{"id":99988,"date":"2026-10-16T13:09:15","date_gmt":"2026-10-16T13:09:15","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=99988"},"modified":"2026-10-16T13:11:12","modified_gmt":"2026-10-16T13:11:12","slug":"planning-time-fence","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/planning-time-fence\/","title":{"rendered":"\uacc4\ud68d \ud0c0\uc784 \ud39c\uc2a4: \uc758\ubbf8, \uae30\uac04\uacfc \uc608\uc678"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">\uacc4\ud68d \ud0c0\uc784 \ud39c\uc2a4: \uc758\ubbf8, \uae30\uac04\uacfc \uc608\uc678<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/ko\/\">\ud648<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/\">\ub9ac\uc18c\uc2a4<\/a> &raquo; \uacc4\ud68d \ud0c0\uc784 \ud39c\uc2a4: \uc758\ubbf8, \uae30\uac04\uacfc \uc608\uc678<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">\uc608\uc0c1 \uc77d\uae30 \uc2dc\uac04: <\/span><span class=\"yoast-reading-time__reading-time\">9<\/span><span class=\"yoast-reading-time__time-unit\"> \ubd84<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p><strong>\uacc4\ud68d \ud0c0\uc784 \ud39c\uc2a4<\/strong>\ub294 \uc0dd\uc0b0 \uacc4\ud68d\uc758 \uacc4\uc0b0 \ubc29\uc2dd\uc774\ub098 \ubcc0\uacbd \uaddc\uce59\uc774 \ub2ec\ub77c\uc9c0\ub294 \uc2dc\uac04\uc0c1\uc758 \uacbd\uacc4\uc785\ub2c8\ub2e4. \ub9ce\uc740 MPS \ubc0f MRP \uc2dc\uc2a4\ud15c\uc5d0\uc11c\ub294 \uc774 \uacbd\uacc4\ub97c \ud1b5\ud574 \uac00\uae4c\uc6b4 \uc2dc\uc810\uc758 \uacf5\uae09 \uc81c\uc548\uc774 \uc790\ub3d9\uc73c\ub85c \ubcc0\uacbd\ub418\uc9c0 \uc54a\ub3c4\ub85d \ubcf4\ud638\ud558\uace0, \uc5b4\ub5a4 \uc608\uc678\ub97c \ud5c8\uc6a9\ud560\uc9c0\ub294 \uacc4\ud68d \ub2f4\ub2f9\uc790\uac00 \ud310\ub2e8\ud558\uac8c \ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc774\ub7ec\ud55c \ubcf4\ud638\ub294 \uae30\uacc4\uac00 \uac00\ub3d9\ub418\uae30 \uc804\ubd80\ud130 \uc911\uc694\ud569\ub2c8\ub2e4. \uc790\uc7ac \ud53c\ud0b9\uacfc \uace0\uc815\uad6c \uc900\ube44\uac00 \ub05d\ub0ac\uace0, \uc791\uc5c5\uc790\uc640 \ub2e4\uc74c \uc791\uc5c5\uae4c\uc9c0 \ud569\uc758\ud588\uc744 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ud558\uc9c0\ub9cc \uacc4\ud68d\uc744 \ub2e4\uc2dc \uacc4\uc0b0\ud558\uba74 \uc774\ubbf8 \ud574 \ub193\uc740 \uc900\ube44\uac00 \uc5bc\ub9c8\ub098 \ud5db\uc218\uace0\uac00 \ub420\uc9c0\ub294 \uace0\ub824\ud558\uc9c0 \uc54a\uc740 \ucc44 \ub2e4\ub978 \uacb0\uacfc\uac00 \ub098\uc62c \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\ubaa9\uc801\uc740 \uc0dd\uc0b0 \ud604\uc7a5\uc758 \ub300\uc751\uc744 \ub9c9\ub294 \uac83\uc774 \uc544\ub2d9\ub2c8\ub2e4. \uc77c\uc0c1\uc801\uc778 \uc7ac\uacc4\uc0b0 \ub54c\ubb38\uc5d0 \uc774\ubbf8 \uc815\ud55c \uc0ac\ud56d\uc774 \uc27d\uac8c \ub4a4\uc9d1\ud788\uc9c0 \uc54a\ub3c4\ub85d \ud558\ub294 \uac83\uc785\ub2c8\ub2e4. SkyPlanner APS\ub294 \uc774\ub7ec\ud55c \ud310\ub2e8\uc744 <a href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/production-scheduling\/\">\uc0dd\uc0b0 \uc77c\uc815\uc5d0 \ubc18\uc601\ud558\ub3c4\ub85d \uc9c0\uc6d0\ud569\ub2c8\ub2e4<\/a>. \uc784\ubc15\ud55c \uc791\uc5c5\uc740 \ubcf4\ud638\ud558\uace0, \uc7ac\uc870\uc815\ud560 \uc218 \uc788\ub294 \uc791\uc5c5\uc740 Arcturus\uac00 \ub2e4\uc2dc \uacc4\uc0b0\ud558\uac8c \ud558\uc138\uc694. \uc791\uc5c5 \ub300\uae30\uc5f4\uc744 \uc218\uc791\uc5c5\uc73c\ub85c \ub2e4\uc2dc \uad6c\uc131\ud558\ub294 \ub300\uc2e0 Gantt\uc5d0\uc11c \ud6c4\uc18d \uacf5\uc815\uc5d0 \ubbf8\uce58\ub294 \uc601\ud5a5\uc744 \ud655\uc778\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\uacc4\ud68d \ud0c0\uc784 \ud39c\uc2a4\ub294 \uc2e4\uc81c\ub85c \ubb34\uc5c7\uc744 \uc81c\uc5b4\ud560\uae4c\uc694?<\/h2>\n\n\n<p>\ud0c0\uc784 \ud39c\uc2a4\ub294 \uacc4\ud68d\uc774 \ub05d\ub098\ub294 \uc2dc\uc810\uc774 \uc544\ub2c8\ub77c \uacc4\ud68d \uc815\ucc45\uc774 \ub2ec\ub77c\uc9c0\ub294 \uacbd\uacc4\uc785\ub2c8\ub2e4. \uadf8 \uc774\ud6c4\uc758 \uc218\uc694, \uacf5\uae09, \uc0dd\uc0b0 \ub2a5\ub825\ub3c4 \uacc4\uc18d \ud30c\uc545\ud574\uc57c \ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>MRP\uc5d0\uc11c <strong>\ud655\uc815<\/strong>\uc774\ub780 \uc774\ud6c4 \uacc4\ud68d\uc744 \ub2e4\uc2dc \uacc4\uc0b0\ud560 \ub54c \uacf5\uae09 \uc81c\uc548\uc774 \uc790\ub3d9\uc73c\ub85c \ubc14\ub00c\uc9c0 \uc54a\ub3c4\ub85d \ubcf4\ud638\ud558\ub294 \uac83\uc744 \ub73b\ud569\ub2c8\ub2e4. \ud574\ub2f9 \uc624\ub354\uc758 \uc0dd\uc0b0\uc774 \uc774\ubbf8 \ub05d\ub0ac\ub2e4\uac70\ub098 <a href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/finite-capacity-scheduling\/\">\uc644\ub8cc\uc5d0 \ud544\uc694\ud55c \uc0dd\uc0b0 \ub2a5\ub825\uc774 \ucda9\ubd84\ud788 \ud655\ubcf4\ub418\uc5b4 \uc788\ub2e4<\/a>\ub294 \uc758\ubbf8\ub294 \uc544\ub2d9\ub2c8\ub2e4. \uae30\uc874 \uc81c\uc548\uacfc \uc0c8\ub85c\uc6b4 \uc18c\uc694\ub97c \ucc98\ub9ac\ud558\ub294 \ubc29\uc2dd\uc740 \uc2dc\uc2a4\ud15c\uacfc \ud655\uc815 \uc124\uc815\uc5d0 \ub530\ub77c \ub2ec\ub77c\uc9d1\ub2c8\ub2e4.<\/p>\n\n\n<p>ERP \uc2dc\uc2a4\ud15c\ub9c8\ub2e4 \uba85\uce6d\uacfc \uc758\ubbf8\uac00 \uc644\uc804\ud788 \uac19\uc9c0\ub294 \uc54a\uc2b5\ub2c8\ub2e4. \uc608\ub97c \ub4e4\uc5b4 JD Edwards\uc5d0\uc11c\ub294 \uacc4\ud68d \ud39c\uc2a4\ub85c \uc218\uc694 \uc0c1\uacc4 \uaddc\uce59\uc744 \ubc14\uafb8\uace0, \ubcc4\ub3c4\uc758 \ub3d9\uacb0 \ud39c\uc2a4\ub85c \uc624\ub354 \uc0dd\uc131\uacfc \uc7ac\uacc4\ud68d \uba54\uc2dc\uc9c0\ub97c \uc81c\uc5b4\ud569\ub2c8\ub2e4. Oracle Fusion\uc740 \ud655\uc815\ub41c \uacf5\uae09\uc744 \uae30\uc900\uc73c\ub85c \ud0c0\uc784 \ud39c\uc2a4\ub97c \uc815\ud558\ub294 \uc790\uc5f0 \ud39c\uc2a4(natural fence)\ub3c4 \uc0ac\uc6a9\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ud0c0\uc784 \ud39c\uc2a4\ub97c \uc0dd\uc0b0 \ub3d9\uacb0\ub85c \uac04\uc8fc\ud558\uae30 \uc804\uc5d0, \uc0ac\uc6a9 \uc911\uc778 \uc2dc\uc2a4\ud15c\uc5d0\uc11c \ubb34\uc5c7\uc744 \uc81c\uc5b4\ud558\ub294\uc9c0 \ud655\uc778\ud558\uc138\uc694.