{"id":99770,"date":"2026-10-16T07:53:34","date_gmt":"2026-10-16T07:53:34","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=99770"},"modified":"2026-10-16T10:12:25","modified_gmt":"2026-10-16T10:12:25","slug":"capable-to-promise","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/capable-to-promise\/","title":{"rendered":"Capable to Promise: \ub0a9\uae30\ub97c \uc57d\uc18d\ud558\uae30 \uc804\uc5d0 \uc8fc\ubb38 \uac80\ud1a0\ud558\uae30"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Capable to Promise: \ub0a9\uae30\ub97c \uc57d\uc18d\ud558\uae30 \uc804\uc5d0 \uc8fc\ubb38 \uac80\ud1a0\ud558\uae30<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/ko\/\">\ud648<\/a> &raquo; <a href=\"\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/\">\ub9ac\uc18c\uc2a4<\/a> &raquo; Capable to Promise: \ub0a9\uae30\ub97c \uc57d\uc18d\ud558\uae30 \uc804\uc5d0 \uc8fc\ubb38 \uac80\ud1a0\ud558\uae30<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">\uc608\uc0c1 \uc77d\uae30 \uc2dc\uac04: <\/span><span class=\"yoast-reading-time__reading-time\">7<\/span><span class=\"yoast-reading-time__time-unit\"> \ubd84<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Capable to promise(CTP)\ub294 \uc790\uc7ac \uac00\uc6a9\uc131\uacfc \uc791\uc5c5\uc5d0 \ud544\uc694\ud55c \uc0dd\uc0b0 \ub2a5\ub825\uc744 \ud568\uaed8 \uace0\ub824\ud574 \uc694\uccad \uc218\ub7c9\uc744 \uc0dd\uc0b0\ud560 \uc218 \uc788\ub294\uc9c0, \uc5b8\uc81c \uc0dd\uc0b0\ud560 \uc218 \uc788\ub294\uc9c0 \ud655\uc778\ud558\ub294 \ubc29\ubc95\uc785\ub2c8\ub2e4. \uc7ac\uace0\uc5d0\uc11c \ubc14\ub85c \ucd9c\ud558\ud560 \uc218 \uc5c6\ub294 \uc81c\ud488\uc758 \ub0a9\uae30\ub97c \uc601\uc5c5\ud300\uc774 \uc57d\uc18d\ud560 \ub54c \ud310\ub2e8 \uadfc\uac70\uac00 \ub429\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc911\uc694\ud55c \uac83\uc740 \uc8fc\ubb38\uc744 \uc218\ub77d\ud558\uae30 \uc804\uc5d0 \ud655\uc778\ud558\ub294 \uac83\uc785\ub2c8\ub2e4. \uace0\uac1d\uc758 \ud76c\ub9dd \ub0a9\uae30\ub294 \uc218\uc8fc\ub97c \uc704\ud574 \ub9de\ucdb0\uc57c \ud560 \ub0a0\uc9dc\ub97c, \ud45c\uc900 \ub9ac\ub4dc\ud0c0\uc784\uc740 \ud1b5\uc0c1\uc801\uc73c\ub85c \uac78\ub9ac\ub294 \uc2dc\uac04\uc744 \uc54c\ub824\uc90d\ub2c8\ub2e4. \ud558\uc9c0\ub9cc \uc5b4\ub290 \ucabd\ub3c4 \uc774\ubbf8 \ub0a9\uae30\ub97c \uc57d\uc18d\ud55c \uc791\uc5c5\uacfc \ud568\uaed8 \uc774\ubc88 \uc791\uc5c5\uc744 \uc18c\ud654\ud560 \uc218 \uc788\ub294\uc9c0\ub294 \uc54c\ub824\uc8fc\uc9c0 \uc54a\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>SkyPlanner APS\uc758 Job Prospects(\uc608\uc0c1 \uc8fc\ubb38) \uae30\ub2a5\uc744 \uc0ac\uc6a9\ud558\uba74 \uc0dd\uc0b0\uc744 \ud655\uc815\ud558\uae30 \uc804\uc5d0 \uc7a0\uc7ac \uc8fc\ubb38\uc758 \ud604\uc2e4\uc801\uc778 \ub0a9\uae30\ub97c \uc2dc\ubbac\ub808\uc774\uc158\ud558\uc5ec \uc218\uc8fc \uac00\ub2a5 \uc5ec\ubd80\ub97c \ud655\uc778\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ud604\uc7ac \uc791\uc5c5 \ubd80\ud558\ub97c \ubc18\uc601\ud574 \uc608\uc0c1 \uc8fc\ubb38\uc758 \uc77c\uc815\uc744 \uc7a1\uace0, \uacc4\ud68d\ub41c \uc644\ub8cc \uc2dc\uc810\uacfc Gantt \uc77c\uc815\uc758 \uc8fc\ubcc0 \uc791\uc5c5\uc744 \ud568\uaed8 \uc0b4\ud3b4\ubcf4\uc138\uc694. \uc601\uc5c5\ud300\uc5d0 \ub2f5\ubcc0\ud558\uae30 \uc704\ud574 \uc124\ube44\ubcc4 \ub300\uae30 \uc791\uc5c5\uc744 \uc77c\uc77c\uc774 \uc7ac\uad6c\uc131\ud558\ub294 \ub300\uc2e0, \uacf5\uc7a5\uc5d0\uc11c \uc2e4\uc81c\ub85c \uc774\ud589\ud560 \uc218 \uc788\ub294 \uc81c\uc548\uc5d0 \uc9d1\uc911\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">CTP\uc640 ATP\uc758 \ucc28\uc774<\/h2>\n\n\n<p>Available to promise(ATP)\ub294 \uae30\uc874 \uc218\uc694\ub97c \ubc18\uc601\ud55c \ub4a4 \uc0c8 \uc8fc\ubb38\uc5d0 \uacf5\uae09\ud560 \uc218 \uc788\ub294 \ubb3c\ub7c9\uc774 \uc5bc\ub9c8\ub098 \ub0a8\ub294\uc9c0 \ud655\uc778\ud569\ub2c8\ub2e4. \uc774 \ubb3c\ub7c9\uc5d0\ub294 \ud604\uc7ac \ucc3d\uace0\uc5d0 \uc788\ub294 \ubbf8\ud560\ub2f9 \uc7ac\uace0\ubfd0 \uc544\ub2c8\ub77c \uc785\uace0 \uc608\uc815 \ubb3c\ub7c9\ub3c4 \ud3ec\ud568\ub420 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>CTP\ub294 \uc5ec\uae30\uc5d0 \uc0dd\uc0b0 \uac00\ub2a5 \uc5ec\ubd80\ub97c \ub354\ud574 \uac80\ud1a0\ud569\ub2c8\ub2e4. \uc644\uc81c\ud488\uc774 \uc900\ube44\ub418\uc5b4 \uc788\uc9c0 \uc54a\ub2e4\uba74, \uac00\uc6a9 \uc790\uc7ac\uc640 \uc0dd\uc0b0 \ub2a5\ub825\uc73c\ub85c \ud544\uc694\ud55c \uae30\uac04 \uc548\uc5d0 \uc0dd\uc0b0\ud560 \uc218 \uc788\ub294\uc9c0\ub97c \ud655\uc778\ud558\ub294 \uac83\uc785\ub2c8\ub2e4.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>\uc9c8\ubb38<\/th><th>\uacf5\uae09 \uac00\ub2a5 \ubb3c\ub7c9 \ud655\uc778(ATP)<\/th><th>\uc0dd\uc0b0 \uac00\ub2a5 \uc5ec\ubd80 \ud655\uc778(CTP)<\/th><\/tr><\/thead><tbody><tr><td>\ubb34\uc5c7\uc744 \uadfc\uac70\ub85c \ud310\ub2e8\ud558\ub098\uc694?<\/td><td>\ubbf8\ud560\ub2f9 \uc7ac\uace0\uc640 \uacf5\uae09 \uc608\uc815 \ubb3c\ub7c9<\/td><td>\uc790\uc7ac \uac00\uc6a9\uc131\uacfc \uc0dd\uc0b0\uc5d0 \ud544\uc694\ud55c \uc0dd\uc0b0 \ub2a5\ub825<\/td><\/tr><tr><td>\uc601\uc5c5\ud300\uc774 \ubb34\uc5c7\uc744 \uc81c\uc548\ud560 \uc218 \uc788\uac8c \ub418\ub098\uc694?