{"id":99159,"date":"2026-10-15T15:53:51","date_gmt":"2026-10-15T15:53:51","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=99159"},"modified":"2026-10-15T15:55:53","modified_gmt":"2026-10-15T15:55:53","slug":"rough-cut-capacity-planning","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/rough-cut-capacity-planning\/","title":{"rendered":"\uac1c\ub7b5 \uc0dd\uc0b0\ub2a5\ub825\uacc4\ud68d: RCCP\ub85c MPS \uac80\uc99d\ud558\uae30"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">\uac1c\ub7b5 \uc0dd\uc0b0\ub2a5\ub825\uacc4\ud68d: RCCP\ub85c MPS \uac80\uc99d\ud558\uae30<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/ko\/\">\ud648<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/\">\ub9ac\uc18c\uc2a4<\/a> &raquo; \uac1c\ub7b5 \uc0dd\uc0b0\ub2a5\ub825\uacc4\ud68d: RCCP\ub85c MPS \uac80\uc99d\ud558\uae30<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">\uc608\uc0c1 \uc77d\uae30 \uc2dc\uac04: <\/span><span class=\"yoast-reading-time__reading-time\">11<\/span><span class=\"yoast-reading-time__time-unit\"> \ubd84<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>\uae30\uc900\uc0dd\uc0b0\uacc4\ud68d\uc740 \ubb34\uc5c7\uc744 \uc0dd\uc0b0\ud560 \uac83\uc778\uc9c0\ub97c \uc815\ud569\ub2c8\ub2e4. \uac1c\ub7b5 \uc0dd\uc0b0\ub2a5\ub825\uacc4\ud68d\uc740 \ud575\uc2ec \uc790\uc6d0\uc73c\ub85c \uadf8 \uacc4\ud68d\uc744 \uac10\ub2f9\ud560 \uc218 \uc788\ub294\uc9c0 \ud655\uc778\ud569\ub2c8\ub2e4. \uacf5\uc7a5\uc5d0\uc11c \ub2ec\uc131\ud560 \uc218 \uc5c6\ub294 \uacc4\ud68d\uc744 \ubc14\ud0d5\uc73c\ub85c \uad6c\ub9e4\u00b7\uc0dd\uc0b0\u00b7\uc601\uc5c5 \ubd80\uc11c\uac00 \uc6c0\uc9c1\uc774\uae30 \uc804\uc5d0 \uc774 \uac80\uc99d\uc774 \ud544\uc694\ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\uac1c\ub7b5 \uc0dd\uc0b0\ub2a5\ub825\uacc4\ud68d(RCCP)\uc740 \uacc4\ud68d \uc0dd\uc0b0\ub7c9\uc744 \uc8fc\uc694 \uc790\uc6d0\uc758 \ubd80\ud558\ub85c \ud658\uc0b0\ud558\uace0 \uac00\uc6a9 \uc0dd\uc0b0 \ub2a5\ub825\uacfc \ube44\uad50\ud569\ub2c8\ub2e4. \uc774\ub97c \ud1b5\ud574 \uae30\uc900\uc0dd\uc0b0\uacc4\ud68d\uc744 \uc720\uc9c0\ud560\uc9c0, \uc218\ub7c9\uc774\ub098 \uc77c\uc815\uc744 \ubc14\uafc0\uc9c0, \uc0dd\uc0b0 \ub2a5\ub825\uc744 \ucd94\uac00\ub85c \ud655\ubcf4\ud560\uc9c0 \uc870\uae30\uc5d0 \uacb0\uc815\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\ud558\uc9c0\ub9cc \uc8fc\uac04 \ucd1d\ubd80\ud558\uac00 \uac00\uc6a9 \ub2a5\ub825 \uc548\uc5d0 \ub4e4\uc5b4\uc628\ub2e4\uace0 \ud574\uc11c \uc2e4\ud589 \uac00\ub2a5\ud55c \uc791\uc5c5 \uc21c\uc11c\uae4c\uc9c0 \uc815\ud574\uc9c4 \uac83\uc740 \uc544\ub2d9\ub2c8\ub2e4. \uc124\ube44\uc758 \ucd1d \uac00\uc6a9 \uc2dc\uac04\uc740 \ucda9\ubd84\ud574\ub3c4 \uae34\uae09 \uc8fc\ubb38\uc744 \ucc98\ub9ac\ud574\uc57c \ud560 \uc2dc\uc810\uc5d0\ub294 \uc0ac\uc6a9\ud560 \uc218 \uc5c6\uc744 \uc218 \uc788\uc2b5\ub2c8\ub2e4. RCCP\ub85c \uc0dd\uc0b0 \uc57d\uc18d\uc758 \ud0c0\ub2f9\uc131\uc744 \uac80\uc99d\ud55c \ub2e4\uc74c, SkyPlanner APS\ub85c \ud574\ub2f9 \uc791\uc5c5\ub4e4\uc744 \uc11c\ub85c \ub9de\ubb3c\ub9ac\ub294 \uc77c\uc815\uc73c\ub85c \uad6c\uccb4\ud654\ud558\uc138\uc694. Arcturus\ub294 \uc790\uc6d0\uacfc \uc6b0\uc120\uc21c\uc704\uc5d0 \ub9de\ucdb0 \uc791\uc5c5 \uc2dc\uac04\uc744 \uacc4\uc0b0\ud558\uace0, Gantt \ud0c0\uc784\ub77c\uc778\uc740 \uadf8 \uacb0\uacfc\uac00 \uc0dd\uc0b0\uacfc \ub0a9\uae30\uc5d0 \uc5b4\ub5a4 \uc601\ud5a5\uc744 \uc8fc\ub294\uc9c0 \ubcf4\uc5ec\uc90d\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\uac1c\ub7b5 \uc0dd\uc0b0\ub2a5\ub825\uacc4\ud68d\uc774\ub780?<\/h2>\n\n\n<p>RCCP\ub294 <a href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/master-production-schedule\/\">\uae30\uc900\uc0dd\uc0b0\uacc4\ud68d(MPS)<\/a>\uc758 \ub2ec\uc131\uc744 \uac00\ub85c\ub9c9\uc744 \uc218 \uc788\ub294 \uc790\uc6d0\uc744 \uc911\uc2ec\uc73c\ub85c \uc0dd\uc0b0 \ub2a5\ub825\uc744 \uac80\uc99d\ud558\ub294 \ubc29\ubc95\uc785\ub2c8\ub2e4. \ubcd1\ubaa9 \uacf5\uc815\uc5d0 \ud574\ub2f9\ud558\ub294 \uc124\ube44\uad70, \uc804\ubb38 \uc870\ub9bd\ud300, \uac00\uc5f4\ub85c, \uc0dd\uc0b0 \ub2a5\ub825\uc774 \uc81c\ud55c\ub41c \ub77c\uc778 \ub4f1\uc774 \ub300\uc0c1\uc774 \ub420 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\ud575\uc2ec \uc9c8\ubb38\uc740 \uba85\ud655\ud569\ub2c8\ub2e4. \uac01 \uacc4\ud68d \uae30\uac04\uc5d0 MPS\uac00 \uc694\uad6c\ud558\ub294 \uc790\uc6d0\ub7c9\uc740 \uc5bc\ub9c8\uc774\uba70, \uc2e4\uc81c\ub85c \ud655\ubcf4\ud560 \uc218 \uc788\ub294 \uc591\uc740 \uc5bc\ub9c8\uc77c\uae4c\uc694?<\/p>\n\n\n<p>\ud070 \ubd88\uc77c\uce58\ub97c \ucc3e\uc544\ub0b4\uae30 \uc704\ud574 \ubaa8\ub4e0 \uacf5\uc815\uc758 \uc791\uc5c5 \uc21c\uc11c\ub97c \uc815\ud560 \ud544\uc694\uac00 \uc5c6\ub2e4\ub294 \uc810\uc5d0\uc11c \u2018\uac1c\ub7b5\u2019 \uacc4\ud68d\uc774\ub77c\uace0 \ubd80\ub985\ub2c8\ub2e4. \ud575\uc2ec \uc790\uc6d0\uc744 \uc120\uc815\ud558\uace0, \ud544\uc694\ud55c \uc790\uc6d0\ub7c9\uc744 \ub2e8\uc21c\ud654\ud55c \ubaa8\ub378\ub85c \uacc4\uc0b0\ud569\ub2c8\ub2e4. \ub530\ub77c\uc11c \uc0dd\uc0b0 \uc57d\uc18d\uc744 \uc870\uc815\ud558\uac70\ub098 \ucd94\uac00 \uad50\ub300\uc870\ub97c \ud3b8\uc131\ud558\uace0 \uc678\uc8fc\ub97c \ud611\uc758\ud560 \uc5ec\uc720\uac00 \ub0a8\uc544 \uc788\uc744 \ub54c RCCP\uac00 \uc720\uc6a9\ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\ub9ce\uc740 \uc81c\uc870\uc5c5\uccb4\uc5d0\uc11c \uc8fc \ub2e8\uc704 \uc9d1\uacc4\uac00 \uc720\uc6a9\ud558\uc9c0\ub9cc, RCCP\uc758 \uacc4\ud68d \ubc94\uc704\ub97c \uba87 \uc8fc \ub610\ub294 \uba87 \uac1c\uc6d4\ub85c \uc815\ud574\uc57c \ud55c\ub2e4\ub294 \uacf5\ud1b5 \uae30\uc900\uc740 \uc5c6\uc2b5\ub2c8\ub2e4. \ud544\uc694\ud55c \uc758\uc0ac\uacb0\uc815\uc744 \ud3ec\uad04\ud558\ub3c4\ub85d \uacc4\ud68d \ubc94\uc704\ub97c \uc7a1\uace0, \uadf8 \uacb0\uc815\uc73c\ub85c \ud574\uacb0\ud574\uc57c \ud560 \uacfc\ubd80\ud558\uac00 \ub4dc\ub7ec\ub098\ub3c4\ub85d \uc9d1\uacc4 \uae30\uac04\uc744 \uc815\ud558\uc138\uc694. \uc900\ube44\uc5d0 \uc624\ub798 \uac78\ub9ac\ub294 \uc0dd\uc0b0 \ub2a5\ub825 \ubcc0\uacbd\uc740 \uc5f0\uc7a5\uadfc\ubb34 \ud3b8\uc131\ubcf4\ub2e4 \ub354 \uc77c\ucc0d \uacb0\uc815\ud574\uc57c \ud569\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">MPS\u00b7MRP\u00b7CRP\u00b7\uc2a4\ucf00\uc904\ub9c1\uacfc RCCP\uc758 \uad00\uacc4<\/h2>\n\n\n<p>\uac01 \uacc4\ud68d \ud65c\ub3d9\uc774 \ub2f5\ud558\ub294 \uc9c8\ubb38\uc740 \uc11c\ub85c \ub2e4\ub985\ub2c8\ub2e4.