{"id":99247,"date":"2026-10-15T17:37:09","date_gmt":"2026-10-15T17:37:09","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=99247"},"modified":"2026-10-15T17:39:46","modified_gmt":"2026-10-15T17:39:46","slug":"capacity-requirements-planning","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/capacity-requirements-planning\/","title":{"rendered":"\ub2a5\ub825\uc18c\uc694\uacc4\ud68d: \uc791\uc5c5 \uc13c\ud130 \uacfc\ubd80\ud558 \ud574\uc18c"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">\ub2a5\ub825\uc18c\uc694\uacc4\ud68d: \uc791\uc5c5 \uc13c\ud130 \uacfc\ubd80\ud558 \ud574\uc18c<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/ko\/\">\ud648<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/\">\ub9ac\uc18c\uc2a4<\/a> &raquo; \ub2a5\ub825\uc18c\uc694\uacc4\ud68d: \uc791\uc5c5 \uc13c\ud130 \uacfc\ubd80\ud558 \ud574\uc18c<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">\uc608\uc0c1 \uc77d\uae30 \uc2dc\uac04: <\/span><span class=\"yoast-reading-time__reading-time\">11<\/span><span class=\"yoast-reading-time__time-unit\"> \ubd84<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>\uc790\uc7ac \uacc4\ud68d\uc740 \ub2e4\uc74c\uc5d0 \uc0dd\uc0b0\ud560 \uc624\ub354\ub97c \uc81c\uc548\ud569\ub2c8\ub2e4. \uae30\uc874 \uc791\uc5c5\ub4e4\ub3c4 \uc774\ubbf8 \uc124\ube44 \uc2dc\uac04\uc744 \ub450\uace0 \uacbd\ud569\ud558\uace0 \uc788\uc2b5\ub2c8\ub2e4. \ucd94\uac00 \uc791\uc5c5\uc744 \ud22c\uc785\ud558\uae30 \uc804\uc5d0 \uc5b4\ub290 \uc791\uc5c5 \uc13c\ud130\uac00 \uc774\ub97c \uac10\ub2f9\ud560 \uc218 \uc788\uace0, \uc5b4\ub514\uc5d0\uc11c \ub0a9\uae30\uac00 \uc9c0\uc5f0\ub41c \uc624\ub354\uac00 \uc313\uc774\uac8c \ub420\uc9c0 \uc54c\uc544\uc57c \ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\ub2a5\ub825\uc18c\uc694\uacc4\ud68d(CRP)\uc740 \uacc4\ud68d\ub41c \uc0dd\uc0b0 \uc624\ub354\uc640 \ubbf8\uc644\ub8cc \uc0dd\uc0b0 \uc624\ub354\ub97c \uae30\uac04\ubcc4 \uc790\uc6d0 \uc18c\uc694\ub7c9\uc73c\ub85c \ud658\uc0b0\ud55c \ub4a4, \uadf8 \ubd80\ud558\ub97c \uac00\uc6a9 \ub2a5\ub825\uacfc \ube44\uad50\ud569\ub2c8\ub2e4. \uc774\ub97c \ud1b5\ud574 \uc5b4\ub5a4 \uc790\uc6d0\uc774 \uc5b4\ub290 \uae30\uac04\uc5d0 \ubd80\uc871\ud55c\uc9c0, \uadf8 \ubd80\uc871\uc744 \uc720\ubc1c\ud558\ub294 \uc624\ub354\uac00 \ubb34\uc5c7\uc778\uc9c0 \ud30c\uc545\ud558\uace0 \uc0c1\uc138 \uc0dd\uc0b0 \uacc4\ud68d\uc5d0\uc11c \uc218\uc815\ud560 \ubd80\ubd84\uc744 \ucc3e\uc744 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc911\uc694\ud55c \uac83\uc740 \ube68\uac04\uc0c9\uc73c\ub85c \ud45c\uc2dc\ub41c \ubd80\ud558\uc728 \uc790\uccb4\uac00 \uc544\ub2d9\ub2c8\ub2e4. \uc5b4\ub5a4 \uc791\uc5c5\uc744 \uc62e\uae30\uace0, \uc5b4\ub5a4 \uc0dd\uc0b0 \ub2a5\ub825\uc744 \ucd94\uac00\ud558\uace0, \uc5b4\ub5a4 \ub0a9\uae30 \uc57d\uc18d\uc744 \uc870\uc815\ud560\uc9c0 \uacb0\uc815\ud558\ub294 \ub370 \uc758\ubbf8\uac00 \uc788\uc2b5\ub2c8\ub2e4. SkyPlanner APS\ub294 \uadf8 \uacb0\uc815\uc744 \uc0dd\uc0b0 \uc77c\uc815\uc5d0 \ubc18\uc601\ud558\ub3c4\ub85d \ub3c4\uc640\uc90d\ub2c8\ub2e4. Arcturus\ub294 \uc790\uc6d0\uacfc \uc6b0\uc120\uc21c\uc704\ub97c \uace0\ub824\ud574 \uac01 \uacf5\uc815\uc758 \uc77c\uc815\uc744 \uacc4\uc0b0\ud558\uba70, Gantt \ud654\uba74\uc5d0\uc11c\ub294 \ubcc0\uacbd\uc774 \ub098\uba38\uc9c0 \uc791\uc5c5\uc5d0 \ubbf8\uce58\ub294 \uc601\ud5a5\uc744 \ud655\uc778\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\ub2a5\ub825\uc18c\uc694\uacc4\ud68d\uc740 \ubb34\uc5c7\uc744 \ud655\uc778\ud560\uae4c\uc694?<\/h2>\n\n\n<p>CRP\ub294 \uc790\uc7ac \uacc4\ud68d\uc5d0 \ub530\ub978 \uc0dd\uc0b0 \uc791\uc5c5\uc744 \uc218\ud589\ud558\uae30\uc5d0 \uc124\ube44\uc640 \uc778\ub825\uc758 \ub2a5\ub825\uc774 \ucda9\ubd84\ud55c\uc9c0 \ud655\uc778\ud569\ub2c8\ub2e4. \uacc4\uc0b0\uc5d0 \ud544\uc694\ud55c \uc0c1\uc138 \uc815\ubcf4\ub294 \uc624\ub354\uc640 \uac01 \uacf5\uc815\uc5d0\uc11c \uac00\uc838\uc635\ub2c8\ub2e4. \uc218\ub7c9, \uacf5\uc815 \uc21c\uc11c, \uc14b\uc5c5 \ubc0f \uac00\uacf5 \uc2dc\uac04, \uc794\uc5ec \uc791\uc5c5\ub7c9, \uac01 \uc790\uc6d0\uc774 \ud544\uc694\ud55c \uc2dc\uc810 \ub4f1\uc774 \uc5ec\uae30\uc5d0 \ud574\ub2f9\ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc791\uc5c5 \uc13c\ud130\ub294 \uc124\ube44 \ud55c \ub300\uc77c \uc218\ub3c4, \ub3d9\ub4f1\ud55c \uc791\uc5c5\uc744 \uc218\ud589\ud558\ub294 \uc124\ube44 \uadf8\ub8f9\uc774\ub098 \uc0dd\uc0b0\ud300\uc77c \uc218\ub3c4 \uc788\uc2b5\ub2c8\ub2e4. \uc81c\uc57d\uc774 \ub4dc\ub7ec\ub0a0 \ub9cc\ud07c \uad6c\uccb4\uc801\uc778 \ub2e8\uc704\ub85c \ubd80\ud558\uc640 \ub2a5\ub825\uc744 \ube44\uad50\ud574\uc57c \ud569\ub2c8\ub2e4. \uac80\uc0ac \uc2dc\uac04\uc774 \ub0a8\ub294\ub2e4\uace0 \ud574\uc11c \uba38\uc2dc\ub2dd \uc13c\ud130\uc758 \uacfc\ubd80\ud558\ub97c \uba54\uc6b8 \uc218\ub294 \uc5c6\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>CRP\ub294 \ub2e4\ub978 \uacc4\ud68d \ud65c\ub3d9\uc744 \ub300\uccb4\ud558\ub294 \uac83\uc774 \uc544\ub2c8\ub77c, \ub2e4\uc74c\uacfc \uac19\uc774 \ud568\uaed8 \ud65c\uc6a9\ud558\ub294 \ud65c\ub3d9\uc785\ub2c8\ub2e4.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>\uacc4\ud68d \ud65c\ub3d9<\/th><th>\ud655\uc778\ud558\uac70\ub098 \uacb0\uc815\ud558\ub294 \uc0ac\ud56d<\/th><\/tr><\/thead><tbody><tr><td><a href=\"\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/mrp-%ea%b0%84%eb%8b%a8%ed%95%9c-%ea%b0%80%ec%9d%b4%eb%93%9c\/\">\uc790\uc7ac\uc18c\uc694\uacc4\ud68d(MRP)<\/a><\/td><td>\uc7ac\uace0\uc640 \uacf5\uae09\uc744 \uace0\ub824\ud588\uc744 \ub54c \ud544\uc694\ud55c \uc790\uc7ac \ubc0f \ubd80\ud488\uc758 \uc885\ub958, \uc218\ub7c9, \ud544\uc694 \uc2dc\uc810<\/td><\/tr><tr><td><a href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/rough-cut-capacity-planning\/\">\uac1c\ub7b5 \uc0dd\uc0b0\ub2a5\ub825\uacc4\ud68d(RCCP)<\/a><\/td><td>\ud575\uc2ec \uc790\uc6d0\uc73c\ub85c \uae30\uc900\uc0dd\uc0b0\uacc4\ud68d\uc744 \uc774\ud589\ud560 \uc218 \uc788\ub294\uc9c0 \uc5ec\ubd80<\/td><\/tr><tr><td>\ub2a5\ub825\uc18c\uc694\uacc4\ud68d(CRP)<\/td><td>\uacc4\ud68d\ub41c \uc0dd\uc0b0 \uc624\ub354\uc640 \ubbf8\uc644\ub8cc \uc0dd\uc0b0 \uc624\ub354\uc5d0\uc11c \ubc1c\uc0dd\ud558\ub294 \uc0c1\uc138 \uc790\uc6d0 \ubd80\ud558<\/td><\/tr><tr><td><a href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/finite-capacity-scheduling\/\">\uc720\ud55c \uc6a9\ub7c9 \uc2a4\ucf00\uc904\ub9c1<\/a><\/td><td>\uc790\uc6d0\uc758 \uac00\uc6a9 \uc2dc\uac04 \ub0b4\uc5d0\uc11c \uac1c\ubcc4 \uacf5\uc815\uc744 \uc218\ud589\ud560 \uc704\uce58\uc640 \uc2dc\uc810<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>\uc804\ud1b5\uc801\uc778 CRP\ub294 \uacfc\ubd80\ud558\ub97c \ub4dc\ub7ec\ub0b4\uc9c0\ub9cc, \uc774\ub97c \uc720\ubc1c\ud55c \uc791\uc5c5 \uac04 \uacbd\ud569\uae4c\uc9c0 \uc790\ub3d9\uc73c\ub85c \ud574\uc18c\ud558\uc9c0\ub294 \uc54a\uc2b5\ub2c8\ub2e4. \uac00\uc6a9 \uc2dc\uac04\uc740 36\uc2dc\uac04\uc778\ub370 \uc18c\uc694 \uc2dc\uac04\uc740 44\uc2dc\uac04\uc774\ub77c\uace0 \ubcf4\uc5ec \uc8fc\ub294 \ubcf4\uace0\uc11c\ub294 \ubc14\ub85c \uadf8 \ubd80\uc871\ubd84\uc744 \uadf8\ub300\ub85c \ub4dc\ub7ec\ub0b8\ub2e4\ub294 \uc810\uc5d0\uc11c \uac00\uce58\uac00 \uc788\uc2b5\ub2c8\ub2e4. \uc774\ub97c \ud574\uc18c\ud558\ub824\uba74 \uc0dd\uc0b0 \uce21\uba74\uc758 \uc758\uc0ac\uacb0\uc815\uacfc \uacc4\ud68d \uc218\uc815\uc774 \ud544\uc694\ud569\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\uc544\uc9c1 \uc218\ud589\ud574\uc57c \ud560 \uc791\uc5c5\uc744 \uae30\uc900\uc73c\ub85c \ubd80\ud558 \uc0b0\uc815\ud558\uae30<\/h2>\n\n\n<p>\uba3c\uc800 \uc77c\uad00\ub41c \uae30\uc900\uc73c\ub85c \uacc4\uc0b0 \ub300\uc0c1 \uc624\ub354\ub97c \uc815\ud558\uc138\uc694. \uac80\ud1a0 \uc911\uc778 \uc0dd\uc0b0 \uc81c\uc548\uacfc \ubbf8\uc644\ub8cc \uc624\ub354\uc758 \uc794\uc5ec \uacf5\uc815\uc744 \ud3ec\ud568\ud574\uc57c \ud569\ub2c8\ub2e4. \uc0dd\uc0b0 \uc81c\uc548\uc774 \ud655\uc815\ub418\uc5b4 \uc791\uc5c5\uc774 \uc9c0\uc2dc\ub418\uba74 \ub3d9\uc77c\ud55c \uc791\uc5c5\uc774 \uc81c\uc548 \uc0c1\ud0dc\ub85c\ub3c4 \ub0a8\uc544 \uc911\ubcf5 \uacc4\uc0b0\ub418\uc9c0 \uc54a\ub3c4\ub85d \ud574\uc57c \ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\ucd1d \ud310\ub9e4 \uc218\uc694\ub97c \ucd94\uac00\ub85c \ub354\ud558\uc9c0 \ub9d0\uace0 \uc790\uc7ac \uacc4\ud68d\uc758 \uc21c\uc0dd\uc0b0 \uc18c\uc694\ub7c9\uc744 \uc0ac\uc6a9\ud558\uc138\uc694. \uc774\ubbf8 \uc7ac\uace0\ub85c \ucda9\ub2f9\ub418\ub294 \uc218\uc694\ub97c \ub2e4\uc2dc \uc0dd\uc0b0\ud560 \ud544\uc694\ub294 \uc5c6\uc2b5\ub2c8\ub2e4. \ubc18\uba74 \ubbf8\uc644\ub8cc \uc0dd\uc0b0 \uc624\ub354\uc758 \uc794\uc5ec \uc791\uc5c5\uc740 \uc5ec\uc804\ud788 \uc0dd\uc0b0 \ub2a5\ub825\uc744 \uc18c\ubaa8\ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\uac01 \uacf5\uc815\uc5d0 \ud544\uc694\ud55c \uc815\ubcf4\ub294 \ub2e4\uc74c\uacfc \uac19\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<ul class=\"wp-block-list\"><li>\ud655\uc778\ub41c \uc7ac\uc791\uc5c5\uc744 \ud3ec\ud568\ud55c \uc794\uc5ec \uc218\ub7c9\uacfc \uacf5\uc815 \uc9c4\ud589 \uc0c1\ud0dc<\/li><li>\uacf5\uc815 \uc21c\uc11c \uc815\ubcf4, \uc791\uc5c5 \uac00\ub2a5\ud55c \uc791\uc5c5 \uc13c\ud130, \uacf5\uc815 \uac04 \uc120\ud6c4 \uad00\uacc4<\/li><li>\ub3d9\uc77c\ud55c \ub2e8\uc704\ub85c \ud658\uc0b0\ud55c \uc794\uc5ec \uc14b\uc5c5 \uc2dc\uac04\uacfc \uac00\uacf5 \uc2dc\uac04<\/li><li>\uc18c\uc694\ub7c9\uc744 \ud574\ub2f9 \uc2dc\uc810\uc5d0 \ubc30\ubd84\ud558\uae30 \uc704\ud55c \uacf5\uc815 \uc608\uc815\uc77c \ub610\ub294 \ub9ac\ub4dc\ud0c0\uc784 \uc624\ud504\uc14b<\/li><li>\uc790\uc6d0\ubcc4 \uc791\uc5c5 \uce98\ub9b0\ub354, \uc778\ub825 \ubc30\uce58, \ud655\uc778\ub41c \uac00\ub3d9 \ubd88\uac00 \uae30\uac04<\/li><\/ul>\n\n\n<p>\uc790\uc7ac\uba85\uc138\uc11c\ub294 \uc81c\ud488\uc5d0 \ubb34\uc5c7\uc774 \ub4e4\uc5b4\uac00\ub294\uc9c0 \uc54c\ub824\uc90d\ub2c8\ub2e4. \uacf5\uc815 \uc21c\uc11c \uc815\ubcf4\ub294 \uc0dd\uc0b0 \uc791\uc5c5\uc744 \uc5b4\ub514\uc5d0\uc11c \uc218\ud589\ud558\uace0 \uc790\uc6d0 \uc2dc\uac04\uc774 \uc5bc\ub9c8\ub098 \ud544\uc694\ud55c\uc9c0 \uc54c\ub824\uc90d\ub2c8\ub2e4. CRP\uc5d0\ub294 \uc790\uc7ac \uacc4\ud68d\uc5d0\uc11c \uac00\uc838\uc628 \uc218\ub7c9\ubfd0 \uc544\ub2c8\ub77c \uc774\ub7ec\ud55c \uacf5\uc815 \uc815\ubcf4\ub3c4 \ud544\uc694\ud569\ub2c8\ub2e4.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\uacf5\uc815\uc758 \uc794\uc5ec \uc18c\uc694 \uc2dc\uac04 \uacc4\uc0b0\ud558\uae30<\/h3>\n\n\n<p>\uac1c\ub2f9 \uac00\uacf5 \uc2dc\uac04\uc744 \uc801\uc6a9\ud558\ub294 \ub2e8\uc21c\ud55c \uacf5\uc815\uc740 \ub2e4\uc74c\uacfc \uac19\uc774 \uacc4\uc0b0\ud569\ub2c8\ub2e4.<\/p>\n\n\n<p><strong>\uacf5\uc815\uc758 \uc794\uc5ec \ubd80\ud558 = \uc794\uc5ec \uc14b\uc5c5 \uc2dc\uac04 + \uc794\uc5ec \uc218\ub7c9 \u00d7 \uac1c\ub2f9 \uac00\uacf5 \uc2dc\uac04.<\/strong><\/p>\n\n\n<p>\uc791\uc5c5 \uc13c\ud130\ubcc4, \uae30\uac04\ubcc4\ub85c \uac01 \uacf5\uc815\uc758 \ubd80\ud558\ub97c \ud569\uc0b0\ud558\uc138\uc694. \uc774\ubbf8 \uc644\ub8cc\ud55c \uc14b\uc5c5\uc740 \uc55e\uc73c\ub85c \ud544\uc694\ud55c \uc791\uc5c5\ub7c9\uc5d0 \ub2e4\uc2dc \ud3ec\ud568\ud558\uc9c0 \uc54a\uc2b5\ub2c8\ub2e4. \uc794\uc5ec \uc624\ub354\ub97c \uac01\uac01 \ubcc4\ub3c4 \uc14b\uc5c5\uc774 \ud544\uc694\ud55c \ubc30\uce58\ub85c \ub098\ub220\uc57c \ud55c\ub2e4\uba74, \ubd84\ud560\uc5d0 \ucd94\uac00 \uc2dc\uac04\uc774 \ub4e4\uc9c0 \uc54a\ub294\ub2e4\uace0 \uac00\uc815\ud558\uc9c0 \ub9d0\uace0 \ucd94\uac00 \uc14b\uc5c5 \uc2dc\uac04\uc744 \ubc18\uc601\ud558\uc138\uc694.<\/p>\n\n\n<p>\ubaa8\ub4e0 \uacf5\uc815\uc774 \uac1c\ub2f9 \uc2dc\uac04\uc744 \uae30\uc900\uc73c\ub85c \ud558\uc9c0\ub294 \uc54a\uc2b5\ub2c8\ub2e4. \uac00\uc5f4\ub85c\ub294 \ubc30\uce58\ub2f9 \uc77c\uc815\ud55c \uc2dc\uac04 \ub3d9\uc548 \uc0dd\uc0b0 \ub2a5\ub825\uc744 \uc810\uc720\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ubaa8\ub4e0 \uc2dc\uac04\uc5d0 \uc218\ub7c9\uc744 \uacf1\ud558\uc9c0 \ub9d0\uace0 \uac01 \uacf5\uc815\uc758 \uc2e4\uc81c \uc2dc\uac04 \uc0b0\uc815 \uae30\uc900\uc744 \uc801\uc6a9\ud558\uc138\uc694.<\/p>\n\n\n<p>\uc124\ube44 \uc2dc\uac04\uacfc \uc778\ub825 \uacf5\uc218\ub294 \uad6c\ubd84\ud574\uc11c \uad00\ub9ac\ud558\uc138\uc694. \uacf5\uc815\uc758 \uc77c\ubd80 \uad6c\uac04\uc5d0\uc11c\ub294 \uc124\ube44\uac00 \ubb34\uc778\uc73c\ub85c \uac00\ub3d9\ub420 \uc218 \uc788\uace0, \uc870\ub9bd \uc791\uc5c5\uc5d0\ub294 \uc5ec\ub7ec \uba85\uc774 \ud544\uc694\ud560 \uc218\ub3c4 \uc788\uc2b5\ub2c8\ub2e4. \uacf5\uc7a5 \uc804\uccb4\uc758 \uc2dc\uac04\uc744 \ud558\ub098\ub85c \ud569\uc0b0\ud558\uba74\uc11c \uc774\ub7ec\ud55c \uc870\uac74\uc774 \uac00\ub824\uc838\uc11c\ub294 \uc548 \ub429\ub2c8\ub2e4.