{"id":42693,"date":"2024-09-17T07:16:46","date_gmt":"2024-09-17T07:16:46","guid":{"rendered":"https:\/\/skyplanner.ai\/%eb%b6%84%eb%a5%98%eb%90%98%ec%a7%80-%ec%95%8a%ec%9d%8c\/%ec%83%9d%ec%82%b0-%ed%9a%a8%ec%9c%a8%ec%84%b1-%ec%a0%81%ec%9d%80-%eb%85%b8%eb%a0%a5%ec%9c%bc%eb%a1%9c-%eb%8d%94-%eb%a7%8e%ec%9d%80-%ec%84%b1%ea%b3%bc-%eb%8b%ac%ec%84%b1\/"},"modified":"2026-10-19T14:42:01","modified_gmt":"2026-10-19T14:42:01","slug":"production-efficiency-achieve-more-with-less-effort","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/production-efficiency-achieve-more-with-less-effort\/","title":{"rendered":"\uc0dd\uc0b0 \ud6a8\uc728: \uacc4\uc0b0\ubd80\ud130 \uc2e4\uc9c8\uc801\uc778 \uac1c\uc120\uae4c\uc9c0"},"content":{"rendered":"<div class=\"gb-container gb-container-bf558a89 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\" id=\"production-efficiency-calculate-it-and-improve-what-matters\">\uc0dd\uc0b0 \ud6a8\uc728: \uacc4\uc0b0\ubd80\ud130 \uc2e4\uc9c8\uc801\uc778 \uac1c\uc120\uae4c\uc9c0<\/h1>\n\n\n\n<p>\uc0dd\uc0b0 \ud6a8\uc728\uc740 \ub3d9\uc77c\ud55c \uc790\uc6d0\uacfc \uce21\uc815 \uae30\uac04\uc744 \uae30\uc900\uc73c\ub85c \uc2e4\uc81c \uc0dd\uc0b0\ub7c9\uc744 \uc815\ud574\uc9c4 \ud45c\uc900\uacfc \ube44\uad50\ud558\ub294 \uc9c0\ud45c\uc785\ub2c8\ub2e4. \uc774 \ube44\uc728\uc744 \ubcf4\uba74 \ud45c\uc900 \ub300\ube44 \uc2e4\uc801 \ucc28\uc774\ub97c \ud30c\uc545\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ub2e4\uc74c\uc73c\ub85c\ub294 \uadf8 \ucc28\uc774\uac00 \uc65c \ubc1c\uc0dd\ud588\ub294\uc9c0, \uc5b4\ub5a4 \ubcc0\ud654\ub97c \uc8fc\uc5b4\uc57c \ud544\uc694\ud55c \uc791\uc5c5\uc744 \ub354 \ub9ce\uc774 \uc644\ub8cc\ud560 \uc218 \uc788\ub294\uc9c0 \ucc3e\uc544\uc57c \ud569\ub2c8\ub2e4.<\/p>\n\n\n\n<p>\ubd84\uc8fc\ud55c \uc0dd\uc0b0 \ud604\uc7a5\uc5d0\uc11c\ub294 \uc218\uce58\uc640 \uc2e4\uc81c \uc131\uacfc\ub97c \uad6c\ubd84\ud558\ub294 \uac83\uc774 \uc911\uc694\ud569\ub2c8\ub2e4. \uc5b4\ub5a4 \uc124\ube44\ub294 \ubaa9\ud45c\ub97c \ucd08\uacfc \ub2ec\uc131\ud558\uba74\uc11c\ub3c4 \ub2e4\uc74c \uacf5\uc815\uc758 \ub300\uae30 \ubb3c\ub7c9\ub9cc \ub298\ub9ac\ub294 \ubd80\ud488\uc744 \uc0dd\uc0b0\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ubc18\uba74 \ub2e4\ub978 \uc124\ube44\ub294 \uc790\uc7ac\ub098 \uc120\ud589 \uacf5\uc815\uc774 \uc900\ube44\ub418\uc9c0 \uc54a\uc544 \uba48\ucdb0 \uc788\uc744 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ubaa8\ub4e0 \uc124\ube44\ub97c \ub354 \ubc14\uc058\uac8c \ub3cc\ub9b0\ub2e4\uace0 \ud574\uc11c \uace0\uac1d \uc8fc\ubb38\uc744 \ub354 \ube68\ub9ac \ucd9c\ud558\ud560 \uc218 \uc788\ub294 \uac83\uc740 \uc544\ub2d9\ub2c8\ub2e4.<\/p>\n\n\n\n<p>\uba3c\uc800 \ub3d9\uc77c\ud55c \uae30\uc900\uc73c\ub85c \ube44\uad50\ud560 \uc218 \uc788\ub3c4\ub85d \uacc4\uc0b0\ud55c \ub4a4, \uc0dd\uc0b0 \uacfc\uc815\uc5d0\uc11c \uc190\uc2e4\uc774 \ubc1c\uc0dd\ud55c \uc6d0\uc778\uc744 \ucd94\uc801\ud558\uc138\uc694. \uacf5\uc815 \uc0ac\uc774\uc758 \ub300\uae30\uc640 \uc7a6\uc740 \uc791\uc5c5 \uc21c\uc11c \uc7ac\uc870\uc815\uc774 \ubb38\uc81c\ub77c\uba74 SkyPlanner APS\uac00 \ub3c4\uc6c0\uc774 \ub429\ub2c8\ub2e4. \ud30c\uc545\ud55c \ubb38\uc81c\ub97c \ubc14\ud0d5\uc73c\ub85c \ubaa8\ub450\uac00 \ud568\uaed8 \uc0ac\uc6a9\ud558\ub294 \uc0dd\uc0b0 \uc77c\uc815\uc744 \uac1c\uc120\ud558\uace0, \uc218\uc791\uc5c5\uc73c\ub85c \uacc4\ud68d\uc744 \uc870\uc815\ud558\ub294 \ubd80\ub2f4\uc744 \uc904\uc77c \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"what-is-production-efficiency\">\uc0dd\uc0b0 \ud6a8\uc728\uc774\ub780?<\/h2>\n\n\n\n<p>\uc81c\uc870\uc5c5\uc5d0\uc11c \uc0dd\uc0b0 \ud6a8\uc728\uc740 \uc2e4\uc81c \uc2e4\uc801\uc774 \uba85\uc2dc\ub41c \uc0dd\uc0b0 \ud45c\uc900\uc5d0 \ube44\ud574 \uc5b4\ub290 \uc218\uc900\uc778\uc9c0\ub97c \ub098\ud0c0\ub0c5\ub2c8\ub2e4. \ud45c\uc900\uc740 \uc124\ube44 1\uc2dc\uac04\ub2f9 \uc0dd\uc0b0\ub7c9\uc77c \uc218\ub3c4 \uc788\uace0, \ud2b9\uc815 \uacf5\uc815\uc5d0 \ud5c8\uc6a9\ub41c \ub178\ub3d9\uc2dc\uac04\uc77c \uc218\ub3c4 \uc788\uc2b5\ub2c8\ub2e4. \uc5b4\ub5a4 \ud45c\uc900\uc774\ub4e0 \uc2e4\uc81c\ub85c \uce21\uc815\ud558\ub294 \uc791\uc5c5\uacfc \uc790\uc6d0\uc5d0 \ub9de\uc544\uc57c \ud569\ub2c8\ub2e4.<\/p>\n\n\n\n<p>\uc774 \uc9c0\ud45c\ub97c \uc798 \ud65c\uc6a9\ud558\uba74 \uc2dc\uac04\uacfc \ub178\ub825, \uc790\uc7ac \ub0ad\ube44\ub97c \uc904\uc774\uba74\uc11c \uc591\ud488\uc744 \uc0dd\uc0b0\ud560 \uc218 \uc788\ub294 \uac1c\uc120 \uae30\ud68c\ub97c \ucc3e\uc744 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc190\uc2e4\uc744 \uc904\uc5ec \uc0dd\uc0b0\uc5d0 \uc4f8 \uc218 \uc788\ub294 \uc5ec\ub825\uc744 \ud655\ubcf4\ud558\uba74 \uc644\uc81c\ud488 \ub2e8\uc704\ub2f9 \ud22c\uc785 \ube44\uc6a9\uc744 \ub0ae\ucd94\uace0, \ub2f9\uc7a5 \uc124\ube44\ub97c \ub298\ub9ac\uc9c0 \uc54a\uace0\ub3c4 \ucd94\uac00 \uc8fc\ubb38\uc744 \ucc98\ub9ac\ud560 \uc5ec\uc720\ub97c \ub9cc\ub4e4 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n\n<p>\ud6a8\uc728 \uc218\uce58\ub9cc\uc73c\ub85c\ub294 \ud544\uc694\ud55c \uc81c\ud488\uc744 \ub9cc\ub4e4\uc5c8\ub294\uc9c0, \uc57d\uc18d\ud55c \ub0a9\uae30\ub97c \uc9c0\ucf30\ub294\uc9c0, \uc218\uc775\uc131\uc774 \uac1c\uc120\ub418\uc5c8\ub294\uc9c0 \uc54c \uc218 \uc5c6\uc2b5\ub2c8\ub2e4. \uac1c\uc120 \ud65c\ub3d9\uc740 \uc774\ub7f0 \uc131\uacfc\ub85c \uc774\uc5b4\uc838\uc57c \ud569\ub2c8\ub2e4. \uc774\ubbf8 \ub300\uae30 \ubb3c\ub7c9\uc774 \uac00\ub4dd\ud55c \uacf5\uc815\uc5d0 \ubb3c\ub7c9\uc744 \ub354 \ubcf4\ub0b4\uba74\uc11c \ub192\uc740 \ud6a8\uc728\uc744 \uae30\ub85d\ud558\ub294 \uac83\ubcf4\ub2e4, \uc624\ub298 \ub0a9\ud488\ud574\uc57c \ud558\ub294 \uc8fc\ubb38\uc744 \uac00\ub85c\ub9c9\ub294 \ub300\uae30\ub97c \uc5c6\uc560\ub294 \ud3b8\uc774 \ub354 \uac00\uce58 \uc788\uc744 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"how-to-calculate-production-efficiency\">\uc0dd\uc0b0 \ud6a8\uc728 \uacc4\uc0b0 \ubc29\ubc95<\/h2>\n\n\n\n<p>\uc0dd\uc0b0\ub7c9\uc744 \uae30\uc900\uc73c\ub85c \uacc4\uc0b0\ud560 \ub54c\ub294 \uc77c\ubc18\uc801\uc73c\ub85c \ub2e4\uc74c \uacf5\uc2dd\uc744 \uc0ac\uc6a9\ud569\ub2c8\ub2e4.<\/p>\n\n\n\n<p><strong>\uc0dd\uc0b0 \ud6a8\uc728(%) = \uc2e4\uc81c \uc0dd\uc0b0\ub7c9 \u00f7 \ud45c\uc900 \uc0dd\uc0b0\ub7c9 \u00d7 100<\/strong><\/p>\n\n\n\n<p>\ud45c\uc900 \uc0dd\uc0b0\ub7c9\uc740 \uc120\ud0dd\ud55c \ud45c\uc900\uc744 \ub3d9\uc77c\ud55c \uce21\uc815 \uae30\uac04\uc5d0 \uc801\uc6a9\ud588\uc744 \ub54c\uc758 \uc0dd\uc0b0\ub7c9\uc785\ub2c8\ub2e4. \uc2dc\uac04\ub2f9 \uc0dd\uc0b0\ub7c9\uc73c\ub85c \ube44\uad50\ud55c\ub2e4\uba74 \uc2e4\uc81c \uc2dc\uac04\ub2f9 \uc0dd\uc0b0\ub7c9\uc744 \ud45c\uc900 \uc2dc\uac04\ub2f9 \uc0dd\uc0b0\ub7c9\uc73c\ub85c \ub098\ub204\uc138\uc694. \uc81c\ud488, \uc790\uc6d0, \uc2dc\uac04 \uae30\uc900\uc740 \uc77c\uad00\ub418\uac8c \uc720\uc9c0\ud574\uc57c \ud569\ub2c8\ub2e4.