{"id":96112,"date":"2026-10-04T04:30:32","date_gmt":"2026-10-04T04:30:32","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=96112"},"modified":"2026-10-19T14:42:42","modified_gmt":"2026-10-19T14:42:42","slug":"production-schedule-template","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/production-schedule-template\/","title":{"rendered":"\uc81c\uc870\uc5c5 \uc0dd\uc0b0\uacc4\ud68d \uc5d1\uc140 \uc591\uc2dd: \uc2e4\uc81c\ub85c \uc2e4\ud589 \uac00\ub2a5\ud55c \uc77c\uc815 \ub9cc\ub4e4\uae30"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">\uc81c\uc870\uc5c5 \uc0dd\uc0b0\uacc4\ud68d \uc5d1\uc140 \uc591\uc2dd: \uc2e4\uc81c\ub85c \uc2e4\ud589 \uac00\ub2a5\ud55c \uc77c\uc815 \ub9cc\ub4e4\uae30<\/h1>\n\n\n<p>\uc0dd\uc0b0\uacc4\ud68d \uc591\uc2dd\uc744 \uc0ac\uc6a9\ud558\uba74 \uc624\ub354\ub97c \ubb38\uc11c\uc5d0 \uc815\ub9ac\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ud558\uc9c0\ub9cc \ub354 \uc5b4\ub824\uc6b4 \ubb38\uc81c\ub294 \uadf8 \uc624\ub354\ub97c \uacf5\uc7a5\uc5d0\uc11c \uc2e4\uc81c\ub85c \ucc98\ub9ac\ud560 \uc218 \uc788\ub290\ub0d0\ub294 \uac83\uc785\ub2c8\ub2e4. \uc0ac\uc6a9 \uac00\ub2a5\ud55c \uc124\ube44\uc640 \uc801\ud569\ud55c \uc791\uc5c5\uc790\ub97c \ud655\ubcf4\ud558\uace0, \ub2e4\uc74c \uacf5\uc815\uacfc \uace0\uac1d \ub0a9\uae30\uc5d0 \ub9de\ucdb0 \uc81c\ub54c \uc791\uc5c5\ud560 \uc218 \uc788\uc5b4\uc57c \ud569\ub2c8\ub2e4.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-template.csv\">\uc0dd\uc0b0\uacc4\ud68d \uc591\uc2dd \ub2e4\uc6b4\ub85c\ub4dc(Excel\uc6a9 CSV)<\/a>. \uacf5\uc815\ub9c8\ub2e4 \ud55c \ud589\uc744 \uc0ac\uc6a9\ud558\ub294 \uac04\ub2e8\ud55c \uc81c\uc870 \uc608\uc81c\ub85c, \ud544\uc694\uc5d0 \ub9de\uac8c \uc218\uc815\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc544\ub798 \ud45c\uc5d0\ub294 \uc0d8\ud50c \uc791\uc5c5 \ub450 \uac1c\uac00 \ub098\uc640 \uc788\uc73c\uba70, \ud30c\uc77c\uc5d0\ub294 \uc2dc\uac04\ubfd0 \uc544\ub2c8\ub77c \uc804\uccb4 \ub0a0\uc9dc\ub3c4 \ud3ec\ud568\ub418\uc5b4 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<figure class=\"wp-block-table\"><table>\n<thead>\n<tr>\n<th>\uc624\ub354 \/ \uacf5\uc815<\/th>\n<th>\uc124\ube44 \/ \uc791\uc5c5\uc790<\/th>\n<th style=\"text-align: right;\">\uc900\ube44 \uc2dc\uac04(\ubd84)<\/th>\n<th style=\"text-align: right;\">\uac00\uacf5 \uc2dc\uac04(\ubd84)<\/th>\n<th>\uc2dc\uc791<\/th>\n<th>\uc885\ub8cc<\/th>\n<th>\uc644\ub8cc \uae30\ud55c<\/th>\n<th>\uc0c1\ud0dc<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>A \/ A-10<\/td>\n<td>M1 \/ O1<\/td>\n<td style=\"text-align: right;\">30<\/td>\n<td style=\"text-align: right;\">120<\/td>\n<td>08:00<\/td>\n<td>10:30<\/td>\n<td>12:00<\/td>\n<td>\uacc4\ud68d\ub428<\/td>\n<\/tr>\n<tr>\n<td>B \/ B-10<\/td>\n<td>M1 \/ O1<\/td>\n<td style=\"text-align: right;\">15<\/td>\n<td style=\"text-align: right;\">180<\/td>\n<td>10:30<\/td>\n<td>13:45<\/td>\n<td>16:00<\/td>\n<td>\uacc4\ud68d\ub428<\/td>\n<\/tr>\n<\/tbody>\n<\/table><\/figure>\n\n\n<p>\uc774 \uc591\uc2dd\uc73c\ub85c \uc5b4\ub5a4 \uc785\ub825 \uc815\ubcf4\uac00 \ud544\uc694\ud55c\uc9c0 \ud30c\uc545\ud558\uace0 \uac04\ub2e8\ud55c \uc791\uc5c5 \uc21c\uc11c\ub97c \uc2dc\ud5d8\ud574 \ubcf4\uc138\uc694. \uc2e0\uaddc \uc624\ub354, \uc9c0\uc5f0, \uc0dd\uc0b0 \ub2a5\ub825\uc758 \ubcc0\ud654 \uc18d\uc5d0\uc11c\ub3c4 \uc720\ud6a8\ud55c \uc0dd\uc0b0 \uacc4\ud68d\uc744 \uc720\uc9c0\ud574\uc57c \ud55c\ub2e4\uba74 SkyPlanner APS\ub85c \uc77c\uc815\uc744 \uacc4\uc0b0\ud558\uc138\uc694. \uc2a4\ud504\ub808\ub4dc\uc2dc\ud2b8\ub294 \uc0ac\uc6a9\uc790\uac00 \uc815\ud55c \uc2dc\uc791 \uc2dc\uac04\uc744 \ubcf4\uc5ec\uc904 \uc218 \uc788\uc9c0\ub9cc, SkyPlanner\ub294 \ud655\ubcf4\ub41c \uc0dd\uc0b0 \ub2a5\ub825 \uc548\uc5d0 \uacf5\uc815\uc744 \ubc30\uce58\ud558\ub294 \uacc4\uc0b0\uc744 \uc218\ud589\ud569\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\uc0dd\uc0b0\uacc4\ud68d \uc591\uc2dd\uc5d0\uc11c \ubb34\uc5c7\uc744 \ud655\uc778\ud560 \uc218 \uc788\uc5b4\uc57c \ud560\uae4c\uc694?<\/h2>\n\n\n<p>\uc81c\uc870\uc5c5\uc758 \uc0dd\uc0b0 \uc77c\uc815\uc5d0\ub294 \uc791\uc5c5\ubcc4\ub85c \uc0ac\uc6a9\ud560 \uc790\uc6d0\uacfc \uc791\uc5c5\ud560 \uc2dc\uac04\uc774 \uc815\ud574\uc838 \uc788\uc2b5\ub2c8\ub2e4. \uacf5\uc815 \ub2e8\uc704\ub85c\ub294 \ub2e4\uc74c \ub124 \uac00\uc9c0 \uc9c8\ubb38\uc5d0 \ub2f5\ud560 \uc218 \uc788\uc5b4\uc57c \ud569\ub2c8\ub2e4.<\/p>\n\n\n<ul class=\"wp-block-list\">\n<li><strong>\uc5b4\ub5a4 \uc791\uc5c5\uc744 \ud558\ub098\uc694?<\/strong> \uc81c\ud488\uba85\ub9cc \uc801\uc9c0 \ub9d0\uace0 \uc624\ub354\uc640 \ud574\ub2f9 \uacf5\uc815\uc744 \uba85\ud655\ud788 \ud45c\uc2dc\ud558\uc138\uc694.<\/li>\n<li><strong>\uc5b4\ub514\uc11c \uc791\uc5c5\ud560 \uc218 \uc788\ub098\uc694?<\/strong> \uc791\uc5c5\uc5d0 \ud544\uc694\ud55c \uc124\ube44 \ub610\ub294 \uc791\uc5c5\uc7a5\uacfc \uc778\ub825\uc744 \uba85\uc2dc\ud558\uc138\uc694.<\/li>\n<li><strong>\uc5b8\uc81c \uc791\uc5c5\ud560 \uc218 \uc788\ub098\uc694?<\/strong> \uc900\ube44 \uc2dc\uac04, \uac00\uacf5 \uc2dc\uac04, \uc791\uc5c5 \uac00\ub2a5 \uc2dc\uac04\ub300\uc640 \uc0ac\uc804\uc5d0 \uc900\ube44\ub418\uc5b4\uc57c \ud560 \uc0ac\ud56d\uc744 \ubc18\uc601\ud558\uc138\uc694.<\/li>\n<li><strong>\uc81c\ub54c \ub05d\ub0bc \uc218 \uc788\ub098\uc694?<\/strong> \uacc4\uc0b0 \uacb0\uacfc\ub97c \ud574\ub2f9 \uacf5\uc815\uc758 \uc644\ub8cc \uae30\ud55c\uacfc \ube44\uad50\ud558\uace0, \ucd9c\ud558 \uc804\uae4c\uc9c0 \ub0a8\uc740 \uc791\uc5c5\ub3c4 \ud655\uc778\ud558\uc138\uc694.