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>\uacc4\ud68d \ud65c\ub3d9<\/th><th>\ud575\uc2ec \uc9c8\ubb38<\/th><th>\uc8fc\uc694 \uac80\ud1a0 \ud56d\ubaa9<\/th><\/tr><\/thead><tbody><tr><td>\uae30\uc900\uc0dd\uc0b0\uacc4\ud68d \uc218\ub9bd<\/td><td>\uc5b4\ub5a4 \uc81c\ud488\uc744 \uc5b8\uc81c, \uc5bc\ub9c8\ub098 \uc0dd\uc0b0\ud574\uc57c \ud558\ub294\uac00?<\/td><td>\uae30\uc900\uc0dd\uc0b0\uacc4\ud68d \ub300\uc0c1 \ud488\ubaa9\uacfc \uacc4\ud68d \uc644\uc131 \uc218\ub7c9<\/td><\/tr><tr><td>\uac1c\ub7b5 \uc0dd\uc0b0\ub2a5\ub825\uacc4\ud68d<\/td><td>\uc8fc\uc694 \uc790\uc6d0\uc73c\ub85c \uae30\uc900\uc0dd\uc0b0\uacc4\ud68d\uc744 \uac10\ub2f9\ud560 \uc218 \uc788\ub294\uac00?<\/td><td>\uae30\uac04\ubcc4 \ud575\uc2ec \uc790\uc6d0 \ubd80\ud558<\/td><\/tr><tr><td>\uc790\uc7ac\uc18c\uc694\uacc4\ud68d(MRP)<\/td><td>\uc5b4\ub5a4 \uc790\uc7ac\uc640 \ubd80\ud488\uc774 \uc5b8\uc81c \ud544\uc694\ud55c\uac00?<\/td><td>\uc81c\ud488 \uad6c\uc870\uc640 \uacf5\uae09 \ub370\uc774\ud130\ub97c \ubc14\ud0d5\uc73c\ub85c \uc0b0\ucd9c\ud55c \uc18c\uc694\ub7c9<\/td><\/tr><tr><td>\ub2a5\ub825\uc18c\uc694\uacc4\ud68d(CRP)<\/td><td>\uc0c1\uc138 \uc790\uc7ac \uacc4\ud68d\uc744 \uc2e4\ud589\ud558\ub824\uba74 \uc0dd\uc0b0 \ub2a5\ub825\uc774 \uc5bc\ub9c8\ub098 \ud544\uc694\ud55c\uac00?<\/td><td>\uacf5\uc815\ubcc4\u00b7\uc791\uc5c5\uc7a5\ubcc4 \uc0c1\uc138 \uc18c\uc694 \ub2a5\ub825<\/td><\/tr><tr><td>\uc0c1\uc138 \uc0dd\uc0b0 \uc2a4\ucf00\uc904\ub9c1<\/td><td>\uc5b4\ub5a4 \uc791\uc5c5\uc744 \uc5b4\ub514\uc11c \uc5b8\uc81c \uc218\ud589\ud560 \uac83\uc778\uac00?<\/td><td>\uc791\uc5c5 \uc790\uc6d0, \uacf5\uc815, \uad50\ub300\uc870, \uc120\ud6c4\ud589 \uad00\uacc4, \uc791\uc5c5 \uc6b0\uc120\uc21c\uc704<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>MPS\uc640 RCCP\ub294 \uacb0\uacfc\ub97c \uc11c\ub85c \ubc18\uc601\ud558\uba70 \ubc18\ubcf5 \uac80\ud1a0\ud574\uc57c \ud569\ub2c8\ub2e4. \uc0dd\uc0b0 \ub2a5\ub825\uc774 \ubd80\uc871\ud558\ub2e4\ub294 \uacb0\uacfc\uac00 \ub098\uc624\uba74 \uacc4\ud68d\uc548\uc774\ub098 \uac00\uc6a9 \ub2a5\ub825\uc744 \uc870\uc815\ud55c \ub4a4 \ub2e4\uc2dc \uac80\uc99d\ud558\uc138\uc694. \uacfc\ubd80\ud558 \uc0c1\ud0dc\uc758 \uae30\uc900\uc0dd\uc0b0\uacc4\ud68d\uc744 \ud6c4\uc18d \ub2e8\uacc4\ub85c \ub118\uae30\uba74\uc11c \uc0c1\uc138 \uc2a4\ucf00\uc904\ub9c1\uc774 \ubd80\uc871\ud55c \uc2dc\uac04\uc744 \ub9cc\ub4e4\uc5b4 \uc904 \uac83\uc774\ub77c\uace0 \uae30\ub300\ud574\uc11c\ub294 \uc548 \ub429\ub2c8\ub2e4.<\/p>\n\n\n<p>\ubc18\ub300 \ubc29\ud5a5\uc758 \ud53c\ub4dc\ubc31\ub3c4 \uc911\uc694\ud569\ub2c8\ub2e4. \uc0c1\uc138 \uc2a4\ucf00\uc904\ub9c1\uc5d0\uc11c \ubc18\ubcf5\ub418\ub294 \ubcd1\ubaa9 \uacf5\uc815\uc774 \ub4dc\ub7ec\ub098\uba74 \uadf8 \uc815\ubcf4\ub97c \uc0dd\uc0b0 \ub2a5\ub825 \uc0b0\uc815\uc758 \uc804\uc81c\uc5d0 \ubc18\uc601\ud558\uc138\uc694. \uc9c0\ub09c \ubd84\uae30\uc758 \uc81c\ud488 \uad6c\uc131\uc5d0\uc11c\ub294 \uc911\uc694\ud558\uc9c0 \uc54a\uc544 \ubcf4\uc600\ub358 \uc790\uc6d0\ub3c4 \ub2e4\uc74c RCCP \uac80\ud1a0\uc5d0\uc11c\ub294 \ud3ec\ud568\ud574\uc57c \ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\uac1c\ub7b5 \uc18c\uc694 \uc0dd\uc0b0 \ub2a5\ub825 \uacc4\uc0b0 \ubc29\ubc95<\/h2>\n\n\n<p>\uacc4\uc0b0\uc740 MPS\uc758 \uc0dd\uc0b0 \uc218\ub7c9\uc5d0\uc11c \uc2dc\uc791\ud574\uc57c \ud569\ub2c8\ub2e4. \uc5ec\uae30\uc5d0 \ud310\ub9e4 \uc218\uc694\ub97c \ub354\ud574\uc11c\ub294 \uc548 \ub429\ub2c8\ub2e4. \uae30\uc900\uc0dd\uc0b0\uacc4\ud68d\uc5d0\ub294 \uc774\ubbf8 \uc0dd\uc0b0 \uacb0\uc815\uc774 \ubc18\uc601\ub418\uc5b4 \uc788\uc5b4\uc57c \ud569\ub2c8\ub2e4. \uac19\uc740 \uc218\uc694\ub97c \ub2e4\uc2dc \uacc4\uc0b0\ud558\uba74 \ubd80\ud558\uac00 \uc2e4\uc81c\ubcf4\ub2e4 \ucee4\uc9d1\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc2dc\uac04 \uae30\uc900 \ubaa8\ub378\uc758 \uacc4\uc0b0\uc2dd\uc740 \ub2e4\uc74c\uacfc \uac19\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p><strong>\uc790\uc6d0 \uc18c\uc694 \uc2dc\uac04 = (MPS \uc218\ub7c9 \u00d7 \uc81c\ud488 \ub2e8\uc704\ub2f9 \uc790\uc6d0 \uc18c\uc694 \uc2dc\uac04)\uc758 \ud569\uacc4 + \ubcc4\ub3c4\ub85c \ubaa8\ub378\ub9c1\ud55c \uc14b\uc5c5 \uc2dc\uac04.<\/strong><\/p>\n\n\n<p>\uc120\uc815\ud55c \uc790\uc6d0\ub9c8\ub2e4 \uae30\uac04\ubcc4\ub85c \uacc4\uc0b0\ud55c \ub2e4\uc74c, \ub3d9\uc77c\ud55c \ub2e8\uc704\uc758 \uac00\uc6a9 \ub2a5\ub825\uacfc \ube44\uad50\ud569\ub2c8\ub2e4.<\/p>\n\n\n<p><strong>\ub2a5\ub825 \ubd80\ud558\uc728 = \uc18c\uc694 \uc2dc\uac04 \u00f7 \uac00\uc6a9 \uc2dc\uac04 \u00d7 100%.<\/strong><\/p>\n\n\n<p>\ubd80\ud558\uc728\uc774 100%\ub97c \ub118\uc73c\uba74 \uc801\uc6a9\ud55c \uc804\uc81c\ud558\uc5d0\uc11c \uacfc\ubd80\ud558\uac00 \ubc1c\uc0dd\ud55c\ub2e4\ub294 \ub73b\uc785\ub2c8\ub2e4. 100% \ubbf8\ub9cc\uc774\uba74 \ucd1d\uc18c\uc694 \uc2dc\uac04\uc774 \uac00\uc6a9 \uc2dc\uac04 \uc548\uc5d0 \ub4e4\uc5b4\uc628\ub2e4\ub294 \uc758\ubbf8\uc77c \ubfd0, \ubaa8\ub4e0 \uc791\uc5c5\uc774 \uac01\uac01\uc758 \ub0a9\uae30\ub97c \ub9de\ucd9c \uc218 \uc788\ub2e4\ub294 \uc99d\uac70\ub294 \uc544\ub2d9\ub2c8\ub2e4.<\/p>\n\n\n<p>\ub2e4\uc74c \ub2e4\uc12f \ub2e8\uacc4\ub85c \uacc4\uc0b0\uc744 \uad6c\uc131\ud558\uc138\uc694.<\/p>\n\n\n<p>1. <strong>\ud575\uc2ec \uc790\uc6d0\uc744 \uc120\uc815\ud569\ub2c8\ub2e4.<\/strong> \uc57d\uc18d\ud55c \uc0dd\uc0b0\ub7c9\uacfc \ub0a9\uae30\ub97c \uc81c\uc57d\ud560 \uc218 \uc788\ub294 \uc124\ube44, \uc219\ub828 \uc778\ub825, \uc0dd\uc0b0 \ub77c\uc778\uc744 \ud3ec\ud568\ud558\uc138\uc694. \uacf5\uc7a5 \uc804\uccb4\ub97c \ud569\uc0b0\ud558\uba74 \ud55c \uc790\uc6d0\uc758 \uc5ec\uc720 \ub2a5\ub825\uc5d0 \ub2e4\ub978 \uc790\uc6d0\uc758 \uacfc\ubd80\ud558\uac00 \uac00\ub824\uc9c8 \uc218 \uc788\uc73c\ubbc0\ub85c \ud53c\ud574\uc57c \ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>2. <strong>\uc790\uc6d0 \uc18c\uc694\ub7c9\uc744 \uc815\uc758\ud569\ub2c8\ub2e4.<\/strong> \uae30\uc900\uc0dd\uc0b0\uacc4\ud68d\uc758 \uac01 \ud488\ubaa9\uc5d0 \ub300\ud574 \uc77c\uad00\ub41c \uae30\uc900\uc758 \ub2a5\ub825\uba85\uc138\uc11c \ub610\ub294 \uc790\uc6d0 \ud504\ub85c\ud30c\uc77c\uc744 \uc0ac\uc6a9\ud558\uc138\uc694. \uc124\ube44 \uc18c\uc694 \uc2dc\uac04\uacfc \uc778\ub825 \uc18c\uc694 \uc2dc\uac04\uc740 \uad6c\ubd84\ud574\uc57c \ud569\ub2c8\ub2e4. \uad00\ub828 \ubd80\ud488 \uc791\uc5c5\ub3c4 \ud3ec\ud568\ud558\ub418 \ub2e4\ub978 \ud56d\ubaa9\uc5d0\uc11c \uc911\ubcf5 \uacc4\uc0b0\ud558\uc9c0 \ub9c8\uc138\uc694.