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"a-worked-example\">\uacc4\uc0b0 \uc608\uc2dc<\/h3>\n\n\n\n<p>\uc124\ube44 \uc2dc\uac04\ub2f9 \uc591\ud488 50\uac1c\ub97c \uc0dd\uc0b0\ud558\ub294 \uac83\uc73c\ub85c \uae30\uc900\uc744 \ud569\uc758\ud55c \uae30\uacc4\uac00\uacf5 \uacf5\uc815\uc744 \uac00\uc815\ud574 \ubcf4\uaca0\uc2b5\ub2c8\ub2e4. \uc608\uc815\ub41c \ud734\uac8c\uc2dc\uac04\uc744 \uc81c\uc678\ud55c \uc5ec\uc12f \uc2dc\uac04\uc758 \uc0dd\uc0b0 \uc2dc\uac04\uc744 \uce21\uc815\ud569\ub2c8\ub2e4. \uc774 \uc2dc\uac04 \uc548\uc5d0 \ubc1c\uc0dd\ud558\ub294 \uc791\uc5c5 \uc900\ube44, \ub300\uae30, \uc815\uc9c0\ub294 \ubaa8\ub450 \ud3ec\ud568\ud569\ub2c8\ub2e4. \uc774 \uacf5\uc815\uc5d0\uc11c \uc5ec\uc12f \uc2dc\uac04 \ub3d9\uc548 \uc0dd\uc0b0\ud55c \uc591\ud488\uc740 240\uac1c\uc785\ub2c8\ub2e4.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>\uacc4\uc0b0 \ud56d\ubaa9<\/th><th>\uacb0\uacfc<\/th><\/tr><\/thead><tbody><tr><td>\ud45c\uc900 \uc0dd\uc0b0\ub7c9: \uc2dc\uac04\ub2f9 50\uac1c \u00d7 6\uc2dc\uac04<\/td><td>300\uac1c<\/td><\/tr><tr><td>\uc2e4\uc81c \uc591\ud488 \uc0dd\uc0b0\ub7c9<\/td><td>240\uac1c<\/td><\/tr><tr><td>\uc0dd\uc0b0 \ud6a8\uc728: 240 \u00f7 300 \u00d7 100<\/td><td>80%<\/td><\/tr><tr><td>\uc2e4\uc81c \uc2dc\uac04\ub2f9 \uc0dd\uc0b0\ub7c9: 240 \u00f7 6<\/td><td>\uc2dc\uac04\ub2f9 40\uac1c<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p>\ud574\ub2f9 \uc0dd\uc0b0 \uc2dc\uac04 \ub3d9\uc548 \uae30\uc900 \uc18d\ub3c4\ub85c \uc0dd\uc0b0\ud560 \uc218 \uc788\ub294 \ubb3c\ub7c9\uc758 80%\ub97c \ub2ec\uc131\ud55c \uac83\uc785\ub2c8\ub2e4. \uc2dc\uac04\ub2f9 \uc0dd\uc0b0\ub7c9\uc744 \ube44\uad50\ud574\ub3c4 \uacb0\uacfc\ub294 \uac19\uc2b5\ub2c8\ub2e4. 40 \u00f7 50 \u00d7 100 = 80%\uc785\ub2c8\ub2e4.<\/p>\n\n\n\n<p>\ud45c\uc900\uacfc\uc758 \ucc28\uc774\ub294 60\uac1c\uc774\uba70, \uae30\uc900 \uc18d\ub3c4\ub85c \ud658\uc0b0\ud558\uba74 1.2\uc2dc\uac04\uc5d0 \ud574\ub2f9\ud558\ub294 \ubb3c\ub7c9\uc785\ub2c8\ub2e4. \uadf8\ub807\ub2e4\uace0 \uc124\ube44\uac00 \uc2e4\uc81c\ub85c 1.2\uc2dc\uac04 \ub3d9\uc548 \uc26c\uc5c8\ub2e4\uac70\ub098, \uc77c\uc815\ub9cc \ubc14\uafb8\uba74 \uadf8 \ubb3c\ub7c9\uc744 \uc804\ubd80 \ud68c\ubcf5\ud560 \uc218 \uc788\ub2e4\ub294 \ub73b\uc740 \uc544\ub2d9\ub2c8\ub2e4. \uc774 \ucc28\uc774\uc5d0\ub294 \uc791\uc5c5 \uc900\ube44, \ub300\uae30, \uc800\uc18d \uc6b4\uc804, \ubd88\ub7c9 \ub4f1\uc758 \uc190\uc2e4\uc774 \ud568\uaed8 \ubc18\uc601\ub418\uc5b4 \uc788\uc744 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ubb34\uc5c7\uc744 \uac1c\uc120\ud560\uc9c0 \ud310\ub2e8\ud558\ub824\uba74 \uc0dd\uc0b0 \uae30\ub85d\uc744 \ud655\uc778\ud574\uc57c \ud569\ub2c8\ub2e4.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"make-the-comparison-meaningful\">\ube44\uad50 \uae30\uc900\uc744 \uba85\ud655\ud788 \uc815\ud558\uae30<\/h3>\n\n\n\n<p>\ud6a8\uc728 \uc218\uce58\ub97c \ubc14\ud0d5\uc73c\ub85c \uc870\uce58\ud558\uae30 \uc804\uc5d0, \uacc4\uc0b0\uc5d0 \ubb34\uc5c7\uc744 \ud3ec\ud568\ud560\uc9c0 \ud569\uc758\ud558\uc138\uc694.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>\uc0dd\uc0b0\ub7c9\uc758 \uc9d1\uacc4 \ubc94\uc704.<\/strong> \ud55c \uacf5\uc815\uc5d0\uc11c \ub098\uc628 \uc591\ud488\uc744 \uc140 \uac83\uc778\uc9c0, \ucd9c\ud558 \uc900\ube44\uac00 \ub05d\ub09c \uc644\uc81c\ud488\uc744 \uc140 \uac83\uc778\uc9c0 \uc815\ud558\uc138\uc694. \ubbf8\uc644\ub8cc \uc791\uc5c5\uc744 \uc644\ub8cc \uc0dd\uc0b0\ub7c9\uc5d0 \ub123\uac70\ub098, \uc7ac\uc791\uc5c5 \ud6c4 \ud569\uaca9\ud55c \ub3d9\uc77c \ubd80\ud488\uc744 \ub450 \ubc88 \uc9d1\uacc4\ud574\uc11c\ub294 \uc548 \ub429\ub2c8\ub2e4.<\/li>\n\n<li><strong>\uc790\uc6d0\uacfc \uc2dc\uac04\uc758 \uce21\uc815 \ubc94\uc704.<\/strong> \uc124\ube44\uc2dc\uac04, \uc791\uc5c5\uc790 \ud22c\uc785\uc2dc\uac04, \uacbd\uacfc\uc2dc\uac04\uc740 \uc11c\ub85c \ub2e4\ub978 \uac12\uc785\ub2c8\ub2e4. \uce21\uc815 \uae30\uac04\uc5d0 \uc791\uc5c5 \uc900\ube44, \ub300\uae30, \uc815\uc9c0\ub97c \ud3ec\ud568\ud558\ub294\uc9c0 \uba85\uc2dc\ud558\uc138\uc694. \uc124\ube44\uac00 \uac00\ub3d9 \uc911\uc77c \ub54c\ub9cc \uc2dc\uac04\ub2f9 \uc0dd\uc0b0\ub7c9\uc744 \uce21\uc815\ud558\uba74 \uc815\uc9c0 \uc911\uc5d0 \ubc1c\uc0dd\ud55c \uc190\uc2e4\uc740 \ub4dc\ub7ec\ub098\uc9c0 \uc54a\uc2b5\ub2c8\ub2e4.<\/li>\n\n<li><strong>\uc801\uc6a9\ud560 \ud45c\uc900.<\/strong> \uc5b4\ub5a4 \uc81c\ud488, \uc791\uc5c5 \ubc29\ubc95, \uc790\uc6d0\uc5d0 \uc801\uc6a9\ub418\ub294 \ud45c\uc900\uc778\uc9c0, \uc5b4\ub5a4 \uadfc\uac70\ub85c \uc815\ud588\uc73c\uba70 \uc5b8\uc81c \uac1c\uc815\ud588\ub294\uc9c0 \uae30\ub85d\ud558\uc138\uc694. \uacfc\uac70\uc758 \ud3c9\uade0\uac12\uacfc \uc774\uc0c1\uc801\uc778 \uac00\ub3d9 \uc18d\ub3c4\ub294 \uc11c\ub85c \uac19\uc740 \uae30\ub300 \uc218\uc900\uc744 \ub098\ud0c0\ub0b4\uc9c0 \uc54a\uc2b5\ub2c8\ub2e4.<\/li>\n<\/ul>\n\n\n\n<p>\uc544\uc9c1 \uacf5\uc815\uc5d0 \ud0c0\ub2f9\ud55c \uadfc\uac70\ub97c \uac16\ucd98 \ud45c\uc900\uc774 \uc5c6\ub2e4\uba74, \ud6a8\uc728 \uc218\uce58\ub85c \ud300\uc774\ub098 \uacf5\uc7a5\uc744 \ube44\uad50\ud558\uae30 \uc804\uc5d0 \uba3c\uc800 \ud45c\uc900\uc744 \uc218\ub9bd\ud558\uc138\uc694. <a href=\"\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/manufacturing-time-study\/\">\ud45c\uc900\uc2dc\uac04 \uc0b0\uc815<\/a> \uac00\uc774\ub4dc\uc5d0\uc11c \uad00\uce21\ud55c \uc791\uc5c5\uc744 \uc2e4\uc81c\ub85c \ud65c\uc6a9\ud560 \uc218 \uc788\ub294 \ud45c\uc900\uc73c\ub85c \ub9cc\ub4dc\ub294 \ubc29\ubc95\uc744 \uc124\uba85\ud569\ub2c8\ub2e4.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"what-if-you-make-several-products\">\uc5ec\ub7ec \uc81c\ud488\uc744 \uc0dd\uc0b0\ud55c\ub2e4\uba74?<\/h3>\n\n\n\n<p>\uc81c\ud488\ub9c8\ub2e4 \uc0dd\uc0b0\uc5d0 \uac78\ub9ac\ub294 \uc2dc\uac04\uc774 \ud06c\uac8c \ub2e4\ub974\uba74 \ub2e8\uc21c\ud788 \uc218\ub7c9\ub9cc \ube44\uad50\ud574\uc11c\ub294 \uc2e4\uc801\uc744 \uc81c\ub300\ub85c \ud30c\uc545\ud560 \uc218 \uc5c6\uc2b5\ub2c8\ub2e4. \uc2dc\uac04\uc744 \uae30\uc900\uc73c\ub85c \ube44\uad50\ud558\uba74 \uc11c\ub85c \ub2e4\ub978 \uc81c\ud488\ub3c4 \ub3d9\uc77c\ud55c \uc790\uc6d0\u00b7\uc2dc\uac04 \uae30\uc900\uc73c\ub85c \ud658\uc0b0\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n\n<p><strong>\ud6a8\uc728(%) = \uc591\ud488 \uc0dd\uc0b0\ub7c9\uc744 \ud45c\uc900\uc2dc\uac04\uc73c\ub85c \ud658\uc0b0\ud55c \uc2dc\uac04 \u00f7 \uc2e4\uc81c \uc0ac\uc6a9 \uc2dc\uac04 \u00d7 100<\/strong><\/p>\n\n\n\n<p>\uc591\ud488 \uc0dd\uc0b0\ub7c9\uc744 \ud45c\uc900\uc2dc\uac04\uc73c\ub85c \ud658\uc0b0\ud558\ub824\uba74 \uac01 \uc81c\ud488\uc758 \uc591\ud488 \uc218\ub7c9\uc5d0 \ud574\ub2f9 \uc81c\ud488\uc758 \ud45c\uc900\uc2dc\uac04\uc744 \uacf1\ud55c \ub4a4 \ubaa8\ub450 \ub354\ud569\ub2c8\ub2e4. \uc2dc\uac04 \uae30\uc900\uc740 \uc77c\uce58\uc2dc\ucf1c\uc57c \ud569\ub2c8\ub2e4. \ud45c\uc900 \ub178\ub3d9\uc2dc\uac04\uc740 \uc2e4\uc81c \ub178\ub3d9\uc2dc\uac04\uacfc \ube44\uad50\ud574\uc57c \ud558\uba70, \uc124\ube44\uc758 \uacbd\uacfc\uc2dc\uac04\uacfc \ube44\uad50\ud574\uc11c\ub294 \uc548 \ub429\ub2c8\ub2e4. \uc791\uc5c5 \uc900\ube44\uc2dc\uac04\uacfc \uc5ec\uc720\uc2dc\uac04\ub3c4 \ube44\uad50 \uc804\ubc18\uc5d0 \uac78\uccd0 \uac19\uc740 \uae30\uc900\uc73c\ub85c \ucc98\ub9ac\ud558\uc138\uc694.