<\/td><td>\uac00\uc6a9 \uacf5\uae09 \ubb3c\ub7c9\uc73c\ub85c \uc81c\uacf5\ud560 \uc218 \uc788\ub294 \uc218\ub7c9\uacfc \uc2dc\uae30<\/td><td>\ucd94\uac00 \uc0dd\uc0b0\uc73c\ub85c \uc81c\uacf5\ud560 \uc218 \uc788\ub294 \uc218\ub7c9\uacfc \uc2dc\uae30<\/td><\/tr><tr><td>\uc5b4\ub5a4 \uc0c1\ud669\uc5d0 \uc801\ud569\ud55c\uac00\uc694?<\/td><td>\uc7ac\uace0\ub098 \uc785\uace0 \uc608\uc815 \ubb3c\ub7c9\uc73c\ub85c \uc81c\ud488\uc744 \uacf5\uae09\ud560 \uc218 \uc788\uc744 \ub54c<\/td><td>\uacf5\uc6a9 \uc790\uc6d0\uc744 \uc0ac\uc6a9\ud574 \uc8fc\ubb38 \ud488\ubaa9\uc744 \uc0dd\uc0b0\ud558\uac70\ub098 \uc870\ub9bd\ud574\uc57c \ud560 \ub54c<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>ATP\ub294 \uac00\uc6a9 \uacf5\uae09 \ubb3c\ub7c9\uc73c\ub85c \uc8fc\ubb38\uc744 \uc774\ud589\ud560 \uc218 \uc788\uc744 \ub54c \uc720\uc6a9\ud569\ub2c8\ub2e4. CTP\ub294 \uc218\uc8fc\ud558\uba74 \uacf5\uc7a5\uc5d0\uc11c \uc18c\ud654\ud574\uc57c \ud560 \uc791\uc5c5\uc774 \uc0dd\uae30\ub294 <a href=\"\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/production-make-to-order\/\">\uc218\uc8fc\uc0dd\uc0b0<\/a>\uacfc <a href=\"\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/assemble-to-order\/\">\uc8fc\ubb38\uc870\ub9bd\uc0dd\uc0b0<\/a>\uc5d0\uc11c \ud2b9\ud788 \uac00\uce58\uac00 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\ubd80\ud488\uc774 \ubaa8\ub450 \uc788\ub2e4\uace0 \ud574\uc11c \uc870\ub9bd\ud560 \uc5ec\ub825\uae4c\uc9c0 \uc788\ub294 \uac83\uc740 \uc544\ub2d9\ub2c8\ub2e4. \ubc18\ub300\ub85c \uc644\uc81c\ud488 \uc7ac\uace0\uac00 \uc5c6\ub2e4\uace0 \ud574\uc11c \ubc18\ub4dc\uc2dc \uc8fc\ubb38\uc744 \uac70\uc808\ud574\uc57c \ud558\ub294 \uac83\ub3c4 \uc544\ub2d9\ub2c8\ub2e4. CTP\ub294 \uc774 \ub450 \uac00\uc9c0 \uac00\uc815 \uc0ac\uc774\uc5d0\uc11c \uc218\uc8fc \uae30\ud68c\ub97c \ucc3e\ub3c4\ub85d \ub3d5\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\uc0c8 \ub0a9\uae30 \uc57d\uc18d\uc774 \uae30\uc874 \uc57d\uc18d\uc744 \uc704\ud0dc\ub86d\uac8c \ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4<\/h2>\n\n\n<p>\uc218\ud0c1 \uac00\uacf5\uc5c5\uccb4\uac00 \uc0e4\ud504\ud2b8\uc640 \uc7a5\ucc29 \ud50c\ub808\uc774\ud2b8\ub85c \uad6c\uc131\ub41c \uc138\ud2b8\uc758 \uacac\uc801\uc744 \ub0b4\ub294 \uc0c1\ud669\uc744 \uac00\uc815\ud574 \ubcf4\uaca0\uc2b5\ub2c8\ub2e4. \uc790\uc7ac\ub294 \ud655\ubcf4\ub418\uc5b4 \uc788\uace0, \uc601\uc5c5\ud300\uc740 \uae08\uc694\uc77c \ucd9c\ud558\ub97c \uc81c\uc548\ud558\ub824\uace0 \ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc0e4\ud504\ud2b8\ub294 \ubaa9\uc694\uc77c\uae4c\uc9c0 \uc120\uc0ad \uac00\uacf5\uacfc \uac80\uc0ac\ub97c \ub9c8\uce60 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ud558\uc9c0\ub9cc \ud50c\ub808\uc774\ud2b8\ub294 \uc774\ubbf8 \ub0a9\uae30\uac00 \ud655\uc815\ub41c \uc8fc\ubb38\ub4e4\uc774 \ucc28\uc9c0\ud558\uace0 \uc788\ub294 \uba38\uc2dc\ub2dd\uc13c\ud130\uc5d0\uc11c \ubc00\ub9c1 \uac00\uacf5\uc744 \ud574\uc57c \ud569\ub2c8\ub2e4. \ud604\uc7ac \uc791\uc5c5 \uc21c\uc11c\ub300\ub85c\ub77c\uba74 \ud50c\ub808\uc774\ud2b8\ub294 \ub2e4\uc74c \uc8fc\uac00 \ub418\uc5b4\uc57c \uc644\ub8cc\ub429\ub2c8\ub2e4.<\/p>\n\n\n<p>\uac00\uc7a5 \uac04\ub2e8\ud55c \ud488\ubaa9\uc758 \uc0dd\uc0b0\uc774 \ub05d\ub0ac\ub2e4\uace0 \uc8fc\ubb38 \uc804\uccb4\uac00 \uc900\ube44\ub418\ub294 \uac83\uc740 \uc544\ub2d9\ub2c8\ub2e4. \uace0\uac1d\uc5d0\uac8c \uc644\uc804\ud55c \uc138\ud2b8\uac00 \ud544\uc694\ud558\ub2e4\uba74 \ucd9c\ud558 \uc2dc\uc810\uc740 \ud50c\ub808\uc774\ud2b8\uac00 \uacb0\uc815\ud569\ub2c8\ub2e4. \uc7ac\uace0\ub9cc \ud655\uc778\ud558\uba74 \ubc00\ub9c1 \uc791\uc5c5 \ub300\uae30\uc5f4\uc744 \ub193\uce58\uace0, \ud45c\uc900 \ub9ac\ub4dc\ud0c0\uc784\ub9cc \ubcf4\uba74 \ud604\uc7ac \uadf8 \ub300\uae30\uc5f4\uc5d0 \uc313\uc778 \uc791\uc5c5\ub7c9\uc744 \ub193\uce58\uac8c \ub429\ub2c8\ub2e4.<\/p>\n\n\n<p>\ud50c\ub808\uc774\ud2b8\uc758 \uc791\uc5c5 \uc21c\uc11c\ub97c \uc55e\ub2f9\uae30\uba74 \uae08\uc694\uc77c \ucd9c\ud558\uac00 \uac00\ub2a5\ud560 \uc218\ub3c4 \uc788\uc9c0\ub9cc, \uae30\uc874 \uace0\uac1d\uc758 \uc791\uc5c5\uc774 \uc9c0\uc5f0\ub420 \uc218\ub3c4 \uc788\uc2b5\ub2c8\ub2e4. \uc774\ub294 \uc5ec\uc720 \uc0dd\uc0b0 \ub2a5\ub825\uc744 \ud65c\uc6a9\ud558\ub294 \uac83\uc774 \uc544\ub2d9\ub2c8\ub2e4. \uc5b4\ub290 \ub0a9\uae30 \uc57d\uc18d\uc744 \uc6b0\uc120\ud560\uc9c0 \uc120\ud0dd\ud558\ub294 \uac83\uc785\ub2c8\ub2e4.<\/p>\n\n\n<p>\ub530\ub77c\uc11c \uc2e4\ubb34\uc5d0 \ub3c4\uc6c0\uc774 \ub418\ub294 CTP \uac80\ud1a0\ub294 \ub450 \uac00\uc9c0 \uc9c8\ubb38\uc5d0 \ud568\uaed8 \ub2f5\ud574\uc57c \ud569\ub2c8\ub2e4. <strong>\uc774 \uc8fc\ubb38\uc740 \uc5b8\uc81c \uc644\ub8cc\ud560 \uc218 \uc788\uc73c\uba70, \uc774 \uc8fc\ubb38\uc744 \ub07c\uc6cc \ub123\uc73c\uba74 \uc774\ubbf8 \ub0a9\uae30\ub97c \uc57d\uc18d\ud55c \uc791\uc5c5\uc5d0 \uc5b4\ub5a4 \uc601\ud5a5\uc774 \uc0dd\uae38\uae4c\uc694?