<\/p>\n\n\n<p>\uc77c\uc0c1\uc801\uc778 \uc758\uc0ac\uacb0\uc815\uc5d0\uc11c\ub294 \ub2e4\uc74c\uc744 \uad6c\ubd84\ud574\uc57c \ud569\ub2c8\ub2e4.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>\uc81c\uc5b4 \uc218\ub2e8<\/th><th>\ud310\ub2e8\ud560 \uc0ac\ud56d<\/th><\/tr><\/thead><tbody><tr><td>\uc5c5\ubb34\uc0c1 \ubcc0\uacbd \uc815\ucc45<\/td><td>\uac00\uae4c\uc6b4 \uc2dc\uc810\uc758 \uc81c\ud488 \uc218\ub7c9\uacfc \uc77c\uc815\uc744 \ubc14\uafc0 \ub54c \uc5b4\ub5a4 \ubcc0\uacbd\uc5d0 \uba85\uc2dc\uc801\uc778 \uacb0\uc815\uc774 \ud544\uc694\ud55c\uac00?<\/td><\/tr><tr><td>MRP \ud655\uc815<\/td><td>\uc774\ud6c4 \uacc4\ud68d\uc744 \ub2e4\uc2dc \uacc4\uc0b0\ud560 \ub54c \uc5b4\ub5a4 \uacf5\uae09 \uc81c\uc548\uc744 \uadf8\ub300\ub85c \uc720\uc9c0\ud574\uc57c \ud558\ub294\uac00?<\/td><\/tr><tr><td>\uc0c1\uc138 \uc77c\uc815 \uc7a0\uae08<\/td><td>\uc2a4\ucf00\uc904\ub7ec\uac00 \uc774\ubbf8 \ubc30\uce58\ub41c \uacf5\uc815 \uc911 \uc5b4\ub5a4 \uac83\uc744 \uadf8\ub300\ub85c \uc720\uc9c0\ud574\uc57c \ud558\ub294\uac00?<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>\uc81c\ud488 \uc218\ub7c9\uacfc \uc77c\uc815\uc744 \ud655\uc815\ud588\ub2e4\uace0 \ud574\uc11c \uae30\uacc4\uc758 \uc791\uc5c5 \uc2dc\uac04\ub300\uae4c\uc9c0 \ud655\ubcf4\ub418\ub294 \uac83\uc740 \uc544\ub2d9\ub2c8\ub2e4. \ubc18\ub300\ub85c \uac00\uacf5 \uacf5\uc815\uc744 \uc7a0\uac14\ub2e4\uace0 \ud574\uc11c <a href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/master-production-schedule\/\">MPS \uc218\ub7c9<\/a> \ubcc0\uacbd\uc774 \uc2b9\uc778\ub418\ub294 \uac83\ub3c4 \uc544\ub2d9\ub2c8\ub2e4. \ud558\ub098\uc758 \uc81c\uc5b4 \uc218\ub2e8\uc774 \ub450 \uac00\uc9c0\ub97c \ubaa8\ub450 \ucc98\ub9ac\ud55c\ub2e4\uace0 \uac00\uc815\ud558\uc9c0 \ub9d0\uace0, \ub450 \uacb0\uc815\uc744 \uc5f0\uacc4\ud558\uc138\uc694.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\uc784\ubc15\ud55c \uc791\uc5c5\uacfc \uc774\ud6c4 \uc791\uc5c5\uc5d0 \uc11c\ub85c \ub2e4\ub978 \uaddc\uce59\uc744 \uc801\uc6a9\ud558\uc138\uc694<\/h2>\n\n\n<p>\uc2e4\ubb34\uc5d0 \uc720\uc6a9\ud55c \uc0dd\uc0b0 \uc815\ucc45\uc740 \ud754\ud788 \ubcc0\uacbd \ud5c8\uc6a9 \uc218\uc900\uc744 \uc138 \ub2e8\uacc4\ub85c \ub098\ub215\ub2c8\ub2e4. \uc774\ub294 \uc5c5\ubb34\uc0c1 \ud569\uc758\uc774\uc9c0, \ubaa8\ub4e0 ERP\uc5d0\uc11c \ub3d9\uc77c\ud558\uac8c \uad6c\ud604\ud558\ub294 \uc138 \uac00\uc9c0 \uc124\uc815\uc740 \uc544\ub2d9\ub2c8\ub2e4.<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>\ub3d9\uacb0 \uc791\uc5c5:<\/strong> \uc77c\uc0c1\uc801\uc778 \ubcc0\uacbd\uc744 \ud5c8\uc6a9\ud558\uc9c0 \uc54a\uc2b5\ub2c8\ub2e4. \uc774\ubbf8 \uc900\ube44\ub098 \uc2e4\ud589\uc774 \ud655\uc815\ub41c \uc0c1\ud0dc\uc774\ubbc0\ub85c \uc9c0\uc815\ub41c \uacc4\ud68d \ub2f4\ub2f9\uc790\ub098 \uc0dd\uc0b0 \uad00\ub9ac\uc790\uac00 \uc608\uc678\ub97c \uacb0\uc815\ud569\ub2c8\ub2e4.<\/li><li><strong>\ud1b5\uc81c \uc791\uc5c5:<\/strong> \uc790\uc7ac, \uc0dd\uc0b0 \ub2a5\ub825, \ub2e4\ub978 \ub0a9\uae30 \uc57d\uc18d\uc744 \ud655\uc778\ud55c \ub4a4 \ubcc0\uacbd\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/li><li><strong>\uc720\uc5f0 \uc791\uc5c5:<\/strong> \uc218\uc694\uac00 \uad6c\uccb4\ud654\ub428\uc5d0 \ub530\ub77c \uac00\uc6a9 \uc790\uc6d0\uacfc \uc5c5\ubb34 \uc6b0\uc120\uc21c\uc704 \ubc94\uc704 \uc548\uc5d0\uc11c \uacc4\ud68d\uc744 \ub354 \uc790\uc720\ub86d\uac8c \uc870\uc815\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/li><\/ul>\n\n\n<p>\uac01 \ud569\uc758\uac00 \ubb34\uc5c7\uc744 \ubcf4\ud638\ud558\ub294\uc9c0 \uc815\ud558\uc138\uc694. \uc218\ub7c9\uc744 \ubc14\uafc0 \ub54c \uac80\ud1a0\uac00 \ud544\uc694\ud55c\uac00\uc694? \uc644\ub8cc\uc77c\uc744 \uc62e\uae30\uac70\ub098, \uc790\uc6d0\uc744 \ubc14\uafb8\uac70\ub098, \ub2e4\ub978 \ubc30\uce58\ub97c \ub07c\uc6cc \ub123\uc744 \ub54c\ub294 \uc5b4\ub5a4\uac00\uc694? \uadf8 \uacb0\uacfc\ub97c \ub204\uac00 \uc218\uc6a9\ud560 \uad8c\ud55c\uc774 \uc788\ub098\uc694?<\/p>\n\n\n<p>\uc774 \uc9c8\ubb38\uc5d0 \ub2f5\ud558\uc9c0 \uc54a\uc73c\uba74 \ud0c0\uc784 \ud39c\uc2a4\ub294 \uc0ac\ub78c\ub9c8\ub2e4 \ub2e4\ub974\uac8c \ud574\uc11d\ud558\ub294 \ub0a0\uc9dc\uc5d0 \ubd88\uacfc\ud574\uc9d1\ub2c8\ub2e4. \uae30\uc900\uc774 \uba85\ud655\ud558\uba74 \uad6c\ub9e4 \ubd80\uc11c\uc640 \uc0dd\uc0b0 \ubd80\uc11c\ub294 \uacc4\ud68d\uc744 \uc774\ud574\ud558\uace0 \uadf8\uc5d0 \ub9de\ucdb0 \uc900\ube44\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc601\uc5c5 \ubd80\uc11c\ub3c4 \ub0a9\uae30 \ub2e8\ucd95 \uc694\uccad\uc5d0 \ub300\ud574 \uc5b8\uc81c \ub4dd\uc2e4\uc744 \uba85\uc2dc\uc801\uc73c\ub85c \ud310\ub2e8\ud574\uc57c \ud558\ub294\uc9c0 \uc54c \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\uacc4\ud68d \ud0c0\uc784 \ud39c\uc2a4\uc758 \uae30\uac04\uc740 \uc5bc\ub9c8\ub098 \uae38\uc5b4\uc57c \ud560\uae4c\uc694?<\/h2>\n\n\n<p>\uc77c\ub960\uc801\uc778 \uc77c\uc218\uac00 \uc544\ub2c8\ub77c, \ubb34\ub9ac \uc5c6\uc774 \uc791\uc5c5\uc744 \ubcc0\uacbd\ud558\ub294 \ub370 \ud544\uc694\ud55c \uc2dc\uac04\uc744 \uae30\uc900\uc73c\ub85c \uae30\uac04\uc744 \uc815\ud558\uc138\uc694.