{"id":99334,"date":"2026-10-15T20:34:27","date_gmt":"2026-10-15T20:34:27","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=99334"},"modified":"2026-10-19T15:12:41","modified_gmt":"2026-10-19T15:12:41","slug":"make-to-stock","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/make-to-stock\/","title":{"rendered":"\uc7ac\uace0\uc0dd\uc0b0: \uace0\uac1d\uc774 \uae30\ub2e4\ub9ac\uae30 \uc804\uc5d0 \uc7ac\uace0\ub97c \ubcf4\ucda9\ud558\uc138\uc694"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">\uc7ac\uace0\uc0dd\uc0b0: \uace0\uac1d\uc774 \uae30\ub2e4\ub9ac\uae30 \uc804\uc5d0 \uc7ac\uace0\ub97c \ubcf4\ucda9\ud558\uc138\uc694<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/ko\/\">\ud648<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/\">\ub9ac\uc18c\uc2a4<\/a> &raquo; \uc7ac\uace0\uc0dd\uc0b0: \uace0\uac1d\uc774 \uae30\ub2e4\ub9ac\uae30 \uc804\uc5d0 \uc7ac\uace0\ub97c \ubcf4\ucda9\ud558\uc138\uc694<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">\uc608\uc0c1 \uc77d\uae30 \uc2dc\uac04: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> \ubd84<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>\uace0\uac1d\uc774 \ud45c\uc900 \uc81c\ud488\uc744 \ub0b4\uc77c\uae4c\uc9c0 \ubc1b\uace0 \uc2f6\uc5b4 \ud569\ub2c8\ub2e4. \uc774\ubbf8 \uc7ac\uace0\uac00 \uc788\ub2e4\uba74 \uc0dd\uc0b0\uc774 \ub05d\ub0a0 \ub54c\uae4c\uc9c0 \uae30\ub2e4\ub824 \ub2ec\ub77c\uace0 \ud560 \ud544\uc694 \uc5c6\uc774 \ucd9c\ud558\ub97c \uc900\ube44\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc8fc\ubb38\uc774 \ub4e4\uc5b4\uc624\uae30 \uc804\uc5d0 \ubbf8\ub9ac \uc0dd\uc0b0\ud574 \ub450\ub294 \uac83, \uc774\uac83\uc774 \uc7ac\uace0\uc0dd\uc0b0\uc758 \ub9e4\ub825\uc785\ub2c8\ub2e4.<\/p>\n\n\n<p>\ub354 \uc5b4\ub824\uc6b4 \uacb0\uc815\uc740 \ud310\ub9e4 \uc804\uc5d0 \ub0b4\ub824\uc57c \ud569\ub2c8\ub2e4. \uc5b4\ub5a4 \uc81c\ud488\uc744 \uc644\uc81c\ud488 \uc7ac\uace0\ub85c \ubcf4\uc720\ud560\uc9c0, \uc5bc\ub9c8\ub098 \uc0dd\uc0b0\ud560\uc9c0, \ub2e4\uc74c \ubc30\uce58\ub294 \uc5b8\uc81c\uae4c\uc9c0 \uc900\ube44\ud574\uc57c \ud560\uc9c0\ub97c \uc815\ud574\uc57c \ud569\ub2c8\ub2e4. \uc798 \ud314\ub9ac\uc9c0 \uc54a\ub294 \uc0ac\uc591\uc758 \uc81c\ud488\uc744 \uc313\uc544 \ub450\uba74 \uc790\uae08\uc774 \ubb36\uc785\ub2c8\ub2e4. \ud544\uc694\ud55c \uc81c\ud488\uc774\ub77c\ub3c4 \ubcf4\ucda9\uc774 \ub2a6\uc5b4\uc9c0\uba74 \ube44\uc6a9\uc744 \ub4e4\uc5ec \ud655\ubcf4\ud558\ub824\ub358 \ube60\ub978 \ub0a9\ud488\uc758 \uc774\uc810\uc744 \uc783\uac8c \ub429\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc2e4\ud6a8\uc131 \uc788\ub294 MTS \uacc4\ud68d\uc740 \uc774\ub7ec\ud55c \uacb0\uc815\uc744 \uacf5\uc7a5\uc758 \uc2e4\uc81c \uc791\uc5c5 \ubd80\ud558\uc640 \uc5f0\uacb0\ud569\ub2c8\ub2e4. SkyPlanner APS\ub294 \uac19\uc740 \uc124\ube44\uc640 \uc778\ub825\uc744 \uc0ac\uc6a9\ud558\ub294 \ub2e4\ub978 \uc791\uc5c5\uacfc \ud568\uaed8 \uc7ac\uace0 \ubcf4\ucda9 \uc77c\uc815\uc744 \uc218\ub9bd\ud558\ub3c4\ub85d \ub3d5\uc2b5\ub2c8\ub2e4. \uc7ac\uace0\uc0dd\uc0b0\uc744 \uae34\uae09 \uc8fc\ubb38 \ucc98\ub9ac \ud6c4 \ub0a8\ub294 \uc2dc\uac04\uc5d0 \ub9e1\uae30\ub294 \ub300\uc2e0, \uc2e4\uc81c\ub85c \uc2e4\ud589 \uac00\ub2a5\ud55c \uc77c\uc815\uc5d0 \ubc30\uc815\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\uc7ac\uace0\uc0dd\uc0b0\uc774\ub780?<\/h2>\n\n\n<p>\uc7ac\uace0\uc0dd\uc0b0(MTS)\uc740 \uac1c\ubcc4 \uace0\uac1d \uc8fc\ubb38\uc744 \ubc1b\uae30 \uc804\uc5d0 \uc608\uc0c1 \uc218\uc694\uc5d0 \ub9de\ucdb0 \uc644\uc81c\ud488\uc744 \ubbf8\ub9ac \uc0dd\uc0b0\ud558\ub294 \uc804\ub7b5\uc785\ub2c8\ub2e4. \uc774\ud6c4 \uace0\uac1d\uc774 \uc8fc\ubb38\ud558\uba74 \ubcf4\uc720\ud55c \uc644\uc81c\ud488 \uc7ac\uace0\uc5d0\uc11c \uacf5\uae09\ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc218\uc694 \uc608\uce21\uc774\ub098 \uc7ac\uace0 \ubcf4\ucda9 \uc815\ucc45\uc5d0 \ub530\ub77c \uc0dd\uc0b0\ud560 \uc218\ub3c4 \uc788\uace0, \uc608\uc0c1 \uc218\uc694\uc640 \uace0\uac1d\uc774 \uad6c\ub9e4\ud558\uae30\ub85c \uc57d\uc815\ud55c \ubb3c\ub7c9\uc744 \ud568\uaed8 \uace0\ub824\ud574 \uc0dd\uc0b0\ud560 \uc218\ub3c4 \uc788\uc2b5\ub2c8\ub2e4. \ud575\uc2ec\uc740 \uac1c\ubcc4 \ud310\ub9e4 \uc8fc\ubb38\uc774 \ub4e4\uc5b4\uc62c \ub54c\uae4c\uc9c0 \uc0dd\uc0b0\uc744 \ubbf8\ub8e8\uc9c0 \uc54a\ub294\ub2e4\ub294 \uc810\uc785\ub2c8\ub2e4.<\/p>\n\n\n<p>\ud45c\uc900 \uad50\uccb4\uc6a9 \ud544\ud130\ub97c \ud310\ub9e4\ud558\ub294 \uc81c\uc870\uc5c5\uccb4\ub97c \uac00\uc815\ud574 \ubcf4\uaca0\uc2b5\ub2c8\ub2e4. \uace0\uac1d\uc740 \uac19\uc740 \uaddc\uaca9\uc758 \ud544\ud130\ub97c \uc815\uae30\uc801\uc73c\ub85c \uad6c\ub9e4\ud558\uace0 \ube60\ub978 \ucd9c\ud558\ub97c \uae30\ub300\ud569\ub2c8\ub2e4. \uc81c\uc870\uc5c5\uccb4\ub294 \uc8fc\ubb38\uc5d0 \uc55e\uc11c \ud544\ud130\ub97c \uc0dd\uc0b0\ud558\uace0, \uc644\uc81c\ud488 \uc7ac\uace0\uac00 \uc18c\uc9c4\ub418\ub294 \ub9cc\ud07c \ubcf4\ucda9\ud569\ub2c8\ub2e4. \ubc18\uba74 \uc218\uc694\uac00 \ubd88\ud655\uc2e4\ud55c \ub9de\ucda4\ud615 \ud544\ud130\ub294 \uace0\uac1d \uc8fc\ubb38\uc774 \ub4e4\uc5b4\uc628 \ub4a4\uc5d0\ub9cc \uc0dd\uc0b0\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>MTS\ub294 \uc608\uc0c1 \uc218\uc694\ub97c \ubc14\ud0d5\uc73c\ub85c \ud310\ub9e4 \uc804\uc5d0 \uc0dd\uc0b0\ud558\ubbc0\ub85c \ud754\ud788 \ud478\uc2dc \uc804\ub7b5\uc774\ub77c\uace0 \ud569\ub2c8\ub2e4. \uadf8\ub807\ub2e4\uace0 \ubaa8\ub4e0 \uc124\ube44\ub97c \ucd5c\ub300\ud55c \uac00\ub3d9\ud55c \ub4a4 \uc0dd\uc0b0\ud488\uc774 \ud314\ub9ac\uae30\ub97c \ubc14\ub780\ub2e4\ub294 \ub73b\uc740 \uc544\ub2d9\ub2c8\ub2e4. \uc0ac\uc5c5\uc0c1 \ubaa9\uc801\uc740 \uace0\uac1d\uc774 \ud544\uc694\ud560 \ub54c \uacf5\uae09\ud560 \uc218 \uc788\ub3c4\ub85d \ud558\ub294 \ub370 \uc788\uc2b5\ub2c8\ub2e4. \uc798 \ud314\ub9ac\uc9c0 \uc54a\ub294 \uc7ac\uace0\uc5d0 \ud070 \ube44\uc6a9\uc744 \ubb36\uc5b4 \ub450\uc9c0 \uc54a\uc73c\uba74\uc11c, \uace0\uac1d\uc5d0\uac8c \ud544\uc694\ud55c \uc644\uc81c\ud488\uc744 \ucda9\ubd84\ud788 \ud655\ubcf4\ud558\ub294 \uac83\uc785\ub2c8\ub2e4.