<\/p>\n\n\n<p>3. <strong>\ubd80\ud558\ub97c \uc62c\ubc14\ub978 \uae30\uac04\uc5d0 \ubc30\uce58\ud569\ub2c8\ub2e4.<\/strong> \ud575\uc2ec \uacf5\uc815\uc774 \uc644\uc81c\ud488 \ub0a9\uae30\ubcf4\ub2e4 \uc55e\uc11c \uc9c4\ud589\ub41c\ub2e4\uba74 \uadf8\ub9cc\ud07c \uc18c\uc694 \uc2dc\uc810\uc744 \uc55e\ub2f9\uaca8 \ubc18\uc601\ud558\uc138\uc694. \ud3b8\uc758\uc0c1 \uc644\uc131 \uc8fc\ucc28\uc5d0\ub9cc \uc18c\uc694\ub7c9\uc744 \uc7a1\uc73c\uba74 \uadf8 \uc774\uc804\uc5d0 \ubc1c\uc0dd\ud558\ub294 \ub2a5\ub825 \ubd80\uc871\uc744 \ub193\uce60 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>4. <strong>\ud604\uc2e4\uc801\uc778 \uac00\uc6a9 \ub2a5\ub825\uc744 \uacc4\uc0b0\ud569\ub2c8\ub2e4.<\/strong> \uc791\uc5c5 \ub2ec\ub825, \uc778\ub825 \ubc30\uce58, \uacc4\ud68d \uc815\uc9c0 \uc2dc\uac04\uc744 \ubc18\uc601\ud558\uc138\uc694. \uc131\ub2a5 \uc190\uc2e4\uc5d0 \ub300\ud55c \uc5ec\uc720\uc728\uc740 \uc77c\uad00\ub418\uac8c \uc801\uc6a9\ud558\uace0, \uac19\uc740 \uc190\uc2e4\uc744 \ub450 \ubc88 \ucc28\uac10\ud558\uc9c0 \ub9c8\uc138\uc694.<\/p>\n\n\n<p>5. <strong>\ubd80\uc871\ubd84\uc744 \uac80\ud1a0\ud558\uace0 \uacc4\ud68d\uc744 \ub2e4\uc2dc \uacc4\uc0b0\ud569\ub2c8\ub2e4.<\/strong> \uc81c\uc548\ud55c \uc870\uce58, \uadf8 \uc870\uce58\ub85c \ubc14\ub00c\ub294 \uc790\uc6d0\uacfc \uae30\uac04, \uc218\uc815 \ud6c4 \ubd80\ud558\ub97c \uae30\ub85d\ud558\uc138\uc694. \ub300\uc751 \ubc29\uc548\uc5d0 \ud569\uc758\ud558\uc9c0 \ubabb\ud588\ub2e4\uba74 \uacfc\ubd80\ud558\ub294 \uc5ec\uc804\ud788 \ud574\uacb0\ub418\uc9c0 \uc54a\uc740 \uc0c1\ud0dc\uc785\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc0dd\uc0b0\ub7c9\uc744 \uae30\uc900\uc73c\ub85c \ub77c\uc778\uc744 \uacc4\ud68d\ud558\ub294 \ud3b8\uc774 \uc801\ud569\ud558\ub2e4\uba74, \uc2dc\uac04 \ub300\uc2e0 \uae30\uac04\ubcc4 \uacc4\ud68d \uc218\ub7c9\uacfc \ub2ec\uc131 \uac00\ub2a5\ud55c \uc0dd\uc0b0 \uc218\ub7c9\uc744 \ube44\uad50\ud558\uc138\uc694. \uc774\ub54c \uc0dd\uc0b0 \uc18d\ub3c4\uc5d0\ub294 \uc81c\ud488 \uad6c\uc131\uc774 \ubc18\uc601\ub418\uc5b4\uc57c \ud569\ub2c8\ub2e4. \uc11c\ub85c \ub2e4\ub978 \uc81c\ud488\uc744 \uc5b8\uc81c\ub098 \uac19\uc740 \ud55c \uac1c\ub85c \ucde8\uae09\ud560 \uc218\ub294 \uc5c6\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\uc5b4\ub5a4 RCCP \ubc29\ubc95\uc744 \uc0ac\uc6a9\ud574\uc57c \ud560\uae4c\uc694?<\/h3>\n\n\n<p>\ub300\ud45c\uc801\uc778 \ubc29\ubc95\uc740 \uc138 \uac00\uc9c0\uc785\ub2c8\ub2e4. \ub2e8\uc21c\ud558\uac8c \uacc4\uc0b0\ud560\uc9c0, \ubd80\ud558\ub97c \ub354 \uad6c\uccb4\uc801\uc73c\ub85c \ud30c\uc545\ud560\uc9c0\uc5d0 \ub530\ub77c \uc120\ud0dd\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>\uc885\ud569\uacc4\uc218\uc5d0 \uc758\ud55c \uc0dd\uc0b0 \ub2a5\ub825 \uacc4\ud68d(CPOF)<\/strong>\uc740 MPS\ub97c \ucd1d\uc791\uc5c5 \ubd80\ud558\ub85c \ud658\uc0b0\ud55c \ub4a4 \uacfc\uac70\uc758 \uc790\uc6d0\ubcc4 \ube44\uc911\uc5d0 \ub530\ub77c \ubc30\ubd84\ud569\ub2c8\ub2e4. \uc2e0\uc18d\ud558\uac8c \ucd94\uc815\ud560 \uc218 \uc788\uc9c0\ub9cc, \uc81c\ud488 \uad6c\uc131\uc774 \ub2ec\ub77c\uc9c0\uba74 \uacfc\uac70 \ube44\uc911\uc744 \uc801\uc6a9\ud55c \uacb0\uacfc\uac00 \uc2e4\uc81c\uc640 \uc5b4\uae0b\ub0a0 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/li><li><strong>\ub2a5\ub825\uba85\uc138\uc11c<\/strong>\ub294 \uc81c\ud488\ubcc4\ub85c \ud544\uc694\ud55c \ud575\uc2ec \uc790\uc6d0\uc758 \uc2dc\uac04\uc744 \uba85\uc2dc\ud569\ub2c8\ub2e4. \ucd1d\uc218\ub7c9\uc774 \uac19\uc740 \ub450 \uae30\uc900\uc0dd\uc0b0\uacc4\ud68d\uc5d0\uc11c\ub3c4 \uc804\ud600 \ub2e4\ub978 \ubcd1\ubaa9 \uacf5\uc815\uc774 \uc0dd\uae38 \uc218 \uc788\ub294 \uc774\uc720\ub97c \ubcf4\uc5ec\uc90d\ub2c8\ub2e4.<\/li><li><strong>\uc790\uc6d0 \ud504\ub85c\ud30c\uc77c<\/strong>\uc740 \uc5ec\uae30\uc5d0 \ub9ac\ub4dc\ud0c0\uc784 \uc624\ud504\uc14b\uc744 \uc801\uc6a9\ud574 \uc18c\uc694\ub7c9\uc744 \uae30\uac04\ubcc4\ub85c \ubc30\ubd84\ud569\ub2c8\ub2e4. \uc644\uc81c\ud488\uc774 \uc644\uc131\ub418\ub294 \uae30\uac04\ubcf4\ub2e4 \uc55e\uc11c \uc218\ud589\ud574\uc57c \ud558\ub294 \ud575\uc2ec \uacf5\uc815\uc744 \ud30c\uc545\ud558\ub294 \ub370 \ub3c4\uc6c0\uc774 \ub429\ub2c8\ub2e4.<\/li><\/ul>\n\n\n<p>\ud544\uc694\ud55c \uc758\uc0ac\uacb0\uc815\uc758 \uadfc\uac70\ub97c \ud30c\uc545\ud560 \uc218 \uc788\ub294 \ubc94\uc704\uc5d0\uc11c \uac00\uc7a5 \ub2e8\uc21c\ud55c \ubaa8\ub378\uc744 \uc0ac\uc6a9\ud558\uc138\uc694. \uc81c\ud488\ub9c8\ub2e4 \uacf5\uc6a9 \uc790\uc6d0\uc5d0 \uc694\uad6c\ud558\ub294 \ubd80\ud558\uac00 \ub2e4\ub974\ub2e4\uba74 \ub2a5\ub825\uba85\uc138\uc11c \uacc4\uc0b0\ubd80\ud130 \uc2dc\uc791\ud558\ub294 \uac83\uc774 \uc720\uc6a9\ud569\ub2c8\ub2e4. \uacf5\uc815 \uacbd\ub85c\uac00 \uc5ec\ub7ec \uacc4\ud68d \uae30\uac04\uc5d0 \uac78\uccd0 \uc788\uc73c\uba74 \uc2dc\uc810 \uc624\ud504\uc14b\uc744 \ucd94\uac00\ud558\uc138\uc694.<\/p>\n\n\n<h2 class=\"wp-block-heading\">RCCP \uc608\uc81c: \ud55c \uc8fc\uc5d0 \uc124\ube44 \uc2dc\uac04\uc774 19\uc2dc\uac04 \ubd80\uc871\ud558\ub2e4\uba74<\/h2>\n\n\n<p>\ud38c\ud504 \uc870\ub9bd\ud488 A\uc640 B\ub97c \uc0dd\uc0b0\ud558\ub294 \uc81c\uc870\uc5c5\uccb4\ub97c \uac00\uc815\ud574 \ubcf4\uaca0\uc2b5\ub2c8\ub2e4. \ub450 \uc81c\ud488\uc740 \uac19\uc740 \uac00\uacf5 \uc124\ube44\uad70\uacfc \uc870\ub9bd\ud300\uc744 \uc774\uc6a9\ud569\ub2c8\ub2e4. \uc774 \uc608\uc81c\uc5d0\uc11c\ub294 \uacc4\uc0b0\uc744 \ub2e8\uc21c\ud654\ud558\uae30 \uc704\ud574 \ud575\uc2ec \uc791\uc5c5\uc774 \uc81c\ud488 \uc644\uc131\uacfc \uac19\uc740 \uc8fc\uc5d0 \uc774\ub8e8\uc5b4\uc9c4\ub2e4\uace0 \uac00\uc815\ud569\ub2c8\ub2e4. \ub2e8\uc704\ub2f9 \uc18c\uc694 \uc2dc\uac04\uc5d0\ub294 \uac00\uc815\ud55c \uc14b\uc5c5 \uc2dc\uac04 \ubc30\ubd84\ub7c9\uc774 \uc774\ubbf8 \ud3ec\ud568\ub418\uc5b4 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>\uc81c\ud488<\/th><th>\ub2e8\uc704\ub2f9 \uac00\uacf5 \uc124\ube44 \uc2dc\uac04<\/th><th>\ub2e8\uc704\ub2f9 \uc870\ub9bd \uc778\ub825 \uc2dc\uac04<\/th><th>1\uc8fc\ucc28 MPS<\/th><th>2\uc8fc\ucc28 MPS<\/th><th>3\uc8fc\ucc28 MPS<\/th><\/tr><\/thead><tbody><tr><td>A<\/td><td>0.40<\/td><td>0.25<\/td><td>120<\/td><td>180<\/td><td>100<\/td><\/tr><tr><td>B<\/td><td>0.75<\/td><td>0.50<\/td><td>80<\/td><td>100<\/td><td>80<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>\uae30\uacc4\uac00\uacf5 \ubd80\ubb38\uc5d0\ub294 \uc124\ube44\uac00 \ub450 \ub300 \uc788\uc2b5\ub2c8\ub2e4. \uac01 \uc124\ube44\ub294 \uad50\ub300\ub2f9 \uc5ec\ub35f \uc2dc\uac04\uc529 \ud558\ub8e8 \ub450 \uad50\ub300\ub85c \uc8fc \ub2f7\uc0c8 \uac00\ub3d9\ud569\ub2c8\ub2e4. \uacc4\ud68d\uc0c1 \uac00\ub3d9 \ub2a5\ub825\uc740 \uc124\ube44 2\ub300 \u00d7 \ud558\ub8e8 2\uad50\ub300 \u00d7 \uad50\ub300\ub2f9 8\uc2dc\uac04 \u00d7 5\uc77c = 160 \uc124\ube44\uc2dc\uac04\uc785\ub2c8\ub2e4. \uc5ec\uae30\uc5d0 \uacc4\ud68d \uacc4\uc218 80%\ub97c \uc801\uc6a9\ud558\uba74 \uc8fc\ub2f9 \uac00\uc6a9 \uc124\ube44\uc2dc\uac04\uc740 128\uc2dc\uac04\uc774 \ub429\ub2c8\ub2e4. \uc774 \uacc4\uc218\uc5d0\ub294 \uc608\uc0c1\ub418\ub294 \uac00\ub3d9 \uc190\uc2e4\uc774 \uc774\ubbf8 \ubc18\uc601\ub418\uc5b4 \uc788\uc73c\ubbc0\ub85c \ub3d9\uc77c\ud55c \uc190\uc2e4\uc744 \ub2e4\uc2dc \ucc28\uac10\ud558\uc9c0 \uc54a\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc870\ub9bd\ud300\uc758 \uac00\uc6a9 \ub2a5\ub825\uc740 \uc778\ub825 \ubc30\uce58\uc640 \uc791\uc5c5 \ub2ec\ub825\uc744 \ubc14\ud0d5\uc73c\ub85c \ubcc4\ub3c4 \uacc4\uc0b0\ud55c \uc8fc\ub2f9 96\uc778\uc2dc\uc785\ub2c8\ub2e4.<\/p>\n\n\n<p>2\uc8fc\ucc28 \uac00\uacf5\uc5d0 \ud544\uc694\ud55c \uc124\ube44 \uc2dc\uac04\uc740 \ub2e4\uc74c\uacfc \uac19\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p><strong>(180 \u00d7 0.40) + (100 \u00d7 0.75) = \uc124\ube44 \uc2dc\uac04 147\uc2dc\uac04.<\/strong><\/p>\n\n\n<p>\uac00\uc6a9 \uc2dc\uac04 128\uc2dc\uac04\ubcf4\ub2e4 19\uc2dc\uac04 \ub9ce\uc2b5\ub2c8\ub2e4. \ub2a5\ub825 \ubd80\ud558\uc728\uc740 \uc18c\uc218\uc810 \uccab\uc9f8 \uc790\ub9ac\ub85c \ubc18\uc62c\ub9bc\ud558\uba74 114.8%\uc785\ub2c8\ub2e4.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>\ud575\uc2ec \uc790\uc6d0<\/th><th>\uc8fc\uac04 \uac00\uc6a9 \uc2dc\uac04<\/th><th>1\uc8fc\ucc28 \uc18c\uc694 \uc2dc\uac04<\/th><th>2\uc8fc\ucc28 \uc18c\uc694 \uc2dc\uac04<\/th><th>3\uc8fc\ucc28 \uc18c\uc694 \uc2dc\uac04<\/th><\/tr><\/thead><tbody><tr><td>\uac00\uacf5 \uc124\ube44\uad70<\/td><td>128<\/td><td>108<\/td><td>147<\/td><td>100<\/td><\/tr><tr><td>\uc870\ub9bd\ud300<\/td><td>96<\/td><td>70<\/td><td>95<\/td><td>65<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>\uc870\ub9bd \ubd80\ud558\ub294 \ubaa8\ub4e0 \uc8fc\uc5d0\uc11c \uac00\uc6a9 \ub2a5\ub825 \uc774\ub0b4\uc9c0\ub9cc, \ub0a8\ub294 \uc870\ub9bd \uc778\uc2dc\ub85c \uae30\uacc4\uac00\uacf5 \uc2dc\uac04\uc744 \ub300\uc2e0\ud560 \uc218\ub294 \uc5c6\uc2b5\ub2c8\ub2e4. \ub0a9\uae30\uc77c\uc744 \ubcc0\uacbd\ud558\uc9c0 \uc54a\ub294 \ud55c, 3\uc8fc\ucc28\uc758 \uc5ec\uc720 \uae30\uacc4 \ub2a5\ub825\uc73c\ub85c 2\uc8fc\ucc28 \ub0a9\uae30 \uc57d\uc18d\uc744 \uc9c0\ud0ac \uc218\ub3c4 \uc5c6\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\uacfc\ubd80\ud558\ub97c \ud655\uc778\ud588\ub2e4\uba74 \ub300\uc751 \ubc29\uc548\uc744 \uacb0\uc815\ud558\uc138\uc694<\/h3>\n\n\n<p>\ud55c \uac00\uc9c0 \ubc29\ubc95\uc740 2\uc8fc\ucc28\uc5d0 \uc2e4\uc81c\ub85c \uc0ac\uc6a9\ud560 \uc218 \uc788\ub294 \uae30\uacc4\uac00\uacf5 \uc2dc\uac04\uc744 19\uc2dc\uac04 \ub354 \ud655\ubcf4\ud558\ub294 \uac83\uc785\ub2c8\ub2e4. \ube44\uc6a9\uacfc \uc778\ub825 \ubc30\uce58\ub97c \uac80\ud1a0\ud574\uc57c \ud558\uc9c0\ub9cc, \ud544\uc694\ud55c \uc0dd\uc0b0 \ub2a5\ub825\uc740 \uba85\ud655\ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\ub2e4\ub978 \ubc29\ubc95\uc740 A \uc81c\ud488 50\uac1c\ub97c 2\uc8fc\ucc28 \ub300\uc2e0 1\uc8fc\ucc28\uc5d0 \uc0dd\uc0b0\ud558\ub294 \uac83\uc785\ub2c8\ub2e4. \uc774\ub807\uac8c \ud558\uba74 \uae30\uacc4\uac00\uacf5 20\uc2dc\uac04\uacfc \uc870\ub9bd 12.5\uc778\uc2dc\uac00 \uc55e\ub2f9\uaca8\uc9d1\ub2c8\ub2e4.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>\ud575\uc2ec \uc790\uc6d0<\/th><th>\uc870\uc815 \ud6c4 1\uc8fc\ucc28 \ubd80\ud558<\/th><th>\uc870\uc815 \ud6c4 2\uc8fc\ucc28 \ubd80\ud558<\/th><th>\uc8fc\uac04 \uac00\uc6a9 \ub2a5\ub825<\/th><\/tr><\/thead><tbody><tr><td>\uae30\uacc4\uac00\uacf5 \uc124\ube44\uad70<\/td><td>128<\/td><td>127<\/td><td>128<\/td><\/tr><tr><td>\uc870\ub9bd\ud300<\/td><td>82.5<\/td><td>82.5<\/td><td>96<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>\uc218\uc815\ub41c MPS\uc5d0\uc11c A\uc758 \uc8fc\ubcc4 \uc0dd\uc0b0\ub7c9\uc740 170, 130, 100\uc774\uba70, B\ub294 80, 100, 80\uc73c\ub85c \uc720\uc9c0\ub429\ub2c8\ub2e4. \uc138 \uc8fc\uac04\uc758 \ucd1d\uc0dd\uc0b0\ub7c9\uc740 \ubcc0\ud558\uc9c0 \uc54a\uc2b5\ub2c8\ub2e4. \uc774 \uacc4\uc0b0\uc0c1\uc73c\ub85c\ub294 \uacfc\ubd80\ud558\uac00 \ud574\uc18c\ub418\uc9c0\ub9cc, 1\uc8fc\ucc28 \uae30\uacc4\uac00\uacf5\uc5d0\ub294 \uac00\uc6a9 \ub2a5\ub825 \uc0b0\uc815\uc5d0 \uc774\ubbf8 \ubc18\uc601\ud55c \uc190\uc2e4 \uc678\uc5d0 \ucd94\uac00 \uc5ec\uc720\uac00 \uc5c6\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\ub530\ub77c\uc11c \uc120\ud589 \uc0dd\uc0b0\uc740 \ube44\uc6a9 \uc5c6\uc774 \ubb38\uc81c\ub97c \ud574\uacb0\ud558\ub294 \ubc29\ubc95\uc774 \uc544\ub2c8\ub77c \uacbd\uc601\uc0c1\uc758 \uc120\ud0dd\uc785\ub2c8\ub2e4. \uc790\uc7ac\ub97c \ub354 \uc77c\ucc0d \ud655\ubcf4\ud558\uace0 \uc870\ub9bd\ud488\uc744 \ubcf4\uad00\ud560 \uacf5\uac04\uc744 \ub9c8\ub828\ud574\uc57c \ud558\uba70, \uc81c\ud488\uc758 \uc218\uc694\uc640 \uc0ac\uc591\ub3c4 \uc120\ud589 \uc0dd\uc0b0\uc5d0 \uc801\ud569\ud574\uc57c \ud569\ub2c8\ub2e4. \uc774\ub54c \ub4dc\ub294 \ube44\uc6a9\uc744 \uc794\uc5c5, \uc678\uc8fc \ub610\ub294 \ud611\uc758\ub97c \ud1b5\ud55c \ub0a9\uae30 \ubcc0\uacbd \ube44\uc6a9\uacfc \ube44\uad50\ud558\uc138\uc694.