<\/strong> \ub450 \uac00\uc9c0\ub97c \ud568\uaed8 \ud655\uc778\ud558\uba74 \uc8fc\ubb38\uc744 \ud655\uc815\ud55c \ub4a4\uc5d0\uc57c \uadf8 \ub300\uac00\ub97c \uc54c\uac8c \ub418\ub294 \uc77c\uc744 \ud53c\ud558\uba74\uc11c \uc2e0\uaddc \uc218\uc8fc\ub97c \ucd94\uc9c4\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">SkyPlanner\uc5d0\uc11c \uc218\uc8fc \uac80\ud1a0 \uc911\uc778 \uc8fc\ubb38 \ud655\uc778\ud558\uae30<\/h2>\n\n\n<p>SkyPlanner\uc5d0\uc11c\ub294 \uc2e4\uc81c \uc791\uc5c5 \uc77c\uc815\uc744 \ud1b5\ud574 \uc774 \uc9c8\ubb38\uc758 \ub2f5\uc744 \ud655\uc778\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc2a4\ucf00\uc904\ub9c1 \uc778\uacf5\uc9c0\ub2a5 Arcturus\ub294 \uc124\uc815\ub41c <a href=\"\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/production-scheduling\/\">\uc0dd\uc0b0 \uc790\uc6d0, \uc120\ud6c4 \uad00\uacc4, \uc6b0\uc120\uc21c\uc704<\/a>\ub97c \ubc14\ud0d5\uc73c\ub85c \uac01 \uacf5\uc815\uc744 \uc77c\uc815\uc5d0 \ubc30\uce58\ud569\ub2c8\ub2e4. \ubaa8\ub4e0 \uacf5\uc815\uc744 \uc218\ub3d9\uc73c\ub85c \ubc30\uc815\ud558\ub294 \ub300\uc2e0 \uacc4\uc0b0\ub41c \uc77c\uc815\uc744 \ud655\uc778\ud558\uba74 \ub429\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc8fc\ubb38 \ub0a9\uae30\ub97c \uc57d\uc18d\ud560 \uc218 \uc788\ub294\uc9c0 \ud310\ub2e8\ud558\ub294 \uc2e4\ubb34 \uc808\ucc28\ub294 \uac04\ub2e8\ud569\ub2c8\ub2e4.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\uc601\uc5c5\ud300\uc774 \uc2e4\uc81c\ub85c \uc81c\uc548\ud558\ub294 \uc8fc\ubb38\uc758 \uc77c\uc815\uc744 \uc218\ub9bd\ud558\uc138\uc694<\/h3>\n\n\n<p>\uc8fc\ubb38\uc744 \uc0dd\uc131\ud558\uace0 \uc81c\uc548\ud560 \uc8fc\ubb38 \ud488\ubaa9\uc744 \uc608\uc0c1 \uc8fc\ubb38(Prospect)\uc73c\ub85c \ud45c\uc2dc\ud558\uc138\uc694. \ud3c9\uade0 \uc18c\uc694 \uc2dc\uac04\uc744 \uc801\uc6a9\ud55c \uc77c\ubc18\uc801\uc778 \uc791\uc5c5\uc73c\ub85c \uc2dc\ud5d8\ud558\uc9c0 \ub9d0\uace0, \uace0\uac1d\uc774 \uc694\uccad\ud55c \ud488\ubaa9\uacfc \uc218\ub7c9, \ud544\uc694\ud55c \uacf5\uc815 \ub2e8\uacc4\ub97c \ubc18\uc601\ud558\uc138\uc694. \uc791\uc5c5 \uc77c\uc815\uc744 \uc7a1\uc740 \ub4a4 \uacc4\ud68d\uc744 \uc218\ub77d\ud558\uae30 \uc804\uc5d0 \ud0c0\uc784\ub77c\uc778\uc5d0\uc11c \uc791\uc5c5\uc774 \ubc30\uce58\ub420 \uc704\uce58\ub97c \ud655\uc778\ud558\uc138\uc694. \uc218\uc8fc\ub97c \ud655\uc815\ud558\uae30 \uc804, \uc544\uc9c1 \uc608\uc0c1 \uc8fc\ubb38\uc778 \uc0c1\ud0dc\uc5d0\uc11c \ud604\uc2e4\uc801\uc778 \uc644\ub8cc\uc77c\uc744 \uac80\ud1a0\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\ud310\ub2e8\uc744 \ubc14\uafc0 \uc218 \uc788\ub294 \uc815\ubcf4\uac00 \uc720\uc6a9\ud55c \uc785\ub825\uac12\uc785\ub2c8\ub2e4. \uc791\uc5c5 \uac00\ub2a5\ud55c \uc790\uc6d0, \uacf5\uc815\ubcc4 \uc18c\uc694 \uc2dc\uac04\uacfc \uc900\ube44 \uc791\uc5c5, \uadfc\ubb34 \uad50\ub300, \uc790\uc7ac \uc900\ube44 \uc0c1\ud0dc, \uc774\ubbf8 \uc0dd\uc0b0 \ub2a5\ub825\uc744 \ucc28\uc9c0\ud558\uace0 \uc788\ub294 \uc8fc\ubb38\uc774 \uc5ec\uae30\uc5d0 \ud574\ub2f9\ud569\ub2c8\ub2e4. \uc790\uc7ac\ub97c \uace0\ub824\ud558\ub294 \uc2a4\ucf00\uc904\ub9c1 \uae30\ub2a5\uc744 \ud65c\uc131\ud654\ud558\uba74 Arcturus\uac00 \uc790\uc7ac \uac00\uc6a9\uc131\ub3c4 \uacc4\uc0b0\uc5d0 \ubc18\uc601\ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc55e\uc11c \uac00\uc815\ud55c \uac00\uacf5\uc5c5\uccb4\ub77c\uba74 \uc0e4\ud504\ud2b8\uc640 \ud50c\ub808\uc774\ud2b8 \ubaa8\ub450\uc758 \uc77c\uc815\uc744 \uc218\ub9bd\ud574\uc57c \ud55c\ub2e4\ub294 \ub73b\uc785\ub2c8\ub2e4. \uc2dc\uac04\uc774 \ub354 \uac78\ub9ac\ub294 \uacf5\uc815 \uacbd\ub85c\ub97c \uc81c\uc678\ud558\uba74 \uc81c\uc548 \ub0a9\uae30\ub294 \uc88b\uc544 \ubcf4\uc774\uaca0\uc9c0\ub9cc, \uc8fc\ubb38 \uc804\uccb4\ub97c \ub0a9\ud488\ud560 \uc218 \uc788\uac8c \ub418\ub294 \uac83\uc740 \uc544\ub2d9\ub2c8\ub2e4.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\ud76c\ub9dd \ub0a9\uae30\ubfd0 \uc544\ub2c8\ub77c \uc644\ub8cc \uc2dc\uac01\uc744 \ud655\uc778\ud558\uc138\uc694<\/h3>\n\n\n<p>\uc608\uc0c1 \uc8fc\ubb38\uc758 \uc77c\uc815\uc744 \uc7a1\uc558\ub2e4\uba74 \uac01 \uc8fc\ubb38 \ud488\ubaa9\uc758 \uacc4\ud68d \uc885\ub8cc \uc2dc\uac04(Planned End Time)\uc744 \ud655\uc778\ud558\uc138\uc694. \uac00\uc7a5 \ub2a6\uac8c \uc644\ub8cc\ub418\ub294 \ud488\ubaa9\uc758 \uc644\ub8cc \uc2dc\uc810\uc774 \ud604\uc7ac \uc791\uc5c5 \ubd80\ud558\uc5d0\uc11c \uc8fc\ubb38 \uc804\uccb4\uc758 \ub0a9\uae30\ub97c \uc57d\uc18d\ud560 \ub54c \uae30\uc900\uc73c\ub85c \uc0bc\uc744 \uc0dd\uc0b0 \uc644\ub8cc \uc2dc\uc810\uc785\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc774 \uacb0\uacfc\ub97c \uace0\uac1d\uc774 \uc81c\ud488\uc744 \ubc1b\ub294 \ub0a0\uc9dc\uc640 \uad6c\ubd84\ud574\uc57c \ud569\ub2c8\ub2e4. \uacc4\ud68d\uc5d0 \uc544\uc9c1 \ubc18\uc601\ub418\uc9c0 \uc54a\uc740 \uac80\uc0ac, \ud3ec\uc7a5, \ucd9c\ud558, \uc6b4\uc1a1 \uc2dc\uac04\uc774 \uc788\ub2e4\uba74 \ubcc4\ub3c4\ub85c \uace0\ub824\ud558\uc138\uc694. \uc601\uc5c5\ud300\uacfc \uc0dd\uc0b0\ud300\uc740 \uc81c\uc548\ud558\ub294 \ub0a0\uc9dc\uac00 \uc778\uc218 \uc900\ube44 \uc644\ub8cc\uc77c\uc778\uc9c0, \ucd9c\ud558\uc77c\uc778\uc9c0, \uace0\uac1d \ub3c4\ucc29\uc77c\uc778\uc9c0 \uba85\ud655\ud788 \ud569\uc758\ud574\uc57c \ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\ud76c\ub9dd \ub0a0\uc9dc\ub97c \uc785\ub825\ud558\ub294 \uac83\uacfc \uc0dd\uc0b0 \uce21\uba74\uc5d0\uc11c \uadf8 \ub0a0\uc9dc\ub97c \ub9de\ucd9c \uc218 \uc788\ub294\uc9c0 \ud655\uc778\ud558\ub294 \uac83\uc740 \ub2e4\ub985\ub2c8\ub2e4. \uace0\uac1d\uc5d0\uac8c \ub0a9\uae30\ub97c \uc57d\uc18d\ud560 \ucc45\uc784\uc740 \ub2f4\ub2f9\uc790\uc5d0\uac8c \uc788\uc2b5\ub2c8\ub2e4. SkyPlanner\ub294 \uadf8 \uc57d\uc18d\uc5d0 \uc2e0\ub8b0\ud560 \ub9cc\ud55c \uadfc\uac70\ub97c \ub354\ud558\ub3c4\ub85d \uc77c\uc815\uc0c1\uc758 \uc644\ub8cc \uc2dc\uac01\uc744 \uc81c\uacf5\ud569\ub2c8\ub2e4.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\uae30\uc874\uc5d0 \uc57d\uc18d\ud55c \uc8fc\ubb38\ub3c4 \ud568\uaed8 \uac80\ud1a0\ud558\uc138\uc694<\/h3>\n\n\n<p><a href=\"\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/gantt-chart-for-production-planning\/\">Gantt \uc77c\uc815<\/a>\uc5d0\uc11c \uac80\ud1a0 \uc911\uc778 \uc791\uc5c5\uc744 \uae30\uc874 \uc8fc\ubb38\uacfc \ud568\uaed8 \ud655\uc778\ud558\uc138\uc694. \ub354 \uc77c\ucc0d \uc644\ub8cc\ud558\uae30 \uc704\ud574 \uc6b0\uc120\uc21c\uc704\ub97c \ubc14\uafbc\ub2e4\uba74 \ub2e4\uc2dc \uacc4\uc0b0\ud558\uace0, \uadf8 \uc870\uac74\uc744 \uace0\uac1d\uc5d0\uac8c \uc57d\uc18d\ud558\uae30 \uc804\uc5d0 \ub2e4\ub978 \uc791\uc5c5\uc758 \uc77c\uc815\uc774 \uc5b4\ub5bb\uac8c \ubc14\ub00c\ub294\uc9c0 \ud655\uc778\ud574\uc57c \ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc6b0\uc120\uc21c\uc704\ub294 \ub2f4\ub2f9\uc790\uac00 \uc815\ud558\uba70, \uc7a0\uae08 \uae30\ub2a5\uc73c\ub85c \uc774\ubbf8 \ub0b4\ub9b0 \uc77c\uc815 \uacb0\uc815\uc744 \uc720\uc9c0\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. Arcturus\ub294 \uc774 \uc9c0\uc2dc \ubc94\uc704 \uc548\uc5d0\uc11c \uacc4\uc0b0\uc744 \uc218\ud589\ud569\ub2c8\ub2e4. \ub530\ub77c\uc11c \uc5b4\ub5a4 \uc791\uc5c5\uc774 \ubc00\ub824\ub098\ub294\uc9c0 \uc54c\uc544\ub0b4\ub824\uace0 \ub300\uae30\uc5f4\uc744 \uc218\ub3d9\uc73c\ub85c \ub2e4\uc2dc \uc9dc\ub294 \ub300\uc2e0, \uae34\uae09 \uc8fc\ubb38\uc744 \uc218\ub77d\ud560 \uac00\uce58\uac00 \uc788\ub294\uc9c0 \ub17c\uc758\ud558\ub294 \ub370 \uc2dc\uac04\uc744 \uc4f8 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>SkyPlanner\ub294 <a href=\"\/ko\/%ed%86%b5%ed%95%a9\/\">\uac1c\ubc29\ud615 REST API<\/a>\ub97c \ud1b5\ud574 \ubaa8\ub4e0 ERP \ub610\ub294 MES\uc640 \uc5f0\ub3d9\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uae30\uc874 \uc8fc\ubb38 \uad00\ub9ac \uc2dc\uc2a4\ud15c\uc744 \uc720\uc9c0\ud558\uba74\uc11c \ub0a9\uae30 \ud310\ub2e8\uc5d0 \ud544\uc694\ud55c \uc77c\uc815 \ud654\uba74\uacfc \uc5f0\uacb0\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\ub2e8\uc21c\ud55c \uc218\ub77d\u00b7\uac70\uc808\uc744 \ub118\uc5b4 \uc2e4\uc81c \uc81c\uc548\uc73c\ub85c \uc5f0\uacb0\ud558\uc138\uc694<\/h2>\n\n\n<p>\uae30\uc874 \uc791\uc5c5\uc5d0 \uac10\ub2f9\ud558\uae30 \uc5b4\ub824\uc6b4 \uc601\ud5a5\uc744 \uc8fc\uc9c0 \uc54a\uc73c\uba74\uc11c \uc694\uccad \uc218\ub7c9\uc744 \ud76c\ub9dd \ub0a0\uc9dc\uae4c\uc9c0 \uc0dd\uc0b0\ud560 \uc218 \uc788\ub2e4\uba74 \uc8fc\ubb38\uc744 \ud655\uc815\ud560 \uadfc\uac70\uac00 \ub354 \ud0c4\ud0c4\ud574\uc9d1\ub2c8\ub2e4. \uadf8\ub807\uc9c0 \uc54a\ub2e4\uba74 \uace0\uac1d\uc774 \uad6c\ub9e4\ud560 \uc218 \uc788\ub294 \ub300\uc548\uc744 \uc81c\uc2dc\ud558\ub294 \uac83\uc774 \uc720\uc6a9\ud55c \ub300\uc751\uc785\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc55e\uc11c \uac00\uc815\ud55c \uac00\uacf5\uc5c5\uccb4\uc758 \uc8fc\ubb38\uc5d0\ub294 \ub2e4\uc74c\uacfc \uac19\uc740 \ub300\uc548\uc744 \uc81c\uc2dc\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>\uc804\uccb4 \ub0a9\ud488\uc77c\uc744 \ub2a6\ucdb0 \uc81c\uc548\ud558\uc138\uc694.<\/strong> \uae30\uc874 \ub0a9\uae30 \uc57d\uc18d\uc740 \uc720\uc9c0\ud558\uace0, \uc2dc\uac04\uc774 \ub354 \uac78\ub9ac\ub294 \ud50c\ub808\uc774\ud2b8 \uacf5\uc815 \uacbd\ub85c\ub97c \uae30\uc900\uc73c\ub85c \uac00\ub2a5\ud55c \ub0a0\uc9dc\ub97c \uc81c\uc2dc\ud569\ub2c8\ub2e4.<\/li><li><strong>\ubd84\ud560 \ub0a9\ud488\uc744 \ud611\uc758\ud558\uc138\uc694.<\/strong> \uace0\uac1d\uc774 \uc0e4\ud504\ud2b8\ub9cc \ub530\ub85c \uc0ac\uc6a9\ud560 \uc218 \uc788\ub2e4\uba74 \uc0e4\ud504\ud2b8\ub97c \uba3c\uc800, \ud50c\ub808\uc774\ud2b8\ub97c \ub098\uc911\uc5d0 \ub0a9\ud488\ud558\ub294 \ubc29\uc548\uc744 \uc81c\uc548\ud569\ub2c8\ub2e4. \ucd94\uac00 \ucde8\uae09 \uc791\uc5c5\uacfc \uc6b4\uc1a1\ube44\uac00 \ubc1c\uc0dd\ud558\uae30 \uc804\uc5d0 \ubd80\ubd84 \ucd9c\ud558\uac00 \uace0\uac1d\uc5d0\uac8c \uc2e4\uc9c8\uc801\uc778 \uac00\uce58\uac00 \uc788\ub294\uc9c0 \ud655\uc778\ud558\uc138\uc694.<\/li><li><strong>\uacc4\ud68d\uc744 \ubcc0\uacbd\ud574 \ub0a9\uae30\ub97c \uc55e\ub2f9\uae38 \uc218 \uc788\ub294\uc9c0 \uac80\ud1a0\ud558\uc138\uc694.