<\/p>\n\n\n<p>\uba3c\uc800 \ud574\ub2f9 \uc790\uc7ac\uc640 \uc0dd\uc0b0\uc758 \ub9ac\ub4dc\ud0c0\uc784\uc744 \uc0b4\ud3b4\ubcf4\uc138\uc694. \ud55c \ubc30\uce58\ub97c \uc644\uc131\ud558\ub824\uba74 \uad6c\ub9e4 \ubd80\ud488, \uc678\uc8fc \uac00\uacf5, \uc5ec\ub7ec \ub0b4\ubd80 \uacf5\uc815\uc774 \ud544\uc694\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ubcf4\ud638 \ubc94\uc704\ub97c \uacb0\uc815\ud560 \ub54c\ub294 \ub9c8\uc9c0\ub9c9 \uacf5\uc815\uc758 \uc18c\uc694 \uc2dc\uac04\ub9cc\uc774 \uc544\ub2c8\ub77c \uc804\uccb4 \uacbd\ub85c\uc5d0\uc11c \uc774\ubbf8 \uc57d\uc18d\ud558\uac70\ub098 \ud655\uc815\ud55c \uc0ac\ud56d\uc744 \uace0\ub824\ud574\uc57c \ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\uadf8\ub2e4\uc74c \uacc4\ud68d \ubcc0\uacbd\uc73c\ub85c \uc2e4\uc81c \uc900\ube44\uac00 \ud5db\uc218\uace0\uac00 \ub418\uae30 \uc2dc\uc791\ud558\ub294 \uc2dc\uc810\uc744 \ucc3e\uc73c\uc138\uc694. \uacf5\uae09\uc5c5\uccb4\uc640\uc758 \uc57d\uc815, \uc900\ube44\ub41c \uc790\uc7ac \ud0a4\ud2b8, \uc608\uc57d\ub41c \uace0\uc815\uad6c, \uc644\ub8cc\ub41c \uc14b\uc5c5, \ud569\uc758\ub41c \uad50\ub300\uc870 \uc791\uc5c5 \uc21c\uc11c \ub4f1\uc774 \uae30\uc900\uc774 \ub420 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ubd88\ud544\uc694\ud55c \ube44\uc6a9 \uc5c6\uc774 \uc791\uc5c5 \ubc29\ud5a5\uc744 \ubc14\uafb8\ub824\uba74 \uad00\ub828 \ub2f4\ub2f9\uc790\uc5d0\uac8c \uc5bc\ub9c8\ub098 \ubbf8\ub9ac \uc54c\ub824\uc57c \ud558\ub294\uc9c0 \ud655\uc778\ud558\uc138\uc694.<\/p>\n\n\n<p>\ud0c0\uc784 \ud39c\uc2a4\uac00 <strong>\ub108\ubb34 \uc9e7\uc73c\uba74<\/strong> \uc900\ube44\uac00 \uc2dc\uc791\ub41c \ub4a4\uc5d0\ub3c4 \uacc4\ud68d\uc774 \ubc14\ub014 \uc218 \uc788\uc2b5\ub2c8\ub2e4. <strong>\ub108\ubb34 \uae38\uba74<\/strong> \ud53c\ud560 \uc218 \uc788\ub294 \uc9c0\uc5f0\uae4c\uc9c0 \uadf8\ub300\ub85c \uc720\uc9c0\ub418\uace0, \uac00\uce58 \uc788\ub294 \uc0c8 \uc8fc\ubb38\uc744 \uc218\uc6a9\ud560 \uc5ec\uc9c0\uac00 \uc904\uc5b4\ub4ed\ub2c8\ub2e4. \uc81c\ud488\uc774\ub098 \uacf5\uae09 \uacbd\ub85c\uc5d0 \ub530\ub77c \uc11c\ub85c \ub2e4\ub978 \uacc4\ud68d \uc815\ucc45\uc774 \ud544\uc694\ud560 \uc218 \uc788\uc73c\ubbc0\ub85c ERP\uac00 \uc774\ub7ec\ud55c \uad6c\ubd84\uc744 \uc5b4\ub5bb\uac8c \uc9c0\uc6d0\ud558\ub294\uc9c0 \ud655\uc778\ud558\uc138\uc694.<\/p>\n\n\n<p>\uc5c5\ubb34 \uacc4\ud68d\uc5d0\uc11c \ubcc0\uacbd\uc744 \ud1b5\uc81c\ud558\ub294 \uae30\uac04\uacfc \uc0dd\uc0b0 \ud604\uc7a5\uc758 \uc791\uc5c5\uc744 \ubcf4\ud638\ud558\ub294 \uae30\uac04\ub3c4 \uad6c\ubd84\ud558\uc138\uc694. \uc608\ub97c \ub4e4\uc5b4 \uadfc\ubb34\uc77c \uae30\uc900\uc73c\ub85c \uba70\uce60 \uc55e\uc120 \uc2dc\uc810\ubd80\ud130 \uc81c\ud488 \uacf5\uae09 \uc57d\uc18d\uc758 \ubcc0\uacbd\uc744 \ud1b5\uc81c\ud558\uba74\uc11c, \uc0c1\uc138 \uc791\uc5c5 \uc21c\uc11c\ub294 \uc55e\uc73c\ub85c \uba87 \uc2dc\uac04 \ub3d9\uc548 \ubcf4\ud638\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ub450 \uae30\uac04\uc740 \ubaa9\uc801\uc774 \ub2e4\ub974\ubbc0\ub85c \uae38\uc774\uac00 \uac19\uc744 \ud544\uc694\ub294 \uc5c6\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc608\uc678\uac00 \ubc18\ubcf5\ub418\uba74 \uc815\ucc45\uc744 \uac80\ud1a0\ud558\uc138\uc694. \uc900\ube44\ub41c \uc791\uc5c5\uc774 \uacc4\uc18d \ubc00\ub824\ub09c\ub2e4\uba74 \ubcf4\ud638\uac00 \ub108\ubb34 \ub2a6\uac8c \uc2dc\uc791\ub418\ub294 \uac83\uc77c \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc791\uc5c5\uc744 \ubcf4\ud638\ud588\ub294\ub370\ub3c4 \uc2e4\ud589\ud558\uc9c0 \ubabb\ud558\ub294 \uc77c\uc774 \uc7a6\ub2e4\uba74, \ud0c0\uc784 \ud39c\uc2a4\ub97c \ub298\ub9ac\uae30 \uc804\uc5d0 \uc790\uc7ac \uc900\ube44 \uc0c1\ud0dc\uc640 \uc0dd\uc0b0 \ub2a5\ub825, \uc6d0\ub798 \uacc4\ud68d\uc758 \ud604\uc2e4\uc131\uc744 \uc810\uac80\ud558\uc138\uc694.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\uc900\ube44\uac00 \ub05d\ub09c \ubc30\uce58\uc640 \ub0a9\uae30 \ub2e8\ucd95 \uc694\uccad\uc774 \ucda9\ub3cc\ud560 \ub54c<\/h2>\n\n\n<p>\ud55c \uc815\ubc00 \ubd80\ud488 \uc81c\uc870\uc5c5\uccb4\uac00 \ubc38\ube0c \ud558\uc6b0\uc9d5 \ubc30\uce58\ub97c \uc900\ube44\ud558\uace0 \uc788\ub2e4\uace0 \uac00\uc815\ud574 \ubcf4\uaca0\uc2b5\ub2c8\ub2e4. \uace7 \uc2dc\uc791\ud560 \uac00\uacf5\uc744 \uc704\ud574 \uc790\uc7ac \ud53c\ud0b9\uc744 \ub9c8\ucce4\uace0 \uace0\uc815\uad6c\ub3c4 \uc900\ube44\ud588\uc2b5\ub2c8\ub2e4. \uc774\ub54c \ub2e4\ub978 \uace0\uac1d\uc774 \uc790\uc2e0\uc758 \ubc30\uce58\ub97c \uc55e\ub2f9\uae38 \uc218 \uc788\ub294\uc9c0 \ubb38\uc758\ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>MPS\/MRP \uc815\ucc45\uc0c1 \uac00\uae4c\uc6b4 \uc2dc\uc810\uc758 \uc218\ub7c9\uacfc \uc644\ub8cc\uc77c \ubcc0\uacbd\uc740 \uac80\ud1a0\ub97c \uac70\uccd0\uc57c \ud569\ub2c8\ub2e4. \ud558\uc9c0\ub9cc \ud604\uc7a5\uc5d0\uc11c \ub2f9\uc7a5 \ud310\ub2e8\ud560 \ubb38\uc81c\ub294 \ub354 \uad6c\uccb4\uc801\uc785\ub2c8\ub2e4. \uc900\ube44\uac00 \ub05d\ub09c \ud558\uc6b0\uc9d5 \ubc30\uce58\uc758 \uc21c\uc11c\ub97c \ub4a4\ub85c \ubbf8\ub904\uc57c \ud560\uae4c\uc694?