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\uc7ac\uace0\uc0dd\uc0b0\uacfc \uc218\uc8fc\uc0dd\uc0b0\uc758 \ucc28\uc774<\/h3>\n\n\n<p>\ub450 \ubc29\uc2dd\uc740 \ubb34\uc5c7\uc744 \uacc4\uae30\ub85c \uc0dd\uc0b0\uc744 \uc2dc\uc791\ud558\ub294\uc9c0, \uace0\uac1d\uc774 \uc5b4\ub290 \ub2e8\uacc4\uc5d0\uc11c \uae30\ub2e4\ub824\uc57c \ud558\ub294\uc9c0\uac00 \ub2e4\ub985\ub2c8\ub2e4.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>\ube44\uad50 \ud56d\ubaa9<\/th><th>\uc7ac\uace0\uc0dd\uc0b0<\/th><th>\uc218\uc8fc\uc0dd\uc0b0<\/th><\/tr><\/thead><tbody><tr><td>\uc0dd\uc0b0 \uc2dc\uc791 \uae30\uc900<\/td><td>\uc608\uc0c1 \uc218\uc694 \ub610\ub294 \uc644\uc81c\ud488 \uc7ac\uace0 \ubcf4\ucda9 \ud544\uc694\uc131<\/td><td>\ud2b9\uc815 \uace0\uac1d\uc758 \uc8fc\ubb38<\/td><\/tr><tr><td>\uace0\uac1d \ub300\uae30 \uc2dc\uac04<\/td><td>\ud544\uc694\ud55c \uc7ac\uace0\uac00 \uc788\ub2e4\uba74 \ud53c\ud0b9, \ud3ec\uc7a5, \ucd9c\ud558\uc5d0 \uac78\ub9ac\ub294 \uc2dc\uac04<\/td><td>\uc0dd\uc0b0\ubd80\ud130 \uc8fc\ubb38 \uc774\ud589\uae4c\uc9c0 \uac78\ub9ac\ub294 \uc2dc\uac04<\/td><\/tr><tr><td>\uc8fc\uc694 \uc704\ud5d8<\/td><td>\ubbf8\ud310\ub9e4, \uc9c4\ubd80\ud654 \ub610\ub294 \uc720\ud6a8\uae30\uac04 \ub9cc\ub8cc\ub85c \ub0a8\ub294 \uc644\uc81c\ud488 \uc7ac\uace0<\/td><td>\uc218\uc8fc \ud6c4 \ubc1c\uc0dd\ud558\ub294 \uc791\uc5c5 \ub300\uae30\uc640 \uc0dd\uc0b0 \ub9ac\ub4dc\ud0c0\uc784<\/td><\/tr><tr><td>\uc8fc\ub85c \uc801\ud569\ud55c \uacbd\uc6b0<\/td><td>\ube60\ub978 \uacf5\uae09\uc774 \ud544\uc694\ud55c \ud45c\uc900 \uc81c\ud488\uc758 \ubc18\ubcf5 \uc218\uc694<\/td><td>\uc218\uc694 \uc608\uce21\uc774 \uc5b4\ub824\uc6b4 \uc0ac\uc591 \ub610\ub294 \uace0\uac1d\ubcc4 \ub9de\ucda4 \uc694\uad6c<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>\ud55c \uacf5\uc7a5\uc5d0\uc11c \ub450 \ubc29\uc2dd\uc744 \ud568\uaed8 \uc0ac\uc6a9\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ud45c\uc900 \uc81c\ud488\uad70\uc740 \uc7ac\uace0\ub85c \ubcf4\uc720\ud558\uace0, <a href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/production-make-to-order\/\">\ud2b9\uc218 \uc0ac\uc591\uc740 \uc8fc\ubb38\uc5d0 \ub9de\ucdb0 \uc0dd\uc0b0<\/a>\ud558\ub294 \ubc29\uc2dd\uc785\ub2c8\ub2e4. \ub450 \uc885\ub958\uc758 \uc81c\ud488\uc774 \uac19\uc740 \uc0dd\uc0b0 \uc790\uc6d0\uc744 \ub450\uace0 \uacbd\ud569\ud560 \uc218 \uc788\uc73c\ubbc0\ub85c, \uc77c\uc815\ub3c4 \ub450 \uc720\ud615\uc758 \uc791\uc5c5\uc744 \ud568\uaed8 \uace0\ub824\ud574 \uc218\ub9bd\ud574\uc57c \ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>MTS\ub294 \ub300\ub7c9\uc0dd\uc0b0\uacfc \uac19\uc740 \ub73b\ub3c4 \uc544\ub2d9\ub2c8\ub2e4. MTS\ub294 \uc0dd\uc0b0\uc744 \uc2dc\uc791\ud558\ub294 \uc774\uc720\ub97c \uc124\uba85\ud558\ub294 \ubc18\uba74, <a href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/batch-production-in-manufacturing\/\">\ubc30\uce58 \uc0dd\uc0b0<\/a>, \ub300\ub7c9\uc0dd\uc0b0, \uc5f0\uc18d\uc0dd\uc0b0\uc740 \uc791\uc5c5\uc744 \uad6c\uc131\ud558\ub294 \ubc29\uc2dd\uc744 \uc124\uba85\ud569\ub2c8\ub2e4. \uc18c\ub7c9\uc758 \uace0\uac1d \ub9de\ucda4 \uc8fc\ubb38\uc744 \ucc98\ub9ac\ud558\ub294 \uacf5\uc7a5\uc5d0\uc11c\ub3c4 \uc7ac\uace0 \ubcf4\ucda9\uc6a9 \ubc30\uce58\ub294 \uc7ac\uace0\uc0dd\uc0b0\uc5d0 \ud574\ub2f9\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\uc7ac\uace0\uc0dd\uc0b0\uc740 \uc5b8\uc81c \uc0ac\uc5c5\uc5d0 \ub3c4\uc6c0\uc774 \ub420\uae4c\uc694?<\/h2>\n\n\n<p>\uacf5\uc7a5\uc5d0\uc11c \ub298 \ud574 \uc624\ub358 \ubc29\uc2dd\uc774\ub77c\ub294 \uc774\uc720\ub9cc\uc73c\ub85c MTS\ub97c \uc120\ud0dd\ud558\uc9c0 \ub9c8\uc138\uc694. \uc81c\ud488\uc774\ub098 \uc81c\ud488\uad70\ubcc4\ub85c \uc801\ud569\uc131\uc744 \ud310\ub2e8\ud574\uc57c \ud569\ub2c8\ub2e4. \ub2e4\uc74c \ub124 \uac00\uc9c0 \uc9c8\ubb38\uc774 \ud310\ub2e8\uc5d0 \ub3c4\uc6c0\uc774 \ub429\ub2c8\ub2e4.<\/p>\n\n\n<p><strong>\uace0\uac1d\uc774 \uac19\uc740 \uc0ac\uc591\uc744 \ubc18\ubcf5\ud574\uc11c \uad6c\ub9e4\ud558\ub098\uc694?<\/strong> \uc548\uc815\uc801\uc778 \ud45c\uc900 \uc81c\ud488\uad70\uc740 \uc8fc\ubb38\uc774 \ub4dc\ubb38 \uc218\ubc31 \uac00\uc9c0 \uc870\ud569\ubcf4\ub2e4 \uc7ac\uace0\ub85c \uad00\ub9ac\ud558\uae30 \uc27d\uc2b5\ub2c8\ub2e4. \uc81c\ud488\uad70 \uc804\uccb4\uc758 \uc218\uc694\uac00 \ub9ce\ub2e4\uace0 \ud574\uc11c \ubaa8\ub4e0 \ud06c\uae30, \uc0c9\uc0c1, \ub9c8\uac10 \uc0ac\uc591\uc774 \ub611\uac19\uc774 \uc798 \ud314\ub9ac\ub294 \uac83\uc740 \uc544\ub2d9\ub2c8\ub2e4.<\/p>\n\n\n<p><strong>\uc7ac\uace0 \ubcf4\ucda9 \ub9ac\ub4dc\ud0c0\uc784 \ub3d9\uc548\uc758 \uc218\uc694\ub97c \ucda9\ubd84\ud788 \uc608\uce21\ud560 \uc218 \uc788\ub098\uc694?<\/strong> \ub2e4\uc74c \ubc30\uce58\ub97c \uacf5\uae09\ud560 \uc218 \uc788\uc744 \ub54c\uae4c\uc9c0 \uc5bc\ub9c8\ub098 \uc18c\uc9c4\ub420\uc9c0 \uc2e0\ub8b0\ud560 \ub9cc\ud55c \uc804\ub9dd\uc774 \ud544\uc694\ud569\ub2c8\ub2e4. \uacfc\uac70 \ud310\ub9e4 \uc2e4\uc801\uc774 \ub3c4\uc6c0\uc774 \ub418\uc9c0\ub9cc, \ud310\ucd09 \ud589\uc0ac\ub098 \uacc4\uc808\uc801 \ubcc0\ud654, \uc774\ubbf8 \ud655\uc778\ub41c \uace0\uac1d \uc57d\uc815 \ubb3c\ub7c9\uc5d0 \ub530\ub77c \uc0c1\ud669\uc740 \ub2ec\ub77c\uc9c8 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ucd1d\ud310\ub9e4\ub7c9\ubfd0 \uc544\ub2c8\ub77c \uc5b4\ub5a4 \uc81c\ud488\uc774 \uc5bc\ub9c8\ub098 \ud314\ub9ac\ub294\uc9c0\ub3c4 \uac80\ud1a0\ud558\uc138\uc694.<\/p>\n\n\n<p><strong>\uace0\uac1d\uc774 \uc0dd\uc0b0\uc774 \ub05d\ub0a0 \ub54c\uae4c\uc9c0 \uae30\ub2e4\ub824 \uc904\uae4c\uc694?<\/strong> \uc2dc\uc7a5\uc5d0\uc11c \uc694\uad6c\ud558\ub294 \ucd9c\ud558 \uc2dc\uc810\uc774 \uc0dd\uc0b0 \uacf5\uc815\uc744 \uac70\uccd0 \uc548\uc815\uc801\uc73c\ub85c \uc644\uc131\ud560 \uc218 \uc788\ub294 \uc2dc\uc810\ubcf4\ub2e4 \ube60\ub974\ub2e4\uba74, \ubbf8\ub9ac \uc0dd\uc0b0\ud574 \ub450\ub294 \uac83\uc774 \uac70\ub798 \ud655\ubcf4\uc640 \uc720\uc9c0\uc5d0 \ub3c4\uc6c0\uc774 \ub420 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uace0\uac1d\uc774 \uc0dd\uc0b0 \ub9ac\ub4dc\ud0c0\uc784\uc744 \ubc1b\uc544\ub4e4\uc778\ub2e4\uba74 \uc644\uc81c\ud488 \uc7ac\uace0\ub97c \ubcf4\uc720\ud558\ub294 \uac00\uce58\uac00 \uc0c1\ub300\uc801\uc73c\ub85c \uc791\uc744 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p><strong>\ubcf4\uad00\ud558\ub294 \ub3d9\uc548\uc5d0\ub3c4 \uc81c\ud488\uc758 \uac00\uce58\ub97c \uc720\uc9c0\ud560 \uc218 \uc788\ub098\uc694?