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\uacf5\uc815\uc5d0 \uc2e4\uc81c\ub85c \ud544\uc694\ud55c \uae30\uac04\uc5d0 \uc18c\uc694\ub7c9 \ubc30\ubd84\ud558\uae30<\/h3>\n\n\n<p>\ubaa8\ub4e0 \uacf5\uc815\uc744 \uc644\uc81c\ud488 \uc624\ub354\uc758 \ub0a9\ud488 \uc8fc\uac04\uc5d0 \ubab0\uc544\ub123\uc9c0 \ub9c8\uc138\uc694. \ud6c4\uac00\uacf5\uacfc \uc870\ub9bd\uc774 \uc774\uc5b4\uc9c8 \uc218 \uc788\ub3c4\ub85d \uae30\uacc4\uac00\uacf5\uc744 \ub354 \uc77c\ucc0d \ud574\uc57c \ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uacf5\uc815 \uc608\uc815\uc77c\uc774\ub098 \uacf5\uc815\ubcc4 \uc624\ud504\uc14b\uc744 \uc0ac\uc6a9\ud574 \uae30\uac04\ubcc4\ub85c \ubd80\ud558\ub97c \ubc30\ubd84\ud558\uc138\uc694. \uacf5\uc815\uc774 \uc5ec\ub7ec \uae30\uac04\uc5d0 \uac78\uccd0 \uc788\uc73c\uba74 \uc0ac\uc6a9\ud558\ub294 \uacc4\ud68d \ubaa8\ub378\uc758 \ubc30\ubd84 \uaddc\uce59\uc744 \ub530\ub974\uc138\uc694.<\/p>\n\n\n<p>\uc77c \ub2e8\uc704\ub85c \ubcf4\uba74 \uc8fc\uac04 \ud569\uacc4\uc5d0 \uac00\ub824\uc9c4 \uc791\uc5c5 \ucda9\ub3cc\uc744 \ud655\uc778\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ubc18\uba74 \uc7a5\uae30\uac04\uc758 \ubd80\ud558 \ucd94\uc774\ub97c \uac80\ud1a0\ud560 \ub54c\ub294 \uc8fc \ub2e8\uc704\uac00 \uc720\uc6a9\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc758\uc0ac\uacb0\uc815\uc5d0 \ud544\uc694\ud55c \uc0c1\uc138 \uc218\uc900\uc744 \uc120\ud0dd\ud558\ub418, \ud2b9\uc815 \uae30\uac04\uc758 \uc218\uae09\uc774 \ub9de\ub294\ub2e4\ub294 \uc774\uc720\ub9cc\uc73c\ub85c \ub0a9\uae30\ub97c \uc57d\uc18d\ud558\uae30 \uc804\uc5d0 \uc2e4\uc81c \uacf5\uc815 \uc21c\uc11c\ub97c \ud655\uc778\ud558\uc138\uc694.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\uc2e4\uc81c\ub85c \uc0ac\uc6a9\ud560 \uc218 \uc788\ub294 \uc0dd\uc0b0 \ub2a5\ub825\uacfc \ube44\uad50\ud558\uae30<\/h3>\n\n\n<p>\uc124\ube44\uac00 \uc788\ub2e4\ub294 \uc774\uc720\ub9cc\uc73c\ub85c \uac00\ub3d9 \uac00\ub2a5\ud558\ub2e4\uace0 \ubcf4\uc9c0 \ub9d0\uace0, \ub0a0\uc9dc\ubcc4 \uc791\uc5c5 \uce98\ub9b0\ub354\ub97c \uae30\uc900\uc73c\ub85c \uac00\uc6a9 \uc2dc\uac04\uc744 \uacc4\uc0b0\ud558\uc138\uc694. \uc608\uc815\ub41c \uc790\uc6d0 \uac00\ub3d9 \uc2dc\uac04\uc5d0\uc11c \uc2dc\uc791\ud574 \uc720\uc9c0\ubcf4\uc218, \ud734\uc77c, \uc778\ub825 \ubc30\uce58\uc640 \uadf8 \ubc16\uc5d0 \ud655\uc778\ub41c \uc81c\uc57d\uc744 \ubc18\uc601\ud558\uc138\uc694.<\/p>\n\n\n<p>\uc2dc\uac04\uc744 \uae30\uc900\uc73c\ub85c \ub2e8\uc21c \ube44\uad50\ud558\uba74 \ub2e4\uc74c\uacfc \uac19\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p><strong>\uc0dd\uc0b0 \ub2a5\ub825 \uc5ec\uc720\ubd84 = \uac00\uc6a9 \uc2dc\uac04 \u2212 \uc18c\uc694 \uc2dc\uac04.<\/strong><\/p>\n\n\n<p><strong>\ubd80\ud558\uc728 = \uc18c\uc694 \uc2dc\uac04 \u00f7 \uac00\uc6a9 \uc2dc\uac04 \u00d7 100%.<\/strong><\/p>\n\n\n<p>\uc5ec\uc720\ubd84\uc774 \uc74c\uc218\uc774\uac70\ub098 \ubd80\ud558\uc728\uc774 100%\ub97c \ub118\uc73c\uba74 \uacfc\ubd80\ud558 \uc0c1\ud0dc\uc785\ub2c8\ub2e4. \uac00\uc6a9 \ub2a5\ub825\uc774 \uc601\uc774\uba74 \uc601\uc73c\ub85c \ub098\ub204\ub824\uace0 \ud558\uc9c0 \ub9d0\uace0, \ud574\ub2f9 \uae30\uac04\uc5d0\ub294 \uadf8 \uc791\uc5c5\uc758 \uc77c\uc815\uc744 \ubc30\uc815\ud560 \uc218 \uc5c6\ub2e4\uace0 \ud45c\uc2dc\ud558\uc138\uc694.<\/p>\n\n\n<p>\uc2dc\uac04 \uc0b0\uc815 \uae30\uc900\uc740 \uc77c\uad00\ub418\uac8c \uc720\uc9c0\ud558\uc138\uc694. \uac00\uacf5 \uc2dc\uac04\uc5d0 \ud45c\uc900 \uc2dc\uac04\uc744 \uc0ac\uc6a9\ud558\uace0 \uac00\uc6a9 \ub2a5\ub825\uc5d0\ub294 \uc791\uc5c5 \uc131\uacfc\ub97c \ubc18\uc601\ud574 \ubcf4\uc815\ud55c\ub2e4\uba74, \uadf8 \ubcf4\uc815 \ub0b4\uc6a9\uc744 \ubb38\uc11c\ud654\ud558\uc138\uc694. \uac00\uacf5 \uc2dc\uac04\uc5d0 \uc774\ubbf8 \ub3d9\uc77c\ud55c \uc608\uc0c1 \uc190\uc2e4\uc774 \ud3ec\ud568\ub418\uc5b4 \uc788\ub2e4\uba74 \uc774\ub97c \ub2e4\uc2dc \ucc28\uac10\ud574\uc11c\ub294 \uc548 \ub429\ub2c8\ub2e4. \uacfc\uac70 \uc0dd\uc0b0 \uc2e4\uc801\uc740 \uc0dd\uc0b0 \ub2a5\ub825\uc744 \uc9c0\ub098\uce58\uac8c \ub099\uad00\uc801\uc73c\ub85c \uac00\uc815\ud558\uc9c0 \uc54a\uc558\ub294\uc9c0 \uc810\uac80\ud558\ub294 \ub370 \uc720\uc6a9\ud569\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">CRP \uc608\uc2dc: \uae30\uacc4\uac00\uacf5\uc758 8\uc2dc\uac04 \uacfc\ubd80\ud558 \ucc3e\uae30<\/h2>\n\n\n<p>\ud55c \uc81c\uc870\uc5c5\uccb4\uac00 \uba38\uc2dc\ub2dd \uc13c\ud130 \ud55c \ub300\uc758 \ub2e4\uc74c \uc8fc \uc791\uc5c5\uc744 \uac80\ud1a0\ud55c\ub2e4\uace0 \uac00\uc815\ud574 \ubcf4\uaca0\uc2b5\ub2c8\ub2e4. \uadfc\ubb34\uc77c \ub2f7\uc0c8 \ub3d9\uc548 \ub9e4\uc77c \uc5ec\ub35f \uc2dc\uac04\uc529 \ud55c \uad50\ub300\ub85c \uac00\ub3d9\ud558\ubbc0\ub85c \ucd1d \uc124\ube44 \uc2dc\uac04\uc740 40\uc2dc\uac04\uc785\ub2c8\ub2e4. \uc608\uc815\ub41c \uc720\uc9c0\ubcf4\uc218 \ub124 \uc2dc\uac04\uc744 \ube7c\uba74 <strong>\uac00\uc6a9 \uc124\ube44 \uc2dc\uac04\uc740 36\uc2dc\uac04<\/strong>\uc785\ub2c8\ub2e4. \uc774 \ub2e8\uc21c\ud654\ub41c \uc608\uc2dc\uc5d0\uc11c\ub294 \ud6a8\uc728\uc5d0 \ub530\ub978 \ucd94\uac00 \ucc28\uac10\uc740 \uc801\uc6a9\ud558\uc9c0 \uc54a\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\ud574\ub2f9 \uc8fc\uc5d0 \uae30\uacc4\uac00\uacf5\uc774 \ud544\uc694\ud55c \uc624\ub354\ub294 \uc138 \uac74\uc785\ub2c8\ub2e4.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>\uc624\ub354<\/th><th>\uc0c1\ud0dc \ubc0f \uc794\uc5ec \uc791\uc5c5<\/th><th>\uc794\uc5ec \uc14b\uc5c5 \uc2dc\uac04<\/th><th>\uac1c\ub2f9 \uac00\uacf5 \uc2dc\uac04<\/th><th>\uae30\uacc4\uac00\uacf5 \uc18c\uc694 \uc2dc\uac04<\/th><\/tr><\/thead><tbody><tr><td>J101<\/td><td>\ubbf8\uc644\ub8cc \uc624\ub354: \uc794\uc5ec 60\uac1c<\/td><td>0\uc2dc\uac04<\/td><td>0.25\uc2dc\uac04<\/td><td>15\uc2dc\uac04<\/td><\/tr><tr><td>J202<\/td><td>\uacc4\ud68d \uc624\ub354: 80\uac1c<\/td><td>2\uc2dc\uac04<\/td><td>0.20\uc2dc\uac04<\/td><td>18\uc2dc\uac04<\/td><\/tr><tr><td>J203<\/td><td>\uacc4\ud68d \uc624\ub354: 40\uac1c<\/td><td>1\uc2dc\uac04<\/td><td>0.25\uc2dc\uac04<\/td><td>11\uc2dc\uac04<\/td><\/tr><tr><td>\ud569\uacc4<\/td><td><\/td><td><\/td><td><\/td><td>44\uc2dc\uac04<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>J101\uc758 \uc6d0\ub798 \uc218\ub7c9\uc740 100\uac1c\uc600\uc2b5\ub2c8\ub2e4. \uc774 \uc911 \ub9c8\ud754 \uac1c\ub294 \uc774\ubbf8 \uac00\uacf5\ud588\uc73c\uba70 \uc14b\uc5c5\ub3c4 \uc644\ub8cc\ub41c \uc0c1\ud0dc\uc785\ub2c8\ub2e4. \ub530\ub77c\uc11c \uae30\uacc4\uac00\uacf5 \ubd80\ud558\uc5d0\ub294 \uc794\uc5ec 60\uac1c\ub9cc \ud3ec\ud568\ub429\ub2c8\ub2e4. <strong>60 \u00d7 0.25 = 15\uc2dc\uac04<\/strong>\uc785\ub2c8\ub2e4.