{"id":101006,"date":"2026-10-17T13:00:38","date_gmt":"2026-10-17T13:00:38","guid":{"rendered":"https:\/\/skyplanner.ai\/?page_id=101006"},"modified":"2026-10-17T13:00:38","modified_gmt":"2026-10-17T13:00:38","slug":"gamybos-planavimas","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/netsuite\/gamybos-planavimas\/","title":{"rendered":"Ar NetSuite palaiko gamybos planavim\u0105? Integruotos galimyb\u0117s ir SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/lt\/integracijos\/\">Integracijos<\/a> \/ <a href=\"\/lt\/integracijos\/erp\/\">ERP<\/a> \/ Oracle NetSuite<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Ar NetSuite palaiko gamybos planavim\u0105? <span class=\"hl\">Integruotos galimyb\u0117s ir SkyPlanner APS<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">Oracle NetSuite sudaro gamybos tvarkara\u0161\u010dius neatsi\u017evelgdama \u012f paj\u0117gum\u0173 ribas, nebent \u012fdiegiate Advanced Manufacturing SuiteApp. <a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/netsuite\/ns-online-help\/bridgehead_1508338236.html\">Pa\u010dios Oracle dokumentacijoje<\/a> nurodyta, kad planavimas neribojant paj\u0117gum\u0173 \u201edoesn&#8217;t account for current work center capacity or resource use.\u201c (neatsi\u017evelgia \u012f esamus darbo centro paj\u0117gumus ar i\u0161tekli\u0173 naudojim\u0105). Advanced Manufacturing prideda Finite Scheduling proced\u016br\u0105, kuri paleid\u017eia gamybos u\u017esakymus planuotojo nustatyta seka.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lt\/bandymas\/\">Prad\u0117ti nemokam\u0105 bandom\u0105j\u012f laikotarp\u012f<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lt\/susisiekite-su-pardavejais\/\">U\u017esakyti demonstracij\u0105<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Gamybos tvarkara\u0161\u010di\u0173 sudarymas<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"SkyPlanner APS Gantt diagrama su darbo centrams suplanuotomis u\u017eduotimis ir u\u017esakym\u0173 s\u0105ra\u0161u apa\u010dioje.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Vykdydamas \u0161i\u0105 proced\u016br\u0105, planuotojas nustato u\u017esakym\u0173 paleidimo sek\u0105, o pasikeitus aplinkyb\u0117ms pakartotinai vykdo paleidimo proced\u016br\u0105. Gamyklos, norin\u010dios, kad tvarkara\u0161tis b\u016bt\u0173 apskai\u010diuojamas, kartu su NetSuite naudoja SkyPlanner APS, kad tur\u0117t\u0173:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>apskai\u010diuot\u0105 u\u017eduo\u010di\u0173 sek\u0105 kiekvienai ma\u0161inai, darbuotojui ir \u012frankiui<\/li>\n\n\n<li>plan\u0105, kuriame \u012fvertinami nuo sekos priklausantys perderinimai, bendri \u012frankiai ir keli vienai u\u017eduo\u010diai reikalingi operatoriai<\/li>\n\n\n<li>plan\u0105, kuriame atsi\u017evelgiama \u012f med\u017eiag\u0173 prieinamumo laik\u0105<\/li>\n\n\n<li>tvarkara\u0161t\u012f, kuris automati\u0161kai perskai\u010diuojamas pasikeitus pad\u0117\u010diai gamybos ceche<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-netsuite-schedules-production-step-by-step\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kaip NetSuite sudaro gamybos tvarkara\u0161\u010dius: \u017eingsnis po \u017eingsnio<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h3 class=\"wp-block-heading\">1. Darbo centrai ir darbo kalendoriai<\/h3>\n\n\n<p>NetSuite darbo centras n\u0117ra ma\u0161inos \u012fra\u0161as. Tai statin\u0117 grup\u0117 <strong>Group<\/strong> (Lists &gt; Relationships &gt; Groups, <a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/netsuite\/ns-online-help\/subsect_158618203997.html\">Oracle<\/a>), kurioje pa\u017eym\u0117tas langelis <strong>Manufacturing Work Center<\/strong>. Grup\u0117s antrin\u0117je kortel\u0117je <strong>Manufacturing Work Center Settings<\/strong> pateikiami laukai <strong>Machine Resources<\/strong>, <strong>Labor Resources<\/strong> ir <strong>Work Calendar<\/strong>. Numatytoji i\u0161tekli\u0173 skai\u010diaus reik\u0161m\u0117 yra 0, o numatytasis kalendorius \u2013 <strong>Default Work Calendar<\/strong>.<\/p>\n\n\n<p>Standartin\u0117se gamybos funkcijose kiekvieno darbo centro paj\u0117gumus apibr\u0117\u017eia ma\u0161in\u0173 skai\u010dius, darbuotoj\u0173 skai\u010dius ir kalendorius. Atskiri gamybiniai i\u0161tekliai \u012ftraukiami naudojant Advanced Manufacturing Work Bench (5 \u017eingsnis).<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. Manufacturing Routing<\/h3>\n\n\n<p><a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/netsuite\/ns-online-help\/section_N2345383.html\">Manufacturing Routing<\/a> \u012fra\u0161e (REST: <code>manufacturingRouting<\/code>) pateikiami gaminio surinkimo etapai. Kiekviename etape nurodomi laukai <strong>Operation Sequence<\/strong>, <strong>Operation Name<\/strong>, <strong>Manufacturing Work Center<\/strong>, <strong>Setup Time<\/strong>, <strong>Run Rate<\/strong> ir laiko tarpo tarp operacij\u0173 nustatymai (<strong>Auto-calculate Lag<\/strong>, <strong>Lag Type<\/strong>, <strong>Lag Amount<\/strong>, <strong>Lag Unit<\/strong>). Setup Time nurodo paruo\u0161imo laik\u0105 minut\u0117mis vienam u\u017esakymui, o Run Rate \u2013 gamybos laik\u0105 minut\u0117mis vienam vienetui. Pagal \u0161ias abi reik\u0161mes ir darbo kalendori\u0173 NetSuite nustato kiekvieno etapo laik\u0105. Kai gamybos u\u017esakymui taikomas technologinis mar\u0161rutas, NetSuite sukuria <strong>Manufacturing Operation Task<\/strong> \u012fra\u0161us (REST: <code>manufacturingOperationTask<\/code>) \u2013 po vien\u0105 kiekvienam etapui.