<\/strong> \uc720\ud6a8\uae30\uac04, \uc124\uacc4 \ubcc0\uacbd, \ubcf4\uad00 \uc870\uac74, \uc7ac\uace0\uc5d0 \ubb36\uc774\ub294 \uc790\uae08\uc744 \ubaa8\ub450 \uace0\ub824\ud574\uc57c \ud569\ub2c8\ub2e4. \uc989\uc2dc \uacf5\uae09\ud560 \uc218 \uc788\ub354\ub77c\ub3c4 \uc5ec\uc804\ud788 \uace0\uac1d\uc774 \uc6d0\ud558\ub294 \uc81c\ud488\uc774\uc5b4\uc57c \uac00\uce58\uac00 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>MTS\ub294 \ud6a8\uc728\uc801\uc778 \uc0dd\uc0b0 \ubb3c\ub7c9\uc744 \ud655\ubcf4\ud558\uace0 \uc14b\uc5c5 \ud69f\uc218\ub97c \uc904\uc5ec \uc0dd\uc0b0 \ube44\uc6a9\uc744 \ub0ae\ucd9c \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uace0\uac1d\uc758 \ub0a9\ud488 \ub300\uae30 \uc2dc\uac04\uc744 \uc81c\uc870 \ub9ac\ub4dc\ud0c0\uc784\uacfc \ubd84\ub9ac\ud560 \uc218\ub3c4 \uc788\uc2b5\ub2c8\ub2e4. \ub2e4\ub9cc \uc774\ub7ec\ud55c \uc774\uc810\uc774 \ubcf4\uad00, \ucde8\uae09, \uc790\uae08 \uc870\ub2ec, \uc7ac\uace0 \uc190\uc2e4\uc5d0 \ub4dc\ub294 \ube44\uc6a9\ubcf4\ub2e4 \ucee4\uc57c \ud569\ub2c8\ub2e4. \uac1c\ub2f9 \uc0dd\uc0b0 \ube44\uc6a9\uc774 \ub0ae\uc544\ub3c4 \uacb0\uad6d \ud314\ub9ac\uc9c0 \uc54a\ub294\ub2e4\uba74 \uc808\uac10\uc774\ub77c\uace0 \ud560 \uc218 \uc5c6\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\ub2e4\uc591\ud55c \uc81c\ud488\uc744 \ucde8\uae09\ud55c\ub2e4\uba74 \uacf5\uc7a5 \uc804\uccb4\uc5d0 \ud55c \uac00\uc9c0 \ubc29\uc2dd\uc744 \uc801\uc6a9\ud558\uae30\ubcf4\ub2e4 \uc81c\ud488\ubcc4\ub85c \uc120\ud0dd\ud558\ub294 \uc815\ucc45\uc774 \ub354 \ud569\ub9ac\uc801\uc778 \uacbd\uc6b0\uac00 \ub9ce\uc2b5\ub2c8\ub2e4. \uafb8\uc900\ud788 \ud314\ub9ac\ub294 \uc81c\ud488\uc740 \ubcf4\ucda9\ud558\uace0, \uc7a5\uae30 \ubcf4\uad00\uc774 \ubc18\ubcf5\ub418\ub294 \uc81c\ud488\uc740 \uc7ac\uac80\ud1a0\ud558\uba70, \uc218\uc694\uac00 \ub108\ubb34 \ubd88\ud655\uc2e4\ud55c \uc81c\ud488\uc5d0\ub294 \ub2e4\ub978 \uc0dd\uc0b0 \uc804\ub7b5\uc744 \uc801\uc6a9\ud558\uc138\uc694.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\uc608\uc0c1 \uc218\uc694\ub97c \ub2e4\uc74c \uc7ac\uace0 \ubcf4\ucda9 \ubc30\uce58\ub85c \uc5f0\uacb0\ud558\uae30<\/h2>\n\n\n<p>\uc2e4\ubb34\uc5d0\uc11c MTS\ub294 \ubc18\ubcf5\uc801\uc73c\ub85c \uc6b4\uc601\ub429\ub2c8\ub2e4. \uc218\uc694\uc640 \uc0ac\uc6a9 \uac00\ub2a5\ud55c \uc7ac\uace0\ub97c \uac80\ud1a0\ud558\uace0, \ubcf4\ucda9\ud560 \ubb3c\ub7c9\uc744 \uacb0\uc815\ud574 \uc77c\uc815\uc744 \uc218\ub9bd\ud55c \ub2e4\uc74c, \uc18c\uc9c4\ub7c9\uacfc \uc0dd\uc0b0 \uc0c1\ud669\uc758 \ubcc0\ud654\uc5d0 \ub9de\ucdb0 \uacc4\ud68d\uc744 \uac31\uc2e0\ud569\ub2c8\ub2e4.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\uc2e4\uc81c\ub85c \uc0ac\uc6a9 \uac00\ub2a5\ud55c \uc7ac\uace0 \ud655\uc778\ud558\uae30<\/h3>\n\n\n<p>\uc0ac\uc6a9 \uac00\ub2a5\ud55c \uc644\uc81c\ud488 \uc7ac\uace0\ub97c \uc774\ubbf8 \uc8fc\ubb38\uc5d0 \ud560\ub2f9\ub41c \uc218\ub7c9, \ucd9c\ud558 \uc2b9\uc778 \ub300\uae30 \uc218\ub7c9, \uadf8 \ubc16\uc758 \uc774\uc720\ub85c \uc0ac\uc6a9\ud560 \uc218 \uc5c6\ub294 \uc218\ub7c9\uacfc \uad6c\ubd84\ud558\uc138\uc694. \uc9c4\ud589 \uc911\uc778 \uc0dd\uc0b0 \uc624\ub354\ub3c4 \ud655\uc778\ud574\uc57c \ud569\ub2c8\ub2e4. \uc774\ubbf8 \uc0dd\uc0b0 \uc911\uc778 \ubc30\uce58\ub294 \uc55e\uc73c\ub85c \uacf5\uae09\ub420 \ubb3c\ub7c9\uc774\ubbc0\ub85c, \uac19\uc740 \uc218\ub7c9\uc744 \uc911\ubcf5 \uc0dd\uc0b0\ud558\uc9c0 \uc54a\ub3c4\ub85d \ud574\uc57c \ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\uadf8 \ubb3c\ub7c9\uc774 \uc5b8\uc81c \uacf5\uae09 \uac00\ub2a5\ud55c\uc9c0\ub3c4 \uc0b4\ud3b4\ubcf4\uc138\uc694. \uc2dc\uc2a4\ud15c\uc5d0 \uc218\ub7c9\uc774 \ud45c\uc2dc\ub418\uc5b4 \uc788\ub354\ub77c\ub3c4, \uc608\uc0c1 \uc7ac\uace0 \uc18c\uc9c4 \uc2dc\uc810\ubcf4\ub2e4 \ub2a6\uac8c \uc644\uc131\ub418\ub294 \ubc30\uce58\ub85c\ub294 \uadf8 \uc774\uc804\uc758 \ub0a9\ud488\uc744 \uc9c0\ud0ac \uc218 \uc5c6\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\uc218\ub7c9\uacfc \uacf5\uae09 \uac00\ub2a5\uc77c \uacb0\uc815\ud558\uae30<\/h3>\n\n\n<p>\ud569\uc758\ub41c \uc7ac\uace0 \uad00\ub9ac \uc815\ucc45\uc5d0 \ub530\ub77c \ubcf4\ucda9\ud560 \ud488\ubaa9\uc744 \uacb0\uc815\ud558\uc138\uc694. \uc7ac\uc8fc\ubb38\uc810 \ubc29\uc2dd\uc744 \uc0ac\uc6a9\ud558\uba74 \uc7ac\uace0\uac00 \uae30\uc900 \uc218\uc900\uc5d0 \ub3c4\ub2ec\ud588\uc744 \ub54c \ubcf4\ucda9 \uc5ec\ubd80\ub97c \uac80\ud1a0\ud560 \uc218 \uc788\uace0, \uc815\uae30 \uac80\ud1a0 \ubc29\uc2dd\uc744 \uc0ac\uc6a9\ud558\uba74 \uc815\ud574\uc9c4 \uc8fc\uae30\ub9c8\ub2e4 \ubcf4\ucda9 \uacc4\ud68d\uc744 \uc138\uc6b8 \uc218 \uc788\uc2b5\ub2c8\ub2e4. <a href=\"\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/safety-stock-in-manufacturing\/\">\uc548\uc804 \uc7ac\uace0<\/a>\ub294 \ubd88\ud655\uc2e4\uc131\uc5d0 \ub300\ube44\ud558\ub294 \uc644\ucda9 \uc5ed\ud560\uc744 \ud569\ub2c8\ub2e4. \uc5b4\ub290 \ubc29\uc2dd\uc744 \uc0ac\uc6a9\ud558\ub4e0 \uc218\uc694, \uc0dd\uc0b0 \ub9ac\ub4dc\ud0c0\uc784, \ud604\uc7ac \ubcf4\uc720 \uc7ac\uace0\ub294 \ubc18\ub4dc\uc2dc \ud655\uc778\ud574\uc57c \ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\uacb0\uc815\ud55c \ub0b4\uc6a9\uc744 \uc0dd\uc0b0 \ud604\uc7a5\uc5d0\uc11c \uc2e4\ud589\ud560 \uc218 \uc788\ub3c4\ub85d \uc81c\ud488, \uc218\ub7c9, \uc644\uc81c\ud488\uc774 \uacf5\uae09 \uac00\ub2a5\ud574\uc57c \ud558\ub294 \ub0a0\uc9dc\ub85c \uad6c\uccb4\ud654\ud558\uc138\uc694. \uc8fc\ubb38 \uc774\ud589\uc5d0 \uc0ac\uc6a9\ud560 \uc218 \uc788\ub294 \uc0c1\ud0dc\uac00 \ub418\uae30\uae4c\uc9c0 \ud544\uc694\ud55c \uc0dd\uc0b0 \uacf5\uc815\uacfc \uac80\uc0ac, \ucd9c\ud558 \uc2b9\uc778, \ud3ec\uc7a5 \uc2dc\uac04\ub3c4 \ubc18\uc601\ud574\uc57c \ud569\ub2c8\ub2e4.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/master-production-schedule\/\">\uae30\uc900\uc0dd\uc0b0\uacc4\ud68d<\/a>\uc740 \uc120\uc815\ub41c \uc81c\ud488\uacfc \uc218\ub7c9\uc744 \uae30\uac04\ubcc4\ub85c \ubcf4\uc5ec \uc8fc\ub294 \ubcf4\ub2e4 \ub113\uc740 \ubc94\uc704\uc758 \uacc4\ud68d\uc785\ub2c8\ub2e4. \uc774\uc81c \ub354 \uc9c1\uc811\uc801\uc778 \uc9c8\ubb38\uc744 \ud574\uc57c \ud569\ub2c8\ub2e4. \uc774\ubc88 \uc7ac\uace0 \ubcf4\ucda9 \ubc30\uce58\uac00 \ud544\uc694\ud55c \ubaa8\ub4e0 \uacf5\uc815\uc744 \uc81c\ub54c \ub9c8\uce60 \uc218 \uc788\uc744\uae4c\uc694?