<\/p>\n\n\n\n<p>\uc5ec\ub7ec \uc2e4\uc801\uc744 \ud569\uc0b0\ud560 \ub54c\ub294 \ube44\uad50 \uac00\ub2a5\ud55c \ud45c\uc900\uc2dc\uac04\uacfc \uc2e4\uc81c \uc0ac\uc6a9 \uc2dc\uac04\uc744 \uac01\uac01 \ub354\ud55c \ub2e4\uc74c \ub098\ub204\uc138\uc694. \uc791\uc5c5\ub7c9\uc774 \uc11c\ub85c \ub2e4\ub978 \uacf5\uc815\uc758 \ud6a8\uc728\uc744 \ub2e8\uc21c \ud3c9\uade0\ud574\uc11c\ub294 \uc548 \ub429\ub2c8\ub2e4.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"production-efficiency-productivity-utilization-and-oee\">\uc0dd\uc0b0 \ud6a8\uc728, \uc0dd\uc0b0\uc131, \uac00\ub3d9\ub960, OEE\uc758 \ucc28\uc774<\/h2>\n\n\n\n<p>\uac01 \uc9c0\ud45c\uac00 \uc54c\ub824 \uc8fc\ub294 \ub0b4\uc6a9\uc740 \uc11c\ub85c \ub2e4\ub985\ub2c8\ub2e4. \uc5b4\ub5a4 \uc9c0\ud45c\uac00 \ud544\uc694\ud55c\uc9c0 \uc54c\uc544\uc57c \ubcf4\uace0\uc11c\uc758 \uc218\uce58\ub97c \ubcf4\uae30 \uc88b\uac8c \ub9cc\ub4dc\ub294 \uc77c\uc774 \uc798\ubabb\ub41c \uc0dd\uc0b0 \ubaa9\ud45c\ub85c \uc774\uc5b4\uc9c0\ub294 \uac83\uc744 \ub9c9\uc744 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>\uc9c0\ud45c<\/th><th>\uc54c \uc218 \uc788\ub294 \ub0b4\uc6a9<\/th><\/tr><\/thead><tbody><tr><td>\uc0dd\uc0b0 \ud6a8\uc728<\/td><td>\uc2e4\uc81c \uc2e4\uc801\uc740 \uc815\ud574\uc9c4 \ud45c\uc900\uc5d0 \ube44\ud574 \uc5b4\ub290 \uc218\uc900\uc778\uac00?<\/td><\/tr><tr><td>\uc0dd\uc0b0\uc131<\/td><td>\ub178\ub3d9\uc2dc\uac04, \uc5d0\ub108\uc9c0, \ube44\uc6a9 \ub4f1 \ud22c\uc785 \ub2e8\uc704\ub2f9 \uc5bc\ub9c8\ub098 \uc0dd\uc0b0\ud588\ub294\uac00?<\/td><\/tr><tr><td>\uac00\ub3d9\ub960<\/td><td>\uc815\ud574\uc9c4 \uc0ac\uc6a9 \uae30\uc900\uc5d0 \ub530\ub77c, \uc790\uc6d0\uc758 \uac00\uc6a9 \uc2dc\uac04 \uc911 \uc5bc\ub9c8\ub098 \uc0ac\uc6a9\ud588\ub294\uac00?<\/td><\/tr><tr><td>\uc124\ube44\uc885\ud569\ud6a8\uc728(OEE)<\/td><td>\uacc4\ud68d \uc0dd\uc0b0 \uc2dc\uac04 \uc911 \uc774\uc0c1\uc801\uc778 \uc18d\ub3c4\ub85c \uc7ac\uc791\uc5c5 \uc5c6\uc774 \uc591\ud488\uc744 \uc0dd\uc0b0\ud55c \uc2dc\uac04\uc758 \ube44\uc911\uc740 \uc5bc\ub9c8\uc778\uac00?<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p>\uc0dd\uc0b0\uc131\uc740 \ub2e8\uc21c\ud55c \uc0dd\uc0b0 \uc218\ub7c9\uc774 \uc544\ub2d9\ub2c8\ub2e4. \uc778\ub825\uc744 \ub354 \ub9ce\uc774 \ud22c\uc785\ud574 \uc0dd\uc0b0\uc744 \ub298\ub9ac\uba74 \ucd1d\uc0dd\uc0b0\ub7c9\uc740 \uc99d\uac00\ud574\ub3c4 \ub178\ub3d9\uc2dc\uac04\ub2f9 \uc0dd\uc0b0\ub7c9\uc740 \uc904\uc5b4\ub4e4 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ubc18\uba74 \ud6a8\uc728\uc5d0\ub294 \ube44\uad50 \uae30\uc900\uc774 \uc788\uc2b5\ub2c8\ub2e4. \ud574\ub2f9 \uc791\uc5c5\uc758 \ud45c\uc900\uc5d0 \ube44\ud574 \uc2e4\uc801\uc774 \uc5b4\ub290 \uc218\uc900\uc778\uc9c0\ub97c \ubcf4\uc5ec \uc90d\ub2c8\ub2e4.<\/p>\n\n\n\n<p>\uac00\ub3d9\ub960\uc740 \uc790\uc6d0\uc774 \uc5bc\ub9c8\ub098 \ubc14\uc058\uac8c \uac00\ub3d9\ub418\uc5c8\ub294\uc9c0\ub97c \ubcf4\uc5ec \uc904 \ubfd0, \uac00\uc7a5 \ud544\uc694\ud55c \uc791\uc5c5\uc744 \ud588\ub294\uc9c0\uae4c\uc9c0 \uc54c\ub824 \uc8fc\uc9c0\ub294 \uc54a\uc2b5\ub2c8\ub2e4. \ubcd1\ubaa9\uc774 \uc544\ub2cc \uc124\ube44\ub97c \uacc4\uc18d \ub3cc\ub9ac\uba74 \uc644\uc81c\ud488 \uc0dd\uc0b0\ub7c9\uc744 \uc81c\ud55c\ud558\ub294 \uacf5\uc815\uc5d0\ub294 \ub3c4\uc6c0\uc774 \ub418\uc9c0 \uc54a\uace0 \uc7ac\uace0\ub9cc \ub298\uc5b4\ub0a0 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc218\uc694, \uc120\ud6c4\ud589 \uad00\uacc4, \ub2e4\uc74c \uacf5\uc815\uc758 \uc0c1\ud669\uc744 \uace0\ub824\ud560 \ub54c \ucd94\uac00 \uc0dd\uc0b0\uc774 \ud544\uc694\ud558\uc9c0 \uc54a\ub2e4\uba74 \uc5b4\ub290 \uc815\ub3c4 \uc5ec\uc720 \uc2dc\uac04\uc744 \ub450\ub294 \uac83\uc774 \ud569\ub9ac\uc801\uc77c \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n\n<p>OEE\uc5d0\ub294 \uc815\ud574\uc9c4 \uacc4\uc0b0\uc2dd\uc774 \uc788\uc2b5\ub2c8\ub2e4. <strong>\uc2dc\uac04\uac00\ub3d9\ub960 \u00d7 \uc131\ub2a5\uac00\ub3d9\ub960 \u00d7 \uc591\ud488\ub960<\/strong>\uc785\ub2c8\ub2e4. \uacc4\ud68d \uc0dd\uc0b0 \uc2dc\uac04\uacfc \uc774\uc0c1\uc801\uc778 \uc0ac\uc774\ud074 \ud0c0\uc784\uc744 \uae30\uc900\uc73c\ub85c \uc815\uc9c0, \uc18d\ub3c4 \uc800\ud558, \ubd88\ub7c9\uc5d0 \ub530\ub978 \uc190\uc2e4\uc744 \uad6c\ubd84\ud569\ub2c8\ub2e4. \ub2e4\ub978 \uc0dd\uc0b0 \ud45c\uc900\uc73c\ub85c \uacc4\uc0b0\ud55c \uc77c\ubc18\uc801\uc778 \ud6a8\uc728 \uc218\uce58\ub97c \uace7\ubc14\ub85c OEE\ub85c \ubcfc \uc218\ub294 \uc5c6\uc2b5\ub2c8\ub2e4. \uc124\ube44 \uc190\uc2e4\uc744 \ubd84\uc11d\ud558\ub824\uba74 \ud558\ub098\uc758 \ube44\uc728\ub9cc\uc73c\ub85c \uc9c4\ub2e8\ud558\uc9c0 \ub9d0\uace0 \uac01 \uc190\uc2e4 \uc694\uc778\uc744 \ub530\ub85c \ud655\uc778\ud560 \uc218 \uc788\uc5b4\uc57c \ud569\ub2c8\ub2e4.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"how-to-improve-production-efficiency-fix-the-loss-behind-the-number\">\uc0dd\uc0b0 \ud6a8\uc728 \uac1c\uc120 \ubc29\ubc95: \uc218\uce58 \ub4a4\uc5d0 \uc228\uc740 \uc190\uc2e4 \ud574\uacb0\ud558\uae30<\/h2>\n\n\n\n<p>\uc644\ub8cc\ud574\uc57c \ud560 \uc791\uc5c5\uc5d0 \uc2e4\uc9c8\uc801\uc778 \uc601\ud5a5\uc744 \ubbf8\uce58\ub294 \uc81c\ud488\uad70\uc774\ub098 \uacf5\uc815\ubd80\ud130 \uc0b4\ud3b4\ubcf4\uc138\uc694. \ube44\uad50 \uae30\uc900\uc744 \ud655\uc778\ud55c \ub2e4\uc74c, \uacb0\uacfc\uc758 \ubc14\ud0d5\uc774 \ub41c \uc791\uc5c5\uacfc \uc2dc\uac04 \uae30\ub85d\uc744 \uac80\ud1a0\ud558\uc138\uc694. \uc2e4\uc81c \uc791\uc5c5\uc790\uc640\ub3c4 \uc774\uc57c\uae30\ud574 \ubcf4\uc138\uc694. \uc791\uc5c5\uc774 \uc624\ub798 \uac78\ub9ac\ub294 \uc774\uc720\ub294 \uae4c\ub2e4\ub85c\uc6b4 \uc900\ube44 \uc791\uc5c5, \uc815\ubcf4 \ub204\ub77d, \uc790\uc7ac \ub300\uae30, \uc7a6\uc740 \uc124\ube44 \uc774\uc0c1 \ub4f1 \ub2e4\uc591\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc6d0\uc778\ub9c8\ub2e4 \ub300\uc751 \ubc29\ubc95\ub3c4 \ub2ec\ub77c\uc57c \ud569\ub2c8\ub2e4.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"remove-avoidable-waits-and-sequence-conflicts\">\ubd88\ud544\uc694\ud55c \ub300\uae30\uc640 \uc791\uc5c5 \uc21c\uc11c \ucda9\ub3cc \uc5c6\uc560\uae30<\/h3>\n\n\n\n<p>\ubd80\ud488\uc774 \uc5c6\uac70\ub098 \uc120\ud589 \uacf5\uc815\uc774 \ub05d\ub098\uc9c0 \uc54a\uc740 \uac83 \uc678\uc5d0\ub294 \ubaa8\ub4e0 \uc900\ube44\uac00 \ub418\uc5b4 \uc788\ub2e4\uba74, \uc791\uc5c5\uc790\uc5d0\uac8c \ub354 \ube68\ub9ac \uc77c\ud558\ub77c\uace0 \ud574\ub3c4 \ub300\uae30\ub294 \ud574\uacb0\ub418\uc9c0 \uc54a\uc2b5\ub2c8\ub2e4. \uc790\uc7ac \uc900\ube44 \uc0c1\ud0dc, \uacf5\uc815 \uac04 \uc120\ud6c4\ud589 \uad00\uacc4, \uc5ec\ub7ec \uc791\uc5c5\uc774 \ud568\uaed8 \uc0ac\uc6a9\ud558\ub294 \uc0dd\uc0b0 \ub2a5\ub825\uc774 \uc77c\uc815\uc5d0 \ubc18\uc601\ub418\uc5b4 \uc788\ub294\uc9c0 \ud655\uc778\ud558\uc138\uc694.