyplanner.ai\/lt\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lt\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lt\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lt-LT"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lt\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lt\/","logo":{"@type":"ImageObject","inLanguage":"lt-LT","@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lt\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integracijos \/ ERP \/ SAP S\/4HANA Ar SAP S\/4HANA palaiko gamybos planavim\u0105? Apkrov\u0173 i\u0161lyginimas, PP\/DS ir SkyPlanner APS Bendr\u0105ja prasme gamybos planavimas pagal turimus paj\u0117gumus rei\u0161kia tvarkara\u0161\u010dio sudarym\u0105 atsi\u017evelgiant \u012f realiai prieinamus \u012frengini\u0173 ir darbuotoj\u0173 paj\u0117gumus. SAP S\/4HANA paj\u0117gum\u0173 apribojimai taikomi dviem b\u016bdais: bazin\u0117je sistemoje apkrovos i\u0161lyginamos rankiniu b\u016bdu, o integruotame PP\/DS tvarkara\u0161\u010diai sudaromi automati\u0161kai.&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/pages\/101125","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/comments?post=101125"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/pages\/101125\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/pages\/100798"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/media?parent=101125"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}