<\/p>\n\n\n<p>\uba3c\uc800 \uae30\uc874 \uc900\ube44\uc5d0 \uc9c0\uc7a5\uc744 \uc8fc\uc9c0 \uc54a\uace0 \ub450 \ubc88\uc9f8 \ubc30\uce58\ub97c \ubc30\uce58\ud560 \uc218 \uc788\ub294\uc9c0 \ud655\uc778\ud558\uc138\uc694. \uac00\uacf5 \uc2dc\uac04\ub300\uc758 \ud655\ubcf4\ub9cc\uc73c\ub85c\ub294 \ucda9\ubd84\ud558\uc9c0 \uc54a\uc2b5\ub2c8\ub2e4. \ucd9c\ud558 \uc804\uc5d0 \ub514\ubc84\ub9c1\uacfc \uac80\uc0ac\ub3c4 \uac70\uccd0\uc57c \ud558\uae30 \ub54c\ubb38\uc785\ub2c8\ub2e4. \ub0a8\uc740 \uacf5\uc815\uc5d0\uc11c\ub3c4 \uc694\uccad \ub0a9\uae30\ub97c \ub9de\ucd9c \uc218 \uc788\uc5b4\uc57c \uc870\uae30 \ucc29\uc218\uac00 \uc758\ubbf8 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\ub450 \ubc88\uc9f8 \ubc30\uce58\ub97c \uc55e\ub2f9\uae30\ub290\ub77c \ud558\uc6b0\uc9d5 \ubc30\uce58\uac00 \ubc00\ub824\ub09c\ub2e4\uba74, \uc774\ub4dd\uacfc \uadf8\uc5d0 \ub530\ub978 \uc601\ud5a5\uc744 \ube44\uad50\ud558\uc138\uc694. \uc900\ube44\ud55c \uc790\uc7ac\ub97c \ubc18\ub0a9\ud574\uc57c \ud558\ub098\uc694? \uace0\uc815\uad6c \uc900\ube44\uac00 \ud5db\uc218\uace0\uac00 \ub418\ub098\uc694? \uc5b4\ub290 \uace0\uac1d\uc758 \uc644\ub8cc\uc77c\uc774 \uc5bc\ub9c8\ub098 \ubc14\ub00c\ub098\uc694? \uc6b0\uc120\uc21c\uc704\ub97c \ubcc0\uacbd\ud558\ub824\uba74 \uc774\ub7ec\ud55c \ucc28\uc9c8\uc744 \uac10\uc218\ud560 \ub9cc\ud07c\uc758 \uac00\uce58\uac00 \uc788\uc5b4\uc57c \ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc774\ub7f4 \ub54c\ub294 \ub0a0\uc9dc\ub9cc \ud655\uc815\ud574 \ub450\ub294 \uac83\ubcf4\ub2e4 \uacf5\uc815 \uac04 \uc5f0\uacb0\uc744 \ub208\uc73c\ub85c \ud655\uc778\ud560 \uc218 \uc788\ub294 \uc77c\uc815\uc774 \ub354 \uc720\uc6a9\ud569\ub2c8\ub2e4. SkyPlanner\uc5d0\uc11c\ub294 \ubcf4\ud638 \ub300\uc0c1 \uacf5\uc815\uc744 \uadf8\ub300\ub85c \uc720\uc9c0\ud558\uba74\uc11c, \uc124\uc815\ud55c \uc6b0\uc120\uc21c\uc704\uc5d0 \ub530\ub77c Arcturus\uac00 \uc7ac\uc870\uc815 \uac00\ub2a5\ud55c \uc791\uc5c5\uc744 \ub2e4\uc2dc \uacc4\uc0b0\ud558\uac8c \ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. Gantt\uc5d0 \uc791\uc5c5\uc7a5\ubcc4\ub85c \uacc4\uc0b0\ub41c \uc791\uc5c5 \uc21c\uc11c\uac00 \ud45c\uc2dc\ub418\ubbc0\ub85c, \ubcc0\uacbd\uc758 \ub4dd\uc2e4\uc744 \uc218\uc6a9\ud558\uae30 \uc804\uc5d0 \ud6c4\uc18d \uc791\uc5c5\uc758 \uc644\ub8cc\uc77c\uc744 \ud310\ub2e8\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">SkyPlanner\ub85c \uc804\uccb4 \uacc4\ud68d\uc744 \ubcf4\uba74\uc11c \uc784\ubc15\ud55c \uc791\uc5c5\uc744 \ubcf4\ud638\ud558\uc138\uc694<\/h2>\n\n\n<p>SkyPlanner\uc758 <strong>Running Time Lock<\/strong>\uc740 \ud604\uc7ac\ubd80\ud130 \uc124\uc815\ud55c \uc2dc\uac04 \uc774\ub0b4\uc758 \uc791\uc5c5\uc774 \uc7ac\uc870\uc815\ub418\uc9c0 \uc54a\ub3c4\ub85d \ubcf4\ud638\ud569\ub2c8\ub2e4. \uc774 \ubcf4\ud638 \uad6c\uac04\uc740 \ud604\uc7ac \uc2dc\uc810\uc744 \uae30\uc900\uc73c\ub85c \uacc4\uc18d \uc774\ub3d9\ud569\ub2c8\ub2e4. \ud604\uc7a5\uc5d0\uc11c\ub294 \uc784\ubc15\ud55c \uc791\uc5c5 \uc21c\uc11c\ub97c \uc548\uc815\uc801\uc73c\ub85c \uc720\uc9c0\ud558\uba74\uc11c, \uadf8 \uc774\ud6c4\uc758 \uc7ac\uc870\uc815 \uac00\ub2a5\ud55c \uc791\uc5c5\uc740 \uacc4\uc18d \ub2e4\uc2dc \uacc4\uc0b0\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>Gantt\uc5d0\uc11c\ub294 \ubcf4\ud638\ub41c \uc791\uc5c5\uc774 \ubd84\ud64d\uc0c9\uc73c\ub85c \ud45c\uc2dc\ub418\uace0, \uac01 \uc791\uc5c5\uc7a5\uc5d0\uc11c \uc2dc\uac04 \uc7a0\uae08\uc774 \ub05d\ub098\ub294 \uc9c0\uc810\uc740 \uc8fc\ud669\uc0c9 \uc120\uc73c\ub85c \ud45c\uc2dc\ub429\ub2c8\ub2e4. \ubcf4\ud638 \ubc94\uc704\uc640 \uadf8 \ub4a4\uc5d0 \uc774\uc5b4\uc9c0\ub294 \uc791\uc5c5\uc744 \ud568\uaed8 \ud655\uc778\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ub530\ub77c\uc11c \uc791\uc5c5 \ub300\uae30\uc5f4\uc744 \ubc18\ubcf5\ud574\uc11c \uc900\ube44\ud558\ub294 \uc218\uace0\ub97c \uc904\uc774\uace0, \uc0c8\ub85c\uc6b4 \uc6b0\uc120\uc21c\uc704\uac00 \uc0dd\uacbc\ub294\ub370\ub3c4 \ub2e4\uc74c \uc791\uc5c5\uc744 \ubc14\ub85c \ubc00\uc5b4\ub0b4\uc9c0 \uc54a\uc740 \uc774\uc720\ub97c \ub354 \uc27d\uac8c \uc124\uba85\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\ubc38\ube0c \ud558\uc6b0\uc9d5 \uc0ac\ub840\uc5d0\uc11c\ub294 \ud604\uc7ac \uc2dc\uc810\uc744 \ub530\ub77c \uc774\ub3d9\ud558\ub294 \uc7a0\uae08\uc73c\ub85c \uc900\ube44\uac00 \ub05d\ub09c \uc784\ubc15\ud55c \uc791\uc5c5\uc744 \ubcf4\ud638\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc774\ub294 \uc5c5\ubb34 \uacc4\ud68d \uc815\ucc45\uacfc \ud568\uaed8 \uc0ac\uc6a9\ud558\ub294 \uc0c1\uc138 \uc77c\uc815 \uc81c\uc5b4 \uc218\ub2e8\uc774\uc9c0, MRP \ud655\uc815 \uaddc\uce59\uc774\ub098 MPS \ubcc0\uacbd \uc2b9\uc778 \uc808\ucc28\ub294 \uc544\ub2d9\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc774\ub7ec\ud55c \ubcf4\ud638\ub97c \uc801\uc6a9\ud560 \ub54c\ub294 \ub2e4\uc74c \ub450 \uac00\uc9c0\ub3c4 \uad6c\ubd84\ud574\uc57c \ud569\ub2c8\ub2e4.<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>\uc791\uc5c5\uc7a5 \uc7a0\uae08\uc740 \uc790\uc6d0 \ubc30\uc815\uc744 \ubcf4\ud638\ud569\ub2c8\ub2e4.<\/strong> \uacf5\uc815\uc744 \ud604\uc7ac \uc791\uc5c5\uc7a5\uc5d0 \uc7a0\uadf8\uba74 \uc77c\uc815\uc744 \uc7ac\uc870\uc815\ud574\ub3c4 \ud574\ub2f9 \uc790\uc6d0\uc5d0 \uadf8\ub300\ub85c \ub0a8\uc2b5\ub2c8\ub2e4. \uc774\ub97c \ubaa8\ub4e0 \uc791\uc5c5 \uc2dc\uc810\uc744 \uace0\uc815\ud558\ub294 \uac83\uacfc \ud63c\ub3d9\ud558\uc9c0 \ub9c8\uc138\uc694.<\/li><li><strong>\uc774\ubbf8 \uc2dc\uc791\ud55c \uc791\uc5c5\uc740 \uc2e4\ud589\uc5d0 \ub4e4\uc5b4\uac04 \uc0c1\ud0dc\uc785\ub2c8\ub2e4.