<\/li>\n<\/ul>\n\n\n<p>\ub9c8\uc9c0\ub9c9 \uc9c8\ubb38\uc5d0\uc11c\ub294 \uacf5\uc815 \uc644\ub8cc\uc640 \ucd9c\ud558 \uc900\ube44 \uc644\ub8cc\ub97c \uad6c\ubd84\ud558\ub294 \uac83\uc774 \uc911\uc694\ud569\ub2c8\ub2e4. \uae30\uacc4 \uac00\uacf5\uc774 \ub05d\ub098\ub3c4 \uc774\ud6c4 \uc870\ub9bd, \uac80\uc0ac \ub610\ub294 \ud3ec\uc7a5\uc774 \ub0a8\uc544 \uc788\ub2e4\uba74 \ud574\ub2f9 \uc624\ub354\ub97c \ubc14\ub85c \ucd9c\ud558\ud560 \uc218\ub294 \uc5c6\uc2b5\ub2c8\ub2e4. \ud6c4\uc18d \uc791\uc5c5\uc744 \uc218\ud589\ud560 \uc2dc\uac04\uc744 \ud655\ubcf4\ud560 \uc218 \uc788\ub3c4\ub85d \uac01 \uacf5\uc815\uc758 \uc644\ub8cc \uae30\ud55c\uc744 \uc815\ud558\uc138\uc694.<\/p>\n\n\n<p>\uc8fc\uac04 \uc218\ub7c9 \uacc4\ud68d\ub3c4 \uc720\uc6a9\ud558\uc9c0\ub9cc, \ubaa9\uc801\uc740 \ub2e4\ub985\ub2c8\ub2e4. <a href=\"\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/master-production-schedule\/\">\uae30\uc900 \uc0dd\uc0b0 \uacc4\ud68d<\/a>\uc740 \uc5b4\ub5a4 \uc644\uc81c\ud488\uc774 \uc5b8\uc81c \ud544\uc694\ud55c\uc9c0\ub97c \uc815\ud569\ub2c8\ub2e4. \uc774 \uc591\uc2dd\uc740 \uadf8\ubcf4\ub2e4 \uc138\ubd80\uc801\uc778 \ub2e8\uacc4, \uc989 \uc124\ube44\uc640 \uc791\uc5c5\uc790\uc758 \uc2dc\uac04\uc744 \ub193\uace0 \uacbd\ud569\ud558\ub294 \uc2e4\uc81c \uacf5\uc815\uc744 \uc704\ud55c \uac83\uc785\ub2c8\ub2e4. \uc774\ub7ec\ud55c \uc785\ub825 \uc815\ubcf4\ub97c \uc2e4\ud589 \uac00\ub2a5\ud55c \uc791\uc5c5 \uc21c\uc11c\ub85c \ub9cc\ub4dc\ub294 \ubc29\ubc95\uc740 <a href=\"\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/production-scheduling\/\">\uc0dd\uc0b0 \uc2a4\ucf00\uc904\ub9c1 \uac00\uc774\ub4dc<\/a>\uc5d0\uc11c \uc124\uba85\ud569\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\uc608\uc81c\ub97c \ud1b5\ud574 \uc0dd\uc0b0 \ub2a5\ub825\uc774 \uc5b4\ub5bb\uac8c \ubc30\uc815\ub418\ub294\uc9c0 \ud655\uc778\ud558\uc138\uc694<\/h2>\n\n\n<p>\uc0dd\uc0b0 \ud604\uc7a5\uc5d0\uc11c \ub450 \uc791\uc5c5\uc774 \ub3d9\uc77c\ud55c \uc124\ube44 M1\uacfc \ub3d9\uc77c\ud55c \uc791\uc5c5\uc790 O1\uc744 \uae30\ub2e4\ub9ac\uace0 \uc788\ub2e4\uace0 \uac00\uc815\ud574 \ubcf4\uaca0\uc2b5\ub2c8\ub2e4. \ub450 \uc791\uc5c5\uc758 \uc790\uc7ac\ub294 \ubaa8\ub450 \uc900\ube44\ub418\uc5b4 \uc788\uc2b5\ub2c8\ub2e4. \uc124\ube44\uc640 \uc791\uc5c5\uc790\ub294 08:00\ubd80\ud130 16:00\uae4c\uc9c0 \uc911\ub2e8 \uc5c6\uc774 \uc791\uc5c5\ud560 \uc218 \uc788\uc73c\uba70, \ub450 \uacf5\uc815 \ubaa8\ub450 \ubbf8\uc644\ub8cc\ub41c \uc120\ud589 \uacf5\uc815\uc774 \uc5c6\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc791\uc5c5 A\uc5d0\ub294 \uc900\ube44 \uc2dc\uac04 30\ubd84\uacfc \uac00\uacf5 \uc2dc\uac04 120\ubd84\uc744 \ubc30\uc815\ud569\ub2c8\ub2e4. \uc774 \uc791\uc5c5\uc740 10:30\uae4c\uc9c0 \uc790\uc6d0\uc744 \uc810\uc720\ud569\ub2c8\ub2e4. \uc774\uc5b4\uc11c \uc791\uc5c5 B\uc5d0 \uc900\ube44 \uc2dc\uac04 15\ubd84\uacfc \uac00\uacf5 \uc2dc\uac04 180\ubd84\uc744 \ubc30\uc815\ud558\uba74 13:45\uc5d0 \ub05d\ub0a9\ub2c8\ub2e4. \ub450 \uc791\uc5c5\uc758 \uc2dc\uac04\uc740 \uc11c\ub85c \uacb9\uce58\uc9c0 \uc54a\uc73c\uba70, \ubaa8\ub450 \uba85\uc2dc\ub41c \uc644\ub8cc \uae30\ud55c \uc804\uc5d0 \ub05d\ub0a9\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc774 \uc21c\uc11c\uac00 \uc2e4\ud589 \uac00\ub2a5\ud55c \uac83\uc740 \uc804\uc81c \uc870\uac74\uc774 \ucda9\uc871\ub418\uae30 \ub54c\ubb38\uc785\ub2c8\ub2e4. 11:00\uc5d0 \ub2e4\ub978 \uc124\ube44\uc5d0\uc11c O1\uc774 \ud544\uc694\ud558\ub2e4\uba74, M1\uc774 \ube44\uc5b4 \uc788\uc5b4\ub3c4 B\uc5d0 \ubc30\uc815\ub41c \uc77c\uc815\uc740 \ub354 \uc774\uc0c1 \uc2e4\ud589\ud560 \uc218 \uc5c6\uc2b5\ub2c8\ub2e4. \uc810\uc2ec\uc2dc\uac04\uc774 \uc788\ub2e4\uba74 \uc5f0\uc18d\uc73c\ub85c \uc791\uc5c5\ud560 \uc218 \uc788\ub2e4\ub294 \uc804\uc81c\ub3c4 \uae68\uc9d1\ub2c8\ub2e4. \ub450 \uc791\uc5c5\uc774 \uc911\uac04 \uacf5\uc815\uc774\ub77c\uba74 \ud6c4\uc18d \uacf5\uc815\uc5d0\ub3c4 \ubcc4\ub3c4\uc758 \uc0dd\uc0b0 \ub2a5\ub825\uc744 \ud655\ubcf4\ud574\uc57c \ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc774 \ud45c\uc5d0\uc11c \uc911\uc694\ud55c \uac83\uc740 \uc0c9\uc0c1\uc774 \uc544\ub2d9\ub2c8\ub2e4. \uac01 \ud589\uc774 \uc790\uc6d0\uc758 \uac00\uc6a9 \uc2dc\uac04 \uc911 \uc5bc\ub9c8\ub97c \uc810\uc720\ud558\ub294\uc9c0\uac00 \ud575\uc2ec\uc785\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\uc81c\uc57d \uc870\uac74\uc774 \ub4dc\ub7ec\ub098\ub3c4\ub85d \uc591\uc2dd\uc744 \uc218\uc815\ud558\uc138\uc694<\/h2>\n\n\n<p>CSV\ub97c Excel\uc5d0\uc11c \uc5f4\uace0 \uc791\uc5c5\uc6a9 \uc0ac\ubcf8\uc744 Excel \ud1b5\ud569 \ubb38\uc11c\ub85c \uc800\uc7a5\ud558\uc138\uc694. \ubaa8\ub4e0 \ub0b4\uc6a9\uc774 \ud55c \uc5f4\uc5d0 \ud45c\uc2dc\ub41c\ub2e4\uba74 \uc27c\ud45c\ub97c \uad6c\ubd84 \uae30\ud638\ub85c \uc9c0\uc815\ud574 \ud30c\uc77c\uc744 \uac00\uc838\uc624\uc138\uc694. \ub2e4\uc6b4\ub85c\ub4dc\ud55c CSV\uc5d0\ub294 \uc608\uc81c \uac12\uc774 \ub4e4\uc5b4 \uc788\uc744 \ubfd0, \uc790\ub3d9\uc73c\ub85c \uc77c\uc815\uc744 \uacc4\uc0b0\ud558\ub294 \ubaa8\ub378\uc740 \uc5c6\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc608\uc81c\uc5d0 \uc0ac\uc6a9\ub41c \ub0a0\uc9dc\ub294 <strong>2026\ub144 10\uc6d4 5\uc77c<\/strong>\uc785\ub2c8\ub2e4. \uc2e4\uc81c \uc791\uc5c5 \ub0a0\uc9dc\ub85c \ubc14\uafb8\uace0, \uc2dc\uc791\u00b7\uc885\ub8cc\u00b7\uc644\ub8cc \uae30\ud55c\uc774 \uac00\uc838\uc628 \ud14d\uc2a4\ud2b8\uac00 \uc544\ub2c8\ub77c \uc2a4\ud504\ub808\ub4dc\uc2dc\ud2b8\uc758 \uc2e4\uc81c \ub0a0\uc9dc\/\uc2dc\uac04 \uac12\uc778\uc9c0 \ud655\uc778\ud558\uc138\uc694. \uc2dc\uac04\uacfc \ud568\uaed8 \ub0a0\uc9dc\ub3c4 \ud45c\uc2dc\ud558\uc138\uc694. \uadf8\ub807\uc9c0 \uc54a\uc73c\uba74 \ub0b4\uc77c 08:00\uc774 \uc624\ub298\uc758 \uc2dc\uac04\ucc98\ub7fc \ubcf4\uc77c \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\uacf5\uc815\ub9c8\ub2e4 \uc2dd\ubcc4\uc790\uc640 \uc2dc\uac04 \uc0b0\uc815 \uae30\uc900\uc744 \uba85\ud655\ud788 \ud558\uc138\uc694<\/h3>\n\n\n<p>A\uc640 B\ub97c \uc2e4\uc81c \uc624\ub354 ID\uc640 \uacf5\uc815 ID\ub85c \ubc14\uafb8\uc138\uc694. \ud55c \uc624\ub354\uc5d0 \uc808\ub2e8, \uc808\uace1, \uc6a9\uc811\uc774 \ud544\uc694\ud558\ub2e4\uba74 \uac01 \uacf5\uc815\uc744 \ubcc4\ub3c4 \ud589\uc73c\ub85c \uc791\uc131\ud558\uc138\uc694. \uacf5\uc815\uc758 \uc21c\uc11c\ub294 \uc2a4\ud504\ub808\ub4dc\uc2dc\ud2b8\uc5d0\uc11c \uc6b0\uc5f0\ud788 \ub2e4\uc74c\uc5d0 \ub193\uc778 \ud589\uc774 \uc544\ub2c8\ub77c <a href=\"\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/production-routing\/\">\uc81c\uc870 \uacf5\uc815 \uc21c\uc11c<\/a>\uc5d0 \ub530\ub77c \uacb0\uc815\ub429\ub2c8\ub2e4.<\/p>\n\n\n<p>\uac00\uacf5 \uc2dc\uac04(\ubd84)\uc740 <strong>\ubc30\uce58 \uc804\uccb4\uc758 \ucd1d \uac00\uacf5 \uc2dc\uac04<\/strong>\uc744 \uc758\ubbf8\ud569\ub2c8\ub2e4. \uac1c\ub2f9 \uc2dc\uac04\uc744 \uae30\uc900\uc73c\ub85c \uc0b0\uc815\ud588\ub2e4\uba74 \uc218\ub7c9\uc744 \uacf1\ud55c \ub4a4 \uc785\ub825\ud558\uc138\uc694. \uc900\ube44 \uc2dc\uac04(\ubd84)\uc740 \uc124\ube44\ub97c \ucd94\uac00\ub85c \uc810\uc720\ud558\ub294 \uc2dc\uac04\uc785\ub2c8\ub2e4. \uad6c\ubd84 \uc5c6\uc774 \ucd1d\uc2dc\uac04\uc5d0 \ud3ec\ud568\ud558\uac70\ub098 \uc911\ubcf5\uc73c\ub85c \uacc4\uc0b0\ud558\uc9c0 \ub9c8\uc138\uc694.<\/p>\n\n\n<p>\uc911\ub2e8 \uc5c6\uc774 \uc9c4\ud589\ub418\ub294 \uacf5\uc815\uc774\ub77c\uba74 F2\uc5d0 \uace0\uc815\uac12\uc73c\ub85c \uc785\ub825\ub41c \uc885\ub8cc \uc2dc\uac04\uc744 \ub2e4\uc74c \uc218\uc2dd\uc73c\ub85c \ubc14\uafb8\uace0 \uc544\ub798 \ud589\uc5d0\ub3c4 \ubcf5\uc0ac\ud558\uc138\uc694.<\/p>\n\n\n<p><code>=E2+(C2+D2)\/1440<\/code><\/p>\n\n\n<p>\uc774 \uc218\uc2dd\uc740 \uc2dc\uc791 \uc2dc\uac04\uc5d0 \uc900\ube44 \uc2dc\uac04\uacfc \uac00\uacf5 \uc2dc\uac04\uc744 \ubd84 \ub2e8\uc704\ub85c \ub354\ud569\ub2c8\ub2e4. \uc2dc\uc791 \uc2dc\uac04\uc744 \uc815\ud558\uac70\ub098 \ub2e4\ub978 \uc791\uc5c5\uacfc\uc758 \uc911\ubcf5\uc744 \ud53c\ud558\uac70\ub098 \ube44\uac00\ub3d9 \uc2dc\uac04\ub300\ub97c \ud53c\ud574 \uc791\uc5c5\uc744 \uc62e\uaca8\uc8fc\uc9c0\ub294 \uc54a\uc2b5\ub2c8\ub2e4. \uc774 \uc2dc\ud2b8\uc5d0\uc11c\ub294 \uadf8\ub7ec\ud55c \uc77c\uc815 \uacb0\uc815\uc744 \uc5ec\uc804\ud788 \uc0ac\uc6a9\uc790\uac00 \ub0b4\ub824\uc57c \ud569\ub2c8\ub2e4.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\uc791\uc5c5 \uc2dc\uc791 \uc804\uc5d0 \ud655\ubcf4\ub418\uc5b4\uc57c \ud560 \uc870\uac74\uc744 \uae30\ub85d\ud558\uc138\uc694<\/h3>\n\n\n<p>\uacf5\uc815 \ubaa9\ub85d\uacfc \ud568\uaed8 \uac01 \uc124\ube44\uc640 \uc791\uc5c5\uc790\uc758 \ub0a0\uc9dc\ubcc4 \uc791\uc5c5 \uac00\ub2a5 \uc2dc\uac04\ub300\ub97c \uad00\ub9ac\ud558\uc138\uc694. \ud734\uc2dd, \uc815\ube44 \ub4f1 \uc791\uc5c5\ud560 \uc218 \uc5c6\ub294 \uc2dc\uac04\ub300\ub3c4 \uae30\ub85d\ud558\uc138\uc694. \uc124\ube44\uc640 \uc791\uc5c5\uc790\uc758 \ubc30\uc815\uc744 \uac01\uac01 \ud655\uc778\ud574\uc57c \ud55c\ub2e4\uba74 \uc124\ube44 \uc5f4\uacfc \uc791\uc5c5\uc790 \uc5f4\uc744 \ubd84\ub9ac\ud558\uc138\uc694.<\/p>\n\n\n<p>\uc5ec\ub7ec \uacf5\uc815\uc744 \uac70\uce58\ub294 \uc624\ub354\uc5d0\ub294 \uc120\ud589 \uacf5\uc815 \uc5f4\uc744 \ucd94\uac00\ud558\uace0 \uc774\uc804 \uacf5\uc815\uc758 ID\ub97c \uc785\ub825\ud558\uc138\uc694. \uc790\uc7ac \uc785\uace0 \uc2dc\uc810\uc5d0 \ub530\ub77c \uc2dc\uc791 \uc2dc\uac04\uc774 \uacb0\uc815\ub41c\ub2e4\uba74 \uc790\uc7ac \uc900\ube44 \uc815\ubcf4\ub3c4 \ucd94\uac00\ud558\uc138\uc694. \ud544\uc694\ud55c \ud22c\uc785 \uc694\uc18c\uac00 \ud655\ubcf4\ub418\uace0 \uc120\ud589 \uc791\uc5c5\ub3c4 \uc644\ub8cc\ub418\uc5b4\uc57c \ud574\ub2f9 \ud589\uc758 \uc791\uc5c5\uc744 \uc77c\uc815\uc5d0 \ubc30\uc815\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc911\uac04\uc5d0 \uba48\ucd9c \uc218 \uc5c6\ub294 \uacf5\uc815\uc740 \uc900\ube44\uc640 \uac00\uacf5\uc744 \ubaa8\ub450 \uc218\ud589\ud560 \ub9cc\ud07c \ucda9\ubd84\ud55c \uc5f0\uc18d \uc791\uc5c5 \uc2dc\uac04\uc744 \ud655\ubcf4\ud574\uc57c \ud569\ub2c8\ub2e4. \uc911\uac04\uc5d0 \uba48\ucd9c \uc218 \uc788\ub294 \uacf5\uc815\uc774\ub77c\ub3c4 \uc774 \ub2e8\uc21c\ud55c \uc885\ub8cc \uc2dc\uac04 \uc218\uc2dd\uc73c\ub85c\ub294 \uc5ec\ub7ec \uc791\uc5c5 \uc2dc\uac04\ub300\uc5d0 \uac78\uce5c \uc644\ub8cc \uc2dc\uc810\uc744 \uacc4\uc0b0\ud560 \uc218 \uc5c6\uc2b5\ub2c8\ub2e4. \uc774\ub97c \uacc4\uc0b0\ud558\ub824\uba74 \uc791\uc5c5 \uce98\ub9b0\ub354\ub97c \ubc18\uc601\ud558\ub294 \ubcc4\ub3c4\uc758 \uacc4\uc0b0\uc774 \ud544\uc694\ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc5ec\uae30\uc11c\ubd80\ud130 \uc591\uc2dd\uc740 \uc0dd\uc0b0 \uacc4\ud68d\uc758 \uc2e4\uc81c \uacfc\uc81c\uac00 \ubb34\uc5c7\uc778\uc9c0 \ub4dc\ub7ec\ub0c5\ub2c8\ub2e4. \ud589\uc744 \ub354 \uc785\ub825\ud558\ub294 \uac83\uc774 \uc544\ub2c8\ub77c, \uac01 \ud589\uc758 \uc791\uc5c5\uc774 \uc11c\ub85c \uc5b4\ub5a4 \uc601\ud5a5\uc744 \ubbf8\uce58\ub294\uc9c0 \ud655\uc778\ud558\ub294 \uc77c\uc785\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\uc804\uc81c \uc870\uac74 \ud558\ub098\ub97c \ubc14\uafd4 \uacc4\ud68d\uc744 \uac80\uc99d\ud558\uc138\uc694<\/h2>\n\n\n<p>\uc2a4\ud504\ub808\ub4dc\uc2dc\ud2b8\ub85c \ub9cc\ub4e0 \uc77c\uc815\uc744 \uc2e0\ub8b0\ud558\uae30 \uc804\uc5d0 \uc0dd\uc0b0 \uc870\uac74\uc774 \ubc14\ub00c\uba74 \uc5b4\ub5a4 \uc77c\uc774 \uc0dd\uae30\ub294\uc9c0 \ud655\uc778\ud558\uc138\uc694.