<\/p>\n\n\n\n<p>\uc870\ub9bd\ud300\uc740 \ubd80\ud488\uc744 \uae30\ub2e4\ub9ac\ub294\ub370 \uae30\uacc4\uac00\uacf5 \uacf5\uc815\uc740 \ub35c \uae09\ud55c \ubc30\uce58\ub97c \uc0dd\uc0b0\ud558\ub290\ub77c \ubc14\uc05c \uc0c1\ud669\uc744 \uac00\uc815\ud574 \ubcf4\uaca0\uc2b5\ub2c8\ub2e4. \uae30\uacc4\uac00\uacf5\uc758 \uc0dd\uc0b0\ub7c9\ub9cc \ub298\ub9ac\uba74 \ud6a8\uc728\uc801\uc73c\ub85c \ubcf4\uc77c \uc218\ub294 \uc788\uc5b4\ub3c4 \uc870\ub9bd\ud300\uc740 \uacc4\uc18d \ub300\uae30\ud558\uac8c \ub429\ub2c8\ub2e4. \ud544\uc694\ud55c \uc8fc\ubb38\uc758 \uc0dd\uc0b0\uc774 \uc9c4\ud589\ub418\ub3c4\ub85d \ud574\ub2f9 \ubd80\ud488\uc758 \uac00\uacf5 \uc21c\uc11c\ub97c \uc55e\ub2f9\uae30\ub294 \ud3b8\uc774 \ub354 \uc720\uc6a9\ud55c \uac1c\uc120\uc77c \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n\n<p>\ubc14\ub85c \uc774\ub7f0 \uc0c1\ud669\uc5d0\uc11c \uacf5\ud1b5 \uc77c\uc815\uc5d0 \ub530\ub978 \uc0dd\uc0b0 \uc2a4\ucf00\uc904\ub9c1\uc774 \uc9c1\uc811\uc801\uc778 \ud6a8\uacfc\ub97c \ub0c5\ub2c8\ub2e4. SkyPlanner\ub294 \uc11c\ub85c \uc5f0\uacb0\ub41c \uacf5\uc815\uc758 \uc77c\uc815\uc744 \ud568\uaed8 \uc218\ub9bd\ud569\ub2c8\ub2e4. \uac01 \uc791\uc5c5\uc7a5\uc774 \uc790\uccb4 \uc0dd\uc0b0\ub7c9 \ubaa9\ud45c\ub9cc \ucd94\uad6c\ud558\ub294 \ub300\uc2e0, \uc6b0\uc120\uc21c\uc704\uc640 \uacf5\uc815 \uac04 \uc120\ud6c4\ud589 \uad00\uacc4\uc5d0 \ub530\ub77c \uc791\uc5c5 \uc21c\uc11c\uac00 \uc815\ud574\uc9d1\ub2c8\ub2e4.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"reduce-setup-and-process-losses\">\uc791\uc5c5 \uc900\ube44\uc640 \uacf5\uc815 \uc190\uc2e4 \uc904\uc774\uae30<\/h3>\n\n\n\n<p>\uae30\ub85d\uc5d0\uc11c \ud488\ubaa9 \uad50\uccb4\uac00 \ubc18\ubcf5\ub418\ub294 \uac83\uc73c\ub85c \ub098\ud0c0\ub098\uba74 \uc124\ube44\ub97c \uba48\ucd94\uae30 \uc804\uc5d0 \uacf5\uad6c\uc640 \uc790\uc7ac\ub97c \uc900\ube44\ud558\uace0, \uc791\uc5c5\uc744 \uc5b4\ub5a4 \uae30\uc900\uc73c\ub85c \ubb36\ub294\uc9c0 \uac80\ud1a0\ud558\uc138\uc694. \uc900\ube44 \uc870\uac74\uc774 \ube44\uc2b7\ud55c \uc791\uc5c5\uc744 \ubb36\uc5b4 \uc0dd\uc0b0\ud558\uba74 \uc900\ube44 \uc190\uc2e4\uc744 \uc904\uc77c \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ud558\uc9c0\ub9cc \ub2e4\ub978 \uacf5\uc815\uc758 \uae34\uae09 \uc791\uc5c5\uc774 \uc9c0\uc5f0\ub41c\ub2e4\uba74, \ubc30\uce58 \uaddc\ubaa8\ub97c \ucd5c\ub300\ud55c \ud0a4\uc6b0\ub294 \uac83\uc774 \ubc18\ub4dc\uc2dc \ucd5c\uc120\uc740 \uc544\ub2d9\ub2c8\ub2e4.<\/p>\n\n\n\n<p>\uc800\uc18d \uc6b4\uc804, \ubd88\ub7c9, \ubc18\ubcf5 \uace0\uc7a5\uc774 \uc8fc\ub41c \uc190\uc2e4\uc774\ub77c\uba74 \uad00\ub828 \uc791\uc5c5 \ubc29\ubc95, \uc124\uc815\uac12, \uad50\uc721, \uacf5\uad6c, \uc720\uc9c0\ubcf4\uc218 \uc0c1\ud0dc\ub97c \uc870\uc0ac\ud558\uc138\uc694. \uc6d0\uc778\uc744 \ud574\uacb0\ud55c \ub4a4 \ub2ec\ub77c\uc9c4 \uacf5\uc815\uc774\ub098 \uc790\uc6d0 \uac00\uc6a9\uc131\uc744 \uacc4\ud68d\uc5d0 \ubc18\uc601\ud558\uc138\uc694. \uc791\uc5c5 \uc21c\uc11c\ub97c \ubc14\uafb8\ub294 \uac83\uc73c\ub85c \ubc18\ubcf5\ub418\ub294 \uace0\uc7a5\uc758 \uc218\ub9ac\ub97c \ub300\uc2e0\ud560 \uc218\ub294 \uc5c6\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"prioritize-the-effect-on-completed-work\">\uc791\uc5c5 \uc644\ub8cc\uc5d0 \ub354 \ub3c4\uc6c0\uc774 \ub418\ub294 \uac1c\uc120\ubd80\ud130 \uc120\ud0dd\ud558\uae30<\/h3>\n\n\n\n<p>\ud544\uc694\ud55c \uc0dd\uc0b0\ub7c9\uc744 \ub2ec\uc131\ud558\ub294 \ub370 \uc2e4\uc9c8\uc801\uc778 \uac78\ub9bc\ub3cc\uc774 \ub418\ub294 \ubb38\uc81c\ubd80\ud130 \uac1c\uc120\ud558\uc138\uc694. \ub2e4\uc74c \uacf5\uc815\uc758 \uc9c4\ud589\uc744 \ub9c9\ub294 \uc790\uc6d0\uc5d0\uc11c \uba87 \ubd84\uc744 \ud655\ubcf4\ud558\ub294 \uac83\uc774, \uc774\ubbf8 \uc0dd\uc0b0 \uc5ec\ub825\uc774 \ucda9\ubd84\ud55c \uacf3\uc5d0\uc11c \ub354 \ub9ce\uc740 \uc2dc\uac04\uc744 \uc808\uc57d\ud558\ub294 \uac83\ubcf4\ub2e4 \uac00\uce58 \uc788\uc744 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc0dd\uc0b0\uc744 \uc81c\uc57d\ud558\ub294 \uc9c0\uc810\uc744 \ucc3e\uc544\uc57c \ud55c\ub2e4\uba74 <a href=\"\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/production-bottlenecks\/\">\uc0dd\uc0b0 \ubcd1\ubaa9 \uacf5\uc815<\/a> \uac00\uc774\ub4dc\ub97c \ucc38\uace0\ud558\uc138\uc694.<\/p>\n\n\n\n<p>\uacf5\uc815\uc774 \uc774\ubbf8 \uc548\uc815\uc801\uc73c\ub85c \uc6b4\uc601\ub418\ub294\ub370\ub3c4 \uc218\uc694\uac00 \uc2e4\uc81c \uac00\uc6a9 \uc0dd\uc0b0 \ub2a5\ub825\uc744 \ucd08\uacfc\ud55c\ub2e4\uba74, \ud6a8\uc728 \uac1c\uc120 \ud65c\ub3d9\uc744 \ub2e4\uc2dc \ubc8c\uc774\uae30\ubcf4\ub2e4\ub294 \uad50\ub300\uc870 \ucd94\uac00, \uc678\uc8fc, \ud22c\uc790\ub97c \uacb0\uc815\ud574\uc57c \ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc774\ub7ec\ud55c \uc0dd\uc0b0 \ub2a5\ub825 \ud655\ub300 \uacb0\uc815\uc740 \uae30\uc874 \uacf5\uc815\uc5d0\uc11c \uc81c\uac70\ud560 \uc218 \uc788\ub294 \uc190\uc2e4\uacfc \uad6c\ubd84\ud574 \ud310\ub2e8\ud558\uc138\uc694.<\/p>\n\n\n\n<p>\ubcc0\uacbd \ud6c4\uc5d0\ub294 \uac19\uc740 \uae30\uc900\uc73c\ub85c \ub2e4\uc2dc \uce21\uc815\ud558\uc138\uc694. \uc591\ud488 \uc0dd\uc0b0\ub7c9, \uc790\uc6d0 \uc0ac\uc6a9 \uc2dc\uac04, \uc644\ub8cc\ub41c \uc791\uc5c5\uc744 \ud655\uc778\ud574\uc57c \ud569\ub2c8\ub2e4. \ud45c\uc900\uc774 \ubc14\ub00c\uc5c8\uac70\ub098 \uc81c\ud488 \uad6c\uc131\uc774 \ub2ec\ub77c\uc838 \ubaa9\ud45c \ube44\uc728\uc744 \ub2ec\uc131\ud558\uae30 \uc26c\uc6cc\uc84c\ub2e4\ub294 \uc774\uc720\ub9cc\uc73c\ub85c \uacf5\uc815\uc774 \uac1c\uc120\ub418\uc5c8\ub2e4\uace0 \ud310\ub2e8\ud574\uc11c\ub294 \uc548 \ub429\ub2c8\ub2e4.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"turn-the-finding-into-a-better-schedule-with-skyplanner\">\ubd84\uc11d \uacb0\uacfc\ub97c SkyPlanner\ub85c \ub354 \ub098\uc740 \uc0dd\uc0b0 \uc77c\uc815\uc5d0 \ubc18\uc601\ud558\uc138\uc694<\/h2>\n\n\n\n<p>\uc77c\uc815 \uc870\uc728\uc5d0\uc11c \ubc1c\uc0dd\ud558\ub294 \uc190\uc2e4\uc744 \ucc3e\ub294 \uac83\uc740 \uc2dc\uc791\uc77c \ubfd0\uc785\ub2c8\ub2e4. \uacf5\uc7a5\uc5d0\uc11c\ub294 \uae34\uae09 \uc8fc\ubb38\uc774 \ub4e4\uc5b4\uc624\uace0, \uacf5\uc815\uc774 \uc644\ub8cc\ub418\uace0, \uc0dd\uc0b0 \ub2a5\ub825\uc774 \ubc14\ub01d\ub2c8\ub2e4. \uc774\ub7f0 \ubcc0\ud654 \uc18d\uc5d0\uc11c\ub3c4 \uc0c8\ub85c \uc815\ud55c \uc791\uc5c5 \uc21c\uc11c\uac00 \uc2e4\ud589 \uac00\ub2a5\ud558\ub3c4\ub85d \uacc4\uc18d \uad00\ub9ac\ud574\uc57c \ud569\ub2c8\ub2e4. \uc124\ube44\ubcc4 \uc791\uc5c5 \ub300\uae30\uc5f4\uc744 \uc218\uc791\uc5c5\uc73c\ub85c \ub2e4\uc2dc \uc9dc\ub294 \ub370\ub294 \uc2dc\uac04\uc774 \ub4e4\uba70, \uc5b4\ub835\uac8c \uc5c6\uc564 \ub300\uae30\uac00 \ub2e4\uc2dc \uc0dd\uae38 \uc218\ub3c4 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n\n<p>SkyPlanner APS\ub294 \uc774\ub7ec\ud55c \uc870\uc728\uc744 \ub2f4\ub2f9\ud569\ub2c8\ub2e4. \uc2a4\ucf00\uc904\ub9c1 \uc778\uacf5\uc9c0\ub2a5 Arcturus\ub294 \uc124\uc815\ub41c \uc791\uc5c5\uc7a5, \uad50\ub300\uc870, \uc791\uc5c5\uc790, \uacf5\uc815 \uc18c\uc694\uc2dc\uac04, \uc791\uc5c5\uc5d0 \ud22c\uc785\ud560 \uc218 \uc788\ub294 \uc790\uc6d0, \uc120\ud6c4 \uad00\uacc4\ub97c \ubc14\ud0d5\uc73c\ub85c \uc77c\uc815\uc744 \uacc4\uc0b0\ud569\ub2c8\ub2e4. \uc0ac\uc6a9\uc790\ub294 \uc6b0\uc120\uc21c\uc704\uc640 \uc7a0\uae08 \uc124\uc815\uc73c\ub85c \uc77c\uc815 \uc218\ub9bd \ubc29\ud5a5\uc744 \uc81c\uc5b4\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc790\uc7ac\ub97c \uace0\ub824\ud558\ub294 \uc2a4\ucf00\uc904\ub9c1\uc744 \ud65c\uc131\ud654\ud558\uba74 \uc7ac\uace0 \uac00\uc6a9 \uc5ec\ubd80\ub3c4 \uc791\uc5c5\uc744 \ubc30\uc815\ud560 \uc218 \uc788\ub294 \uc2dc\uc810\uc5d0 \uc601\ud5a5\uc744 \uc90d\ub2c8\ub2e4.