<\/strong> \uc2dc\uc791\ud55c \uc791\uc5c5\uc740 \uc2dc\uc791 \ud6c4 \uc77c\uc2dc\uc815\uc9c0\ud55c \uacbd\uc6b0\uc5d0\ub3c4 \uc9c4\ud589 \uc911 \uc0c1\ud0dc\ub85c \uc720\uc9c0\ub418\uba70 Gantt\uc0c1\uc758 \uc704\uce58\uac00 \uc7a0\uae41\ub2c8\ub2e4. Arcturus\ub294 \uc77c\uc2dc\uc815\uc9c0\ub97c \uc791\uc5c5 \uc774\ub3d9\uc5d0 \ub300\ud55c \ud5c8\uc6a9\uc73c\ub85c \uac04\uc8fc\ud558\uc9c0 \uc54a\uc2b5\ub2c8\ub2e4. \uc544\uc9c1 \uc2dc\uc791\ud558\uc9c0 \uc54a\uc740 \ub300\uae30 \uc791\uc5c5\uc740 \ub2e4\ub978 \uaddc\uce59\uc73c\ub85c \ubcf4\ud638\ub418\uc9c0 \uc54a\ub294 \ud55c \uacc4\uc18d \uc7ac\uc870\uc815\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/li><\/ul>\n\n\n<p>\uc6b0\uc120\uc21c\uc704\uc640 \ubcc0\uacbd\ud558\uc9c0 \uc54a\uace0 \ubcf4\ud638\ud560 \uc0ac\ud56d\uc740 \uc0ac\uc6a9\uc790\uac00 \uc815\ud558\uace0, Arcturus\ub294 \uadf8 \uc81c\uc57d\uc5d0 \ub9de\ucdb0 \uc77c\uc815\uc744 \uacc4\uc0b0\ud569\ub2c8\ub2e4. \ub0a8\uc740 \uc791\uc5c5\uc5d0 \ubb34\uc5c7\uc774 \ud544\uc694\ud55c\uc9c0 \ud30c\uc545\ud558\uba74\uc11c\ub3c4 \uc218\uc791\uc5c5 \uc7ac\ubc30\uce58\ub97c \uc904\uc77c \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p><strong>SkyPlanner\ub294 <a href=\"https:\/\/skyplanner.ai\/ko\/%ed%86%b5%ed%95%a9\/\">\uac1c\ubc29\ud615 REST API\ub97c \ud1b5\ud574 \uc5b4\ub5a4 ERP \ub610\ub294 MES\uc640\ub3c4 \uc5f0\ub3d9\ub429\ub2c8\ub2e4<\/a>.<\/strong> \ud488\ubaa9\ubcc4 \uacc4\ud68d \uc815\ucc45\uc740 \uae30\uc874 \ud504\ub85c\uc138\uc2a4\uc5d0\uc11c \uc720\uc9c0\ud558\uace0, \uc0dd\uc0b0 \uc624\ub354\ub97c \uc0c1\uc138 \uc77c\uc815\uacfc \uc5f0\uacb0\ud574 \uc57d\uc18d\ud55c \uc0dd\uc0b0\uc744 \uc5b4\ub5bb\uac8c \uc2e4\ud589\ud560\uc9c0 \ud655\uc778\ud558\uc138\uc694.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\uc548\uc815\uc801\uc778 \uc791\uc5c5 \ub300\uae30\uc5f4\uc774 Mamec\uc5d0 \uac00\uc838\uc628 \ubcc0\ud654<\/h2>\n\n\n<p>\ud540\ub780\ub4dc\uc5d0\uc11c \uc0b0\uc5c5\uc6a9 \ubbf9\uc11c\uc640 \ucca8\ub2e8 \uc81c\ud488\uc744 \uc704\ud0c1 \uc0dd\uc0b0\ud558\ub294 Mamec\uc740 \uc11c\ub85c \uc5f0\uacc4\ub41c \uc218\ucc9c \uac74\uc758 \uc791\uc5c5\uc9c0\uc2dc\ub97c \uad00\ub9ac\ud558\uace0 \uc788\uc5c8\uc2b5\ub2c8\ub2e4. \uc774\uc804\uc5d0\ub294 \uc804\uccb4 \ubd80\ud558\ub97c \uc2e0\ub8b0\ud560 \ub9cc\ud558\uac8c \ud30c\uc545\ud558\uc9c0 \ubabb\ud55c \ucc44 \uc885\uc774 \uc791\uc5c5\uc9c0\uc2dc\uc11c\uc640 \ud604\uc7a5\uc758 \ub0a9\uae30 \uc6b0\uc120\uc21c\uc704\uc5d0 \uc758\uc874\ud574 \uacc4\ud68d\uc744 \uc138\uc6e0\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>SkyPlanner\ub97c Oscar ERP\uc640 \uc5f0\ub3d9\ud55c \ub4a4\uc5d0\ub294 \uc778\uacf5\uc9c0\ub2a5 \uae30\ubc18 \uc720\ud55c \uc6a9\ub7c9 \uc2a4\ucf00\uc904\ub9c1\uc774 \uacc4\ud68d\uc758 \uae30\ubc18\uc744 \ub9c8\ub828\ud558\uace0, \uc791\uc5c5 \ub300\uae30\uc5f4\uc744 \ud55c \uc8fc \ub2e8\uc704\ub85c \uc7a0\uac00 \uae30\uacc4 \uac00\uacf5 \uc791\uc5c5\uc790\uc5d0\uac8c \ub354 \uba85\ud655\ud55c \uc791\uc5c5 \uc21c\uc11c\ub97c \uc81c\uacf5\ud569\ub2c8\ub2e4. \uc791\uc5c5\uc790\ub294 \ub2e4\uc74c \uc791\uc5c5\uc744 \ubbf8\ub9ac \uc54c \uc218 \uc788\uc5b4 \uc7a5\uc2dc\uac04 \uac00\uacf5\uc774 \uc9c4\ud589\ub418\ub294 \ub3d9\uc548 \ud6c4\uc18d \uc791\uc5c5\uc744 \uc900\ube44\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uacbd\uc601\uc9c4\ub3c4 \uc8fc\uad00\uc801\uc778 \ucd94\uc815\uc5d0 \uc758\uc874\ud558\ub294 \ub300\uc2e0 \uc0dd\uc0b0 \ubd80\ud558\ub97c \ud655\uc778\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/ko\/%ea%b3%a0%ea%b0%9d-%ec%82%ac%eb%a1%80\/mamec\/\">Mamec\uc5d0 \ub530\ub974\uba74<\/a> \uacc4\ud68d \uc5c5\ubb34 \ubd80\ub2f4\uc774 \ub69c\ub837\ud558\uac8c \uc904\uc5c8\uace0 \ub0a9\uae30 \uc900\uc218\uc728\uc774 \uac1c\uc120\ub418\uc5c8\uc2b5\ub2c8\ub2e4. \uadf8\ub807\ub2e4\uace0 \ubaa8\ub4e0 \uacf5\uc7a5\uc5d0 \uc77c\uc8fc\uc77c\uc758 \ud0c0\uc784 \ud39c\uc2a4\ub97c \uad8c\uc7a5\ud558\ub294 \uac83\uc740 \uc544\ub2d9\ub2c8\ub2e4. \uc774 \uc0ac\ub840\ub294 \uc548\uc815\uc131\uc774 \uc9c0\ub2cc \uc2e4\ubb34\uc801 \uac00\uce58\ub97c \ubcf4\uc5ec \uc90d\ub2c8\ub2e4. \uc791\uc5c5\uc790\ub294 \ud544\uc694\ud55c \uc900\ube44\ub97c \ud560 \uc218 \uc788\uace0, \uc870\uc9c1\uc740 \uc804\uccb4 \uc0dd\uc0b0 \ub2a5\ub825\uc744 \uacc4\uc18d \ud30c\uc545\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\uc5b8\uc81c \uc608\uc678\ub97c \ud5c8\uc6a9\ud574\uc57c \ud560\uae4c\uc694?<\/h2>\n\n\n<p>\ud604\uc7ac \uacc4\ud68d\uc744 \ub354 \uc774\uc0c1 \uc720\uc9c0\ud560 \uc218 \uc5c6\uac70\ub098, \ubcc0\uacbd\uc758 \uc774\ub4dd\uc774 \uc804\uccb4 \ube44\uc6a9\uc744 \uac10\uc218\ud560 \ub9cc\ud07c \ud074 \ub54c \uc608\uc678\ub97c \ud5c8\uc6a9\ud558\uc138\uc694. \uc790\uc7ac \ubd80\uc871, \ud488\uc9c8 \ubb38\uc81c\ub85c \uc778\ud55c \ubcf4\ub958, \uc790\uc6d0 \uc0ac\uc6a9 \ubd88\uac00\ub85c \ubcf4\ud638\ub41c \uc791\uc5c5 \uc21c\uc11c\ub97c \uc2e4\ud589\ud560 \uc218 \uc5c6\uac8c \ub420 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc911\uc694\ud55c \ub0a9\uae30 \ub2e8\ucd95 \uc694\uccad\uc774\ub77c\uba74 \ubcc0\uacbd\ud560 \uc774\uc720\uac00 \ub420 \uc218 \uc788\uc9c0\ub9cc, \uae09\ud558\ub2e4\uace0 \ud574\uc11c \uc0dd\uc0b0 \ub2a5\ub825\uc774 \uc0dd\uae30\ub294 \uac83\uc740 \uc544\ub2d9\ub2c8\ub2e4.<\/p>\n\n\n<p>\ubcf4\ud638\ub41c \uc791\uc5c5\uc744 \ubcc0\uacbd\ud558\uae30 \uc804\uc5d0 \ub2e4\uc74c \uc138 \uac00\uc9c0\ub97c \uba85\ud655\ud788 \ud558\uc138\uc694.<\/p>\n\n\n<p>1. <strong>\ubb34\uc5c7\uc774 \ubc14\ub00c\uc5c8\ub098\uc694?<\/strong> \ud574\ub2f9 \ub2f4\ub2f9\uc790\uc640 \uc218\uc694, \uc790\uc7ac, \ud488\uc9c8 \ub610\ub294 \uc790\uc6d0 \uc0c1\ud669\uc744 \ud655\uc778\ud558\uc138\uc694.<\/p>\n\n\n<p>2. <strong>\ubcc0\uacbd\ud558\uba74 \uc5b4\ub5a4 \uc791\uc5c5\uc774 \ubc00\ub824\ub098\uac8c \ub429\ub2c8\uae4c?<\/strong> \uac00\uc7a5 \uba3c\uc800 \ube44\uc5b4 \uc788\ub294 \uc2dc\uac04\ub300\ub9cc \ubcf4\uc9c0 \ub9d0\uace0, \uc900\ube44\uac00 \ub05d\ub0ac\uac70\ub098 \uc9c4\ud589 \uc911\uc778 \uc791\uc5c5, \ub0a8\uc740 \uacf5\uc815, \uc644\ub8cc \uc2dc\uc810\uc744 \uc57d\uc18d\ud55c \ub2e4\ub978 \uc791\uc5c5\ub3c4 \ud655\uc778\ud558\uc138\uc694.