<\/p>\n\n\n<p>A\ub294 10:30\uc5d0 \ub05d\ub0ac\uc9c0\ub9cc M1\uc744 10:30\ubd80\ud130 13:00\uae4c\uc9c0 \uc0ac\uc6a9\ud560 \uc218 \uc5c6\ub2e4\uace0 \uac00\uc815\ud574 \ubcf4\uaca0\uc2b5\ub2c8\ub2e4. B\ub294 \uc544\uc9c1 \uc2dc\uc791\ud558\uc9c0 \uc54a\uc558\uc2b5\ub2c8\ub2e4. \uc774\uc81c \uc900\ube44\uc640 \uac00\uacf5\uc5d0 \ud544\uc694\ud55c 195\ubd84 \ub3d9\uc548 \uc911\ub2e8 \uc5c6\uc774 \uc791\uc5c5\ud55c\ub2e4\uba74 B\ub294 16:15\uc5d0 \ub05d\ub0a9\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc774 \uc644\ub8cc \uc2dc\uc810\uc740 \uc791\uc5c5 \uac00\ub2a5 \uc2dc\uac04\ub300\uac00 \ub05d\ub098\ub294 16:00\ub3c4, B\uc758 \uc644\ub8cc \uae30\ud55c\uc778 16:00\ub3c4 \ub118\uae41\ub2c8\ub2e4. \uc774\ub294 \uacbd\uace0\uc77c \ubfd0, \uc2b9\uc778\ub41c \ub300\uccb4 \uc77c\uc815\uc774 \uc544\ub2d9\ub2c8\ub2e4. B\uc758 \uc2dc\uc791 \uc2dc\uac04 \uc140\uc744 \ubc14\uafb8\uba74\uc11c \ubb38\uc81c\uac00 \ub4dc\ub7ec\ub0ac\uc9c0\ub9cc, \ud574\uacb0\ub41c \uac83\uc740 \uc544\ub2d9\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc791\uc5c5 \uac00\ub2a5\ud55c \uc778\ub825\uacfc \ud568\uaed8 \uc0ac\uc6a9\ud560 \uc218 \uc788\ub294 \ub2e4\ub978 \uc801\ud569\ud55c \uc124\ube44\ub97c \ucc3e\uac70\ub098, \uc2b9\uc778\ub41c \uadfc\ubb34\uc2dc\uac04 \uc5f0\uc7a5 \ub610\ub294 \ub0a9\uae30 \uc57d\uc18d \ubcc0\uacbd\uc744 \uac80\ud1a0\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ud558\uc9c0\ub9cc B\ub97c \ub2e4\ub978 \uc124\ube44\ub85c \uc62e\uae30\ub824\uba74 \uadf8\uacf3\uc5d0 \uc774\ubbf8 \ubc30\uc815\ub41c \uc791\uc5c5\ub3c4 \ud655\uc778\ud574\uc57c \ud569\ub2c8\ub2e4. B\uc5d0 \ud6c4\uc18d \uacf5\uc815\uc774 \uc788\ub2e4\uba74 \uadf8 \uacf5\uc815\uc758 \uc2dc\uc791 \uc2dc\uac04\ub3c4 \ubc14\uafd4\uc57c \ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc774\uac83\uc774 \ub2e8\uc21c\ud55c \uc2dc\uac04 \uacc4\uc0b0\uacfc <a href=\"\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/finite-capacity-scheduling\/\">\uc720\ud55c \ub2a5\ub825 \uc2a4\ucf00\uc904\ub9c1<\/a>\uc758 \ucc28\uc774\uc785\ub2c8\ub2e4. \uc2dc\uac04 \uacc4\uc0b0\uc740 \uc815\ud574\uc9c4 \ubc30\uc815\ub300\ub85c \uc791\uc5c5\ud560 \ub54c \uc5b8\uc81c \ub05d\ub098\ub294\uc9c0\ub97c \uad6c\ud569\ub2c8\ub2e4. \uc2a4\ucf00\uc904\ub9c1\uc740 \uac00\uc6a9 \uc0dd\uc0b0 \ub2a5\ub825\uc744 \ucd08\uacfc\ud558\uc9c0 \uc54a\uc73c\uba74\uc11c \uc791\uc5c5\uc744 \ubc30\uce58\ud560 \uc218 \uc788\ub294 \uc2dc\uac04\uacfc \uc790\uc6d0\uc744 \ucc3e\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc2a4\ud504\ub808\ub4dc\uc2dc\ud2b8\ub85c \uc791\uc131\ud55c \uacc4\ud68d\uc744 \ubc30\ud3ec\ud558\uae30 \uc804\uc5d0 \uc124\ube44\uc640 \uc791\uc5c5\uc790\uc758 \uc911\ubcf5 \ubc30\uc815, \uc790\uc7ac, \uc120\ud589 \uacf5\uc815, \uc791\uc5c5 \uac00\ub2a5 \uc2dc\uac04\ub300, \uc644\ub8cc \uae30\ud55c\uc744 \ud655\uc778\ud558\uc138\uc694. \uc644\ub8cc\ub41c \uc791\uc5c5\uc758 \uc2e4\uc81c \uc2dc\uac04\uc744 \ubcf4\uad00\ud558\uace0 \uc2b9\uc778\ub41c \ubc84\uc804\uc744 \uba85\ud655\ud788 \ud45c\uc2dc\ud574 \uc0dd\uc0b0 \ud604\uc7a5\uc5d0\uc11c \uc624\ub798\ub41c \uc0ac\ubcf8\uc744 \ub530\ub974\uc9c0 \uc54a\ub3c4\ub85d \ud558\uc138\uc694.<\/p>\n\n\n<p>\uc774 \uc608\uc81c\uc5d0\uc11c\ub294 \uc774\ub7ec\ud55c \uc810\uac80\uc744 \uc9c1\uc811 \uc218\ud589\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ud558\uc9c0\ub9cc \uc0dd\uc0b0 \uc870\uac74\uc774 \uacc4\uc18d \ubc14\ub00c\ub294 \uacf5\uc7a5\uc5d0\uc11c\ub294 \uc601\ud5a5\uc744 \ubc1b\ub294 \ubaa8\ub4e0 \uc624\ub354\uc5d0 \ub300\ud574 \uc810\uac80\uc744 \ubc18\ubcf5\ud574\uc57c \ud569\ub2c8\ub2e4. \ubc14\ub85c \uc774 \uc77c\uc744 \uc2a4\ucf00\uc904\ub9c1 \uc2dc\uc2a4\ud15c\uc5d0 \ub9e1\uae30\ub824\ub294 \uac83\uc785\ub2c8\ub2e4. <a href=\"\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/excel-production-planning-challenges-and-the-superior-alternative-skyplanner-aps\/\">Excel \uc0dd\uc0b0 \uacc4\ud68d\uc758 \ud55c\uacc4\ub97c \ub2e4\ub8ec \uac00\uc774\ub4dc<\/a>\uc5d0\uc11c\ub294 \uc774\ub7ec\ud55c \uc720\uc9c0\u00b7\uad00\ub9ac \ubd80\ub2f4\uc774 \ucee4\uc9c0\ub294 \uc774\uc720\ub97c \ub354 \uc790\uc138\ud788 \uc0b4\ud3b4\ubd05\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\uacc4\ud68d\uc758 \ubc29\ud5a5\uc740 \uc9c1\uc811 \uc815\ud558\uace0, \uc791\uc5c5 \ubc30\uce58 \uacc4\uc0b0\uc740 SkyPlanner\uc5d0 \ub9e1\uae30\uc138\uc694<\/h2>\n\n\n<p>SkyPlanner\ub294 \uc791\uc5c5\uc7a5, \uad50\ub300 \uadfc\ubb34, \uc791\uc5c5\uc790, \uc6b0\uc120\uc21c\uc704, \uc790\uc7ac\ub97c \uc2a4\ucf00\uc904\ub9c1 \uacfc\uc815\uc5d0 \ubc18\uc601\ud569\ub2c8\ub2e4. \uc0ac\uc6a9\uc790\uac00 \uc0dd\uc0b0 \uc790\uc6d0\uacfc \uacf5\uc815 \ub370\uc774\ud130\ub97c \uc815\uc758\ud558\uba74, \uc2a4\ucf00\uc904\ub9c1 \uc778\uacf5\uc9c0\ub2a5 Arcturus\uac00 \uc124\uc815\ub41c \uc0dd\uc0b0 \ub2a5\ub825\uacfc \uacf5\uc815 \uac04 \uc758\uc874 \uad00\uacc4\uc5d0 \ub9de\ucdb0 \uc791\uc5c5 \uc21c\uc11c\ub97c \uacc4\uc0b0\ud569\ub2c8\ub2e4. \uacb0\uacfc\ub294 Gantt \ud0c0\uc784\ub77c\uc778\uc5d0 \ud45c\uc2dc\ub418\uba70, \uac01 \uc791\uc5c5\uc7a5\uc758 \uc791\uc5c5 \ub300\uae30\uc5f4\uacfc \uad00\ub828 \uacf5\uc815 \uac04 \uc5f0\uacb0 \uad00\uacc4\ub3c4 \ud655\uc778\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>M1\uc758 \uac00\ub3d9\uc774 \uc911\ub2e8\ub418\uba74 \uc0ac\uc6a9\ud560 \uc218 \uc5c6\ub294 \uc2dc\uac04\ub300\ub97c \uae30\ub85d\ud558\uace0 \uc77c\uc815\uc744 \ub2e4\uc2dc \uacc4\uc0b0\ud569\ub2c8\ub2e4. Arcturus\ub294 \uc0ac\uc6a9\uc790\uac00 \uc815\uc758\ud55c \uc790\uc6d0 \uc120\ud0dd\uc9c0\uc640 \uc81c\uc57d \uc870\uac74\uc5d0 \ub530\ub77c \uac00\uc6a9 \uc790\uc6d0\uacfc \uc2dc\uac04 \uc548\uc5d0\uc11c \uc791\uc5c5\uc744 \ubc30\uce58\ud569\ub2c8\ub2e4. \uc0ac\uc6a9\uc790\ub294 \uacb0\uacfc\ub97c \uac80\ud1a0\ud574 \uc5b4\ub5a4 \uc624\ub354\uc758 \uc644\ub8cc \uc2dc\uc810\uc5d0 \uc8fc\uc758\ub97c \uae30\uc6b8\uc5ec\uc57c \ud558\ub294\uc9c0 \ud655\uc778\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc2a4\ud504\ub808\ub4dc\uc2dc\ud2b8\uc758 \ud589\uc744 \ub530\ub77c\uac00\uba70 \uc5f0\uc1c4\uc801\uc778 \ubcc0\uacbd \uc0ac\ud56d\uc744 \uc77c\uc77c\uc774 \ucd94\uc801\ud558\ub294 \ub300\uc2e0 \uacc4\uc0b0 \uacb0\uacfc\ub97c \uac80\ud1a0\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc790\uc7ac\ub97c \uace0\ub824\ud55c \uc2a4\ucf00\uc904\ub9c1\uc744 \ud65c\uc131\ud654\ud558\uba74 \uc790\uc7ac \uac00\uc6a9\uc131\ub3c4 \uacc4\uc0b0\uc5d0 \ubc18\uc601\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc7a0\uae08 \uae30\ub2a5\uc740 \uc774\ub3d9\uc2dc\ud0a4\uace0 \uc2f6\uc9c0 \uc54a\uc740 \uc791\uc5c5\uc744 \ubcf4\ud638\ud558\uace0, \ubbf8\ub9ac \uc124\uc815\ud55c \uc6b0\uc120\uc21c\uc704\ub294 \uc5b4\ub5a4 \ub0a9\uae30 \uc57d\uc18d\uc774 \uac00\uc7a5 \uc911\uc694\ud55c\uc9c0\ub97c \ub098\ud0c0\ub0c5\ub2c8\ub2e4. <strong>\uc6b0\uc120\uc21c\uc704\ub294 \uc0ac\uc6a9\uc790\uac00 \uc815\ud558\uace0, \uc778\uacf5\uc9c0\ub2a5\uc740 \uadf8\uc5d0 \ub530\ub985\ub2c8\ub2e4.<\/strong> \uc774\ub7ec\ud55c \uacb0\uc815\uc744 \uc2e4\ud589\ud558\uae30 \uc704\ud574 \uc0ac\uc6a9\uc790\uac00 \ubaa8\ub4e0 \uc791\uc5c5\uc744 \ud558\ub098\uc529 \ubc30\uce58\ud560 \ud544\uc694\ub294 \uc5c6\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc774\uc810\uc740 \ub2e8\uc21c\ud788 \uc624\ub354 \ubaa9\ub85d\uc774 \uae54\ub054\ud574\uc9c0\ub294 \ub370 \uadf8\uce58\uc9c0 \uc54a\uc2b5\ub2c8\ub2e4. \uacf5\uc7a5 \uc0c1\ud669\uc774 \ubc14\ub00c\uc5b4\ub3c4 \ud65c\uc6a9\ud560 \uc218 \uc788\ub294 \uacc4\ud68d\uc744 \uac16\ucd94\uac8c \ub429\ub2c8\ub2e4. \uc0ac\uc6a9\uc790\ub294 \uc0dd\uc0b0 \ub2a5\ub825\uc744 \ucd94\uac00\ud560\uc9c0, \uc6b0\uc120\uc21c\uc704\ub97c \ubc14\uafc0\uc9c0, \uace0\uac1d\uacfc \ub0a9\uae30\ub97c \ud611\uc758\ud560\uc9c0 \uac19\uc740 \uc0dd\uc0b0 \uad00\ub828 \uc758\uc0ac\uacb0\uc815\uc5d0 \uc9d1\uc911\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uadf8 \uacb0\uc815\uc5d0 \ud544\uc694\ud55c \uc77c\uc815 \uacc4\uc0b0\uc740 SkyPlanner\uac00 \ucc98\ub9ac\ud569\ub2c8\ub2e4.<\/p>\n\n\n<p><a href=\"\/ko\/%ea%b8%b0%eb%8a%a5\/\">SkyPlanner\uc758 \uc2a4\ucf00\uc904\ub9c1 \uae30\ub2a5 \uc0b4\ud3b4\ubcf4\uae30<\/a>\uc5d0\uc11c Gantt, \uc790\uc6d0 \uac00\uc6a9\uc131, \uc790\ub3d9 \uc2a4\ucf00\uc904\ub9c1\uc774 \uc774\ub7ec\ud55c \uc5c5\ubb34\ub97c \uc5b4\ub5bb\uac8c \uc9c0\uc6d0\ud558\ub294\uc9c0 \ud655\uc778\ud558\uc138\uc694.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Excel\uc5d0\uc11c \ubc97\uc5b4\ub09c \ub4a4 UTU\uc5d0 \uc0dd\uae34 \ubcc0\ud654<\/h2>\n\n\n<p>UTU\uc758 Ulvila \uacf5\uc7a5\uc740 \uc804\uae30 \ubc30\uc804\ubc18\uacfc \uac1c\ud3d0\uc7a5\uce58\ub97c \uc81c\uc870\ud569\ub2c8\ub2e4. SkyPlanner\ub97c \ub3c4\uc785\ud558\uae30 \uc804\uc5d0\ub294 \uac01 \ubd80\uc11c\uac00 \uc218\ub3d9\uc73c\ub85c \uac31\uc2e0\ud558\ub294 \uc790\uccb4 Excel \uc2a4\ud504\ub808\ub4dc\uc2dc\ud2b8\ub85c \uacc4\ud68d\uc744 \uc138\uc6e0\uc2b5\ub2c8\ub2e4. ERP\uc5d0\uc11c \uc791\uc5c5 \uc21c\uc11c\ub97c \ubc14\uafd4\ub3c4 \uc0dd\uc0b0 \ud604\uc7a5\uc5d0 \ud56d\uc0c1 \uc804\ub2ec\ub418\ub294 \uac83\uc740 \uc544\ub2c8\uc5c8\uace0, \uc2e4\uc81c \uac00\uc6a9 \uc0dd\uc0b0 \ub2a5\ub825\uc744 \ud30c\uc545\ud558\uae30\ub3c4 \uc5b4\ub824\uc6e0\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\ub2e8\uc21c\ud788 \uc5f4 \ud558\ub098\uac00 \ubd80\uc871\ud574\uc11c \uc0dd\uae34 \ubb38\uc81c\uac00 \uc544\ub2c8\uc5c8\uc2b5\ub2c8\ub2e4. \uc624\ub354 \uc815\ubcf4\uc640 \uc0dd\uc0b0 \uc21c\uc11c, \uc2e4\uc81c \uc791\uc5c5\uc744 \uc218\ud589\ud558\ub294 \uc778\ub825\uc774 \uac19\uc740 \uacc4\ud68d\uc5d0 \ub9de\ucdb0 \uc6c0\uc9c1\uc774\ub3c4\ub85d \uc720\uc9c0\ud558\ub294 \uac83\uc774 \ubb38\uc81c\uc600\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>UTU\ub294 Oracle NetSuite\ub85c \uc804\ud658\ud558\ub294 \uacfc\uc815\uc5d0\uc11c SkyPlanner\ub97c \uc120\ud0dd\ud588\uc2b5\ub2c8\ub2e4. UTU\uc758 \uad6c\ucd95 \ud658\uacbd\uc5d0\uc11c SkyPlanner\ub294 NetSuite \ubc0f \uae09\uc5ec \uc2dc\uc2a4\ud15c\uacfc \uc5f0\ub3d9\ub418\uba70, \uacf5\uc7a5\uc758 \uc0dd\uc0b0 \ub77c\uc778\uacfc \ubd80\uc11c\ub97c \ud558\ub098\uc758 \uc2dc\uc2a4\ud15c\uc73c\ub85c \ud1b5\ud569\ud569\ub2c8\ub2e4. \ub2f4\ub2f9 \ud300\uc740 \uc778\uacf5\uc9c0\ub2a5 \uae30\ubc18 \uc2a4\ucf00\uc904\ub9c1\uacfc Gantt \ud0c0\uc784\ub77c\uc778\uc758 \uc870\ud569\uc744 \uc8fc\uc694 \uc7a5\uc810\uc73c\ub85c \uaf3d\uc2b5\ub2c8\ub2e4. \uc791\uc5c5 \uc21c\uc11c, \uc0dd\uc0b0 \ub2a5\ub825, \uc9c4\ud589 \uc0c1\ud669\uc744 \ud55c\ub208\uc5d0 \ubcfc \uc218 \uc788\uae30 \ub54c\ubb38\uc785\ub2c8\ub2e4.