<\/p>\n\n\n\n<p>\uacc4\uc0b0 \uacb0\uacfc\ub294 Gantt \ud654\uba74\uc5d0 \ud45c\uc2dc\ub429\ub2c8\ub2e4. \uc791\uc5c5 \uc21c\uc11c\uc640 \uacf5\uc815 \uac04 \uc5f0\uacb0 \uad00\uacc4, \uc9c0\uc5f0 \uc704\ud5d8\uc774 \uc788\ub294 \uc791\uc5c5\uc744 \ud655\uc778\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uac1c\ubcc4 \uc124\ube44\uc5d0 \uc77c\uac10\uc774 \ucda9\ubd84\ud55c\uc9c0\ub9cc \uc0b4\ud53c\ub294 \ub300\uc2e0, \uc218\uc815\ud55c \uacc4\ud68d\uc774 \ud6c4\uc18d \uacf5\uc815\uacfc \uace0\uac1d \uc8fc\ubb38 \uc774\ud589\uc5d0 \ub3c4\uc6c0\uc774 \ub418\ub294\uc9c0 \uac80\ud1a0\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n\n<p>Autopilot\uc740 \uacc4\ud68d\uc744 \ucd5c\uc2e0 \uc0c1\ud0dc\ub85c \uc720\uc9c0\ud558\ub294 \ub370 \ub4dc\ub294 \uc218\uace0\ub97c \uc904\uc5ec \uc90d\ub2c8\ub2e4. \ud65c\uc131\ud654\ud558\uba74 \uad00\ub828 \uc0dd\uc0b0 \uc0c1\ud669\uc774 \ubc14\ub00c\uac70\ub098 \uc124\uc815\ub41c \uc2e4\ud589 \uc2dc\uc810\uc774 \ub418\uc5c8\uc744 \ub54c \uacc4\ud68d\uc744 \ub2e4\uc2dc \uc218\ub9bd\ud560 \uc218 \uc788\uc73c\ubbc0\ub85c, \uc0ac\uc6a9\uc790\uac00 \uc77c\uc815\uc744 \uacc4\uc18d \uc9c0\ucf1c\ubcf4\uba70 \ub9e4\ubc88 \uc7ac\uacc4\uc0b0\uc744 \uc2e4\ud589\ud560 \ud544\uc694\uac00 \uc5c6\uc2b5\ub2c8\ub2e4. \uc124\uc815\ud55c \uaddc\uce59\uacfc \uc7a0\uae08\uc740 \uadf8\ub300\ub85c \uc720\uc9c0\ub429\ub2c8\ub2e4. \uc791\uc5c5 \ub300\uae30\uc5f4\uc744 \uc218\uc815\ud558\ub294 \uc2dc\uac04\uc740 \uc904\uc774\uace0, \uc5b4\ub5a4 \ub0a9\uae30 \uc57d\uc18d\uc774\ub098 \uc0dd\uc0b0 \ubb38\uc81c\uc5d0 \uc8fc\uc758\ub97c \uae30\uc6b8\uc5ec\uc57c \ud560\uc9c0 \ud310\ub2e8\ud558\ub294 \ub370 \ub354 \ub9ce\uc740 \uc2dc\uac04\uc744 \uc4f8 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n\n<p>\uc870\uc728 \ubb38\uc81c\ub85c \uc190\uc2e4\uc774 \ubc1c\uc0dd\ud55c\ub2e4\uba74, \uc774\ub7ec\ud55c \uae30\ub2a5\uc744 \uac16\ucd98 SkyPlanner\ub294 \uc0dd\uc0b0 \ud6a8\uc728\uc744 \ub192\uc774\ub294 \ub370 \uc2e4\uc6a9\uc801\uc778 \uc120\ud0dd\uc785\ub2c8\ub2e4. Arcturus\uac00 \uc804\uccb4 \uc791\uc5c5 \uc21c\uc11c\ub97c \uacc4\uc0b0\ud558\uace0, Gantt\uac00 \uacb0\uacfc\ub97c \uc2dc\uac01\uc801\uc73c\ub85c \ubcf4\uc5ec \uc8fc\uba70, Autopilot\uc774 \uc9c0\uc18d\uc801\uc778 \uc77c\uc815 \uad00\ub9ac \ubd80\ub2f4\uc744 \uc904\uc5ec \uc90d\ub2c8\ub2e4. <a href=\"\/ko\/%ea%b8%b0%eb%8a%a5\/\">SkyPlanner\uc758 \uc2a4\ucf00\uc904\ub9c1 \uae30\ub2a5\uc744 \uc0b4\ud3b4\ubcf4\uc138\uc694<\/a>.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"what-changed-for-eskomatic\">Eskomatic\uc5d0\ub294 \uc5b4\ub5a4 \ubcc0\ud654\uac00 \uc788\uc5c8\uc744\uae4c\uc694?<\/h3>\n\n\n\n<p>\ud540\ub780\ub4dc\uc758 \uae30\uacc4\uac00\uacf5 \uc218\ud0c1\uc5c5\uccb4 Eskomatic\uc740 \ub2e4\uc591\ud55c \uc81c\ud488\uc744 \uc11c\ub85c \ub2e4\ub978 \ubc30\uce58 \ud06c\uae30\ub85c \uc0dd\uc0b0\ud569\ub2c8\ub2e4. \uc774\uc804\uc5d0\ub294 \uad6c\ud615 ERP\uc640 \uc0dd\uc0b0 \uad00\ub9ac \uc2dc\uc2a4\ud15c\uc5d0\uc11c \uc791\uc5c5 \ub300\uae30\uc5f4\uc744 \ub300\ubd80\ubd84 \uc218\uc791\uc5c5\uc73c\ub85c \uad00\ub9ac\ud588\uc2b5\ub2c8\ub2e4. \uc790\uc7ac \ud604\ud669\uc744 \ucda9\ubd84\ud788 \ud30c\uc545\ud558\uae30 \uc5b4\ub824\uc6cc \uc791\uc5c5 \uc2dc\uc791 \uc804\uc5d0 \uc790\uc7ac \ubd80\uc871\uc744 \uc608\uce21\ud558\ub294 \ub370\ub3c4 \uc5b4\ub824\uc6c0\uc774 \uc788\uc5c8\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n\n<p>SkyPlanner\ub97c \uae30\uc874 ERP \ub370\uc774\ud130\uc640 \uc5f0\ub3d9\ud55c \ud6c4, \ub2f4\ub2f9 \ud300\uc740 Gantt \ud654\uba74\uc5d0\uc11c \uc791\uc5c5 \ub300\uae30\uc5f4\uc744 \ud655\uc778\ud558\uace0 \ubd80\ud558\ub97c \uace0\ub824\ud55c \uc77c\uc815 \ubc30\uc815\uc744 \uc790\ub3d9\ud654\ud560 \uc218 \uc788\uac8c \ub418\uc5c8\uc2b5\ub2c8\ub2e4. \uc790\uc7ac \ubd80\uc871 \ud604\ud669\ub3c4 \ub354 \uba85\ud655\ud788 \ud30c\uc545\ud558\uac8c \ub418\uc5c8\uc2b5\ub2c8\ub2e4. Eskomatic\uc5d0 \ub530\ub974\uba74 \uc790\uc7ac \ubd80\uc871\uc73c\ub85c \uc778\ud55c \uc0dd\uc0b0 \uc911\ub2e8\uc774 \uc904\uc5c8\uace0 \ub0a9\uae30\uc77c\uc744 \ub354 \uc815\ud655\ud558\uac8c \uc124\uc815\ud560 \uc218 \uc788\uac8c \ub418\uc5c8\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n\n<p>\ud53c\ud560 \uc218 \uc788\ub294 \ub300\uae30\uc640 \ub9e4\uc77c \ubcf5\uc7a1\ud558\uac8c \uc5bd\ud78c \uacc4\ud68d\uc744 \uc815\ub9ac\ud558\ub294 \uc218\uace0\uac00 \uc904\uc5c8\ub2e4\ub294 \uc810\uc740 \ud6a8\uc728\uacfc \uc9c1\uc811 \uc5f0\uacb0\ub429\ub2c8\ub2e4. \uc2e4\uc81c \uc0dd\uc0b0\uc5d0\uc11c \uc2dc\uc2a4\ud15c\uc744 \uc5b4\ub5bb\uac8c \ud65c\uc6a9\ud588\ub294\uc9c0\ub294 <a href=\"\/ko\/%ea%b3%a0%ea%b0%9d-%ec%82%ac%eb%a1%80\/eskomatic\/\">Eskomatic\uc758 SkyPlanner \uc0ac\uc6a9 \ud6c4\uae30<\/a>\uc5d0\uc11c \ud655\uc778\ud558\uc138\uc694.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"use-actual-results-to-improve-the-next-plan\">\uc2e4\uc81c \uc2e4\uc801\uc744 \ub2e4\uc74c \uacc4\ud68d\uc758 \uac1c\uc120\uc5d0 \ud65c\uc6a9\ud558\uc138\uc694<\/h2>\n\n\n\n<p>\ubd84\uc11d\uc744 \ud1b5\ud574 \ubc30\uc6b4 \uc810\uc744 \ub2e4\uc74c \uc77c\uc815\uc5d0 \ubc18\uc601\ud558\uba74 \uac1c\uc120 \ud6a8\uacfc\ub97c \uc720\uc9c0\ud558\uae30\uac00 \ub354 \uc27d\uc2b5\ub2c8\ub2e4. \uc5b4\ub5a4 \uacf5\uc815\uc774 \uacc4\ud68d\ud55c \uc2dc\uac04\ubcf4\ub2e4 \ubc18\ubcf5\ud574\uc11c \uc624\ub798 \uac78\ub9ac\ub294\ub370\ub3c4 \uc608\uc0c1 \uc18c\uc694\uc2dc\uac04\uc744 \uadf8\ub300\ub85c \ub450\uba74, \ub3d9\uc77c\ud55c \uc791\uc5c5 \ub300\uae30\uc5f4 \ucda9\ub3cc\uc774 \ub2e4\uc2dc \ubc1c\uc0dd\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n\n<p>SkyPlanner\uc758 Timer\ub294 \uc791\uc5c5 \uc2dc\uac04\uacfc \uc0dd\uc0b0 \uc218\ub7c9 \ub610\ub294 \ubd88\ub7c9 \uc218\ub7c9\uc744 \uae30\ub85d\ud569\ub2c8\ub2e4. Job Reports\uc5d0\uc11c\ub294 \uc77c\uc815\uc5d0 \ubc30\uc815\ud55c \uc2dc\uac04\uc774\ub098 \uc608\uc0c1 \uc18c\uc694\uc2dc\uac04\uc744 \uae30\ub85d\ub41c \uc2dc\uac04\uacfc \ube44\uad50\ud558\uace0, \ucc28\uc774\uac00 \ubc1c\uc0dd\ud55c \uc791\uc5c5\uc744 \uc0b4\ud3b4\ubcfc \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ud655\uc778\ud558\ub824\ub294 \ub0b4\uc6a9\uc5d0 \ub9de\ub294 \uae30\ub85d\uc744 \uc0ac\uc6a9\ud574\uc57c \ud569\ub2c8\ub2e4. \uc791\uc5c5\uc790\uac00 \uae30\ub85d\ud55c \uc2dc\uac04\uc774 \uace7 \uc124\ube44 \uac00\ub3d9 \uc2dc\uac04\uc774\ub098 \ud574\ub2f9 \uc791\uc5c5\uc774 \ub300\uae30\ud55c \uc804\uccb4 \uc2dc\uac04\uc744 \uc758\ubbf8\ud558\ub294 \uac83\uc740 \uc544\ub2d9\ub2c8\ub2e4.