<\/p>\n\n\n<p>3. <strong>\ubcc0\uacbd\ub41c \uc57d\uc18d\uc740 \ub204\uac00 \uc218\uc6a9\ud569\ub2c8\uae4c?<\/strong> \uad00\ub828\uc790\ub4e4\uacfc \uacb0\uc815\uc5d0 \ud569\uc758\ud558\uace0, \ubc14\ub010 \uc791\uc5c5 \uc21c\uc11c\ub97c \uacf5\uc720\ud55c \ub4a4 \uc601\uc5c5\u00b7\uad6c\ub9e4\u00b7\uc0dd\uc0b0 \ubd80\uc11c\uc5d0\uc11c \uc0ac\uc6a9\ud558\ub294 \uc218\ub7c9\uc774\ub098 \uc77c\uc815\uc744 \uac31\uc2e0\ud558\uc138\uc694.<\/p>\n\n\n<p>\ub2e8\uc9c0 \ub2e4\ub978 \uc2a4\ucf00\uc904\ub9c1 \uacb0\uacfc\ub97c \uc5bb\uae30 \uc704\ud574 \ubaa8\ub4e0 \ubcf4\ud638 \uc124\uc815\uc744 \ud574\uc81c\ud558\uc9c0 \ub9c8\uc138\uc694. \ubcc0\uacbd\uc758 \uc601\ud5a5\uc744 \ubc1b\ub294 \uae30\uc874 \uc57d\uc18d\uc744 \uc5b4\ub5bb\uac8c \ucc98\ub9ac\ud560\uc9c0 \uc815\ud558\uace0, \ud544\uc694\ud55c \uaddc\uce59\uc774\ub098 \uc6b0\uc120\uc21c\uc704 \ubcc0\uacbd\uc744 \uc801\uc6a9\ud55c \ub4a4 \uc77c\uc815\uc744 \uc870\uc815\ud560 \uc218 \uc788\ub294 \uc791\uc5c5\uc744 \ub2e4\uc2dc \uacc4\uc0b0\ud558\uc138\uc694. \uc774\ubbf8 \uc2dc\uc791\ud588\uac70\ub098 \uc2dc\uc791 \ud6c4 \uc77c\uc2dc \uc911\uc9c0\ud55c \uc791\uc5c5\uc740 \uc0dd\uc0b0 \uce21\uc5d0\uc11c \ubcc4\ub3c4\ub85c \uba85\ud655\ud55c \uacb0\uc815\uc744 \ub0b4\ub824\uc57c \ud569\ub2c8\ub2e4. \ud604\uc7ac \uc2dc\uc810\ubd80\ud130 \uc77c\uc815 \uc2dc\uac04 \ub3d9\uc548 \uc801\uc6a9\ub418\ub294 \uc7a0\uae08\uc744 \ud574\uc81c\ud558\ub354\ub77c\ub3c4 \uc774\ub7ec\ud55c \uc791\uc5c5\uc774 \uc544\uc9c1 \ucc29\uc218\ud558\uc9c0 \uc54a\uc740 \ub300\uae30 \uc791\uc5c5\uc73c\ub85c \ubc14\ub00c\uc9c0\ub294 \uc54a\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc608\uc678\uac00 \ubc1c\uc0dd\ud55c \uc774\uc720\uc640 \uadf8\ub85c \uc778\ud574 \uc5b4\ub5a4 \uc900\ube44\ub098 \uacc4\ud68d\uc744 \ub418\ub3cc\ub824\uc57c \ud588\ub294\uc9c0 \ucd94\uc801\ud558\uc138\uc694. \ubaa9\ud45c\ub294 \ud604\uc7a5\uc774 \ub4a4\ucc98\uc838\ub3c4 \uacc4\ud68d\uc744 \uadf8\ub300\ub85c \uc720\uc9c0\ud558\ub294 \uac83\uc774 \uc544\ub2d9\ub2c8\ub2e4. \ud53c\ud560 \uc218 \uc788\ub294 \ubcc0\uacbd\uc744 \uc904\uc774\uace0, \uc815\ub9d0 \ud544\uc694\ud55c \ubcc0\uacbd\uc5d0\ub294 \ub354 \uba85\ud655\ud55c \uacb0\uc815\uc744 \ub0b4\ub9ac\ub294 \uac83\uc785\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc5ec\ub7ec\ubd84\uc758 \uc0dd\uc0b0 \ud604\uc7a5\uc5d0\uc11c \uc774\ub7ec\ud55c \uade0\ud615\uc744 \uc5b4\ub5bb\uac8c \uc7a1\uc744 \uc218 \uc788\ub294\uc9c0 \uc54c\uc544\ubcf4\ub824\uba74 <a href=\"https:\/\/skyplanner.ai\/ko\/%ec%98%81%ec%97%85%ed%8c%80%ec%97%90-%eb%ac%b8%ec%9d%98\/\">SkyPlanner \ub370\ubaa8\ub97c \uc608\uc57d\ud558\uc138\uc694<\/a>. \ud3c9\uc18c \uc900\ube44\ud574 \ub450\ub294 \ubc30\uce58\uc758 \uc0ac\ub840, \ubcc0\uacbd\uc73c\ub85c\ubd80\ud130 \ubcf4\ud638\ud558\ub824\ub294 \uc2dc\uac04 \ubc94\uc704, \ucd5c\uadfc \uadf8 \ubc94\uc704 \ub0b4 \ubcc0\uacbd\uc744 \uc694\uad6c\ubc1b\uc558\ub358 \uc0ac\ub840\ub97c \uac00\uc838\uc624\uc138\uc694. \ubcf4\ud638\ub41c \uc791\uc5c5\uacfc \uc774\ud6c4\uc758 \ubd80\ud558\ub97c \ud558\ub098\uc758 \uc77c\uc815\uc5d0\uc11c \ud568\uaed8 \ud655\uc778\ud558\ub294 \ubc29\uc2dd\uc744 \uc0b4\ud3b4\ubcfc \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc2a4\ucf00\uc904\ub9c1 \uc81c\uc5b4 \uae30\ub2a5\ubd80\ud130 \uc0b4\ud3b4\ubcf4\uace0 \uc2f6\ub2e4\uba74 <a href=\"https:\/\/skyplanner.ai\/ko\/%ed%8f%89%ea%b0%80%ed%8c%90\/\">\ub370\ubaa8 \ub370\uc774\ud130\ub85c SkyPlanner\ub97c \uccb4\ud5d8\ud574 \ubcf4\uc138\uc694<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>\uacc4\ud68d \ud0c0\uc784 \ud39c\uc2a4: \uc758\ubbf8, \uae30\uac04\uacfc \uc608\uc678 \ud648 &raquo; \ub9ac\uc18c\uc2a4 &raquo; \uacc4\ud68d \ud0c0\uc784 \ud39c\uc2a4: \uc758\ubbf8, \uae30\uac04\uacfc \uc608\uc678 \uacc4\ud68d \ud0c0\uc784 \ud39c\uc2a4\ub294 \uc0dd\uc0b0 \uacc4\ud68d\uc758 \uacc4\uc0b0 \ubc29\uc2dd\uc774\ub098 \ubcc0\uacbd \uaddc\uce59\uc774 \ub2ec\ub77c\uc9c0\ub294 \uc2dc\uac04\uc0c1\uc758 \uacbd\uacc4\uc785\ub2c8\ub2e4. \ub9ce\uc740 MPS \ubc0f MRP \uc2dc\uc2a4\ud15c\uc5d0\uc11c\ub294 \uc774 \uacbd\uacc4\ub97c \ud1b5\ud574 \uac00\uae4c\uc6b4 \uc2dc\uc810\uc758 \uacf5\uae09 \uc81c\uc548\uc774 \uc790\ub3d9\uc73c\ub85c \ubcc0\uacbd\ub418\uc9c0 \uc54a\ub3c4\ub85d \ubcf4\ud638\ud558\uace0, \uc5b4\ub5a4 \uc608\uc678\ub97c \ud5c8\uc6a9\ud560\uc9c0\ub294 \uacc4\ud68d \ub2f4\ub2f9\uc790\uac00 \ud310\ub2e8\ud558\uac8c \ud569\ub2c8\ub2e4. \uc774\ub7ec\ud55c \ubcf4\ud638\ub294 \uae30\uacc4\uac00 \uac00\ub3d9\ub418\uae30 &#8230; <a title=\"\uacc4\ud68d \ud0c0\uc784 \ud39c\uc2a4: \uc758\ubbf8, \uae30\uac04\uacfc \uc608\uc678\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/planning-time-fence\/\" aria-label=\"Read more about \uacc4\ud68d \ud0c0\uc784 \ud39c\uc2a4: \uc758\ubbf8, \uae30\uac04\uacfc \uc608\uc678\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":99992,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2530,496],"tags":[],"class_list":["post-99988","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps--","category-496","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>\uacc4\ud68d \ud0c0\uc784 \ud39c\uc2a4: \uc758\ubbf8, \uae30\uac04\uacfc \uc608\uc678<\/title>\n<meta name=\"description\" content=\"\uc77c\uc0c1\uc801\uc778 \uacc4\ud68d \ubcc0\uacbd\uc73c\ub85c \uc791\uc5c5 \uc900\ube44\uac00 \ud5db\ub418\uc9c0 \uc54a\uac8c \ud558\uc138\uc694. \uacc4\ud68d \ud0c0\uc784 \ud39c\uc2a4 \uc124\uc815\uacfc SkyPlanner\ub85c \ub2f9\uc7a5\uc758 \uc0dd\uc0b0\uc744 \ubcf4\ud638\ud558\ub294 \ubc95\uc744 \uc54c\uc544\ubcf4\uc138\uc694.