<\/p>\n\n\n<p>UTU\ub294 <strong>\uc2a4\ud504\ub808\ub4dc\uc2dc\ud2b8\ub97c \uc218\ub3d9\uc73c\ub85c \uc5c5\ub370\uc774\ud2b8\ud558\ub294 \uc2dc\uac04\uc744 \uc8fc\ub2f9 \uc57d \ub450 \uc2dc\uac04 \uc808\uc57d\ud588\ub2e4<\/strong>\uace0 \ubc1d\ud614\uc2b5\ub2c8\ub2e4. \ubcc0\uacbd\ub41c \uc791\uc5c5 \ub300\uae30\uc5f4\ub3c4 \uc218 \ucd08 \uc548\uc5d0 \uc124\uce58 \uc791\uc5c5\uc790\uc5d0\uac8c \uc804\ub2ec\ub429\ub2c8\ub2e4. \uc774\ub294 \uc591\uc2dd\ub9cc\uc73c\ub85c \uc791\uc5c5\uc744 \uad00\ub9ac\ud560 \ub54c\ubcf4\ub2e4 \uc2e4\uc9c8\uc801\uc73c\ub85c \ub098\uc544\uc9c4 \uc810\uc785\ub2c8\ub2e4. \uc0ac\ubcf8\uc744 \ucd5c\uc2e0 \uc0c1\ud0dc\ub85c \uc720\uc9c0\ud558\ub294 \uc218\uace0\ub294 \uc904\uace0, \uc2e4\uc81c \uc791\uc5c5\uc744 \uc218\ud589\ud558\ub294 \uc0ac\ub78c\ub4e4\uc740 \uc791\uc5c5 \uc21c\uc11c\ub97c \ub354 \uba85\ud655\ud558\uac8c \ud30c\uc545\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p><a href=\"\/ko\/%ea%b3%a0%ea%b0%9d-%ec%82%ac%eb%a1%80\/utu\/\">Excel\uc5d0\uc11c SkyPlanner\ub85c \uc804\ud658\ud55c UTU\uc758 \uacbd\ud5d8\uc744 \uc77d\uc5b4\ubcf4\uc138\uc694<\/a>.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\ud544\uc694\ud55c \uc785\ub825 \uc815\ubcf4\ub294 \uadf8\ub300\ub85c \ud65c\uc6a9\ud558\uace0, \uc77c\uc815\uc740 \ub9e4\ubc88 \ub2e4\uc2dc \uc9dc\uc9c0 \ub9c8\uc138\uc694.<\/h2>\n\n\n<p>\uc774 \uc591\uc2dd\uc744 \ud65c\uc6a9\ud558\uba74 \uc2a4\ucf00\uc904\ub9c1\uc5d0 \ud544\uc694\ud55c \uacf5\uc815, \uc18c\uc694 \uc2dc\uac04, \uc790\uc6d0, \uac00\uc6a9 \uc2dc\uac04, \uc644\ub8cc \uae30\ud55c\uc744 \ud30c\uc545\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc774 \uc815\ubcf4\ub97c \uc2e4\uc81c \uc77c\uc815\uc5d0 \ubc18\uc601\ud558\uae30 \uc704\ud574 Excel\uc5d0\uc11c \uac01 \uc694\uc18c\uac00 \uc11c\ub85c \ubbf8\uce58\ub294 \uc601\ud5a5\uc744 \uacc4\uc18d \uacc4\uc0b0\ud560 \ud544\uc694\ub294 \uc5c6\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p><strong>SkyPlanner\ub294 \uac1c\ubc29\ud615 REST API\ub97c \ud1b5\ud574 \uc5b4\ub5a4 ERP \ub610\ub294 MES\uc640\ub3c4 \uc5f0\ub3d9\ub429\ub2c8\ub2e4.<\/strong> \uae30\uc874 \uc2dc\uc2a4\ud15c\uc744 \uae30\ubc18\uc73c\ub85c \uc2a4\ucf00\uc904\ub9c1\uc744 \uac1c\uc120\ud558\uba74\uc11c\ub3c4, \uc6b0\uc120\uc21c\uc704\uc640 \uc0dd\uc0b0\uc5d0 \uad00\ud55c \uacb0\uc815\uc740 \uc5ec\uc804\ud788 \ub2f4\ub2f9\uc790\uac00 \ub0b4\ub9b4 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\ub300\ud45c\uc801\uc778 \uc8fc\ubb38\uc758 \uacf5\uc815 \uc21c\uc11c\uc640 \ucd5c\uadfc \uc77c\uc815\uc744 \ubcc0\uacbd\ud588\ub358 \uc0ac\ub840\ub97c \uc0dd\uac01\ud574 \ub450\uace0 <a href=\"\/ko\/%ec%98%81%ec%97%85%ed%8c%80%ec%97%90-%eb%ac%b8%ec%9d%98\/\">SkyPlanner \ub370\ubaa8\ub97c \uc608\uc57d\ud558\uc138\uc694<\/a>. \uc774 \uc0ac\ub840\ub97c \ubc14\ud0d5\uc73c\ub85c \uc5ec\ub7ec \uc791\uc5c5\uc774 \uac19\uc740 \uc124\ube44\uc640 \uc778\ub825\uc744 \ud544\uc694\ub85c \ud558\uace0 \ub0a9\uae30\uae4c\uc9c0 \ub9de\ucdb0\uc57c \ud560 \ub54c, \uc5b4\ub5bb\uac8c \uc77c\uc815\uc744 \uc7a1\uc744 \uc218 \uc788\ub294\uc9c0 \uc0b4\ud3b4\ubcf4\uc138\uc694. \ub610\ub294 <a href=\"\/ko\/%ed%8f%89%ea%b0%80%ed%8c%90\/\">\ub370\ubaa8 \ub370\uc774\ud130\ub85c SkyPlanner\ub97c \uccb4\ud5d8\ud558\uace0<\/a>, \uc790\uccb4 \ud658\uacbd \uad6c\uc131\uc744 \uacc4\ud68d\ud558\uae30 \uc804\uc5d0 Gantt\uc5d0\uc11c \uc77c\uc815\uc744 \ud655\uc778\ud574 \ubcf4\uc138\uc694.<\/p>\n\n<\/div>","protected":false},"excerpt":{"rendered":"<p>\uc81c\uc870\uc5c5 \uc0dd\uc0b0\uacc4\ud68d \uc5d1\uc140 \uc591\uc2dd: \uc2e4\uc81c\ub85c \uc2e4\ud589 \uac00\ub2a5\ud55c \uc77c\uc815 \ub9cc\ub4e4\uae30 \uc0dd\uc0b0\uacc4\ud68d \uc591\uc2dd\uc744 \uc0ac\uc6a9\ud558\uba74 \uc624\ub354\ub97c \ubb38\uc11c\uc5d0 \uc815\ub9ac\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ud558\uc9c0\ub9cc \ub354 \uc5b4\ub824\uc6b4 \ubb38\uc81c\ub294 \uadf8 \uc624\ub354\ub97c \uacf5\uc7a5\uc5d0\uc11c \uc2e4\uc81c\ub85c \ucc98\ub9ac\ud560 \uc218 \uc788\ub290\ub0d0\ub294 \uac83\uc785\ub2c8\ub2e4. \uc0ac\uc6a9 \uac00\ub2a5\ud55c \uc124\ube44\uc640 \uc801\ud569\ud55c \uc791\uc5c5\uc790\ub97c \ud655\ubcf4\ud558\uace0, \ub2e4\uc74c \uacf5\uc815\uacfc \uace0\uac1d \ub0a9\uae30\uc5d0 \ub9de\ucdb0 \uc81c\ub54c \uc791\uc5c5\ud560 \uc218 \uc788\uc5b4\uc57c \ud569\ub2c8\ub2e4. \uc0dd\uc0b0\uacc4\ud68d \uc591\uc2dd \ub2e4\uc6b4\ub85c\ub4dc(Excel\uc6a9 CSV). \uacf5\uc815\ub9c8\ub2e4 \ud55c \ud589\uc744 \uc0ac\uc6a9\ud558\ub294 \uac04\ub2e8\ud55c \uc81c\uc870 &#8230; <a title=\"\uc81c\uc870\uc5c5 \uc0dd\uc0b0\uacc4\ud68d \uc5d1\uc140 \uc591\uc2dd: \uc2e4\uc81c\ub85c \uc2e4\ud589 \uac00\ub2a5\ud55c \uc77c\uc815 \ub9cc\ub4e4\uae30\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/production-schedule-template\/\" aria-label=\"Read more about \uc81c\uc870\uc5c5 \uc0dd\uc0b0\uacc4\ud68d \uc5d1\uc140 \uc591\uc2dd: \uc2e4\uc81c\ub85c \uc2e4\ud589 \uac00\ub2a5\ud55c \uc77c\uc815 \ub9cc\ub4e4\uae30\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":97779,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2530,496],"tags":[],"class_list":["post-96112","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps--","category-496","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>\uc81c\uc870\uc5c5 \uc0dd\uc0b0\uacc4\ud68d \uc5d1\uc140 \uc591\uc2dd: \uc2e4\uc81c\ub85c \uc2e4\ud589 \uac00\ub2a5\ud55c \uc77c\uc815 \ub9cc\ub4e4\uae30<\/title>\n<meta name=\"description\" content=\"\uc0dd\uc0b0\uacc4\ud68d \uc5d1\uc140 \uc591\uc2dd\uc744 \ub0b4\ub824\ubc1b\uace0 \uc2e4\ud589 \uac00\ub2a5\ud55c \uc77c\uc815\uc758 \uc870\uac74\uacfc \uc0dd\uc0b0 \ubcc0\ud654\uc5d0 \ub300\uc751\ud558\ub294 SkyPlanner\uc758 \uacc4\ud68d \ubc29\uc2dd\uc744 \uc54c\uc544\ubcf4\uc138\uc694.