<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. Planavimas nuo prad\u017eios arba nuo pabaigos<\/h3>\n\n\n<p>Kiekvienas gamybos u\u017esakymas planuojamas vienu i\u0161 <a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/netsuite\/ns-online-help\/section_4000988757.html\">dviej\u0173 b\u016bd\u0173<\/a>. <strong>Forward Scheduling<\/strong>: nustatote <strong>Production Start Date<\/strong>, o NetSuite apskai\u010diuoja pabaigos dat\u0105. <strong>Backward Scheduling<\/strong>: nustatote <strong>Production End Date<\/strong>, o NetSuite pagal technologin\u012f mar\u0161rut\u0105 ir darbo centro kalendori\u0173 atgaline tvarka apskai\u010diuoja prad\u017eios dat\u0105. Kad gal\u0117tum\u0117te gamybos u\u017esakymuose pasirinkti planavimo b\u016bd\u0105, pirmiausia reikia \u012fjungti nuostat\u0105 <strong>Generate Work Orders in Supply Planning<\/strong>.<\/p>\n\n\n<p>Abiem b\u016bdais planuojama neatsi\u017evelgiant \u012f paj\u0117gum\u0173 ribas. Oracle ai\u0161kiai nurodo: \u201eNetSuite uses infinite capacity scheduling to schedule work\u201c (NetSuite planuoja darbus neribodama paj\u0117gum\u0173), o \u0161i strategija \u201ecan result in resource overloads.\u201c (gali lemti i\u0161tekli\u0173 perkrov\u0105). Kiekvieno gamybos u\u017esakymo laikas nustatomas pagal jo technologin\u012f mar\u0161rut\u0105 ir kalendori\u0173, tarsi visas darbo centras b\u016bt\u0173 skirtas tik jam. Visi de\u0161imt gamybos u\u017esakym\u0173, kuriuos reikia baigti penktadien\u012f, gali b\u016bti suplanuoti tam pa\u010diam darbo centrui ketvirtadien\u012f. Oracle taip pat \u012fsp\u0117ja, kad planuojant nuo pabaigos apskai\u010diuota prad\u017eios data \u201emay be a date in the past, prior to the current date.\u201c (gali b\u016bti praeityje, ankstesn\u0117 u\u017e dabartin\u0119 dat\u0105).<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. Supply Planning ir Rough-Cut Capacity Planning<\/h3>\n\n\n<p><strong>Demand Planning<\/strong>, <strong>Supply Planning<\/strong> ir <strong>Master Production Schedule<\/strong> nustato, k\u0105 gaminti ir kada to reikia. Paj\u0117gumai tikrinami dviem b\u016bdais:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong><a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/netsuite\/ns-online-help\/article_0707031656.html\">Rough-Cut Capacity Planning<\/a> (RCCP)<\/strong> standartin\u0117se gamybos funkcijose (Transactions &gt; Manufacturing &gt; Capacity Planning). \u0160i funkcija palygina darbo centr\u0173 paj\u0117gumus su gamybos u\u017esakymams ir planuojamiems gamybos u\u017esakymams numatytu laiku, kad pateikt\u0173 \u201ea mid- to long-term view,\u201c (vidutin\u0117s trukm\u0117s ir ilgalaik\u0119 perspektyv\u0105), ir pa\u017eymi per didel\u0119 bei per ma\u017e\u0105 apkrov\u0105.<\/li>\n\n\n<li><strong><a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/netsuite\/ns-online-help\/bridgehead_1508338018.html\">Rough Cut Capacity Planning<\/a> (RCP)<\/strong> modulyje Advanced Manufacturing (Advanced Manufacturing &gt; Capacity Planning &gt; Capacity Planning &gt; Create Plan). \u0160i funkcija parodo darbo centr\u0173 apkrov\u0105 procentais per planavimo laikotarp\u012f ir leid\u017eia kurti \u201ekas b\u016bt\u0173, jeigu\u201c scenarijus.<\/li>\n\n<\/ul>\n\n\n<p>Abi funkcijos pateikia paj\u0117gum\u0173 ataskaitas. N\u0117 viena neperkelia n\u0117 vienos operacijos.<\/p>\n\n\n<h3 class=\"wp-block-heading\">5. Advanced Manufacturing: Work Bench ir gamybiniai i\u0161tekliai<\/h3>\n\n\n<p><a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/netsuite\/ns-online-help\/chapter_1506100009.html\">Advanced Manufacturing SuiteApp<\/a> kiekvien\u0105 technologinio mar\u0161ruto \u017eingsn\u012f papildo <strong>Manufacturing Work Bench<\/strong> \u012fra\u0161u. Jame apibr\u0117\u017eiami gamybiniai i\u0161tekliai, delsos laikai, darbo j\u0117gos poreikis, darbo instrukcijos, med\u017eiag\u0173 sunaudojimas ir planuojama trukm\u0117. Work Bench operacij\u0173 seka, operacijos pavadinimas ir darbo centras turi sutapti su NetSuite technologiniu mar\u0161rutu.<\/p>\n\n\n<h3 class=\"wp-block-heading\">6. Finite Scheduling: seka ir u\u017esakym\u0173 paleidimas<\/h3>\n\n\n<p>\u0160iame etape jau atsi\u017evelgiama \u012f paj\u0117gum\u0173 ribas. Planuotojas atidaro <strong>Advanced Manufacturing &gt; Finite Scheduling &gt; Release Work Orders<\/strong> ir \u0161iame lange atlieka \u0161iuos veiksmus:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li>Nustato rodymo filtrus: <strong>Location<\/strong>, <strong>Production Class<\/strong>, <strong>Horizon Start<\/strong> (turi b\u016bti pirmadienis) ir <strong>Horizon End<\/strong>, <strong>Planned Orders<\/strong>, <strong>Released Orders<\/strong>.<\/li>\n\n\n<li>Pasirenka <strong>Schedule Date<\/strong>, <strong>Schedule Method<\/strong> (Forward arba Backward) ir kaip tvarkomi <strong>Child Work Orders<\/strong>.<\/li>\n\n\n<li>Pa\u017eymi kiekvieno gamybos u\u017esakymo langel\u012f <strong>WO Release<\/strong> ta seka, kuria u\u017esakymai tur\u0117t\u0173 b\u016bti paleisti. Laukas <strong>Sequence<\/strong> u\u017epildomas automati\u0161kai, ta\u010diau j\u012f galima redaguoti.<\/li>\n\n\n<li>Spusteli <strong>Sort Demand<\/strong>, jei reikia \u2013 <strong>Preview Schedule<\/strong>, tada \u2013 <strong>Release Work Orders<\/strong>.