<\/p>\n\n\n\n<p>\uacfc\uac70 \uc2dc\uac04 \uae30\ub85d \ub370\uc774\ud130\ub294 SkyPlanner\uc758 \uacf5\uc815\ubcc4 \uc18c\uc694\uc2dc\uac04 \uc608\uce21\uc5d0\ub3c4 \ud65c\uc6a9\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc774\ub97c \ud1b5\ud574 \uc77c\uc815 \uc218\ub9bd\uc5d0 \uc0ac\uc6a9\ud558\ub294 \uc18c\uc694\uc2dc\uac04\uc758 \uc815\ud655\ub3c4\ub97c \ub192\uc77c \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ub2e4\ub9cc \ud604\uc2e4\uc801\uc778 \uacc4\ud68d\uc744 \uc704\ud55c \uc774 \ucd94\uc815\uce58\ub294 \uac1c\uc120 \uc5ec\ubd80\ub97c \ud3c9\uac00\ud558\ub294 \uc131\uacfc \ud45c\uc900\uacfc \uad6c\ubd84\ud574\uc57c \ud569\ub2c8\ub2e4. \ubc18\ubcf5\ub418\ub294 \uc190\uc2e4\uc774 \ud3ec\ud568\ub41c \ud3c9\uade0 \uc18c\uc694\uc2dc\uac04\uc744 \uc0ac\uc6a9\ud558\uba74\uc11c \uadf8 \uc190\uc2e4\uae4c\uc9c0 \ub2f9\uc5f0\ud788 \ud5c8\uc6a9\ub418\ub294 \uc131\uacfc\ub85c \ubc1b\uc544\ub4e4\uc774\uac8c \ub418\uc5b4\uc11c\ub294 \uc548 \ub429\ub2c8\ub2e4.<\/p>\n\n\n\n<p>\ud604\uc7ac \uc5c5\ubb34\uc5d0 \uc798 \ud65c\uc6a9\ud558\uace0 \uc788\ub294 ERP\ub098 MES\ub97c \uad50\uccb4\ud560 \ud544\uc694\ub294 \uc5c6\uc2b5\ub2c8\ub2e4. SkyPlanner\ub294 \uac1c\ubc29\ud615 REST API\ub97c \ud1b5\ud574 \ubaa8\ub4e0 ERP \ub610\ub294 MES\uc640 \uc5f0\ub3d9\ud558\uc5ec \uae30\uc874 \uc2dc\uc2a4\ud15c\uc744 \ud558\ub098\uc758 \uacf5\ud1b5 \uc0dd\uc0b0 \uc77c\uc815\uc73c\ub85c \uc5f0\uacb0\ud569\ub2c8\ub2e4.<\/p>\n\n\n\n<p>\ud6a8\uc728 \uc9c0\ud45c\ub294 \uc2e4\uc9c8\uc801\uc778 \uac1c\uc120\uc73c\ub85c \uc774\uc5b4\uc838\uc57c \ud569\ub2c8\ub2e4. \uc791\uc5c5 \ub300\uae30\uc5f4 \uac04 \ucda9\ub3cc, \uacf5\uc815 \ub300\uae30, \uc218\uc791\uc5c5 \uc77c\uc815 \uc7ac\uc870\uc815\uc73c\ub85c \uacc4\uc18d \uc2dc\uac04\uc744 \uc783\uace0 \uc788\ub2e4\uba74 <a href=\"\/ko\/%ec%98%81%ec%97%85%ed%8c%80%ec%97%90-%eb%ac%b8%ec%9d%98\/\">SkyPlanner \ub370\ubaa8\ub97c \uc608\uc57d\ud558\uc138\uc694<\/a>. \ud558\ub098\uc758 \uacf5\ud1b5 \uc77c\uc815\uc73c\ub85c \uc0dd\uc0b0\uc744 \uc870\uc728\ud558\ub294 \ubc29\uc2dd\uc774 \ud604\uc7a5\uc5d0 \uc5b4\ub5a4 \ub3c4\uc6c0\uc774 \ub418\ub294\uc9c0 \ud655\uc778\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ucd5c\uadfc \ubc1c\uc0dd\ud55c \uc9c0\uc5f0 \uc0ac\ub840\uc640 \uadf8 \uc601\ud5a5\uc744 \ubc1b\uc740 \uacf5\uc815\uc744 \uc900\ube44\ud574 \uc8fc\uc138\uc694. \uba3c\uc800 \uc9c1\uc811 \uc0b4\ud3b4\ubcf4\uace0 \uc2f6\ub2e4\uba74 <a href=\"\/ko\/%ed%8f%89%ea%b0%80%ed%8c%90\/\">\ub370\ubaa8 \ub370\uc774\ud130\ub85c SkyPlanner\ub97c \uccb4\ud5d8\ud574 \ubcf4\uc138\uc694<\/a>.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"production-efficiency-faq\">\uc0dd\uc0b0 \ud6a8\uc728\uc5d0 \uad00\ud55c \uc790\uc8fc \ubb3b\ub294 \uc9c8\ubb38<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"what-is-a-good-production-efficiency-percentage\">\uc0dd\uc0b0 \ud6a8\uc728\uc740 \uba87 %\uac00 \uc801\uc815\ud55c\uac00\uc694?<\/h3>\n\n\n\n<p>\ud45c\uc900, \uc81c\ud488 \uad6c\uc131, \uce21\uc815 \ubc94\uc704\ub97c \uc11c\ub85c \ube44\uad50\ud560 \uc218 \uc5c6\ub2e4\uba74 \uc77c\ub960\uc801\uc778 \ubaa9\ud45c\ub97c \uc815\ud560 \uc218 \uc5c6\uc2b5\ub2c8\ub2e4. \uba3c\uc800 \uc790\uccb4 \uacf5\uc815\uc5d0\uc11c \uc2e0\ub8b0\ud560 \uc218 \uc788\ub294 \uae30\uc900 \uc2e4\uc801\uc744 \ud655\ubcf4\ud558\uace0 \uc8fc\uc694 \uc190\uc2e4\uc744 \ud30c\uc545\ud558\uc138\uc694. \uadf8\ub7f0 \ub2e4\uc74c \uac1c\uc120\uc744 \ud1b5\ud574 \uac19\uac70\ub098 \ub354 \uc801\uc740 \uc790\uc6d0\uc73c\ub85c \ud544\uc694\ud55c \uc0dd\uc0b0\ubb3c\uc744 \ub354 \ub9ce\uc774 \ub9cc\ub4e4\uc5b4 \ub0b4\ub294\uc9c0 \ud655\uc778\ud574\uc57c \ud569\ub2c8\ub2e4.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"can-production-efficiency-exceed-100\">\uc0dd\uc0b0 \ud6a8\uc728\uc774 100%\ub97c \ub118\uc744 \uc218 \uc788\ub098\uc694?<\/h3>\n\n\n\n<p>\ub124, \uc2e4\uc81c \uc131\uacfc\uac00 \uc124\uc815\ud55c \ud45c\uc900\uc744 \ub118\uc73c\uba74 \uac00\ub2a5\ud569\ub2c8\ub2e4. \ub354 \ub098\uc740 \uc791\uc5c5 \ubc29\ubc95\uc744 \ucc3e\uc740 \uac83\uc778\uc9c0, \ud45c\uc900\uc774 \ub0a1\uc740 \uac83\uc778\uc9c0, \uce21\uc815\uc774 \uc77c\uad00\ub418\uc9c0 \uc54a\uc740 \uac83\uc778\uc9c0 \ud655\uc778\ud574\uc57c \ud569\ub2c8\ub2e4. \uae30\uc900\uc774 \uc2e4\uc81c \uc774\uc0c1\uc801 \uc0ac\uc774\ud074 \ud0c0\uc784\uc774\ub77c\uba74, 100%\ub97c \ub118\ub294 \uacb0\uacfc\uac00 \ub098\uc654\uc744 \ub54c \uacf5\uc815\uc774 \ubb3c\ub9ac\uc801 \ud55c\uacc4\ub97c \ub6f0\uc5b4\ub118\uc5c8\ub2e4\uace0 \ubcf4\uae30\ubcf4\ub2e4\ub294 \uae30\uc900\uacfc \ub370\uc774\ud130\ub97c \uc810\uac80\ud574\uc57c \ud569\ub2c8\ub2e4.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"does-higher-machine-utilization-mean-higher-production-efficiency\">\uc124\ube44 \uac00\ub3d9\ub960\uc774 \ub192\uc544\uc9c0\uba74 \uc0dd\uc0b0 \ud6a8\uc728\ub3c4 \ub192\uc544\uc9c0\ub098\uc694?<\/h3>\n\n\n\n<p>\ubc18\ub4dc\uc2dc \uadf8\ub807\uc9c0\ub294 \uc54a\uc2b5\ub2c8\ub2e4. \uc124\ube44\uac00 \uacc4\uc18d \uac00\ub3d9\ub418\uace0 \uc788\uc5b4\ub3c4 \ud6c4\uc18d \uacf5\uc815\uc5d0\uc11c \uc544\uc9c1 \uc0ac\uc6a9\ud560 \uc218 \uc5c6\ub294 \uc0dd\uc0b0\ubb3c\uc744 \ub9cc\ub4e4\uace0 \uc788\uc744 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ubaa8\ub4e0 \uc790\uc6d0\uc744 \ucd5c\ub300\ud55c \uac00\ub3d9\ud558\ub294 \uac83\uc744 \ubaa9\ud45c\ub85c \uc0bc\uae30\ubcf4\ub2e4, \ud544\uc694\ud55c \uc791\uc5c5\uc758 \uc21c\uc11c\ub97c \uac1c\uc120\ud558\uace0 \uc791\uc5c5\uc744 \uc2dc\uc791\ud560 \uc900\ube44\uac00 \uac16\ucdb0\uc9c0\ub3c4\ub85d \ud558\uc138\uc694.