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/planning-time-fence\/\" \/>\n<meta property=\"og:locale\" content=\"ko_KR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"\uacc4\ud68d \ud0c0\uc784 \ud39c\uc2a4: \uc758\ubbf8, \uae30\uac04\uacfc \uc608\uc678\" \/>\n<meta property=\"og:description\" content=\"\uc77c\uc0c1\uc801\uc778 \uacc4\ud68d \ubcc0\uacbd\uc73c\ub85c \uc791\uc5c5 \uc900\ube44\uac00 \ud5db\ub418\uc9c0 \uc54a\uac8c \ud558\uc138\uc694. \uacc4\ud68d \ud0c0\uc784 \ud39c\uc2a4 \uc124\uc815\uacfc SkyPlanner\ub85c \ub2f9\uc7a5\uc758 \uc0dd\uc0b0\uc744 \ubcf4\ud638\ud558\ub294 \ubc95\uc744 \uc54c\uc544\ubcf4\uc138\uc694.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/planning-time-fence\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-16T13:09:15+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-16T13:11:12+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/planning-time-fence-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1576\" \/>\n\t<meta property=\"og:image:height\" content=\"887\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\uae00\uc4f4\uc774\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/planning-time-fence\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/planning-time-fence\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"\uacc4\ud68d \ud0c0\uc784 \ud39c\uc2a4: \uc758\ubbf8, \uae30\uac04\uacfc \uc608\uc678\",\"datePublished\":\"2026-10-16T13:09:15+00:00\",\"dateModified\":\"2026-10-16T13:11:12+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/planning-time-fence\\\/\"},\"wordCount\":49,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/planning-time-fence\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/planning-time-fence-hero.png\",\"articleSection\":[\"APS \ubc0f \uc2a4\ucf00\uc904\ub9c1\",\"\ub9ac\uc18c\uc2a4\"],\"inLanguage\":\"ko-KR\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/planning-time-fence\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/planning-time-fence\\\/\",\"name\":\"\uacc4\ud68d \ud0c0\uc784 \ud39c\uc2a4: \uc758\ubbf8, \uae30\uac04\uacfc \uc608\uc678\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/planning-time-fence\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/planning-time-fence\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/planning-time-fence-hero.png\",\"datePublished\":\"2026-10-16T13:09:15+00:00\",\"dateModified\":\"2026-10-16T13:11:12+00:00\",\"description\":\"\uc77c\uc0c1\uc801\uc778 \uacc4\ud68d \ubcc0\uacbd\uc73c\ub85c \uc791\uc5c5 \uc900\ube44\uac00 \ud5db\ub418\uc9c0 \uc54a\uac8c \ud558\uc138\uc694. \uacc4\ud68d \ud0c0\uc784 \ud39c\uc2a4 \uc124\uc815\uacfc SkyPlanner\ub85c \ub2f9\uc7a5\uc758 \uc0dd\uc0b0\uc744 \ubcf4\ud638\ud558\ub294 \ubc95\uc744 \uc54c\uc544\ubcf4\uc138\uc694.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/planning-time-fence\\\/#breadcrumb\"},\"inLanguage\":\"ko-KR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/planning-time-fence\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"ko-KR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/planning-time-fence\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/planning-time-fence-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/planning-time-fence-hero.png\",\"width\":1576,\"height\":887,\"caption\":\"A prepared valve-housing batch and fixture inside a protective boundary, with later batches outside.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/planning-time-fence\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"\uacc4\ud68d \ud0c0\uc784 \ud39c\uc2a4: \uc758\ubbf8, \uae30\uac04\uacfc \uc608\uc678\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ko-KR\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ko-KR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ko-KR\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"\uacc4\ud68d \ud0c0\uc784 \ud39c\uc2a4: \uc758\ubbf8, \uae30\uac04\uacfc \uc608\uc678","description":"\uc77c\uc0c1\uc801\uc778 \uacc4\ud68d \ubcc0\uacbd\uc73c\ub85c \uc791\uc5c5 \uc900\ube44\uac00 \ud5db\ub418\uc9c0 \uc54a\uac8c \ud558\uc138\uc694. \uacc4\ud68d \ud0c0\uc784 \ud39c\uc2a4 \uc124\uc815\uacfc SkyPlanner\ub85c \ub2f9\uc7a5\uc758 \uc0dd\uc0b0\uc744 \ubcf4\ud638\ud558\ub294 \ubc95\uc744 \uc54c\uc544\ubcf4\uc138\uc694.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/planning-time-fence\/","og_locale":"ko_KR","og_type":"article","og_title":"\uacc4\ud68d \ud0c0\uc784 \ud39c\uc2a4: \uc758\ubbf8, \uae30\uac04\uacfc \uc608\uc678","og_description":"\uc77c\uc0c1\uc801\uc778 \uacc4\ud68d \ubcc0\uacbd\uc73c\ub85c \uc791\uc5c5 \uc900\ube44\uac00 \ud5db\ub418\uc9c0 \uc54a\uac8c \ud558\uc138\uc694. \uacc4\ud68d \ud0c0\uc784 \ud39c\uc2a4 \uc124\uc815\uacfc SkyPlanner\ub85c \ub2f9\uc7a5\uc758 \uc0dd\uc0b0\uc744 \ubcf4\ud638\ud558\ub294 \ubc95\uc744 \uc54c\uc544\ubcf4\uc138\uc694.","og_url":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/planning-time-fence\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-16T13:09:15+00:00","article_modified_time":"2026-10-16T13:11:12+00:00","og_image":[{"width":1576,"height":887,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/planning-time-fence-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"\uae00\uc4f4\uc774":"Jussi