<\/p>\n\n\n<h3 class=\"wp-block-heading\">\uac19\uc740 \uc790\uc6d0\uc744 \uc0ac\uc6a9\ud558\ub294 \ub2e4\ub978 \uc791\uc5c5\uacfc \ud568\uaed8 \uac80\ud1a0\ud558\uae30<\/h3>\n\n\n<p>\ub2e4\ub978 MTS \ubc30\uce58\ubfd0 \uc544\ub2c8\ub77c \ud544\uc694\ud55c \uc790\uc6d0\uc744 \uc774\ubbf8 \uc0ac\uc6a9\ud558\uace0 \uc788\ub294 \ubaa8\ub4e0 \uc791\uc5c5\uc744 \ud568\uaed8 \uace0\ub824\ud558\uc138\uc694. \uc790\uc7ac, \uc791\uc5c5 \uac00\ub2a5\ud55c \uc6cc\ud06c\uc2a4\ud14c\uc774\uc158, \uad50\ub300\uc870, \uc791\uc5c5\uc790 \uac00\uc6a9 \uc5ec\ubd80, \uac00\uacf5 \uc2dc\uac04, \uc14b\uc5c5\uc744 \ud655\uc778\ud574\uc57c \ud569\ub2c8\ub2e4. \ud6c4\uc18d \uacf5\uc815\uae4c\uc9c0 \uc804\uccb4 \ud750\ub984\uc744 \ub530\ub77c\uac00\uba70 \uc0b4\ud3b4\ubcf4\uc138\uc694. \uccab \uc124\ube44\uc5d0\uc11c \uc77c\ucc0d \uc2dc\uc791\ud55c\ub2e4\uace0 \ud574\uc11c \uc644\uc81c\ud488 \uc7ac\uace0\uac00 \uc81c\ub54c \ud655\ubcf4\ub418\ub294 \uac83\uc740 \uc544\ub2d9\ub2c8\ub2e4.<\/p>\n\n\n<p>\ud55c \ubc88\uc5d0 \ub354 \ub9ce\uc774 \uc0dd\uc0b0\ud558\uba74 \uc14b\uc5c5 \ube44\uc6a9\uc744 \ub354 \ub9ce\uc740 \uc81c\ud488\uc5d0 \ubd84\uc0b0\ud560 \uc218 \uc788\uc9c0\ub9cc, \uadf8\ub9cc\ud07c \uc0dd\uc0b0\ub2a5\ub825\uc744 \uc624\ub798 \uc810\uc720\ud558\uace0 \uc7ac\uace0\ub3c4 \ub298\uc5b4\ub0a9\ub2c8\ub2e4. \uc624\ub298 \uc124\ube44\uac00 \ube44\uc5b4 \uc788\ub2e4\ub294 \uc774\uc720\ub85c \uac00\ub3d9 \uc2dc\uac04\uc744 \ucc44\uc6b0\uae30\ubcf4\ub2e4, \uc7ac\uace0 \uc815\ucc45\uacfc \uc0dd\uc0b0 \uc0c1\ud669\uc5d0 \ub9de\ub294 \uc218\ub7c9\uc744 \uc120\ud0dd\ud558\uc138\uc694.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\uc7ac\uace0 \ubcf4\ucda9\ub3c4 \uc804\uccb4 \uc0dd\uc0b0 \uc77c\uc815\uc5d0 \ud3ec\ud568\ud574\uc57c \ud558\ub294 \uc774\uc720<\/h2>\n\n\n<p>\ud45c\uc900 \uc6a9\uae30\ub294 \uc7ac\uace0\ub85c \ubcf4\uc720\ud558\uace0 \ud2b9\uc218 \uc0ac\uc591\uc740 \uc8fc\ubb38\uc5d0 \ub530\ub77c \uc0dd\uc0b0\ud558\ub294 \uc81c\uc870\uc5c5\uccb4\ub97c \uac00\uc815\ud574 \ubcf4\uaca0\uc2b5\ub2c8\ub2e4. \ud604\uc7ac \uc7ac\uace0\uac00 \uc18c\uc9c4\ub420 \uac83\uc73c\ub85c \uc608\uc0c1\ub418\ub294 \uc2dc\uc810 \uc804\uc5d0 \ub2e4\uc74c \ud45c\uc900 \uc81c\ud488 \ubc30\uce58\uac00 \uc900\ube44\ub418\uc5b4\uc57c \ud569\ub2c8\ub2e4. \uc774 \ubc30\uce58\ub294 \uc131\ud615 \uacf5\uc815\uacfc \uacf5\uc6a9 \ud3ec\uc7a5 \ub77c\uc778\uc744 \uac70\uccd0\uc57c \ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\uadf8\ub7f0\ub370 \ud2b9\uc218 \uc0ac\uc591\uc758 \uc18c\ub7c9 \uae34\uae09 \uc8fc\ubb38\uc774 \ub4e4\uc5b4\uc635\ub2c8\ub2e4. \uace0\uac1d\uc774 \ub204\uad6c\uc778\uc9c0 \uba85\ud655\ud558\uace0 \uc57d\uc18d\ud55c \ucd9c\ud558\uc77c\ub3c4 \uc788\uc2b5\ub2c8\ub2e4. \ubc18\uba74 \uc7ac\uace0 \ubcf4\ucda9 \ubc30\uce58\uc5d0\ub294 \uc544\uc9c1 \uac1c\ubcc4 \uace0\uac1d\uc774 \uc5f0\uacb0\ub418\uc5b4 \uc788\uc9c0 \uc54a\uc73c\ubbc0\ub85c, \uc77c\uc815\uc744 \ub4a4\ub85c \ubbf8\ub904\ub3c4 \ubb38\uc81c\uac00 \uc5c6\uc744 \uac83\ucc98\ub7fc \ub290\uaef4\uc9d1\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc131\ud615 \uc791\uc5c5\uc740 \uc5ec\uc804\ud788 \uc77c\uc815 \uc548\uc5d0 \ub4e4\uc5b4\uac00\uc9c0\ub9cc \ud3ec\uc7a5\uc740 \uadf8\ub807\uc9c0 \uc54a\uc2b5\ub2c8\ub2e4. \uae34\uae09 \uc8fc\ubb38\uc774 \ud3ec\uc7a5 \uc77c\uc815\uc744 \ucc28\uc9c0\ud558\uba74\uc11c \ud45c\uc900 \uc81c\ud488 \ubc30\uce58\uc758 \uc644\ub8cc\uac00 \ub2a6\uc5b4\uc9c0\uace0, \uc608\uc0c1 \uc7ac\uace0 \ubd80\uc871 \uc2dc\uc810 \uc804\uc5d0 \ubcf4\ucda9\ud560 \uc218 \uc5c6\uac8c \ub429\ub2c8\ub2e4. \uc624\ub298\uc758 \uae34\uae09 \ub0a9\ud488\uc744 \ucc98\ub9ac\ud558\ub2e4\uac00 \ub208\uc5d0 \ub744\uc9c0 \uc54a\uac8c \ub0b4\uc77c\uc758 \uacf5\uae09 \ubb38\uc81c\ub97c \ub9cc\ub4e0 \uc148\uc785\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc7ac\uace0 \ubcf4\ucda9\uc744 \ubb34\uc870\uac74 \uc6b0\uc120\ud558\ub294 \uac83\uc774 \ud56d\uc0c1 \uc815\ub2f5\uc740 \uc544\ub2d9\ub2c8\ub2e4. \uc791\uc5c5 \uc21c\uc11c\ub97c \ubc14\uafb8\uac70\ub098, \uc791\uc5c5 \uac00\ub2a5\ud55c \ub300\uccb4 \uc790\uc6d0\uc744 \uc0ac\uc6a9\ud558\uac70\ub098, \uc2b9\uc778\ub41c \uad50\ub300\uc870\ub97c \ucd94\uac00\ud558\uac70\ub098, \uace0\uac1d\uacfc\uc758 \ub0a9\ud488 \uc57d\uc18d\uc744 \uc870\uc815\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc911\uc694\ud55c \uac83\uc740 \uacb0\uc815\uc744 \ub0b4\ub9ac\uae30 \uc804\uc5d0 \uadf8 \uacb0\uacfc\ub97c \ud655\uc778\ud558\ub294 \uac83\uc785\ub2c8\ub2e4.<\/p>\n\n\n<p><strong>\uc7ac\uace0\uc6a9 \uc0dd\uc0b0 \uc624\ub354\uc758 \uc6b0\uc120\uc21c\uc704\ub294 \uace0\uac1d\uba85\uc774 \uc5c6\ub2e4\ub294 \uc774\uc720\uac00 \uc544\ub2c8\ub77c, \uadf8 \uc624\ub354\uac00 \uc9c0\ucf1c \uc8fc\ub294 \uacf5\uae09 \uac00\ub2a5\uc131\uc744 \uae30\uc900\uc73c\ub85c \uc815\ud574\uc57c \ud569\ub2c8\ub2e4.<\/strong> \uc7ac\uace0\uac00 \ubc14\ub2e5\ub098\uba74 \uc774\ud6c4 \uc5ec\ub7ec \uc8fc\ubb38\uc5d0 \uc601\ud5a5\uc744 \uc904 \uc218 \uc788\uc9c0\ub9cc, \ud604\uc7ac \uc7ac\uace0\ub85c \ucda9\ubd84\ud55c \uae30\uac04\uc744 \uac10\ub2f9\ud560 \uc218 \uc788\ub2e4\uba74 \ubcf4\ucda9 \ubc30\uce58\ub97c \ub2a6\ucdb0\ub3c4 \uad1c\ucc2e\uc744 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc0dd\uc0b0\uacc4\ud68d \ub2f4\ub2f9\uc790\ub294 \uc7ac\uace0 \ubcf4\ucda9 \ud544\uc694\uc131\uacfc \uac19\uc740 \uc790\uc6d0\uc744 \ub450\uace0 \uacbd\ud569\ud558\ub294 \uc791\uc5c5\uc744 \ud568\uaed8 \uc0b4\ud3b4\ubd10\uc57c \ud569\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\uc77c\uc815 \uacc4\uc0b0\uc740 SkyPlanner\uc5d0 \ub9e1\uae30\uace0, \uc548\uc815\uc801\uc778 \uacf5\uae09\uc5d0 \uc9d1\uc911\ud558\uc138\uc694<\/h2>\n\n\n<p>SkyPlanner\ub294 \uc6cc\ud06c\uc2a4\ud14c\uc774\uc158, \uad50\ub300\uc870, \uc791\uc5c5\uc790, \uc790\uc7ac, \uc6b0\uc120\uc21c\uc704\ub97c \ud558\ub098\uc758 \uc0dd\uc0b0 \uc77c\uc815\uc5d0 \ubc18\uc601\ud569\ub2c8\ub2e4. \uc2a4\ucf00\uc904\ub9c1 \uc778\uacf5\uc9c0\ub2a5 Arcturus\ub294 \uc124\uc815\ub41c \uc0dd\uc0b0\ub2a5\ub825, \uc120\ud6c4 \uad00\uacc4, \uc2a4\ucf00\uc904\ub9c1 \uaddc\uce59\uc744 \ubc14\ud0d5\uc73c\ub85c \uac01 \uacf5\uc815\uc744 \uc5b8\uc81c \ubc30\uce58\ud560 \uc218 \uc788\ub294\uc9c0 \uacc4\uc0b0\ud569\ub2c8\ub2e4. <a href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/gantt-chart-for-production-planning\/\">Gantt \ud0c0\uc784\ub77c\uc778<\/a>\uc5d0\uc11c\ub294 \uacc4\uc0b0 \uacb0\uacfc\uc5d0 \ub530\ub77c \uc790\uc6d0\ubcc4\ub85c \ubc30\uc815\ub41c \uc791\uc5c5\uacfc \uc608\uc0c1 \uc644\ub8cc \uc2dc\uc810\uc744 \ud655\uc778\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc55e\uc11c \uac00\uc815\ud55c \uc6a9\uae30 \uc81c\uc870\uc5c5\uccb4\ub77c\uba74 \uc7ac\uace0 \ubcf4\ucda9 \ubc30\uce58\uc640 \ud2b9\uc218 \uc0ac\uc591 \uae34\uae09 \uc8fc\ubb38\uc744 \ud558\ub098\uc758 \uacc4\ud68d\uc5d0\uc11c \ud655\uc778\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uacf5\uc815\ubcc4 \ub300\uae30\uc5f4\uc744 \ubcc4\uac1c\ub85c \ub2e4\ub8e8\ub294 \ub300\uc2e0, \uc131\ud615\ubd80\ud130 \ud3ec\uc7a5\uae4c\uc9c0 \ub450 \uc791\uc5c5\uc758 \ud750\ub984\uc744 \ub530\ub77c\uac00\uba70 \ubcfc \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc6b0\uc120\uc21c\uc704\uac00 \ubc14\ub00c\uba74 Arcturus\uac00 \uc77c\uc815\uc744 \ub2e4\uc2dc \uacc4\uc0b0\ud558\uace0, Gantt \ud654\uba74\uc5d0\uc11c \ub2e4\ub978 \uc791\uc5c5\uc5d0 \ubbf8\uce58\ub294 \uc601\ud5a5\uc744 \ubcf4\uc5ec \uc90d\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc0dd\uc0b0\uacc4\ud68d \ub2f4\ub2f9\uc790\ub294 \uc124\ube44\ubcc4 \uc791\uc5c5 \uc21c\uc11c\ub97c \uc77c\uc77c\uc774 \uc218\uc791\uc5c5\uc73c\ub85c \ub2e4\uc2dc \uc9e4 \ud544\uc694\uac00 \uc5c6\uc2b5\ub2c8\ub2e4. \uac00\uc6a9 \uc0dd\uc0b0\ub2a5\ub825\ub3c4 \ub354 \uc720\uc6a9\ud558\uac8c \ud65c\uc6a9\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uacb0\uad6d \ud3ec\uc7a5 \uacf5\uc815 \uc55e\uc5d0\uc11c \ub300\uae30\ud560 \ubb3c\ub7c9\uc744 \uc0c1\ub958 \uacf5\uc815\uc5d0\uc11c \ub354 \uc0dd\uc0b0\ud558\uae30\ubcf4\ub2e4, \uc5b4\ub514\uc5d0\uc11c \uc791\uc5c5\uc744 \uc9c4\ud589\ud560 \uc218 \uc788\uace0 \uc2e4\uc81c \ucda9\ub3cc\uc740 \uc5b4\ub514\uc5d0 \ub0a8\uc544 \uc788\ub294\uc9c0 \ud655\uc778\ud560 \uc218 \uc788\uae30 \ub54c\ubb38\uc785\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc5b4\ub5a4 \ub0a9\ud488 \uc57d\uc18d\uc774 \uac00\uc7a5 \uc911\uc694\ud55c\uc9c0\ub294 \ub2f4\ub2f9\uc790\uac00 \ud310\ub2e8\ud558\uace0, \uadf8\uc5d0 \ub9de\uac8c \uc6b0\uc120\uc21c\uc704\ub97c \uc124\uc815\ud569\ub2c8\ub2e4. \uace0\uc815\ud574\uc57c \ud558\ub294 \uc77c\uc815\uc740 \uc7a0\uae08 \uae30\ub2a5\uc73c\ub85c \ubcf4\ud638\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc790\uc7ac \uac00\uc6a9\uc131\uc744 \uace0\ub824\ud558\ub294 \uc2a4\ucf00\uc904\ub9c1\uc744 \ud65c\uc131\ud654\ud558\uba74 \uc790\uc7ac \ud655\ubcf4 \uc5ec\ubd80\ub3c4 \uacc4\uc0b0\uc5d0 \ubc18\uc601\ub429\ub2c8\ub2e4. \ub530\ub77c\uc11c \uc544\uc9c1 \uc5c6\ub294 \uc790\uc7ac\uac00 \uc774\ubbf8 \uc900\ube44\ub41c \uac83\ucc98\ub7fc \uac00\uc815\ud574 \uc7ac\uace0 \ubcf4\ucda9 \ubc30\uce58\uc758 \uc77c\uc815\uc744 \uc7a1\uc9c0 \uc54a\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p><strong>SkyPlanner\ub294 <a href=\"https:\/\/skyplanner.ai\/ko\/%ed%86%b5%ed%95%a9\/\">\uac1c\ubc29\ud615 REST API<\/a>\ub97c \ud1b5\ud574 \ubaa8\ub4e0 ERP \ub610\ub294 MES\uc640 \uc5f0\ub3d9\ub429\ub2c8\ub2e4.<\/strong> \uae30\uc874 \uc2dc\uc2a4\ud15c\uc758 \uc7ac\uace0 \ubcf4\ucda9 \uacb0\uc815\uacfc \uc0dd\uc0b0 \ub370\uc774\ud130\ub97c \uc77c\uc815 \uacc4\uc0b0\uc5d0 \ubc18\uc601\ud558\uc138\uc694. ERP\ub098 \uc7ac\uace0 \uacc4\ud68d \ud504\ub85c\uc138\uc2a4\uc5d0\uc11c \ud544\uc694\ud55c \uc7ac\uace0\ub7c9\uc744 \uc815\ud558\uba74, SkyPlanner\ub294 \uc774\ub97c \uc0dd\uc0b0\ud558\ub294 \ub370 \ud544\uc694\ud55c \uacf5\uc815\uc744 \uacf5\uc7a5 \ub0b4 \ub2e4\ub978 \uc791\uc5c5\uacfc \ud568\uaed8 \uc870\uc728\ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc774\ub807\uac8c \ud558\uba74 \ub354 \uc77c\ucc0d \ub300\uc751\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc608\uc0c1 \uc644\ub8cc \uc2dc\uc810\uc73c\ub85c\ub294 \ud544\uc694\ud55c \uc7ac\uace0\ub97c \uc81c\ub54c \ud655\ubcf4\ud560 \uc218 \uc5c6\ub2e4\uba74, \uc544\uc9c1 \ub300\uc751\ud560 \uc5ec\uc720\uac00 \uc788\uc744 \ub54c \uc0dd\uc0b0 \ub2a5\ub825 \uacbd\ud569\uc744 \ud574\uc18c\ud558\uac70\ub098 \uc7ac\uace0 \ubcf4\ucda9 \uacb0\uc815\uc744 \uc218\uc815\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc0dd\uc0b0 \uc77c\uc815\uc744 \ub354 \uc798 \uc218\ub9bd\ud558\uba74, \ucc28\uc9c8\uc774 \uc0dd\uae38 \ub54c\ub9c8\ub2e4 \uc644\ucda9 \uc7ac\uace0\ub97c \ub298\ub9ac\ub294 \ub370 \uc758\uc874\ud558\uc9c0 \uc54a\uace0\ub3c4 \uc81c\ud488\uc744 \uc81c\ub54c \uacf5\uae09\ud558\ub294 \ub370 \ub3c4\uc6c0\uc774 \ub429\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Opes: \uc218\uc694\ub97c \uc608\uce21\ud560 \uc218 \uc788\uc5b4\ub3c4 \uc0dd\uc0b0\uc5d0\ub294 \uc720\uc5f0\uc131\uc774 \ud544\uc694\ud569\ub2c8\ub2e4<\/h2>\n\n\n<p>\ud540\ub780\ub4dc\uc758 \uc804\ubb38 \uc81c\uc870\uc5c5\uccb4 Opes Corporation\uc740 \ub300\uccb4\ub85c \uc608\uce21 \uac00\ub2a5\ud55c 3\uac1c\uc6d4 \ub2e8\uc704\uc758 \uace0\uac1d \uad6c\ub9e4 \uc57d\uc815\uc744 \ubc14\ud0d5\uc73c\ub85c \uc7ac\uace0\uc0dd\uc0b0\uc744 \ud569\ub2c8\ub2e4. \uc774 \ud68c\uc0ac\uc758 <a href=\"https:\/\/skyplanner.ai\/ko\/%ea%b3%a0%ea%b0%9d-%ec%82%ac%eb%a1%80\/opes-corporation\/\">SkyPlanner \uc0ac\uc6a9 \ud6c4\uae30<\/a>\ub294 \uc218\uc694\uac00 \ube44\uad50\uc801 \uc548\uc815\uc801\uc774\uc5b4\ub3c4 \uc0dd\uc0b0 \ud604\ud669\uc744 \uba85\ud655\ud788 \ud30c\uc545\ud558\ub294 \uac83\uc774 \uc65c \uc911\uc694\ud55c\uc9c0 \ubcf4\uc5ec \uc90d\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc774 \ud68c\uc0ac\ub294 \uc774\uc804\uc5d0 Excel\uacfc \ubcc4\ub3c4\uc758 \ucc3d\uace0 \uad00\ub9ac \uc560\ud50c\ub9ac\ucf00\uc774\uc158\uc744 \uc0ac\uc6a9\ud574 \uc815\ubcf4\uac00 \uc5ec\ub7ec \uacf3\uc5d0 \ud769\uc5b4\uc838 \uc788\uc5c8\uc2b5\ub2c8\ub2e4. SkyPlanner \ub3c4\uc785 \uacfc\uc815\uc5d0\uc11c\ub294 Visma Nova\uc640\uc758 \uc5f0\ub3d9\uc744 \uc9c4\ud589\ud588\uc2b5\ub2c8\ub2e4. Opes\uc5d0 \ub530\ub974\uba74, \uc774\uc81c \uc0dd\uc0b0 \ub2a5\ub825\uc744 \ub354 \uba85\ud655\ud558\uac8c \ud30c\uc545\ud558\uace0 \uc81c\ud488 \uac1c\ubc1c\uc6a9 \uc0dd\uc0b0\uc774\ub098 \uae34\uae09 \uc18c\ub7c9 \uc8fc\ubb38\uc774 \ub4e4\uc5b4\uc62c \ub54c \uc77c\uc815\uc744 \ub354 \ube60\ub974\uac8c \ubcc0\uacbd\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ub2f4\ub2f9\uc790\ub4e4\uc740 \uc791\uc5c5\uc774 \uc5b8\uc81c \ub05d\ub098\ub294\uc9c0, \ubcc0\uacbd \uc0ac\ud56d\uc774 \ub0a9\ud488 \uc2dc\uc810\uc5d0 \uc5b4\ub5a4 \uc601\ud5a5\uc744 \ubbf8\uce58\ub294\uc9c0 \ud655\uc778\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc7ac\uace0\uc0dd\uc0b0(MTS)\uc5d0\uc11c \uc8fc\ubaa9\ud560 \uc810\ub3c4 \ubc14\ub85c \uc774\uac83\uc785\ub2c8\ub2e4. \uc218\uc694\ub97c \uc608\uce21\ud560 \uc218 \uc788\ub2e4\uace0 \ud574\uc11c \uc0dd\uc0b0 \uc911 \ubcc0\uc218\uac00 \uc0ac\ub77c\uc9c0\ub294 \uac83\uc740 \uc544\ub2d9\ub2c8\ub2e4. \ub300\uae30 \uc911\uc778 \uc791\uc5c5\uacfc \uc0dd\uc0b0 \ub2a5\ub825\uc744 \ud568\uaed8 \ubcfc \uc218 \uc788\uc73c\uba74, \uc644\uc81c\ud488 \uc7ac\uace0\ub97c \uc720\uc9c0\ud558\uae30 \uc704\ud55c \uc0dd\uc0b0\uc5d0 \uc608\uc0c1\uce58 \ubabb\ud55c \uc791\uc5c5\uc744 \ub07c\uc6cc \ub123\uae30\uac00 \ub354 \uc26c\uc6cc\uc9d1\ub2c8\ub2e4.<\/p>\n\n\n<p>Opes\ub294 \uc0dd\uc0b0 \uc2e4\uc801 \ubcf4\uace0\ub3c4 \uac04\uc18c\ud654\ub418\uc5c8\uace0 \uc2e0\uaddc \uc0dd\uc0b0\uacc4\ud68d \ub2f4\ub2f9\uc790\uac00 \uc5c5\ubb34\uc5d0 \uc801\uc751\ud558\ub294 \uc2dc\uac04\ub3c4 \uc9e7\uc544\uc84c\ub2e4\uace0 \uc124\uba85\ud569\ub2c8\ub2e4. \uacc4\ud68d\uc744 \uc138\uc6b4 \uc0ac\ub78c\ub9cc \ub0b4\uc6a9\uc744 \uc544\ub294 \uac83\uc774 \uc544\ub2c8\ub77c, \ub2e4\ub978 \uc0ac\ub78c\ub3c4 \uc774\ud574\ud558\uace0 \uc870\uc815\ud560 \uc218 \uc788\ub294 \uc0dd\uc0b0 \uacc4\ud68d\uc774 \ub41c\ub2e4\ub294 \ub370 \uac00\uce58\uac00 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\ub2e4\uc74c \uc7ac\uace0 \ubcf4\ucda9 \ubb3c\ub7c9\uc744 \ub354 \uc218\uc6d4\ud558\uac8c \uc0dd\uc0b0\ud558\uc138\uc694<\/h2>\n\n\n<p>\uc7ac\uace0\uc0dd\uc0b0\uc740 \uc7ac\uace0\uc5d0 \ud22c\uc790\ud558\ub294 \ub9cc\ud07c \ub0a9\ud488 \uce21\uba74\uc758 \uc774\uc810\uc774 \uc788\uc744 \ub54c \ud6a8\uacfc\uc801\uc785\ub2c8\ub2e4. \ubc18\ubcf5 \uc218\uc694\ub97c \uc2e0\ub8b0\ud560 \uc218 \uc788\ub294 \uc81c\ud488\uc744 \uc120\ud0dd\ud558\uace0, \uc2e4\uc81c\ub85c \ud544\uc694\ud55c \uc7ac\uace0\ub7c9\uc744 \uac80\ud1a0\ud558\uba70, \ubcf4\ucda9 \ubb3c\ub7c9\uc774 \uc0dd\uc0b0 \uacf5\uc815\uc744 \ubb34\ub9ac \uc5c6\uc774 \uac70\uce60 \uc218 \uc788\ub3c4\ub85d \uacc4\ud68d\ud558\uc138\uc694.<\/p>\n\n\n<p>\uc131\uacfc\ub294 \uc591\ucabd \uce21\uba74\uc5d0\uc11c \uc0b4\ud3b4\uc57c \ud569\ub2c8\ub2e4. \uc81c\ud488\uc744 \uc81c\ub54c \uacf5\uae09\ud560 \uc218 \uc788\ub294\uc9c0\uc640 \ud488\uc808 \uc5ec\ubd80\ubfd0 \uc544\ub2c8\ub77c \uc7a5\uae30 \uc7ac\uace0, \uc7ac\uace0 \ud22c\uc790\uc561, \uc11c\ube44\uc2a4 \uc218\uc900\uc744 \uc720\uc9c0\ud558\ub294 \ub370 \ud544\uc694\ud55c \uc0dd\uc0b0 \ubd80\ub2f4\ub3c4 \ud655\uc778\ud558\uc138\uc694. \uc124\ube44\uac00 \ubc14\uc058\uac8c \ub3cc\uc544\uac04\ub2e4\ub294 \uc0ac\uc2e4\ub9cc\uc73c\ub85c\ub294 MTS \uc804\ub7b5\uc774 \uc131\uacfc\ub97c \ub0b4\uace0 \uc788\ub294\uc9c0 \uc54c \uc218 \uc5c6\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc7ac\uace0 \ubcf4\ucda9 \uc791\uc5c5\uacfc \uc0dd\uc0b0 \ub2a5\ub825\uc744 \ub193\uace0 \uacbd\ud569\ud558\ub294 \ub2e4\ub978 \uc791\uc5c5\uc744 \ub9e4\uc77c \uc218\uc791\uc5c5\uc73c\ub85c \uc870\uc728\ud558\ub290\ub77c \ubd80\ub2f4\uc774 \ucee4\uc84c\ub2e4\uba74 SkyPlanner\ub97c \uc120\ud0dd\ud558\uc138\uc694. \uc77c\uc815 \uacc4\uc0b0\uc740 Arcturus\uac00 \ucc98\ub9ac\ud569\ub2c8\ub2e4. \ub2f4\ub2f9\uc790\ub294 \uc6b0\uc120\uc21c\uc704\ub97c \uc815\ud558\uace0 Gantt \ud654\uba74\uc5d0\uc11c \uadf8 \uacb0\uacfc\ub97c \uac80\ud1a0\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc815\uae30\uc801\uc73c\ub85c \uc7ac\uace0\ub97c \ud655\ubcf4\ud558\ub294 \uc81c\ud488 \ud558\ub098\uc640 \ud574\ub2f9 \uc81c\ud488\uc758 \uc0dd\uc0b0 \uacbd\ub85c, \ucd5c\uadfc \uadf8 \uc81c\ud488\uc758 \ubcf4\ucda9 \uc0dd\uc0b0\uc744 \ubc00\uc5b4\ub0b8 \uae34\uae09 \uc791\uc5c5 \uc0ac\ub840\ub97c \uc900\ube44\ud574 <a href=\"https:\/\/skyplanner.ai\/ko\/%ec%98%81%ec%97%85%ed%8c%80%ec%97%90-%eb%ac%b8%ec%9d%98\/\">SkyPlanner \ub370\ubaa8\ub97c \uc608\uc57d\ud558\uc138\uc694<\/a>. \ud1b5\ud569\ub41c \uc0dd\uc0b0 \uc77c\uc815\uc73c\ub85c \uc81c\ud488 \uacf5\uae09\uc744 \uc720\uc9c0\ud558\uace0 \uc0dd\uc0b0 \ub2a5\ub825\uc744 \ub354 \uc798 \ud65c\uc6a9\ud558\ub294 \ubc29\ubc95\uc744 \uad6c\uccb4\uc801\uc73c\ub85c \ud655\uc778\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uba3c\uc800 \uc9c1\uc811 \uc0b4\ud3b4\ubcf4\uace0 \uc2f6\ub2e4\uba74 <a href=\"https:\/\/skyplanner.ai\/ko\/%ed%8f%89%ea%b0%80%ed%8c%90\/\">\ub370\ubaa8 \ub370\uc774\ud130\ub85c SkyPlanner\ub97c \uccb4\ud5d8\ud574 \ubcf4\uc138\uc694<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>\uc7ac\uace0\uc0dd\uc0b0: \uace0\uac1d\uc774 \uae30\ub2e4\ub9ac\uae30 \uc804\uc5d0 \uc7ac\uace0\ub97c \ubcf4\ucda9\ud558\uc138\uc694 \ud648 &raquo; \ub9ac\uc18c\uc2a4 &raquo; \uc7ac\uace0\uc0dd\uc0b0: \uace0\uac1d\uc774 \uae30\ub2e4\ub9ac\uae30 \uc804\uc5d0 \uc7ac\uace0\ub97c \ubcf4\ucda9\ud558\uc138\uc694 \uace0\uac1d\uc774 \ud45c\uc900 \uc81c\ud488\uc744 \ub0b4\uc77c\uae4c\uc9c0 \ubc1b\uace0 \uc2f6\uc5b4 \ud569\ub2c8\ub2e4. \uc774\ubbf8 \uc7ac\uace0\uac00 \uc788\ub2e4\uba74 \uc0dd\uc0b0\uc774 \ub05d\ub0a0 \ub54c\uae4c\uc9c0 \uae30\ub2e4\ub824 \ub2ec\ub77c\uace0 \ud560 \ud544\uc694 \uc5c6\uc774 \ucd9c\ud558\ub97c \uc900\ube44\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc8fc\ubb38\uc774 \ub4e4\uc5b4\uc624\uae30 \uc804\uc5d0 \ubbf8\ub9ac \uc0dd\uc0b0\ud574 \ub450\ub294 \uac83, \uc774\uac83\uc774 \uc7ac\uace0\uc0dd\uc0b0\uc758 \ub9e4\ub825\uc785\ub2c8\ub2e4. \ub354 \uc5b4\ub824\uc6b4 \uacb0\uc815\uc740 \ud310\ub9e4 \uc804\uc5d0 \ub0b4\ub824\uc57c \ud569\ub2c8\ub2e4. &#8230; <a title=\"\uc7ac\uace0\uc0dd\uc0b0: \uace0\uac1d\uc774 \uae30\ub2e4\ub9ac\uae30 \uc804\uc5d0 \uc7ac\uace0\ub97c \ubcf4\ucda9\ud558\uc138\uc694\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/make-to-stock\/\" aria-label=\"Read more about \uc7ac\uace0\uc0dd\uc0b0: \uace0\uac1d\uc774 \uae30\ub2e4\ub9ac\uae30 \uc804\uc5d0 \uc7ac\uace0\ub97c \ubcf4\ucda9\ud558\uc138\uc694\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":99338,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2530,496],"tags":[],"class_list":["post-99334","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps--","category-496","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>\uc7ac\uace0\uc0dd\uc0b0: \uace0\uac1d\uc774 \uae30\ub2e4\ub9ac\uae30 \uc804\uc5d0 \uc7ac\uace0\ub97c \ubcf4\ucda9\ud558\uc138\uc694<\/title>\n<meta name=\"description\" content=\"\uc7ac\uace0\ub97c \uc81c\ub54c \ubcf4\ucda9\ud558\uba74 \uc7ac\uace0\uc0dd\uc0b0\uc73c\ub85c \ub0a9\ud488\uc744 \uc55e\ub2f9\uae38 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc801\uc6a9 \uc870\uac74\uacfc SkyPlanner\ub85c \ubcf4\ucda9 \ubc30\uce58 \uc77c\uc815\uc744 \uc9dc\ub294 \ubc95\uc744 \uc54c\uc544\ubcf4\uc138\uc694.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/make-to-stock\/\" \/>\n<meta property=\"og:locale\" content=\"ko_KR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"\uc7ac\uace0\uc0dd\uc0b0: \uace0\uac1d\uc774 \uae30\ub2e4\ub9ac\uae30 \uc804\uc5d0 \uc7ac\uace0\ub97c \ubcf4\ucda9\ud558\uc138\uc694\" \/>\n<meta property=\"og:description\" content=\"\uc7ac\uace0\ub97c \uc81c\ub54c \ubcf4\ucda9\ud558\uba74 \uc7ac\uace0\uc0dd\uc0b0\uc73c\ub85c \ub0a9\ud488\uc744 \uc55e\ub2f9\uae38 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc801\uc6a9 \uc870\uac74\uacfc SkyPlanner\ub85c \ubcf4\ucda9 \ubc30\uce58 \uc77c\uc815\uc744 \uc9dc\ub294 \ubc95\uc744 \uc54c\uc544\ubcf4\uc138\uc694.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/make-to-stock\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-15T20:34:27+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-19T15:12:41+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/make-to-stock-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1774\" \/>\n\t<meta property=\"og:image:height\" content=\"887\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\uae00\uc4f4\uc774\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/make-to-stock\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/make-to-stock\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"\uc7ac\uace0\uc0dd\uc0b0: \uace0\uac1d\uc774 \uae30\ub2e4\ub9ac\uae30 \uc804\uc5d0 \uc7ac\uace0\ub97c \ubcf4\ucda9\ud558\uc138\uc694\",\"datePublished\":\"2026-10-15T20:34:27+00:00\",\"dateModified\":\"2026-10-19T15:12:41+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/make-to-stock\\\/\"},\"wordCount\":43,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/make-to-stock\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/make-to-stock-hero.png\",\"articleSection\":[\"APS \ubc0f \uc2a4\ucf00\uc904\ub9c1\",\"\ub9ac\uc18c\uc2a4\"],\"inLanguage\":\"ko-KR\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/make-to-stock\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/make-to-stock\\\/\",\"name\":\"\uc7ac\uace0\uc0dd\uc0b0: \uace0\uac1d\uc774 \uae30\ub2e4\ub9ac\uae30 \uc804\uc5d0 \uc7ac\uace0\ub97c \ubcf4\ucda9\ud558\uc138\uc694\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/make-to-stock\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/make-to-stock\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/make-to-stock-hero.png\",\"datePublished\":\"2026-10-15T20:34:27+00:00\",\"dateModified\":\"2026-10-19T15:12:41+00:00\",\"description\":\"\uc7ac\uace0\ub97c \uc81c\ub54c \ubcf4\ucda9\ud558\uba74 \uc7ac\uace0\uc0dd\uc0b0\uc73c\ub85c \ub0a9\ud488\uc744 \uc55e\ub2f9\uae38 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc801\uc6a9 \uc870\uac74\uacfc SkyPlanner\ub85c \ubcf4\ucda9 \ubc30\uce58 \uc77c\uc815\uc744 \uc9dc\ub294 \ubc95\uc744 \uc54c\uc544\ubcf4\uc138\uc694.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/make-to-stock\\\/#breadcrumb\"},\"inLanguage\":\"ko-KR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/make-to-stock\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"ko-KR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/make-to-stock\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/make-to-stock-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/make-to-stock-hero.png\",\"width\":1774,\"height\":887,\"caption\":\"Standard stock containers and special orders share a packing line beside a finished-stock rack.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/make-to-stock\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"\uc7ac\uace0\uc0dd\uc0b0: \uace0\uac1d\uc774 \uae30\ub2e4\ub9ac\uae30 \uc804\uc5d0 \uc7ac\uace0\ub97c \ubcf4\ucda9\ud558\uc138\uc694\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ko-KR\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ko-KR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ko-KR\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"\uc7ac\uace0\uc0dd\uc0b0: \uace0\uac1d\uc774 \uae30\ub2e4\ub9ac\uae30 \uc804\uc5d0 \uc7ac\uace0\ub97c \ubcf4\ucda9\ud558\uc138\uc694","description":"\uc7ac\uace0\ub97c \uc81c\ub54c \ubcf4\ucda9\ud558\uba74 \uc7ac\uace0\uc0dd\uc0b0\uc73c\ub85c \ub0a9\ud488\uc744 \uc55e\ub2f9\uae38 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc801\uc6a9 \uc870\uac74\uacfc SkyPlanner\ub85c \ubcf4\ucda9 \ubc30\uce58 \uc77c\uc815\uc744 \uc9dc\ub294 \ubc95\uc744 \uc54c\uc544\ubcf4\uc138\uc694.