<\/p>\n\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>\uc0dd\uc0b0 \ud6a8\uc728: \uacc4\uc0b0\ubd80\ud130 \uc2e4\uc9c8\uc801\uc778 \uac1c\uc120\uae4c\uc9c0 \uc0dd\uc0b0 \ud6a8\uc728\uc740 \ub3d9\uc77c\ud55c \uc790\uc6d0\uacfc \uce21\uc815 \uae30\uac04\uc744 \uae30\uc900\uc73c\ub85c \uc2e4\uc81c \uc0dd\uc0b0\ub7c9\uc744 \uc815\ud574\uc9c4 \ud45c\uc900\uacfc \ube44\uad50\ud558\ub294 \uc9c0\ud45c\uc785\ub2c8\ub2e4. \uc774 \ube44\uc728\uc744 \ubcf4\uba74 \ud45c\uc900 \ub300\ube44 \uc2e4\uc801 \ucc28\uc774\ub97c \ud30c\uc545\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ub2e4\uc74c\uc73c\ub85c\ub294 \uadf8 \ucc28\uc774\uac00 \uc65c \ubc1c\uc0dd\ud588\ub294\uc9c0, \uc5b4\ub5a4 \ubcc0\ud654\ub97c \uc8fc\uc5b4\uc57c \ud544\uc694\ud55c \uc791\uc5c5\uc744 \ub354 \ub9ce\uc774 \uc644\ub8cc\ud560 \uc218 \uc788\ub294\uc9c0 \ucc3e\uc544\uc57c \ud569\ub2c8\ub2e4. \ubd84\uc8fc\ud55c \uc0dd\uc0b0 \ud604\uc7a5\uc5d0\uc11c\ub294 \uc218\uce58\uc640 \uc2e4\uc81c \uc131\uacfc\ub97c \uad6c\ubd84\ud558\ub294 \uac83\uc774 \uc911\uc694\ud569\ub2c8\ub2e4. \uc5b4\ub5a4 &#8230; <a title=\"\uc0dd\uc0b0 \ud6a8\uc728: \uacc4\uc0b0\ubd80\ud130 \uc2e4\uc9c8\uc801\uc778 \uac1c\uc120\uae4c\uc9c0\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/production-efficiency-achieve-more-with-less-effort\/\" aria-label=\"Read more about \uc0dd\uc0b0 \ud6a8\uc728: \uacc4\uc0b0\ubd80\ud130 \uc2e4\uc9c8\uc801\uc778 \uac1c\uc120\uae4c\uc9c0\">Read more<\/a><\/p>\n","protected":false},"author":6,"featured_media":42069,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[496,2558],"tags":[],"class_list":["post-42693","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-496","category-2558","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>\uc0dd\uc0b0 \ud6a8\uc728 \uacc4\uc0b0\uacfc \uac1c\uc120 \ubc29\ubc95 | SkyPlanner<\/title>\n<meta name=\"description\" content=\"\uc0dd\uc0b0 \ud6a8\uc728\uc744 \uac19\uc740 \uae30\uc900\uc73c\ub85c \uacc4\uc0b0\ud574 \uac1c\uc120\uc5d0 \ud65c\uc6a9\ud558\uc138\uc694. \uc190\uc2e4\uc744 \ucc3e\uace0 SkyPlanner\ub85c \uc77c\uc815 \uad00\ub828 \ub300\uae30\ub97c \uc904\uc774\uc138\uc694.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/production-efficiency-achieve-more-with-less-effort\/\" \/>\n<meta property=\"og:locale\" content=\"ko_KR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"\uc0dd\uc0b0 \ud6a8\uc728: \uacc4\uc0b0\ubd80\ud130 \uc2e4\uc9c8\uc801\uc778 \uac1c\uc120\uae4c\uc9c0\" \/>\n<meta property=\"og:description\" content=\"\uc0dd\uc0b0 \ud6a8\uc728\uc744 \uac19\uc740 \uae30\uc900\uc73c\ub85c \uacc4\uc0b0\ud574 \uac1c\uc120\uc5d0 \ud65c\uc6a9\ud558\uc138\uc694. \uc190\uc2e4\uc744 \ucc3e\uace0 SkyPlanner\ub85c \uc77c\uc815 \uad00\ub828 \ub300\uae30\ub97c \uc904\uc774\uc138\uc694.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/production-efficiency-achieve-more-with-less-effort\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2024-09-17T07:16:46+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-19T14:42:01+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/09\/Production-efficiency-1024x683.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"683\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\uae00\uc4f4\uc774\" \/>\n\t<meta name=\"twitter:data1\" content=\"SkyPlanner\" \/>\n\t<meta name=\"twitter:label2\" content=\"\uc608\uc0c1 \ub418\ub294 \ud310\ub3c5 \uc2dc\uac04\" \/>\n\t<meta name=\"twitter:data2\" content=\"12\ubd84\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/production-efficiency-achieve-more-with-less-effort\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/production-efficiency-achieve-more-with-less-effort\\\/\"},\"author\":{\"name\":\"SkyPlanner\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\"},\"headline\":\"\uc0dd\uc0b0 \ud6a8\uc728: \uacc4\uc0b0\ubd80\ud130 \uc2e4\uc9c8\uc801\uc778 \uac1c\uc120\uae4c\uc9c0\",\"datePublished\":\"2024-09-17T07:16:46+00:00\",\"dateModified\":\"2026-10-19T14:42:01+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/production-efficiency-achieve-more-with-less-effort\\\/\"},\"wordCount\":41,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/production-efficiency-achieve-more-with-less-effort\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2024\\\/09\\\/Production-efficiency.png\",\"articleSection\":[\"\ub9ac\uc18c\uc2a4\",\"\uc81c\uc870 \ud6a8\uc728\"],\"inLanguage\":\"ko-KR\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/production-efficiency-achieve-more-with-less-effort\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/production-efficiency-achieve-more-with-less-effort\\\/\",\"name\":\"\uc0dd\uc0b0 \ud6a8\uc728 \uacc4\uc0b0\uacfc \uac1c\uc120 \ubc29\ubc95 | SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/production-efficiency-achieve-more-with-less-effort\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/production-efficiency-achieve-more-with-less-effort\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2024\\\/09\\\/Production-efficiency.png\",\"datePublished\":\"2024-09-17T07:16:46+00:00\",\"dateModified\":\"2026-10-19T14:42:01+00:00\",\"description\":\"\uc0dd\uc0b0 \ud6a8\uc728\uc744 \uac19\uc740 \uae30\uc900\uc73c\ub85c \uacc4\uc0b0\ud574 \uac1c\uc120\uc5d0 \ud65c\uc6a9\ud558\uc138\uc694. \uc190\uc2e4\uc744 \ucc3e\uace0 SkyPlanner\ub85c \uc77c\uc815 \uad00\ub828 \ub300\uae30\ub97c \uc904\uc774\uc138\uc694.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/production-efficiency-achieve-more-with-less-effort\\\/#breadcrumb\"},\"inLanguage\":\"ko-KR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/production-efficiency-achieve-more-with-less-effort\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"ko-KR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/production-efficiency-achieve-more-with-less-effort\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2024\\\/09\\\/Production-efficiency.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2024\\\/09\\\/Production-efficiency.png\",\"width\":4990,\"height\":3327,\"caption\":\"Production efficiency. Image for Illustrative purposes.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/production-efficiency-achieve-more-with-less-effort\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"\uc0dd\uc0b0 \ud6a8\uc728: \uacc4\uc0b0\ubd80\ud130 \uc2e4\uc9c8\uc801\uc778 \uac1c\uc120\uae4c\uc9c0\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ko-KR\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ko-KR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\",\"name\":\"SkyPlanner\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ko-KR\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"caption\":\"SkyPlanner\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"\uc0dd\uc0b0 \ud6a8\uc728 \uacc4\uc0b0\uacfc \uac1c\uc120 \ubc29\ubc95 | SkyPlanner","description":"\uc0dd\uc0b0 \ud6a8\uc728\uc744 \uac19\uc740 \uae30\uc900\uc73c\ub85c \uacc4\uc0b0\ud574 \uac1c\uc120\uc5d0 \ud65c\uc6a9\ud558\uc138\uc694. \uc190\uc2e4\uc744 \ucc3e\uace0 SkyPlanner\ub85c \uc77c\uc815 \uad00\ub828 \ub300\uae30\ub97c \uc904\uc774\uc138\uc694.