<\/p>\n\n\n<p>J202\uc758 \uc18c\uc694 \uc2dc\uac04\uc740 <strong>2 + (80 \u00d7 0.20) = 18\uc2dc\uac04<\/strong>\uc785\ub2c8\ub2e4. J203\uc740 <strong>1 + (40 \u00d7 0.25) = 11\uc2dc\uac04<\/strong>\uc758 \ubd80\ud558\ub97c \ub354\ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\ub530\ub77c\uc11c \uc774 \uba38\uc2dc\ub2dd \uc13c\ud130\ub294 \uc18c\uc694 \uc2dc\uac04\uc774 44\uc2dc\uac04\uc774\uace0 \uac00\uc6a9 \uc2dc\uac04\uc774 36\uc2dc\uac04\uc774\ubbc0\ub85c <strong>\uc5ec\ub35f \uc2dc\uac04\uc758 \uacfc\ubd80\ud558<\/strong>\uac00 \ubc1c\uc0dd\ud569\ub2c8\ub2e4. \ubd80\ud558\uc728\uc740 \uc18c\uc218\uc810 \uccab\uc9f8 \uc790\ub9ac\ub85c \ubc18\uc62c\ub9bc\ud558\uba74 <strong>122.2%<\/strong>\uc785\ub2c8\ub2e4.<\/p>\n\n\n<p>\uac19\uc740 \uc624\ub354\ub97c \ubcc4\ub3c4\uc758 \ubc84 \uc81c\uac70 \uc791\uc5c5\uc7a5\uc5d0\uc11c \ucc98\ub9ac\ud558\ub294 \ub370 \ud544\uc694\ud55c \uc778\ub825 \uacf5\uc218\ub294 \uac01\uac01 6, 8, 4\uc778\uc2dc\uc785\ub2c8\ub2e4. \ucd1d \ubd80\ud558\ub294 18\uc778\uc2dc\ub85c, \uac00\uc6a9 \uacf5\uc218 28\uc778\uc2dc \uc774\ub0b4\uc785\ub2c8\ub2e4. \ub0a8\ub294 \uc5f4 \uc778\uc2dc\ub294 \uc720\uc6a9\ud55c \uc5ec\ub825\uc774\uc9c0\ub9cc, \ubd80\uc871\ud55c \uae30\uacc4\uac00\uacf5 \uc791\uc5c5\uc744 \ub300\uc2e0\ud560 \uc218\ub294 \uc5c6\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\ube68\uac04 \ub9c9\ub300\ub97c \uc904\uc774\ub294 \ub370 \uadf8\uce58\uc9c0 \ub9d0\uace0 \uc2e4\uc81c \ub300\uc751\ucc45 \ube44\uad50\ud558\uae30<\/h3>\n\n\n<p>J203\uc744 \uac00\uacf5\ud560 \uc218 \uc788\ub294 \ub300\uccb4 \uc124\ube44\uac00 \uc788\uace0, \ud544\uc694\ud55c \uae30\uac04\uc5d0 \uac00\uc6a9 \uc2dc\uac04\uc774 16\uc2dc\uac04\uc774\ub77c\uace0 \uac00\uc815\ud574 \ubcf4\uaca0\uc2b5\ub2c8\ub2e4. \uc774 \uc124\ube44\uc5d0\uc11c\ub294 \uc791\uc5c5\uc774 \ub354 \ub290\ub824 \uc14b\uc5c5\uc5d0 1.5\uc2dc\uac04, \uac1c\ub2f9 \uac00\uacf5\uc5d0 0.30\uc2dc\uac04\uc774 \uac78\ub9bd\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc774 \uacf5\uc815\uc744 \uc62e\uae30\uba74 \ub300\uccb4 \uc124\ube44\uc5d0\uc11c\ub294 \uae30\uc874\uc758 11\uc2dc\uac04\uc774 \uc544\ub2c8\ub77c <strong>1.5 + (40 \u00d7 0.30) = 13.5\uc2dc\uac04<\/strong>\uc774 \ud544\uc694\ud569\ub2c8\ub2e4.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>\uc790\uc6d0<\/th><th>J203 \uc774\ub3d9 \ud6c4 \ubd80\ud558<\/th><th>\uac00\uc6a9 \ub2a5\ub825<\/th><th>\uc794\uc5ec \ub2a5\ub825<\/th><\/tr><\/thead><tbody><tr><td>\uae30\uc874 \uba38\uc2dc\ub2dd \uc13c\ud130<\/td><td>33\uc2dc\uac04<\/td><td>36\uc2dc\uac04<\/td><td>3\uc2dc\uac04<\/td><\/tr><tr><td>\ub300\uccb4 \uc124\ube44<\/td><td>13.5\uc2dc\uac04<\/td><td>16\uc2dc\uac04<\/td><td>2.5\uc2dc\uac04<\/td><\/tr><tr><td>\ub514\ubc84\ub9c1 \uc791\uc5c5\uc7a5<\/td><td>18\uc778\uc2dc<\/td><td>28\uc778\uc2dc<\/td><td>10\uc778\uc2dc<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>\uc774\uc81c \ub450 \uc124\ube44 \ubaa8\ub450 \uac00\uacf5 \ubd80\ud558\uac00 \uac00\uc6a9 \ub2a5\ub825 \uc548\uc5d0 \ub4e4\uc5b4\uc635\ub2c8\ub2e4. \ud558\uc9c0\ub9cc \uc791\uc5c5\uc744 \uc62e\uae30\uba74 \ucd1d \uac00\uacf5 \uc2dc\uac04\uc740 44\uc2dc\uac04\uc5d0\uc11c 46.5\uc2dc\uac04\uc73c\ub85c \ub298\uc5b4\ub0a9\ub2c8\ub2e4. \ub0a9\uae30\ub97c \uc9c0\ud0a4\uae30 \uc704\ud574 \uac10\uc218\ud560 \ub9cc\ud55c \uc120\ud0dd\uc77c \uc218\ub294 \uc788\uc5b4\ub3c4 \uc0dd\uc0b0\uc131 \ud5a5\uc0c1\uc73c\ub85c \ubcfc \uc218\ub294 \uc5c6\uc2b5\ub2c8\ub2e4. \ucd94\uac00 \uc124\ube44 \uac00\ub3d9 \uc2dc\uac04\uacfc \uacf5\uad6c \ube44\uc6a9, \uadf8 \ubc16\uc5d0 \uc791\uc5c5 \uc774\uc804\uc5d0 \ub4dc\ub294 \ube44\uc6a9\uc744 \uc794\uc5c5 \ube44\uc6a9\uc774\ub098 \ub0a9\uae30 \uc9c0\uc5f0 \ube44\uc6a9\uacfc \ube44\uad50\ud574\uc57c \ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\ub2e4\uc74c\uc73c\ub85c \ud6c4\uc18d \uacf5\uc815\uc5d0 \ub118\uae30\ub294 \uc2dc\uc810\uc744 \ud655\uc778\ud574\uc57c \ud569\ub2c8\ub2e4. \ucd9c\ud558 \uc804\uc5d0 \ub514\ubc84\ub9c1\uc5d0 \ud544\uc694\ud55c \ub124 \uc2dc\uac04\uc744 \ud655\ubcf4\ud560 \uc218 \uc788\ub3c4\ub85d \ub300\uccb4 \uc124\ube44\uc5d0\uc11c J203 \uac00\uacf5\uc744 \ucda9\ubd84\ud788 \uc77c\ucc0d \ub9c8\uccd0\uc57c \ud569\ub2c8\ub2e4. \ud6c4\uc18d \uacf5\uc815\uc5d0 \ub118\uaca8\uc57c \ud560 \uc2dc\uc810\uc774 \uc9c0\ub09c \ub4a4\uc5d0 \uc5ec\uc720 \uc2dc\uac04\uc774 \uc0dd\uaca8\ub3c4 \uc18c\uc6a9\uc774 \uc5c6\uc2b5\ub2c8\ub2e4. \ubd80\ud558\uc640 \ub2a5\ub825\uc774 \uade0\ud615\uc744 \uc774\ub8ec CRP \uacb0\uacfc\ub294 \ud574\uacb0\uc548\uc758 \ud6c4\ubcf4\ub97c \uc81c\uc2dc\ud558\uba70, \uc0c1\uc138 \uc77c\uc815\uc740 \uadf8 \uc548\uc774 \uc2dc\uac04\uc0c1\uc73c\ub85c\ub3c4 \uac00\ub2a5\ud55c\uc9c0 \uac80\uc99d\ud569\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\uac01 \uacfc\ubd80\ud558\uc758 \ud574\uacb0 \ubc29\ubc95 \uacb0\uc815\ud558\uae30<\/h2>\n\n\n<p>\ube44\uc6a9\uc744 \ub4e4\uc5ec \ub2a5\ub825\uc744 \ucd94\uac00\ud558\uae30 \uc804\uc5d0 \ubd80\ud558\uac00 \uc9d1\uc911\ub41c \uad6c\uac04\uc758 \uc624\ub354\ubd80\ud130 \uc5f4\uc5b4 \ubcf4\uc138\uc694. \uc911\ubcf5\ub41c \uacc4\ud68d \uc81c\uc548, \uc774\ubbf8 \uc644\ub8cc\ub410\ub294\ub370\ub3c4 \ubbf8\uc644\ub8cc\ub85c \uc9d1\uacc4\ub418\ub294 \uacf5\uc815, \uac31\uc2e0\ub418\uc9c0 \uc54a\uc740 \uc218\ub7c9, \uc798\ubabb\ub41c \uacf5\uc815 \uc2dc\uac04\uc744 \ud655\uc778\ud574\uc57c \ud569\ub2c8\ub2e4. \ub370\uc774\ud130 \uc624\ub958\ub97c \ubc14\ub85c\uc7a1\uc73c\uba74 \uc2e4\uc81c\ub85c\ub294 \ud544\uc694\ud558\uc9c0 \uc54a\uc558\ub358 \uc794\uc5c5\uc5d0 \ube44\uc6a9\uc744 \uc4f0\ub294 \uc77c\uc744 \ud53c\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc2e4\uc81c\ub85c \ub2a5\ub825\uc774 \ubd80\uc871\ud558\ub2e4\uba74 \ud574\ub2f9 \uc624\ub354\ub97c \uae30\uc900\uc73c\ub85c \ub2e4\uc74c \ub300\uc751\uc548\uc744 \ube44\uad50\ud558\uc138\uc694.<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>\uacf5\uc815\uc744 \uc218\ud589\ud560 \uc218 \uc788\ub294 \ub300\uccb4 \uc790\uc6d0\uc73c\ub85c \uc62e\uae41\ub2c8\ub2e4.<\/strong> J203 \uc0ac\ub840\ucc98\ub7fc \ud574\ub2f9 \uc790\uc6d0\uc758 \uc2e4\uc81c \uc14b\uc5c5 \uc2dc\uac04\uacfc \uac00\uacf5 \uc2dc\uac04\uc744 \uc801\uc6a9\ud558\uc138\uc694. \uc5ec\uc720 \uc2dc\uac04\ubfd0 \uc544\ub2c8\ub77c \uacf5\uad6c\uc640 \uc778\ub825\ub3c4 \ud655\uc778\ud574\uc57c \ud569\ub2c8\ub2e4.<\/li><li><strong>\uc791\uc5c5\uc744 \ub2e4\ub978 \uae30\uac04\uc73c\ub85c \uc62e\uae41\ub2c8\ub2e4.