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/production-schedule-template\/\" \/>\n<meta property=\"og:locale\" content=\"ko_KR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"\uc81c\uc870\uc5c5 \uc0dd\uc0b0\uacc4\ud68d \uc5d1\uc140 \uc591\uc2dd: \uc2e4\uc81c\ub85c \uc2e4\ud589 \uac00\ub2a5\ud55c \uc77c\uc815 \ub9cc\ub4e4\uae30\" \/>\n<meta property=\"og:description\" content=\"\uc0dd\uc0b0\uacc4\ud68d \uc5d1\uc140 \uc591\uc2dd\uc744 \ub0b4\ub824\ubc1b\uace0 \uc2e4\ud589 \uac00\ub2a5\ud55c \uc77c\uc815\uc758 \uc870\uac74\uacfc \uc0dd\uc0b0 \ubcc0\ud654\uc5d0 \ub300\uc751\ud558\ub294 SkyPlanner\uc758 \uacc4\ud68d \ubc29\uc2dd\uc744 \uc54c\uc544\ubcf4\uc138\uc694.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/production-schedule-template\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-04T04:30:32+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-19T14:42:42+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-template-hero-2.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\uae00\uc4f4\uc774\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/production-schedule-template\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/production-schedule-template\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"\uc81c\uc870\uc5c5 \uc0dd\uc0b0\uacc4\ud68d \uc5d1\uc140 \uc591\uc2dd: \uc2e4\uc81c\ub85c \uc2e4\ud589 \uac00\ub2a5\ud55c \uc77c\uc815 \ub9cc\ub4e4\uae30\",\"datePublished\":\"2026-10-04T04:30:32+00:00\",\"dateModified\":\"2026-10-19T14:42:42+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/production-schedule-template\\\/\"},\"wordCount\":76,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/production-schedule-template\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-schedule-template-hero-2.png\",\"articleSection\":[\"APS \ubc0f \uc2a4\ucf00\uc904\ub9c1\",\"\ub9ac\uc18c\uc2a4\"],\"inLanguage\":\"ko-KR\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/production-schedule-template\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/production-schedule-template\\\/\",\"name\":\"\uc81c\uc870\uc5c5 \uc0dd\uc0b0\uacc4\ud68d \uc5d1\uc140 \uc591\uc2dd: \uc2e4\uc81c\ub85c \uc2e4\ud589 \uac00\ub2a5\ud55c \uc77c\uc815 \ub9cc\ub4e4\uae30\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/production-schedule-template\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/production-schedule-template\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-schedule-template-hero-2.png\",\"datePublished\":\"2026-10-04T04:30:32+00:00\",\"dateModified\":\"2026-10-19T14:42:42+00:00\",\"description\":\"\uc0dd\uc0b0\uacc4\ud68d \uc5d1\uc140 \uc591\uc2dd\uc744 \ub0b4\ub824\ubc1b\uace0 \uc2e4\ud589 \uac00\ub2a5\ud55c \uc77c\uc815\uc758 \uc870\uac74\uacfc \uc0dd\uc0b0 \ubcc0\ud654\uc5d0 \ub300\uc751\ud558\ub294 SkyPlanner\uc758 \uacc4\ud68d \ubc29\uc2dd\uc744 \uc54c\uc544\ubcf4\uc138\uc694.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/production-schedule-template\\\/#breadcrumb\"},\"inLanguage\":\"ko-KR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/production-schedule-template\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"ko-KR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/production-schedule-template\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-schedule-template-hero-2.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-schedule-template-hero-2.png\",\"width\":1672,\"height\":941,\"caption\":\"Two groups of components waiting for one machining resource in a manufacturing production schedule\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/production-schedule-template\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"\uc81c\uc870\uc5c5 \uc0dd\uc0b0\uacc4\ud68d \uc5d1\uc140 \uc591\uc2dd: \uc2e4\uc81c\ub85c \uc2e4\ud589 \uac00\ub2a5\ud55c \uc77c\uc815 \ub9cc\ub4e4\uae30\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ko-KR\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ko-KR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ko-KR\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"\uc81c\uc870\uc5c5 \uc0dd\uc0b0\uacc4\ud68d \uc5d1\uc140 \uc591\uc2dd: \uc2e4\uc81c\ub85c \uc2e4\ud589 \uac00\ub2a5\ud55c \uc77c\uc815 \ub9cc\ub4e4\uae30","description":"\uc0dd\uc0b0\uacc4\ud68d \uc5d1\uc140 \uc591\uc2dd\uc744 \ub0b4\ub824\ubc1b\uace0 \uc2e4\ud589 \uac00\ub2a5\ud55c \uc77c\uc815\uc758 \uc870\uac74\uacfc \uc0dd\uc0b0 \ubcc0\ud654\uc5d0 \ub300\uc751\ud558\ub294 SkyPlanner\uc758 \uacc4\ud68d \ubc29\uc2dd\uc744 \uc54c\uc544\ubcf4\uc138\uc694.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/production-schedule-template\/","og_locale":"ko_KR","og_type":"article","og_title":"\uc81c\uc870\uc5c5 \uc0dd\uc0b0\uacc4\ud68d \uc5d1\uc140 \uc591\uc2dd: \uc2e4\uc81c\ub85c \uc2e4\ud589 \uac00\ub2a5\ud55c \uc77c\uc815 \ub9cc\ub4e4\uae30","og_description":"\uc0dd\uc0b0\uacc4\ud68d \uc5d1\uc140 \uc591\uc2dd\uc744 \ub0b4\ub824\ubc1b\uace0 \uc2e4\ud589 \uac00\ub2a5\ud55c \uc77c\uc815\uc758 \uc870\uac74\uacfc \uc0dd\uc0b0 \ubcc0\ud654\uc5d0 \ub300\uc751\ud558\ub294 SkyPlanner\uc758 \uacc4\ud68d \ubc29\uc2dd\uc744 \uc54c\uc544\ubcf4\uc138\uc694.","og_url":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/production-schedule-template\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-04T04:30:32+00:00","article_modified_time":"2026-10-19T14:42:42+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-template-hero-2.