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/production-efficiency-achieve-more-with-less-effort\/","og_locale":"ko_KR","og_type":"article","og_title":"\uc0dd\uc0b0 \ud6a8\uc728: \uacc4\uc0b0\ubd80\ud130 \uc2e4\uc9c8\uc801\uc778 \uac1c\uc120\uae4c\uc9c0","og_description":"\uc0dd\uc0b0 \ud6a8\uc728\uc744 \uac19\uc740 \uae30\uc900\uc73c\ub85c \uacc4\uc0b0\ud574 \uac1c\uc120\uc5d0 \ud65c\uc6a9\ud558\uc138\uc694. \uc190\uc2e4\uc744 \ucc3e\uace0 SkyPlanner\ub85c \uc77c\uc815 \uad00\ub828 \ub300\uae30\ub97c \uc904\uc774\uc138\uc694.","og_url":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/production-efficiency-achieve-more-with-less-effort\/","og_site_name":"SkyPlanner","article_published_time":"2024-09-17T07:16:46+00:00","article_modified_time":"2026-10-19T14:42:01+00:00","og_image":[{"width":1024,"height":683,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/09\/Production-efficiency-1024x683.png","type":"image\/png"}],"author":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"\uae00\uc4f4\uc774":"SkyPlanner","\uc608\uc0c1 \ub418\ub294 \ud310\ub3c5 \uc2dc\uac04":"12\ubd84"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/production-efficiency-achieve-more-with-less-effort\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/production-efficiency-achieve-more-with-less-effort\/"},"author":{"name":"SkyPlanner","@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a"},"headline":"\uc0dd\uc0b0 \ud6a8\uc728: \uacc4\uc0b0\ubd80\ud130 \uc2e4\uc9c8\uc801\uc778 \uac1c\uc120\uae4c\uc9c0","datePublished":"2024-09-17T07:16:46+00:00","dateModified":"2026-10-19T14:42:01+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/production-efficiency-achieve-more-with-less-effort\/"},"wordCount":41,"publisher":{"@id":"https:\/\/skyplanner.ai\/ko\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/production-efficiency-achieve-more-with-less-effort\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/09\/Production-efficiency.png","articleSection":["\ub9ac\uc18c\uc2a4","\uc81c\uc870 \ud6a8\uc728"],"inLanguage":"ko-KR"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/production-efficiency-achieve-more-with-less-effort\/","url":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/production-efficiency-achieve-more-with-less-effort\/","name":"\uc0dd\uc0b0 \ud6a8\uc728 \uacc4\uc0b0\uacfc \uac1c\uc120 \ubc29\ubc95 | SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ko\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/production-efficiency-achieve-more-with-less-effort\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/production-efficiency-achieve-more-with-less-effort\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/09\/Production-efficiency.png","datePublished":"2024-09-17T07:16:46+00:00","dateModified":"2026-10-19T14:42:01+00:00","description":"\uc0dd\uc0b0 \ud6a8\uc728\uc744 \uac19\uc740 \uae30\uc900\uc73c\ub85c \uacc4\uc0b0\ud574 \uac1c\uc120\uc5d0 \ud65c\uc6a9\ud558\uc138\uc694. \uc190\uc2e4\uc744 \ucc3e\uace0 SkyPlanner\ub85c \uc77c\uc815 \uad00\ub828 \ub300\uae30\ub97c \uc904\uc774\uc138\uc694.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/production-efficiency-achieve-more-with-less-effort\/#breadcrumb"},"inLanguage":"ko-KR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/production-efficiency-achieve-more-with-less-effort\/"]}]},{"@type":"ImageObject","inLanguage":"ko-KR","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/production-efficiency-achieve-more-with-less-effort\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/09\/Production-efficiency.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/09\/Production-efficiency.png","width":4990,"height":3327,"caption":"Production efficiency. Image for Illustrative purposes."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/production-efficiency-achieve-more-with-less-effort\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/ko\/"},{"@type":"ListItem","position":2,"name":"\uc0dd\uc0b0 \ud6a8\uc728: \uacc4\uc0b0\ubd80\ud130 \uc2e4\uc9c8\uc801\uc778 \uac1c\uc120\uae4c\uc9c0"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/ko\/#website","url":"https:\/\/skyplanner.ai\/ko\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/ko\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/ko\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ko-KR"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/ko\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/ko\/","logo":{"@type":"ImageObject","inLanguage":"ko-KR","@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a","name":"SkyPlanner","image":{"@type":"ImageObject","inLanguage":"ko-KR","@id":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","caption":"SkyPlanner"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/09\/Production-efficiency.png",4990,3327,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/09\/Production-efficiency-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/09\/Production-efficiency-300x200.png",300,200,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/09\/Production-efficiency-768x512.png",768,512,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/09\/Production-efficiency-1024x683.png",1024,683,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/09\/Production-efficiency-1536x1024.png",1536,1024,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/09\/Production-efficiency-2048x1365.png",2048,1365,true],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/09\/Production-efficiency.png",360,240,false]},"uagb_author_info":{"display_name":"SkyPlanner","author_link":"https:\/\/skyplanner.ai\/ko\/author\/bettina\/"},"uagb_comment_info":0,"uagb_excerpt":"\uc0dd\uc0b0 \ud6a8\uc728: \uacc4\uc0b0\ubd80\ud130 \uc2e4\uc9c8\uc801\uc778 \uac1c\uc120\uae4c\uc9c0 \uc0dd\uc0b0 \ud6a8\uc728\uc740 \ub3d9\uc77c\ud55c \uc790\uc6d0\uacfc \uce21\uc815 \uae30\uac04\uc744 \uae30\uc900\uc73c\ub85c \uc2e4\uc81c \uc0dd\uc0b0\ub7c9\uc744 \uc815\ud574\uc9c4 \ud45c\uc900\uacfc \ube44\uad50\ud558\ub294 \uc9c0\ud45c\uc785\ub2c8\ub2e4. \uc774 \ube44\uc728\uc744 \ubcf4\uba74 \ud45c\uc900 \ub300\ube44 \uc2e4\uc801 \ucc28\uc774\ub97c \ud30c\uc545\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ub2e4\uc74c\uc73c\ub85c\ub294 \uadf8 \ucc28\uc774\uac00 \uc65c \ubc1c\uc0dd\ud588\ub294\uc9c0, \uc5b4\ub5a4 \ubcc0\ud654\ub97c \uc8fc\uc5b4\uc57c \ud544\uc694\ud55c \uc791\uc5c5\uc744 \ub354 \ub9ce\uc774 \uc644\ub8cc\ud560 \uc218 \uc788\ub294\uc9c0 \ucc3e\uc544\uc57c \ud569\ub2c8\ub2e4. \ubd84\uc8fc\ud55c \uc0dd\uc0b0 \ud604\uc7a5\uc5d0\uc11c\ub294 \uc218\uce58\uc640 \uc2e4\uc81c \uc131\uacfc\ub97c \uad6c\ubd84\ud558\ub294 \uac83\uc774 \uc911\uc694\ud569\ub2c8\ub2e4. \uc5b4\ub5a4&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts\/42693","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/comments?post=42693"}],"version-history":[{"count":5,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts\/42693\/revisions"}],"predecessor-version":[{"id":95288,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts\/42693\/revisions\/95288"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/media\/42069"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/media?parent=42693"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/categories?post=42693"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/tags?post=42693"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}