<\/strong> \uc0dd\uc0b0\uc744 \uc55e\ub2f9\uae30\ub824\uba74 \uc790\uc7ac\uc640 \uc0dd\uc0b0 \ub2a5\ub825\ub3c4 \ub354 \uc77c\ucc0d \ud655\ubcf4\ud574\uc57c \ud558\uace0, \uc0dd\uc0b0\uc744 \ub2a6\ucd94\uba74 \uc57d\uc18d\ud55c \ub0a9\uae30\uac00 \ub2ec\ub77c\uc9c8 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc120\ud589 \uacf5\uc815\uacfc \ud6c4\uc18d \uacf5\uc815\uc744 \ub2e4\uc2dc \ud655\uc778\ud558\uc138\uc694.<\/li><li><strong>\uc778\ub825\uc744 \ubc30\uce58\ud574 \uc791\uc5c5 \uc2dc\uac04\uc744 \ucd94\uac00\ud569\ub2c8\ub2e4.<\/strong> \ub2a5\ub825\uc774 \ubd80\uc871\ud55c \uc790\uc6d0\uacfc \uc2dc\uac04\ub300\uc5d0 \uc9d1\uc911\ud558\uc138\uc694. \uacf5\uc7a5 \ub0b4 \ub2e4\ub978 \uacf3\uc5d0 \uad50\ub300\uc870\ub97c \ucd94\uac00\ud574\ub3c4 \uc774 \uacfc\ubd80\ud558\ub294 \ud574\uacb0\ub418\uc9c0 \uc54a\uc2b5\ub2c8\ub2e4.<\/li><li><strong>\uc678\uc8fc\uc5d0 \uc801\ud569\ud55c \uc791\uc5c5\uc744 \ub9e1\uae41\ub2c8\ub2e4.<\/strong> \ub2e4\uc74c \uc0ac\ub0b4 \uacf5\uc815\uc5d0 \ub4e4\uc5b4\uac00\uae30 \uc804\uae4c\uc9c0 \ud544\uc694\ud55c \ud611\ub825\uc5c5\uccb4\uc758 \ub9ac\ub4dc\ud0c0\uc784, \uc6b4\uc1a1, \uac80\uc0ac \uc2dc\uac04\uc744 \ud3ec\ud568\ud558\uc138\uc694.<\/li><li><strong>\ub0a9\ud488 \uc870\uac74\uc744 \ub2e4\uc2dc \ud611\uc758\ud569\ub2c8\ub2e4.<\/strong> \uadf8\ub798\ub3c4 \uc791\uc5c5\uc744 \uc18c\ud654\ud560 \uc218 \uc5c6\ub2e4\uba74 \uc9c0\ud0ac \uc218 \uc5c6\ub294 \uc57d\uc18d\uc744 \ud655\uc815\ud558\uae30\ubcf4\ub2e4 \ub0a9\uae30\ub098 \uc218\ub7c9\uc744 \uc870\uc815\ud558\uac70\ub098 \ubd84\ud560 \ub0a9\ud488\uc5d0 \ud569\uc758\ud558\uc138\uc694.<\/li><\/ul>\n\n\n<p>\uc6b0\uc120\uc21c\uc704 \ubcc0\uacbd\uc5d0\ub294 \ud2b9\ud788 \uc8fc\uc758\ud574\uc57c \ud569\ub2c8\ub2e4. \ub2e4\ub978 \uc624\ub354\ub97c \uae30\ub2e4\ub9ac\uac8c \ud574 \uc911\uc694\ud55c \uc624\ub354\uc758 \ub0a9\uae30\ub97c \uc9c0\ud0ac \uc218\ub294 \uc788\uc9c0\ub9cc, \uc0dd\uc0b0 \ub2a5\ub825\uc774 \ub298\uc5b4\ub098\ub294 \uac83\uc740 \uc544\ub2d9\ub2c8\ub2e4. \uae34\uae09 \uc624\ub354 \ubb38\uc81c\uac00 \ud574\uacb0\ub410\ub2e4\uace0 \ud310\ub2e8\ud558\uae30 \uc804\uc5d0 \ub2e4\ub978 \ub0a9\ud488 \uc57d\uc18d\uc774 \uc5b4\ub5bb\uac8c \ub2ec\ub77c\uc9c0\ub294\uc9c0 \uac80\ud1a0\ud558\uc138\uc694.<\/p>\n\n\n<p>\uc120\ud0dd\ud55c \uc870\uce58\ub97c \ud574\ub2f9 \uc791\uc5c5\uc5d0 \uae30\ub85d\ud558\uace0, \uad00\ub828 \uc624\ub354\ub098 \uc0dd\uc0b0 \ub2a5\ub825 \ub370\uc774\ud130\ub97c \uac31\uc2e0\ud55c \ub4a4 \ub2e4\uc2dc \uacc4\uc0b0\ud558\uc138\uc694. \ub0a0\uc9dc\ub098 \uc218\ub7c9\uc774 \ubc14\ub00c\uc5b4 \uc790\uc7ac \uc18c\uc694\ub7c9\uc5d0\ub3c4 \uc601\ud5a5\uc774 \uc788\ub2e4\uba74 \uadf8 \uacb0\uc815\uc740 \uc790\uc7ac \uacc4\ud68d\uc5d0\ub3c4 \ubc18\uc601\ud574\uc57c \ud569\ub2c8\ub2e4. CRP\ub294 \ud68c\uc758\uac00 \ub05d\ub098\uba74 \ubcf4\uad00\ud574 \ub450\ub294 \ubcf4\uace0\uc11c\uac00 \uc544\ub2c8\ub77c, \uacb0\uacfc\ub97c \ubc18\uc601\ud574 \uacc4\ud68d\uc744 \uacc4\uc18d \uc870\uc815\ud558\ub294 \uacfc\uc815\uc785\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\uc0dd\uc0b0 \ub2a5\ub825 \ub300\uc751\uc548\uc744 SkyPlanner \uc77c\uc815\uc73c\ub85c \uad6c\uccb4\ud654\ud558\uae30<\/h2>\n\n\n<p>\uc0dd\uc0b0\uacc4\ud68d \ub2f4\ub2f9\uc790\uac00 \uacfc\ubd80\ud558\ub294 \ud30c\uc545\ud560 \uc218 \uc788\uc9c0\ub9cc \uadf8\uc5d0 \ub530\ub77c \uacf5\uc815\ubcc4 \uc791\uc5c5 \uc21c\uc11c\ub97c \ub2e4\uc2dc \uc9dc\ub294 \ub370 \ud558\ub8e8\uc758 \ub108\ubb34 \ub9ce\uc740 \uc2dc\uac04\uc744 \uc4f4\ub2e4\uba74 SkyPlanner\ub97c \ud65c\uc6a9\ud558\uc138\uc694. \uc218\uc791\uc5c5 \uc870\uc728\uc744 \uc904\uc774\uace0, \ubcf4\uc720\ud55c \uc0dd\uc0b0 \ub2a5\ub825\uc744 \ub354 \uc798 \ud65c\uc6a9\ud558\uba70, \ucd94\uac00 \uc791\uc5c5 \uc2dc\uac04\uc5d0 \ub4dc\ub294 \ube44\uc6a9\uc744 \uac10\uc218\ud560 \uac00\uce58\uac00 \uc788\ub294\uc9c0 \ub354 \uba85\ud655\ud55c \uadfc\uac70\ub85c \ud310\ub2e8\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc5c5\ubb34 \ubc0f \uc0dd\uc0b0 \uae30\ub85d\uc758 \uae30\uc900 \uc2dc\uc2a4\ud15c\uc73c\ub85c\ub294 \uae30\uc874 ERP\ub97c \uacc4\uc18d \uc0ac\uc6a9\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. <strong><a href=\"https:\/\/skyplanner.ai\/ko\/%ed%86%b5%ed%95%a9\/\">SkyPlanner\ub294 \uac1c\ubc29\ud615 REST API\ub97c \ud1b5\ud574 \ubaa8\ub4e0 ERP \ub610\ub294 MES\uc640 \uc5f0\ub3d9\ub418\uba70<\/a><\/strong>, \uc624\ub354\uc640 \uacf5\uc815 \ub2e8\uacc4 \uc815\ubcf4\ub97c \uc0c1\uc138 \uc2a4\ucf00\uc904\ub9c1\uc5d0 \uc5f0\uacb0\ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>SkyPlanner\uc5d0\uc11c\ub294 \uc791\uc5c5\uc7a5, \uad50\ub300\uc870, \uc791\uc5c5\uc790, \uacf5\uc815 \ub2e8\uacc4, \uc6b0\uc120\uc21c\uc704\uac00 \uc2a4\ucf00\uc904\ub9c1\uc758 \uae30\ucd08\uac00 \ub429\ub2c8\ub2e4. \uc608\uc815\ub41c \uc720\uc9c0\ubcf4\uc218 \uc2dc\uac04\uc5d0\ub294 \ud574\ub2f9 \uc790\uc6d0\uc744 \uc0ac\uc6a9\ud560 \uc218 \uc5c6\ub3c4\ub85d \ubc18\uc601\ud569\ub2c8\ub2e4. Arcturus\ub294 \uc124\uc815\ub41c \uc0dd\uc0b0 \ub2a5\ub825, \uacf5\uc815 \uac04 \uc120\ud6c4 \uad00\uacc4, \uc6b0\uc120\uc21c\uc704\ub97c \ubc14\ud0d5\uc73c\ub85c \uc77c\uc815\uc744 \uacc4\uc0b0\ud569\ub2c8\ub2e4. \uc790\uc7ac \uac00\uc6a9\uc131\uc744 \uace0\ub824\ud558\ub294 \uc2a4\ucf00\uc904\ub9c1\uc744 \ud65c\uc131\ud654\ud558\uba74 \uae30\ub85d\ub41c \uc790\uc7ac \uac00\uc6a9 \uc815\ubcf4\ub3c4 \uc77c\uc815\uc5d0 \uc601\ud5a5\uc744 \uc90d\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc55e\uc758 \uac00\uacf5 \uc0ac\ub840\uc5d0\uc11c\ub294 \uc2b9\uc778\ub41c \uc790\uc6d0 \uc120\ud0dd\uacfc \uac00\uc6a9 \uad50\ub300\uc870\ub97c \ubc18\uc601\ud574 \ub2e4\uc2dc \uacc4\uc0b0\ud55c \ub2e4\uc74c, Gantt \ud0c0\uc784\ub77c\uc778\uc5d0\uc11c \uac00\uacf5\uacfc \ub514\ubc84\ub9c1\uc744 \ud568\uaed8 \ud655\uc778\ud558\ub294 \ubc29\uc2dd\uc774 \uc720\uc6a9\ud569\ub2c8\ub2e4. \uac01 \uacf5\uc815\uc774 \uc5b8\uc81c \ub05d\ub098\uace0 \ub2e4\ub978 \uc5b4\ub5a4 \uc624\ub354\uac00 \uc601\ud5a5\uc744 \ubc1b\ub294\uc9c0 \ubcfc \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ub300\uccb4 \uc124\ube44\ub97c \uc8fc \ud6c4\ubc18\uc5d0\uc57c \uc0ac\uc6a9\ud560 \uc218 \uc788\ub2e4\uba74, \ub0a9\uae30\uc5d0 \ubbf8\uce58\ub294 \uc601\ud5a5\ub3c4 \ud569\uacc4 \uc218\uce58 \uc18d\uc5d0 \uac00\ub824\uc9c4 \uac00\uc815\uc774 \uc544\ub2c8\ub77c \uc77c\uc815\uc0c1 \uac80\ud1a0\ud560 \uc218 \uc788\ub294 \ubb38\uc81c\uac00 \ub429\ub2c8\ub2e4.