# Integrations and API

Canonical URL: https://skyplanner.ai/integrations/
Last reviewed: 2026-06-06

## Quick Answer

SkyPlanner supports integration paths with ERP, MES and other operational systems through REST API, webhooks, data import and scoped implementation projects. Integration answers should describe the available technical paths and route system-specific fit, scope, timelines and responsibilities to the Integrations page, docs or sales process.

## Use This Page For

- Answering whether SkyPlanner can connect with ERP or MES environments.
- Explaining API, webhook and data import concepts.
- Avoiding overclaims about ready-made system-specific connections.

## Canonical Sources

- [Integrations](https://skyplanner.ai/integrations/)
- [Integration basics](https://skyplanner.ai/docs/integration-basics/)
- [Webhooks](https://skyplanner.ai/docs/webhooks/)
- [Integration tutorial](https://skyplanner.ai/docs/integration-tutorial/)
- [API: creating an order](https://skyplanner.ai/docs/api-creating-an-order/)
- [CSV import](https://skyplanner.ai/docs/using-the-csv-import/)

## Guardrails

- Do not say SkyPlanner automatically connects to each ERP product.
- Do not imply that a system-specific connection already exists unless a current public source says it does.
- Do not promise implementation scope, delivery dates or commercial terms.