<\/li>\n\n<\/ol>\n\n\n<p>Paleid\u017eiant u\u017esakymus, NetSuite i\u0161 naujo nustato operacij\u0173 prad\u017eios ir pabaigos datas pagal gamybos planavimo rezultat\u0105. Pagal numatyt\u0105sias nuostatas kiekviena operacija priskiriama vienam gamybiniam i\u0161tekliui, kuris atsilaisvina anks\u010diausiai. Planuotojas gali nustatyti lygiagret\u0173 vykdym\u0105, kad operacija vienu metu b\u016bt\u0173 atliekama keliais gamybiniais i\u0161tekliais.<\/p>\n\n\n<p>Oracle teigia, kad Advanced Manufacturing gamybos planavimas \u201eoptimizes work center throughput\u201c (optimizuoja darbo centro pralaidum\u0105) ir \u201econsiders the facility&#8217;s current and future capacity.\u201c (atsi\u017evelgia \u012f esamus ir b\u016bsimus gamyklos paj\u0117gumus). Taip pat priduriama: \u201ePlanners can influence both the work order sequence and the number of assets that a work order can use at one time.\u201c (Planuotojai gali keisti ir gamybos u\u017esakym\u0173 sek\u0105, ir gamybini\u0173 i\u0161tekli\u0173, kuriuos u\u017esakymas gali naudoti vienu metu, skai\u010di\u0173.) Tai ir yra du valdymo svertai.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-oracle-documents-and-what-it-leaves-to-the\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">K\u0105 Oracle apra\u0161o dokumentacijoje, o k\u0105 palieka planuotojui<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Standartin\u0117se gamybos funkcijose paj\u0117gumai neribojami.<\/strong> Be Advanced Manufacturing perkrova i\u0161ry\u0161k\u0117ja gamybos ceche, o ne plane. (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/netsuite\/ns-online-help\/bridgehead_1508338236.html\">Oracle<\/a>)<\/li>\n\n\n<li><strong>Sek\u0105 nustato planuotojas.<\/strong> Oracle nurodo: \u201ework orders must be released in sequence after they are created.\u201c (suk\u016brus gamybos u\u017esakymus, juos reikia paleisti nustatyta seka). Planuotojas pa\u017eymi WO Release arba redaguoja lauk\u0105 Sequence, o Oracle gamybos u\u017esakym\u0173 sek\u0105 \u012fvardija kaip vien\u0105 i\u0161 planuotojo valdymo svert\u0173. (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/netsuite\/ns-online-help\/bridgehead_1508338324.html\">Oracle<\/a>)<\/li>\n\n\n<li><strong>Rekomenduojami trumpi planavimo laikotarpiai.<\/strong> Kad apdorojimas neu\u017etrukt\u0173, Oracle pataria: \u201ekeep horizon periods as short as possible. Generally less than one week.\u201c (rinktis kuo trumpesnius planavimo laikotarpius, paprastai trumpesnius nei viena savait\u0117). Prakti\u0161kai Finite Scheduling tampa savaitiniu u\u017esakym\u0173 paleidimo ciklu. (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/netsuite\/ns-online-help\/bridgehead_1508338324.html\">Oracle<\/a>)<\/li>\n\n\n<li><strong>Perplanavimas rei\u0161kia pakartotin\u012f paleidim\u0105.<\/strong> \u201eThe planner can review existing commitments to capacity and re-schedule them when necessary.\u201c (Planuotojas gali per\u017ei\u016br\u0117ti jau paskirtus paj\u0117gumus ir prireikus juos perplanuoti.) Filtras Released Orders skirtas \u201eto reschedule released work orders,\u201c (paleistiems gamybos u\u017esakymams perplanuoti), o planuotojas paleidimo proced\u016br\u0105 vykdo dar kart\u0105. (tas pats \u0161altinis)<\/li>\n\n\n<li><strong>Planuojam\u0173 gamybos u\u017esakym\u0173 planavimo galimyb\u0117s ribotos.<\/strong> \u201ePlanned status work orders don&#8217;t support full or end-to-end scheduling, even when Auto-Scheduling is enabled.\u201c (Gamybos u\u017esakym\u0173, kuri\u0173 b\u016bsena yra Planned, negalima planuoti visi\u0161kai ar nuo prad\u017eios iki pabaigos, net kai \u012fjungta Auto-Scheduling.) (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/netsuite\/ns-online-help\/bridgehead_1508338278.html\">Oracle<\/a>)<\/li>\n\n\n<li><strong>Be technologinio mar\u0161ruto negalima suplanuoti gamybos pagal realius paj\u0117gumus.<\/strong> \u201eWork orders not associated with a NetSuite routing should not be scheduled.\u201c (Gamybos u\u017esakym\u0173, nesusiet\u0173 su NetSuite technologiniu mar\u0161rutu, nereik\u0117t\u0173 \u012ftraukti \u012f tvarkara\u0161t\u012f.) (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/netsuite\/ns-online-help\/bridgehead_1508338278.html\">Oracle<\/a>)<\/li>\n\n\n<li><strong>Lygiagretus vykdymas turi rib\u0105.<\/strong> \u201eThe number of concurrent assets shouldn&#8217;t exceed the number of assets assigned to the manufacturing work bench operation sequence.\u201c (Vienu metu naudojam\u0173 gamybini\u0173 i\u0161tekli\u0173 skai\u010dius netur\u0117t\u0173 vir\u0161yti j\u0173 skai\u010diaus, priskirto Manufacturing Work Bench operacij\u0173 sekai.) (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/netsuite\/ns-online-help\/bridgehead_1508338278.html\">Oracle<\/a>)<\/li>\n\n\n<li><strong>Paruo\u0161imo laikas nustatomas technologiniame mar\u0161rute.<\/strong> Technologinio mar\u0161ruto \u017eingsnio lauke Setup Time nurodomos vienam u\u017esakymui skirtos minut\u0117s. \u0160i reik\u0161m\u0117 nesikei\u010dia, kad ir kas tame darbo centre buvo gaminama prie\u0161 tai. (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/netsuite\/ns-online-help\/section_N2345383.html\">Oracle<\/a>)<\/li>\n\n\n<li><strong>Kiekvienas technologinio mar\u0161ruto pakeitimas atliekamas du kartus.<\/strong> Kiekvienam technologinio mar\u0161ruto \u017eingsniui reikia atskiro Work Bench \u012fra\u0161o su sutampan\u010diu eil\u0117s numeriu, operacijos pavadinimu ir darbo centru, tod\u0117l mar\u0161ruto pakeitim\u0105 reikia pakartoti ir Work Bench. (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/netsuite\/ns-online-help\/bridgehead_1508337105.html\">Oracle<\/a>)<\/li>\n\n<\/ul>\n\n\n<p>Prakti\u0161kai u\u017esakym\u0173 paleidimo ritm\u0105 valdo planuotojas, seka sudaroma remiantis jo patirtimi, o sustojus ma\u0161inai ar gavus skub\u0173 u\u017esakym\u0105 paleidimo proced\u016br\u0105 tenka vykdyti i\u0161 naujo.