<\/p>\n\n\n<p>RCCP\ub294 \ub300\uc548\uc744 \uad6c\uccb4\uc801\uc73c\ub85c \ubcf4\uc5ec\uc90d\ub2c8\ub2e4. \ud558\uc9c0\ub9cc \uc5b4\ub5a4 \ub0a9\uae30 \uc57d\uc18d\uc744 \uc6b0\uc120\ud558\ub294 \uac83\uc774 \ud68c\uc0ac\uc5d0 \uac00\uc7a5 \uac00\uce58 \uc788\ub294\uc9c0\ub294 \uacb0\uc815\ud574 \uc8fc\uc9c0 \uc54a\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">RCCP\ub97c \ud1b5\uacfc\ud574\ub3c4 \ub0a9\uae30 \uc900\uc218\uac00 \ubcf4\uc7a5\ub418\uc9c0 \uc54a\ub294 \uc774\uc720<\/h2>\n\n\n<p>\uc218\uc815\ub41c \uc608\uc5d0\uc11c\ub294 \uae30\uacc4\uac00\uacf5\uacfc \uc870\ub9bd \ubaa8\ub450 \uc8fc\uac04 \uac00\uc6a9 \ub2a5\ub825 \uc774\ub0b4\ub85c \ubd80\ud558\uac00 \uc870\uc815\ub418\uc5c8\uc2b5\ub2c8\ub2e4. \uadf8\ub7f0\ub370 1\uc8fc\ucc28 \uc8fc\ubb38 \uc911 \ud558\ub098\uc5d0 \ud544\uc694\ud55c \uc790\uc7ac\uac00 \ubaa9\uc694\uc77c\uc5d0\uc57c \ub3c4\ucc29\ud558\uace0, \ub2e4\ub978 \uc5ec\ub7ec \uc8fc\ubb38\ub3c4 \uae08\uc694\uc77c \uc870\ub9bd \uc791\uc5c5 \uc804\uc5d0 \uac19\uc740 \uae30\uacc4\uac00\uacf5 \uc124\ube44\uad70\uc744 \uc0ac\uc6a9\ud574\uc57c \ud55c\ub2e4\uace0 \uac00\uc815\ud574 \ubcf4\uaca0\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\ud55c \uc8fc \uc804\uccb4\uc758 128\uc2dc\uac04\uc744 \uc790\uc7ac \ub3c4\ucc29 \ud6c4 \ub0a8\uc544 \uc788\ub294 \uac00\uc6a9 \uc2dc\uac04\uacfc \ub611\uac19\uc774 \ucde8\uae09\ud560 \uc218\ub294 \uc5c6\uc2b5\ub2c8\ub2e4. \uc774\uc81c\ub294 \uc791\uc5c5 \uc21c\uc11c, \uad50\ub300\uc870\uac00 \ubc14\ub00c\ub294 \uc2dc\uc810, \uc870\ub9bd \uacf5\uc815\uc73c\ub85c \ub118\uae30\ub294 \uc2dc\uc810\uc774 \uc911\uc694\ud574\uc9d1\ub2c8\ub2e4. \uac1c\ub7b5 \uc0dd\uc0b0\ub2a5\ub825\uacc4\ud68d\uc5d0\uc11c\ub294 \ud569\uacc4 \uc218\uce58\ub9cc\uc73c\ub85c \uc774\ub7ec\ud55c \uc791\uc5c5 \uc2dc\uc810\uc744 \ud310\ub2e8\ud560 \uc218 \uc5c6\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\ubd80\ud558\uc640 \ub2a5\ub825\uc774 \uade0\ud615\uc744 \uc774\ub8e8\ub294 \uacc4\ud68d\ub3c4 \uc2e4\ud589 \ub2e8\uacc4\uc5d0\uc11c \ucc28\uc9c8\uc744 \ube5a\uc744 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ub2e4\uc74c \ub124 \uac00\uc9c0 \uc6d0\uc778\uc744 \ud655\uc778\ud558\uc138\uc694.<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>\uacc4\ud68d \uae30\uac04 \ub0b4 \uc791\uc5c5 \uc2dc\uc810:<\/strong> \uc5ec\ub7ec \uc791\uc5c5\uc774 \uac19\uc740 \ub0a0 \ub3d9\uc77c\ud55c \uc790\uc6d0\uc744 \ud544\uc694\ub85c \ud569\ub2c8\ub2e4.<\/li><li><strong>\uacf5\uc815 \uac04 \uc120\ud6c4 \uad00\uacc4:<\/strong> \ud544\uc694\ud55c \ubd80\ud488\uc758 \uae30\uacc4\uac00\uacf5\uc774 \ub05d\ub098\uae30 \uc804\uc5d0\ub294 \uc870\ub9bd \ub2a5\ub825\uc774 \ub0a8\uc544 \uc788\uc5b4\ub3c4 \uc0ac\uc6a9\ud560 \uc218 \uc5c6\uc2b5\ub2c8\ub2e4.<\/li><li><strong>\uc790\uc6d0\uc758 \uc791\uc5c5 \uac00\ub2a5 \uc5ec\ubd80:<\/strong> \ub300\uccb4 \uc124\ube44\uc5d0 \uc5ec\uc720 \uc2dc\uac04\uc774 \uc788\uc5b4\ub3c4 \ud544\uc694\ud55c \uacf5\uc815\uc744 \uc218\ud589\ud560 \uc218 \uc5c6\uc744 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/li><li><strong>\uc0c1\ud669 \ubcc0\ud654:<\/strong> \uac80\ud1a0 \ud6c4 \uc790\uc7ac \uc9c0\uc5f0, \uc124\ube44 \uace0\uc7a5 \ub610\ub294 \uae34\uae09 \uc8fc\ubb38\uc73c\ub85c \uacc4\ud68d\uc774 \ubc14\ub01d\ub2c8\ub2e4.<\/li><\/ul>\n\n\n<p>\uc774 \ub2e8\uacc4\uc5d0\uc11c\ub294 <a href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/finite-capacity-scheduling\/\">\ucd1d\ub7c9 \uae30\uc900 \uac80\ud1a0\uc5d0\uc11c \uc720\ud55c \uc6a9\ub7c9 \uc2a4\ucf00\uc904\ub9c1\uc73c\ub85c<\/a> \ub118\uc5b4\uac00\uc57c \ud569\ub2c8\ub2e4. \ucd08\uae30 \ub0a9\uae30 \uc57d\uc18d\uc744 \uacb0\uc815\ud560 \ub54c\ub294 RCCP\ub97c \ud65c\uc6a9\ud558\uace0, \uc2e4\uc81c \uc791\uc5c5\ub4e4\uc774 \uc11c\ub85c \ub9de\ubb3c\ub824 \uc9c4\ud589\ub420 \uc218 \uc788\ub294\uc9c0\ub294 \uc0c1\uc138 \uc77c\uc815\uc73c\ub85c \uac80\uc99d\ud558\uc138\uc694.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\uc0dd\uc0b0 \ub2a5\ub825\uc5d0 \uad00\ud55c \uacb0\uc815\uc744 SkyPlanner \uc77c\uc815\uc73c\ub85c \uad6c\uccb4\ud654\ud558\uae30<\/h2>\n\n\n<p>\uc0dd\uc0b0\uacc4\ud68d \ub2f4\ub2f9\uc790\uac00 \uc774\ub7ec\ud55c \uacb0\uc815\uc744 \uc124\ube44\ubcc4 \uc791\uc5c5 \uc21c\uc11c\ub85c \uc62e\uae30\uace0, \uc0dd\uc0b0 \uc0c1\ud669\uc774 \ubc14\ub014 \ub54c\ub9c8\ub2e4 \uadf8 \uc21c\uc11c\ub97c \ub2e4\uc2dc \uc9dc\ub294 \ub370 \uc2dc\uac04\uc744 \uc4f0\uace0 \uc788\ub2e4\uba74 \ub2e4\uc74c \ub2e8\uacc4\ub85c SkyPlanner APS\ub97c \uad8c\uc7a5\ud569\ub2c8\ub2e4. \uae30\uc900 \uc0dd\uc0b0\uacc4\ud68d\uc744 \uc218\ub9bd\ud558\ub294 \uacfc\uc815\uc5d0\uc11c\ub294 RCCP\ub97c \uacc4\uc18d \ud65c\uc6a9\ud558\uace0, \uadf8 \uc774\ud6c4\uc758 \uc0c1\uc138 \uc2a4\ucf00\uc904\ub9c1\uc5d0\ub294 SkyPlanner\ub97c \uc0ac\uc6a9\ud558\uc138\uc694.<\/p>\n\n\n<p>\uc5c5\ubb34 \ubc0f \uc0dd\uc0b0 \ub370\uc774\ud130\uc758 \uc6d0\ucc9c \uc2dc\uc2a4\ud15c\uc73c\ub85c\ub294 \uae30\uc874 ERP\ub97c \uacc4\uc18d \uc0ac\uc6a9\ud558\uc138\uc694. SkyPlanner\ub294 <a href=\"https:\/\/skyplanner.ai\/ko\/%ed%86%b5%ed%95%a9\/\">\uac1c\ubc29\ud615 REST API\ub97c \ud1b5\ud574 \ubaa8\ub4e0 ERP \ub610\ub294 MES\uc640 \uc5f0\ub3d9<\/a>\ud558\uc5ec \ud574\ub2f9 \uc815\ubcf4\ub97c \uc0dd\uc0b0 \uc2a4\ucf00\uc904\ub9c1\uc5d0 \uc5f0\uacb0\ud569\ub2c8\ub2e4. \ub2f4\ub2f9\uc790\uac00 \ub9e4\ubc88 \uc218\uc791\uc5c5\uc73c\ub85c \uacc4\ud68d\uc744 \ub2e4\uc2dc \uad6c\uc131\ud560 \ud544\uc694\uac00 \uc5c6\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc791\uc5c5 \uc790\uc6d0, \uacf5\uc815 \ub2e8\uacc4, \uad50\ub300 \uadfc\ubb34, \uc791\uc5c5\uc790, \uc6b0\uc120\uc21c\uc704\ub97c \uc124\uc815\ud558\uc138\uc694. Arcturus\ub294 \uc124\uc815\ub41c \uac00\uc6a9 \ub2a5\ub825, \uc120\ud6c4 \uad00\uacc4, \uaddc\uce59\uc744 \ubc14\ud0d5\uc73c\ub85c \uc77c\uc815\uc744 \uacc4\uc0b0\ud569\ub2c8\ub2e4. \uc790\uc7ac \uac00\uc6a9\uc131\uc744 \ubc18\uc601\ud558\ub294 \uc2a4\ucf00\uc904\ub9c1\uc744 \ud65c\uc131\ud654\ud558\uba74 \uc790\uc7ac \uac00\uc6a9 \uc5ec\ubd80\uc640 \uc785\uace0 \uc608\uc815 \ubb3c\ub7c9\ub3c4 \uc791\uc5c5 \uc2dc\uc810\uc5d0 \ubc18\uc601\ub429\ub2c8\ub2e4. \uacc4\uc0b0\ub41c \uc791\uc5c5\uacfc \uc791\uc5c5 \uac04 \uad00\uacc4\ub294 Gantt \ud0c0\uc784\ub77c\uc778\uc5d0\uc11c \ud655\uc778\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc55e\uc11c \uc0b4\ud3b4\ubcf8 \ud38c\ud504 \uc608\uc2dc\uc5d0\uc11c \uc2e4\uc81c \ub2e4\uc74c \ub2e8\uacc4\ub294 \uc218\uc815\ub41c \uc0dd\uc0b0\ub7c9\uc73c\ub85c \uc77c\uc815\uc744 \uc9dc\uace0 \uae30\uacc4\uac00\uacf5\uacfc \uc870\ub9bd\uc774 \uc5b8\uc81c \ub05d\ub098\ub294\uc9c0 \ud655\uc778\ud558\ub294 \uac83\uc785\ub2c8\ub2e4. \uc790\uc7ac \ub3c4\ucc29 \uc77c\uc815\uc774 \ubc14\ub00c\uba74 \uacf5\uae09 \uc815\ubcf4\ub97c \uac31\uc2e0\ud558\uace0 \ub2e4\uc2dc \uacc4\uc0b0\ud558\uc138\uc694. Gantt \ud654\uba74\uc740 \ub0a9\uae30 \uc57d\uc18d\uc744 \uc720\uc9c0\ud560\uc9c0, \uc6b0\uc120\uc21c\uc704\ub97c \ubc14\uafc0\uc9c0, \ucd94\uac00 \uc0dd\uc0b0 \ub2a5\ub825\uc744 \ud655\ubcf4\ud560\uc9c0 \ud310\ub2e8\ud560 \uc218 \uc788\ub294 \uad6c\uccb4\uc801\uc778 \uadfc\uac70\ub97c \uc81c\uacf5\ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc774\ub807\uac8c \ud558\uba74 \uac1c\ub7b5 \uacc4\uc0b0\ub9cc\uc73c\ub85c\ub294 \ud574\uacb0\ud560 \uc218 \uc5c6\ub294 \uc5c5\ubb34, \uc989 \uc5ec\ub7ec \uc790\uc6d0\uc5d0 \uac78\uce5c \uc791\uc5c5\uc744 \uc870\uc728\ud558\uace0 \uc0c1\ud669\uc774 \ubc14\ub00c\uc5b4\ub3c4 \uc870\uc728\ub41c \uc0c1\ud0dc\ub97c \uc720\uc9c0\ud558\ub294 \ub370 \ub4dc\ub294 \uc218\uace0\ub97c \uc904\uc77c \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc6b0\uc120\uc21c\uc704\ub294 \uc0dd\uc0b0\uacc4\ud68d \ub2f4\ub2f9\uc790\uac00 \uacb0\uc815\ud558\uace0, \uc77c\uc815 \uacc4\uc0b0\uc740 Arcturus\uac00 \uc218\ud589\ud569\ub2c8\ub2e4. \uadf8\ub798\ub3c4 \ud544\uc694\ud55c \uc791\uc5c5\uc744 \ub0a9\uae30\uc77c\uae4c\uc9c0 \ub9c8\uce60 \uc218 \uc5c6\ub2e4\uba74, \uade0\ud615 \uc7a1\ud78c \uc8fc\uac04 \ud569\uacc4\uc5d0 \ubb38\uc81c\uac00 \uac00\ub824\uc9c0\uc9c0 \uc54a\uace0 \uacbd\uc601\uc0c1\uc758 \uacb0\uc815\uc774 \ud544\uc694\ud558\ub2e4\ub294 \uc810\uc774 \ub4dc\ub7ec\ub0a9\ub2c8\ub2e4.<\/p>\n\n\n<h3 class=\"wp-block-heading\">KJH-Comp: \ub300\ub7b5\uc801\uc778 \uc8fc\uac04 \ubd80\ud558 \uad00\ub9ac\uc5d0\uc11c \ud55c \ub2e8\uacc4 \ub354<\/h3>\n\n\n<p>\ud540\ub780\ub4dc\uc758 \ud310\uae08 \uc704\ud0c1 \uc81c\uc870\uc5c5\uccb4 KJH-Comp\ub294 \uc774\ubbf8 C9000 ERP\uc640 \uc2a4\ud504\ub808\ub4dc\uc2dc\ud2b8\ub85c \ub300\ub7b5\uc801\uc778 \uc8fc\uac04 \ubd80\ud558\ub97c \uad00\ub9ac\ud558\uace0 \uc788\uc5c8\uc2b5\ub2c8\ub2e4. \ubb38\uc81c\ub294 \uadf8\ub2e4\uc74c \ub2e8\uacc4\uc600\uc2b5\ub2c8\ub2e4. \uace0\uac1d \uc8fc\ubb38\uc5d0\ub294 \ud2b9\uc815 \ub0a0\uc9dc\uc758 \ub0a9\uae30\uac00 \uc815\ud574\uc838 \uc788\uc5c8\uc9c0\ub9cc, \ud604\uc7a5 \uad00\ub9ac\uc790\ub4e4\uc740 \uc5ec\uc804\ud788 \uc218\uc791\uc5c5\uc73c\ub85c \uc124\ube44\uc5d0 \uc791\uc5c5\uc744 \ubc30\uc815\ud588\uc2b5\ub2c8\ub2e4. \uad00\ub9ac\uc790 \ub450 \uba85\uc774 \uac01\uac01 \uc5c5\ubb34 \uc2dc\uac04\uc758 \ucd5c\uc18c \uc808\ubc18\uc744 \uc0dd\uc0b0 \ub2a5\ub825\uc5d0 \ub9de\ucdb0 \uc77c\uc815\uc744 \uc9dc\ub294 \ub370 \uc4f0\uace0 \uc788\uc5c8\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>KJH-Comp\ub294 \uae30\uc874 ERP\ub97c \uc720\uc9c0\ud558\uba74\uc11c \uc720\ud55c \uc6a9\ub7c9 \uc2a4\ucf00\uc904\ub9c1\uc744 \uc704\ud574 SkyPlanner\ub97c \ub3c4\uc785\ud588\uc2b5\ub2c8\ub2e4. \uacf5\uac1c\ub41c \uace0\uac1d \uc0ac\ub840\uc5d0\uc11c KJH-Comp\ub294 \uc124\ube44 \uc790\ub3d9 \ubc30\uc815, \ubcd1\ubaa9 \uacf5\uc815\uc758 \uc870\uae30 \ud30c\uc545, \uc218\uc791\uc5c5 \uc77c\uc815 \ud3b8\uc131 \uc5c5\ubb34 \uac10\uc18c\ub97c \uc18c\uac1c\ud569\ub2c8\ub2e4. \ub450 \uba85\uc774 \ub9e1\ub358 \uc2a4\ucf00\uc904\ub9c1 \uc5c5\ubb34\ub294 \ud55c \uba85\uc774 \ub2f4\ub2f9\ud558\uac8c \ub418\uc5c8\uace0, \ub2e4\ub978 \ud55c \uba85\uc740 \ub2e4\ub978 \uc5c5\ubb34\ub85c \uc774\ub3d9\ud588\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/ko\/%ea%b3%a0%ea%b0%9d-%ec%82%ac%eb%a1%80\/kjh-comp\/\">KJH-Comp\uc5d0 \ub530\ub974\uba74<\/a> \ub0a9\uae30 \uc900\uc218\uc728\uc740 \uc57d 50%\uc5d0\uc11c 2026\ub144 \ucd5c\ub300 98%\ub85c \ub192\uc544\uc84c\uc2b5\ub2c8\ub2e4. \uc774\ub294 \ud574\ub2f9 \uae30\uc5c5\uc774 \uc790\uccb4 \ub3c4\uc785 \uacfc\uc815\uc5d0\uc11c \uacbd\ud5d8\ud55c \uacb0\uacfc\uc785\ub2c8\ub2e4. RCCP \uac80\ud1a0 \uad00\uc810\uc5d0\uc11c \uc8fc\ubaa9\ud560 \uc810\uc740 \uacc4\ud68d\uacfc \uc2e4\ud589 \uc0ac\uc774\uc758 \uac04\uadf9\uc744 \uc5b4\ub5bb\uac8c \uba54\uc6e0\ub290\ub0d0\uc785\ub2c8\ub2e4. \uc8fc\uac04 \ubd80\ud558\ub97c \ud30c\uc545\ud558\ub294 \ub370\uc11c \uadf8\uce58\uac70\ub098 \uad00\ub9ac\uc790\uac00 \ub610\ub2e4\uc2dc \uc124\ube44\ubcc4 \uc791\uc5c5 \uc21c\uc11c\ub97c \uc218\uc791\uc5c5\uc73c\ub85c \uc9dc\ub294 \ub300\uc2e0, \uc774\ub97c \uc11c\ub85c \uc870\uc728\ub41c \uc77c\uc77c \uc791\uc5c5\uc73c\ub85c \uc5f0\uacb0\ud588\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\ub2e4\uc74c \uc0dd\uc0b0 \ub2a5\ub825 \uac80\ud1a0\ub97c \uc2e4\ud589\uc73c\ub85c \uc5f0\uacb0\ud558\uc138\uc694<\/h2>\n\n\n<p>\ub2e4\uc74c MPS \uac80\ud1a0\uc5d0\uc11c\ub294 \uc18c\uc694 \ub2a5\ub825\uacfc \uac00\uc6a9 \ub2a5\ub825\uc758 \ucc28\uc774\uac00 \uac00\uc7a5 \ud070 \ud575\uc2ec \uc790\uc6d0\uc744 \ucc3e\uc544\ubcf4\uc138\uc694. \uc0dd\uc0b0 \uc2dc\uc810\uc744 \uc62e\uae38\uc9c0, \uc2e4\uc81c \uc0ac\uc6a9 \uac00\ub2a5\ud55c \ub2a5\ub825\uc744 \ucd94\uac00\ud560\uc9c0, \ub0a9\uae30 \uc57d\uc18d\uc744 \ubcc0\uacbd\ud560\uc9c0 \ud569\uc758\ud55c \ub2e4\uc74c \uac1c\ub7b5 \ubd80\ud558\ub97c \ub2e4\uc2dc \uacc4\uc0b0\ud558\uc138\uc694. \uc218\uc815\ub41c \uc791\uc5c5\uc744 \ud604\uc7a5\uc5d0 \uc9c0\uc2dc\ud558\uae30 \uc804\uc5d0 \ub2e4\ub978 \uc791\uc5c5\uacfc \uc790\uc7ac \uac00\uc6a9\uc131\uc744 \uace0\ub824\ud574 \uc0c1\uc138 \uc77c\uc815\uc744 \ud655\uc778\ud558\uc138\uc694.<\/p>\n\n\n<p>SkyPlanner\ub85c \uc774 \ub9c8\uc9c0\ub9c9 \ub2e8\uacc4\ub97c \ub354 \ube60\ub974\uace0 \uc720\uc6a9\ud558\uac8c \uc218\ud589\ud558\uc138\uc694. <a href=\"https:\/\/skyplanner.ai\/ko\/%ed%8f%89%ea%b0%80%ed%8c%90\/\">\ub370\ubaa8 \ub370\uc774\ud130\ub85c \uccb4\ud5d8\uc744 \uc2dc\uc791<\/a>\ud574 \uc2a4\ucf00\uc904\ub9c1 \ud750\ub984\uc744 \uc0b4\ud3b4\ubcf4\uac70\ub098, \uadc0\uc0ac\uc758 \ubcd1\ubaa9 \uacf5\uc815, \uad50\ub300 \uadfc\ubb34, \ub0a9\uae30 \uc57d\uc18d\uc744 \uc911\uc2ec\uc73c\ub85c <a href=\"https:\/\/skyplanner.ai\/ko\/%ec%98%81%ec%97%85%ed%8c%80%ec%97%90-%eb%ac%b8%ec%9d%98\/\">\ub370\ubaa8\ub97c \uc608\uc57d<\/a>\ud558\uc138\uc694. \ub2ec\uc131\ud558\uace0\uc790 \ud558\ub294 \uc0dd\uc0b0 \uacc4\ud68d\uc744 \uc900\ube44\ud558\uace0, Arcturus\uc640 Gantt \ud0c0\uc784\ub77c\uc778\uc774 \uc774\ub97c \ud604\uc7a5\uc5d0\uc11c \ud65c\uc6a9\ud560 \uc218 \uc788\ub294 \uc77c\uc815\uc73c\ub85c \ub9cc\ub4dc\ub294 \ub370 \uc5b4\ub5bb\uac8c \ub3c4\uc6c0\uc774 \ub418\ub294\uc9c0 \ud655\uc778\ud558\uc138\uc694.