<\/p>\n\n\n<p>\uadf8 \uc601\ud5a5\uc744 \ubc1b\uc544\ub4e4\uc77c\uc9c0, \uc6b0\uc120\uc21c\uc704\ub97c \ubc14\uafc0\uc9c0, \uc0dd\uc0b0 \ub2a5\ub825\uc744 \ucd94\uac00\ud560\uc9c0\ub294 \ub2f4\ub2f9\uc790\uac00 \uacb0\uc815\ud569\ub2c8\ub2e4. \uc77c\uc815 \uacc4\uc0b0\uc740 Arcturus\uac00 \ub9e1\uc2b5\ub2c8\ub2e4. \ub530\ub77c\uc11c \ubd80\ud558 \ubcf4\uace0\uc11c\ub97c \ub530\ub85c \uad00\ub9ac\ud558\uba74\uc11c \ubcc0\uacbd\uc774 \uc0dd\uae38 \ub54c\ub9c8\ub2e4 \ubaa8\ub4e0 \uc791\uc5c5 \uc21c\uc11c\ub97c \uc218\uc791\uc5c5\uc73c\ub85c \uc870\uc815\ud558\uae30\ubcf4\ub2e4\ub294, SkyPlanner\ub85c \ub2e4\uc74c \uc2e4\ud589 \ub2e8\uacc4\uae4c\uc9c0 \uc774\uc5b4 \uac00\ub294 \ud3b8\uc774 \ub354 \ud6a8\uacfc\uc801\uc785\ub2c8\ub2e4.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Mamec\uc5d0\uc11c\ub294 \ubb34\uc5c7\uc774 \ub2ec\ub77c\uc84c\uc744\uae4c\uc694?<\/h3>\n\n\n<p>\ud63c\ud569 \uae30\uc220 \uc81c\ud488\uc744 \uc81c\uc870\ud558\uace0 \ucca8\ub2e8 \uc81c\ud488\uc744 \uc704\ud0c1 \uc0dd\uc0b0\ud558\ub294 \ud540\ub780\ub4dc \uae30\uc5c5 Mamec\uc740 \uc11c\ub85c \uc5bd\ud78c \uc218\ucc9c \uac74\uc758 \uc791\uc5c5\uc9c0\uc2dc\ub97c \uad00\ub9ac\ud574\uc57c \ud588\uc2b5\ub2c8\ub2e4. \uae30\uc874 ERP\uc758 \uacbd\uc9c1\ub41c \uacc4\ud68d \uae30\ub2a5\uc73c\ub85c\ub294 \ub2f4\ub2f9 \ud300\uc774 \ud544\uc694\ub85c \ud558\ub294 \uc804\uccb4 \uc0c1\ud669\uc744 \ud30c\uc545\ud560 \uc218 \uc5c6\uc5c8\uc2b5\ub2c8\ub2e4. \uc0dd\uc0b0 \ud604\uc7a5\uc5d0\uc11c\ub294 \uac10\ub3c5\uc790\uac00 \uc885\uc774 \uc791\uc5c5\uc9c0\uc2dc\uc11c\uc758 \ub0a9\uae30\ub97c \ubcf4\uace0 \uc791\uc5c5 \uc6b0\uc120\uc21c\uc704\ub97c \uc815\ud588\uace0, \uacbd\uc601\uc9c4\uc740 \uc8fc\uad00\uc801\uc778 \ucd94\uc815\uc5d0 \uc758\uc874\ud574 \ubd80\ud558\ub97c \ud30c\uc545\ud588\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>Mamec\uc740 SkyPlanner\ub97c Oscar ERP\uc640 \uc5f0\ub3d9\ud558\uace0 \uc778\uacf5\uc9c0\ub2a5 \uae30\ubc18 \uc720\ud55c \uc6a9\ub7c9 \uc2a4\ucf00\uc904\ub9c1\uc744 \ub3c4\uc785\ud588\uc2b5\ub2c8\ub2e4. \ub3c4\uc785 \ud6c4\uc5d0\ub294 \uc791\uc5c5 \uc21c\uc11c\ub97c \uc77c\uc8fc\uc77c \ub2e8\uc704\ub85c \uace0\uc815\ud558\uace0, \uc9c1\uc6d0\ub4e4\uc774 \uc624\ub354\uc758 \uc9c4\ud589 \uc0c1\ud669\uacfc \uc77c\uc815\uc744 \uc870\ud68c\ud558\uba70, \uacbd\uc601\uc9c4\ub3c4 \ub3d9\uc77c\ud55c \uacf5\uc720 \uc815\ubcf4\ub97c \ud1b5\ud574 \uc0dd\uc0b0 \ubd80\ud558\ub97c \ud655\uc778\ud558\uace0 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/ko\/%ea%b3%a0%ea%b0%9d-%ec%82%ac%eb%a1%80\/mamec\/\">Mamec\uc5d0 \ub530\ub974\uba74<\/a> \uacc4\ud68d \uc5c5\ubb34 \ubd80\ub2f4\uc774 \ud655\uc2e4\ud788 \uc904\uc5c8\uace0, \uc791\uc5c5 \uc21c\uc11c\uac00 \uac1c\uc120\ub418\uba74\uc11c \uc791\uc5c5\uc7a5 \ube44\uac00\ub3d9 \uc2dc\uac04\uc774 \uac10\uc18c\ud588\uc73c\uba70 \ub0a9\uae30 \uc900\uc218\uc728\ub3c4 \ud5a5\uc0c1\ub410\uc2b5\ub2c8\ub2e4. \uc774 \uc0ac\ub840\ub294 \ubd80\ud558 \ud604\ud669\uc744 \uc2e4\uc81c \uc791\uc5c5\uacfc \uc5f0\uacb0\ud558\ub294 \uac83\uc774 \uc5bc\ub9c8\ub098 \uc911\uc694\ud55c\uc9c0 \ubcf4\uc5ec \uc90d\ub2c8\ub2e4. \uc0dd\uc0b0\uacc4\ud68d \ub2f4\ub2f9\uc790\uc758 \uc218\uc791\uc5c5 \uc870\uc728\uc774 \uc904\uace0, \uacc4\ud68d\uc5d0 \ub9de\ucdb0 \uc77c\ud558\ub294 \uc0ac\ub78c\ub4e4\uc5d0\uac8c \ubcc0\uacbd \uc0ac\ud56d\uc744 \uc124\uba85\ud558\uae30\ub3c4 \uc26c\uc6cc\uc9d1\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\ub2e4\uc74c CRP \uac80\ud1a0\ub97c \uc2e4\ud589 \uac00\ub2a5\ud55c \uacc4\ud68d\uc73c\ub85c \uc5f0\uacb0\ud558\uc138\uc694<\/h2>\n\n\n<p>\ud604\uc7ac \uc790\uc7ac \uacc4\ud68d\uc5d0\uc11c \uacfc\ubd80\ud558\uac00 \ubc1c\uc0dd\ud55c \uc791\uc5c5 \uc13c\ud130 \ud558\ub098\ub97c \uc120\ud0dd\ud558\uc138\uc694. \uadf8 \ubd80\ud558\ub97c \ubc1c\uc0dd\uc2dc\ud0a4\ub294 \ubbf8\uc644\ub8cc \uc624\ub354\uc640 \uacc4\ud68d \uc81c\uc548 \uc624\ub354\ub97c \ucc3e\uc544 \ub0a8\uc740 \uacf5\uc815 \uc2dc\uac04\uc744 \uac80\uc99d\ud558\uace0, \ud604\uc2e4\uc801\uc778 \ub300\uc751\uc548\uc744 \ube44\uad50\ud558\uc138\uc694. \uadf8\ub7f0 \ub2e4\uc74c \uacfc\ubd80\ud558 \uc790\uc6d0\uc758 \ud6c4\uc18d \uacf5\uc815\uae4c\uc9c0 \ud3ec\ud568\ud574, \uc218\uc815\ud55c \uc791\uc5c5\ub4e4\uc774 \ud558\ub098\uc758 \uc5f0\uacb0\ub41c \uc77c\uc815\uc73c\ub85c \uc2e4\ud589 \uac00\ub2a5\ud55c\uc9c0 \ud655\uc778\ud558\uc138\uc694.<\/p>\n\n\n<p>SkyPlanner\ub294 \uc77c\uc815\uc744 \ub9e4\ubc88 \uc218\uc791\uc5c5\uc73c\ub85c \ub2e4\uc2dc \uc9dc\uc9c0 \uc54a\uace0\ub3c4 \uc774\ub7ec\ud55c \uc2a4\ucf00\uc904\ub9c1 \uc5c5\ubb34\ub97c \uc218\ud589\ud560 \uc218 \uc788\ub3c4\ub85d \ub3d5\uc2b5\ub2c8\ub2e4. <a href=\"https:\/\/skyplanner.ai\/ko\/%ed%8f%89%ea%b0%80%ed%8c%90\/\">\ub370\ubaa8 \ub370\uc774\ud130\ub85c \uccb4\ud5d8\uc744 \uc2dc\uc791\ud574<\/a> Arcturus\uc640 Gantt \ud0c0\uc784\ub77c\uc778\uc744 \uc0b4\ud3b4\ubcf4\uac70\ub098, \uacfc\ubd80\ud558\uac00 \ubc1c\uc0dd\ud55c \uc790\uc0ac \uc791\uc5c5 \uc13c\ud130\ub97c \uc911\uc2ec\uc73c\ub85c <a href=\"https:\/\/skyplanner.ai\/ko\/%ec%98%81%ec%97%85%ed%8c%80%ec%97%90-%eb%ac%b8%ec%9d%98\/\">\uc81c\ud488 \uc2dc\uc5f0\uc744 \uc608\uc57d\ud558\uc138\uc694<\/a>. \ud574\ub2f9 \uc791\uc5c5 \uc13c\ud130\uc758 \uad50\ub300\uc870, \ub300\ud45c\uc801\uc778 \uacf5\uc815 \uc21c\uc11c, \uacb0\uc815\ud574\uc57c \ud560 \ub0a9\ud488 \uc0ac\uc548\uc744 \uc900\ube44\ud574 \uc8fc\uc138\uc694. \uc774\ub97c \ucd9c\ubc1c\uc810\uc73c\ub85c \uc0bc\uc73c\uba74 SkyPlanner\uac00 \uc0dd\uc0b0 \ub2a5\ub825\uc5d0 \uad00\ud55c \uacb0\uc815\uc744 \ud300\uc774 \ud65c\uc6a9\ud560 \uc218 \uc788\ub294 \uc0dd\uc0b0 \uacc4\ud68d\uc73c\ub85c \uc5b4\ub5bb\uac8c \uad6c\uccb4\ud654\ud558\ub294\uc9c0 \ud655\uc778\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>\ub2a5\ub825\uc18c\uc694\uacc4\ud68d: \uc791\uc5c5 \uc13c\ud130 \uacfc\ubd80\ud558 \ud574\uc18c \ud648 &raquo; \ub9ac\uc18c\uc2a4 &raquo; \ub2a5\ub825\uc18c\uc694\uacc4\ud68d: \uc791\uc5c5 \uc13c\ud130 \uacfc\ubd80\ud558 \ud574\uc18c \uc790\uc7ac \uacc4\ud68d\uc740 \ub2e4\uc74c\uc5d0 \uc0dd\uc0b0\ud560 \uc624\ub354\ub97c \uc81c\uc548\ud569\ub2c8\ub2e4. \uae30\uc874 \uc791\uc5c5\ub4e4\ub3c4 \uc774\ubbf8 \uc124\ube44 \uc2dc\uac04\uc744 \ub450\uace0 \uacbd\ud569\ud558\uace0 \uc788\uc2b5\ub2c8\ub2e4. \ucd94\uac00 \uc791\uc5c5\uc744 \ud22c\uc785\ud558\uae30 \uc804\uc5d0 \uc5b4\ub290 \uc791\uc5c5 \uc13c\ud130\uac00 \uc774\ub97c \uac10\ub2f9\ud560 \uc218 \uc788\uace0, \uc5b4\ub514\uc5d0\uc11c \ub0a9\uae30\uac00 \uc9c0\uc5f0\ub41c \uc624\ub354\uac00 \uc313\uc774\uac8c \ub420\uc9c0 \uc54c\uc544\uc57c \ud569\ub2c8\ub2e4. \ub2a5\ub825\uc18c\uc694\uacc4\ud68d(CRP)\uc740 \uacc4\ud68d\ub41c \uc0dd\uc0b0 \uc624\ub354\uc640 \ubbf8\uc644\ub8cc \uc0dd\uc0b0 \uc624\ub354\ub97c \uae30\uac04\ubcc4 &#8230; <a title=\"\ub2a5\ub825\uc18c\uc694\uacc4\ud68d: \uc791\uc5c5 \uc13c\ud130 \uacfc\ubd80\ud558 \ud574\uc18c\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/capacity-requirements-planning\/\" aria-label=\"Read more about \ub2a5\ub825\uc18c\uc694\uacc4\ud68d: \uc791\uc5c5 \uc13c\ud130 \uacfc\ubd80\ud558 \ud574\uc18c\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":99251,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2530,496],"tags":[],"class_list":["post-99247","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps--","category-496","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>\ub2a5\ub825\uc18c\uc694\uacc4\ud68d: \uc791\uc5c5 \uc13c\ud130 \uacfc\ubd80\ud558 \ud574\uc18c<\/title>\n<meta name=\"description\" content=\"MRP\uac00 \uc81c\uc548\ud55c \uc791\uc5c5\uc744 \uac10\ub2f9\ud560 \uc218 \uc788\uc744\uae4c\uc694? \ub2a5\ub825\uc18c\uc694\uacc4\ud68d(CRP) \uacc4\uc0b0\uc73c\ub85c \uacfc\ubd80\ud558\ub97c \ucc3e\uace0 \ub300\uc751\ucc45\uc744 \uc815\ud574 \uc2e4\ud589 \uac00\ub2a5\ud55c \uc0dd\uc0b0 \uc77c\uc815\uc744 \uc218\ub9bd\ud558\uc138\uc694.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/capacity-requirements-planning\/\" \/>\n<meta property=\"og:locale\" content=\"ko_KR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"\ub2a5\ub825\uc18c\uc694\uacc4\ud68d: \uc791\uc5c5 \uc13c\ud130 \uacfc\ubd80\ud558 \ud574\uc18c\" \/>\n<meta property=\"og:description\" content=\"MRP\uac00 \uc81c\uc548\ud55c \uc791\uc5c5\uc744 \uac10\ub2f9\ud560 \uc218 \uc788\uc744\uae4c\uc694? \ub2a5\ub825\uc18c\uc694\uacc4\ud68d(CRP) \uacc4\uc0b0\uc73c\ub85c \uacfc\ubd80\ud558\ub97c \ucc3e\uace0 \ub300\uc751\ucc45\uc744 \uc815\ud574 \uc2e4\ud589 \uac00\ub2a5\ud55c \uc0dd\uc0b0 \uc77c\uc815\uc744 \uc218\ub9bd\ud558\uc138\uc694.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/capacity-requirements-planning\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-15T17:37:09+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-15T17:39:46+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capacity-requirements-planning-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1774\" \/>\n\t<meta property=\"og:image:height\" content=\"887\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\uae00\uc4f4\uc774\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/capacity-requirements-planning\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/capacity-requirements-planning\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"\ub2a5\ub825\uc18c\uc694\uacc4\ud68d: \uc791\uc5c5 \uc13c\ud130 \uacfc\ubd80\ud558 \ud574\uc18c\",\"datePublished\":\"2026-10-15T17:37:09+00:00\",\"dateModified\":\"2026-10-15T17:39:46+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/capacity-requirements-planning\\\/\"},\"wordCount\":53,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/capacity-requirements-planning\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/capacity-requirements-planning-hero.png\",\"articleSection\":[\"APS \ubc0f \uc2a4\ucf00\uc904\ub9c1\",\"\ub9ac\uc18c\uc2a4\"],\"inLanguage\":\"ko-KR\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/capacity-requirements-planning\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/capacity-requirements-planning\\\/\",\"name\":\"\ub2a5\ub825\uc18c\uc694\uacc4\ud68d: \uc791\uc5c5 \uc13c\ud130 \uacfc\ubd80\ud558 \ud574\uc18c\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/capacity-requirements-planning\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/capacity-requirements-planning\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/capacity-requirements-planning-hero.png\",\"datePublished\":\"2026-10-15T17:37:09+00:00\",\"dateModified\":\"2026-10-15T17:39:46+00:00\",\"description\":\"MRP\uac00 \uc81c\uc548\ud55c \uc791\uc5c5\uc744 \uac10\ub2f9\ud560 \uc218 \uc788\uc744\uae4c\uc694? \ub2a5\ub825\uc18c\uc694\uacc4\ud68d(CRP) \uacc4\uc0b0\uc73c\ub85c \uacfc\ubd80\ud558\ub97c \ucc3e\uace0 \ub300\uc751\ucc45\uc744 \uc815\ud574 \uc2e4\ud589 \uac00\ub2a5\ud55c \uc0dd\uc0b0 \uc77c\uc815\uc744 \uc218\ub9bd\ud558\uc138\uc694.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/capacity-requirements-planning\\\/#breadcrumb\"},\"inLanguage\":\"ko-KR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/capacity-requirements-planning\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"ko-KR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/capacity-requirements-planning\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/capacity-requirements-planning-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/capacity-requirements-planning-hero.png\",\"width\":1774,\"height\":887,\"caption\":\"A batch moves from an overloaded machining center to an available alternative during a capacity requirements review\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/capacity-requirements-planning\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"\ub2a5\ub825\uc18c\uc694\uacc4\ud68d: \uc791\uc5c5 \uc13c\ud130 \uacfc\ubd80\ud558 \ud574\uc18c\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ko-KR\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ko-KR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ko-KR\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"\ub2a5\ub825\uc18c\uc694\uacc4\ud68d: \uc791\uc5c5 \uc13c\ud130 \uacfc\ubd80\ud558 \ud574\uc18c","description":"MRP\uac00 \uc81c\uc548\ud55c \uc791\uc5c5\uc744 \uac10\ub2f9\ud560 \uc218 \uc788\uc744\uae4c\uc694? \ub2a5\ub825\uc18c\uc694\uacc4\ud68d(CRP) \uacc4\uc0b0\uc73c\ub85c \uacfc\ubd80\ud558\ub97c \ucc3e\uace0 \ub300\uc751\ucc45\uc744 \uc815\ud574 \uc2e4\ud589 \uac00\ub2a5\ud55c \uc0dd\uc0b0 \uc77c\uc815\uc744 \uc218\ub9bd\ud558\uc138\uc694.