<\/strong> \uc2b9\uc778\ub41c \ucd94\uac00 \uad50\ub300\ub098 \uc791\uc5c5 \uac00\ub2a5\ud55c \ub2e4\ub978 \uc790\uc6d0\uc774 \ub3c4\uc6c0\uc774 \ub420 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ub354 \uc774\ub978 \ub0a9\uae30\ub97c \uc81c\uc548\ud558\uae30 \uc804\uc5d0 \uc0dd\uc0b0 \ub2a5\ub825\uc5d0 \uad00\ud55c \uc804\uc81c\ub97c \uc218\uc815\ud558\uace0 \ub2e4\uc2dc \uacc4\uc0b0\ud558\uc138\uc694.<\/li><li><strong>\uc6b0\uc120\uc21c\uc704 \ubcc0\uacbd\uc5d0 \ub530\ub978 \uc601\ud5a5\uc744 \uba85\ud655\ud788 \ud569\uc758\ud558\uc138\uc694.<\/strong> \uacbd\uc601\uc9c4\uc774 \uc774 \uc8fc\ubb38\uc744 \uc55e\ub2f9\uae30\uae30\ub85c \uacb0\uc815\ud55c\ub2e4\uba74, \uc601\ud5a5\uc744 \ubc1b\ub294 \uae30\uc874 \ub0a9\uae30 \uc57d\uc18d\uc744 \ud30c\uc545\ud558\uace0 \uadf8\uc5d0 \ub530\ub978 \uacb0\uacfc\uc5d0 \uc2e0\uc911\ud558\uac8c \ub300\uc751\ud574\uc57c \ud569\ub2c8\ub2e4.<\/li><\/ul>\n\n\n<p>\uc774\ub294 \ub2e8\uc21c\ud55c \uc77c\uc815 \uc870\uc815\uc774 \uc544\ub2c8\ub77c \uc218\uc775\uacfc \uac70\ub798 \uc870\uac74\uc5d0 \uad00\ud55c \uc758\uc0ac\uacb0\uc815\uc785\ub2c8\ub2e4. \uac00\uaca9\uc5d0 \ubc18\uc601\ud558\uc9c0 \uc54a\uc740 \ucd08\uacfc\uadfc\ubb34\ub098 \uae34\uae09 \uc6b4\uc1a1, \uc0dd\uc0b0 \ucc28\uc9c8\uc744 \ucd08\ub798\ud558\ub294 \uae34\uae09 \uc8fc\ubb38\uc740 \uac89\ubcf4\uae30\ubcf4\ub2e4 \uc218\uc775\uc131\uc774 \ub0ae\uc744 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc218\ub77d \uc804\uc5d0 \ud655\uc778\ud558\uba74 \ucd94\uac00 \uc791\uc5c5\uc5d0 \ub4dc\ub294 \ube44\uc6a9\uc744 \uac00\uaca9\uc5d0 \ubc18\uc601\ud558\uac70\ub098 \ub354 \uc801\uc808\ud55c \ub0a9\uae30\ub97c \ud611\uc0c1\ud560 \uc5ec\uc9c0\uac00 \uc0dd\uae41\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\ub0a9\uae30 \uc57d\uc18d\uc5d0 \ud604\uc7ac \uc791\uc5c5 \ubd80\ud558\ub97c \uacc4\uc18d \ubc18\uc601\ud558\uc138\uc694<\/h2>\n\n\n<p>\uc5b4\uc81c \uc77c\uc815\uc5d0 \uadfc\uac70\ud55c \uacac\uc801\uc740 \ub2e4\ub978 \uc8fc\ubb38\uc744 \uc218\ub77d\ud558\uac70\ub098 \uc790\uc7ac \uc785\uace0\uac00 \ub2a6\uc5b4\uc9c0\uba74 \ub354 \uc774\uc0c1 \ub9de\uc9c0 \uc54a\uc744 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uace0\uac1d\uc774 \ud655\uc815\ud558\uae30 \uc804\uc5d0 \uc81c\uc548 \ub0a9\uae30\uc758 \uc804\uc81c\uac00 \ubc14\ub00c\uc5c8\ub2e4\uba74 \ud574\ub2f9 \uc8fc\ubb38\uc744 \ub2e4\uc2dc \uac80\ud1a0\ud558\uc138\uc694.<\/p>\n\n\n<p>\uc77c\uc815\uc774 \uc7a1\ud78c \uc608\uc0c1 \uc8fc\ubb38\uc740 \uacc4\ud68d\uc0c1 \uc791\uc5c5 \ubd80\ud558\uc5d0 \ud3ec\ud568\ub418\uba70, \ud574\ub2f9 \uc791\uc5c5\uc5d0 \ud544\uc694\ud55c \uc0dd\uc0b0 \ub2a5\ub825\uc774 \ubbf8\ub9ac \ubc30\uc815\ub429\ub2c8\ub2e4. \ub530\ub77c\uc11c \uc601\uc5c5\ud300\uc740 \ube44\uc5b4 \uc788\ub294 \uac83\ucc98\ub7fc \ubcf4\uc774\ub294 \ub3d9\uc77c\ud55c \uc2dc\uac04\ub300\ub97c \uae30\uc900\uc73c\ub85c \ubaa8\ub4e0 \uacac\uc801\uc744 \uc81c\uc2dc\ud558\ub294 \ub300\uc2e0, \uc7a0\uc7ac \uc8fc\ubb38\uae4c\uc9c0 \uace0\ub824\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc5b4\ub5a4 \uc608\uc0c1 \uc8fc\ubb38\uc758 \uc77c\uc815\uc744 \uc7a1\uc744\uc9c0, \ub204\uac00 \uc774\ub97c \uad00\ub9ac\ud560\uc9c0, \uace0\uac1d\uc774 \uc218\ub77d\ud558\uc9c0 \uc54a\uc740 \uacac\uc801\uc744 \uc5b8\uc81c\ubd80\ud130 \uacc4\ud68d\uc5d0\uc11c \uc81c\uc678\ud560\uc9c0 \ud569\uc758\ud558\uc138\uc694. \uace0\uac1d\uc774 \uc8fc\ubb38\uc744 \ud655\uc815\ud558\uba74 \uc608\uc0c1 \uc8fc\ubb38 \ud45c\uc2dc\ub97c \ud574\uc81c\ud558\uace0 \ud655\uc815 \uc8fc\ubb38\uc73c\ub85c \uc77c\uc815\uc744 \uc7a1\uc73c\uc138\uc694. \uc774\ub807\uac8c \ud558\uba74 \uc624\ub798\ub41c \uacac\uc801 \ub54c\ubb38\uc5d0 \uac00\uc6a9 \uc0dd\uc0b0 \ub2a5\ub825\uc744 \ud30c\uc545\ud558\uae30 \uc5b4\ub824\uc6cc\uc9c0\ub294 \uc77c\uc744 \ub9c9\uc73c\uba74\uc11c, \uace0\uac1d\uc5d0\uac8c \uc81c\uc548\ud55c \ub0b4\uc6a9\uc744 \ud655\uc815\ub41c \uc0dd\uc0b0 \uacc4\ud68d\uc73c\ub85c \uc774\uc5b4\uac08 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc8fc\ubb38\uc744 \ud655\uc815\ud55c \ub4a4\uc5d0\ub3c4 \uc6b0\uc120\uc21c\uc704, \uc790\uc6d0 \uac00\uc6a9\uc131, \uc790\uc7ac \uc815\ubcf4\ub97c \ucd5c\uc2e0 \uc0c1\ud0dc\ub85c \uc720\uc9c0\ud558\uc138\uc694. \uacc4\uc0b0\uc5d0 \uadfc\uac70\ud55c \ub0a9\uae30 \uc57d\uc18d\uc774 \uac00\uce58\ub97c \uac00\uc9c0\ub824\uba74 \ubaa8\ub4e0 \uad50\ub300 \uadfc\ubb34\uc640 \uc790\uc7ac \uc785\uace0\uac00 \ucc98\uc74c \uc608\uc0c1\ub300\ub85c \uc774\ub904\uc9c4\ub2e4\ub294 \uacc4\ud68d\uc774 \uc544\ub2c8\ub77c, \uc2e4\uc81c\ub85c \uc6b4\uc601\ud560 \uacf5\uc7a5 \uc0c1\ud669\uc744 \uae30\uc900\uc73c\ub85c \uac80\ud1a0\ud574\uc57c \ud569\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\uc77c\uc0c1 \uc5c5\ubb34\uc5d0\uc11c \ub354 \uc815\ud655\ud574\uc9c0\ub294 \ub0a9\uae30 \uc124\uc815<\/h2>\n\n\n<p>\ud540\ub780\ub4dc\uc758 \uc218\ud0c1 \uac00\uacf5\uc5c5\uccb4 Eskomatic\uc740 \uacfc\uac70 \uad6c\ud615 ERP\uc640 \uc0dd\uc0b0 \uad00\ub9ac \uc2dc\uc2a4\ud15c\uc5d0\uc11c \uc791\uc5c5 \ub300\uae30\uc5f4\uc744 \uc8fc\ub85c \uc218\uc791\uc5c5\uc73c\ub85c \uad00\ub9ac\ud588\uc2b5\ub2c8\ub2e4. \uc804\uccb4 \uc0c1\ud669\uc744 \ud30c\uc545\ud558\ub294 \ub370 \uc2dc\uac04\uc774 \uc624\ub798 \uac78\ub838\uace0 \uc790\uc7ac \ud604\ud669\ub3c4 \ucda9\ubd84\ud788 \ubcf4\uc774\uc9c0 \uc54a\uc544, \uc791\uc5c5 \uc2dc\uc791\uc774 \uc784\ubc15\ud574\uc11c\uc57c \uc790\uc7ac \ubd80\uc871\uc744 \ubc1c\uacac\ud558\ub294 \uacbd\uc6b0\uac00 \uc0dd\uae38 \uc218 \uc788\uc5c8\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>SkyPlanner\ub97c \ub3c4\uc785\ud55c \ub4a4\uc5d0\ub294 \uae30\uc874 ERP \ub370\uc774\ud130\uc640 \uc5f0\uacb0\ub41c \uc2dc\uac01\uc801\uc778 Gantt \uc791\uc5c5 \ub300\uae30\uc5f4\uacfc \uc790\ub3d9 \ubd80\ud558 \uc2a4\ucf00\uc904\ub9c1\uc744 \ud65c\uc6a9\ud558\uac8c \ub418\uc5c8\uc2b5\ub2c8\ub2e4. <a href=\"\/ko\/%ea%b3%a0%ea%b0%9d-%ec%82%ac%eb%a1%80\/eskomatic\/\">Eskomatic\uc5d0 \ub530\ub974\uba74<\/a> \uc0dd\uc0b0 \ubd80\ud558\uac00 \ub354 \uba85\ud655\ud558\uac8c \ubcf4\uc5ec \ud604\uc2e4\uc801\uc778 \ub0a9\uae30\ub97c \ud30c\uc545\ud558\uae30 \uc26c\uc6cc\uc84c\uace0, \uace0\uac1d\uc5d0\uac8c \ub354 \uc815\ud655\ud55c \ub0a0\uc9dc\ub97c \uc548\ub0b4\ud558\ub294 \ub370 \ub3c4\uc6c0\uc774 \ub429\ub2c8\ub2e4. \uc0dd\uc0b0 \uacc4\ud68d \uad00\ub9ac\uc790 Tommi M\u00e4nnist\u00f6\ub294 \uc77c\uc0c1 \uc5c5\ubb34\uc5d0\uc11c \ud2b9\ud788 \ub3cb\ubcf4\uc774\ub294 \uac15\uc810\uc73c\ub85c \ub0a9\uae30 \uc124\uc815\uc744 \uaf3d\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc774 \ubb38\uc81c\ub97c \ud574\uacb0\ud558\uae30 \uc704\ud574 SkyPlanner\ub97c \uc120\ud0dd\ud560 \uc2e4\uc9c8\uc801\uc778 \uc774\uc720\uac00 \uc5ec\uae30\uc5d0 \uc788\uc2b5\ub2c8\ub2e4. \uc0dd\uc0b0\uacc4\ud68d \ub2f4\ub2f9\uc790\uac00 \uc77c\uc815\uc744 \uc218\uc791\uc5c5\uc73c\ub85c \ub2e4\uc2dc \uc9dc\uc11c \ub2f5\uc744 \uad6c\ud560 \ud544\uc694 \uc5c6\uc774, \uc601\uc5c5\ud300\uc5d0 \uc2e4\uc81c \uc791\uc5c5 \uc77c\uc815\uc5d0 \uadfc\uac70\ud55c \ub2f5\uc744 \uc904 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p><a href=\"\/ko\/%ec%98%81%ec%97%85%ed%8c%80%ec%97%90-%eb%ac%b8%ec%9d%98\/\">SkyPlanner \ub370\ubaa8\ub97c \uc608\uc57d\ud558\uc138\uc694<\/a>. \uc218\uc8fc \uac80\ud1a0 \uc911\uc778 \uc8fc\ubb38\uacfc \ud76c\ub9dd \ub0a9\uae30, \uadf8\ub9ac\uace0 \uc9c0\uc5f0\uc744 \uc77c\uc73c\ud0ac \uac00\ub2a5\uc131\uc774 \uac00\uc7a5 \ud070 \uc790\uc6d0 \uc815\ubcf4\ub97c \uc900\ube44\ud574 \uc8fc\uc138\uc694. \ub370\ubaa8 \uc0c1\ub2f4\uc5d0\uc11c \uc8fc\ubb38\uc744 \ud655\uc815\ud558\uae30 \uc804\uc5d0 \uae30\uc874 \ub0a9\uae30 \uc57d\uc18d\uacfc \ube44\uad50\ud574 \uc81c\uc548 \uc870\uac74\uc744 \uac80\ud1a0\ud558\ub294 \ubc29\ubc95\uc744 \uc0b4\ud3b4\ubcfc \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uba3c\uc800 \uc9c1\uc811 \uc0b4\ud3b4\ubcf4\uace0 \uc2f6\ub2e4\uba74 <a href=\"\/ko\/%ed%8f%89%ea%b0%80%ed%8c%90\/\">\ub370\ubaa8 \ub370\uc774\ud130\ub85c SkyPlanner\ub97c \uccb4\ud5d8\ud574 \ubcf4\uc138\uc694<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Capable to Promise: \ub0a9\uae30\ub97c \uc57d\uc18d\ud558\uae30 \uc804\uc5d0 \uc8fc\ubb38 \uac80\ud1a0\ud558\uae30 \ud648 &raquo; \ub9ac\uc18c\uc2a4 &raquo; Capable to Promise: \ub0a9\uae30\ub97c \uc57d\uc18d\ud558\uae30 \uc804\uc5d0 \uc8fc\ubb38 \uac80\ud1a0\ud558\uae30 Capable to promise(CTP)\ub294 \uc790\uc7ac \uac00\uc6a9\uc131\uacfc \uc791\uc5c5\uc5d0 \ud544\uc694\ud55c \uc0dd\uc0b0 \ub2a5\ub825\uc744 \ud568\uaed8 \uace0\ub824\ud574 \uc694\uccad \uc218\ub7c9\uc744 \uc0dd\uc0b0\ud560 \uc218 \uc788\ub294\uc9c0, \uc5b8\uc81c \uc0dd\uc0b0\ud560 \uc218 \uc788\ub294\uc9c0 \ud655\uc778\ud558\ub294 \ubc29\ubc95\uc785\ub2c8\ub2e4. \uc7ac\uace0\uc5d0\uc11c \ubc14\ub85c \ucd9c\ud558\ud560 \uc218 \uc5c6\ub294 \uc81c\ud488\uc758 \ub0a9\uae30\ub97c \uc601\uc5c5\ud300\uc774 \uc57d\uc18d\ud560 \ub54c \ud310\ub2e8 \uadfc\uac70\uac00 \ub429\ub2c8\ub2e4. &#8230; <a title=\"Capable to Promise: \ub0a9\uae30\ub97c \uc57d\uc18d\ud558\uae30 \uc804\uc5d0 \uc8fc\ubb38 \uac80\ud1a0\ud558\uae30\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/capable-to-promise\/\" aria-label=\"Read more about Capable to Promise: \ub0a9\uae30\ub97c \uc57d\uc18d\ud558\uae30 \uc804\uc5d0 \uc8fc\ubb38 \uac80\ud1a0\ud558\uae30\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":99840,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2530,496],"tags":[],"class_list":["post-99770","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps--","category-496","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Capable to Promise: \ub0a9\uae30\ub97c \uc57d\uc18d\ud558\uae30 \uc804\uc5d0 \uc8fc\ubb38 \uac80\ud1a0\ud558\uae30<\/title>\n<meta name=\"description\" content=\"\uae30\uc874 \uace0\uac1d \ub0a9\uae30\ub97c \uc9c0\ud0a4\uba70 \uc0c8 \uc8fc\ubb38\uc744 \uc0dd\uc0b0\ud560 \uc218 \uc788\ub098\uc694? \ub0a9\uae30 \ud655\uc815 \uc804 capable to promise\uc640 SkyPlanner\ub85c \uc0dd\uc0b0 \ub2a5\ub825\uc744 \ud655\uc778\ud558\uc138\uc694.