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>\uac1c\ub7b5 \uc0dd\uc0b0\ub2a5\ub825\uacc4\ud68d: RCCP\ub85c MPS \uac80\uc99d\ud558\uae30 \ud648 &raquo; \ub9ac\uc18c\uc2a4 &raquo; \uac1c\ub7b5 \uc0dd\uc0b0\ub2a5\ub825\uacc4\ud68d: RCCP\ub85c MPS \uac80\uc99d\ud558\uae30 \uae30\uc900\uc0dd\uc0b0\uacc4\ud68d\uc740 \ubb34\uc5c7\uc744 \uc0dd\uc0b0\ud560 \uac83\uc778\uc9c0\ub97c \uc815\ud569\ub2c8\ub2e4. \uac1c\ub7b5 \uc0dd\uc0b0\ub2a5\ub825\uacc4\ud68d\uc740 \ud575\uc2ec \uc790\uc6d0\uc73c\ub85c \uadf8 \uacc4\ud68d\uc744 \uac10\ub2f9\ud560 \uc218 \uc788\ub294\uc9c0 \ud655\uc778\ud569\ub2c8\ub2e4. \uacf5\uc7a5\uc5d0\uc11c \ub2ec\uc131\ud560 \uc218 \uc5c6\ub294 \uacc4\ud68d\uc744 \ubc14\ud0d5\uc73c\ub85c \uad6c\ub9e4\u00b7\uc0dd\uc0b0\u00b7\uc601\uc5c5 \ubd80\uc11c\uac00 \uc6c0\uc9c1\uc774\uae30 \uc804\uc5d0 \uc774 \uac80\uc99d\uc774 \ud544\uc694\ud569\ub2c8\ub2e4. \uac1c\ub7b5 \uc0dd\uc0b0\ub2a5\ub825\uacc4\ud68d(RCCP)\uc740 \uacc4\ud68d \uc0dd\uc0b0\ub7c9\uc744 \uc8fc\uc694 \uc790\uc6d0\uc758 \ubd80\ud558\ub85c \ud658\uc0b0\ud558\uace0 \uac00\uc6a9 \uc0dd\uc0b0 \ub2a5\ub825\uacfc \ube44\uad50\ud569\ub2c8\ub2e4. \uc774\ub97c &#8230; <a title=\"\uac1c\ub7b5 \uc0dd\uc0b0\ub2a5\ub825\uacc4\ud68d: RCCP\ub85c MPS \uac80\uc99d\ud558\uae30\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/rough-cut-capacity-planning\/\" aria-label=\"Read more about \uac1c\ub7b5 \uc0dd\uc0b0\ub2a5\ub825\uacc4\ud68d: RCCP\ub85c MPS \uac80\uc99d\ud558\uae30\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":99178,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2530,496],"tags":[],"class_list":["post-99159","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps--","category-496","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>\uac1c\ub7b5 \uc0dd\uc0b0\ub2a5\ub825\uacc4\ud68d: RCCP\ub85c MPS \uac80\uc99d\ud558\uae30<\/title>\n<meta name=\"description\" content=\"\ud575\uc2ec \uc790\uc6d0\uc73c\ub85c MPS\ub97c \ub2ec\uc131\ud560 \uc218 \uc788\uc744\uae4c\uc694? \uac1c\ub7b5 \uc0dd\uc0b0\ub2a5\ub825\uacc4\ud68d(RCCP) \uc608\uc81c\ub85c \uacfc\ubd80\ud558\ub97c \ucc3e\uace0 \uc2e4\ud589 \uac00\ub2a5\ud55c \uc77c\uc815\uc744 \ub9cc\ub4dc\uc138\uc694.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/rough-cut-capacity-planning\/\" \/>\n<meta property=\"og:locale\" content=\"ko_KR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"\uac1c\ub7b5 \uc0dd\uc0b0\ub2a5\ub825\uacc4\ud68d: RCCP\ub85c MPS \uac80\uc99d\ud558\uae30\" \/>\n<meta property=\"og:description\" content=\"\ud575\uc2ec \uc790\uc6d0\uc73c\ub85c MPS\ub97c \ub2ec\uc131\ud560 \uc218 \uc788\uc744\uae4c\uc694? \uac1c\ub7b5 \uc0dd\uc0b0\ub2a5\ub825\uacc4\ud68d(RCCP) \uc608\uc81c\ub85c \uacfc\ubd80\ud558\ub97c \ucc3e\uace0 \uc2e4\ud589 \uac00\ub2a5\ud55c \uc77c\uc815\uc744 \ub9cc\ub4dc\uc138\uc694.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/rough-cut-capacity-planning\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-15T15:53:51+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-15T15:55:53+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/rough-cut-capacity-planning-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\uae00\uc4f4\uc774\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/rough-cut-capacity-planning\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/rough-cut-capacity-planning\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"\uac1c\ub7b5 \uc0dd\uc0b0\ub2a5\ub825\uacc4\ud68d: RCCP\ub85c MPS \uac80\uc99d\ud558\uae30\",\"datePublished\":\"2026-10-15T15:53:51+00:00\",\"dateModified\":\"2026-10-15T15:55:53+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/rough-cut-capacity-planning\\\/\"},\"wordCount\":77,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/rough-cut-capacity-planning\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/rough-cut-capacity-planning-hero.png\",\"articleSection\":[\"APS \ubc0f \uc2a4\ucf00\uc904\ub9c1\",\"\ub9ac\uc18c\uc2a4\"],\"inLanguage\":\"ko-KR\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/rough-cut-capacity-planning\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/rough-cut-capacity-planning\\\/\",\"name\":\"\uac1c\ub7b5 \uc0dd\uc0b0\ub2a5\ub825\uacc4\ud68d: RCCP\ub85c MPS \uac80\uc99d\ud558\uae30\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/rough-cut-capacity-planning\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/rough-cut-capacity-planning\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/rough-cut-capacity-planning-hero.png\",\"datePublished\":\"2026-10-15T15:53:51+00:00\",\"dateModified\":\"2026-10-15T15:55:53+00:00\",\"description\":\"\ud575\uc2ec \uc790\uc6d0\uc73c\ub85c MPS\ub97c \ub2ec\uc131\ud560 \uc218 \uc788\uc744\uae4c\uc694? \uac1c\ub7b5 \uc0dd\uc0b0\ub2a5\ub825\uacc4\ud68d(RCCP) \uc608\uc81c\ub85c \uacfc\ubd80\ud558\ub97c \ucc3e\uace0 \uc2e4\ud589 \uac00\ub2a5\ud55c \uc77c\uc815\uc744 \ub9cc\ub4dc\uc138\uc694.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/rough-cut-capacity-planning\\\/#breadcrumb\"},\"inLanguage\":\"ko-KR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/rough-cut-capacity-planning\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"ko-KR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/rough-cut-capacity-planning\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/rough-cut-capacity-planning-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/rough-cut-capacity-planning-hero.png\",\"width\":1672,\"height\":941},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/rough-cut-capacity-planning\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"\uac1c\ub7b5 \uc0dd\uc0b0\ub2a5\ub825\uacc4\ud68d: RCCP\ub85c MPS \uac80\uc99d\ud558\uae30\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ko-KR\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ko-KR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ko-KR\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"\uac1c\ub7b5 \uc0dd\uc0b0\ub2a5\ub825\uacc4\ud68d: RCCP\ub85c MPS \uac80\uc99d\ud558\uae30","description":"\ud575\uc2ec \uc790\uc6d0\uc73c\ub85c MPS\ub97c \ub2ec\uc131\ud560 \uc218 \uc788\uc744\uae4c\uc694? \uac1c\ub7b5 \uc0dd\uc0b0\ub2a5\ub825\uacc4\ud68d(RCCP) \uc608\uc81c\ub85c \uacfc\ubd80\ud558\ub97c \ucc3e\uace0 \uc2e4\ud589 \uac00\ub2a5\ud55c \uc77c\uc815\uc744 \ub9cc\ub4dc\uc138\uc694.