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/capacity-requirements-planning\/","og_locale":"ko_KR","og_type":"article","og_title":"\ub2a5\ub825\uc18c\uc694\uacc4\ud68d: \uc791\uc5c5 \uc13c\ud130 \uacfc\ubd80\ud558 \ud574\uc18c","og_description":"MRP\uac00 \uc81c\uc548\ud55c \uc791\uc5c5\uc744 \uac10\ub2f9\ud560 \uc218 \uc788\uc744\uae4c\uc694? \ub2a5\ub825\uc18c\uc694\uacc4\ud68d(CRP) \uacc4\uc0b0\uc73c\ub85c \uacfc\ubd80\ud558\ub97c \ucc3e\uace0 \ub300\uc751\ucc45\uc744 \uc815\ud574 \uc2e4\ud589 \uac00\ub2a5\ud55c \uc0dd\uc0b0 \uc77c\uc815\uc744 \uc218\ub9bd\ud558\uc138\uc694.","og_url":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/capacity-requirements-planning\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-15T17:37:09+00:00","article_modified_time":"2026-10-15T17:39:46+00:00","og_image":[{"width":1774,"height":887,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capacity-requirements-planning-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"\uae00\uc4f4\uc774":"Jussi M\u00e4ntyl\u00e4"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/capacity-requirements-planning\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/capacity-requirements-planning\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"\ub2a5\ub825\uc18c\uc694\uacc4\ud68d: \uc791\uc5c5 \uc13c\ud130 \uacfc\ubd80\ud558 \ud574\uc18c","datePublished":"2026-10-15T17:37:09+00:00","dateModified":"2026-10-15T17:39:46+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/capacity-requirements-planning\/"},"wordCount":53,"publisher":{"@id":"https:\/\/skyplanner.ai\/ko\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/capacity-requirements-planning\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capacity-requirements-planning-hero.png","articleSection":["APS \ubc0f \uc2a4\ucf00\uc904\ub9c1","\ub9ac\uc18c\uc2a4"],"inLanguage":"ko-KR"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/capacity-requirements-planning\/","url":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/capacity-requirements-planning\/","name":"\ub2a5\ub825\uc18c\uc694\uacc4\ud68d: \uc791\uc5c5 \uc13c\ud130 \uacfc\ubd80\ud558 \ud574\uc18c","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ko\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/capacity-requirements-planning\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/capacity-requirements-planning\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capacity-requirements-planning-hero.png","datePublished":"2026-10-15T17:37:09+00:00","dateModified":"2026-10-15T17:39:46+00:00","description":"MRP\uac00 \uc81c\uc548\ud55c \uc791\uc5c5\uc744 \uac10\ub2f9\ud560 \uc218 \uc788\uc744\uae4c\uc694? \ub2a5\ub825\uc18c\uc694\uacc4\ud68d(CRP) \uacc4\uc0b0\uc73c\ub85c \uacfc\ubd80\ud558\ub97c \ucc3e\uace0 \ub300\uc751\ucc45\uc744 \uc815\ud574 \uc2e4\ud589 \uac00\ub2a5\ud55c \uc0dd\uc0b0 \uc77c\uc815\uc744 \uc218\ub9bd\ud558\uc138\uc694.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/capacity-requirements-planning\/#breadcrumb"},"inLanguage":"ko-KR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/capacity-requirements-planning\/"]}]},{"@type":"ImageObject","inLanguage":"ko-KR","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/capacity-requirements-planning\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capacity-requirements-planning-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capacity-requirements-planning-hero.png","width":1774,"height":887,"caption":"A batch moves from an overloaded machining center to an available alternative during a capacity requirements review"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/capacity-requirements-planning\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/ko\/"},{"@type":"ListItem","position":2,"name":"\ub2a5\ub825\uc18c\uc694\uacc4\ud68d: \uc791\uc5c5 \uc13c\ud130 \uacfc\ubd80\ud558 \ud574\uc18c"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/ko\/#website","url":"https:\/\/skyplanner.ai\/ko\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/ko\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/ko\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ko-KR"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/ko\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/ko\/","logo":{"@type":"ImageObject","inLanguage":"ko-KR","@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"ko-KR","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capacity-requirements-planning-hero.png",1774,887,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capacity-requirements-planning-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capacity-requirements-planning-hero-300x150.png",300,150,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capacity-requirements-planning-hero-768x384.png",768,384,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capacity-requirements-planning-hero-1024x512.png",1024,512,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capacity-requirements-planning-hero-1536x768.png",1536,768,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capacity-requirements-planning-hero.png",1774,887,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capacity-requirements-planning-hero-360x180.png",360,180,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/ko\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"\ub2a5\ub825\uc18c\uc694\uacc4\ud68d: \uc791\uc5c5 \uc13c\ud130 \uacfc\ubd80\ud558 \ud574\uc18c \ud648 &raquo; \ub9ac\uc18c\uc2a4 &raquo; \ub2a5\ub825\uc18c\uc694\uacc4\ud68d: \uc791\uc5c5 \uc13c\ud130 \uacfc\ubd80\ud558 \ud574\uc18c \uc790\uc7ac \uacc4\ud68d\uc740 \ub2e4\uc74c\uc5d0 \uc0dd\uc0b0\ud560 \uc624\ub354\ub97c \uc81c\uc548\ud569\ub2c8\ub2e4. \uae30\uc874 \uc791\uc5c5\ub4e4\ub3c4 \uc774\ubbf8 \uc124\ube44 \uc2dc\uac04\uc744 \ub450\uace0 \uacbd\ud569\ud558\uace0 \uc788\uc2b5\ub2c8\ub2e4. \ucd94\uac00 \uc791\uc5c5\uc744 \ud22c\uc785\ud558\uae30 \uc804\uc5d0 \uc5b4\ub290 \uc791\uc5c5 \uc13c\ud130\uac00 \uc774\ub97c \uac10\ub2f9\ud560 \uc218 \uc788\uace0, \uc5b4\ub514\uc5d0\uc11c \ub0a9\uae30\uac00 \uc9c0\uc5f0\ub41c \uc624\ub354\uac00 \uc313\uc774\uac8c \ub420\uc9c0 \uc54c\uc544\uc57c \ud569\ub2c8\ub2e4. \ub2a5\ub825\uc18c\uc694\uacc4\ud68d(CRP)\uc740 \uacc4\ud68d\ub41c \uc0dd\uc0b0 \uc624\ub354\uc640 \ubbf8\uc644\ub8cc \uc0dd\uc0b0 \uc624\ub354\ub97c \uae30\uac04\ubcc4&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts\/99247","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/comments?post=99247"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts\/99247\/revisions"}],"predecessor-version":[{"id":99305,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts\/99247\/revisions\/99305"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/media\/99251"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/media?parent=99247"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/categories?post=99247"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/tags?post=99247"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}