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/capable-to-promise\/\" \/>\n<meta property=\"og:locale\" content=\"ko_KR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Capable to Promise: \ub0a9\uae30\ub97c \uc57d\uc18d\ud558\uae30 \uc804\uc5d0 \uc8fc\ubb38 \uac80\ud1a0\ud558\uae30\" \/>\n<meta property=\"og:description\" content=\"\uae30\uc874 \uace0\uac1d \ub0a9\uae30\ub97c \uc9c0\ud0a4\uba70 \uc0c8 \uc8fc\ubb38\uc744 \uc0dd\uc0b0\ud560 \uc218 \uc788\ub098\uc694? \ub0a9\uae30 \ud655\uc815 \uc804 capable to promise\uc640 SkyPlanner\ub85c \uc0dd\uc0b0 \ub2a5\ub825\uc744 \ud655\uc778\ud558\uc138\uc694.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/capable-to-promise\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-16T07:53:34+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-16T10:12:25+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1536\" \/>\n\t<meta property=\"og:image:height\" content=\"864\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\uae00\uc4f4\uc774\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/capable-to-promise\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/capable-to-promise\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Capable to Promise: \ub0a9\uae30\ub97c \uc57d\uc18d\ud558\uae30 \uc804\uc5d0 \uc8fc\ubb38 \uac80\ud1a0\ud558\uae30\",\"datePublished\":\"2026-10-16T07:53:34+00:00\",\"dateModified\":\"2026-10-16T10:12:25+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/capable-to-promise\\\/\"},\"wordCount\":61,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/capable-to-promise\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/capable-to-promise-hero-1.png\",\"articleSection\":[\"APS \ubc0f \uc2a4\ucf00\uc904\ub9c1\",\"\ub9ac\uc18c\uc2a4\"],\"inLanguage\":\"ko-KR\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/capable-to-promise\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/capable-to-promise\\\/\",\"name\":\"Capable to Promise: \ub0a9\uae30\ub97c \uc57d\uc18d\ud558\uae30 \uc804\uc5d0 \uc8fc\ubb38 \uac80\ud1a0\ud558\uae30\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/capable-to-promise\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/capable-to-promise\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/capable-to-promise-hero-1.png\",\"datePublished\":\"2026-10-16T07:53:34+00:00\",\"dateModified\":\"2026-10-16T10:12:25+00:00\",\"description\":\"\uae30\uc874 \uace0\uac1d \ub0a9\uae30\ub97c \uc9c0\ud0a4\uba70 \uc0c8 \uc8fc\ubb38\uc744 \uc0dd\uc0b0\ud560 \uc218 \uc788\ub098\uc694? \ub0a9\uae30 \ud655\uc815 \uc804 capable to promise\uc640 SkyPlanner\ub85c \uc0dd\uc0b0 \ub2a5\ub825\uc744 \ud655\uc778\ud558\uc138\uc694.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/capable-to-promise\\\/#breadcrumb\"},\"inLanguage\":\"ko-KR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/capable-to-promise\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"ko-KR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/capable-to-promise\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/capable-to-promise-hero-1.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/capable-to-promise-hero-1.png\",\"width\":1536,\"height\":864,\"caption\":\"Turned shafts await a mounting plate beside a milling machine before the complete order can ship.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/capable-to-promise\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Capable to Promise: \ub0a9\uae30\ub97c \uc57d\uc18d\ud558\uae30 \uc804\uc5d0 \uc8fc\ubb38 \uac80\ud1a0\ud558\uae30\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ko-KR\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ko-KR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ko-KR\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Capable to Promise: \ub0a9\uae30\ub97c \uc57d\uc18d\ud558\uae30 \uc804\uc5d0 \uc8fc\ubb38 \uac80\ud1a0\ud558\uae30","description":"\uae30\uc874 \uace0\uac1d \ub0a9\uae30\ub97c \uc9c0\ud0a4\uba70 \uc0c8 \uc8fc\ubb38\uc744 \uc0dd\uc0b0\ud560 \uc218 \uc788\ub098\uc694? \ub0a9\uae30 \ud655\uc815 \uc804 capable to promise\uc640 SkyPlanner\ub85c \uc0dd\uc0b0 \ub2a5\ub825\uc744 \ud655\uc778\ud558\uc138\uc694.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/capable-to-promise\/","og_locale":"ko_KR","og_type":"article","og_title":"Capable to Promise: \ub0a9\uae30\ub97c \uc57d\uc18d\ud558\uae30 \uc804\uc5d0 \uc8fc\ubb38 \uac80\ud1a0\ud558\uae30","og_description":"\uae30\uc874 \uace0\uac1d \ub0a9\uae30\ub97c \uc9c0\ud0a4\uba70 \uc0c8 \uc8fc\ubb38\uc744 \uc0dd\uc0b0\ud560 \uc218 \uc788\ub098\uc694? \ub0a9\uae30 \ud655\uc815 \uc804 capable to promise\uc640 SkyPlanner\ub85c \uc0dd\uc0b0 \ub2a5\ub825\uc744 \ud655\uc778\ud558\uc138\uc694.","og_url":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/capable-to-promise\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-16T07:53:34+00:00","article_modified_time":"2026-10-16T10:12:25+00:00","og_image":[{"width":1536,"height":864,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"\uae00\uc4f4\uc774":"Jussi