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"when-netsuite-s-native-scheduling-is-enough\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kada pakanka integruot\u0173 NetSuite tvarkara\u0161\u010di\u0173 sudarymo funkcij\u0173<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Pa\u010dios NetSuite \u012franki\u0173 pakanka, kai:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Naudojate nedaug gamybini\u0173 i\u0161tekli\u0173, o gamini\u0173 \u012fvairov\u0117 ma\u017ea.<\/strong> Viena ar dvi siaurosios vietos, stabil\u016bs technologiniai mar\u0161rutai ir pasikartojantys gaminiai. Tokiu atveju pakanka planavimo neribojant paj\u0117gum\u0173, Rough-Cut Capacity Planning ir planuotojo, kuris vizualiai patikrina apkrov\u0105.<\/li>\n\n\n<li><strong>Jau naudojate Advanced Manufacturing, o gamyba nesud\u0117tinga.<\/strong> Vienas gamybinis i\u0161teklius operacijai, trumpi technologiniai mar\u0161rutai, savaitinis ritmas ir planuotojas, kuriam tinka sek\u0105 nustatyti rankiniu b\u016bdu. Finite Scheduling tai u\u017etikrina.<\/li>\n\n\n<li><strong>Gaminate \u012f sand\u0117l\u012f, o \u012fvykdymo terminai ilgi.<\/strong> Jei pirkimus lemia Supply Planning, o paj\u0117gumus pakanka patikrinti apytiksliai, i\u0161samus operacij\u0173 tvarkara\u0161tis duoda ma\u017eai papildomos naudos.<\/li>\n\n<\/ul>\n\n\n<p>Kai gamini\u0173 \u012fvairov\u0117 i\u0161auga, savait\u0117s viduryje atsiranda skubi\u0173 u\u017esakym\u0173 arba operatoriai tampa gamyb\u0105 ribojan\u010diu veiksniu, pasirodo toliau i\u0161vardyti po\u017eymiai.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"when-you-need-a-finite-capacity-scheduler\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kada reikia gamybos planavimo sistemos<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Integruot\u0173 \u012franki\u0173 nebepakanka, jei j\u016bs\u0173 situacij\u0105 atitinka keli i\u0161 \u0161i\u0173 po\u017eymi\u0173:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Savaitin\u0117 u\u017esakym\u0173 paleidimo seka jau antradien\u012f nebeatitinka pad\u0117ties, tod\u0117l planuotojas j\u0105 perdaro kelis kartus per savait\u0119.<\/li>\n\n\n<li>Pristatymo datos nustatomos pagal \u012fvykdymo trukm\u0119, o pardav\u0117jai vis \u017eada terminus, kuri\u0173 gamyba negali laikytis.<\/li>\n\n\n<li>Perderinimo trukm\u0117 priklauso nuo anks\u010diau gaminto gaminio, o tinkama seka kas savait\u0119 sutaupyt\u0173 valand\u0173.<\/li>\n\n\n<li>U\u017eduotys laukia \u012frankio, tvirtinimo \u012ftaiso ar med\u017eiagos, \u012f kuriuos tvarkara\u0161tyje neatsi\u017evelgta, arba dviem ma\u0161inoms vienu metu reikia to paties \u012frankio.<\/li>\n\n\n<li>Kai kurioms u\u017eduotims vienu metu reikia dviej\u0173 ar trij\u0173 operatori\u0173, o plane nematyti, kas yra laisvas.<\/li>\n\n\n<li>Tikruosius paj\u0117gumus lemia operatoriai, pamainos ir neatvykimai \u012f darb\u0105, o ne darbo centro grup\u0117s lauke Labor Resources \u012fra\u0161ytas skai\u010dius.<\/li>\n\n\n<li>Nenaudojate Advanced Manufacturing ir nenorite jo diegti vien d\u0117l tvarkara\u0161\u010di\u0173 sudarymo.<\/li>\n\n<\/ul>\n\n\n<h3 class=\"wp-block-heading\">\u012e k\u0105 atkreipti d\u0117mes\u012f<\/h3>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Gamybos planavimas pagal kiekvieno i\u0161tekliaus paj\u0117gumus<\/strong>, o ne vien darbo centr\u0173 grup\u0117s, atsi\u017evelgiant \u012f pamainas, darbuotojus, atostogas ir vir\u0161valand\u017eius.<\/li>\n\n\n<li><strong>Automatinis darb\u0173 eili\u0161kumo nustatymas<\/strong> pagal terminus ir prioritetus: eil\u0117 apskai\u010diuojama, o ne sud\u0117liojama rankiniu b\u016bdu.<\/li>\n\n\n<li><strong>Nuo eili\u0161kumo priklausantys perderinimai<\/strong>: kiekvienai gamini\u0173 porai nustatomas perderinimo laikas abiem kryptimis, o pagal j\u012f parenkama darb\u0173 seka.<\/li>\n\n\n<li><strong>\u012erankiai planuojami kaip riboti i\u0161tekliai<\/strong>, tod\u0117l tas pats \u012frankis niekada nepriskiriamas dviem darbo centrams tuo pa\u010diu metu.<\/li>\n\n\n<li><strong>Keli operatoriai vienai u\u017eduo\u010diai<\/strong> ir <strong>alternatyvios stakl\u0117s bei darbuotojai<\/strong>, kai pagrindinis i\u0161teklius nepasiekiamas.<\/li>\n\n\n<li><strong>Med\u017eiag\u0173 prieinamumo tikrinimas<\/strong> kiekvienos operacijos numatytos prad\u017eios momentu, \u012fvertinant ir turimas atsargas, ir dar negautas u\u017esakytas med\u017eiagas.<\/li>\n\n\n<li><strong>Nuolatinis tvarkara\u0161\u010dio perskai\u010diavimas<\/strong>, kai darbai baigiami v\u0117liau, sustoja stakl\u0117s arba pasikei\u010dia u\u017esakymas.<\/li>\n\n\n<li><strong>Vaizdinis tvarkara\u0161tis<\/strong>, kur\u012f planuotojai gali koreguoti, ir <strong>gr\u012f\u017etamasis ry\u0161ys i\u0161 gamybos cecho<\/strong>, pagal kur\u012f tvarkara\u0161tis atnaujinamas.<\/li>\n\n\n<li><strong>NetSuite integravimo b\u016bdas, tinkamas 2026 metams ir v\u0117lesniam laikotarpiui.