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"\uae00\uc4f4\uc774":"Jussi M\u00e4ntyl\u00e4"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/production-schedule-template\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/production-schedule-template\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"\uc81c\uc870\uc5c5 \uc0dd\uc0b0\uacc4\ud68d \uc5d1\uc140 \uc591\uc2dd: \uc2e4\uc81c\ub85c \uc2e4\ud589 \uac00\ub2a5\ud55c \uc77c\uc815 \ub9cc\ub4e4\uae30","datePublished":"2026-10-04T04:30:32+00:00","dateModified":"2026-10-19T14:42:42+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/production-schedule-template\/"},"wordCount":76,"publisher":{"@id":"https:\/\/skyplanner.ai\/ko\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/production-schedule-template\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-template-hero-2.png","articleSection":["APS \ubc0f \uc2a4\ucf00\uc904\ub9c1","\ub9ac\uc18c\uc2a4"],"inLanguage":"ko-KR"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/production-schedule-template\/","url":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/production-schedule-template\/","name":"\uc81c\uc870\uc5c5 \uc0dd\uc0b0\uacc4\ud68d \uc5d1\uc140 \uc591\uc2dd: \uc2e4\uc81c\ub85c \uc2e4\ud589 \uac00\ub2a5\ud55c \uc77c\uc815 \ub9cc\ub4e4\uae30","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ko\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/production-schedule-template\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/production-schedule-template\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-template-hero-2.png","datePublished":"2026-10-04T04:30:32+00:00","dateModified":"2026-10-19T14:42:42+00:00","description":"\uc0dd\uc0b0\uacc4\ud68d \uc5d1\uc140 \uc591\uc2dd\uc744 \ub0b4\ub824\ubc1b\uace0 \uc2e4\ud589 \uac00\ub2a5\ud55c \uc77c\uc815\uc758 \uc870\uac74\uacfc \uc0dd\uc0b0 \ubcc0\ud654\uc5d0 \ub300\uc751\ud558\ub294 SkyPlanner\uc758 \uacc4\ud68d \ubc29\uc2dd\uc744 \uc54c\uc544\ubcf4\uc138\uc694.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/production-schedule-template\/#breadcrumb"},"inLanguage":"ko-KR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/production-schedule-template\/"]}]},{"@type":"ImageObject","inLanguage":"ko-KR","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/production-schedule-template\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-template-hero-2.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-template-hero-2.png","width":1672,"height":941,"caption":"Two groups of components waiting for one machining resource in a manufacturing production schedule"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/production-schedule-template\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/ko\/"},{"@type":"ListItem","position":2,"name":"\uc81c\uc870\uc5c5 \uc0dd\uc0b0\uacc4\ud68d \uc5d1\uc140 \uc591\uc2dd: \uc2e4\uc81c\ub85c \uc2e4\ud589 \uac00\ub2a5\ud55c \uc77c\uc815 \ub9cc\ub4e4\uae30"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/ko\/#website","url":"https:\/\/skyplanner.ai\/ko\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/ko\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/ko\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ko-KR"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/ko\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/ko\/","logo":{"@type":"ImageObject","inLanguage":"ko-KR","@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"ko-KR","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-template-hero-2.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-template-hero-2-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-template-hero-2-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-template-hero-2-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-template-hero-2-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-template-hero-2-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-template-hero-2.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-template-hero-2-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/ko\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"\uc81c\uc870\uc5c5 \uc0dd\uc0b0\uacc4\ud68d \uc5d1\uc140 \uc591\uc2dd: \uc2e4\uc81c\ub85c \uc2e4\ud589 \uac00\ub2a5\ud55c \uc77c\uc815 \ub9cc\ub4e4\uae30 \uc0dd\uc0b0\uacc4\ud68d \uc591\uc2dd\uc744 \uc0ac\uc6a9\ud558\uba74 \uc624\ub354\ub97c \ubb38\uc11c\uc5d0 \uc815\ub9ac\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ud558\uc9c0\ub9cc \ub354 \uc5b4\ub824\uc6b4 \ubb38\uc81c\ub294 \uadf8 \uc624\ub354\ub97c \uacf5\uc7a5\uc5d0\uc11c \uc2e4\uc81c\ub85c \ucc98\ub9ac\ud560 \uc218 \uc788\ub290\ub0d0\ub294 \uac83\uc785\ub2c8\ub2e4. \uc0ac\uc6a9 \uac00\ub2a5\ud55c \uc124\ube44\uc640 \uc801\ud569\ud55c \uc791\uc5c5\uc790\ub97c \ud655\ubcf4\ud558\uace0, \ub2e4\uc74c \uacf5\uc815\uacfc \uace0\uac1d \ub0a9\uae30\uc5d0 \ub9de\ucdb0 \uc81c\ub54c \uc791\uc5c5\ud560 \uc218 \uc788\uc5b4\uc57c \ud569\ub2c8\ub2e4. \uc0dd\uc0b0\uacc4\ud68d \uc591\uc2dd \ub2e4\uc6b4\ub85c\ub4dc(Excel\uc6a9 CSV). \uacf5\uc815\ub9c8\ub2e4 \ud55c \ud589\uc744 \uc0ac\uc6a9\ud558\ub294 \uac04\ub2e8\ud55c \uc81c\uc870&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts\/96112","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/comments?post=96112"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts\/96112\/revisions"}],"predecessor-version":[{"id":96141,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts\/96112\/revisions\/96141"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/media\/97779"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/media?parent=96112"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/categories?post=96112"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/tags?post=96112"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}