M\u00e4ntyl\u00e4"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/capable-to-promise\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/capable-to-promise\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Capable to Promise: \ub0a9\uae30\ub97c \uc57d\uc18d\ud558\uae30 \uc804\uc5d0 \uc8fc\ubb38 \uac80\ud1a0\ud558\uae30","datePublished":"2026-10-16T07:53:34+00:00","dateModified":"2026-10-16T10:12:25+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/capable-to-promise\/"},"wordCount":61,"publisher":{"@id":"https:\/\/skyplanner.ai\/ko\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/capable-to-promise\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1.png","articleSection":["APS \ubc0f \uc2a4\ucf00\uc904\ub9c1","\ub9ac\uc18c\uc2a4"],"inLanguage":"ko-KR"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/capable-to-promise\/","url":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/capable-to-promise\/","name":"Capable to Promise: \ub0a9\uae30\ub97c \uc57d\uc18d\ud558\uae30 \uc804\uc5d0 \uc8fc\ubb38 \uac80\ud1a0\ud558\uae30","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ko\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/capable-to-promise\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/capable-to-promise\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1.png","datePublished":"2026-10-16T07:53:34+00:00","dateModified":"2026-10-16T10:12:25+00:00","description":"\uae30\uc874 \uace0\uac1d \ub0a9\uae30\ub97c \uc9c0\ud0a4\uba70 \uc0c8 \uc8fc\ubb38\uc744 \uc0dd\uc0b0\ud560 \uc218 \uc788\ub098\uc694? \ub0a9\uae30 \ud655\uc815 \uc804 capable to promise\uc640 SkyPlanner\ub85c \uc0dd\uc0b0 \ub2a5\ub825\uc744 \ud655\uc778\ud558\uc138\uc694.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/capable-to-promise\/#breadcrumb"},"inLanguage":"ko-KR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/capable-to-promise\/"]}]},{"@type":"ImageObject","inLanguage":"ko-KR","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/capable-to-promise\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1.png","width":1536,"height":864,"caption":"Turned shafts await a mounting plate beside a milling machine before the complete order can ship."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/capable-to-promise\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/ko\/"},{"@type":"ListItem","position":2,"name":"Capable to Promise: \ub0a9\uae30\ub97c \uc57d\uc18d\ud558\uae30 \uc804\uc5d0 \uc8fc\ubb38 \uac80\ud1a0\ud558\uae30"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/ko\/#website","url":"https:\/\/skyplanner.ai\/ko\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/ko\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/ko\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ko-KR"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/ko\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/ko\/","logo":{"@type":"ImageObject","inLanguage":"ko-KR","@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"ko-KR","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1.png",1536,864,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1.png",1536,864,false],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1.png",1536,864,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/ko\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Capable to Promise: \ub0a9\uae30\ub97c \uc57d\uc18d\ud558\uae30 \uc804\uc5d0 \uc8fc\ubb38 \uac80\ud1a0\ud558\uae30 \ud648 &raquo; \ub9ac\uc18c\uc2a4 &raquo; Capable to Promise: \ub0a9\uae30\ub97c \uc57d\uc18d\ud558\uae30 \uc804\uc5d0 \uc8fc\ubb38 \uac80\ud1a0\ud558\uae30 Capable to promise(CTP)\ub294 \uc790\uc7ac \uac00\uc6a9\uc131\uacfc \uc791\uc5c5\uc5d0 \ud544\uc694\ud55c \uc0dd\uc0b0 \ub2a5\ub825\uc744 \ud568\uaed8 \uace0\ub824\ud574 \uc694\uccad \uc218\ub7c9\uc744 \uc0dd\uc0b0\ud560 \uc218 \uc788\ub294\uc9c0, \uc5b8\uc81c \uc0dd\uc0b0\ud560 \uc218 \uc788\ub294\uc9c0 \ud655\uc778\ud558\ub294 \ubc29\ubc95\uc785\ub2c8\ub2e4. \uc7ac\uace0\uc5d0\uc11c \ubc14\ub85c \ucd9c\ud558\ud560 \uc218 \uc5c6\ub294 \uc81c\ud488\uc758 \ub0a9\uae30\ub97c \uc601\uc5c5\ud300\uc774 \uc57d\uc18d\ud560 \ub54c \ud310\ub2e8 \uadfc\uac70\uac00 \ub429\ub2c8\ub2e4.&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts\/99770","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/comments?post=99770"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts\/99770\/revisions"}],"predecessor-version":[{"id":99893,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts\/99770\/revisions\/99893"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/media\/99840"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/media?parent=99770"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/categories?post=99770"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/tags?post=99770"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}