<\/strong> <a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/netsuite\/ns-online-help\/article_2104046421.html\">Oracle nurodo<\/a>, kad nuo 2026.1 versijos naujas integracijas reik\u0117t\u0173 kurti naudojant REST \u017einiatinklio paslaugas su OAuth 2.0. Nuo 2027.1 versijos nebegalima kurti nauj\u0173 SOAP ar TBA integracij\u0173, o 2028.2 versijoje i\u0161jungiami visi SOAP prieigos ta\u0161kai. Dideli duomen\u0173 kiekiai nuskaitomi per <a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/netsuite\/ns-online-help\/section_157909186990.html\">SuiteQL<\/a> (<code>POST \/services\/rest\/query\/v1\/suiteql<\/code>, iki 100 000 rezultat\u0173 vienai u\u017eklausai).<\/li>\n\n\n<li><strong>Trumpas i\u0161bandymas su savo duomenimis<\/strong> dar prie\u0161 pradedant ra\u0161yti integracijos kod\u0105.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"where-skyplanner-fits\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kur praver\u010dia SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner APS \u2013 tai debesijoje veikianti gamybos planavimo sistema, naudojama kartu su NetSuite. Ji sudaro tvarkara\u0161t\u012f pagal realius \u012frengini\u0173 ir darbuotoj\u0173 paj\u0117gumus. NetSuite lieka preki\u0173, komplektavimo specifikacij\u0173, pirkim\u0173, atsarg\u0173 ir finans\u0173 apskaitos sistema. SkyPlanner kiekvienam darbo centrui, darbuotojui ir \u012frankiui apskai\u010diuoja darb\u0173 eil\u0119 ir perskai\u010diuoja tvarkara\u0161t\u012f \u2013 tai, k\u0105 Finite Scheduling palieka planuotojui.<\/p>\n\n\n<p>Kaip SkyPlanner atitinka pirmiau i\u0161vardytus kriterijus:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Darb\u0173 eil\u0117 apskai\u010diuojama, o ne sud\u0117liojama rankomis.<\/strong> Arcturus algoritmas per kelias sekundes sudaro gamybos tvarkara\u0161t\u012f pagal terminus, prioritetus, kliento svarb\u0105 ir j\u016bs\u0173 taisykles, atsi\u017evelgdamas \u012f realius \u012frengini\u0173 ir darbuotoj\u0173 paj\u0117gumus. Planuotojai j\u012f koreguoja interaktyvioje Gantt diagramoje.<\/li>\n\n\n<li><strong>Nuolat atnaujinamas planas, o ne kart\u0105 per savait\u0119 paleid\u017eiami darbai.<\/strong> Pasikeitus situacijai gamyboje, Autopilot automati\u0161kai perskai\u010diuoja tvarkara\u0161t\u012f. U\u017efiksuotas plano dalis ir prioritetus ir toliau valdote j\u016bs.<\/li>\n\n\n<li><strong>Perderinimai pagal gamini\u0173 sek\u0105.<\/strong> Perderinimo laik\u0173 matricoje saugomi nuo krypties priklausantys perderinimo laikai tarp gamini\u0173 (i\u0161 m\u0117lynos \u012f raudon\u0105 \u2013 30 minu\u010di\u0173, i\u0161 raudonos \u012f m\u0117lyn\u0105 \u2013 60), o algoritmas parenka sek\u0105, kuriai reikia ma\u017eiausiai paruo\u0161imo laiko. Paruo\u0161imo ir u\u017ebaigimo laikai taikomi kiekvienai u\u017eduo\u010diai.<\/li>\n\n\n<li><strong>\u012erankiai, darbuotojai ir alternatyvos.<\/strong> \u012erankiai yra bendri riboti i\u0161tekliai: viename darbo centre naudojamas \u012frankis tuo pa\u010diu metu neplanuojamas kitame. Vienai u\u017eduo\u010diai vienu metu galima priskirti kelis operatorius. Kai pagrindin\u0117s stakl\u0117s ar darbuotojas nepasiekiami, algoritmas \u012fvertina alternatyvas. Modelyje taip pat atsi\u017evelgiama \u012f darbo centr\u0173 grupes ir darbo na\u0161um\u0105.<\/li>\n\n\n<li><strong>Med\u017eiagos \u012ftrauktos \u012f plan\u0105.<\/strong> Kiekvienai operacijai tikrinamos turimos atsargos ir numatomi gavimai pagal pirkimo u\u017esakymus: u\u017esakytos med\u017eiagos laikomos prieinamomis pirkimo u\u017esakyme nurodyt\u0105 pristatymo dien\u0105.<\/li>\n\n\n<li><strong>Nereikia atkartoti Work Bench \u012fra\u0161\u0173.<\/strong> SkyPlanner saugo savo proceso etapus, tod\u0117l jums nereikia nei Advanced Manufacturing, nei Work Bench \u012fra\u0161o kiekvienam technologinio mar\u0161ruto etapui.<\/li>\n\n\n<li><strong>Gr\u012f\u017etamasis ry\u0161ys i\u0161 gamybos cecho toje pa\u010dioje sistemoje.<\/strong> Operatoriai telefone ar plan\u0161et\u0117je mato savo darb\u0173 eil\u0119 ir registruoja darbus naudodami Mobile Confirmations, Production Timer ir Quick Log Mode.<\/li>\n\n<\/ul>\n\n\n<p><strong>Rinkit\u0117s SkyPlanner, jei<\/strong> j\u016bs\u0173 planuotojas kelis kartus per savait\u0119 i\u0161 naujo sud\u0117lioja darb\u0173 paleidimo \u012f gamyb\u0105 eil\u0119.<\/p>\n\n\n<p><strong>Rinkit\u0117s SkyPlanner, jei<\/strong> perderinimai priklauso nuo gamini\u0173 sekos arba galimyb\u0119 vykdyti darbus lemia bendras \u012frankis ar trij\u0173 darbuotoj\u0173 brigada.<\/p>\n\n\n<p><strong>Rinkit\u0117s SkyPlanner, jei<\/strong> plane reikia numatyti laukim\u0105, kol atvyks pagal pirkimo u\u017esakymus u\u017esakytos med\u017eiagos.<\/p>\n\n\n<p><strong>Rinkit\u0117s SkyPlanner, jei<\/strong> nenorite diegti Advanced Manufacturing vien d\u0117l tvarkara\u0161\u010di\u0173 sudarymo.<\/p>\n\n\n<p>Suomijos Ulvilos mieste \u012fsik\u016brusi elektros skyd\u0173 ir skirstom\u0173j\u0173 \u012frengini\u0173 gamintoja UTU Oy gamybos tvarkara\u0161\u010dius sudaro su SkyPlanner, veikian\u010diu kartu su Oracle NetSuite. \u012emon\u0117s ERP konsultantai pristat\u0117 tris tvarkara\u0161\u010di\u0173 sudarymo sprendimus, o UTU pasirinko SkyPlanner d\u0117l lankstumo ir modulin\u0117s strukt\u016bros. UTU prad\u0117jo naudoti sistem\u0105 2025 m. rugs\u0117j\u012f, integravusi SkyPlanner su NetSuite ir savo darbo u\u017emokes\u010dio apskaitos sistema.<\/p>\n\n\n<p>SkyPlanner ir NetSuite kei\u010diasi duomenimis abiem kryptimis. \u012e SkyPlanner perduodami gamybos u\u017esakymai, technologiniai mar\u0161rutai, darbo centrai, prek\u0117s ir pirkimo u\u017esakymai. Atgal gr\u0105\u017einamos suplanuotos operacij\u0173 datos, darb\u0173 eiga ir u\u017eregistruotos darbo valandos, o apie tvarkara\u0161\u010dio pakeitimus i\u0161kart prane\u0161ama per webhook prane\u0161imus.