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/rough-cut-capacity-planning\/","og_locale":"ko_KR","og_type":"article","og_title":"\uac1c\ub7b5 \uc0dd\uc0b0\ub2a5\ub825\uacc4\ud68d: RCCP\ub85c MPS \uac80\uc99d\ud558\uae30","og_description":"\ud575\uc2ec \uc790\uc6d0\uc73c\ub85c MPS\ub97c \ub2ec\uc131\ud560 \uc218 \uc788\uc744\uae4c\uc694? \uac1c\ub7b5 \uc0dd\uc0b0\ub2a5\ub825\uacc4\ud68d(RCCP) \uc608\uc81c\ub85c \uacfc\ubd80\ud558\ub97c \ucc3e\uace0 \uc2e4\ud589 \uac00\ub2a5\ud55c \uc77c\uc815\uc744 \ub9cc\ub4dc\uc138\uc694.","og_url":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/rough-cut-capacity-planning\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-15T15:53:51+00:00","article_modified_time":"2026-10-15T15:55:53+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/rough-cut-capacity-planning-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"\uae00\uc4f4\uc774":"Jussi M\u00e4ntyl\u00e4"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/rough-cut-capacity-planning\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/rough-cut-capacity-planning\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"\uac1c\ub7b5 \uc0dd\uc0b0\ub2a5\ub825\uacc4\ud68d: RCCP\ub85c MPS \uac80\uc99d\ud558\uae30","datePublished":"2026-10-15T15:53:51+00:00","dateModified":"2026-10-15T15:55:53+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/rough-cut-capacity-planning\/"},"wordCount":77,"publisher":{"@id":"https:\/\/skyplanner.ai\/ko\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/rough-cut-capacity-planning\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/rough-cut-capacity-planning-hero.png","articleSection":["APS \ubc0f \uc2a4\ucf00\uc904\ub9c1","\ub9ac\uc18c\uc2a4"],"inLanguage":"ko-KR"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/rough-cut-capacity-planning\/","url":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/rough-cut-capacity-planning\/","name":"\uac1c\ub7b5 \uc0dd\uc0b0\ub2a5\ub825\uacc4\ud68d: RCCP\ub85c MPS \uac80\uc99d\ud558\uae30","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ko\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/rough-cut-capacity-planning\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/rough-cut-capacity-planning\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/rough-cut-capacity-planning-hero.png","datePublished":"2026-10-15T15:53:51+00:00","dateModified":"2026-10-15T15:55:53+00:00","description":"\ud575\uc2ec \uc790\uc6d0\uc73c\ub85c MPS\ub97c \ub2ec\uc131\ud560 \uc218 \uc788\uc744\uae4c\uc694? \uac1c\ub7b5 \uc0dd\uc0b0\ub2a5\ub825\uacc4\ud68d(RCCP) \uc608\uc81c\ub85c \uacfc\ubd80\ud558\ub97c \ucc3e\uace0 \uc2e4\ud589 \uac00\ub2a5\ud55c \uc77c\uc815\uc744 \ub9cc\ub4dc\uc138\uc694.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/rough-cut-capacity-planning\/#breadcrumb"},"inLanguage":"ko-KR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/rough-cut-capacity-planning\/"]}]},{"@type":"ImageObject","inLanguage":"ko-KR","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/rough-cut-capacity-planning\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/rough-cut-capacity-planning-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/rough-cut-capacity-planning-hero.png","width":1672,"height":941},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/rough-cut-capacity-planning\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/ko\/"},{"@type":"ListItem","position":2,"name":"\uac1c\ub7b5 \uc0dd\uc0b0\ub2a5\ub825\uacc4\ud68d: RCCP\ub85c MPS \uac80\uc99d\ud558\uae30"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/ko\/#website","url":"https:\/\/skyplanner.ai\/ko\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/ko\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/ko\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ko-KR"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/ko\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/ko\/","logo":{"@type":"ImageObject","inLanguage":"ko-KR","@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"ko-KR","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/rough-cut-capacity-planning-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/rough-cut-capacity-planning-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/rough-cut-capacity-planning-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/rough-cut-capacity-planning-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/rough-cut-capacity-planning-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/rough-cut-capacity-planning-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/rough-cut-capacity-planning-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/rough-cut-capacity-planning-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/ko\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"\uac1c\ub7b5 \uc0dd\uc0b0\ub2a5\ub825\uacc4\ud68d: RCCP\ub85c MPS \uac80\uc99d\ud558\uae30 \ud648 &raquo; \ub9ac\uc18c\uc2a4 &raquo; \uac1c\ub7b5 \uc0dd\uc0b0\ub2a5\ub825\uacc4\ud68d: RCCP\ub85c MPS \uac80\uc99d\ud558\uae30 \uae30\uc900\uc0dd\uc0b0\uacc4\ud68d\uc740 \ubb34\uc5c7\uc744 \uc0dd\uc0b0\ud560 \uac83\uc778\uc9c0\ub97c \uc815\ud569\ub2c8\ub2e4. \uac1c\ub7b5 \uc0dd\uc0b0\ub2a5\ub825\uacc4\ud68d\uc740 \ud575\uc2ec \uc790\uc6d0\uc73c\ub85c \uadf8 \uacc4\ud68d\uc744 \uac10\ub2f9\ud560 \uc218 \uc788\ub294\uc9c0 \ud655\uc778\ud569\ub2c8\ub2e4. \uacf5\uc7a5\uc5d0\uc11c \ub2ec\uc131\ud560 \uc218 \uc5c6\ub294 \uacc4\ud68d\uc744 \ubc14\ud0d5\uc73c\ub85c \uad6c\ub9e4\u00b7\uc0dd\uc0b0\u00b7\uc601\uc5c5 \ubd80\uc11c\uac00 \uc6c0\uc9c1\uc774\uae30 \uc804\uc5d0 \uc774 \uac80\uc99d\uc774 \ud544\uc694\ud569\ub2c8\ub2e4. \uac1c\ub7b5 \uc0dd\uc0b0\ub2a5\ub825\uacc4\ud68d(RCCP)\uc740 \uacc4\ud68d \uc0dd\uc0b0\ub7c9\uc744 \uc8fc\uc694 \uc790\uc6d0\uc758 \ubd80\ud558\ub85c \ud658\uc0b0\ud558\uace0 \uac00\uc6a9 \uc0dd\uc0b0 \ub2a5\ub825\uacfc \ube44\uad50\ud569\ub2c8\ub2e4. \uc774\ub97c&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts\/99159","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/comments?post=99159"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts\/99159\/revisions"}],"predecessor-version":[{"id":99218,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts\/99159\/revisions\/99218"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/media\/99178"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/media?parent=99159"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/categories?post=99159"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/tags?post=99159"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}