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/make-to-stock\/","og_locale":"ko_KR","og_type":"article","og_title":"\uc7ac\uace0\uc0dd\uc0b0: \uace0\uac1d\uc774 \uae30\ub2e4\ub9ac\uae30 \uc804\uc5d0 \uc7ac\uace0\ub97c \ubcf4\ucda9\ud558\uc138\uc694","og_description":"\uc7ac\uace0\ub97c \uc81c\ub54c \ubcf4\ucda9\ud558\uba74 \uc7ac\uace0\uc0dd\uc0b0\uc73c\ub85c \ub0a9\ud488\uc744 \uc55e\ub2f9\uae38 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc801\uc6a9 \uc870\uac74\uacfc SkyPlanner\ub85c \ubcf4\ucda9 \ubc30\uce58 \uc77c\uc815\uc744 \uc9dc\ub294 \ubc95\uc744 \uc54c\uc544\ubcf4\uc138\uc694.","og_url":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/make-to-stock\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-15T20:34:27+00:00","article_modified_time":"2026-10-19T15:12:41+00:00","og_image":[{"width":1774,"height":887,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/make-to-stock-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"\uae00\uc4f4\uc774":"Jussi M\u00e4ntyl\u00e4"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/make-to-stock\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/make-to-stock\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"\uc7ac\uace0\uc0dd\uc0b0: \uace0\uac1d\uc774 \uae30\ub2e4\ub9ac\uae30 \uc804\uc5d0 \uc7ac\uace0\ub97c \ubcf4\ucda9\ud558\uc138\uc694","datePublished":"2026-10-15T20:34:27+00:00","dateModified":"2026-10-19T15:12:41+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/make-to-stock\/"},"wordCount":43,"publisher":{"@id":"https:\/\/skyplanner.ai\/ko\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/make-to-stock\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/make-to-stock-hero.png","articleSection":["APS \ubc0f \uc2a4\ucf00\uc904\ub9c1","\ub9ac\uc18c\uc2a4"],"inLanguage":"ko-KR"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/make-to-stock\/","url":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/make-to-stock\/","name":"\uc7ac\uace0\uc0dd\uc0b0: \uace0\uac1d\uc774 \uae30\ub2e4\ub9ac\uae30 \uc804\uc5d0 \uc7ac\uace0\ub97c \ubcf4\ucda9\ud558\uc138\uc694","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ko\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/make-to-stock\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/make-to-stock\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/make-to-stock-hero.png","datePublished":"2026-10-15T20:34:27+00:00","dateModified":"2026-10-19T15:12:41+00:00","description":"\uc7ac\uace0\ub97c \uc81c\ub54c \ubcf4\ucda9\ud558\uba74 \uc7ac\uace0\uc0dd\uc0b0\uc73c\ub85c \ub0a9\ud488\uc744 \uc55e\ub2f9\uae38 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc801\uc6a9 \uc870\uac74\uacfc SkyPlanner\ub85c \ubcf4\ucda9 \ubc30\uce58 \uc77c\uc815\uc744 \uc9dc\ub294 \ubc95\uc744 \uc54c\uc544\ubcf4\uc138\uc694.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/make-to-stock\/#breadcrumb"},"inLanguage":"ko-KR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/make-to-stock\/"]}]},{"@type":"ImageObject","inLanguage":"ko-KR","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/make-to-stock\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/make-to-stock-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/make-to-stock-hero.png","width":1774,"height":887,"caption":"Standard stock containers and special orders share a packing line beside a finished-stock rack."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/make-to-stock\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/ko\/"},{"@type":"ListItem","position":2,"name":"\uc7ac\uace0\uc0dd\uc0b0: \uace0\uac1d\uc774 \uae30\ub2e4\ub9ac\uae30 \uc804\uc5d0 \uc7ac\uace0\ub97c \ubcf4\ucda9\ud558\uc138\uc694"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/ko\/#website","url":"https:\/\/skyplanner.ai\/ko\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/ko\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/ko\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ko-KR"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/ko\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/ko\/","logo":{"@type":"ImageObject","inLanguage":"ko-KR","@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"ko-KR","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/make-to-stock-hero.png",1774,887,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/make-to-stock-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/make-to-stock-hero-300x150.png",300,150,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/make-to-stock-hero-768x384.png",768,384,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/make-to-stock-hero-1024x512.png",1024,512,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/make-to-stock-hero-1536x768.png",1536,768,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/make-to-stock-hero.png",1774,887,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/make-to-stock-hero-360x180.png",360,180,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/ko\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"\uc7ac\uace0\uc0dd\uc0b0: \uace0\uac1d\uc774 \uae30\ub2e4\ub9ac\uae30 \uc804\uc5d0 \uc7ac\uace0\ub97c \ubcf4\ucda9\ud558\uc138\uc694 \ud648 &raquo; \ub9ac\uc18c\uc2a4 &raquo; \uc7ac\uace0\uc0dd\uc0b0: \uace0\uac1d\uc774 \uae30\ub2e4\ub9ac\uae30 \uc804\uc5d0 \uc7ac\uace0\ub97c \ubcf4\ucda9\ud558\uc138\uc694 \uace0\uac1d\uc774 \ud45c\uc900 \uc81c\ud488\uc744 \ub0b4\uc77c\uae4c\uc9c0 \ubc1b\uace0 \uc2f6\uc5b4 \ud569\ub2c8\ub2e4. \uc774\ubbf8 \uc7ac\uace0\uac00 \uc788\ub2e4\uba74 \uc0dd\uc0b0\uc774 \ub05d\ub0a0 \ub54c\uae4c\uc9c0 \uae30\ub2e4\ub824 \ub2ec\ub77c\uace0 \ud560 \ud544\uc694 \uc5c6\uc774 \ucd9c\ud558\ub97c \uc900\ube44\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc8fc\ubb38\uc774 \ub4e4\uc5b4\uc624\uae30 \uc804\uc5d0 \ubbf8\ub9ac \uc0dd\uc0b0\ud574 \ub450\ub294 \uac83, \uc774\uac83\uc774 \uc7ac\uace0\uc0dd\uc0b0\uc758 \ub9e4\ub825\uc785\ub2c8\ub2e4. \ub354 \uc5b4\ub824\uc6b4 \uacb0\uc815\uc740 \ud310\ub9e4 \uc804\uc5d0 \ub0b4\ub824\uc57c \ud569\ub2c8\ub2e4.&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts\/99334","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/comments?post=99334"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts\/99334\/revisions"}],"predecessor-version":[{"id":99392,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts\/99334\/revisions\/99392"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/media\/99338"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/media?parent=99334"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/categories?post=99334"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/tags?post=99334"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}