<\/p>\n\n\n<p>Kiekvienos \u012fmon\u0117s NetSuite aplinka sukonfig\u016bruota skirtingai. Diegimo prad\u017eioje SkyPlanner komanda pritaiko integracij\u0105 prie j\u016bs\u0173 technologini\u0173 mar\u0161rut\u0173, darbo centr\u0173 ir pasirinktini\u0173 lauk\u0173, o prad\u0117jus naudoti sistem\u0105 teikia jos palaikym\u0105. J\u016bs\u0173 NetSuite partneris ar programuotojai taip pat gali kurti integracij\u0105 naudodami dokumentuot\u0105 SkyPlanner REST API (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">API \u017einynas<\/a>, <a href=\"\/lt\/docs\/integravimo-pamoka\/\">SkyPlanner dokumentacija<\/a>) \u2013 tam pakanka API rakto.<\/p>\n\n\n<p>Prad\u0117kite nuo CSV fail\u0173, eksportuot\u0173 i\u0161 NetSuite, ir <a href=\"\/lt\/bandymas\/\">30 dien\u0173 nemokamai i\u0161bandykite sistem\u0105<\/a> (iki 20 darbo centr\u0173, mok\u0117jimo kortel\u0117s nereikia). Taip dar prie\u0161 integracijos projekt\u0105 pamatysite savo gamybos tvarkara\u0161t\u012f, sudaryt\u0105 pagal realius \u012frengini\u0173 ir darbuotoj\u0173 paj\u0117gumus. Pasibaigus bandomajam laikotarpiui, kaina prasideda <a href=\"\/lt\/kainodara\/\">nuo 199 \u20ac per m\u0117nes\u012f<\/a>, \u012fskaitant 5 darbo centrus. Mokama kas m\u0117nes\u012f, atsisakyti galima bet kada. Integracijos kaina pagal j\u016bs\u0173 proces\u0105 ir poreikius pateikiama i\u0161 anksto kartu su pasirinkto plano kaina, tod\u0117l visas i\u0161laidas \u017einote dar prie\u0161 prad\u0117dami. Diegimas paprastai u\u017ebaigiamas per kelias savaites nuo pradini\u0173 parengimo darb\u0173 prad\u017eios, tad realius gamybos tvarkara\u0161\u010dius prad\u0117site sudaryti po keli\u0173 savai\u010di\u0173, o ne po ilgo projekto.<\/p>\n\n\n<p>Sprendimo ap\u017evalg\u0105 rasite puslapyje <a href=\"\/lt\/integracijos\/erp\/netsuite\/\">SkyPlanner APS su NetSuite<\/a>, o technin\u0119 \u012fgyvendinimo informacij\u0105 \u2013 <a href=\"\/lt\/integracijos\/erp\/netsuite\/integravimo-vadovas\/\">NetSuite integracijos vadove<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lt\/bandymas\/\">I\u0161bandykite nemokamai<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/lt\/susisiekite-su-pardavejais\/\">U\u017esisakykite demonstracij\u0105<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Gamintoj\u0173 atsiliepimai apie SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"UTU tiekimo grandin\u0117s specialistas Kalle Kalliom\u00e4ki elektros skyd\u0173 gamybos ceche Ulviloje\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>sutaupoma kas savait\u0119<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner pad\u0117jo mums pereiti nuo gamybos planavimo Excel lentel\u0117se prie gamybos optimizavimo realiuoju laiku.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, tiekimo grandin\u0117s specialistas<\/b><br>UTU \u00b7 Elektros skydai ir skirstomieji \u012frenginiai<\/p>\n\n\n<p class=\"ind-cust__result\">Planuojant gamyb\u0105 kas savait\u0119 sutaupomos 2 darbo valandos, o nauja darb\u0173 eil\u0117 gamybos linij\u0105 pasiekia per kelias sekundes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lt\/customers\/utu\/\">Skaitykite UTU atsiliepim\u0105<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"\u0160vari\u0173j\u0173 patalp\u0173 aprang\u0105 vilkintys operatoriai prie buteliuk\u0173 pildymo linijos Laboratory &amp; Allied vaist\u0173 gamykloje Nairobyje\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>gamybos efektyvumas<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eGamybos efektyvumas padid\u0117jo 90%.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, IT vadovas<\/b><br>Laboratory &amp; Allied \u00b7 Vaist\u0173 gamyba<\/p>\n\n\n<p class=\"ind-cust__result\">Gamybos efektyvumas padid\u0117jo 90%, o optimizuotas trij\u0173 m\u0117nesi\u0173 planas visiems darbo centrams sudaromas per ma\u017eiau nei 30 minu\u010di\u0173.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lt\/customers\/laboratory-allied\/\">Skaitykite Laboratory &amp; Allied atsiliepim\u0105<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/13-9cbf2d28-08ef-49a1-94e3-0095e107df55.jpg\" alt=\"Fredman Operations gamybos vadov\u0117 Anu J\u00e4rvinen prie robotizuoto krovimo ant pad\u0117kl\u0173 \u012frenginio Raumoje\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/10-2fd983ec-02a7-440d-b77d-281f37545c8d.png\" alt=\"Fredman Operations\" width=\"137\" height=\"48\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>6 m\u0117nesiams \u012f priek\u012f<\/b><span>pardavim\u0173 komanda mato laisvus paj\u0117gumus<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner suteikia patikim\u0105 pagrind\u0105 visam gamybos planavimui.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Anu J\u00e4rvinen, gamybos vadov\u0117<\/b><br>Fredman Operations \u00b7 Su maistu liestis tinkamas pakavimo popierius<\/p>\n\n\n<p class=\"ind-cust__result\">Pardavim\u0173 komanda mato laisvus paj\u0117gumus \u0161e\u0161iems m\u0117nesiams \u012f priek\u012f, o \u012f u\u017eklausas d\u0117l tvarkara\u0161\u010dio pakeitim\u0173, kurioms anks\u010diau reik\u0117davo valandos ar daugiau, dabar atsakoma per kelias sekundes.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lt\/customers\/fredman-operations\/\">Skaitykite Fredman Operations atsiliepim\u0105<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"KJH-Comp suvirintojas \u0161lifuoja suvirint\u0105 plieno konstrukcij\u0105 Alah\u00e4rm\u00e4 gamykloje\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>pristatymo patikimumas, padid\u0117j\u0119s nuo ma\u017edaug 50%<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner atlieka lemiam\u0105 vaidmen\u012f u\u017etikrinant m\u016bs\u0173 pristatymo patikimum\u0105.