M\u00e4ntyl\u00e4"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/planning-time-fence\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/planning-time-fence\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"\uacc4\ud68d \ud0c0\uc784 \ud39c\uc2a4: \uc758\ubbf8, \uae30\uac04\uacfc \uc608\uc678","datePublished":"2026-10-16T13:09:15+00:00","dateModified":"2026-10-16T13:11:12+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/planning-time-fence\/"},"wordCount":49,"publisher":{"@id":"https:\/\/skyplanner.ai\/ko\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/planning-time-fence\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/planning-time-fence-hero.png","articleSection":["APS \ubc0f \uc2a4\ucf00\uc904\ub9c1","\ub9ac\uc18c\uc2a4"],"inLanguage":"ko-KR"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/planning-time-fence\/","url":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/planning-time-fence\/","name":"\uacc4\ud68d \ud0c0\uc784 \ud39c\uc2a4: \uc758\ubbf8, \uae30\uac04\uacfc \uc608\uc678","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ko\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/planning-time-fence\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/planning-time-fence\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/planning-time-fence-hero.png","datePublished":"2026-10-16T13:09:15+00:00","dateModified":"2026-10-16T13:11:12+00:00","description":"\uc77c\uc0c1\uc801\uc778 \uacc4\ud68d \ubcc0\uacbd\uc73c\ub85c \uc791\uc5c5 \uc900\ube44\uac00 \ud5db\ub418\uc9c0 \uc54a\uac8c \ud558\uc138\uc694. \uacc4\ud68d \ud0c0\uc784 \ud39c\uc2a4 \uc124\uc815\uacfc SkyPlanner\ub85c \ub2f9\uc7a5\uc758 \uc0dd\uc0b0\uc744 \ubcf4\ud638\ud558\ub294 \ubc95\uc744 \uc54c\uc544\ubcf4\uc138\uc694.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/planning-time-fence\/#breadcrumb"},"inLanguage":"ko-KR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/planning-time-fence\/"]}]},{"@type":"ImageObject","inLanguage":"ko-KR","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/planning-time-fence\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/planning-time-fence-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/planning-time-fence-hero.png","width":1576,"height":887,"caption":"A prepared valve-housing batch and fixture inside a protective boundary, with later batches outside."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/planning-time-fence\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/ko\/"},{"@type":"ListItem","position":2,"name":"\uacc4\ud68d \ud0c0\uc784 \ud39c\uc2a4: \uc758\ubbf8, \uae30\uac04\uacfc \uc608\uc678"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/ko\/#website","url":"https:\/\/skyplanner.ai\/ko\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/ko\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/ko\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ko-KR"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/ko\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/ko\/","logo":{"@type":"ImageObject","inLanguage":"ko-KR","@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"ko-KR","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/planning-time-fence-hero.png",1576,887,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/planning-time-fence-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/planning-time-fence-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/planning-time-fence-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/planning-time-fence-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/planning-time-fence-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/planning-time-fence-hero.png",1576,887,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/planning-time-fence-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/ko\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"\uacc4\ud68d \ud0c0\uc784 \ud39c\uc2a4: \uc758\ubbf8, \uae30\uac04\uacfc \uc608\uc678 \ud648 &raquo; \ub9ac\uc18c\uc2a4 &raquo; \uacc4\ud68d \ud0c0\uc784 \ud39c\uc2a4: \uc758\ubbf8, \uae30\uac04\uacfc \uc608\uc678 \uacc4\ud68d \ud0c0\uc784 \ud39c\uc2a4\ub294 \uc0dd\uc0b0 \uacc4\ud68d\uc758 \uacc4\uc0b0 \ubc29\uc2dd\uc774\ub098 \ubcc0\uacbd \uaddc\uce59\uc774 \ub2ec\ub77c\uc9c0\ub294 \uc2dc\uac04\uc0c1\uc758 \uacbd\uacc4\uc785\ub2c8\ub2e4. \ub9ce\uc740 MPS \ubc0f MRP \uc2dc\uc2a4\ud15c\uc5d0\uc11c\ub294 \uc774 \uacbd\uacc4\ub97c \ud1b5\ud574 \uac00\uae4c\uc6b4 \uc2dc\uc810\uc758 \uacf5\uae09 \uc81c\uc548\uc774 \uc790\ub3d9\uc73c\ub85c \ubcc0\uacbd\ub418\uc9c0 \uc54a\ub3c4\ub85d \ubcf4\ud638\ud558\uace0, \uc5b4\ub5a4 \uc608\uc678\ub97c \ud5c8\uc6a9\ud560\uc9c0\ub294 \uacc4\ud68d \ub2f4\ub2f9\uc790\uac00 \ud310\ub2e8\ud558\uac8c \ud569\ub2c8\ub2e4. \uc774\ub7ec\ud55c \ubcf4\ud638\ub294 \uae30\uacc4\uac00 \uac00\ub3d9\ub418\uae30&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts\/99988","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/comments?post=99988"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts\/99988\/revisions"}],"predecessor-version":[{"id":100052,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts\/99988\/revisions\/100052"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/media\/99992"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/media?parent=99988"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/categories?post=99988"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/tags?post=99988"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}