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, generalinis direktorius<\/b><br>KJH-Comp \u00b7 Lak\u0161tinio metalo apdirbimas ir sutartin\u0117 gamyba<\/p>\n\n\n<p class=\"ind-cust__result\">Pristatymo patikimumas padid\u0117jo nuo ma\u017edaug 50% iki net 98%, o tvarkara\u0161\u010diams sudaryti dabar pakanka vieno meistro vietoj dviej\u0173.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/lt\/customers\/kjh-comp\/\">Skaitykite KJH-Comp atsiliepim\u0105<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Da\u017eniausiai u\u017eduodami klausimai<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ar NetSuite turi tvarkara\u0161\u010di\u0173 sudarymo \u012frank\u012f?<\/summary>\n<p class=\"sp-faq__a\">Taip. Standartin\u0117 NetSuite versija planuoja gamybos u\u017esakymus pirmyn arba atgal pagal Manufacturing Routing ir darbo centr\u0173 kalendorius, laikydama paj\u0117gumus neribotais. Advanced Manufacturing SuiteApp papildo sistem\u0105 Finite Scheduling funkcija, kuria naudodamasis planuotojas nustato gamybos u\u017esakym\u0173 eil\u0119 ir paleid\u017eia juos \u012f gamyb\u0105 pagal \u012frangos prieinamum\u0105.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kuo NetSuite sistemoje skiriasi gamybos planavimas atsi\u017evelgiant \u012f paj\u0117gumus ir j\u0173 nepaisant?<\/summary>\n<p class=\"sp-faq__a\">Planuojant pagal neribotus paj\u0117gumus, kiekvieno gamybos u\u017esakymo laikas nustatomas pagal jo technologin\u012f mar\u0161rut\u0105 ir kalendori\u0173, neatsi\u017evelgiant \u012f kitus darbo centrui priskirtus darbus. Advanced Manufacturing funkcija Finite Scheduling priskiria gamybos u\u017esakymus prieinamai \u012frangai ta seka, kuria planuotojas juos paleid\u017eia \u012f gamyb\u0105. Oracle paprastai rekomenduoja trumpesn\u012f nei savait\u0117s planavimo laikotarp\u012f.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ar NetSuite galima preliminariai planuoti gamybos paj\u0117gumus?<\/summary>\n<p class=\"sp-faq__a\">Taip, dviejose vietose. Standartin\u0117je gamybos valdymo dalyje yra Rough-Cut Capacity Planning, pasiekiamas per Transactions &gt; Manufacturing &gt; Capacity Planning, o Advanced Manufacturing turi savo RCP planus. Abu sprendimai parodo kiekvieno darbo centro apkrov\u0105, palyginti su jo paj\u0117gumais. N\u0117 vienas i\u0161 j\u0173 nesudaro operacij\u0173 tvarkara\u0161\u010dio.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ar norint naudoti SkyPlanner APS su NetSuite reikia Advanced Manufacturing?<\/summary>\n<p class=\"sp-faq__a\">Ne. SkyPlanner pats planuoja gamyb\u0105 pagal realius \u012frengini\u0173 ir darbuotoj\u0173 paj\u0117gumus, tod\u0117l jam pakanka standartin\u0117s NetSuite versijos gamybos u\u017esakym\u0173, technologini\u0173 mar\u0161rut\u0173 ir darbo centr\u0173 duomen\u0173.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ar SkyPlanner \u012fvertina nuo gamini\u0173 sekos priklausan\u010dius perderinimus ir bendrus \u012frankius?<\/summary>\n<p class=\"sp-faq__a\">Taip. Paruo\u0161imo laik\u0173 matricoje kiekvienai gamini\u0173 porai nustatomas perderinimo laikas abiem kryptimis, o algoritmas parenka sek\u0105, kuriai reikia ma\u017eiausiai paruo\u0161imo laiko. \u012erankiai yra riboti i\u0161tekliai, tod\u0117l viename darbo centre naudojamas \u012frankis tuo pa\u010diu metu neplanuojamas kitame. U\u017eduo\u010diai vienu metu gali reik\u0117ti keli\u0173 operatori\u0173, o kai pagrindinis i\u0161teklius nepasiekiamas, algoritmas naudoja alternatyvias stakles arba darbuotojus.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integracijos \/ ERP \/ Oracle NetSuite Ar NetSuite palaiko gamybos planavim\u0105? Integruotos galimyb\u0117s ir SkyPlanner APS Oracle NetSuite sudaro gamybos tvarkara\u0161\u010dius neatsi\u017evelgdama \u012f paj\u0117gum\u0173 ribas, nebent \u012fdiegiate Advanced Manufacturing SuiteApp. Pa\u010dios Oracle dokumentacijoje nurodyta, kad planavimas neribojant paj\u0117gum\u0173 \u201edoesn&#8217;t account for current work center capacity or resource use.\u201c (neatsi\u017evelgia \u012f esamus darbo centro paj\u0117gumus ar &#8230; <a title=\"Ar NetSuite palaiko gamybos planavim\u0105? Integruotos galimyb\u0117s ir SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/netsuite\/gamybos-planavimas\/\" aria-label=\"Read more about Ar NetSuite palaiko gamybos planavim\u0105? Integruotos galimyb\u0117s ir SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100739,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-101006","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Ar NetSuite palaiko gamybos planavim\u0105? | SkyPlanner<\/title>\n<meta name=\"description\" content=\"NetSuite planuoja neribodama paj\u0117gum\u0173. Advanced Manufacturing si\u016blo planuotojo valdom\u0105 Finite Scheduling. K\u0105 jos daro ir kada tinka SkyPlanner APS?\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/netsuite\/gamybos-planavimas\/\" \/>\n<meta property=\"og:locale\" content=\"lt_LT\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Ar NetSuite palaiko gamybos planavim\u0105? Integruotos galimyb\u0117s ir SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"NetSuite planuoja neribodama paj\u0117gum\u0173. Advanced Manufacturing si\u016blo planuotojo valdom\u0105 Finite Scheduling. K\u0105 jos daro ir kada tinka SkyPlanner APS?\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/netsuite\/gamybos-planavimas\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"16 minu\u010di\u0173\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/netsuite\\\/gamybos-planavimas\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/netsuite\\\/gamybos-planavimas\\\/\",\"name\":\"Ar NetSuite palaiko gamybos planavim\u0105? | SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#website\"},\"datePublished\":\"2026-10-17T13:00:38+00:00\",\"description\":\"NetSuite planuoja neribodama paj\u0117gum\u0173. Advanced Manufacturing si\u016blo planuotojo valdom\u0105 Finite Scheduling. K\u0105 jos daro ir kada tinka SkyPlanner APS?\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/netsuite\\\/gamybos-planavimas\\\/#breadcrumb\"},\"inLanguage\":\"lt-LT\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/netsuite\\\/gamybos-planavimas\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/netsuite\\\/gamybos-planavimas\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP ir MES programin\u0117s \u012frangos integracijos su SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS j\u016bs\u0173 ERP sistemai\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS, skirta Oracle NetSuite: gamybos planavimas\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/integracijos\\\/erp\\\/netsuite\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Ar NetSuite palaiko gamybos planavim\u0105? Integruotos galimyb\u0117s ir SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lt-LT\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"lt-LT\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/lt\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Ar NetSuite palaiko gamybos planavim\u0105? | SkyPlanner","description":"NetSuite planuoja neribodama paj\u0117gum\u0173. Advanced Manufacturing si\u016blo planuotojo valdom\u0105 Finite Scheduling. K\u0105 jos daro ir kada tinka SkyPlanner APS?","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/netsuite\/gamybos-planavimas\/","og_locale":"lt_LT","og_type":"article","og_title":"Ar NetSuite palaiko gamybos planavim\u0105? Integruotos galimyb\u0117s ir SkyPlanner APS","og_description":"NetSuite planuoja neribodama paj\u0117gum\u0173. Advanced Manufacturing si\u016blo planuotojo valdom\u0105 Finite Scheduling. K\u0105 jos daro ir kada tinka SkyPlanner APS?","og_url":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/netsuite\/gamybos-planavimas\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"16 minu\u010di\u0173"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/netsuite\/gamybos-planavimas\/","url":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/netsuite\/gamybos-planavimas\/","name":"Ar NetSuite palaiko gamybos planavim\u0105? | SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/lt\/#website"},"datePublished":"2026-10-17T13:00:38+00:00","description":"NetSuite planuoja neribodama paj\u0117gum\u0173. Advanced Manufacturing si\u016blo planuotojo valdom\u0105 Finite Scheduling. K\u0105 jos daro ir kada tinka SkyPlanner APS?","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/netsuite\/gamybos-planavimas\/#breadcrumb"},"inLanguage":"lt-LT","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/netsuite\/gamybos-planavimas\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/netsuite\/gamybos-planavimas\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/lt\/"},{"@type":"ListItem","position":2,"name":"ERP ir MES programin\u0117s \u012frangos integracijos su SkyPlanner","item":"https:\/\/skyplanner.ai\/lt\/integracijos\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS j\u016bs\u0173 ERP sistemai","item":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS, skirta Oracle NetSuite: gamybos planavimas","item":"https:\/\/skyplanner.ai\/lt\/integracijos\/erp\/netsuite\/"},{"@type":"ListItem","position":5,"name":"Ar NetSuite palaiko gamybos planavim\u0105? Integruotos galimyb\u0117s ir SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/lt\/#website","url":"https:\/\/skyplanner.ai\/lt\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/lt\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/lt\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lt-LT"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/lt\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/lt\/","logo":{"@type":"ImageObject","inLanguage":"lt-LT","@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/lt\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/lt\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integracijos \/ ERP \/ Oracle NetSuite Ar NetSuite palaiko gamybos planavim\u0105? Integruotos galimyb\u0117s ir SkyPlanner APS Oracle NetSuite sudaro gamybos tvarkara\u0161\u010dius neatsi\u017evelgdama \u012f paj\u0117gum\u0173 ribas, nebent \u012fdiegiate Advanced Manufacturing SuiteApp. Pa\u010dios Oracle dokumentacijoje nurodyta, kad planavimas neribojant paj\u0117gum\u0173 \u201edoesn&#8217;t account for current work center capacity or resource use.\u201c (neatsi\u017evelgia \u012f esamus darbo centro paj\u0117gumus ar&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/pages\/101006","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/comments?post=101006"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/pages\/101006\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/pages\/100739"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/lt\/wp-json\/wp\/v2\/media?parent=101006"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}